JPS5948524A - Construction work of steel tubular sheet pile and spacing holding metal therefor - Google Patents

Construction work of steel tubular sheet pile and spacing holding metal therefor

Info

Publication number
JPS5948524A
JPS5948524A JP57157835A JP15783582A JPS5948524A JP S5948524 A JPS5948524 A JP S5948524A JP 57157835 A JP57157835 A JP 57157835A JP 15783582 A JP15783582 A JP 15783582A JP S5948524 A JPS5948524 A JP S5948524A
Authority
JP
Japan
Prior art keywords
sheet pile
piles
steel pipe
spacing
pipe sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP57157835A
Other languages
Japanese (ja)
Other versions
JPH0216415B2 (en
Inventor
Masayasu Egawa
江川 雅康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASAKAWAGUMI KK
Original Assignee
ASAKAWAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASAKAWAGUMI KK filed Critical ASAKAWAGUMI KK
Priority to JP57157835A priority Critical patent/JPS5948524A/en
Publication of JPS5948524A publication Critical patent/JPS5948524A/en
Publication of JPH0216415B2 publication Critical patent/JPH0216415B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To quickly construct steel tubular sheet piles by a method in which a metal having functions of spacing and holding sheet piles and also preventing the bilateral rocking of sheet pile is fixed to the upper end portion of the first sheet pile already erected, and the second sheet pile is erected while contacting it with the metal. CONSTITUTION:A spacing holding metal 4 is fixed to the upper part of a steel tubular sheet pile P2 already erected by welding the leg portion of the metal 4. A steel tubular sheet pile P3 to be erected subsequently is hung down from a crane, etc., the peripheral side of the sheet pile P3 is contacted with the concaved contact face 1 of the metal tool 4, and the sheet pile P3 is erected while coupling the coupler of the sheet piles with the guide space 3. In this case, the metal tool 4 acts as a guider to prevent the bilateral rocking of the piles on the line to be set in parallel while keeping the spacing between the sheet piles.

Description

【発明の詳細な説明】 不発ツJは鋼管矢板の建込み打設工法とこれに用いる間
隔維持金具番こ関し、行に海−にでの’;hl管矢板等
の建込み打設工事において、作業の安全性と作業能率の
高い工法を提供することを目的としている。
[Detailed description of the invention] The unexploded tsu J relates to the erection method for steel pipe sheet piles and the number of spacing maintenance fittings used therefor, The aim is to provide a construction method with high work safety and work efficiency.

従来の海上での鋼管矢板等の建込み打設は、建込み打設
工事に先立って導材上を設置した免これをガイドとして
杭打船で吊った鋼管矢板を相互の接続部(ジヨイント部
)を合わせながら建込み打設しているが、海面のうねシ
、波浪によって鋼管矢板相互の接合部合わせが非常に困
難で時anがかかると共に安全面において危険性が高い
。又導材上の設置という余分の工事を必要とするため、
前記接合作業の困〃11を性と相俟って鋼管矢板の建込
み打設作業の能率を非常に低いものとしている。
Conventional erection driving of steel pipe sheet piles, etc. on the sea is carried out by placing the steel pipe sheet piles suspended by a pile driving ship at mutual connection points (joints) using the guide material installed on the conductor prior to the erection work. ), but due to sea ridges and waves, it is extremely difficult to align the joints between the steel pipe sheet piles, which is time consuming and highly dangerous from a safety standpoint. Also, since it requires extra work to install on the conductor,
The above-mentioned difficulty in joining work (11), together with the nature of the joining work, makes the efficiency of the work of erecting and driving steel pipe sheet piles very low.

本発明工法は導材上設置をすることなく安全且つ迅速に
打設できる工法であり、表面長手方向にジヨイントを兼
ねたガイドの突設された鋼管矢板の多数を列設するにお
いて、まず第一の鋼管矢板を所定位i1′jに建込み打
設し、この47j首′V矢板を基礎としてその開口;”
1’ir!部に、311.1管矢板間隔維持機能及び列
設すべきラインの左右方向への揺れケ止める揺′IL止
め磯WBとをβ源1′uシた間隔維持金具を装着固定し
た後、第二の;r14管矢板を吊持して前記間隔維持金
具に当接しつつ建込み打設し、次いで第二の鋼管矢板を
基礎としてその開口端部に間隔維持金具を装着し、これ
葡繰返えすことを特徴とする鋼管矢板の建込み打設工法
である。
The method of the present invention is a construction method that allows safe and quick pouring without installing on conductor material, and is the first step when installing a large number of steel pipe sheet piles with guides that also serve as joints protruding in the longitudinal direction of the surface. The steel pipe sheet pile of 47j is erected and poured at the specified position i1'j, and the opening is made using this 47j neck'V sheet pile as the foundation;
1'ir! After attaching and fixing the spacing maintenance fitting with the β source 1'u and the 311.1 pipe sheet pile spacing maintenance function and the rocking rock stopper WB that prevents the lines to be laid in a row from swinging in the left and right direction, the Second: The r14 pipe sheet pile is suspended and erected while touching the spacing maintenance fittings, and then the spacing maintenance fittings are attached to the open end of the second steel pipe sheet pile as a base, and this process is repeated. This is a construction method for erection of steel pipe sheet piles.

