JPS60139993A - Lead-out system of resin for repair and pig in case of repair execution of existing pipe - Google Patents

Lead-out system of resin for repair and pig in case of repair execution of existing pipe

Info

Publication number
JPS60139993A
JPS60139993A JP58246624A JP24662483A JPS60139993A JP S60139993 A JPS60139993 A JP S60139993A JP 58246624 A JP58246624 A JP 58246624A JP 24662483 A JP24662483 A JP 24662483A JP S60139993 A JPS60139993 A JP S60139993A
Authority
JP
Japan
Prior art keywords
pipe
resin
repair
vig
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP58246624A
Other languages
Japanese (ja)
Other versions
JPH0155840B2 (en
Inventor
林 光俊
功 斉藤
宣勝 池
大沢 敏彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Hakko Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Hakko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd, Hakko Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP58246624A priority Critical patent/JPS60139993A/en
Publication of JPS60139993A publication Critical patent/JPS60139993A/en
Publication of JPH0155840B2 publication Critical patent/JPH0155840B2/ja
Granted legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】[Detailed description of the invention] 【産業上の利用分野] 本発明は、地下に配管された既設管の補修施工時において、補修のため既設管の管内に導入された樹脂および樹脂搬送用ビグを、補修完了後、管内から取出す補修用樹脂およびビグの導出方式に関するものである。 【発明の技術的課題】[Industrial application field] The present invention is directed to the derivation of repair resin and resin conveying resin introduced into the pipe of the existing pipe for repair during the repair work of an existing underground pipe, and the resin and resin conveying resin introduced into the pipe for repair. It is related to the method. [Technical problem of the invention]

近時、地下に配管されたガス等の既設管、特に鋳鉄管を
水道型の管継手部材により良く接続して地下(道路下)
に配管1ノだ形態の既設管においては、その管継手部の
接合部が、配管」二を通行する車両の荷重や、地震、あ
るいは経(i等により接合状態が変化して、継手部に間
隙が生じたり、また継手部の構成祠(シール材)が劣化
して、漏洩の原因となるところから、その漏洩修即また
は予防保全の目的で、既設管の管継手部を埋設状態のま
ま管内面かIう補修J゛ることが考えられている。 この補修方式の一種として、地下に配管された既設管の
管内に、管内面に気密に接して摺動するビグを、そのピ
グの前側に樹脂を配した状態で導入し、ピグの牽引によ
り樹脂を管内に治って移動させて行(過程で、その樹脂
を、既設管に介在する複数の管継手部の間隙内に順に充
填する管継手部の補修方式が提案されているが、この補
修施工時において、所定区間の補修が完了すると、管内
に導入された樹脂の残留物および樹脂搬送用ピグを管端
から手際よく導出し得るJ:うにニT−大する必要があ
る。
Recently, existing underground gas pipes, especially cast iron pipes, have been better connected to water-type pipe fittings to connect them underground (under roads).
In the case of existing pipes with pipe 1, the joints of the pipe joints may be affected by the load of vehicles passing through the pipes, earthquakes, or changes in the joint state due to The joints of existing pipes should be left buried for the purpose of repairing leaks or preventive maintenance, as gaps may occur or the sealing material (sealing material) at the joints may deteriorate, causing leaks. One type of repair method is to repair the inner surface of the pipe by inserting a pipe into the pipe of an existing underground pipe, which slides in airtight contact with the inner surface of the pipe. The resin is introduced with resin placed on the front side, and the resin is cured and moved into the pipe by pulling the pig (in the process, the resin is sequentially filled into the gaps of multiple pipe joints in the existing pipe). A method for repairing pipe joints has been proposed, and during this repair work, once the repair of a predetermined section is completed, the resin residue introduced into the pipe and the resin transporting pig can be efficiently guided out from the pipe end. J: Sea urchin ni T-It is necessary to make a big deal.

