JPS5945065B2 - Temporary concrete crushing agent filling hole construction method - Google Patents
Temporary concrete crushing agent filling hole construction methodInfo
- Publication number
- JPS5945065B2 JPS5945065B2 JP817180A JP817180A JPS5945065B2 JP S5945065 B2 JPS5945065 B2 JP S5945065B2 JP 817180 A JP817180 A JP 817180A JP 817180 A JP817180 A JP 817180A JP S5945065 B2 JPS5945065 B2 JP S5945065B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- cap
- standpipe
- crushing agent
- filling hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
【発明の詳細な説明】
本発明は下端にキャップを着脱自在に保持した立管の内
部に円筒形砂袋を挿入した状態を保持し、これを上記キ
ャップから硬化前の生コンクリート内に圧入する工程と
、圧入後立管のみ上方に牽引し離脱して円筒形砂袋柱を
上記生コンクリ−ト内に形成する工程と、同コンクリー
トの硬化後上記砂袋柱内の砂を同コンクリートの外部に
吸引排除して上記砂袋柱を中空孔となす工程の全工程よ
りなる仮設コンクリート破砕剤充填孔施工法に関するも
のであって、上下水道のヒユーム管推進工法のジヤツキ
の反力壁(ジヤツキ受コンクリート壁)や建築用基礎に
採用されているベット杭の杭頭等の解体用破砕孔を振動
、騒音、粉塵発生なしに短時間に行うことを目的とする
ものである。[Detailed description of the invention] The present invention maintains a state in which a cylindrical sand bag is inserted into a standpipe with a cap detachably held at the lower end, and press-fits the sand bag into fresh concrete before hardening through the cap. The process of pulling only the standpipe upwards after press-fitting and separating it to form a cylindrical sand bag column inside the fresh concrete, and the process of removing the sand inside the sand bag column from the outside of the concrete after the concrete hardens. This method is related to the construction method of temporary concrete crushing agent filling hole, which consists of the entire process of making the sand bag column into a hollow hole by suctioning and ejecting it. The purpose is to crush holes for demolition of pile heads of bed piles used in concrete walls (concrete walls) and building foundations in a short time without generating vibration, noise, or dust.
本発明を図面に示す実施例について説明すると、生コン
クリート1を打設してベット杭2を形成し、或はヒユー
ム管推進工法におけるピット内に設けたジヤツキ反力壁
の型枠に生コンクリート1を打設する。To explain the embodiment of the present invention shown in the drawings, ready-mixed concrete 1 is cast to form bed piles 2, or ready-mixed concrete 1 is placed in the formwork of a jack reaction wall provided in a pit in the humid pipe propulsion method. to be poured.
この打設前に予め金属又は硬化合成樹脂等による立管3
の下端に下向円錐形キャップ4の上面嵌合部4′を着脱
自在に嵌合し、同キャップ4に穿設した透孔イに挿通し
た番線5を立管3の上端の透孔に挿通したピン6に掛渡
して上記キャップ4を立管3の下端に保持し、同立管3
の内部に挿入した円筒形砂袋7の下端を上記キャップ4
で保持する。Before this installation, stand pipe 3 made of metal or hardened synthetic resin, etc.
The upper surface fitting part 4' of the downward conical cap 4 is removably fitted to the lower end, and the wire 5 inserted through the through hole A drilled in the cap 4 is inserted into the through hole at the upper end of the standpipe 3. Hold the cap 4 at the lower end of the standpipe 3 by hanging it over the pin 6
The lower end of the cylindrical sand bag 7 inserted into the cap 4
hold it.
立管3は継ぎ管3’、3’をピン8,9で接続してその
長さを加減し或は単一管を用いることができる。For the standpipe 3, the length can be adjusted by connecting the joint pipes 3', 3' with pins 8, 9, or a single pipe can be used.
このようにした砂袋内装立管3をキャップ4から上記硬
化前の生コンクリート1内に圧入するものである。The standpipe 3 inside the sand bag thus constructed is press-fitted from the cap 4 into the fresh concrete 1 before hardening.
圧入に際しては番線接続ピン6に振動機10の下部を挿
入又は係合し同振動機10を動作してこれを圧下すると
立管3は生コンクリート1内にキャップ4から迅速に所
要深度圧入される。When press-fitting, the lower part of the vibrator 10 is inserted or engaged with the wire connecting pin 6, and the vibrator 10 is operated to press down the vertical pipe 3, so that the standpipe 3 is quickly press-fitted into the fresh concrete 1 from the cap 4 to the required depth. .
圧入停止後ペンチで番線5を切断してピン6から分離し
、振動機10と共に或は振動機10をピン6から分離し
立管3のみ手動或はワイヤロープ等で上方に牽引して生
コンクリート1から分離除去すると番線5、キャップ4
および砂袋7は上記生コンクリート1内に残留し砂袋柱
が形成される。After the press-fitting is stopped, cut the wire 5 with pliers to separate it from the pin 6, and separate the vibrator 10 together with the vibrator 10 from the pin 6, and pull only the standpipe 3 upward manually or with a wire rope, etc. to form ready-mixed concrete. When separated and removed from 1, wire 5 and cap 4
The sandbags 7 remain in the fresh concrete 1 to form sandbag pillars.