上記方法において使用する1j1昆′1イ維持金具は、
少くとも列設すべきラインの左右方向への揺れ止め機能
と鋼管矢板間隔A・fB持機能を具11i#することを
必要とし、図示の如く、鋼管矢板の外周面の一部が当接
される当1d!!J部1の最奥2にガイド用逃げ空間3
が形成された当接用ヘッド4と、鋼管矢板の管端壁を挟
着する挿入空間5の形成された挟着脚部6とから成り、
挟着脚部6の挿入空間5と当接用ヘッド4の当接凹部1
の最奥2との水平方向間隔7を、XEN管矢板の打設間
隔として、当接用ヘッド40F面に挟着脚部6が垂設固
定されている構成のものが最適である。
The maintenance fittings used in the above method are as follows:
It is necessary to provide the tool 11i# with at least the function of preventing the lines to be installed in a row from swaying in the left-right direction and the function of maintaining the steel pipe sheet pile spacing A/fB, and as shown in the figure, a part of the outer peripheral surface of the steel pipe sheet piles is in contact. Ruto 1d! ! Escape space 3 for guide at the innermost part 2 of J part 1
It consists of an abutting head 4 formed with an abutting head 4, and a clamping leg 6 formed with an insertion space 5 for clamping the pipe end wall of the steel pipe sheet pile,
Insertion space 5 of clamping leg 6 and abutment recess 1 of abutment head 4
It is optimal to use a structure in which the clamping legs 6 are vertically fixed to the abutting head 40F surface, with the horizontal distance 7 from the innermost part 2 of the XEN pipe sheet piles being set as the driving interval of the XEN pipe sheet piles.

しかし、前記両機能を具備する限シ、本発明工法の利点
は生かすことができる。
However, as long as the above-mentioned functions are provided, the advantages of the method of the present invention can be utilized.

例えば、第5図のようにガイド用逃げ空間3を挾んで間
隔維持を兼ねた補強体8,8′ を鋼管矢板Plに溶接
し1.この補強体8,8′の自由端部に次期建込み打設
する鋼管矢板P2例周面を当接し、接合部を合わせて打
設するのである。この補強体8,8′ は鋼管矢板に予
め溶接固定しておく。尚第3図乃至第5図において9わ
」、ジヨイントを兼ねたガイドを示している。
For example, as shown in FIG. 5, reinforcing bodies 8, 8' which also serve to maintain the spacing by sandwiching the guide relief space 3 are welded to the steel pipe sheet pile Pl.1. The circumferential surface of two steel pipe sheet piles P to be installed in the next stage is brought into contact with the free ends of the reinforcing bodies 8, 8', and the joints are aligned and installed. The reinforcing bodies 8, 8' are welded and fixed to the steel pipe sheet piles in advance. In FIGS. 3 to 5, 9" indicates a guide that also serves as a joint.

以上のように本発明工法によれi−、+:、所定のf+
7置に建込み打設した6(・ii管管板板付基礎して、
この’t、iiq管矢板に打設ラインの左右方向の揺れ
止め機能と矢板間隔機能とを具11i!f L/た間隔
維持金具固定し、これにガイドさせつつ次の鋼j〒矢板
を建込むから、杭打船がγiσ面のうねり、波浪によっ
て揺れても鋼管矢板は間11I’、%維持金具に押付け
られた状態でスムーズに建込みができ、簡単に接合?X
13の合わせができる。このため導材上の設置をするこ
となく又建込み時の接合1Xliの合わせも容易である
から31・信管矢板の建込み打設作−1τtよ極めて短
期間に能率良く遂行できる。
As described above, by the construction method of the present invention, i-, +:, predetermined f+
6 (ii) The foundation with tube board was built and poured at 7th place,
This 't, IIQ pipe sheet pile is equipped with a function to prevent the horizontal movement of the pouring line and a sheet pile spacing function! Since the steel pipe sheet pile is erected while the steel pipe sheet pile is erected while being guided by the spacing maintenance metal fitting f L/, even if the pile driving ship is shaken by undulations or waves on the γiσ plane, the steel pipe sheet pile will remain between 11I' and % maintenance metal fittings. Can it be built smoothly and easily joined while being pressed against the wall? X
You can make 13 combinations. Therefore, there is no need to install on the conductor material, and since it is easy to fit the joints 1Xli during erection, it can be efficiently carried out in an extremely short period of time compared to 31. Erecting the fuze sheet pile - 1τt.

