JPS60222679A - Rail supporter - Google Patents

Rail supporter

Info

Publication number
JPS60222679A
JPS60222679A JP7822484A JP7822484A JPS60222679A JP S60222679 A JPS60222679 A JP S60222679A JP 7822484 A JP7822484 A JP 7822484A JP 7822484 A JP7822484 A JP 7822484A JP S60222679 A JPS60222679 A JP S60222679A
Authority
JP
Japan
Prior art keywords
rail
pipe
laying
rail support
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7822484A
Other languages
Japanese (ja)
Other versions
JPH0155833B2 (en
Inventor
日出男 福田
保 石橋
渉 川嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP7822484A priority Critical patent/JPS60222679A/en
Publication of JPS60222679A publication Critical patent/JPS60222679A/en
Publication of JPH0155833B2 publication Critical patent/JPH0155833B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Liquid Crystal Substances (AREA)
  • Insulation, Fastening Of Motor, Generator Windings (AREA)
  • Finger-Pressure Massage (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (a)0発明の技術分野 本発明は、敷設管中において、ケーブル管路、水道管、
ガス管、下水道管等の管路を敷設する管#敷設用台車を
走行させるためのレールを支持する、レール支持装置に
関する。
Detailed Description of the Invention (a) 0 Technical Field of the Invention The present invention relates to a cable conduit, a water pipe,
The present invention relates to a rail support device that supports a rail for running a pipe-laying truck for laying pipes such as gas pipes and sewer pipes.

(b)、技術の背景 出願人は、特願昭58−234842号その他において
、管路敷設用台車を敷設管上部に設けられたレールに沿
って走行させ、ケーブル管路を前記敷設管中に敷設して
ゆく方法を提案しているが、台車を支持するレールを敷
設管の頂部に設ける場合には、そのレールをどの様に敷
設管に対して支持するかが問題となる。
(b), Background of the Technology In Japanese Patent Application No. 58-234842 and others, the applicant runs a conduit laying trolley along a rail provided above the laid pipe, and installs a cable conduit into the laid pipe. We have proposed a method of laying the rails, but if a rail to support the cart is provided at the top of the pipe, the problem is how to support the rail with respect to the pipe.

通常、敷設管には、管相互を接続するための接続金具の
取り付はボルト穴が90°ピツチ等の適宜なピッチで設
けられているが、このボルト穴等の保合手段を利用する
方法が最も一般的である。
Normally, bolt holes are provided at an appropriate pitch such as 90° pitch to attach connecting fittings for connecting pipes to each other, but there is a method that uses securing means such as bolt holes. is the most common.

しかし、敷設管は地中にどのような形で埋設セットされ
るか分からず、従って、必ず隣接する敷設管の係合手段
の位相が一致するとは言えず、むしろ、位相がズレるほ
うが一般的である。
However, it is not known in what form the laying pipes will be buried underground, and therefore it cannot be said that the phases of the engaging means of adjacent laying pipes will necessarily match, but rather, it is more common for the phases to be out of sync. be.

また、重量のある敷設管を、その係合手段の位相が一致
するように敷設することは、徒に現場の作業工数を増大
させることになり、適当ではなく、相互にズした位相位
置に敷設された敷設管に対してもレールを敷設管の頂部
に設置し得るレ−ル支持装置の開発が望まれていた。
In addition, laying heavy pipes so that the phases of their engaging means match will unnecessarily increase the number of work hours on site, and it is not appropriate to lay them in phase positions that are out of phase with each other. It has been desired to develop a rail support device that can install a rail at the top of a pipe that has been laid.

(C)0発明の目的 本発明は、前述の欠点を解消すべく、敷設管の係合手段
の位相が一致していなくとも、レールを敷設管の頂部に
容易に敷設することの出来るレール支持装置を提供する
ことを目的とするものである。
(C)0Object of the Invention In order to eliminate the above-mentioned drawbacks, the present invention provides a rail support that allows the rail to be easily laid on the top of the laying pipe even if the phases of the engaging means of the laying pipe do not match. The purpose is to provide a device.

