CN220581040U - Reusable tunnel lining plug template fixing device - Google Patents

Reusable tunnel lining plug template fixing device Download PDF

Info

Publication number
CN220581040U
CN220581040U CN202321988897.4U CN202321988897U CN220581040U CN 220581040 U CN220581040 U CN 220581040U CN 202321988897 U CN202321988897 U CN 202321988897U CN 220581040 U CN220581040 U CN 220581040U
Authority
CN
China
Prior art keywords
plug template
steel pipe
steel
reinforcement
pipe back
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321988897.4U
Other languages
Chinese (zh)
Inventor
浦瑞
赵勇
戴乐军
李祥民
赵太东
陈开焱
王逍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN202321988897.4U priority Critical patent/CN220581040U/en
Application granted granted Critical
Publication of CN220581040U publication Critical patent/CN220581040U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The application discloses repeatedly usable's tunnel lining plug template fixing device belongs to tunnel engineering technical field, including longitudinal reinforcement, hoop reinforcement, wooden wedge, steel pipe back of the body stupefied, longitudinal reinforcement one end is connected with steel mould platform truck or main muscle, and the other end is connected with hoop reinforcement, hoop reinforcement forms a whole with longitudinal reinforcement, and the steel pipe back of the body stupefied is installed to hoop reinforcement below, is fixed in the steel pipe back of the body stupefied with the plug template through the wooden wedge on, still be provided with square wooden back of the body stupefied between plug template and the wooden wedge. The device is convenient to install and detach, most of materials can be reused, potential safety hazards caused by drilling and dowel bars are effectively reduced, fixing cost is reduced when stable fixing and quick detachment are realized, and the device is simple in structure, safe and reliable and has good practicality and economic benefit.

