JPS60184113A - Bracing method for extension pier - Google Patents
Bracing method for extension pierInfo
- Publication number
- JPS60184113A JPS60184113A JP3927084A JP3927084A JPS60184113A JP S60184113 A JPS60184113 A JP S60184113A JP 3927084 A JP3927084 A JP 3927084A JP 3927084 A JP3927084 A JP 3927084A JP S60184113 A JPS60184113 A JP S60184113A
- Authority
- JP
- Japan
- Prior art keywords
- chain
- buckle
- place
- turn
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 238000010276 construction Methods 0.000 claims description 8
- 238000009412 basement excavation Methods 0.000 abstract 2
- 230000001105 regulatory effect Effects 0.000 abstract 2
- 239000002184 metal Substances 0.000 abstract 1
- 239000000463 material Substances 0.000 description 5
- 238000004904 shortening Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Description
【発明の詳細な説明】 この発明は、乗り入れ桟橋用プレース工法に係わる。[Detailed description of the invention] The present invention relates to a place construction method for a boarding pier.
従来の乗り入れ桟橋プレースは、アングル刊。The conventional pier place is published by Angle.
チャンネル材あるいは丸鋼を使用している。 これらの
鋼材は、単位重量が大きいこと、取イ」が溶接作業が多
いこと、そのために作業足場を設けなければならないな
どの問題点がある。 また、根切り山止め工事の進行に
伴ない、切梁材等が複雑に絡み合い、盛り替えが生じた
場合には、プレースの切断、取付直しをせざるをえなく
なり、作業の手間2時間が多くかかっている。Channel material or round steel is used. These steel materials have problems such as a large unit weight, a large amount of welding work required, and the need to provide work scaffolding for this purpose. In addition, as the root-cutting and mountain-stopping work progresses, the strut beams, etc. become intertwined in a complicated manner, and if rearranging occurs, the place must be cut and reattached, which takes two hours and a lot of work. It costs a lot.
地下躯体作業時にも同様なことが起っている。The same thing happens when working on underground structures.
本発明は、主に叙上の実情に鑑みなされたもので、その
要旨とするところは、下端部にターンバックル機構付の
取付金具を有する高強度チェーンを乗り入れ桟橋の鉄骨
柱の上、下に配設の取付プレート間にプレース状に架設
し、該ターンバックルの操作にて該チェーンプレースの
長さ調整と締め付けとを同時に行なうとして前記従来工
法に於ける難点を全く解消するとした点にある。The present invention was made mainly in view of the above-mentioned circumstances, and its gist is that a high-strength chain having a mounting bracket with a turnbuckle mechanism at the lower end is attached to the top and bottom of the steel columns of the pier. The chain is installed in the form of a place between the installed mounting plates, and the length adjustment and tightening of the chain place are performed at the same time by operating the turnbuckle, thereby completely eliminating the difficulties in the conventional construction method.
以下、これを図にもとづいて詳細に説明する。This will be explained in detail below based on the drawings.
即ち、第1図a −eは本発明工法にて完成された乗り
入れ桟橋の全体図、各要部詳示図で、図中1は乗り入れ
桟橋柱としての鉄骨、2は鉄骨柱に所定間隔をもって配
設の取付プレート、3は該取付プレート2間にプレース
状に架設の高強度チェーン、4は覆板を夫々示し、b
w e図の詳示図にあって5は高強度チェーン3にテン
ションを導入するために介装されるターンバックル、6
はシャソクルを夫々示す。That is, Figures 1a to 1e are overall views and detailed views of each main part of the access pier completed using the construction method of the present invention. 3 indicates a high-strength chain installed in a place between the mounting plates 2, 4 indicates a cover plate, and b
In the detailed view of Fig. w, 5 indicates a turnbuckle inserted to introduce tension into the high-strength chain 3;
indicate the respective chassocles.
