JPS60242217A - Formwork for pile head - Google Patents

Formwork for pile head

Info

Publication number
JPS60242217A
JPS60242217A JP9812784A JP9812784A JPS60242217A JP S60242217 A JPS60242217 A JP S60242217A JP 9812784 A JP9812784 A JP 9812784A JP 9812784 A JP9812784 A JP 9812784A JP S60242217 A JPS60242217 A JP S60242217A
Authority
JP
Japan
Prior art keywords
pile
tube
head
formwork
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9812784A
Other languages
Japanese (ja)
Inventor
Hiroshi Enoki
博史 榎
Mikio Tanaka
幹夫 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP9812784A priority Critical patent/JPS60242217A/en
Publication of JPS60242217A publication Critical patent/JPS60242217A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To easily obtain the head of a pile by providing a tube which prevents the intrusion of soil cement by pressingly contacing with the inner surfacae of a pile by expansion caused by injection of a fluid on the outside of a cylinder with tapered face. CONSTITUTION:A tube 3 contracted in such a way as to position a coupling portion upwards and a cylinder 2 with a tapered face 1 are fitted on the head of a concrete pile B. Air or a liquid is injected into the tube 3 to cause it to expand so that the tube 3 is pressingly contacted with the inner surface of the pile B to set a formwork A for the head of pile. Cement milk and excavated soil are mixed together with stirring to form a soil cement column, and while the soil cement column is unhardened, the pile B is penetrated into an excavated pit C. The head of the pile is excavated, air is discharged from the tube 3 to cause the tube 3 to contract, and the coupling portion 4 is pulled to draw out the formwork A.

Description

【発明の詳細な説明】 (1)産業上の利用分野 この発明は、コンクリ−1・杭の杭頭型枠に関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION (1) Industrial Application Field The present invention relates to pile cap formwork for concrete piles.

(2)従来の技術 フーチングを造成するには、オーガースクリューを用い
て地面から地中の所定深さまで掘削すると共に、掘削時
にオーガースクリューの軸芯に設けである通孔を利用し
てベントナイトを配合したセメントミルり等の自硬性ミ
ルりを注入しながら削孔し、そのミルりと掘削土壌とを
攪拌混練して地中にソイルセメント柱を造成し、上記ソ
イルセメント柱の未硬化の間にコンクリート杭を挿入埋
設する。
(2) Conventional technology To create a footing, an auger screw is used to excavate from the ground to a predetermined depth underground, and during excavation, bentonite is mixed using a through hole provided in the axis of the auger screw. A hole is drilled while injecting a self-hardening mill such as a cement mill, and the mill and the excavated soil are stirred and kneaded to create a soil cement pillar underground. Insert and bury concrete piles.

このとき、コンクリート杭の頭部は、地面と同レベル或
は地面以下に埋設するので、コンクリート杭の中空部に
ソイルセメントが充満してやがて硬化する。
At this time, since the head of the concrete pile is buried at the same level as the ground or below the ground, soil cement fills the hollow part of the concrete pile and hardens over time.

しかして、コンクリート杭の頭端から約/m以上中空部
に充満しているソイルセメントを削シ出し、入念にけれ
ん掃除してから、フーチングと連結のための生コンクリ
ートをコンクリート杭の中空部に打設している。
After scraping out the soil cement that has filled the hollow part of the concrete pile for about 1/2 meter or more from the head end of the concrete pile, and carefully cleaning it, pour fresh concrete into the hollow part of the concrete pile to connect the footing. It is being poured.

(3) 発明が解決しようとする問題点ソイルセメント
の削シ出しは、コンクリート杭の埋設後日数が経過した
のち行なうので、コンクリート杭の中空部に充満してい
るソイルセメントを簡単に削シ出すことができない問題
がめった。
(3) Problems to be solved by the invention Since soil cement is removed after a number of days have passed after the concrete pile is buried, the soil cement filling the hollow part of the concrete pile can be easily removed. I rarely had problems that I couldn't do.

また、中空部の内周にソイルセメントが強固に付着して
いるので、打設生コンクリートとコンクリート杭との結
合に悪影響の発生しないようなソイルセメントの完全な
除去に手数と時間がかかる問題もあった。
In addition, since soil cement is firmly attached to the inner periphery of the hollow part, there is the problem that it takes time and effort to completely remove the soil cement without adversely affecting the bond between the freshly poured concrete and the concrete pile. there were.