このような動作によって同生コンクリート1が硬化する
以前に複数個の砂袋柱を形成する(第7図)。By such an operation, a plurality of sandbag pillars are formed before the homogeneous concrete 1 hardens (FIG. 7).
この状態を放置すると同コンクリート1は養生されて硬
化する。If left in this state, the concrete 1 will cure and harden.
この硬化コンクリートの上面に露出している砂袋7の上
端を開き同砂袋7内に吸引ノズル11を挿入し真空式ク
リーナー12で砂袋7内の砂を吸引除去し中空孔13を
形成することができる。The upper end of the sand bag 7 exposed on the upper surface of this hardened concrete is opened, the suction nozzle 11 is inserted into the sand bag 7, and the sand inside the sand bag 7 is suctioned and removed by the vacuum cleaner 12 to form a hollow hole 13. be able to.
尚図中14で示すものは継ぎ管3’、3′に穿設じた継
ぎピン挿入孔、15は粘土バッキング、16は圧入深度
規準棒、17は圧入深度指示レベルである。In the figure, reference numeral 14 indicates a connecting pin insertion hole drilled in the connecting pipes 3', 3', 15 is a clay backing, 16 is a press-in depth standard rod, and 17 is a press-in depth indication level.
従って上記コンクリート1が凝結し工事終了後上記中空
孔13の一つ置きに静的破砕剤18(商標名プライスタ
ー、小野田セメント製)を充填し、これに点火すると同
破砕剤18が無1騒音、無振動で飛石、粉塵およびガス
等の発生なく強力に膨張しく 3000 t/m”)第
11図、第12図に示す亀裂14を発生する。Therefore, after the concrete 1 has solidified and construction is completed, a static crushing agent 18 (trade name Plaister, manufactured by Onoda Cement) is filled into every other hollow hole 13, and when it is ignited, the crushing agent 18 produces no noise. , it expands strongly without vibration and without the generation of flying stones, dust, gas, etc. (3000 t/m") and generates the cracks 14 shown in FIGS. 11 and 12.
この亀裂14によって上記コンクリート1は容易に分割
除去することができる。These cracks 14 allow the concrete 1 to be easily divided and removed.
従来凝結した堅固なコンクリートに静的破砕剤充填用そ
の他の内部加熱式破砕用孔を穿設する場合はエヤコンプ
レッサー、クローラ−ドリル等を要し、騒音、振動、粉
塵等を発生しかつ穿孔作業に長時間を要するもめであっ
た。Traditionally, when drilling holes for static crushing agent filling or other internal heating type crushing in solidified concrete, an air compressor, crawler drill, etc. is required, which generates noise, vibration, dust, etc., and the drilling process is difficult. It was a long-running dispute.
本発明は上述の方法によったので土木施工後廃棄又は破
砕するベット杭の頭部やヒユーム管推進用ジヤツキの反
力壁等に予め迅速に破砕剤充填孔13を形成し、迅速に
破砕し得て工期を短縮し得るばかりでなく設備費を軽減
しかつ騒音、振動および粉塵等の発生が無く市街地にお
ける穿孔施工に適するものである。Since the present invention is based on the above-mentioned method, the crushing agent filling hole 13 is quickly formed in advance in the head of the bed pile to be discarded or crushed after civil engineering work, the reaction wall of the jack for propelling the humid pipe, etc., and the crushing agent filling hole 13 is quickly crushed. This not only shortens the construction period but also reduces equipment costs and does not generate noise, vibration, dust, etc., making it suitable for drilling in urban areas.
第1図は本発明の仮設コンクリート破砕剤充填孔施工法
に用いる装置の縦断側面図、第2図および第3図はそれ
ぞれ継ぎ管の斜視図、第4図は上記施工法の側面図、第
5図は立管上方牽引状態の側面図、第6図は立管1個の
場合の施工装置の側面図、第7図は砂袋柱形成状態の側
面図、第8図は砂吸引状態の側面図、第9図は静的破砕
剤充填状態の縦断側面図、第10図は第9図の平面図、
第11図は亀裂発生状態の縦断側面図、第12図は第1
1図の平面図である。
4・・・・・・キャップ、3・・・・・・立管、7・・
・・・・円筒形砂袋、1・・・・・・生コンクリート、
13・・・・・・中空孔、4′・・・・・・嵌合部、5
・・・・・・番線。Fig. 1 is a vertical side view of the device used in the temporary concrete crushing agent filling hole construction method of the present invention, Figs. Figure 5 is a side view of the standpipe being pulled upwards, Figure 6 is a side view of the construction equipment for one standpipe, Figure 7 is a side view of the sand bag column forming state, and Figure 8 is the sand suction state. A side view, FIG. 9 is a vertical side view of the static crushing agent filled state, FIG. 10 is a plan view of FIG. 9,
Figure 11 is a vertical cross-sectional side view of the state in which cracks have occurred, and Figure 12 is the first
FIG. 1 is a plan view of FIG. 4... Cap, 3... Standpipe, 7...
