JPS60222680A - Rail supporter - Google Patents

Rail supporter

Info

Publication number
JPS60222680A
JPS60222680A JP7822584A JP7822584A JPS60222680A JP S60222680 A JPS60222680 A JP S60222680A JP 7822584 A JP7822584 A JP 7822584A JP 7822584 A JP7822584 A JP 7822584A JP S60222680 A JPS60222680 A JP S60222680A
Authority
JP
Japan
Prior art keywords
rail
pipe
laying
base plate
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7822584A
Other languages
Japanese (ja)
Other versions
JPH0155834B2 (en
Inventor
信治 中川
昭 本間
日出男 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP7822584A priority Critical patent/JPS60222680A/en
Publication of JPS60222680A publication Critical patent/JPS60222680A/en
Publication of JPH0155834B2 publication Critical patent/JPH0155834B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Liquid Crystal Substances (AREA)
  • Insulation, Fastening Of Motor, Generator Windings (AREA)
  • Finger-Pressure Massage (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (a)0発明の技術分舒 本発明は、敷設管中において、ケーブル管路、水道管、
ガス管、下水道管等の管路を敷設する管#敷設用台車を
走行させるためのレールを支持する、レール支持装置に
関する。
DETAILED DESCRIPTION OF THE INVENTION (a) 0 Technical distribution of the invention The present invention provides for the construction of cable conduits, water pipes,
The present invention relates to a rail support device that supports a rail for running a pipe-laying truck for laying pipes such as gas pipes and sewer pipes.

(b)、技術の背景 出願人は、特願昭58−234842号その他において
、管轄敷設用台車を敷設管上部に設けられたレールに沿
って走行させ、ケーブル管路を前記敷設管中に敷設して
ゆく方法を提案している゛が、台車を支持するレールを
敷設管の頂部に設ける場合には、そのレールをどの様に
敷設管に対して支持するかが問題となる。
(b), Technical Background In Japanese Patent Application No. 58-234842 and others, the applicant has laid a cable conduit into the pipe by running a cart for laying the cable along a rail provided above the pipe. However, if a rail to support the truck is provided at the top of the pipe, the problem is how to support the rail with respect to the pipe.

通常、敷設管には、管相互を接続するための接続金具の
、萼り付はボルト穴が90’ピッチ等Q適宜なピッチで
設けられているが、このボルト穴等の係合手段を利用す
る方法が最も一般的である。
Normally, installed pipes are provided with bolt holes at an appropriate pitch, such as a 90' pitch, for connection fittings to connect the pipes. The most common method is

しかし、敷設管は地中にどのような形で埋設セットされ
るか分からず、従って、必ず隣接する敷設管の保合手段
の位相が一致するとは言えず、むしろ、位相がズレるほ
うが一般的である。
However, it is not known how the installed pipes will be buried underground, and therefore it cannot be said that the phases of the retaining means of adjacent installed pipes will necessarily match, but rather, it is more common for the phases to be out of sync. be.

また、重量のある敷設管を、その係合手段の°位相が一
致するように敷設することは、徒に現場の作業工数を増
大させることになり、適当ではなく、相互にズレな位相
位置に敷設された敷設管に対してもレールを敷設管の頂
部に設置し得るレール支持装置の開発が望まれていた。
In addition, laying heavy pipes so that the phases of their engagement means match will unnecessarily increase the number of work hours on site, and it is not appropriate to lay them in phase positions that are out of phase with each other. It has been desired to develop a rail support device that can install a rail on the top of a laid pipe.

(C)0発明の目的 本発明は、前述の欠点を解消すべく、敷設管の係合手段
の位相が一致していなくとも、レールを敷設管あ頂部に
容易に一般することの出来るレール支持装置を提供する
ことを目的とするものである。
(C)0Object of the Invention In order to eliminate the above-mentioned drawbacks, the present invention provides a rail support that can easily attach a rail to the top of a laying pipe even if the phases of the engaging means of the laying pipe do not match. The purpose is to provide a device.