【発明の目的] 本発明は、上k[の1題に基づき、所定区間の補修が完
了するど、牽引索の巻取りにより、ビグの取出し、残留
樹脂の排出が、集約的に能率よく行え施工工事の能率化
を図ることができると共に、ぞの導出部が、前述の管継
手部の補修方式を実施するに際して要求される既設管内
への圧力空気供給1段を貝鍋していて、作業性を^め得
るようにした導出方式を提供することにある。 【発明の構成] この目的のため、本発明は、補修しようとする対象の既
設管を、補修に際して、所定長さの補修単位に区切り、
イの分111tされた既設管の一方の出ロ側分1lll
t開ロ部を地上に開口する竪穴内に露出させ、該竪穴内
において上記分離開口部に地上へ向けて屈曲したビグ導
出管を着脱自在に連接し、該導出管に、残留樹脂の排出
口部と圧力空気の供給口部とを段Gノるど共に、牽引索
の引出口を有する蓋体をト記導出管の管端出口に着脱自
在にti着して、補修作業時は上記圧力空気供給口部か
らF!L段管内に対して樹脂の充填作用に要求される空
気圧を付加ぐき、補修完了時は蓋体を離脱づることで残
留樹脂の排出およびビグの取出しが牽引索の巻取りによ
りfjえるように構成してなることを特徴どJ−るもの
である。 【実 施 例】 以下、図面を参照して本発明の一実施例を具体的に説明
する。 第1図は、補修施]:装置の全体を概略的に示す図であ
って、その図中符号1は、地下に配管された補修対象の
既設管である。これは在来の配管方式により所定寸法の
vi鉄管を、水潰型の管継手部13により順に接続して
長く地下に配管されているものモある。なお、上記既設
管1の管継手部13は第7図に拡大して示されているよ
うに、例えば一方の管の管端に設けられた大1]径部1
3aに、他方の管端13b Ifi衝き合され、その衝
き合せ嵌合部に通常[廃航、1と称されるシールi14
が詰め込まれて開口部を鉛材15で封栓して□なる構造
のものであって、地下(道路下)に配管された既設管1
において□は、前述した理由から上記管継手部13の接
合状態が変化して間隙を生じたり、あるいはシール材1
4が劣化して漏洩の′原因と□なるところより、これの
補修の必要が生じ、ここに本発明では」−!管継平部1
3の間隙およびシール□材14中に樹脂を浸透。 充填きせてイのシーしし効果を高め得るJ:うに補修し
ようとするものである。 ゛ 本発明においては、−1−記の血□設管10′@継手部
13を補修するにあたり、既設管″1を、まず補修に適
する□長さく例えば100m)の単(:1. ’@補修
区間1に区切゛つて、イの一方の分離端11を地十に開
目した5− 竪穴へに、他方の分離端12を同じく地上に開口した竪
穴Bに、それぞれ露出させる。 −ヒ記一方の分離[11は、入口側としてその分離間1
1部に、先端を地上へ向けて屈曲した曲管状のピグ挿入
導管5が、クランプにより着脱自在に接続される。なお
、このビグ挿へ導管5には、第2図に拡大して示されて
いるように、@脂充填用口部5aと、それJ:り名干高
いレベル位置に空気排出用口部5bとが設けてあり、こ
れらの11部5a、5bにはそれぞれ開閉コック52.
53が設
[Objective of the Invention] Based on the above problem, the present invention is based on the above problem, and the present invention is based on the above problem, and it is possible to take out the vig and discharge the residual resin in an intensive and efficient manner by winding up the tow rope once the repair of a predetermined section is completed. Not only can construction work be made more efficient, but the outlet section also provides one stage of pressurized air supply into the existing pipes, which is required when carrying out the above-mentioned pipe joint repair method. The purpose of this invention is to provide a derivation method that allows for improved performance. [Structure of the Invention] For this purpose, the present invention divides an existing pipe to be repaired into repair units of a predetermined length,
111t for one exit side of the existing pipe
The T-opening part is exposed in a shaft opening above the ground, and a VIG lead-out pipe bent toward the ground is removably connected to the separation opening in the shaft, and a residual resin discharge port is provided in the lead-out pipe. and the pressure air supply port are removably attached to the end of the lead-out pipe, and the lid body with the tow cable outlet is attached to the outlet of the lead-out pipe to maintain the above pressure during repair work. F from the air supply port! The structure is such that the air pressure required for resin filling is applied to the inside of the L-tier pipe, and when the repair is completed, the lid can be removed to discharge the residual resin and take out the big by winding the tow cable. It is characterized by what it does. [Embodiment] Hereinafter, an embodiment of the present invention will be specifically described with reference to the drawings. FIG. 1 is a diagram schematically showing the entire apparatus for repair work, and reference numeral 1 in the figure indicates an existing pipe to be repaired that is installed underground. This is a conventional piping method in which VI iron pipes of a predetermined size are sequentially connected through water-collapse type pipe joints 13 and are piped underground for a long time. Note that, as shown in an enlarged view in FIG. 7, the pipe joint portion 13 of the existing pipe 1 is, for example, a large diameter portion 1 provided at the pipe end of one pipe.
3a, the other tube end 13b Ifi abuts, and the abutment fitting is provided with a seal i14, usually referred to as [Decommissioned, 1].
The existing pipe 1 is filled with water and the opening is sealed with lead material 15 to form a □, and the existing pipe 1 is installed underground (under the road).
In □, due to the above-mentioned reasons, the joint state of the pipe joint 13 changes and a gap is created, or the sealing material 1
4 deteriorates and becomes the cause of leakage, and it becomes necessary to repair it, and this is where the present invention takes place.''-! Pipe joint flat part 1
Infiltrate the resin into the gap 3 and the seal □ material 14. J: This is an attempt to repair sea urchins by filling the sea urchin.゛In the present invention, when repairing the blood □ installed pipe 10'@joint part 13 described in -1-, the existing pipe ``1'' is first repaired with a length of □, for example, 100 m, that is suitable for repair. Divide into repair section 1, and expose one separated end 11 of A to the 5-pit opened above the ground, and expose the other separated end 12 to the 5-pit opened to the ground, respectively. One of the separations [11 is between the separations 1 and 11 as the inlet side.
A curved pig insertion conduit 5 whose tip is bent toward the ground is detachably connected to one part by a clamp. In addition, as shown in an enlarged view in FIG. 2, this big insertion conduit 5 has a fat filling opening 5a and an air exhaust opening 5b located at a high level. These 11 parts 5a and 5b each have an opening/closing cock 52.
53 was established

