JPS60184129A - Method of driving foundation pile for latticed wall - Google Patents

Method of driving foundation pile for latticed wall

Info

Publication number
JPS60184129A
JPS60184129A JP3906684A JP3906684A JPS60184129A JP S60184129 A JPS60184129 A JP S60184129A JP 3906684 A JP3906684 A JP 3906684A JP 3906684 A JP3906684 A JP 3906684A JP S60184129 A JPS60184129 A JP S60184129A
Authority
JP
Japan
Prior art keywords
foundation
piles
foundation piles
wall
lattice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3906684A
Other languages
Japanese (ja)
Other versions
JPH0328532B2 (en
Inventor
Takashi Takeshita
竹下 隆司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON S II C KK
Original Assignee
NIPPON S II C KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON S II C KK filed Critical NIPPON S II C KK
Priority to JP3906684A priority Critical patent/JPS60184129A/en
Publication of JPS60184129A publication Critical patent/JPS60184129A/en
Publication of JPH0328532B2 publication Critical patent/JPH0328532B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

PURPOSE:To construct the foundation which is excellent in a support force and an earthquake resistant force, by a method wherein foundation piles, which are continuously connected with each other, are simultaneously driven by means of a 3-shaft agitating rod by the use of an improved hardener, the foundation piles are continuously connected in a lattice shape, and intersection parts and corner parts are filled with a core body. CONSTITUTION:By means of a 3-shaft rod 9 having agitating vanes 12 and injection holes 13, which is located at the lower end of a driving machine 7 having a 3-shaft swivel 8, triplex foundation piles 2 are simultaneously driven in a ground, where foundation is intended to be constructed, by the use of an improved hardener. The foundation piles 2 are continuously driven, in order, to construct a latticed wall 6, and the intersection parts and corner parts of the foundation piles 2 are filled with a core body 3, such as steel pipes, and are cured to construct a foundation. This enables a total foundation to be integrally constructed, and enables provision of the foundation which is high in a supporting strength, earthquake resistant force, and horizontality.

Description

【発明の詳細な説明】 この発明は各種の建築物の基礎を地盤中に改良硬化剤を
以って造成する連続基礎杭によって構成する格子状壁の
基礎杭施工方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing foundation piles for lattice-like walls, which are constructed by continuous foundation piles, which are constructed using an improved hardening agent in the ground for the foundations of various buildings.

一般にこの種の建築物の造成杭による基礎施工方法は、
基礎とする全面積を順次改良造成して全体に基礎杭を構
成するものでは、全面積を平均に造成するため多くの施
工回数と時間とが係る欠点と、また、硬化剤等が多量に
必要となり高価となる等の欠点がある。また、基礎杭を
造成するのに一本づつ施工機械を以って順次造成するも
のでは−その造成された基礎杭に対する横方向の水平力
が大変に弱体化すると一共K、技術的に確実でないと云
う欠点がある。
Generally, the foundation construction method using prepared piles for this type of building is as follows:
The method of constructing foundation piles by sequentially improving the entire area of the foundation has the disadvantage that it requires many construction times and time because the entire area is created evenly, and a large amount of hardening agent, etc. is required. It has drawbacks such as being expensive. In addition, if the foundation piles are constructed one by one using a construction machine, the horizontal force in the lateral direction against the created foundation piles will be greatly weakened, which is technically not reliable. There is a drawback.

この発明は、このような従来の問題点を解決するための
ものであって、その主たる要旨とする所は、基礎を構成
する地盤中に3軸のスーイペル装置を有する施工機械の
下端に位置する攪拌翼及び噴射孔を設けた3軸の攪拌ロ
ッドを以って3連の改良硬化剤による基礎杭を連接して
同時に造成する。また、造成された基礎杭を順次格子状
壁に連続施工する。前記格子状壁に施工された基礎杭の
交差部分又は角隅部分の内部に各種の鋼管等の芯体を充
挿硬化して基礎を造成するものである。
This invention is intended to solve such conventional problems, and its main gist is that the construction machine has a three-axis suipel device located at the lower end of the ground constituting the foundation. Using a triaxial stirring rod equipped with stirring blades and injection holes, three foundation piles made of improved hardener are connected and constructed simultaneously. In addition, the constructed foundation piles will be successively installed on the lattice wall. The foundation is constructed by filling and hardening core bodies such as various steel pipes inside the intersection parts or corner parts of the foundation piles constructed on the lattice-like wall.