(d)0発明の構成 即ち、本発明は、敷設管に設けられた係合手段と係合し
得るベースプレートを有し、前記ベースプレートに、敷
設管の内周方向にガイド手段を設け、該ガイド手段に、
レールを保持し褥るレールの保持手段の設けられたレー
ル支持機構を敷設管の内周に沿って移動固定自在に設け
て構成される。
(d) Configuration of the invention 0, that is, the present invention has a base plate capable of engaging with an engaging means provided on a laying pipe, a guide means is provided on the base plate in the inner circumferential direction of the laying pipe, and the guide To the means,
A rail support mechanism provided with a rail holding means for holding and folding the rail is provided so as to be movable and fixed along the inner periphery of the laying pipe.

(e)0発明の実施例 以下、図面に基づき、本発明の実施例を、具体的に説明
する。
(e) 0 Examples of the Invention Examples of the present invention will now be described in detail based on the drawings.

第1図は本発明によるレール支持装置の一実施例を示す
正面図、第2図は本発明によるレール支持装置が用いら
れた管路の敷設現場を示す概略図、第3図は第1図のレ
ール支持装置におけるレール支持機構の詳細を示す拡大
図、第4図は第3図における■−■線による断面図、第
5図は第1図における■矢視図、第6図は第5図におけ
る■−■線による断面図、第7図はジヨイントバーを示
す正面図、第8図はレールの接続状態を示す斜視図、第
9図はレールの接i部分を示す正面図である。
FIG. 1 is a front view showing one embodiment of the rail support device according to the present invention, FIG. 2 is a schematic diagram showing a pipeline installation site where the rail support device according to the present invention is used, and FIG. 3 is the same as FIG. 4 is a sectional view taken along the line ■-■ in FIG. 3, FIG. 5 is a view taken along the ■ arrow in FIG. 1, and FIG. FIG. 7 is a front view showing the joint bar, FIG. 8 is a perspective view showing how the rails are connected, and FIG. 9 is a front view showing the contact portion of the rail.

管路の敷設現場1は、第2図に示すように、地上2から
wi9下げられた立坑3を有しており、立坑3からは水
平方向に、円筒形の敷設管5がそれぞれ相互に接続され
た形で地中17に埋設設置されている。敷設管5の接続
部付近、即ち敷設管5の両端部付近には、第1図に示す
ように、係合手段であるボルト穴5aが、その内周に沿
った形で90°ピツチで設けられており、更に、各敷設
管5の上部には、本発明によるレール支持装置6が設け
られている。レール支持装置6は、第1図に示すように
、敷設管5の内周面5bに沿った形で形成されたベース
プレート7を有しており、ベースプレート7の両端には
、第5図に示すように、ボルト挿入用の穴7aが各2個
づつ合計4個穿設されている。また、ベースプレート7
には、第6図に示すように、中央部に敷設管5と接触す
る台座7bが図中紙面と直角方向、即ちベースプレー1
−7の長手方向に形成されており、従って台座7bの両
側にはガイドレール7c、7cが同様にベースプレート
7の長手方向に形成されている。ガイドレール70には
、レール支持機構9がガイドレール7Cに沿って、敷設
管5の内周方向である第1図矢印A1B方向に移動自在
に設けられており、レール支持機構9は1対のレールホ
ルダ9a19aを有している。各レールホルダ9aは、
第3図及び第4図に示すように、レール係合溝9bの形
成された1対の保持プレーh9cを有しており、各保持
プレート9Cは、2個のネジ穴9eが貫通螺設された連
結板9dにより連結接続されている。
As shown in Fig. 2, the pipeline installation site 1 has a vertical shaft 3 lowered from the ground level 2, and from the vertical shaft 3, cylindrical installation pipes 5 are connected to each other in the horizontal direction. It is buried 17 times underground. As shown in FIG. 1, bolt holes 5a serving as engagement means are provided at 90° pitches along the inner periphery of the connecting portion of the laying pipe 5, that is, near both ends of the laying pipe 5, as shown in FIG. Furthermore, a rail support device 6 according to the present invention is provided on the top of each laying pipe 5. As shown in FIG. 1, the rail support device 6 has a base plate 7 formed along the inner circumferential surface 5b of the laying pipe 5, and at both ends of the base plate 7, as shown in FIG. A total of four bolt insertion holes 7a are drilled, two each. Also, base plate 7
As shown in FIG. 6, the pedestal 7b that contacts the installation pipe 5 in the center is located in the direction perpendicular to the plane of the paper in the figure, that is, the base plate 1.
Therefore, guide rails 7c, 7c are similarly formed in the longitudinal direction of the base plate 7 on both sides of the pedestal 7b. A rail support mechanism 9 is provided on the guide rail 70 so as to be movable along the guide rail 7C in the direction of arrow A1B in FIG. It has a rail holder 9a19a. Each rail holder 9a is
As shown in FIGS. 3 and 4, it has a pair of holding plates h9c in which rail engagement grooves 9b are formed, and each holding plate 9C has two threaded holes 9e through which they are screwed. They are connected by a connecting plate 9d.