【プられている。 上記樹脂充l 141口部5aは、ホース7aを介して
樹脂充填タン欠7と連通され、上記@4脂充填タンク7
への充填圧は、発電機7bの駆動により小型コンプレッ
号70から与えられるようにしである。 また、他/jの分1lIlifa12は、これを出口側
として本発明は、その分1IIIt開口部に、ピグの導
出管6を接@する。 このピグの導出管6は、管端が地−トに向くように屈曲
されでおり、またこの導出管6には、第3図に拡大して
示されているように斜め上方へ向く6− 部分に残留樹脂を排出する樹脂排出用[]部6aが設け
てあり、イこには開閉ロック61が設けられている。ま
た、上記樹脂排出用口部61J:り上方位置において、
上記導出管6には、ビグ2,3の進行り白菊側の既設管
1内に圧力空気を供給づるための空気供給口管6bが股
(プられており、この空気供給1]管6bは、圧力操作
]ニット10aを介してコンプレッサ10に連通されて
いる。J:た導出管6には、既設管1内から引出される
牽引索4を導出Jるガイドリール81を備えた蓋8が、
上記導出管6の開[1喘に、クランプ82によって着脱
可能に取付番)られている。 ト記蓋8は、第6図に示すようにガイドリール81をブ
ラウン1−83で支持した半割蓋8aと、残りの半割1
18bどの組合わUで構成され、牽引索4の引出口84
は、その両者の半割蓋8a、8bの合U箇所に設けられ
ている。なお蓋8は、外周に溝条8Cを具備しており、
導出管6の開目端に設けたカプラー85内に挿入されて
いて、クランプレバ−86を操作することで、カフ”ク
ー85内に設置プ4うれたカム87が上記溝条8Cに嵌
合して抜止めされている。 しか1ノで補修作業に際しては、前記一方のビグ挿入導
管5から、牽引索4を、既設管1の管内に通して他方の
ビグ導出管6から引ぎ出し、この牽引索4の先端をウィ
ンチ9のドラム9aにより巻取ることによって、牽引索
4に取付られた萌後一対のビグ2,3が、王の前側ビグ
2の前には低粘瓜樹脂Cを、後側ビグ3の前には継手部
シール用樹脂りを、イれぞれ配した状態で既設管1内に
導入され、イの管内を入目側から出口側に向(プて牽引
。 移動される。 なお上記前側ピグ2は、第4図に拡大して示されるよう
に円柱体の周辺にシール用のヒレを突出した構造のもの
r−、n+’J後にはクランプ付カラー28゜29を具
備し、また円柱中心部には牽引索4を挿通づる孔を有し
て前後に空気が流通可能で、上記カラー28.29を牽
引索4にクランプすることで前側ピグ2が牽引索4に固
定されている。 また、後側ビグ3は、第5図に示されるように樹脂IC
換機能を具@せる必要から、イの外周部には、進行方向
前側に向けて開通する樹脂導入用溝条11をビグの左右
外周壁位置に形成しており、また、これに平行するよう
にビグ3の胴部には、置換用溝条18が、ビグの上下外
周壁位置に形成されている。そして、これらの溝条17
.18は、進行方向の各後端壁が、後方に向けて斜めに
傾斜づるテーパ端壁17a 、 18aに形成されてあ
り、また、上記置換用溝条18は、ビグ内に埋設(〕た
例えばポリエチレンチコープなどの通路19を介して後
側ビグ3の後方に開通されている。 よってウィンチ9による牽引索4の巻取りにより、ビグ
2,3が牽引され、ビグ2,3の牽引で樹脂C,Dが既
設管1内を移動する時、前段の樹脂Cは、既設管1内の
塵埃および管lf=部13の空間にある塵埃を、その樹
脂自体の持つ粘着性で付着して取去る作用をする。 また、後側ビグ3が、管継手部13の位置に到達すると
(第7図参照)、その後側ビグ3の前側にある樹脂りは
、牽引移動中において既設管1の内壁との間の粘性抵抗
により樹脂自体に樹脂圧が生−〇− 起すること、また樹脂の進行方向前側の既設管1内に前
記圧力空気供給ロ部61)からの空気圧が作用し、この
空気圧が前側ピグ2の中心孔を通して樹脂りに作用して
いること、などより、これらの充填圧によって樹脂りは
、ビグ外周の溝条17を介して管継手部13の接合空間
へ流入される。一方、管継手部13の接合空間からは、
そこに滞留する空気が、上記充填圧を受(プることで他
方の溝条18を介して後方に自然に押(〕出される。か
くして樹脂りが管継手部13の衝き合せ間隙からシール
材14中に浸透、充填されて管継手部13のシール効果
が達成されるものCある。 【発明の作用】 上述のビグ2.3の牽引による樹脂C,Dの移動で補修
区間の既設管1に介在される多数の管継手部13の補修
が完了され、前側ピグ2が、[膜管1の終端よりビグ導
出管6内に到達すると、ここでウィンチ9の巻取りを一
時停止する。そしてクランプ82を外してH8を取外す
と共に、コツクロ1を開いて、先ず前側ピグ2の前にあ
る樹脂Cの残留10− 物を4i111H排出用ロ部排出ハロ排除する。 次いで、前側ビグ2の固定ボルト28a 、 28bを
緩めてカラー28の締付けを解除し、その前側ビグ2と
牽引索4との連着を解き、前側ビグ2を牽引索4に対し
てフリーにして、さらにウィンチ9で牽引索4を引くと
、前側ビグ2は移動せず、後側ピグ3のみが導出管6内
をせり上って(る。この時、後側ピグ3の前に残留する
樹脂りの残留物は樹脂排出用口部f、ahstら排出さ
れて容器41内に回収され、また後側ピグ3の移動によ
り前側ビグ2が押されて、前後のピグ2,3が導出管6
の管端用[1部より取出される。この場合、蓋8は図示
のように2つ割りになっているので、牽引索4がウィン
チ9に巻かれていても、前後のピグ2.3の取出しの邪
魔にはならない。 【発明の効果] かくて本発明にJ:れば、補修区間の既設管の補修が完
了するど、ウィンチの巻取りにより、残留樹脂の排出回
収と、ピグの取出しが、集約的に能率まく行なえるから
、補修完了時の終了作業が簡単、容易となり、直ちに次
の補修区間の補修に移ることができて、補修施工工事の
大幅な能率化を達成することができる。 また」二記ビグ導出管には、その管端用1]に牽引索の
引出口を有する蓋体が着脱自在に設けられて管端用[]
を開閉でき得るようにし、かつ、(のビグ導出管に、l
+I力空気の供給口部を備えて、既設管内への圧力空気
の供給を行え′るように(〕ているので、導出管が、r
R設膜管管継手部補修において必要とされる圧力空気の
供給機能を有し、この結束、補修施:[装置自体の構成
も簡略化され、また作業性を高めることができる等の効
果が併t!得られる。 なお、本発明の実施において、図示の実施例では、前側
ビグ2が導出管6内に引込まれるとウィングの操作を一
時停せさ「る必要があり、これをウィンチ操作者が認知
できるように、前側ビグ2J:り前方の牽引索4の適当
位置に、たとえば鉄片などの目印片を取付6jで、前側
ビグ2が導出管6の位置まで来たことを外部から確認で
きるようにするとよい。 また導出管6内にピグ2,3が導入されてくるとこれを
センサで検知してセイッチ・オンし、警報するような手
段を導出管6に装備して、前側ビグ2、さらkは後側ピ
グ3が導出管i内に入って来たことを報知するようにし
てもよい。
[It's being pulled. The mouth portion 5a of the resin filling tank 141 is communicated with the resin filling tank 7 via the hose 7a, and the resin filling tank 7 is connected to the resin filling tank 7 through the hose 7a.