(4) 問題点を解消するだめの手段 この発明は、上記問題点を解消するために、内周に上方
への引き抜きが容易となるテーパー面を有する筒体と、
この筒体の外側少なくとも上下端に取付けると共に、エ
ア、液体の注入にともない膨らませてコンクリート杭の
内周に圧接するチューブとで杭頭型枠を構成したもので
ある。
(4) Means for Solving the Problems In order to solve the above problems, the present invention provides a cylindrical body having a tapered surface on its inner periphery to facilitate upward pulling;
A pile cap formwork is constructed of tubes that are attached to at least the upper and lower ends of the outside of this cylindrical body, and that are inflated when air or liquid is injected to press against the inner periphery of the concrete pile.

(5)作用 この発明は、削孔内に自硬性ミルりと掘削土壌との攪拌
混練によりフィルセメント柱を造成し、然るのち、上記
の削孔に頭端内にチューブを膨らませて杭頭型枠をセッ
トしたコンクリート杭を挿入埋設する。
(5) Function This invention creates a fill cement column in a bored hole by stirring and kneading excavated soil with a self-hardening mill, and then inflates a tube inside the head end of the above-mentioned drilled hole to cap the pile. Insert and bury concrete piles with formwork set.

ソイルセメントの硬化後にチューブ内のエア、液体を排
出して杭頭型枠を引き抜き、そしてコンクリート杭の頭
端内に残るテーパー柱を破砕捕去し、杭頭の内周にソイ
ルセメントの付層しない凹所を設けるようにしたもので
砂る。
After the soil cement has hardened, the air and liquid in the tube are discharged, the pile cap formwork is pulled out, and the tapered column remaining inside the concrete pile head is crushed and removed, and a layer of soil cement is applied to the inner circumference of the pile cap. Sand with a material that has a recess that will not prevent sanding.

(6)実施例 第1図及び癌λ図において、Aは杭頭型枠である。(6) Examples In FIG. 1 and the Cancer λ diagram, A is the pile head formwork.

上記の杭頭型#Aは、内周に上方への引き抜きが容易と
なるテーパー面1.を傅する筒体2と、この筒体2の外
周少なくとも上下端にエア、液体の注入及び排出が可能
で膨らませたときコンクリート杭の円周に圧接するチュ
ーブ3と、筒体2の上端に設けた引き抜き保合部4とで
構成されている。
The above pile head type #A has a tapered surface 1 on the inner circumference that facilitates upward pulling. a tube 3 that can be injected and discharged with air or liquid to at least the upper and lower ends of the outer periphery of the cylinder 2, and that presses against the circumference of the concrete pile when inflated; and a pull-out retaining part 4.

上記のチューブ3は、図示の場合筒体2の外側全長に設
けたが、筒体2の上下端のみに設けるとともに、上下の
チューブをバイパスパイプによジ接続した構造等であっ
てもよい。
Although the tubes 3 described above are provided along the entire outer length of the cylinder body 2 in the illustrated case, they may be provided only at the upper and lower ends of the cylinder body 2, and may have a structure in which the upper and lower tubes are connected by a bypass pipe.

また、保合部4は図示の場合筒体2の上端内に中心を横
切るよう一体に設けた板状体5と、この板状体5の中央
に設けた透孔すとで構成し、この透孔6に挿通したワイ
ヤ或はフックを係合して引張りによシ引き抜くようにし
たが、その他の構造であってもよい。
In addition, in the illustrated case, the retaining part 4 is composed of a plate-shaped body 5 that is integrally provided within the upper end of the cylinder body 2 so as to cross the center thereof, and a through hole provided in the center of this plate-shaped body 5. Although the wire or hook inserted into the through hole 6 is engaged and pulled out by pulling, other structures may be used.

さらに、上記エア、液体の注入及び排出は、チューブ3
の頂壁に栓8付の口筒7を設けたがその他の構造のもの
でおってもよい。
Furthermore, the air and liquid are injected and discharged through the tube 3.
Although a spout 7 with a stopper 8 is provided on the top wall of the mouth, other structures may be used.

なお、筒体2ば、合成樹脂や金属等で形成されている。Note that the cylindrical body 2 is made of synthetic resin, metal, or the like.