また、各レールホルダ9aの、第4図上部(ζ(よ、ブ
ラケット9f、9fが形成されており、更にボルト穴9
g、9gが、第3図に示すように、貫通螺設されている
。更に、各レールホルダ9a19a間には、ジヨイント
バー22.22が、各ボルト穴9gに螺合されたボルト
10を、ジヨイントバー22の両側に穿設されたボルト
穴22aと長穴22bに貫通させた形で取り付けられて
おり、従って長穴22bにより、第3図右方のレールホ
ルダ9aは、左方のレールホルダ9aに対しである範囲
でガイドレール7Cに沿って矢印A、B方向に移動する
ことが出来る。
In addition, brackets 9f, 9f are formed in the upper part of each rail holder 9a in FIG.
g and 9g are provided with penetrating screws, as shown in FIG. Further, between each rail holder 9a19a, a joint bar 22.22 has a shape in which bolts 10 screwed into each bolt hole 9g are passed through bolt holes 22a and elongated holes 22b drilled on both sides of the joint bar 22. Therefore, the elongated hole 22b allows the rail holder 9a on the right side of FIG. 3 to move in the directions of arrows A and B along the guide rail 7C within a certain range with respect to the rail holder 9a on the left side. I can do it.

(以下余白) □ □ □ また、レール支持機構9のレール保持空間23には、複
数のレール部材11x、11.が接続されて構成された
レール11が嵌入支持されており、接続状態にある一方
のレール部材11xのウェブ端部には、第8図に示すよ
うに、2枚のガイド板11aが対向する形で溶接設置さ
れ、両ガイド板11a、llaの先端は、図中前方へ突
出してガイド板11a、Ila間にウェブ挿入空間11
bを形成している。また、隣接するレール部材11x、
117の上部フランジには、互いに対向する形で接続プ
レート15.16が溶接接続されており、接続プレート
15には突出部15aが、接続プレート16には前記突
出部15aが嵌入係合し得る窪み16aが形成されてい
る。
(The following is a blank space) □ □ □ Moreover, in the rail holding space 23 of the rail support mechanism 9, a plurality of rail members 11x, 11. As shown in FIG. 8, the rail 11 configured by connecting the rail members 11 is fitted and supported, and the web end of one of the rail members 11x in the connected state has two guide plates 11a facing each other, as shown in FIG. The tips of both guide plates 11a and lla protrude forward in the figure to form a web insertion space 11 between the guide plates 11a and lla.
It forms b. In addition, the adjacent rail member 11x,
Connection plates 15 and 16 are welded and connected to the upper flanges of 117 so as to face each other, and the connection plate 15 has a protrusion 15a, and the connection plate 16 has a recess into which the protrusion 15a can fit and engage. 16a is formed.

管路の敷設現場1は以上のような構成を有するので、地
中17に埋設された敷設管5中に管路を敷設するには、
まず敷設管5中に管路を搬入するための管路敷設用台車
を支持するレール11を敷設する必要が有る。レール1
1は、第2図に示すように、敷設管5の頂部に1本だけ
、敷設管5の敷設方向である第2図矢印C方向に設ける
が□、この敷設に際しては、各敷設w5にレール支持装
置6を取り付ける。
Since the conduit installation site 1 has the above configuration, in order to lay the conduit in the installation pipe 5 buried underground 17,
First, it is necessary to lay the rails 11 that support the conduit-laying trolley for carrying the conduit into the pipe-laying pipe 5. rail 1
1 is installed at the top of the laying pipe 5 in the direction of arrow C in FIG. 2, which is the laying direction of the laying pipe 5, as shown in FIG. Attach the support device 6.