(d)0発明の構成 即ち、本発明は、レールを支持し得るレールの支持手段
を設け、該支持手段に、敷設管に設けられた保合手段と
係合し得る調整溝を、敷設管の内周に沿った形で形成し
た調整部を設け、前記調整部を介して前記支持手段を敷
設管の内周面に沿って移動し得るようにして構成される
(d) Configuration of the 0 invention, that is, the present invention provides a rail support means capable of supporting the rail, and includes an adjustment groove in the support means that can engage with a retaining means provided on the laid pipe. An adjustment portion formed along the inner circumference of the pipe is provided, and the support means is configured to be movable along the inner circumference of the laying pipe via the adjustment portion.

(e)9発明の実施例 以下、図面に基づき、本発明の実施例を、具体的に説明
する。
(e) 9 Embodiments of the Invention Hereinafter, embodiments of the present invention will be specifically described based on the drawings.

第1図は本発明によるレール支持装置が用いられた管路
の敷設現場を示す概略図、第2図は本発明によるレール
支持装置の一実施例を示す正面図、第3図は第2図の支
持装置のI[−I線による断面図、第4図は第3図のI
V−IV線による断面図、第5図は第2図における■矢
視図、第6図はレールの接続状態を示す斜視図、第7図
はレールの接続部分を示す正面図である。
FIG. 1 is a schematic diagram showing a pipeline installation site using a rail support device according to the present invention, FIG. 2 is a front view showing an embodiment of the rail support device according to the present invention, and FIG. A sectional view taken along the line I[-I of the support device of FIG.
5 is a sectional view taken along the line V-IV, FIG. 5 is a view taken in the direction of the ■ arrow in FIG. 2, FIG. 6 is a perspective view showing the connected state of the rails, and FIG. 7 is a front view showing the connected portion of the rails.

管路の敷設現場1は、第1図に示すように、地上2から
掘り下げられた立坑3を有しており、立坑3からは水平
方向に、円筒形の敷設管5がそれぞれ相互に接続された
形で地中17に埋設設置。
As shown in Fig. 1, the pipeline installation site 1 has a shaft 3 dug from the ground 2, and from the shaft 3, cylindrical construction pipes 5 are connected to each other in the horizontal direction. It was installed 17 times underground.

されている。各敷設管5の接続部付近、即ち敷設管5の
両端部付近には、第2図に示すように、係合手段である
ボルト穴5aが、その円周に沿った形で90°ピツチで
設けられており、更に、各敷設管5の上部には、本発明
によるレール支持装置6が設けられている。レール支持
装置6は、中央部のレール支持部7とレール支持部7の
両側に設けられた調整部9.10を有しており、レール
支持部7はレール11が嵌入支持される支持溝7aの形
成された3枚のリブ7bが、敷設管5の内周に沿った形
で成型された帯状のベースプレート7c上に溶接接合さ
れている。ベースプレート7Cの両端には、第3図及び
第4図に示すように、アングル材からなるフランジ7d
、7dが設けられており、フランジ7d、7dを介して
調整部9.10が、同様に各調整部9.10の端部に、
フランジ7dに対向した形で形成されたフランジ9a。
has been done. As shown in FIG. 2, bolt holes 5a, which are engagement means, are arranged at a pitch of 90° along the circumference of each laying pipe 5 near the connection part, that is, near both ends of the laying pipe 5, as shown in FIG. Furthermore, a rail support device 6 according to the invention is provided at the top of each laying pipe 5. The rail support device 6 has a rail support part 7 in the center and adjustment parts 9 and 10 provided on both sides of the rail support part 7, and the rail support part 7 has a support groove 7a into which the rail 11 is fitted and supported. The three ribs 7b are welded onto a band-shaped base plate 7c formed along the inner periphery of the installation pipe 5. As shown in FIGS. 3 and 4, flanges 7d made of angle material are provided at both ends of the base plate 7C.
, 7d are provided, via flanges 7d, 7d an adjustment part 9.10, likewise at the end of each adjustment part 9.10,
A flange 9a is formed to face the flange 7d.