従って、この発明によれば、地盤の改良固結剤を以って
複数以上の造成杭により基礎杭を連続施工するので、非
常に簡単敏速に基礎全体を一体化でき、鉛直力と水平力
に対して耐力を増大せしめる効果と、従来の如く単数の
基礎杭を順次連接して造成するものと比較すると、横方
向の水平力が著しく強靭化されると共に、基礎の全面積
を造成するものより遥かに使用材料が節減でき経済的で
ある効果がある。また、交差部分及び角隅部分に芯体を
挿入硬化するため−大きな鉛直支持力や水平耐力を充分
に得ることができ構造物を充分に支持できる特性がある
Therefore, according to the present invention, the foundation piles are continuously constructed using a plurality of piles prepared using a soil improving solidifying agent, so that the entire foundation can be integrated very easily and quickly, and the vertical and horizontal forces can be easily and quickly constructed. However, compared to the conventional method of building a single foundation pile by sequentially connecting them, the horizontal force in the lateral direction is significantly strengthened, and compared to the method of building the entire area of the foundation. This has the effect of significantly reducing the amount of materials used and being economical. In addition, since the core is inserted and hardened at the intersections and corners, it is possible to obtain sufficient vertical support force and horizontal support force, which has the property of being able to sufficiently support the structure.

次に、この発明の実施例を図示によって説明すると、第
1図はこの発明施工方法により完成された基礎机上に建
築された建築物が載置された全体の斜面図を示すもので
、(りは、格子状壁に造成された基礎構造物で、この基
礎構造物(1)は、地盤中で改良硬化せしめる各種の固
結剤で混合攪拌して造成される多数の基礎杭(21(2
+・・・・・・を以って構成されている。この基礎杭(
21(21・・・・・・は、下記に述べる施工機械(7
)によって3連−組となって連続して造成され、これを
順次第2図及び第3図に示す如く、格子状の格子状壁(
6) (61(6)・・・・・・を以って順次造成され
るように構成される。この格子状壁(6) (61は、
交差部分又は角隅部分の基礎杭(2)の内部に固結剤の
硬化前に鋼管。
Next, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 shows a slope view of the entire building on which a building built on a foundation table completed by the construction method of the present invention is placed. is a foundation structure built on a lattice-like wall, and this foundation structure (1) consists of a large number of foundation piles (21 (2)
It is composed of +... This foundation pile (
21 (21...... is the construction machine (7) described below.
), and as shown in Figures 2 and 3, lattice-like lattice walls (
6) (61 (6)...) This lattice wall (6) (61 is
Steel pipes inside the foundation piles (2) at intersections or corners before hardening of the cement.

H鋼等の各種断面形状を有する芯体(31Ta2を挿入
硬化せしめである。そして、該格子状壁(61(61・
・・・・・とを以って格子状の内部に方形状の空間部(
4)((転)を形成するものである。(5)は−該基礎
構造物(1)の上部に構築され、\各種の建築物を示す
ものである。次に、前記施工機械(7)には上部に3連
式の3軸スイベル装置(8)を位置せしめ、その3@ス
イベル装置(8)の下端には3本のロッド(9) (9
1(9)を連結せしめである。前記ロッド(91(91
(91の下端にはアースオーガーマシンaαを設けると
共に−その下端に3連の攪拌ロッドαn (111(1
1)をレジューサ−等を介在し【昇降自在に連結せしめ
である。
A core body (31Ta2) having various cross-sectional shapes such as H steel is inserted and hardened.
・・・・・・A rectangular space inside the lattice (
4) ((trans)).(5) is constructed on top of the foundation structure (1) and represents various buildings.Next, the construction machine (7) ) has a 3-shaft swivel device (8) located at the top, and three rods (9) at the bottom end of the 3@swivel device (8).
1(9) are connected. The rod (91 (91
(At the lower end of 91, an earth auger machine aα is installed, and at the lower end there are three stirring rods αn (111 (1
1) are connected via a reducer or the like so that they can be raised and lowered.