The filling pressure is applied from the small compressor 70 by driving the generator 7b. Further, in the present invention, the outlet pipe 6 of the pig is connected to the opening of the other /j 11Ilifa 12 with this as the outlet side. The lead-out pipe 6 of this pig is bent so that the end of the pipe faces the ground, and the lead-out pipe 6 has a 6-shaped pipe 6 facing diagonally upward, as shown in an enlarged view in FIG. A resin discharging part 6a for discharging residual resin is provided at one part, and an opening/closing lock 61 is provided there. In addition, at the upper position of the resin discharge port 61J,
The outlet pipe 6 has an air supply port pipe 6b for supplying pressurized air into the existing pipe 1 on the forward white chrysanthemum side of the bigs 2 and 3. , pressure operation] The outlet pipe 6 is connected to the compressor 10 through the unit 10a.The outlet pipe 6 is equipped with a lid 8 equipped with a guide reel 81 for guiding the tow rope 4 pulled out from inside the existing pipe 1. ,
The outlet pipe 6 is opened and detachably attached by a clamp 82. As shown in FIG. 6, the lid 8 consists of a half lid 8a with a guide reel 81 supported by Braun 1-83, and the remaining half 1.
18b, which is composed of a combination U, and a pullout port 84 for the tow rope 4.
is provided at a point U between the two half-lids 8a and 8b. Note that the lid 8 is provided with grooves 8C on the outer periphery.
The cam 87 is inserted into the coupler 85 provided at the open end of the lead-out tube 6, and by operating the clamp lever 86, the cam 87 installed in the cuff 85 is fitted into the groove 8C. However, when performing repair work, the tow cable 4 is passed through the existing pipe 1 from one of the VIG insertion pipes 5 and pulled out from the other VIG outlet pipe 6. By winding the tip of the tow rope 4 with the drum 9a of the winch 9, the pair of rear vigs 2 and 3 attached to the tow rope 4 are coated with low viscosity melon resin C in front of the front vig 2 of the king. In front of the rear big 3, resin glue for sealing the joint parts is placed in each case and introduced into the existing pipe 1, and the pipe is pulled from the entrance side to the exit side. The front pig 2 has a structure in which sealing fins are protruded from the periphery of a cylindrical body, as shown in an enlarged view in FIG. The center of the cylinder has a hole through which the tow rope 4 is inserted, allowing air to flow back and forth, and by clamping the collars 28 and 29 to the tow rope 4, the front pig 2 can pass through the tow rope 4. The rear big 3 is fixed to the resin IC as shown in FIG.
Because it is necessary to provide a switching function, resin introduction grooves 11 that open toward the front in the traveling direction are formed on the left and right outer peripheral walls of the BIG, and parallel to this. In the body of the vig 3, replacement grooves 18 are formed at the upper and lower outer circumferential walls of the vig. And these grooves 17
