Intermediate jack station for steel pipe propulsion

Info

Publication number
JPS5941270Y2
JPS5941270Y2 JP6066080U JP6066080U JPS5941270Y2 JP S5941270 Y2 JPS5941270 Y2 JP S5941270Y2 JP 6066080 U JP6066080 U JP 6066080U JP 6066080 U JP6066080 U JP 6066080U JP S5941270 Y2 JPS5941270 Y2 JP S5941270Y2
Authority
JP
Japan
Prior art keywords
tube
propulsion
short
ring
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP6066080U
Other languages
Japanese (ja)
Other versions
JPS56163193U (en
Inventor
信夫 笠牟田
隆雄 入野
文男 辻本
俊明 秋葉
Original Assignee
日本鋼管工事株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本鋼管工事株式会社 filed Critical 日本鋼管工事株式会社
Priority to JP6066080U priority Critical patent/JPS5941270Y2/en
Publication of JPS56163193U publication Critical patent/JPS56163193U/ja
Application granted granted Critical
Publication of JPS5941270Y2 publication Critical patent/JPS5941270Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は、鋼管の地中推進4行う際の中間ジヤツキステ
ーションに関するものであって、装を着脱に際して、本
管内面え損傷させることなく、良質な管接合え行うこと
のできること種のステーション金実現すること全目的と
する。
[Detailed description of the invention] This invention relates to an intermediate jacking station for underground propulsion of steel pipes 4, which allows high-quality pipe joints to be made without damaging the inner surface of the main pipe when attaching and removing fittings. It is possible to achieve all kinds of station gold with the objective.

鋼管□長距輪推進するためには、立坑内の元押ジヤツキ
だけでは推力が不足したり、鋼管が挫屈したりするため
、推進鋼管の中間にジヤツキ用のステーションえ設け、
ここに中間ジヤツキ全着脱ニ装着し、これに補助推進作
中エサせるようにしている。
Steel pipes □In order to propel long-distance wheels, the thrust force is insufficient or the steel pipes buckle if only the main jacks in the shaft are used, so a jacking station is installed in the middle of the propulsion steel pipes.
A fully removable intermediate jack is installed here, and this can be fed during auxiliary propulsion operations.

第1図は、従来公知の中間ジヤツキステーションの説明
図で、イは、先行推進管P1および後行推進管P2に装
置え装着した状態え示す断面図であり、口は先行推進管
P1と後行推進管P2の各端面4当接し、該部の溶接音
完了した状態4示す断面図である。
FIG. 1 is an explanatory diagram of a conventionally known intermediate jacking station, and A is a cross-sectional view showing a state in which the device is attached to the leading propulsion tube P1 and the trailing propulsion tube P2, and the opening is connected to the leading propulsion tube P1. It is a cross-sectional view showing a state 4 in which each end face 4 of the trailing propulsion pipe P2 is in contact and the welding sound of the part is completed.

イ図において、先行推進管P1卦よび後行推進管P2の
各端面には、ばじめリフ2b1.2b2によって補強さ
れた当て金リング2a1.2a2がそれビれ固定でれて
卦り、また先行推進管P□には、外部カラー1が装着で
れ、後行推進管P2には、ストッパー3およびパツキン
4が装着でれている。
In the figure, a pad ring 2a1.2a2 reinforced by a fitting ridge 2b1.2b2 is secured to each end face of the leading propulsion tube P1 and the trailing propulsion tube P2. An external collar 1 is attached to the leading propulsion tube P□, and a stopper 3 and a gasket 4 are attached to the trailing propulsion tube P2.

先行推進管P1と後行推進管P2とは、所定間隔で接近
し、両管端面に固定されている当て金リング2a1,2
a2が対向する中間の間隙に図では示してない中間ジヤ
ツキ金挾着させて推進し、所定距離推進した位置におい
て、中間推進作中全行わせる。
The leading propulsion tube P1 and the trailing propulsion tube P2 are close to each other at a predetermined interval, and there are pad rings 2a1 and 2 fixed to the end surfaces of both tubes.
A2 is propelled by attaching an intermediate jack (not shown) to the intermediate gap in the opposing position, and at a position where the a2 has been propelled a predetermined distance, the entire intermediate propulsion operation is performed.