前記攪拌ロッド初αυ(Lυには、各々外周に数個の攪
拌用の攪拌翼α々α3・・・・・・を装設すると共に、
略下方の所要位置に粉体等の硬化剤を注出する噴射孔(
13(11(1:Iを各々穿設せしめである。符号(1
1k”L。
Each of the stirring rods αυ (Lυ) is equipped with several stirring blades α, α3, etc. for stirring on the outer periphery, and
There is an injection hole (
13(11(1:I) are drilled in each. Code (1
1k”L.

施工する場所の地面を示したものである。This shows the ground where construction will be carried out.

この発明は上記した施工機械(7)を用いて施工するも
ので、基礎杭(2)を造成する場所に施工機械(7)を
設置し、一般的には第6図(イ)乃至−図に示す如く、
3軸スイベル装置(8)とアースオーガーマシンαGの
駆動回転作動により、それに並列サレf、−3連ノ攪拌
c−:)’ l’a11(lnallカflll’FX
(laaaaa、と共に、掘進混合攪拌且つ硬化剤を圧
力空気と共に噴射孔<13 (l罎より噴射したり、又
は噴射しないで所定深度まで均一に混合しながら降下貫
入し、第6図(9図の如く引抜混合攪拌して引上げる。
In this invention, construction is carried out using the above-mentioned construction machine (7), and the construction machine (7) is installed at the place where the foundation pile (2) is to be created, and generally, the construction machine (7) is installed in the place where the foundation pile (2) is to be created. As shown in
By the driving rotation operation of the 3-axis swivel device (8) and the earth auger machine αG, parallel rotation f, -3 continuous stirring c-:)'l'a11(lnallka full'FX)
(along with laaaaaa, the hardening agent is injected from the injection hole <13 (l) with pressurized air, or the curing agent is not injected and is penetrated down to a predetermined depth while uniformly mixing, as shown in Fig. 6 (Fig. 9). Mix, stir and pull out.

また、この引抜き行程の時のみに硬化剤を圧力空気と共
に噴射しながら造成される基礎杭(2)施工する時もあ
る。また、第6図に)図、(ホ)図の如く再度掘進混合
したり、再度引抜き混合したりして、第2図、第3図に
示す如く適宜忙基礎杭(21(2+ (21を一回の昇
降混合作業により3連連結して一体的に造成する。 。
In addition, there are times when the foundation pile (2) is constructed while injecting a hardening agent together with pressurized air only during this pulling process. In addition, as shown in Figure 6) and (E), by digging and mixing again, or by pulling out and mixing again, as shown in Figures 2 and 3, the foundation pile (21 (2 + (21) By one lifting and lowering mixing operation, three units are connected and created as one.

この3連一体に造成された各基礎杭(2)・旧・・を順
次格子状になるように連結して格子状壁(6)を形成す
る。その格子状壁(6)と連接する格子状壁(6)との
予め設定された交差部分又は角隅部分の基礎杭(2)の
硬化剤の硬化以前に鋼管等の芯体(3)(3)を各々挿
入埋没して固化せしめ、建築物(5)の柱又は壁部分α
4が該芯体(3) (3)が埋め込まれている部分で受
載されるものである。
The foundation piles (2), old, and so on built in three series are successively connected in a grid pattern to form a grid wall (6). Before the curing agent of the foundation pile (2) at the preset intersection or corner portion of the lattice wall (6) and the connected lattice wall (6) is hardened, the core body (3) such as a steel pipe ( 3) are respectively inserted and buried and solidified to form the column or wall portion α of the building (5).
4 is the part where the core body (3) (3) is embedded and is received.

上述の如(この発明による地中に改良硬化剤を以って格
子状壁の基礎杭施工方法によると。
As described above (according to the method of constructing foundation piles for lattice walls using an improved hardening agent in the ground according to the present invention).