.. 18, each rear end wall in the traveling direction is formed into a tapered end wall 17a, 18a that slopes obliquely toward the rear, and the replacement groove 18 is buried in the big (for example) A passage 19 made of polyethylene tycope or the like is opened to the rear of the rear vig 3. Therefore, the winch 9 winds up the tow rope 4 to pull the vig 2 and 3, and the vig 2 and 3 tow the resin. When C and D move inside the existing pipe 1, the resin C in the previous stage removes the dust inside the existing pipe 1 and the dust in the space of the pipe lf= section 13 by adhering it with the adhesiveness of the resin itself. In addition, when the rear side big 3 reaches the position of the pipe joint part 13 (see Fig. 7), the resin on the front side of the rear side big 3 is removed from the inner wall of the existing pipe 1 during the towing movement. Resin pressure is generated in the resin itself due to viscous resistance between is acting on the resin through the center hole of the front pig 2, and due to these filling pressures, the resin flows into the joining space of the pipe joint part 13 via the groove 17 on the outer periphery of the pig. On the other hand, from the joint space of the pipe joint part 13,
The air staying there is naturally pushed out backwards through the other groove 18 by receiving the above-mentioned filling pressure.In this way, the resin is released from the sealing material from the abutment gap of the pipe joint 13. There is a part C that penetrates and fills into the pipe joint part 13 and achieves the sealing effect of the pipe joint part 13. [Operation of the invention] The existing pipe 1 in the repair section is moved by the movement of the resins C and D by the pulling of the above-mentioned Vig 2.3. When the repair of the large number of pipe joints 13 interposed in the pipe joints 13 is completed, and the front pig 2 reaches the inside of the VIG outlet pipe 6 from the terminal end of the membrane pipe 1, the winding of the winch 9 is temporarily stopped. Remove the clamp 82 and remove H8, and at the same time, open the bottom 1 and remove the residual resin C in front of the front pig 2 from the 4i111H discharge hole. Next, remove the fixing bolt of the front pig 2. 28a and 28b are loosened to release the tightening of the collar 28, the front side vig 2 and the tow line 4 are uncoupled, the front side vig 2 is made free from the tow line 4, and the winch 9 is used to tighten the tow line 4. When pulled, the front side pig 2 does not move and only the rear side pig 3 climbs up inside the outlet pipe 6. At this time, the resin residue remaining in front of the rear side pig 3 is discharged. The mouth parts f and ahst are discharged and collected into the container 41, and the front side pig 2 is pushed by the movement of the rear side pig 3, and the front and rear pigs 2 and 3 are connected to the outlet pipe 6.
For the tube end [taken out from 1 part. In this case, since the lid 8 is divided into two parts as shown, even if the tow line 4 is wound around the winch 9, it will not interfere with the removal of the front and rear pigs 2.3. [Effects of the Invention] Thus, according to the present invention, once the repair of the existing pipe in the repair section is completed, the removal and recovery of the residual resin and the removal of the pig can be efficiently carried out in a centralized manner by winding the winch. Because of this, the finishing work upon completion of the repair becomes simple and easy, and the next repair section can be repaired immediately, making it possible to significantly improve the efficiency of the repair work. In addition, the BIG lead-out pipe described in "2" is removably provided with a lid having an outlet for the tow cable at the pipe end [1].