10aを介してボルトナツト等の締結手段12により締
結され、これによりレール支持部7及び再調整部9.1
0は一体化されている。調整部10は、敷設管5の内周
に沿った形で成型された帯状のベースプレート10bを
有しており、各ベースプレート10bには第5図に示す
ように、3枚のリブ10cが平行に、敷設管5の内周に
沿った形で設けられている。調整部10のベースプレー
ト10bには、第5図に示すように、敷設管5内周に沿
った形で長さがL2なる2つの長穴10d1す10dが
平行に貫通穿設されている。なお、調整部9は調整部1
0と同様にベースプレート9b13枚のリブ9c、長さ
L2なる2つの長穴9dが設けられているが、調整部1
0に比してその円周方向の長さLlが短い。
10a by a fastening means 12 such as a bolt/nut, whereby the rail support part 7 and the readjustment part 9.1
0 is integrated. The adjustment unit 10 has a band-shaped base plate 10b molded along the inner circumference of the installation pipe 5, and each base plate 10b has three ribs 10c arranged in parallel, as shown in FIG. , are provided along the inner circumference of the installation pipe 5. As shown in FIG. 5, two elongated holes 10d1 and 10d having a length of L2 are bored through the base plate 10b of the adjustment section 10 in parallel along the inner periphery of the laying pipe 5. Note that the adjustment section 9 is the adjustment section 1.
0, the base plate 9b is provided with 13 ribs 9c and two elongated holes 9d with length L2, but the adjustment part 1
Its circumferential length Ll is shorter than that of 0.

なお、レール支持装置6は、各調整部9.10の長穴9
d110dを介して敷設管5のボルト穴5aに螺合され
た4本のボルト13により敷設管5に取り付は支持され
ており、各ボルト13を緩めると、レール支持装置6は
敷設管5の内周面5bに沿って長さL2の範囲で矢印A
、B方向に自由に移動することが出来る。一方、レール
支持部7の支持溝7aには複数のレール部材11.11
1 が接続されて構成されたレール11が嵌入支持され
ており、接続状態にある一方のレール部材1 .1 の
ウェブ端部には、第6図に示すように、2枚のガイド板
11aが対向する形で溶接設置され、 ・□ 両ガイド板11a、llaの先端は、図中前方へ 。
Note that the rail support device 6 has elongated holes 9 in each adjustment section 9.10.
The installation is supported on the installation pipe 5 by four bolts 13 screwed into the bolt holes 5a of the installation pipe 5 through d110d, and when each bolt 13 is loosened, the rail support device 6 is attached to the installation pipe 5. Arrow A within a length L2 along the inner circumferential surface 5b
, can move freely in direction B. On the other hand, a plurality of rail members 11.11 are provided in the support groove 7a of the rail support portion 7.
A rail 11 configured by connecting two rail members 1 . As shown in Fig. 6, two guide plates 11a are welded to the end of the web 1 in such a way that they face each other, and the tips of both guide plates 11a and lla are directed forward in the figure.

突出してガイド板11a、lla間にウェブ挿入室 、
間11bを形成している。また、隣接するレール ”部
材xx 、xxty5上部フランジには、互いに対向す
る形で接続プレート15.16が溶接接続されており、
接続プレート15には突出部15aが、接続プレート1
6には前記突出部15aが嵌入係合し得る窪み16gが
形成されている。
A web insertion chamber protrudes between the guide plates 11a and lla,
It forms a gap 11b. In addition, connection plates 15 and 16 are welded and connected to the upper flanges of the adjacent rail members xx and xxty5 in a manner that they face each other,
The connection plate 15 has a protrusion 15a that is connected to the connection plate 1.
6 is formed with a recess 16g into which the protrusion 15a can fit and engage.