レール支持装置6の取り付けは、ベースプレート7の4
個の穴7aを介してボルト13を敷設管5のボルト穴5
aに螺合させることにより行うが、ボルト穴5aの位置
は各敷設管5の敷設状態によりまちまちであり、一致し
ていない。そこで、ベースプレート7を各敷設管5に取
り付けた状態で、ベースプレート7のガイドレール7C
にA1B方向に移動自在に係合されtコレール支持機構
9を、ブラケット9f及び連結板9d間にベースプレー
ト7を挾む形で移動させ、対向した各゛レールホルダ9
a、9aのレール係合溝9bにより支持されるレール1
1の中心CLが、敷設管5の頂部に一致し得るように調
整する。こうして、レール支持機構9のベースプレート
7に対する位置決めが終了したところで、第3図左方の
レールホルダ9aの連結板9dに螺合されたボルト25
G′締めて、当該レールホルダ9aをベースプレート7
に対して固定する。すると、シリインドバー22の長大
22゛bを介して第3図右方のレールホルダ9aのみが
ASB方向にある範囲で移動可能な状態となる。このよ
うに、敷設管5の全てのレール支持機構9の一方のレー
ルホルダ9aを固定し、他方のレールホルダ9aを移動
し得る状態にし、そこで、当該レールホルダ9aを第3
図最右方に移動させて、対向する1対の保持プレート9
Cの保合溝9b等により形成されるレール保持空間23
を拡大させ、当該拡大したレール保持空間23中に、第
3図下方から、レール11を挿入セットする。レール1
1がレール保持空間23中にセットされたところで、そ
れまで図中最右方(ζ移動していたもう一方のレールホ
ルダ9aを長穴22bに沿ってA方向に移動させ、レー
ル保持空間23を狭めてレール11を当該レール保持空
間23中、従って係合溝9b、9b間に保持する。第3
図右方のレールホルダ9aがレール11を保持スるに十
分なだけA方向に移動したところで、当該レールホルダ
9aの連結板9dのボルト25を締めて、レールホルダ
9aをベースプレート7に対して固定し、レール11を
敷設管5に対して確実に支持する。
The rail support device 6 is attached to the base plate 7 at 4.
Install the bolt 13 through the hole 7a of the bolt hole 5 of the pipe 5.
However, the positions of the bolt holes 5a vary depending on the installation state of each installation pipe 5 and do not match. Therefore, with the base plate 7 attached to each installation pipe 5, the guide rail 7C of the base plate 7 is
The rail support mechanism 9, which is movably engaged in the A1B direction, is moved with the base plate 7 sandwiched between the bracket 9f and the connecting plate 9d, and each of the opposing rail holders 9
Rail 1 supported by rail engaging groove 9b of a, 9a
Adjust so that the center CL of 1 can coincide with the top of the installation pipe 5. In this way, when the positioning of the rail support mechanism 9 with respect to the base plate 7 is completed, the bolt 25 screwed into the connecting plate 9d of the rail holder 9a on the left side of FIG.
Tighten G' and attach the rail holder 9a to the base plate 7.
Fixed against. Then, only the rail holder 9a on the right side in FIG. 3 becomes movable within a certain range in the ASB direction via the long length 22'b of the cylinder bar 22. In this way, one rail holder 9a of all the rail support mechanisms 9 of the installation pipe 5 is fixed, the other rail holder 9a is made movable, and then the third rail holder 9a is moved.
A pair of holding plates 9 facing each other are moved to the rightmost side in the figure.
Rail holding space 23 formed by the retaining groove 9b etc. of C
is expanded, and the rail 11 is inserted and set into the expanded rail holding space 23 from below in FIG. rail 1
1 is set in the rail holding space 23, the other rail holder 9a, which had been moved to the far right (ζ) in the figure, is moved in the direction A along the elongated hole 22b, and the rail holding space 23 is moved. The rail 11 is held in the rail holding space 23, and therefore between the engagement grooves 9b, 9b.Third
When the rail holder 9a on the right side of the figure has moved in the A direction enough to hold the rail 11, tighten the bolt 25 on the connecting plate 9d of the rail holder 9a to fix the rail holder 9a to the base plate 7. Thus, the rail 11 is reliably supported with respect to the installation pipe 5.

