JPS60115715A JP22233983A JP22233983A JPS60115715A JP S60115715 A JPS60115715 A JP S60115715A JP 22233983 A JP22233983 A JP 22233983A JP 22233983 A JP22233983 A JP 22233983A JP S60115715 A JPS60115715 A JP S60115715A
Authority
JP
Japan
Prior art keywords
pile
widening
excavation
head
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22233983A
Other languages
Japanese (ja)
Other versions
JPS6334256B2 (en
Inventor
Masayasu Ishijima
石島 正康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUGO KISO KOGYO KK
Original Assignee
MARUGO KISO KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUGO KISO KOGYO KK filed Critical MARUGO KISO KOGYO KK
Priority to JP22233983A priority Critical patent/JPS60115715A/en
Publication of JPS60115715A publication Critical patent/JPS60115715A/en
Publication of JPS6334256B2 publication Critical patent/JPS6334256B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

PURPOSE:To easily construct an expanded head and tiered pile by a method in which excavation for pile pit and an expanded head of the pile is made until a given depth is reached, a width expansion blade is folded, and the excavation for the pile pit is continued. CONSTITUTION:A rod tube B is rotationally operated to excavate a pit of a diameter (d) by an excavating bit C, and excavation for expanded head of pile is concurrently made with a given interval by a head-expanding bit G. When a given depth (h) is reached by the bit G, the rod tube B is lifted up, the bit G is pulled up to the upper end of a stand pipe A, and a stopper bolt 6 is removed out. The rod tube B is hung down and again driven rotationally to complete excavation for the diameter (d) of the pile. An expanded head and tiered pile as a theoretically cast-in-place pile can be constructed economically and safely.

Description

【発明の詳細な説明】 一般に場所打杭工法はまず所定地盤1こ杭径と所要深度
の掘削孔を穿ち、次に該掘削孔内に鉄筋籠9吊り下げ挿
入し、六らにコンクリートを打設して所望の鉄筋コンク
11−ト杭を築造するもので、こr+を式ら易こ経済的
に然も安全で理論的な場所打杭とするため波頭拡底杭が
築造さね、ている。
[Detailed Description of the Invention] In general, the cast-in-place pile construction method first involves drilling an excavation hole with the required diameter and depth in the specified ground, then suspending and inserting reinforcing bar cages into the excavation hole, and pouring concrete into the holes. The purpose is to build the desired reinforced concrete pile by setting the concrete pile, and in order to make this formula easy, economical, safe, and theoretically cast-in-place pile, the wave crest expansion pile is constructed. .

不発明けこの削孔のは頭部の築造方法及びその装置の改
良に関するものである。
This invention relates to the improvement of a head construction method and device.

従来行われている拡頭部築造工法は、所要の拡@部径り
を有するスタンドパイプAをハンマークラブ等により、
スタンドパイプ内部の土砂を取り除きながら、所定の深
度りまで挿入してスタンドパイプ内の掘削を完了した後
、軸部径dの掘削ピットルスタンドパイプ内に挿入して
削孔する方法がとられている。この場合、杭頭部の所要
長りが深い場合に、スタンドパイプの挿入に者しい時間
をを丁ゐことにな0、又地質lこよってにスタンドパイ
プの挿入が困難となる場合がある。
The conventional construction method for expanding the head is to use a hammer club, etc. to create a standpipe A with the required expanded diameter.
After completing the excavation inside the standpipe by inserting it to a predetermined depth while removing earth and sand inside the standpipe, the method is used to drill a hole by inserting it into an excavation pit standpipe with a shaft diameter d. There is. In this case, if the required length of the pile head is deep, it may take an appropriate amount of time to insert the standpipe, and the geology may make it difficult to insert the standpipe.

不発明けこれに餉みなされたものであり。It was considered a non-invention.

次1こ本発明を図示の実施例に基づいてその施工法及び
装置りこついて説明−(b。
Next, the present invention will be explained in detail based on the illustrated embodiments and its construction method and apparatus. (b.