中間推進作中完了後は、先行推進管PIs後行推進管P
と、リプ2b1,2b2との溶接部(すみ内部)2c
1s2c2に溶断することによって各当て金リング2a
□、2 a 2 k離脱し、口図に示す如く、後行推進
管P2倉漸進せしめて、円椎進管P 1 、P 2の端
面金当接し、この当接面全溶接するようにしている。
After the intermediate propulsion operation is completed, the leading propulsion pipe PIs and the trailing propulsion pipe P
and the welded part (inside the corner) 2c with lips 2b1 and 2b2
Each padding ring 2a is cut by melting into 1s2c2.
□, 2 a 2 k are separated, and as shown in the diagram, the trailing propulsion tube P2 is gradually advanced, and the end surfaces of the cylindrical advancement tubes P 1 and P 2 are brought into contact with metal, and the contact surfaces are fully welded. There is.

このような従来公知の手法によれば、リブ2b□2b2
’に円椎進管P1.P2より離脱するのに、すみ内部2
C1t2e2付近金溶断する必要があるために、本管内
面定損傷する心配があり、特に中小口径管では熟練作業
4要し、大口径管においても溶断後の仕上げ作業に相当
の時間4要していた。
According to such a conventionally known method, the rib 2b□2b2
'The vertebral progression canal P1. To leave from P2, corner inside 2
Since it is necessary to melt the gold around C1t2e2, there is a risk of damage to the inner surface of the main pipe, especially for small and medium diameter pipes, which requires skilled work, and even for large diameter pipes, it takes a considerable amount of time to finish the work after melting. Ta.

筐た、この手法によるものは、止水性が十分でなく、湧
水池においては、能率1品質とも低下する傾向があった
However, this method did not have sufficient water-stopping properties, and in spring ponds, both efficiency and quality tended to decline.

ここにおいて、本考案は従来におけるこのようす欠点の
ない中間ジヤツキステーションに提供りようとするもの
である。
Here, the present invention seeks to provide an intermediate jacking station that does not have these drawbacks of the prior art.

本考案においては、後行推進管の管端に第1の短管倉固
着するとともに、この短管の外周に第1と第2のストッ
パー4設け、捷た、先行推進管の後端に第2の短管え固
着するとともに、この短管の外囲にリングえ介して、第
1と第2のストッパー倉十分カバーする長さえもったカ
ラー全装着させ、カラーの内側であって、第1の短管と
第2の短管の両方にまたかるように帯環状の裏当金倉介
装させたこと金構戊上の特徴としている。
In the present invention, a first short tube is fixed to the end of the trailing propulsion tube, and first and second stoppers 4 are provided on the outer periphery of this short tube, and a At the same time, a ring is inserted around the outer circumference of the short tube, and a collar that is long enough to cover the first and second stopper chambers is fully attached. The main feature of the metal structure is that a ring-shaped backing metal plate is interposed so as to span both the first short pipe and the second short pipe.

第2図は本考案にかかわる装置全推進管に装着し中間推
進後、各推進管に固着した各短管5,6の端部全それぞ
れ切断して当接し、溶接が完了した状態金石す断面図、
第3図は第2図におけるA部の拡大図、第4図〜第8図
は本考案にかかわる装置の使用法に示す説明図である。
Figure 2 shows a cross-section of the device related to the present invention when it is attached to all propulsion tubes and after intermediate propulsion, the ends of the short tubes 5 and 6 fixed to each propulsion tube are cut and abutted, and welding is completed. figure,
FIG. 3 is an enlarged view of section A in FIG. 2, and FIGS. 4 to 8 are explanatory diagrams showing how to use the apparatus according to the present invention.

これらの図において、先行推進管P□の後端および後行
推進管P2の管端には、それぞれこれら本管と同一の管
径、管厚、管材の短管5および6が固着でれている。
In these figures, short tubes 5 and 6 of the same diameter, thickness, and material as these main tubes are fixed to the rear end of the leading propulsion tube P□ and the tube end of the trailing propulsion tube P2, respectively. There is.

短管5の管端付近の外面には、上面前方に傾斜した針面
52akもつリング52が環装でれるとともに、環状の
ディスタンドビス53倉介してカラー54が環装でれて
おり、リング52の片側面とディスタンドピース53お
よびカラー54の端面とが固定されている。
On the outer surface of the short tube 5 near the tube end, a ring 52 having a needle surface 52ak inclined forward on the upper surface is mounted, and a collar 54 is mounted around the ring through an annular distance screw 53. One side of 52 and the end surfaces of distance piece 53 and collar 54 are fixed.