このように、″敷設管5のボルト穴5aがどのような位
−にあっても、レール支持機構9をベースプレート7に
沿って移動させることにより、容易にレール11のi心
CLを敷設管5の頂部と一致した形で保持することが出
来る。
In this way, by moving the rail support mechanism 9 along the base plate 7, no matter where the bolt holes 5a of the laying pipe 5 are located, it is easy to move the i-center CL of the rail 11 to the laying pipe 5. It can be held in a shape that matches the top of the

なお、レール11を構成するレール部材11・、11V
相互間の接続は、第8図に示すように、一方のレール部
材11xの端部に設けられたガイド板11a、llaか
らなるウェブ挿入空間11bに、:゛ もう一方のレール部材117のウェブを挿入すると ′
共に、レール部材11xの接続プレート15の突出 ′
部15mを、レール部材11 の接続プレート16の窪
み16gに挿入係合させて行う。接続プレート15.1
6の突出部15a及び窪み16aは、第9図に示すよう
に、互いに相手のレール部材11.111Xのフランジ
11c上に突出しているので、レール部材11x、 1
1.:は相互に第7図上下方向にズレること無く接続さ
れる。この状態で、レール部材11x、11.v相互間
を溶接接合しても良いが、レール部材11x、 11.
は、第9図左右方向、即ち矢印り、E方向に連続的に接
続されることから、一度レール部材11x111vが接
続されるとその自重により、容易にE、F方向に移動す
ることは無いので、溶接する。ことなく、ガイド板11
a、lla及び接続プレート15.16による係合のみ
でも、実用上何らの支障も生じることは無い。
In addition, the rail members 11, 11V that constitute the rail 11
For mutual connection, as shown in FIG. 8, the web of the other rail member 117 is inserted into the web insertion space 11b consisting of the guide plates 11a and lla provided at the end of one rail member 11x. When you insert ′
In addition, the protrusion of the connection plate 15 of the rail member 11x'
This is done by inserting and engaging the portion 15m into the recess 16g of the connection plate 16 of the rail member 11. Connection plate 15.1
As shown in FIG. 9, the protruding portions 15a and the recesses 16a of the rail members 11.
1. : are connected to each other without shifting in the vertical direction in FIG. In this state, the rail members 11x, 11. Although the rail members 11x and 11.v may be welded together, the rail members 11x, 11.
are connected continuously in the left and right direction in Figure 9, that is, in the arrow direction and E direction, so once the rail member 11x111v is connected, it will not easily move in the E and F directions due to its own weight. ,Weld. Guide plate 11
Engagement only by a, lla and the connecting plates 15, 16 does not cause any practical problems.

こうして、レール11が、第2図に示すように、各敷設
管5を貫通する形で連続的に敷設されたところで、立坑
3から、レール11に、複数の管路21を支持した管路
敷設用台車20を、車輪20aをレール11に、第1図
に示すように係合させる形でセットし、管#21及び電
路敷設用台車20を灰々に立坑3内で継ぎ足しつつ、管
路敷設用台車20及び管路21をレール11に沿って矢
印C方向に押し込み、管路21の敷設管5内への敷設を
行ってゆ(。管Ws21の敷設管5内への敷設が完了し
、たところで、敷設管5内にコンクリート(セメントの
みを含む。)を充填打設して、管路21を敷設管5内に
定着させる。
In this way, as shown in FIG. 2, when the rail 11 is continuously laid to pass through each laying pipe 5, a pipe line supporting a plurality of pipe lines 21 is installed from the vertical shaft 3 to the rail 11. Set the trolley 20 so that the wheels 20a are engaged with the rail 11 as shown in FIG. The trolley 20 and the pipe line 21 are pushed in the direction of arrow C along the rail 11, and the pipe line 21 is laid inside the laid pipe 5. (The laying of the pipe Ws21 inside the laid pipe 5 is completed, Then, the pipe 5 is filled with concrete (containing only cement) to fix the conduit 21 in the pipe 5.