まず場所打杭を築造丁ゐ位置にスタンドパイプAを配設
L1ハンマークラブ等によりこのスタンドパイプA内の
土砂を掘削しながら、該スタンドパイプAを所定深度1
で挿入すゐ。そしてスタンドパイプの挿入を完了した後
、ロッド管Bの先端1こ軸部径dの掘削ビットCを取杓
付け、このピットの上にスタビライザーE及び重錘Fを
順次接続固定し1更ら1コ重錘の上部に杭頭部径りの拡
幅用杭頭拡幅ピットGを上記ロッド管に接続して該ロッ
ド管Bを介して回転駆動する。このロッド管の回動ルこ
てロッド管先端の掘削ピットCIこより軸部径dの削孔
を掘削するがこの時掘削ピットより上方1こ一定の間隔
をおいて設けられた波頭拡幅ビットGlこよって拡頭部
径りの削孔が同時に行aれゐこと1こなゐ。この杭頭拡
幅ピッ)()が所定の深度hrと到達すれば、ロッド管
Bの回転を一時停止して、該枕頭拡幅ピッ)Gをスタン
ドパイプAの上端まで引キ上ケ止めボールトロを取り外
してロット管ノ外周に設けた外廓鋼管1の外周に放射状
に突設した複数の拡幅興6を折りた\み、その丑\ロッ
ド管Bを再度削孔内に吊り降し再びロッド管Bを回転駆
動して4IllI都住dの削孔不行う。
First, cast-in-place piles are built, and stand pipe A is placed at position 1. While excavating the earth and sand inside this stand pipe A using an L1 hammer club, etc., the stand pipe A is moved to a predetermined depth of 1.
Insert it. After completing the insertion of the stand pipe, a drilling bit C with diameter d at the tip of the rod pipe B is attached, and a stabilizer E and a weight F are sequentially connected and fixed on top of this pit. A pile head widening pit G having the diameter of the pile head is connected to the rod pipe above the top of the weight, and is driven to rotate through the rod pipe B. Rotating the rod pipe A hole with a shaft diameter d is excavated from the excavation pit CI at the tip of the rod pipe. Therefore, the drilling of the enlarged head diameter can be done at the same time. When this pile head widening pipe () () reaches a predetermined depth hr, the rotation of the rod pipe B is temporarily stopped, the pile head widening pipe) () is pulled to the upper end of the stand pipe A, and the upper stop ball trolley is removed. Then, the plurality of widening brackets 6 protruding radially from the outer periphery of the outer steel pipe 1 provided on the outer periphery of the rod pipe are folded down, and the rod pipe B is again suspended into the drilled hole. Rotate and drive to drill 4IllI Tsuzumi d.

上記杭頭拡幅ピッ)Gの構造に、外郭鋼管1にに拡幅興
3が嵌挿され掘削≦こ伴う堀削翼6の上昇を拘束し1そ
の下降に自由と7?ゐ如き 型切込部1aを設け、リブ
21こよってロッド管BIこ固定丁b0 リブ2に拡@
X3の両側jC設け、拡幅翼6が上下自在に摺動し得ろ
間隔とし、ボールド孔4 rc回転軸ボ〜ルト5を挿入
して拡幅翼3の脱着を自在とな丁リブ2の下端1こ汀突
起部2aを設け、ボールド孔2bに止めボールトロを挿
入して拡幅掘削時におけろ拡幅翌3の下降を防rhする
。又拡幅調節孔4aG設けてセき拡頭部の墳減に対処し
得る如くなす。
In the above-mentioned structure of the pile head widening pin (G), the widening pin 3 is fitted into the outer steel pipe 1, and the excavation ≦ restrains the upward movement of the excavation blade 6, and 1 frees its downward movement.7? The mold notch 1a is provided, and the rib 21 is used to fix the rod pipe BI.
The lower ends of the ribs 2 are provided at both sides of the X3, with a spacing that allows the widening blades 6 to freely slide up and down, and the lower end of the rib 2 allows the widening blades 3 to be freely attached and detached by inserting the RC rotating shaft bolt 5 into the bold hole 4. A base protrusion 2a is provided, and a stopper ball is inserted into the bold hole 2b to prevent the descending of the widening material 3 during widening excavation. In addition, a width adjustment hole 4aG is provided so as to be able to cope with the reduction of the width of the enlarged head.

拡幅翼3の外側下Iglcは所要個の爪3aを設けて掘
削を容易となし、内側に設けたボールド孔41mよって
両側のリプ21こ狭さまれ回転軸ボールド5によって上
下摺動自在の構造となす。
The outer lower Iglc of the widening blade 3 is provided with the required number of claws 3a to facilitate excavation, and has a structure in which the ribs 21 on both sides are narrowed by the bold holes 41m provided on the inside and can freely slide up and down by the rotating shaft bold 5. Eggplant.

従ってロッド管Bを回転駆動すわば先づ軸部って波頭掘
削が同時5こ進行し枕頭拡幅ビットGカ所定の深度りに
到達した時点で、−UロッドgBの回転′を中止してロ
ッド管BG吊り上げ、杭頭拡幅ビットロルスタンドパイ
プAの上端まで引き上げ、リプ2の2bに挿入してあろ
止めボールトロを取り外し、拡幅翼3ル下降せしめて折
りたたみ、そのま−ロッド管B、G吊り降して回転駆動
を再開し、軸部径dの堀(1t+p完了して、杭頭拡幅
杭を築造するものである。
Therefore, when the wave crest excavation proceeds five times at the same time and the head widening bit G reaches a predetermined depth, the rotation of the -U rod gB is stopped and the rod pipe B is rotated. Lift the pipe BG, pull up the pile head widening bit roll to the top of the stand pipe A, insert it into lip 2 2b, remove the locking ball toro, lower the widening wing 3 and fold it, then lower the rod pipes B and G. Then, the rotational drive is restarted, the trench of shaft diameter d (1t+p) is completed, and the pile head is expanded and the pile is constructed.

又軸部径dの掘削を完了した後、公知の拡底掘削機を挿
入して拡底掘削ル行ない、波頭拡底杭を築造するこ七が
出来る。
After completing the excavation of the shaft diameter d, a well-known bottom-expanding excavator is inserted and the bottom-expanding drill is carried out to construct a wave crest-expanding pile.

第4@に示すものは本発明施工法によって築造できる拡
頭部の一実施例を示すもので、同図(a)は拡頭部h、
軸部X、拡底部yからなる波頭拡底杭を示すものであり
、(b)は拡頭部長さ6部(c) 分を2段階とし、陽はこれを更に3段階となしたもので
、何れも段付波頭拡底杭ル表けし、前記施工順序により
容易に施工し得るものであろう面シて本発明による時は
スタンドパイプAid適宜の長さとし、杭頭部長りが畏
くなっても容易に施工ができると共に、杭頭拡幅ピット
を取り姓す手間が省略され、それだけ唯工時間が短縮さ
jろことになり、又杭頭拡幅ビットGの外廓1管1の外
径をスタビライザーEのK 径ト同径にすることにより
、上下2個のスタビライザーにより削孔の垂直端[7i
、−高めることにもなり、その上重錘の役目を果たす等
の多くの利点がある。
What is shown in No. 4 @ shows an example of an enlarged head that can be constructed using the construction method of the present invention. Figure (a) shows an enlarged head h,
This shows a wave crest expansion pile consisting of a shaft part Also, when the present invention is used, the standpipe Aid should be set to an appropriate length, and even if the pile head length is too large, Not only can construction be done easily, but the trouble of handling the pile head widening pit is omitted, which reduces the construction time accordingly. By making the K diameter of E the same diameter, the vertical end of the hole [7i
, - It also has many advantages, such as increasing the weight and also acting as a weight.

【図面の簡単な説明】 第1図は本発明施工法の姿啜、第2勿は杭頭拡幅装置の
断面(支)、第3図は同平面図、第4面は本発明施工法
にて築造できる波頭拡底杭の実施例図である。 Aoo、スタッドパイプ Bol、ロッド管 C10,軸間掘削ビット Dol、杭頭部径 dol、軸部径 Eol、スタビライザー F106重錘 Gol、杭頭拡幅ビット 111.外廓鋼管 1a01. 型切込部 2 +0.+1プ 2a、 、、突起部 2b、 、 、ボールド孔 311.拡幅翼 3a、 、 、爪 4!6.ボールド孔 4J10.、拡幅調節孔 5101101回転軸ホ ールト、止めボールド 7、、.7ランヂ 特許出晒人 丸五基礎工業株式会社 ・、′乙。 代 理 人 林 清 明’、:’:、’ 9’、、、:
。 +1/ 外 1名 ir図 一ン 慎A図 ごr (ctン (Iy> Cc ) ]
[Brief explanation of the drawings] Figure 1 shows the construction method of the present invention, the second figure shows the cross section (support) of the pile cap widening device, Figure 3 shows the same plan view, and the fourth side shows the construction method of the present invention. FIG. Aoo, stud pipe Bol, rod pipe C10, interaxial drilling bit Dol, pile head diameter dol, shaft diameter Eol, stabilizer F106 weight Gol, pile head widening bit 111. Outer steel pipe 1a01. Mold notch 2 +0. +1 pin 2a, , protrusion 2b, , bold hole 311. Widening wing 3a, , , claw 4!6. Bold hole 4J10. , widening adjustment hole 5101101 rotation shaft hold, stop bolt 7, . 7 Land Patent Publisher: Marugo Basic Industry Co., Ltd. Agent Kiyoaki Hayashi',:':,'9',,,:
. +1/ Outside 1 person IR Figure 1 Shin A Figure (ctn (Iy> Cc)]

Claims (2)

【特許請求の範囲】[Claims] (1) I+パースエ法1こ於て、杭軸孔堀削装置の上
部に予め杭頭拡幅ピントを取り付けて置キ、ロッド管の
回転により、杭軸孔堀削の進行と同時に杭頭拡幅掘削を
行なし)、杭頭拡幅掘削が所定の深度に到達したら、−
巨ロツド管の回転ル停市し、ロッド+fを吊り上げ杭頭
拡幅ピットルスタンドパイプ上端まで引き上げて、拡幅
翼ル折りた\み、そのま−ロット°管を吊り下し、杭軸
孔堀削を継続して杭頭拡幅段付杭ル築造するこ七を特徴
とする場所打杭に於ける杭頭拡幅段付杭の施工方法。
(1) In I+Persue Method 1, a pile head widening pin is installed in advance on the top of the pile shaft hole drilling device, and the pile head widening is carried out at the same time as the pile shaft hole drilling progresses by rotating the rod pipe. ), when the pile cap widening excavation reaches the specified depth, −
Stop the rotation of the large rod pipe, lift the rod +f to the top of the pile head widening pit stand pipe, fold the widening blade, hang the rod pipe, and drill the pile shaft hole. A method for constructing stepped piles with widened pile heads in cast-in-place piles, which is characterized by continuously constructing stepped piles with widened pile heads.
(2)杭軸孔径より稍々小径を有する外廓鋼管をリブに
よってロッド管に固定し、拡幅翼の両側Gこのリプによ
って挟み、1つ拡幅翼が上下自在に摺動し得る如く装着
し、拡幅掘削碗罰修了後拡幅翼を下降して折りた−み得
るようになしたることを特徴とする場所打杭に於ける杭
頭拡幅段付杭の施工装置。
(2) An outer steel pipe having a slightly smaller diameter than the pile shaft hole diameter is fixed to the rod pipe with ribs, sandwiched between the ribs on both sides of the widening wing, and installed so that one widening wing can freely slide up and down, A construction device for a stepped pile with a pile head for widening in a cast-in-place pile, characterized in that the widening wing can be lowered and folded after completion of widening excavation.
JP22233983A 1983-11-25 1983-11-25 Method and apparatus for formation of expanded head and tiered pile for cast-in-place pile Granted JPS60115715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22233983A JPS60115715A (en) 1983-11-25 1983-11-25 Method and apparatus for formation of expanded head and tiered pile for cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22233983A JPS60115715A (en) 1983-11-25 1983-11-25 Method and apparatus for formation of expanded head and tiered pile for cast-in-place pile

Publications (2)

Publication Number Publication Date
JPS60115715A true JPS60115715A (en) 1985-06-22
JPS6334256B2 JPS6334256B2 (en) 1988-07-08

Family

ID=16780790

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22233983A Granted JPS60115715A (en) 1983-11-25 1983-11-25 Method and apparatus for formation of expanded head and tiered pile for cast-in-place pile

Country Status (1)

Country Link
JP (1) JPS60115715A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02289718A (en) * 1989-04-28 1990-11-29 Mitani Sekisan Co Ltd Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill
JP2004197321A (en) * 2002-12-16 2004-07-15 Traverse:Kk Soil cement pile constructing method
JP2015096676A (en) * 2013-11-15 2015-05-21 三谷セキサン株式会社 Excavation method of pile hole having expanded head part

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02289718A (en) * 1989-04-28 1990-11-29 Mitani Sekisan Co Ltd Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill
JP2004197321A (en) * 2002-12-16 2004-07-15 Traverse:Kk Soil cement pile constructing method
JP2015096676A (en) * 2013-11-15 2015-05-21 三谷セキサン株式会社 Excavation method of pile hole having expanded head part

Also Published As

Publication number Publication date
JPS6334256B2 (en) 1988-07-08

Similar Documents

Publication Publication Date Title
EP1154078B1 (en) Apparatus for and a method of boring the ground
CN106522213A (en) Rotary jet grouting bar inserting type mini pile construction method
JPS6347878B2 (en)
US1706002A (en) Method of producing and placing shafts, piles, and the like
JPS60115715A (en) Method and apparatus for formation of expanded head and tiered pile for cast-in-place pile
JP3361776B2 (en) Crushing equipment for underground piles
JPH07145616A (en) Cast-in-place concrete piling method
KR19990076368A (en) Pile construction device and construction method
JP3827309B2 (en) Auxiliary pile method and embedded pile method
KR101302143B1 (en) Method construction anchor rock pressure style use the hole which widens double
JPS6033186Y2 (en) Bottom-expanding excavator for foundation piles
JPS60219321A (en) Pile driving method
JP3415794B2 (en) Drilling method and equipment
JPH10169360A (en) Drilling method and drilling device
JPS63289115A (en) Method and apparatus for foundation pile
JPS6346549Y2 (en)
JPS5923109Y2 (en) Earth drill bottom expansion device
JP3900938B2 (en) Folding machine folding structure
JPS6128774B2 (en)
JPH0351875B2 (en)
JPS6146608B2 (en)
JPH086103Y2 (en) Multiple rod excavator
JPH0733667B2 (en) Support pile construction method and construction equipment
JPH04185814A (en) Construction of structural core column
JPH0348316B2 (en)