管路の敷設現場1は以上のような構成を有するので、地
中17に埋設された敷設管5中に管路21を敷設するに
は、まず敷設管5中に、管Ws21を搬入するための管
路敷設用台車20を支持するレール11を敷設する必要
が有る。レール11は、第2図に示すように、敷設管5
0頂部に1本だけ、敷設管5の敷設方向である第1図矢
印C方向に設けるが、乙の敷設に際しては、各敷設管5
にレール支持装置6を取り付ける。
Since the pipeline installation site 1 has the above configuration, in order to lay the pipeline 21 in the installation pipe 5 buried underground 17, it is necessary to first carry the pipe Ws21 into the installation pipe 5. It is necessary to lay the rails 11 that support the conduit laying trolley 20. As shown in FIG.
Only one pipe is installed at the top of the installation pipe 5 in the direction of arrow C in Figure 1, which is the installation direction of the installation pipe 5.
Attach the rail support device 6 to.

レール支持装置6の取り付けは、調整部9.10の長穴
9d、10dを介してボルト13を、敷設管5のボルト
穴58に螺合させることにより行うが(なお、部品19
は座金である。)、ボルト穴5aの位置は各敷設管5の
敷設状態によりまちまちであり、隣接する敷設管5のボ
ルト穴5aの位相は一致していない。そこで、レール支
持装置6を敷設管5にボルト13により締結固着する際
に、まずボルト13をある程度緩めた状態、即ちレール
支持装置6を敷設管5に仮止めした状態で、レール支持
装置6を内周面5bに沿って第2図矢印A、B方向に移
動させ、レール支持部7の支持溝7aの中心CLが、敷
設管5の頂部に一致するように調整する。この調整は、
レール支持装置f6t−1長穴9d、10de介してボ
ルト13を長穴9d、10dに対して相対的に移動させ
る形で行うので、円周方向に90’ピツチで設けられた
敷設管5のボルト穴5aがどのような位置に在っても、
レール支持装置6を長さL2の範囲で移動させることに
より、容易に中心CLを敷設管5の頂部に位置させるこ
とが出来る。中心OLが敷設管5の頂部に一致したとこ
ろでボルト13を締めて、レール支持装置6を敷設管5
に対して固定させる。
The rail support device 6 is installed by screwing the bolts 13 into the bolt holes 58 of the installation pipe 5 through the elongated holes 9d and 10d of the adjustment part 9.10 (note that the parts 19
is a washer. ), the positions of the bolt holes 5a vary depending on the installation state of each installation pipe 5, and the phases of the bolt holes 5a of adjacent installation pipes 5 do not match. Therefore, when fastening and fixing the rail support device 6 to the installation pipe 5 with bolts 13, first loosen the bolts 13 to some extent, that is, with the rail support device 6 temporarily fastened to the installation pipe 5, and then attach the rail support device 6 to the installation pipe 5. It is moved along the inner circumferential surface 5b in the directions of arrows A and B in FIG. 2, and adjusted so that the center CL of the support groove 7a of the rail support part 7 coincides with the top of the installation pipe 5. This adjustment is
Since the bolts 13 are moved relatively to the long holes 9d and 10d through the long holes 9d and 10de of the rail support device f6t-1, the bolts of the laying pipe 5 provided at a pitch of 90' in the circumferential direction No matter where the hole 5a is located,
By moving the rail support device 6 within the range of length L2, the center CL can be easily positioned at the top of the installation pipe 5. When the center OL coincides with the top of the installation pipe 5, tighten the bolt 13 and attach the rail support device 6 to the installation pipe 5.
fixed against.