Description

Reusable tunnel lining plug template fixing device
Technical Field
The application belongs to the technical field of tunnel engineering, and particularly relates to a reusable tunnel lining plug template fixing device.
Background
Under the general condition, after the tunnel is excavated and supported once, reinforced concrete is adopted to carry out secondary lining, and at present, the secondary lining is constructed by adopting a steel mould trolley sectional pouring method along the axial direction of the tunnel.
The lining concrete of the tunnel is related to surrounding rock conditions, the thickness of the lining concrete and the arrangement conditions of the steel bars are all changed, so that the end position of the lining concrete cannot adopt a shaping template, and the main construction method of the plug template at present is as follows: and (3) inserting bars are punched on the side wall of the tunnel, and tools such as steel pipes, iron wires and the like are adopted to fix the plug templates. However, the method has many problems, such as long time consumption, high safety risk of drilling holes at high altitude at local positions, high labor intensity and waste of dowel bars, the method for fixing the plug templates by adopting tools such as steel pipes, iron wires and the like is unreliable, templates are easy to shift and burst in the pouring process, and finally the plug templates are inconvenient to detach and waste of more time.
Disclosure of Invention
The utility model provides the reusable tunnel lining plug template fixing device, which aims at the problems in the prior art, and a plurality of structures are matched to rapidly install and fix the plug template without drilling, so that the device is simple in structure, convenient to install and detach and reusable.
In order to achieve the above purpose, the present application adopts the following technical scheme: the utility model provides a repeatedly usable's tunnel lining plug template fixing device, includes longitudinal reinforcement, hoop reinforcement, wooden wedge, steel pipe back of the body stupefied, square timber back of the body stupefied, and longitudinal reinforcement one end is connected with steel mould platform truck or main muscle, and the other end is connected with hoop reinforcement, hoop reinforcement and longitudinal reinforcement form a whole, and steel pipe back of the body stupefied is installed to hoop reinforcement below, is fixed in steel pipe back of the body stupefied with the plug template through wooden wedge on, still be provided with square timber back of the body stupefied between plug template and the wooden wedge.
Further, the tightness of the plug template is adjusted by the fixing device through the upper part or the lower part of the hammer striking wood wedge. The beneficial effects of this application:
the utility model provides a repeatedly usable's tunnel lining plug template fixing device, through vertical reinforcing bar, hoop reinforcing bar, wooden wedge and the stupefied quick installation of steel pipe back of the body with the plug template is fixed and is avoided pouring the in-process template aversion, the device installation is dismantled conveniently, most material is all repeatedly usable, effectively reduce the potential safety hazard that drilling dowel bar brought, reduce fixed cost when realizing firm fixed and quick dismantlement, device simple structure, safe and reliable has better practicality and economic benefits.
Drawings
FIG. 1 is a schematic front elevational view of the present utility model;
FIG. 2 is a schematic diagram of a bulk sample of the present utility model;
fig. 3 is a schematic side elevational view of the present utility model.
The reference numerals in the figures are: 1-longitudinal steel bars; 2-ring-direction steel bars; 3-wooden wedge; 4-back edge of the steel tube; 5-a steel mould trolley; 6-plug templates; 7-square wood back ribs, 8-tunnel primary supports and 9-main ribs; 10-lining concrete.
Detailed Description
The following description of the embodiments of the present application will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all, of the embodiments of the present application. All other embodiments, which can be made by one of ordinary skill in the art without undue burden from the present disclosure, are within the scope of the present disclosure.
In the description of the present application, it should be noted that the azimuth or positional relationship indicated by the terms "vertical", "upper", "lower", "horizontal", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of description of the present application and for simplification of the description, and do not indicate or imply that the apparatus or element in question must have a specific azimuth, be configured and operated in a specific azimuth, and thus should not be construed as limiting the present application.
In the description of the present application, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the terms in this application will be understood by those of ordinary skill in the art as the case may be.
The reusable tunnel lining plug template fixing device comprises longitudinal steel bars 1, circumferential steel bars 2, wooden wedges 3, steel pipe back edges 4 and square wood back edges 7. A plurality of longitudinal steel bars 1 are arranged, one end of a first longitudinal steel bar 1 is welded with a steel mould trolley 5, and a second longitudinal steel bar 1 is welded with a longitudinal main steel bar 99. The 2 steel bars are used as annular steel bars 2 and are respectively welded with the other ends of the longitudinal steel bars 1 to form a whole, and the main function is to transfer the force transferred by the back edges 4 of the steel pipes to the longitudinal steel bars 1. A steel pipe back ridge 4 is arranged below the circumferential steel bar 2, and a plug template 6 is fixed on the steel pipe back ridge 4 through a wooden wedge 3. The wooden wedges 3 are made by cutting wood and mainly act to transfer the force applied by the plug templates 6 to the steel pipe back edges 4. The steel pipe back edge 4 is a steel pipe with phi 48 mm and is arranged below the 2 annular steel bars 2 and mainly used for transmitting the force transmitted by the plug templates 6 to the annular steel bars 2. A square wood back edge 7 is arranged between the plug template 6 and the wood wedge 3, the square wood back edge 7 plays a role in transmitting force, the stress area is increased, and the damage of the plug template 6 is prevented. The end of the lining concrete 10 is completely plugged by the plug templates 6 by adopting the device, and then the concrete can be poured.
The application process comprises the following steps: taking the construction of lining concrete of a certain engineering tunnel as an example, the section of a certain diversion tunnel is U-shaped, the section size is 8.12 multiplied by 8.78m (clear width multiplied by clear height), the design flow is 95m < 3 >/s, the secondary lining of the tunnel is lined by C30 reinforced concrete, and the concrete thickness is designed according to the surrounding rock category condition and 0.3 m-0.7 m. The tunnel lining concrete is poured by adopting a steel mould trolley 5, the concrete is split along the axial direction of the tunnel, the length of each bin is 10.0m, and copper water stop is arranged between the split. Before lining concrete is poured, binding the steel bars, positioning a steel mould trolley 5 after acceptance inspection is qualified, plugging one side of the concrete end by adopting a plug template 6, and finally pouring concrete. Before the concrete end is plugged by the plug template 6, a fixing device of the plug template 6 needs to be prepared in advance. Firstly, arranging longitudinal steel bars 1, welding one end of each phi 12 steel bar to a steel mould trolley 5, wherein the length is 25cm, the welding interval is 50cm, the steel mould trolley is uniformly arranged along the periphery of the steel mould trolley 5, and the other batch of the phi 12 steel bars is uniformly arranged along the periphery of lining concrete, wherein one end of each phi 12 steel bar is welded to a main steel bar 9, the length is 25cm, and the welding interval is 50 cm; and then the 2 phi 20 circumferential steel bars 2 are respectively welded and connected with the other ends of the longitudinal steel bars 1. Preparing a plurality of wooden wedges 3 and steel pipe back edges 4, wherein the steel pipe back edges 4 are steel pipes with the diameter of 48 mm or 3mm, and each steel pipe is 1.0m long; when the plug template 6 is installed, the steel pipe back edge 4 is firstly installed below the 2 annular steel bars 2, the plug template 6 is fixed on the steel pipe back edge 4 by adopting the wooden wedge 3, the tightness of the template can be adjusted by knocking the upper part or the lower part of the wooden wedge 3 through a hammer, the whole lining concrete end is plugged by adopting the plug template 6 according to the method, and concrete can be poured after all plugging is completed. After the concrete strength reaches the design requirement, the formwork can be dismantled, firstly, the wooden wedge 3 is knocked, the plug formwork 6 is loosened, the steel pipe back edge 4 is dismantled, the end formwork is completely dismantled, the steel mould trolley 5 is removed, and the next-warehouse concrete pouring is performed in a reciprocating manner.
The utility model provides a repeatedly usable's tunnel lining plug template fixing device, through vertical reinforcing bar, hoop reinforcing bar, wooden wedge and the stupefied quick installation of steel pipe back of the body with the plug template is fixed and is avoided pouring the in-process template aversion, the device installation is dismantled conveniently, most material is all repeatedly usable, effectively reduce the potential safety hazard that drilling dowel bar brought, reduce fixed cost when realizing firm fixed and quick dismantlement, device simple structure, safe and reliable has better practicality and economic benefits.
Finally, it is noted that the above-mentioned preferred embodiments are only intended to illustrate rather than limit the technical solution of the present application, and that, although the present application has been described in detail by means of the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the scope of the present application as defined by the appended claims.