固化された基礎杭が格子状な連続壁を以って基礎全体を
一体化した構造とするため、支持力、鉛直力及び水平力
に対して耐力を著しく増大させる効果と、技術的に確実
で、大変に経済的°な基礎構造を得る事ができる。また
、この発明は従来の単数づ〜に造成する基礎杭の如く、
その水平力の弱さに対する心配がなく、充分に強靭化さ
れると共に、基礎の全面積を造成□するものより地盤の
改良率が低いので施工費が著しく低減となり大変に経済
的となる効果がある。
Because the solidified foundation piles form a structure that integrates the entire foundation with continuous walls in the form of a lattice, it has the effect of significantly increasing bearing capacity, vertical force, and horizontal force, and is technically reliable. , a very economical basic structure can be obtained. In addition, this invention is similar to the conventional foundation pile that is constructed in single units.
There is no need to worry about the weakness of the horizontal force, the foundation is made sufficiently strong, and the improvement rate of the ground is lower than when building the entire area of the foundation, so construction costs are significantly reduced, making it extremely economical. be.

更K、この発明によれば、攪拌翼及び噴射孔を各々設け
た3軸の攪拌ロッドを以って水平に連続した基礎杭を同
時に造成するため、施工能力が著しく能力的であると共
に、隣接する基礎杭が重複造成されるため充分の強度と
、止水性とを発輝できる効果がある。そして、造成され
た各格子状壁と格子状壁との交差部分及び角隅部分等に
管鋼等の芯体を充挿硬化せしめたことKより、建築物に
対する更に大きな鉛直支持力や水平耐力を充分に達成で
きると云う実利的な効果がある。
Furthermore, according to this invention, horizontally continuous foundation piles are created simultaneously using a three-axis stirring rod each having a stirring blade and an injection hole, so the construction capacity is extremely high, and the construction capacity is extremely high. Because the foundation piles are built in duplicate, they have sufficient strength and water-stopping properties. By filling and hardening core bodies such as tubular steel at the intersections and corners of each lattice-shaped wall, the building has even greater vertical and horizontal bearing capacity. It has the practical effect of being able to fully achieve the following.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の格子状壁の基礎杭施工方法による基
礎杭上に構造物を載置された状態の一部欠除した斜面図
、第2図は格子状壁の造成状態の斜面図、第3図は同じ
く横断平面図、第4図は第1図の要部の欠除した一部拡
大斜面図、第5図はこの方法に使用する施工機械の正面
図、第6図←)乃至(ホ)はこの発明の施工工程の順次
示した地中継面図である、符号(1)は基礎構造物。 (2)は基礎杭、(3)は芯体、(4)は空間部、(6
)は格子状壁、(7)は施工機械、(8)t23軸スイ
ベル装置。 (9)はロッド、α0はアースオーガーマシン、(il
l Gt攪拌ロッド、(13G’!噴射孔である。 第1図 第2図 第3図 第4図 第5図
Fig. 1 is a partially cut-out slope view of a structure placed on a foundation pile using the foundation pile construction method for a lattice-like wall according to the present invention, and Fig. 2 is a slope view of the lattice-like wall in its construction state. , Figure 3 is a cross-sectional plan view, Figure 4 is a partially enlarged slope view with important parts of Figure 1 removed, Figure 5 is a front view of the construction machine used in this method, Figure 6 ←) 7(E) are ground plan views sequentially showing the construction process of the present invention, and the reference numeral (1) indicates the foundation structure. (2) is the foundation pile, (3) is the core, (4) is the space, (6
) is a lattice wall, (7) is a construction machine, and (8) is a t23-axis swivel device. (9) is the rod, α0 is the earth auger machine, (il
l Gt stirring rod, (13G'! injection hole. Figure 1 Figure 2 Figure 3 Figure 4 Figure 5

Claims (1)