高強度チェーン3はその上端のフック3゛を鉄骨1の上
部に配設の取付プレート2の穿孔に引っ掛けることで鉄
骨1の柱に取り付き、その下端を対峙鉄骨の下部に配設
の取付プレート2に対して組み付けている。The high-strength chain 3 is attached to the column of the steel frame 1 by hooking the hook 3' at its upper end into the hole in the mounting plate 2 disposed on the top of the steel frame 1, and attaches its lower end to the mounting plate 2 disposed at the bottom of the opposing steel frame. It is assembled against.
高強度チェーン3の下端にはターンバックル機構付の取
付金具(ターンバックル5とシャックル6と後述のショ
ートニング)が長さ調整ショートニング8を介して組み
付くが、この取41金具のみを予じめ該取付プレート2
側に組み付けておくとしてもよい。A mounting bracket with a turnbuckle mechanism (turnbuckle 5, shackle 6, and shortening to be described later) is attached to the lower end of the high-strength chain 3 via a length adjustment shortening 8, but only this bracket 41 is attached in advance. Mounting plate 2
It may be attached to the side.
該長さ調整ショートニング8で大まかな長さの調整を行
ない、ターンバックル5の操作で締め付け(所定のテン
ション付与)を行なう。The length adjustment shortening 8 is used to roughly adjust the length, and the turnbuckle 5 is operated to tighten (apply a predetermined tension).
次に、上述のプレース工法を第2図の工程手順図にもと
づいて説明する。Next, the above-mentioned place construction method will be explained based on the process flowchart shown in FIG.
先ず、最上段の取付プレート2を鉄骨1に配設し、これ
にチェーン3をフック3’fJIけにて取り付ける。First, the uppermost mounting plate 2 is placed on the steel frame 1, and the chain 3 is attached to it using the hook 3'fJI.
吊下のチェーン3は、li用のベール缶9に収納してお
(。 (イ図)
根切りの進行に伴いチェーン3を伸ばして、ベール缶9
を根切り底に置く。所定の位置まで根切った段階でチェ
ーン3を点線から実線位置へ動かし、その下端を取付プ
レート2に取付ける。(四回)
以下、これを繰り返す。(ハ図)
上述の本発明工法によるならば、以下列記の如き諸特徴
が奏されることとなる。The hanging chain 3 is stored in the bale can 9 for li.
Cut the root and place it at the bottom. When the chain 3 is cut to a predetermined position, the chain 3 is moved from the dotted line to the solid line position and its lower end is attached to the mounting plate 2. (4 times) Repeat this from now on. (Figure C) According to the construction method of the present invention described above, various features as listed below will be exhibited.
(1)従来のアングル材、チャンネル材あるいは丸鋼と
異り取付用足場の架設を要するような溶接作業が全く無
く、取付作業の簡単さ、足場の不要というメリットがあ
る。(1) Unlike conventional angle materials, channel materials, or round steel, there is no welding work required to erect a scaffold for installation, and there are advantages in that the installation work is simple and no scaffolding is required.
(2)溶接したものは切断で寸足らずとなり転用が困難
であるが、チェーンであるので脱掛して転用が出来、資
材経費上比較にならぬほどに有利となる。(2) Welded items are difficult to repurpose because they are too small to cut, but since they are chains, they can be taken off and repurposed, which is incomparably advantageous in terms of material costs.
(3)溶接、揚重が無(作業性が極めて良い。(3) No welding or lifting required (workability is extremely good).
(4ン盛替えが容易に出来る。(You can easily change the 4-inch container.
第1図a −eは本発明工法にて完成された乗り入れ桟
イ喬の全体図、各要部詳示図、第2図イ〜ハは本発明工
法の工程手順説明図である。
■・・・鉄骨、2・・・取付プレート、3・・・高強度
チェーン、4・・・m板、5・・・ターンバックル、6
・・・シャンクル、8・・・長さ調整ショートニング、
9・・・ベール缶
ンツ/4の
q。
ンツン7の
す、 C。
りτへど乞
イ。Figures 1a to 1e are general views and detailed views of each main part of a boarding pier completed using the construction method of the present invention, and Figures 2a to 2c are diagrams illustrating the process steps of the construction method of the present invention. ■...Steel frame, 2...Mounting plate, 3...High strength chain, 4...M plate, 5...Turnbuckle, 6
... Shankle, 8... Length adjustment shortening,
9...Bale cans/4 q. Ntsun7nosu, C. I'm begging you.