(f)0発明の効果 以上、説明したように、本発明によれば、敷設管5に設
けられたボルト穴5a等の係合手段とボルト13等を介
して係合し得るベースプレート7を有し、前記ベースプ
レート7に敷設管5の内周方向−(即ち、矢印A、B方
向)にガイドレール70等のガイド手段を設け、前記ガ
イド手段に、レール11を保持し得るレールホルダ9a
等のレールの保持手段の設けられたレール支持機構9を
敷設管5の内周に沿って移動固定自在に設けたので、内
周面5bに均等な角度ピッチで設けられたボルト穴5a
等の係合手段がどのような位相となるように敷設管5が
敷設されていても、ベースプレート7に設けられたガイ
ド手段に沿ってル−ル支持機構9を移動させることによ
り、レール11を敷設管5の頂部に正確にセットするこ
とが可能となり、レール11の敷設作業を現場の作業工
数を増大させることなく、円滑に行うことが出来る。
(f) 0 Effects of the Invention As explained above, according to the present invention, the base plate 7 that can be engaged with the engagement means such as the bolt hole 5a provided in the installation pipe 5 via the bolt 13 or the like is provided. A guide means such as a guide rail 70 is provided on the base plate 7 in the inner peripheral direction of the installation pipe 5 (that is, in the direction of arrows A and B), and the guide means is provided with a rail holder 9a capable of holding the rail 11.
Since the rail support mechanism 9 provided with a rail holding means such as the above is provided so as to be movable and fixed along the inner circumference of the installation pipe 5, bolt holes 5a provided at equal angular pitches on the inner circumferential surface 5b are provided.
Regardless of the phase of the engaging means such as It becomes possible to set the rail 11 accurately at the top of the laying pipe 5, and the work of laying the rail 11 can be carried out smoothly without increasing the number of man-hours on site.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明によるレール支持装置の一実施例を示す
正面図、第2図は本発明によるレール支持装置が用いら
れた管路の敷設現場を示す概略図、第3図は第1図のレ
ール支持装置におけるレール支持機構の詳細を示す拡大
図、第4図は第3図におけるIV−IV線による断面図
、第5図は第1図における■矢視図、第6図は第5図に
おける■−■線による断面図、第7図はジヨイントバー
を示す正面図、第8図はレールの接続状態を示す斜視図
、第9図はレールの接続部分を示す正面図である。 5・・・・・・敷設管 5a・・・・・・係合手段(ボルト穴)5b・・・・内
周面 6・・・・・・レール支持装置 7・・・・・ベースプレート 7c・・・・・・ガイド手段(ガイドレール)9・・・
・・・レール支持機構 9a・・・・・・レールの保持手段(レールホルダ)出
願人 三井建設株式会社 代理人 弁理士 相1)伸二 :; 第 5 図 第6図 第7図
FIG. 1 is a front view showing one embodiment of the rail support device according to the present invention, FIG. 2 is a schematic diagram showing a pipeline installation site where the rail support device according to the present invention is used, and FIG. 3 is the same as FIG. 4 is a sectional view taken along the line IV-IV in FIG. 3, FIG. 5 is a view in the direction of the ■ arrow in FIG. 1, and FIG. FIG. 7 is a front view showing the joint bar, FIG. 8 is a perspective view showing the connected state of the rails, and FIG. 9 is a front view showing the connecting portion of the rails. 5... Laying pipe 5a... Engaging means (bolt hole) 5b... Inner peripheral surface 6... Rail support device 7... Base plate 7c. ...Guide means (guide rail) 9...
...Rail support mechanism 9a...Rail holding means (rail holder) Applicant Mitsui Construction Co., Ltd. Agent Patent attorney Phase 1) Shinji:; Fig. 5 Fig. 6 Fig. 7

Claims (1)