こうして、各敷設管5について、レール支持部W6を、
その支持溝7mの中心CLを敷設管5の頂部に一致させ
た形で設けたところで、レール11を第2図紙面と直角
方向から支持溝7a中に挿入し、レール11を支持溝7
a中で支持させ、管路敷設用台車20を吊下し得る状態
にする。なお、レール11を構成するレール部材11.
.11相互間の接続は、第6図に示すように、一方のレ
ール部材11.の端部に設けられた、ガイド板11a、
llaからなるウェブ挿入空間11bに、もう一方のレ
ール部材11 のウェブを挿入すると共に、レール部材
11 の接続プレート15の突出部15aを、レール部
材11.の接続プレート16の窪み16 a’に挿入係
合させて行う。接続プレート15.16の突出部15a
及び窪み16aは、第7図に示すように、互いに相手の
レール部材11y111、のフラ、ンジlie上に突出
しているので、レール部材11 .11 は相互に第7
図上下方向にズレる乙と無く接続される。この状態で、
レール部材110.11.相互間を溶接接合しても良い
が、レール部材11..11.は、第7図左右方向、即
ち矢印り、E方向に連続的に接続される乙とから、一度
レール部材11..11.が接続されるとその自重によ
り、容易にE、F方向に移動することは無いので、溶接
することなく、ガイド板11a111a及び接続プレー
)15.16による係合のみでも実用上何らの支障も生
じることは無い。なお、各レール支持部W6のレール支
持部7における支持溝7aは既に述べたように、各敷設
管5を通じてその頂部に一致した形で設けられているの
で、レール11の敷設は円滑に行われる。
In this way, for each laying pipe 5, the rail support portion W6 is
When the center CL of the support groove 7m is aligned with the top of the installation pipe 5, the rail 11 is inserted into the support groove 7a from a direction perpendicular to the paper surface of FIG.
a, so that the conduit laying trolley 20 can be suspended. Note that the rail member 11. which constitutes the rail 11.
.. The connection between the rail members 11.11 and 11.11 is as shown in FIG. A guide plate 11a provided at the end of the
The web of the other rail member 11 is inserted into the web insertion space 11b consisting of the rail member 11. This is done by inserting and engaging the recess 16a' of the connecting plate 16. Projection 15a of connecting plate 15.16
As shown in FIG. 7, the recesses 16a protrude above the flanges of the opposing rail members 11y111, so that the rail members 11. 11 is mutually the 7th
It is connected without shifting in the vertical direction of the figure. In this state,
Rail member 110.11. Although they may be joined together by welding, the rail members 11. .. 11. The rail member 11. is connected continuously from the rail member 11. .. 11. Once connected, it will not easily move in the E and F directions due to its own weight, so even if the guide plate 11a111a and connection plate 15.16 are engaged without welding, there will be no practical problem. There's nothing wrong with that. In addition, as already mentioned, the support groove 7a in the rail support part 7 of each rail support part W6 is provided in a shape that matches the top of each laying pipe 5, so that the rail 11 can be laid smoothly. .

こうして、レール11が、第1図に示すように、各敷設
管5を貫通する形で連続的に敷設されたところで、立坑
3からレール11に、複数の管路21を支持した管轄敷
設用台車20を、車輪20aをレール11に、第2図に
示すように係合させる形でセットし、管路21及び管路
敷設用台車20JI!次々に立坑3内で継ぎ足しつつ、
管−敷設用台車20及び管路21をレール11に沿って
矢印C方向に押し込み、管#21の敷設管s内への敷設
を行ってゆく。管路21の敷設管5内への敷設が完了し
たところで、敷設管5内にコンクリート(セメントのみ
を含む。)を充填打設して、管路21を敷設管5内に定
着させる。
In this way, as shown in FIG. 1, when the rail 11 has been continuously laid so as to pass through each of the laying pipes 5, the jurisdictional laying trolley supporting the plurality of pipe lines 21 is installed from the vertical shaft 3 to the rail 11. 20 is set so that the wheels 20a are engaged with the rail 11 as shown in FIG. While adding one after another in shaft 3,
The pipe-laying cart 20 and the pipe line 21 are pushed along the rail 11 in the direction of arrow C, and the pipe #21 is laid into the pipe s. When the installation of the conduit 21 into the installation pipe 5 is completed, the installation pipe 5 is filled with concrete (containing only cement) and the conduit 21 is fixed inside the installation pipe 5.