Claims (1)
度チェーンを乗り入れ桟橋の鉄骨柱の上。 下に配設の取付プレート間にプレース状に架設し、該タ
ーンバックルの操作にて該チェーンプレースの長さ調整
と締め付けとを同時に行なうとしてなることを特徴とす
る乗り入れ桟橋用プレース工法。[Claims] A high-strength chain having a mounting bracket with a turnbuckle mechanism at the lower end is mounted on a steel column of a pier. A place construction method for a boarding pier, characterized in that the chain place is installed in a place shape between mounting plates disposed below, and the length adjustment and tightening of the chain place are performed simultaneously by operating the turnbuckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3927084A JPS60184113A (en) | 1984-03-01 | 1984-03-01 | Bracing method for extension pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3927084A JPS60184113A (en) | 1984-03-01 | 1984-03-01 | Bracing method for extension pier |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS60184113A true JPS60184113A (en) | 1985-09-19 |
JPH0141766B2 JPH0141766B2 (en) | 1989-09-07 |
Family
ID=12548450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3927084A Granted JPS60184113A (en) | 1984-03-01 | 1984-03-01 | Bracing method for extension pier |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS60184113A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02136411A (en) * | 1988-11-16 | 1990-05-25 | Maeda Corp | Construction method of structure subject to transverse external force |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5544207A (en) * | 1978-09-13 | 1980-03-28 | Hosiden Electronics Co Ltd | Manufacture for electret michrophone |
-
1984
- 1984-03-01 JP JP3927084A patent/JPS60184113A/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5544207A (en) * | 1978-09-13 | 1980-03-28 | Hosiden Electronics Co Ltd | Manufacture for electret michrophone |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02136411A (en) * | 1988-11-16 | 1990-05-25 | Maeda Corp | Construction method of structure subject to transverse external force |
Also Published As
Publication number | Publication date |
---|---|
JPH0141766B2 (en) | 1989-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2965408A (en) | Apparatus for mounting purlins on a roof under structure | |
DK142946B (en) | BUILDING CRANE FOR BUILDING FORM WITH A CONCRETE SPREADER MASTER | |
CN207469103U (en) | A kind of building bridge pier anchor ear and its escape way steel pipe frame structure | |
CN108222062B (en) | A kind of underground pipe gallery framework of steel reinforcement temporary fixing rack and longitude and latitude binding method | |
WO2020098394A1 (en) | Gob-side entry confined concrete supporting construction device and mechanized construction method | |
US6695528B2 (en) | Method for constructing structures useful as scaffolds on slopes | |
JPS60184113A (en) | Bracing method for extension pier | |
US4145024A (en) | Form for reinforced concrete wall | |
JP3158383U (en) | Body reinforcement assembly jig | |
CN211036680U (en) | Bracket for high pier variable-height curve continuous steel truss girder main pier | |
JPH01190883A (en) | Lift up or down method | |
CN212715845U (en) | Well cementation ash can platform with protective structure | |
CN217054226U (en) | Manual hole digging pile operating platform | |
CN215714679U (en) | Steel purlin arched bridge side span unstressed construction equipment | |
CN218667143U (en) | Bridge pier column reinforcing bar installation auxiliary stand | |
KR0135678B1 (en) | Method for installing safety nets on steel structure | |
CN216839545U (en) | Roofing hangs basic support | |
JPH03194093A (en) | Elevating step for erecting steel frame | |
CN211621238U (en) | Bridge pier stud turns over mould construction reinforcing bar operation safety protection cage | |
JP3243539B2 (en) | Equipment for setting up piles | |
KR900008874B1 (en) | Scaffolding board and method for placing scaffolding board | |
JPH07216829A (en) | Falling stone guiding fence | |
JPH0348967Y2 (en) | ||
CN109577203A (en) | Column piers and abutments pile extension reinforcing bar is without bracket and construction method | |
JP2669305B2 (en) | Structure using covered steel tube concrete columns |