be able to be opened and closed, and
Since the outlet pipe is equipped with a supply port for pressurized air and can supply pressurized air into the existing pipe,
It has the function of supplying the pressurized air required for the repair of R installation membrane pipe joints, and has the effect of simplifying the configuration of the device itself and improving work efficiency for bundling and repair. Also! can get. In carrying out the present invention, in the illustrated embodiment, it is necessary to temporarily stop the operation of the wing when the front big 2 is drawn into the outlet pipe 6, so that the winch operator can recognize this. Then, it is preferable to attach a marker piece, such as a piece of iron, to an appropriate position of the tow rope 4 in front of the front big 2J, so that it can be confirmed from the outside that the front big 2 has reached the outlet pipe 6. In addition, when the pigs 2 and 3 are introduced into the lead-out pipe 6, the lead-out pipe 6 is equipped with a means to detect this with a sensor, turn on the switch, and issue an alarm. It may be possible to notify that the rear pig 3 has entered the outlet pipe i.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例□を示す補修施工装置全体め
概略図、第2図はピグ挿入用導管の部分を示・す−路側
面図、第ご)図はピグ導出管の部分を示す概略側□面図
、第4図はピグの牽引状−を示す1新例面図、第5図は
後側ピグの斜視図、第6図はビグ導出管の管端出口を塞
ぐ蓋体の斜視図、第7図は樹脂の充填状況を示す要部の
拡大断面図であるリ ド・・既設管、11.12・・・分離端、1ζト・・管
継手部、13a・・・大口径部、13b・・・管端、1
4・・・シール材、15・・・鉛材、17.18・・・
溝条、17a 、 18a・・・ラーーバ端壁、19・
・・通路、 2・・・前側ビグ、28.29・・・カラー、13− 3・・・後側ピグ、 4・・・牽引索、40・・・分岐41・・・容器、5・
・・ビグ挿入導管、5i・・・樹脂充填口部、5b・・
・空気排出川口部、51・・・クランプ、52.53・
・・コック、54・・・クロスビン、 6・・・ピグ導出管、6a・・・□排出用口部、6b・
・・空気供給[1管、61・・・開閉コック、 7・・・樹脂充填タンク、7a・・・ホース、1b・・
・発電機、IC・・・コンプレッサ、 8・・・蓋、81・・・ガイドレール、82・・・クラ
ンプ、9・・・ウィンチ、9a・・・ドラム、10・・
・コンプレッサ、10a・・・圧力操作1ニツト、A、
’B・・・竪穴、C1D・・・樹脂。 14−
Fig. 1 is a schematic diagram of the entire repair work equipment showing an embodiment of the present invention, Fig. 2 is a road side view showing a section of a pipe for inserting a pig, and Fig. 2 is a section of a pipe leading out of a pig. Figure 4 is a schematic side view showing the pig in its towed state, Figure 5 is a perspective view of the rear pig, Figure 6 is a lid that closes the outlet of the pipe end of the Vig outlet pipe. Fig. 7 is an enlarged cross-sectional view of the main parts showing the state of resin filling. Large diameter part, 13b...tube end, 1
4...Sealing material, 15...Lead material, 17.18...
Grooves, 17a, 18a... Rava end wall, 19.
...Passway, 2...Front side big, 28.29...Collar, 13-3...Rear side pig, 4...Tow rope, 40...Branch 41...Container, 5...
...Vig insertion conduit, 5i...Resin filling port, 5b...
・Air discharge mouth part, 51...Clamp, 52.53・
... Cock, 54... Cross bin, 6... Pig outlet pipe, 6a... □ Discharge opening, 6b.
... Air supply [1 pipe, 61... Opening/closing cock, 7... Resin filling tank, 7a... Hose, 1b...
- Generator, IC...Compressor, 8...Lid, 81...Guide rail, 82...Clamp, 9...Winch, 9a...Drum, 10...
・Compressor, 10a...pressure operation 1 nit, A,
'B... Pit, C1D... Resin. 14-