又本発明工法に用いられる間@維持金具はクレーン等で
吊り下げ、ガイド用逃げ空間がジヨイントを兼ねるガイ
ドに一致若しくはガイドの上方となるよう作業者が補助
しつつ打設された鋼管矢板の管端部に装着する。装置は
当接用ヘッド下に垂設した挟着脚部の挿入空間へ、鋼管
矢板の管端壁を入れることにより行なわれる。
In addition, the maintenance fitting used in the construction method of the present invention is suspended by a crane, etc., and the steel pipe sheet pile pipe is driven with the assistance of a worker so that the escape space for the guide is in line with the guide that also serves as a joint, or is above the guide. Attach to the end. The device is operated by inserting the pipe end wall of the steel pipe sheet pile into the insertion space of the clamping legs that are vertically disposed below the abutting head.

従って、次の鋼管矢板を建込み打設する際、吊シ下げら
れた鋼管矢板を、そのガイドがガイド用逃げ空間に位置
するように当接凹部に当てがい、順次吊り降して行く。
Therefore, when erecting and driving the next steel pipe sheet pile, the suspended steel pipe sheet piles are applied to the abutting recesses so that their guides are located in the guide escape space, and are successively suspended.

然る時、鋼管矢板は相互の間隔が維持されたままで、相
互のガイドが自然に噛合う状態となる。従って作業者は
、吊シ下げられた間隔維持金具の鋼管矢板端への誘導セ
ットと、次期建込み打設する鋼管矢板の押えだけの簡単
な作業を行なえば良く、作業は極めて安全且つ正確に、
しかも迅速に遂行できる。又間隔維持金具は鋼管矢板端
に対し脱着自在となっているので、鋼管矢板の建込み打
設毎に反復使用でき経済的である。
At that time, the mutual spacing between the steel pipe sheet piles is maintained, and the mutual guides naturally mesh with each other. Therefore, the worker only has to perform the simple work of guiding the suspended spacing maintenance fittings to the ends of the steel pipe sheet piles and holding down the steel pipe sheet piles for the next erection, and the work is extremely safe and accurate. ,
Moreover, it can be executed quickly. Furthermore, since the spacing maintenance fittings are detachable from the ends of the steel pipe sheet piles, they can be used repeatedly every time the steel pipe sheet piles are erected, which is economical.

【図面の簡単な説明】[Brief explanation of drawings]

第11ンjは不発Iy1工法に用いる間1¥ji A’
ib持金Jt−の平(rロー、第2図は側面図、第3図
は建込み[H−7の平面図、第4図は同(ill 1j
ii図、第5図は別の1昌11)悄維持金具を用いた場
合の建込み時の平面1刊である。 1・・・当接凹部     2・・・最 奥3・・・ガ
イド用逃げ空間  4・・・当接用ヘッド6・・・挿入
空間     7・・・水平方向1i−il 陥8.8
′・・・補強体    9・・・ガイド、Pl、 P2
. P3.・・・鋼管矢板特許出願人 株式会社 浅 川 組 代理人 弁理士  杉 本   巌 弁理士  杉 本 勝 徳
The 11th j is used for the unexploded Iy1 construction method.
ib holding Jt-'s flat (r-row, Figure 2 is a side view, Figure 3 is a built-in plan view of H-7, Figure 4 is the same (ill 1j
Figures ii and 5 are different 1sho 11) planes at the time of construction when using maintenance fittings. 1... Contact recess 2... Innermost part 3... Guide escape space 4... Contact head 6... Insertion space 7... Horizontal direction 1i-il recess 8.8
'...Reinforcement body 9...Guide, Pl, P2
.. P3. ...Steel Pipe Sheet Pile Patent Applicant Asakawa Co., Ltd. Representative Patent Attorney Iwao Sugimoto Patent Attorney Katsunori Sugimoto

Claims (3)