Claims (1)

1. Reusable tunnel lining plug template fixing device, its characterized in that: the steel pipe back edge is arranged below the circumferential reinforcing steel bar, a plug template is fixed on the steel pipe back edge through the wood wedge, and a square wood back edge is further arranged between the plug template and the wood wedge.
CN202321988897.4U 2023-07-27 2023-07-27 Reusable tunnel lining plug template fixing device Active CN220581040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321988897.4U CN220581040U (en) 2023-07-27 2023-07-27 Reusable tunnel lining plug template fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321988897.4U CN220581040U (en) 2023-07-27 2023-07-27 Reusable tunnel lining plug template fixing device

Publications (1)

Publication Number Publication Date
CN220581040U true CN220581040U (en) 2024-03-12

Family

ID=90113743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321988897.4U Active CN220581040U (en) 2023-07-27 2023-07-27 Reusable tunnel lining plug template fixing device

Country Status (1)

Country Link
CN (1) CN220581040U (en)

Similar Documents

Publication Publication Date Title
CN107574930A (en) It is a kind of that H profile steel and the regeneration monolith connecting node of U-shaped steel are set
CN206748695U (en) The prefabricated edges of boards mould of zigzag
CN220581040U (en) Reusable tunnel lining plug template fixing device
CN211848785U (en) Cast-in-place concrete road terrace template quick supporting and dismounting device
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN106049531B (en) High-moisture ultra-soft soil box multicell cast in place frame method for tunnel construction
CN212027084U (en) Adjustable combined steel formwork with supporting rod
CN108532939A (en) Shear wall single side formwork method
CN207717504U (en) A kind of support construction for ultra-large type bifurcated pipe group&#39;s water pressure test
CN109098456A (en) A kind of aluminum alloy pattern plate Transfer pipe molding machine and construction method
CN109594687A (en) A kind of nodal connection device and its methods and applications for vertical shear wall piece
CN212772377U (en) Recoverable foundation pit steel stand connecting device
CN109826186B (en) General prefabricated reinforced concrete guide wall for underground diaphragm wall and implementation method
CN206503377U (en) A kind of movable railing of steel trestle
CN102051888B (en) Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN219933207U (en) Concrete pouring embedded sleeve
CN205776182U (en) A kind of armored concrete support pile and pile splicing structure thereof
CN213928379U (en) Ditch template for fast pouring of mine underground roadway
CN216476425U (en) Support positioner in wearing structure roof beam steel casing
CN217631268U (en) Comprehensive pipe gallery pipeline buttress pouring mold
CN217896505U (en) Cross water concrete face flatness control device
CN204326495U (en) A kind of structure of tool-type anchored end of Overhanging Outside Scaffold section steel beam
CN212641233U (en) Pile and column integrated assembling type bridge cap beam elevation control equipment
CN219430743U (en) Tubular pile repairing device
CN217839979U (en) Prestressed concrete pipe pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant