JPS6010760Y2 JP3038979U JP3038979U JPS6010760Y2 JP S6010760 Y2 JPS6010760 Y2 JP S6010760Y2 JP 3038979 U JP3038979 U JP 3038979U JP 3038979 U JP3038979 U JP 3038979U JP S6010760 Y2 JPS6010760 Y2 JP S6010760Y2
Authority
JP
Japan
Prior art keywords
blank material
carts
blank
paths
blanking press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP3038979U
Other languages
Japanese (ja)
Other versions
JPS55134036U (en
Inventor
敏裕 田中
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to JP3038979U priority Critical patent/JPS6010760Y2/en
Publication of JPS55134036U publication Critical patent/JPS55134036U/ja
Application granted granted Critical
Publication of JPS6010760Y2 publication Critical patent/JPS6010760Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)

Description

【考案の詳細な説明】 本考案はブランキングプレスで切断されたブランク材を
トランスファプレス等に設置されたディスタッカに送り
込むブランク材のスタック装置に関するものである。
[Detailed Description of the Invention] The present invention relates to a blank stacking device that feeds blanks cut by a blanking press into a destacker installed in a transfer press or the like.

従来、この種のブランク材のスタック装置としてはブラ
ンキングプレスで切断されたブランク材を一枚ずつ積み
重ね所定枚数となったらブランキングプレスを停止し、
所定枚数積み重ねたブランク材をフォークリフト等でト
ランスファプレス等に設置したディスタッカに搬送送り
込むようにしたものが知られている。
Conventionally, this type of blank stacking device stacks blanks cut by a blanking press one by one, stops the blanking press when a predetermined number of sheets is reached, and
There is a known method in which a predetermined number of stacked blanks are transported and fed by a forklift or the like to a destacker installed in a transfer press or the like.

このような構成のブランク材のスタック装置であると各
工程がばらばらであり効率良くブランク材をディスクツ
カに送り込みできないとの不具合を有する。
A blank material stacking device having such a configuration has a problem in that each process is performed separately and the blank material cannot be efficiently fed to the disk stacker.

本考案は上記の事情に鑑みなされたものであり、その目
的はブランキングプレスで切断されたブランク材をディ
スクツカに効率良く送り込みできるようにしたブランク
材のスタック装置を提供することである。
The present invention was developed in view of the above circumstances, and its purpose is to provide a blank stacking device that can efficiently feed blanks cut by a blanking press to a disc stacker.

以下図面を参照して本考案の実施例を説明する。Embodiments of the present invention will be described below with reference to the drawings.

ブランキングプレス1はコイルラインAに連続して設置
されてコイル材よりブランクBを切断する。
A blanking press 1 is installed continuously on a coil line A to cut a blank B from a coil material.

ブランキングプレス1の排出側には主搬送路Cが設けら
れ、その主搬送路Cと直交して第1・第2補助搬送路D
工、D2が主搬送路Cより下方位置に設けであると共に
、第1・第2補助搬送路D1.D2と直交して第1・第
2搬出路E1.E2が設けである。
A main conveyance path C is provided on the discharge side of the blanking press 1, and first and second auxiliary conveyance paths D are orthogonal to the main conveyance path C.
The first and second auxiliary conveyance paths D1.D2 are provided at a position below the main conveyance path C. D2 is orthogonal to the first and second discharge paths E1. E2 is provided.

前記第1・第2補助搬送路D1.D2には第1・第2台
車21,2□がブランク材受は位置イ(主搬送路Cとの
交点)とブランク材渡し位置口(第1・第2搬出路E□
、E2との交点)とに亘って第1・第2台車移動用シリ
ンダ3□、3□により往復動自在に設けであると共に、
前記各ブランク材渡し位置口には台車上のブランク材B
を第1・第2搬出路E1.E2に送り込む第1・第2ブ
ツシャシリンダ4a1,4a2を備えた第1・第2ブツ
シヤ41.4゜が設けである。
The first and second auxiliary conveyance paths D1. In D2, the first and second carts 21 and 2 □ are located at the blank material receiving position A (intersection with the main conveyance path C) and the blank material delivery position opening (the first and second transport path E □
, intersection with E2), and is provided so as to be reciprocally movable by cylinders 3□ and 3□ for moving the first and second carts, and
Blank material B on the trolley is placed at each blank material delivery position opening.
to the first and second unloading paths E1. The first and second bushings 41.4° are provided with first and second bushing cylinders 4a1 and 4a2 that feed into E2.

前記第1・第2搬出路E、、E2には第1・第2トラン
スファプレス51,5゜に設置したブランク材を一枚ず
つトランスファブレス5に搬送する第1・第2ディスタ
ッカ61,6゜がディスタッカコンベヤ71,7゜を介
して連続設置しである。
In the first and second unloading paths E and E2, there are first and second stackers 61 and 6° for conveying the blank materials installed in the first and second transfer presses 51 and 5° one by one to the transfer press 5. are successively installed via destacker conveyors 71 and 7°.