【特許請求の範囲】[Claims] (1)  表面長手方向にジヨイントを兼ねたガイドの
突設された矢板の多数を列設するにおいて、まず第一の
矢板を所だ位置に建込み打設し、この矢板を基礎として
その上端部に、矢板間隔維持機能及び列設すべきンイン
の左右方向への揺れ止め機能を具備した間隔維持金具を
固定した後、第二の矢板をクレーン等で吊持して、前記
間隔維持金具に当接しつつ建込み打設し、次いで第二の
矢板を基礎とし前記作業を繰返えすことを特徴とする鋼
管矢板等の建込み打設工法。
(1) When installing a large number of sheet piles with guides that also serve as joints protruding in the longitudinal direction of the surface, first, the first sheet pile is erected and driven in place, and the upper end of the sheet pile is constructed using this sheet pile as a foundation. After fixing the spacing maintenance fittings that have the function of maintaining the sheet pile spacing and the function of preventing the horizontal movement of the piles to be installed in rows, the second sheet pile is suspended by a crane, etc. A method for erecting steel pipe sheet piles, etc., characterized by erecting the piles while touching each other, and then repeating the above operation using a second sheet pile as a foundation.
(2)矢板が、ffj管矢板で心る11テ許請求のJl
・[)囲パ151項記載の鋼管矢板等の建込み打設工法
(2) The sheet pile is a JL for which the 11th grade permit is requested in the FFJ pipe sheet pile.
・[) Construction method for constructing steel pipe sheet piles, etc. as described in Paragraph 151 of Paragraph 151.
(3)鋼管矢板の外周面の一部か当接される当接凹部の
最奥にガイド用逃げ空間が形成された当接用ヘッドと、
jTjil管矢板の管端壁全挾着する挿入空間の形成さ
れた挟着脚j’l(とから成り、挟着脚部の挿入空間と
当接用ヘッドの当接凹部の最奥との水平方向間隔をHi
+i %−:矢板の打設間隔として、当接用ヘッドの下
面に挾着脚j’51(が垂設固定されていること金時G
’にとする鋼管矢板打設用の間隔維持金具。
(3) a contact head in which a guide escape space is formed in the innermost part of the contact recess that is brought into contact with a part of the outer peripheral surface of the steel pipe sheet pile;
It consists of a clamping leg (j'l) formed with an insertion space that clamps the entire pipe end wall of the pipe sheet pile, and the horizontal position between the insertion space of the clamping leg and the innermost part of the abutment recess of the abutment head. Hi direction spacing
+i %-: As the driving interval of the sheet piles, the clamping leg j'51 (is vertically fixed on the lower surface of the abutment head).
Spacing maintenance fittings for driving steel pipe sheet piles.
JP57157835A 1982-09-09 1982-09-09 Construction work of steel tubular sheet pile and spacing holding metal therefor Granted JPS5948524A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57157835A JPS5948524A (en) 1982-09-09 1982-09-09 Construction work of steel tubular sheet pile and spacing holding metal therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57157835A JPS5948524A (en) 1982-09-09 1982-09-09 Construction work of steel tubular sheet pile and spacing holding metal therefor

Publications (2)

Publication Number Publication Date
JPS5948524A true JPS5948524A (en) 1984-03-19
JPH0216415B2 JPH0216415B2 (en) 1990-04-17

Family

ID=15658370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57157835A Granted JPS5948524A (en) 1982-09-09 1982-09-09 Construction work of steel tubular sheet pile and spacing holding metal therefor

Country Status (1)

Country Link
JP (1) JPS5948524A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919610Y1 (en) * 1970-04-28 1974-05-25
JPS54162804A (en) * 1978-06-15 1979-12-24 Minoru Kuroda Auxiliary tool for fitting pile and its pile fitting auxiliary method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS534740Y2 (en) * 1972-05-22 1978-02-06

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919610Y1 (en) * 1970-04-28 1974-05-25
JPS54162804A (en) * 1978-06-15 1979-12-24 Minoru Kuroda Auxiliary tool for fitting pile and its pile fitting auxiliary method

Also Published As

Publication number Publication date
JPH0216415B2 (en) 1990-04-17

Similar Documents

Publication Publication Date Title
JP3336430B2 (en) Vertical joints for steel pipe sheet piles
JPS5948524A (en) Construction work of steel tubular sheet pile and spacing holding metal therefor
JP4014050B2 (en) Steel pipe temporary facility construction method
US3416277A (en) Building components
CN205348741U (en) Can link wall spare by pivoted scaffold
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
JPS5873623A (en) Sheathing work for excavated trench and sheeting therefor
CN206859653U (en) Special-shaped clear-water concrete steel template system
CN112127551A (en) Novel connector for connecting reinforcing steel bars at joints of super high-rise concrete frame beams and strength columns
JPS6321962Y2 (en)
KR100509262B1 (en) The apparatus of attaching between concrete and steel structural members and attaching method
RU97140U1 (en) COMPOUND PILET JOINT
JPH0220271Y2 (en)
JPS63233118A (en) Driving work of sheet pile under water
US2946360A (en) Concrete form clamp
JPS6127387Y2 (en)
CN215367440U (en) Fixing device for water stop
CN220581040U (en) Reusable tunnel lining plug template fixing device
CN211572254U (en) Easily-disassembled stirrup
JPH09317058A (en) Joint construction method of wall type precast structure
CN209025437U (en) A kind of detachable construction joint plugging device
JPS6335933A (en) Beam connection method using guide device and connection device
JPS595078Y2 (en) Shoring frame
JPS5920424Y2 (en) Shoring frame
KR20220102323A (en) Strong bag for the wailer fixing