この発明に保る杭頭型枠は、以上の構成であって、次に
使用方法を説明すると、まずオーガースクリューを用い
て地面から地中の所定深さまで掘削すると共に、掘削時
にオーガーヌクリュー〇軸芯に設けである通孔を利用し
てベントナイトを配合したセメントミルり等の自硬性ミ
ルクを注入しながら削孔し、そのミルりと掘削土壌とを
攪拌混練して地中にソイルセメント柱を造成したのち、
上記フィルセメント柱の未硬化の間に削孔C内にコンク
リート杭Bを挿入埋設する。
The pile head formwork according to the present invention has the above-mentioned configuration, and the method of use will be explained below. First, an auger screw is used to excavate from the ground to a predetermined depth underground, and during excavation, the auger screw Using the through hole provided in the shaft core, the hole is drilled while injecting self-hardening milk such as cement mill mixed with bentonite, and the mill and the excavated soil are stirred and kneaded to form a soil-cement pillar underground. After creating the
A concrete pile B is inserted into the drilled hole C while the fill cement column is not yet hardened.

上記挿入埋設げIJのコンクリート杭Bの頭端には、保
合部4が上側となるようにして収縮させたチューブ3及
び筒体2を低装し、然るのち、チューブ3にエア、或は
液体を注入して上記チューブ3を膨らませ、そしてコン
クリート杭Bの内周面にチューブ3を圧接して上記コン
クリート杭Bの頭端に杭頭型枠Aをセットしておく。
At the head end of the concrete pile B of the above-mentioned inserted and buried IJ, the tube 3 and the cylindrical body 2, which have been contracted so that the retaining part 4 is on the upper side, are mounted low, and then the tube 3 is injected with air or The tube 3 is inflated by injecting liquid, and the tube 3 is pressed against the inner peripheral surface of the concrete pile B, and the pile cap formwork A is set at the head end of the concrete pile B.

削孔C内にコンクリート杭Bを挿入埋設したとき、尚体
2内にソイルセメントが充満シ、コンクリート杭Bと杭
頭型枠Aとの間には、チューブ3によpソイルセメント
の侵入が阻止される。
When the concrete pile B is inserted and buried in the drilled hole C, soil cement fills the inside of the body 2, and between the concrete pile B and the pile head formwork A, p soil cement enters through the tube 3. thwarted.

コンクリート杭Bの埋設工事が完了したのち杭頭を掘シ
起し、また、チューブ3内のエア或は液体を排出して上
記チューブ3を収縮させ、然るのち、保合部4を引張っ
て杭頭型枠Aを引き抜く。
After the burying work of the concrete pile B is completed, the pile head is excavated and the air or liquid inside the tube 3 is discharged to contract the tube 3, and then the retaining part 4 is pulled. Pull out the pile head formwork A.

上記の引き抜きにともないコンクリート杭Bの頭端内に
残るテーパー柱は、妊/図鎖線E部分から上方を剣先ス
コップ等で破砕すると共に撤去する。
The tapered column remaining within the head end of concrete pile B due to the above-mentioned pulling out will be crushed upward from the chain line E in the diagram with a shovel or the like and removed.

しかして、コンクリートを打設して躬3図で示したよう
にフーチングDを設ける。
Then, concrete is poured and a footing D is provided as shown in Figure 3.

このとき、コンクリート杭Bの頭端内には、打設コンク
リートが流入する。
At this time, poured concrete flows into the head end of the concrete pile B.

(7)効果 以上のように、この発明に係る杭頭型枠の引き抜きにと
もないコンクリート杭の頭端内には、頭端内壁に全く耐
着しないテーパー柱が形成されるのでこのテーパー柱を
簡単かつ迅速に破砕撤去することができる。
(7) Effects As described above, when the pile cap formwork according to the present invention is pulled out, a tapered column is formed within the head end of the concrete pile that does not adhere to the inner wall of the head end at all. Moreover, it can be quickly crushed and removed.

また、膨らませたチューブによシコンクリート杭と杭頭
型枠との間にソイルセメントの侵入を阻止するので、手
間のかかるけれん掃除を省略することができる。
Furthermore, since the inflated tube prevents soil cement from entering between the concrete pile and the pile cap formwork, time-consuming spacing can be omitted.