(f)0発明の効果 以上、説明したように、本発明によれば、し−ル11を
支持し得る支持溝7a等のレールの支持手段を設け、該
支持手段に長穴9d、10d等の、敷設管5に設けられ
たボルト穴5a等の係合手段とボルト13等を介して係
合し得る調整溝を、敷設管5の内周に沿った形で形成し
た、調整部9.10を設け、前記調整部9.10を介し
て前記支持手段を敷設管5の内周面5bに沿って移動し
得るように構成したので、内周面5bに均等な角度ピッ
チで設けられたボルト穴5aがどのような位相となるよ
うに敷設管5が敷設されていても、レールの支持手段を
敷設管5の頂部に正確にセットすることが可能となり、
レール11の敷設作業を現場の作業工数を増大させるこ
となく、円滑に行うことが出来る。
(f) 0 Effects of the Invention As described above, according to the present invention, rail support means such as the support groove 7a capable of supporting the rail 11 are provided, and the support means includes elongated holes 9d, 10d, etc. The adjustment portion 9. has an adjustment groove formed along the inner circumference of the installation pipe 5 that can be engaged with an engaging means such as a bolt hole 5a provided in the installation pipe 5 via a bolt 13 or the like. 10, and the supporting means is configured to be movable along the inner circumferential surface 5b of the laying pipe 5 via the adjusting part 9.10, so that the support means are provided at equal angular pitches on the inner circumferential surface 5b. No matter what phase the bolt holes 5a are in when the pipe 5 is laid, it is possible to accurately set the rail support means at the top of the pipe 5.
The work of laying the rails 11 can be carried out smoothly without increasing the number of man-hours on site.

なお、調整部9.10は必ずしもレール11の支持手段
の両側に1個ずつ設けられている必要は無く、支持手段
の片側に1個だけ設けるように構成することも当然可能
である。また、調整部9.10とレール11の支持手段
の設けられたレール支持部7は、本発明のように3分割
構造である必要も無いことは勿論であり、一体構造の物
や、更に多分割構造にすることも可能である。
Incidentally, it is not necessary that the adjusting portions 9.10 are provided one on each side of the support means of the rail 11, and it is of course possible to provide only one adjustment portion on one side of the support means. Furthermore, it goes without saying that the rail support section 7 provided with the adjustment section 9.10 and the support means for the rail 11 does not need to have a three-part structure as in the present invention; A split structure is also possible.

更に、調整溝も、本実施例に示すような閉鎖した空間と
しての長穴9d、10dに限らず、少くともどちらか一
方(通常の場合、第2図におけるレール支持装置6の左
右両端部分が開放された形状の物が考えられる。)が開
放された形状の、単なる溝でもよいことは勿論である。
Furthermore, the adjustment grooves are not limited to the elongated holes 9d and 10d as closed spaces as shown in this embodiment, but at least one of them (normally, both the left and right end portions of the rail support device 6 in FIG. It is of course possible to use a simple groove with an open shape.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明によるレール支持装置が用いられた管路
の敷設現場を示す概略図、第2図は本発明によるレール
支持装置の一実施例を示す正面図、第3図はfs2図の
支持装置のI−I線による断面図、第4図は第3図のI
V−IV線による断面図、第5図は第2図における■矢
視図、第6図はレールの接続状態を示す斜視図、第7図
はレールの接続部分を示す正面図である。 5・・・・・・敷設管 5a・・・・・・係合手段(ボルト穴)5b・・・・・
・内周面 6・・・・・・レール支持装置 7a・・・・・レールの支持手段(支持溝)9.10・
・・・・・調整部 9d、10d・・・・・・調整溝(長大)11・・・・
・・レール 出願人 三井建設株式 %式% 第5図
Fig. 1 is a schematic diagram showing a pipeline installation site using the rail support device according to the present invention, Fig. 2 is a front view showing an embodiment of the rail support device according to the present invention, and Fig. 3 is a diagram of the fs2 diagram. A sectional view taken along line I-I of the support device, FIG. 4 is I in FIG. 3.
5 is a sectional view taken along the line V-IV, FIG. 5 is a view taken in the direction of the ■ arrow in FIG. 2, FIG. 6 is a perspective view showing the connected state of the rails, and FIG. 7 is a front view showing the connected portion of the rails. 5... Laying pipe 5a... Engaging means (bolt hole) 5b...
・Inner peripheral surface 6...Rail support device 7a...Rail support means (support groove) 9.10.
...Adjustment parts 9d, 10d...Adjustment groove (long) 11...
...Rail applicant Mitsui Construction stock percentage formula% Figure 5