ディスタンドピース53は、短管5の端部切断前の管端
より所定寸法L1(第6図参照)だけ後退した位置に固
定されており、カラー54と短管5の外面との間に所定
間隙W14保持でせる。
The distance piece 53 is fixed at a position set back by a predetermined distance L1 (see FIG. 6) from the end of the short pipe 5 before the end is cut, and has a predetermined distance between the collar 54 and the outer surface of the short pipe 5. This can be done by maintaining the gap W14.

カラー54は、他端側が短管5の端部より所要寸法だけ
突出する(長く延びた)所定巾W2の円筒であって、突
出した端部には例えばゴムの防水性9弾性体の帯環状土
砂流入防止帯55が固定されている。
The collar 54 is a cylinder with a predetermined width W2 whose other end protrudes from the end of the short tube 5 by a predetermined dimension (elongated), and the protruding end has a ring-shaped band made of waterproof elastic material made of rubber, for example. An earth and sand inflow prevention belt 55 is fixed.

短管5の端部切断前の端面には、管軸に直角なる向きで
帯環状の当てリング56(第4図、第5図参照)が固定
され、またこの当てリング56の裏側複数個所には、補
強用リプ57が短管5の内面及び当てリング56に当接
して固定されている。
An annular band-shaped stopper ring 56 (see FIGS. 4 and 5) is fixed to the end surface of the short pipe 5 before the end is cut in a direction perpendicular to the tube axis, and a ring is attached at multiple locations on the back side of the stopper ring 56. A reinforcing lip 57 is fixed in contact with the inner surface of the short tube 5 and the stopper ring 56.

短管7の外面には、端部切断前の管端部より所要寸法L
5 s L 6 (第6図参照)離れた外面にそれぞ
れ厚でI2.I3であって帯環状のストッパー62.6
3が固定でれており、それぞれの前部に環状で防水性、
弾性体のパツキン64および65が摺動自在に環装され
ている。
The outer surface of the short pipe 7 has a required dimension L from the pipe end before cutting the end.
5 s L 6 (see Figure 6) each with a thickness of I2. on separate outer surfaces. I3 and ring-shaped stopper 62.6
3 is fixed, and the front part of each is ring-shaped and waterproof.
Elastic gaskets 64 and 65 are slidably mounted around the ring.

短管6の端部切断前の前方端図には、管軸に直角なる向
きで帯環状の当てリング66(第4図、第5図参照)が
固定でれ、また補強1”I4 リブ67が当てリング6
6と短管6の内面に当接して固定でれている。
In the front end view of the short tube 6 before the end is cut, an annular support ring 66 (see FIGS. 4 and 5) is fixed in a direction perpendicular to the tube axis, and a reinforcing 1" I4 rib 67 is fixed. Guaranteed ring 6
6 and the inner surface of the short tube 6 and is fixed thereto.

当てリング56と当てリング66とは、はぼ同一形状で
あって、互に対向し、この間に中間ジヤツキ8が装着込
れる。
The abutment ring 56 and the abutment ring 66 have substantially the same shape and face each other, and the intermediate jack 8 is fitted between them.

裏当金7は、中間推進作業完了後に短管5と短管6とに
またがるように介装づれるものであって、所定巾W3、
所定厚さI4の帯環状の金属で、管軸方向に複数個に分
割されている。
The backing metal 7 is inserted so as to span the short pipes 5 and 6 after the intermediate propulsion work is completed, and has a predetermined width W3,
It is a ring-shaped metal band having a predetermined thickness I4, and is divided into a plurality of pieces in the tube axis direction.

ここで、この裏当金7の巾W3は、後述する寸法L1
、L3を如えたものより小チク、第3図に示すように裏
当金7が環装されたとき、一端はディスタンドピース5
3の側面に当接し、他端はパツキン65奮介してストッ
パー63と当接する。
Here, the width W3 of this backing metal 7 is the dimension L1 described later.
, is smaller than that of L3. When the backing metal 7 is ring-mounted as shown in FIG.
3, and the other end comes into contact with a stopper 63 through a gasket 65.