【特許請求の範囲】[Claims] 地盤中に改良硬化剤を混合攪拌して連接する基礎杭を連
続造成する格子状壁の基礎杭施工方法に於いて、前記基
礎杭は3軸スイベル装置を有する施工機械の下端に位置
する攪拌翼及び噴射孔を設けた3連の攪拌ロッドを以っ
て水平方向の3連の基礎杭を同時に造成し、前記3連の
基礎杭を順次方形状の空間部を設けて格子状壁に連続施
工し、その格子状壁の交差部分又は角隅部分に位置する
基礎杭の硬化前の内部に鋼管等の芯体を充挿硬化するこ
とを特徴とする格子状壁の基礎杭施工方法。
In a foundation pile construction method for a lattice wall in which connected foundation piles are continuously created by mixing and stirring an improved hardening agent in the ground, the foundation piles are constructed using a stirring blade located at the lower end of a construction machine having a three-axis swivel device. Three sets of foundation piles in the horizontal direction are created simultaneously using three stirring rods equipped with injection holes, and the three sets of foundation piles are sequentially constructed in a grid-like wall with rectangular spaces. A method for constructing a foundation pile for a lattice-like wall, which comprises filling and hardening a core such as a steel pipe into the unhardened interior of the foundation pile located at the intersection or corner portion of the lattice-like wall.
JP3906684A 1984-02-29 1984-02-29 Method of driving foundation pile for latticed wall Granted JPS60184129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3906684A JPS60184129A (en) 1984-02-29 1984-02-29 Method of driving foundation pile for latticed wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3906684A JPS60184129A (en) 1984-02-29 1984-02-29 Method of driving foundation pile for latticed wall

Publications (2)

Publication Number Publication Date
JPS60184129A true JPS60184129A (en) 1985-09-19
JPH0328532B2 JPH0328532B2 (en) 1991-04-19

Family

ID=12542752

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3906684A Granted JPS60184129A (en) 1984-02-29 1984-02-29 Method of driving foundation pile for latticed wall

Country Status (1)

Country Link
JP (1) JPS60184129A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4750816A (en) * 1985-05-01 1988-06-14 Toyoda Gosei Co., Ltd. Electrochromic element comprising an organic, oxidative color-forming layer and an inorganic, reductive color-forming layer
JPH0559719A (en) * 1991-09-02 1993-03-09 Tenotsukusu:Kk Constructing method for combined foundation with ground solidification
CN111810712A (en) * 2020-07-17 2020-10-23 中铁十二局集团有限公司 Push pipe starting construction method for bent pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4750816A (en) * 1985-05-01 1988-06-14 Toyoda Gosei Co., Ltd. Electrochromic element comprising an organic, oxidative color-forming layer and an inorganic, reductive color-forming layer
JPH0559719A (en) * 1991-09-02 1993-03-09 Tenotsukusu:Kk Constructing method for combined foundation with ground solidification
CN111810712A (en) * 2020-07-17 2020-10-23 中铁十二局集团有限公司 Push pipe starting construction method for bent pipeline

Also Published As

Publication number Publication date
JPH0328532B2 (en) 1991-04-19

Similar Documents

Publication Publication Date Title
US4911583A (en) Structure and method for shoring a face of an excavation
CN108035360B (en) A method of for pattern foundation pit supporting structure
JP2596798B2 (en) Existing building seismic isolation method
US5806262A (en) Post and method of emplacing a post
US4232491A (en) Swimming pool deck
JPS60184129A (en) Method of driving foundation pile for latticed wall
JPS615125A (en) Foundation of building
JP3129676B2 (en) Piling columns in building structures using piles as pillars
JP2003147782A (en) Foundation structure for constructing new building on existing basement and its construction method
US5234288A (en) Integrated column and pile
JPH0274715A (en) Construction method of self-standing retaining wall
JPH1060879A (en) Building foundation and construction method thereof
JP2000345554A (en) Ground improvement method
CN210315573U (en) Foundation excavation collapse prevention supporting structure is built in room
CN212427117U (en) Foundation ditch stagnant water supporting construction
JPH04115024A (en) Sheathing method
JPS62178620A (en) Formation of improved angular ground
JPH0336318A (en) Method of construction for stopping natural ground
JPH0387416A (en) Land slide protection works for weak ground
JPS6290445A (en) Block for foundation and its manufacture
SU903485A1 (en) Method of constructing foundation for a tank
JPH0238627A (en) Rebuilding of existing building
JP2000178972A (en) Positioning construction method for permanent structural column
JPH02266016A (en) Structural process of underground concrete body of building
JPS6272817A (en) Construction of retaining wall concurrently serving as sheathing

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term