Claims (1)

【特許請求の範囲】[Claims] 内周面に複数の係合手段が設けられた敷設管に前記係合
手段を介して取り付は支持されるレール支持装置におい
て、レールを支持し得るレールの支持手段を設け、該支
持手段に、前記敷設管に設けられた係合手段と係合し得
る調整溝を、敷設管の内周に沿った形で形成した調整部
を設け、前記調整部を介して前記支持手段を敷設管の内
周面に沿って移動し得るようにして構成したレール支持
装置。
In a rail support device that is installed and supported via the engagement means on a laying pipe having a plurality of engagement means on the inner peripheral surface, a rail support means capable of supporting the rail is provided, and the support means is provided with a rail support means capable of supporting the rail. , an adjustment part is provided in which an adjustment groove that can be engaged with an engagement means provided on the laying pipe is formed along the inner circumference of the laying pipe, and the supporting means is connected to the laying pipe via the adjustment part. A rail support device configured to be movable along an inner peripheral surface.
JP7822484A 1984-04-18 1984-04-18 Rail supporter Granted JPS60222679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7822484A JPS60222679A (en) 1984-04-18 1984-04-18 Rail supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7822484A JPS60222679A (en) 1984-04-18 1984-04-18 Rail supporter

Publications (2)

Publication Number Publication Date
JPS60222679A true JPS60222679A (en) 1985-11-07
JPH0155833B2 JPH0155833B2 (en) 1989-11-27

Family

ID=13656077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7822484A Granted JPS60222679A (en) 1984-04-18 1984-04-18 Rail supporter

Country Status (1)

Country Link
JP (1) JPS60222679A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010007734A (en) * 2008-06-25 2010-01-14 Chugoku Electric Power Co Inc:The Positioning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010007734A (en) * 2008-06-25 2010-01-14 Chugoku Electric Power Co Inc:The Positioning device

Also Published As

Publication number Publication date
JPH0155833B2 (en) 1989-11-27

Similar Documents

Publication Publication Date Title
US6158475A (en) Underground pipe support
US1906209A (en) Pipe support
JP2001323797A (en) Tunnel lining reinforcing structure using segment with non-uniform section, and method for constructing the same
US6508441B1 (en) Sway brace
JPS60222679A (en) Rail supporter
CN210240778U (en) Supporting device for installing drainage pipeline
ATE38259T1 (en) CONNECTING AND PRESSURE DISTRIBUTION ELEMENT FOR CONCRETE COMPONENTS.
JPH0363609B2 (en)
JP2020106044A (en) Transport device of main pipe into sheath pipe
JPH0155834B2 (en)
US8613567B2 (en) Clip and method for joining steel ribs used as tunnel liner supports
KR102232018B1 (en) Railroad rebuilding kit to construct double track railway for railbike
JP4744258B2 (en) Assembling movable bracket kit
JPH09329000A (en) Rail placing technique
CN214116695U (en) Modular prefabricated electric power communication water supply combined channel
JP6944030B1 (en) Rack-support pile connection structure, trough track, fixed connection fitting, variable angle connection fitting and support pile
SU1076685A1 (en) Method of assembling pipe-line of pipe-inside-pipe type
CN212183080U (en) Supporting frame for pipeline arrangement
CN217607405U (en) Combined pre-installed cable duct bank
JPS6343514A (en) Conduit branching joint
CN114294477B (en) Assembled carrier roller assembly
RU2336385C1 (en) Rail joint of ln burkov design
JP6858386B1 (en) Deformation prevention device for rehabilitation pipes and rehabilitation methods for existing pipes
CN215515674U (en) A supplementary mounting structure for gas pipeline lays
JP2001021063A (en) Method for inserting pipe body into sheath pipe