【特許請求の範囲】[Claims] 内周面に複数の係合手段が設けられた敷設管に前記係1
合手段を介して取9付は支持されるレール支持装置にお
いて、敷設管に設けられた前記係合手段と係合し得るベ
ースプレートを有し、前記ベースプレートに、敷設管の
内周方向にガイド手段を設け、咳ガイド手段に、レール
を保持し得るレールの保持手段の設けられたレール支持
機構を敷設管の内周に沿って移動固定自在に設けたレー
ル支持装置。
The above-mentioned engaging means 1 is attached to a laid pipe having a plurality of engaging means provided on the inner circumferential surface.
A rail support device in which the attachment 9 is supported through a coupling means, has a base plate capable of engaging with the engagement means provided on the laying pipe, and has a guide means on the base plate in the inner circumferential direction of the laying pipe. A rail support device comprising a cough guide means and a rail support mechanism provided with a rail holding means capable of holding the rail so as to be movable and fixed along the inner periphery of a laid pipe.
JP7822584A 1984-04-18 1984-04-18 Rail supporter Granted JPS60222680A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7822584A JPS60222680A (en) 1984-04-18 1984-04-18 Rail supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7822584A JPS60222680A (en) 1984-04-18 1984-04-18 Rail supporter

Publications (2)

Publication Number Publication Date
JPS60222680A true JPS60222680A (en) 1985-11-07
JPH0155834B2 JPH0155834B2 (en) 1989-11-27

Family

ID=13656103

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7822584A Granted JPS60222680A (en) 1984-04-18 1984-04-18 Rail supporter

Country Status (1)

Country Link
JP (1) JPS60222680A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015178859A (en) * 2014-03-19 2015-10-08 Jfeエンジニアリング株式会社 Pipeline laying method and equipment transport device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015178859A (en) * 2014-03-19 2015-10-08 Jfeエンジニアリング株式会社 Pipeline laying method and equipment transport device

Also Published As

Publication number Publication date
JPH0155834B2 (en) 1989-11-27

Similar Documents

Publication Publication Date Title
BR112012022508B1 (en) METHOD OF POSITIONING A PIPE FROM A VESSEL, ACCESSORY SUPPORT STRUCTURE, SUPPORT FRAME FOR A PIPE ACCESSORY, AND ASSEMBLY SYSTEM
SE7713127L (en) FOR PLACEMENT ON SJOBOTTNEN INTENDED DEVICE DEVICE FOR EQUIPMENT, PREFERABLY FOR USE IN DRILLING AND SIMILAR WORK
US1906209A (en) Pipe support
NO20011500D0 (en) System, apparatus and method for installing control cables in a well
US2045307A (en) Supporting apparatus for pipes and the like
US4189892A (en) Angle guide apparatus
JPS60222680A (en) Rail supporter
ATE38259T1 (en) CONNECTING AND PRESSURE DISTRIBUTION ELEMENT FOR CONCRETE COMPONENTS.
WO2016094992A1 (en) Process for the manufacture, assembly and continuous construction of duct bundle assemblies ("bundles"), with progressive movement of tubular ducts in individual lines and/or in groups of ducts
CN103890471B (en) Relate to the improvement that pipe lays
BRPI0801681B1 (en) LONGARINE
JP2020106044A (en) Transport device of main pipe into sheath pipe
JPS60222679A (en) Rail supporter
US2238566A (en) Tunnel lining
CN113483148A (en) Assembled pipe jacking construction guide rail device
JPH09329000A (en) Rail placing technique
CN211421742U (en) Electric piping fluting device is used in building electromechanical installation
CN220063668U (en) Pipe rack support testing device
JPH03251019A (en) Setting method for vertical snake type cable
KR200467320Y1 (en) Clamp Wiring for Piping Cable
CN218732864U (en) Cable erecting device with adjustable height
CN217176372U (en) Prevent fire door in utility tunnel and fix subassembly and utility tunnel in advance
SU1076685A1 (en) Method of assembling pipe-line of pipe-inside-pipe type
JPH0630911Y2 (en) Construction jig for PIP method using rolled steel pipe
RU63484U1 (en) SUPPORT FOR PIPELINE SUPPORT