Claims (1)

【特許請求の範囲】 地下に配管された既設管内に、管内面に気密に接して摺
動づるビグを、そのビグの前側に樹脂を配()だ状態で
導入し、ビグの牽引により樹脂を管内に沿って移動さく
#Oて行く過程で、樹脂を、既設管に介在する複数の管
継手部の間隙に充填する補修工事において、上記補修対
象の既設管を、補修に際【ノて所定長さの補修単位に区
切り、イの分離された既設管の一方の出口側分離開口部
を地−トに開f:I する竪穴内に露出さじ、該竪穴内
において上記分離開口部に、地上へ向けて屈曲したビグ
導出管を着脱自在に連接し、該導出管に、残留樹脂の排
出口部と11力空気の供給口部とを設け、かつ牽引索の
引出口を有する蓋体を−11記導出管の管端出口に着脱
自在に嵌着してなることを特徴とする既設管補修施二[
時における補修用樹脂およびビグの導出方式。
[Claims] A VIG that slides in airtight contact with the inner surface of the pipe is introduced into an existing underground pipe with resin placed on the front side of the VIG, and the resin is pulled by the VIG. In the process of moving along the inside of the pipe, resin is filled into the gaps between multiple pipe joints in the existing pipe. During the repair work, the existing pipe to be repaired is Divide into repair units of length, open one exit side separation opening of the separated existing pipe in A to the ground, and insert an exposed spoon into the above-mentioned separation opening in the shaft. A VIG lead-out pipe bent toward the direction is detachably connected, and the lead-out pipe is provided with a residual resin discharge port and an air supply port, and a lid body having a tow cable outlet. 11. Existing pipe repair method 2, characterized by being removably fitted to the pipe end outlet of the lead-out pipe [
Derivation method of repair resin and VIG at the time.
JP58246624A 1983-12-28 1983-12-28 Lead-out system of resin for repair and pig in case of repair execution of existing pipe Granted JPS60139993A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58246624A JPS60139993A (en) 1983-12-28 1983-12-28 Lead-out system of resin for repair and pig in case of repair execution of existing pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58246624A JPS60139993A (en) 1983-12-28 1983-12-28 Lead-out system of resin for repair and pig in case of repair execution of existing pipe