さらに、引き抜いた杭頭型枠を再使用すると、とができ
るので、経済的である。
Furthermore, it is economical to reuse the pile head formwork that has been pulled out, as it can be reused.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明に係る杭頭型枠の縦断正面図、喀2図
は同上の平面図、第3図はフーチングを設けた一部切欠
正面図でるる。 A・・・杭頭型枠、1・・テーパー面、2・・・筒体、
3・・・チューブ、4・・・保合部、7・・・口筒、8
・・栓特許出願人 榎 牧 男 同 同 榎 博 史 同 代理人 鎌 1)文 二
FIG. 1 is a vertical sectional front view of a pile cap form according to the present invention, FIG. 2 is a plan view of the same, and FIG. 3 is a partially cutaway front view with a footing provided. A...Pile head formwork, 1...Tapered surface, 2...Cylinder body,
3...Tube, 4...Retaining part, 7... Mouthpiece, 8
...Applicant for the plug patent: Otodo Enoki, Hiroshi Enoki, Fumito Enoki, agent: Kama 1) Bun 2

Claims (1)

【特許請求の範囲】[Claims] 内周に上方へ引き抜きが容易となるテーパー面を有する
筒体と、この筒体の外側少なくとも上下端にエア或は液
体の注入にともない膨らませてコンクリート杭の内周に
圧接させながらフィルセメントの侵入を阻止し、かつ注
入したエア或は液体を排出できるよう設けたチューブと
、筒体の上端に設けた引抜き保合部とから成る杭頭型枠
A cylindrical body has a tapered surface on the inner circumference that makes it easy to pull out upwards, and the outside of this cylindrical body is inflated by injecting air or liquid at least at the top and bottom ends, and the fill cement enters while being pressed against the inner circumference of the concrete pile. A pile cap formwork consisting of a tube provided to prevent the air or liquid from being removed and to discharge the injected air or liquid, and a pull-out retaining part provided at the upper end of the cylindrical body.
JP9812784A 1984-05-14 1984-05-14 Formwork for pile head Pending JPS60242217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9812784A JPS60242217A (en) 1984-05-14 1984-05-14 Formwork for pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9812784A JPS60242217A (en) 1984-05-14 1984-05-14 Formwork for pile head

Publications (1)

Publication Number Publication Date
JPS60242217A true JPS60242217A (en) 1985-12-02

Family

ID=14211605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9812784A Pending JPS60242217A (en) 1984-05-14 1984-05-14 Formwork for pile head

Country Status (1)

Country Link
JP (1) JPS60242217A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0426225U (en) * 1990-06-26 1992-03-02
JP2017002511A (en) * 2015-06-08 2017-01-05 株式会社熊谷組 Pile head treatment method, and bag assembly used when implementing the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0426225U (en) * 1990-06-26 1992-03-02
JP2017002511A (en) * 2015-06-08 2017-01-05 株式会社熊谷組 Pile head treatment method, and bag assembly used when implementing the same

Similar Documents

Publication Publication Date Title
US3540225A (en) Construction pile and a method of producing same in situ
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
JPS60242217A (en) Formwork for pile head
JP3481508B2 (en) Stone masonry retaining wall reinforcement method
JP2731806B2 (en) Construction method of soil cement composite pile
JPS6146610B2 (en)
JPH0841870A (en) Method of connection precast concrete pile
JPS61134425A (en) Method of forming foundation pile
CN220620152U (en) Slope rock stratum reinforcing device
JPH01182410A (en) Method of building cast-in-place concrete pile
JPH0432166B2 (en)
JPS6117627A (en) Grout injection for cut-off wall construction work
JPS5847527B2 (en) Anti-forming method using soil condensation
JP2879386B2 (en) Ground improvement or reinforcement method
JPS62178620A (en) Formation of improved angular ground
JPS58210211A (en) Treatment of extra-banking concrete in head of on-site concrete pile
JPS63197718A (en) Construction work of in-situ pile
JP4441774B2 (en) Ready-made pile and foundation pile structure
JP2002348887A (en) Connecting method of pc pile and footing foundation
JPS6151097B2 (en)
JPH11217828A (en) Execution 0f cast-in-place concrete pile
JPS56153016A (en) Application of reinforced foundation pile
JP2849147B2 (en) Construction method of prefabricated pile with tip expansion
JP2512157B2 (en) Reinforcement method for soft ground
JPH02136424A (en) Ground bearing power increasing method and steel pipe pile used therefor