なお、ストッパー62,63の厚でI2 、I3は、こ
れら?環装した短管6が、カラー54内に内嵌1され自
由に摺動し得るように選定でれている。
Furthermore, the thicknesses of the stoppers 62 and 63, I2 and I3, are these? A short encircled tube 6 is selected to fit inside the collar 54 and to be able to slide freely.

渣た、カラー54の巾W2や各短管の端部切断後の端面
からディスタンドピース531での寸法L□ストッパー
62.63までの寸法L 2 、L 3は、中間ジヤ
ツキ8の伸縮中および裏当金7の巾W3との関係で、装
置の作中が円滑に行なわれるように設計でれているもの
とする。
The width W2 of the collar 54 and the dimensions L 2 and L 3 from the end face of each short pipe after cutting the end to the distance L □ stopper 62.63 at the distance piece 531 are determined by the width W2 of the collar 54 and the dimensions L 2 and L 3 from the end surface after cutting the end of each short pipe to the dimension L □ stopper 62.63 during the expansion and contraction of the intermediate jack 8 and In relation to the width W3 of the backing metal 7, it is assumed that the design is such that the device can be operated smoothly.

このように構成した装置の使中法倉次に第4図〜第8図
全参照しながら説明する。
The operation of the apparatus constructed in this way will now be explained with reference to all of FIGS. 4 to 8.

推進側立坑において、先行推進管P1の後端と、短管5
の先端牙溶接し、曾た、後行推進管P2の先端と短管6
の後端櫨溶接する。
In the propulsion side shaft, the rear end of the preceding propulsion pipe P1 and the short pipe 5
Welded the tip of the trailing propulsion tube P2 and the short tube 6.
Weld the rear end.

次に、短管6の先部全短管5のカラー54に内挿し、一
方の当てリング56と他方の当てリング660間隔全所
要にして当てリング66または56に複数個の中間ジヤ
ツキ84管軸に平行して着脱自在に固定し、そのシリン
ダー前面が対向する当てリング56またば66に当接す
るようにして後行推進管Pz k元押しジヤツキ(図示
せず)で押圧し推進させる(第4図参照)。
Next, the entire tip of the short tube 6 is inserted into the collar 54 of the short tube 5, and a plurality of intermediate jacks 84 are attached to the abutment ring 66 or 56 with the entire interval between one abutment ring 56 and the other abutment ring 660. The cylinder is removably fixed in parallel with the rearward propulsion tube Pzk so that the front surface of the cylinder comes into contact with the opposing abutment ring 56 or 66, and the trailing propulsion tube Pzk is pressed and propelled by a pusher jack (not shown) (fourth (see figure).

装置部が地中の所定位置に到達したとき、中間ジヤツキ
82作用せしめ先行推進管P1に所要量推進したのち(
第5図参照)、元押しジヤツキで後行推進管P24推進
すると同時に、伸長した中間ジヤツキ8のシリンダー全
収縮させる。
When the device reaches a predetermined position underground, the intermediate jack 82 is activated to propel the advance propulsion pipe P1 by the required amount (
(Refer to Fig. 5), the rearward propulsion pipe P24 is propelled by the main push jack, and at the same time, the cylinder of the extended intermediate jack 8 is fully retracted.

これらの作業は従来技術のものと変るところはない。These operations are no different from those of the prior art.

中間推進作業完了後は、第6図において破線で示した部
分、即ち、当てリング56,66および補強用リブ57
,67の部分音それぞれ摩り除くため、短管5の後部お
よび短管6の前部定管軸に直角な端面となるように溶断
する。
After the intermediate propulsion work is completed, the parts indicated by broken lines in FIG.
, 67, the rear part of the short pipe 5 and the front part of the short pipe 6 are cut by melting so that the end faces are perpendicular to the fixed pipe axis.

この際の溶断は、図示する寸法L工、L2 、L3 k
保持するようになされる。
The fusing at this time is the dimensions L, L2, L3 k shown in the diagram.
made to hold.

次に、第7図に示すように、この管端間隙より複数に分
割でれた裏当金74端部切断後の短管5の外面とカラー
54との間隙(巾W1に環装する。
Next, as shown in FIG. 7, the backing metal 74, which has been divided into a plurality of pieces from this tube end gap, is ringed to the gap (width W1) between the outer surface of the short tube 5 after cutting and the collar 54.