Publications (2)

Publication Number Publication Date
JPS60139993A true JPS60139993A (en) 1985-07-24
JPH0155840B2 JPH0155840B2 (en) 1989-11-27

Family

ID=17151167

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58246624A Granted JPS60139993A (en) 1983-12-28 1983-12-28 Lead-out system of resin for repair and pig in case of repair execution of existing pipe

Country Status (1)

Country Link
JP (1) JPS60139993A (en)

Also Published As

Publication number Publication date
JPH0155840B2 (en) 1989-11-27

Similar Documents

Publication Publication Date Title
US4556580A (en) Method of repairing pipes laid underground
JPS6049186A (en) Method and device for sealing joining section or leakage section
JPS60139991A (en) Repair system of pipe joint section of existing pipe
US4504204A (en) Pig for repairing interior portions of a pipeline
JPS60139993A (en) Lead-out system of resin for repair and pig in case of repair execution of existing pipe
JPH0155839B2 (en)
JPS60139359A (en) Resin conveying pig for repairing pipe joint part of existing pipe
JPH0379492B2 (en)
JPS60139358A (en) Pig interlocking mechanism at time of repairing of pipe joint part of existing pipe
JPS6118462A (en) Device for repairing pipe joint of existing pipe
JPS6115771A (en) Resin feeding pig for repairing pipe joint part of existing piping
JPS6115772A (en) Resin feeding pig for repairing pipe joint part of existing piping
JPS60139361A (en) Resin conveying pig for repairing pipe joint part of existing pipe
JPH07109276B2 (en) How to connect steel belt parachute tow for pig
JPH0235971A (en) Maintenance of inner surface of existing pipe
JPS6316181B2 (en)
JPS61191740A (en) Repairing of existing piping
JPS6226831B2 (en)
JP2688758B2 (en) Underground pipeline repair device
JP2648924B2 (en) Repair method for fittings of existing piping
JPH0357840B2 (en)
JPS60140135A (en) Air-tightness testing method of supply pipe
JPS60139373A (en) Repairing method of existing piping
JPS60139374A (en) Repairing method of existing piping
JPS6314669B2 (en)