... Cylindrical sand bag, 1 ... Ready-mixed concrete,
13...Hollow hole, 4'...Fitting part, 5
・・・・・・Platform line.
Claims (1)
部に円筒形砂袋7を挿入した状態を保持し、これを上記
キャップ4から硬化前の生コンクリート1内に圧入する
工程と、圧入後立管3のみ上方に牽引し離脱して円筒形
砂袋柱を上記生コンクリート1内に形成する工程と、同
コンクリート1の硬化後上記砂袋柱内の砂を同コンクリ
ート1の外部に吸引排除して上記砂袋柱を中空孔13と
なす工程の全工程よりなる仮設コンクリート破砕剤充填
孔施工法。 2 キャップ4が逆円錐形であって上面に嵌合部4′を
突設した特許請求の範囲第1項記載の仮設コンクリート
破砕剤充填孔施工法。 3 立管3の上端部とキャップ4とを番線5で接続する
ことによってキャップ4を立管3の下端に保持した特許
請求の範囲第1項記載の仮設コンクIJ−ト破砕剤充填
孔施工法。[Scope of Claims] 1. A cylindrical sand bag 7 is inserted into a standpipe 3 which has a cap 4 removably attached to its lower end, and is inserted from the cap 4 into the ready-mixed concrete 1 before hardening. A process of press-fitting, a process of pulling only the standpipe 3 upwards and separating it after press-fitting to form a cylindrical sand bag column in the fresh concrete 1, and a process of removing the sand in the sand bag column after the concrete 1 hardens. A temporary concrete crushing agent filling hole construction method comprising the entire process of forming the sand bag pillar into a hollow hole 13 by suctioning it to the outside of the concrete 1. 2. The method for constructing a temporary concrete crushing agent filling hole according to claim 1, wherein the cap 4 has an inverted conical shape and has a fitting portion 4' projecting from its upper surface. 3. A temporary concrete IJ-crushing agent filling hole construction method according to claim 1, in which the cap 4 is held at the lower end of the standpipe 3 by connecting the upper end of the standpipe 3 and the cap 4 with a wire 5. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP817180A JPS5945065B2 (en) | 1980-01-25 | 1980-01-25 | Temporary concrete crushing agent filling hole construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP817180A JPS5945065B2 (en) | 1980-01-25 | 1980-01-25 | Temporary concrete crushing agent filling hole construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS56105015A JPS56105015A (en) | 1981-08-21 |
JPS5945065B2 true JPS5945065B2 (en) | 1984-11-02 |
Family
ID=11685876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP817180A Expired JPS5945065B2 (en) | 1980-01-25 | 1980-01-25 | Temporary concrete crushing agent filling hole construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5945065B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5961617A (en) * | 1982-09-30 | 1984-04-07 | Sanyo Kogyo Kk | Chipping operation of on-site pile |
-
1980
- 1980-01-25 JP JP817180A patent/JPS5945065B2/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
JPS56105015A (en) | 1981-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2146645A (en) | Foundation construction | |
US4165198A (en) | Method for forming pier foundation columns | |
CN107859352A (en) | Consolidation process construction at skyscraper different strength concrete bean column node | |
JPS5945065B2 (en) | Temporary concrete crushing agent filling hole construction method | |
US1181212A (en) | Method of constructing pile foundations. | |
CN108194101A (en) | A kind of constructing tunnel technique | |
JP2790038B2 (en) | Reinforcement method of existing pile foundation building | |
JPS58204216A (en) | Treatment of head of on-site concrete pile | |
JP6616180B2 (en) | Construction method of foundation pile with reinforced pile head | |
JPH0432166B2 (en) | ||
JP2741095B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JP3323470B2 (en) | Concrete placement method in reverse winding method | |
JP2002115249A (en) | Device and method for treating pile head | |
JP2564465B2 (en) | Ready-made pile burying method | |
JPH08177044A (en) | Constructing method of cast-in-place concrete pile and form device for molding pile head used for constructing method | |
JPH05163841A (en) | Concrete structure and constructing and crushing thereof | |
JPH03183819A (en) | Construction of end-open pile foundation | |
JPS5955913A (en) | Placement of binder-mixed sand pile | |
JPH0336965B2 (en) | ||
JPH05331852A (en) | Construction of hollow pipe pile | |
JPS6132454B2 (en) | ||
JPH0274717A (en) | Piling method for sheet pile | |
JPH07331666A (en) | Slope cutting method | |
JPS6245370B2 (en) | ||
JPH1025733A (en) | Preparation method of sand pile |