前記各ブランク材受は位置イ、イには各台車24,2□
の三側方を覆う固定ガイド8が基台9にブランク材Bの
大きさに応じて取付位置調整自在にそれぞれ設けである
と共に、各台車21,2□にはその一側方を覆う可動ガ
イド10がそれぞれ設けてあって各固定ガイド8と可動
ガイド10とによりブランク材Bが台車2上に正しく積
み重ねできるように構成している。
Each of the blank material receivers is in position A, and each carriage 24, 2□ is in position A.
Fixed guides 8 covering the three sides are provided on the base 9 so that the mounting position can be adjusted freely according to the size of the blank material B, and each trolley 21, 2□ is provided with a movable guide covering one side thereof. 10 are respectively provided, and each fixed guide 8 and movable guide 10 are configured so that the blank materials B can be stacked correctly on the trolley 2.

前記主搬送路Cは第1台車21のブランク材受は位置イ
までブランク材Bを搬送する第1コロコン11と、その
第1コロコン11と連続して第2台車2゜のブランク材
受は位置イまで延設しかつ2台車22のブランク材受は
位置イ側で切換用シリンダ12で上下回動自在に支承さ
れた切換用コロコン13と、第1コロコン11の搬出側
に設けたガイド片16とにより構成しである。
The main conveyance path C includes a first roller controller 11 that conveys the blank material B to a position A where the blank material receiver of the first trolley 21 is located, and a blank material receiver of the second trolley 2° that is continuous with the first roller controller 11 that transports the blank material B to a position A. The blank material receiver of the two carts 22 extends to A, and the switching roller controller 13 is supported on the switching cylinder 12 so as to be movable up and down on the switching cylinder 12 on the A side, and the guide piece 16 provided on the unloading side of the first roller controller 11 It is composed of:

前記第1・第2補助搬送路D1.D2は基台9に設けた
一対のガイドレール14.14によりそれぞれ構成され
、第1・第2搬出路E□、E2は送り方向に自由回転し
かつ別の駆動装置で駆動されるコンベヤ15により構成
しである。
The first and second auxiliary conveyance paths D1. D2 is composed of a pair of guide rails 14, 14 provided on the base 9, and the first and second discharge paths E□, E2 are configured by a conveyor 15 that rotates freely in the feeding direction and is driven by a separate drive device. It is composed.

また、前記第1・第2台車21,2゜の上面にはコロコ
ン17が設けである。
Further, a roller control unit 17 is provided on the upper surface of the first and second carts 21 and 2°.

次に動作を説明する。Next, the operation will be explained.

切換用シリンダ12により切換用コロコン13を上方に
回動して第1コロコン11と不連続とする。
The switching cylinder 12 rotates the switching roller controller 13 upward to make it discontinuous with the first roller controller 11.

(第2図の状態)この状態ではブランキングプレス1で
切断されたブランク材Bは第1コロコン11に沿って移
動しガイド片16でガイドされ一枚ずつ第1台車21上
に落下し積み重ねられる。
(Situation shown in Figure 2) In this state, the blank material B cut by the blanking press 1 moves along the first roller controller 11, is guided by the guide piece 16, falls one by one onto the first cart 21, and is stacked. .

そして第1リミツトスイツチ腸□の所までブランク材B
が積み重ねられると第1リミツトスイツチLS1が検出
動作腰切換用シリンダ12が作動して切換用コロコン1
3が下方に回動して第1コロコン11と連続する位置と
なるのでブランク材Bは第2台車22に落下積み重ねら
れる。
Then, blank material B up to the 1st limit switch intestine □
When the roller controller 1 is stacked, the first limit switch LS1 detects it, and the cylinder 12 for switching is operated, and the switching roller controller 1 is activated.
3 rotates downward to a position where it is continuous with the first roller controller 11, so that the blank material B falls onto the second cart 22 and is stacked.

これと同時に第1台車移動用シリンダ31が動作し第1
台車21はガイドレール14.14に沿ってブランク材
渡し位置口まで移動される。
At the same time, the first truck moving cylinder 31 operates and the first
The carriage 21 is moved along the guide rail 14.14 to the blank transfer position.

この動作は第2リミツトスイツチLS2で検出され、そ
の検出信号により第1ブツシヤシリンダ4a□が動作さ
れ第1台車21上のブランク材Bを第1搬出路E工に押
し出し、押し出されたブランク材Bはディスタツクコン
ベヤ71により第1デイスタツカ6□に送られて一枚ず
つ第1トランスフアプレス51に搬送される。
This operation is detected by the second limit switch LS2, and the first pusher cylinder 4a□ is operated by the detection signal to push out the blank material B on the first cart 21 to the first unloading path E, and the pushed out blank material B are sent to the first de-stacker 6□ by the de-stack conveyor 71, and conveyed one by one to the first transfer press 51.

前記の押し出し完了は第3リミツトスイツチLS3で検
出され、その検出信号により第1台車移動用シリンダ3
□が動作されて第1台車21がブランク材受は位置イま
で復帰動され、かつ第1ブツシヤシリングが元位置に復
帰し次の動作に備え待機する。
The completion of the extrusion is detected by the third limit switch LS3, and the detection signal causes the first truck moving cylinder 3 to be activated.
□ is operated, the blank material receiver of the first cart 21 is moved back to position A, and the first bushing ring is returned to its original position and stands by in preparation for the next operation.

これらの動作は第4、第5リミットスイッチLS4.
LS、で検出されると共に、前記第2台車2□にブラン
ク材Bが所定枚数積み重ねられるまで間に終了する。
These operations are performed by the fourth and fifth limit switches LS4.
LS, and ends until a predetermined number of blank materials B are stacked on the second cart 2□.

次に第2台車2□にブランク材Bが所定枚数積み重ねら
れると第6リミツトスイツチS6が検出動作し、その検
出により切換用シリンダ12が動作して切換用コロコン
13が上方に回動し第1コロコン11と不連続となって
ブランク材Bは第1台車2□に落下積み重ねられる。
Next, when a predetermined number of blanks B are stacked on the second cart 2 □, the sixth limit switch S6 operates to detect, and upon this detection, the switching cylinder 12 operates, the switching roller controller 13 rotates upward, and the first roller controller 11, the blank material B is dropped and stacked on the first cart 2□.

これと同時に前述と同様にして第2台車2゜がブランク
材渡し位置口に移動され、第2台車2□上のブランク材
Bが第2搬出路E2に押し出される。
At the same time, the second cart 2° is moved to the blank material transfer position opening in the same manner as described above, and the blank material B on the second cart 2□ is pushed out to the second carry-out path E2.

以上の様であるから、ブランク材Bは自動的に、ディス
タッカ6□、6□に搬送でき効率良くブランク材をディ
スタッカに送り込みできると共に、一方の台車2□上の
ブランク材を搬送する時には他方の台車2□上にブラン
ク材が積み重ねられるのでブランキングブレス1を休止
することがなくブランキングプレス1の稼動率を向上で
きる。
As described above, the blank material B can be automatically conveyed to the de-stackers 6□ and 6□, and the blank material can be efficiently fed to the de-stackers. Since the blanks are stacked on the cart 2□, the blanking press 1 does not need to be stopped and the operating rate of the blanking press 1 can be improved.

本考案は前述の様に構成したので、ブランキングプレス
1で切断してブランク材Bを主搬送路Cによって第1・
第2補助搬送路D1.D2のどちらか一方の第1・第2
台車21,2□上に積み重ねできるから、どちらか一方
の第1・第2台車21.2゜がブランク材Bを搬出路E
、、E2に搬送している時にどちらか他方の第2.第1
台車2□。
Since the present invention is configured as described above, the blank material B is cut by the blanking press 1 and then passed through the main conveyance path C to the first
Second auxiliary conveyance path D1. Either the first or second of D2
Since it can be stacked on the carts 21 and 2□, either the first or second cart 21.2° carries the blank material B to the delivery path E.
,,E2, when either of the other 2nd . 1st
Trolley 2□.

21上にブランク材Bを積み重ねでき、ブランキングプ
レス1を休止することなくブランク材Bを搬送できる。
The blank materials B can be stacked on the blanking press 21, and the blank materials B can be transported without stopping the blanking press 1.

したがって、ブランキングプレス1で切断シたブランク
材Bを効率良くディスタツク6□に送り込むことができ
ると共に、ブランキングプレス1の稼動率を向上できる
Therefore, the blank material B cut by the blanking press 1 can be efficiently fed into the distack 6□, and the operating rate of the blanking press 1 can be improved.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案の実施例を示すものであり、第1図は平面
図、第2図は主搬送路の正面図、第3図は補助搬送路の
詳細平面図、第4図はそのIV−IV線断面図、第5図
はその■−V線断面図である。 1はブランキングプレス、2□、2゜は第1・第2台車
、31,3゜は第1・第2台車移動用シリンダ、41,
4゜は第1・第2ブツシヤ、61 ・6゜はディスクツ
カ、Bはブランク材、Cは主搬送路、Dl、D2は第1
・第2補助搬送路、El、E2は搬出路、イはブランク
材受は位置、口はブランク材渡し位置口。
The drawings show an embodiment of the present invention, and FIG. 1 is a plan view, FIG. 2 is a front view of the main conveyance path, FIG. 3 is a detailed plan view of the auxiliary conveyance path, and FIG. 4 is its IV- A cross-sectional view taken along the line IV, and FIG. 5 is a cross-sectional view taken along the line ■-V. 1 is a blanking press, 2□, 2° are the first and second carts, 31, 3° are cylinders for moving the first and second carts, 41,
4° is the first and second pushers, 61 and 6° are the disc pushers, B is the blank material, C is the main conveyance path, Dl and D2 are the first
・Second auxiliary conveyance path, El and E2 are unloading paths, A is the position of the blank material receiver, and the opening is the blank material transfer position opening.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] ブランキングプレス1の排出側と第1・第2台車24,
2゜が走行自在なる第1・第2搬送路D1. D2とに
亘って、その排出側を第1・第2補助搬送路D1.D2
のどちらか一方の台車上に選択的に接続切換可能な主搬
送路Cを設けて、その各交点をブランク材受は位置イと
すると共に、前記第1・第2補助搬送路り、、 D2を
搬出路E□、E2にそれぞれ接続してその各接続位置を
ブランク材渡し位置口とし、該各搬出路E1.E2をデ
ィスタツク61,6□にそれぞれ接続すると共に、前記
第1・第2台車21,2゜を、ブランク材受は位置イと
ブランク材渡し位置口とに亘って移動自動自在に設け、
さらに前記各ブランク材渡し位置口に第1・第2台車2
1,2□上のブランク材Bを搬出路E1.E2に押し出
すブツシャ4□、4□をそれぞれ設けたことを特徴とす
るブランク材のスタック装置。
The discharge side of the blanking press 1 and the first and second carts 24,
The first and second conveyance paths D1.2 degrees are freely travelable. D2, and the discharge side thereof is connected to the first and second auxiliary conveyance paths D1. D2
A main conveyance path C that can be selectively connected is provided on one of the carts, and each intersection thereof is set as a blank material receiver at position A, and the first and second auxiliary conveyance paths, D2 are connected to the ejection paths E□ and E2 respectively, and each connection position is used as a blank material delivery position opening, and each of the ejection paths E1. E2 is connected to the distack 61, 6□, respectively, and the first and second carts 21, 2° are provided so that the blank material receiver can be automatically moved between the position A and the blank material transfer position opening,
Furthermore, the first and second carts 2 are placed at the respective blank material delivery position openings.
The blank material B on 1, 2□ is transferred to the unloading path E1. A blank material stacking device characterized in that pushers 4□ and 4□ are respectively provided to push out E2.
JP3038979U 1979-03-12 1979-03-12 Blank stacking device Expired JPS6010760Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3038979U JPS6010760Y2 (en) 1979-03-12 1979-03-12 Blank stacking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3038979U JPS6010760Y2 (en) 1979-03-12 1979-03-12 Blank stacking device

Publications (2)

Publication Number Publication Date
JPS55134036U JPS55134036U (en) 1980-09-24
JPS6010760Y2 true JPS6010760Y2 (en) 1985-04-11

Family

ID=28879956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3038979U Expired JPS6010760Y2 (en) 1979-03-12 1979-03-12 Blank stacking device

Country Status (1)

Country Link
JP (1) JPS6010760Y2 (en)

Also Published As

Publication number Publication date
JPS55134036U (en) 1980-09-24

Similar Documents

Publication Publication Date Title
US8152434B2 (en) Double infeed stacking table with centering and method for transferring stacks to a gripper with an infeed station of this type
CN110329764B (en) Column material storage device and separate cooking column conveying production line
JP2016132034A (en) Carrying-in laminate device to stack
GB2060571A (en) Device for stacking flat articles such as box blanks
CA2446858A1 (en) Stacking device for a sheet processing machine and method for stacking sheets in one such machine
JPS6010760Y2 (en) Blank stacking device
CN112623702B (en) High-speed stacking system and high-speed stacking method
CN110902456B (en) Code spraying point counting and receiving machine
CN210480072U (en) Double-synchronous sintered brick ratchet blank turning grouping belt conveyor
CN208585688U (en) Cutting agency
JPS605503B2 (en) Stacking paperboard stacking device
CN211056221U (en) Pallet roller bed stacking device
CN211943922U (en) Efficient standard brick packaging system
CN209383071U (en) Intelligent logistics cut production line
CN110844609A (en) Pallet roller bed stacking device and control method
CN216140676U (en) Automatic sorting system for intelligent board bin
CN216638208U (en) Cut-off wobble plate system
CN221295124U (en) Stacking device
JPS6213959U (en)
CN219030639U (en) Press fitting equipment
CN114466810B (en) Bag transporting and bag stacking apparatus and method for transporting bags or bag stacks
JPS6133456A (en) Aligning/stacking apparatus for sheet material
JPH05186040A (en) Piling device of plate material
JPS6127865A (en) Device for aligning and stacking sheet material
JP2563949Y2 (en) Newspaper alignment equipment