次に第8図に示すように移行推進管P2全矢印に示す方
向に漸進せしめ各短管5と短管6の切断端面金当接する
Next, as shown in FIG. 8, the transfer propulsion pipe P2 is gradually advanced in the direction shown by the arrow, and the cut end surfaces of the short pipes 5 and 6 come into contact with each other.

このようにすると、裏当金7の巾W3の短管5より突出
した部分は、短管6の外面とカラー54の内面との間隙
(巾■′、)に内挿され、裏当金7は短管5と短管6の
両方に寸たかり、一方の端面ばディスタンドピース53
の測面に当接し、他方の端面ばストッパー63との間に
パツキン65金挾持し、これ金適度の力で押圧する。
In this way, the part of the backing metal 7 having the width W3 that protrudes from the short tube 5 is inserted into the gap (width ■') between the outer surface of the short tube 6 and the inner surface of the collar 54, and the backing metal 7 is attached to both the short pipe 5 and the short pipe 6, and the distance piece 53 is placed on one end face.
The gasket 65 is held between the other end surface and the stopper 63, and the metal is pressed with an appropriate force.

最後に、短管5と短管6の当接部21全溶接して作業え
完了する。
Finally, the contact portions 21 of the short pipes 5 and 6 are completely welded to complete the work.

ここで、管外よりの土砂や地下水等の流入は、土砂流入
防止帯55゜パツキン64.65等により完全に防止で
きるので、短管5と60当接部の溶接は、裏当金7の効
田と相俟って良好に行うことができる。
Here, the inflow of earth, sand, groundwater, etc. from outside the pipe can be completely prevented by the earth and sand inflow prevention band 55° packing 64, 65, etc., so welding of the abutment part of the short pipes 5 and 60 is performed using the backing metal 7. It can be performed well in conjunction with Eida.

以上説明したように、本考案にかかわる装置によれば、
従来技術のように当てリング及びその補強用リブ金除去
するために、本管内面4損傷したり、その補修に多大の
時間4要することなく、良好な継手部が得られるもので
、実田上の効果は極めて大きい。
As explained above, according to the device related to the present invention,
A good joint can be obtained without damaging the inner surface of the main pipe 4 or requiring a large amount of time 4 to repair it due to the removal of the retaining ring and its reinforcing rib metal as in the conventional technology. The effect is extremely large.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来公知の中間ジヤツキステーションの説明図
で、イは先行推進管および後行推進管に装置金装着した
状態金石す断面図、口は先行推進管と後行推進管の各端
面奮当接し、核部の溶接え完了した状態4示す断面図、
第2図は本考案にかかわる装置定推進管に装着し、中間
推進後、各短管の端部えそれぞれ切断して当接し、溶接
が完了した状態え示す断面図、第3図は第2図における
A部の拡大図、第4図〜第8図は本考案にかかわる装置
の使弔法金示す説明図で、第4図は、先行推進管と後行
推進管に実施例装置および中間ジヤツキ全装着した状態
4示す断面図、第5図は第4図において、中間ジヤツキ
のシリンダー4伸長でせた状態金石す断面図、第6図は
、各短管端部上切断した状態え示す断面図、第7図は裏
当金4短管に環装した状態金石す断面図、第8図は切断
後の各短管端面金当接し、核部の溶接音完了した状態金
石す断面図である。 Pl・・・・・・先行推進管、P2・・・・・・後行推
進管55゜6・・・・・・短管、52・・・・・・リン
グ、53・・・・・・ディスタンドピース、54・・・
・・・カラー、55・・・・・・土砂流入防止帯、56
,66・・・・・・当てリング、57,67・・・・・
・補強リフ、62,63・・・・・・ストッパー、64
゜65・・・・・・パツキン、7・・・・・・裏当金、
8・・・・・・中間ジヤツキ、21・・・・・・溶接部
Fig. 1 is an explanatory diagram of a conventionally known intermediate jacking station, where A is a cross-sectional view of the device mounted on the leading and trailing propulsion tubes, and the opening is each end face of the leading and trailing propulsion tubes. Cross-sectional view 4 showing state 4 of complete abutment and core welding;
Fig. 2 is a cross-sectional view showing a state in which the device according to the present invention is attached to a constant propulsion tube, and after intermediate propulsion, the ends of each short tube are cut and abutted, and welding is completed. An enlarged view of part A in the figure, and FIGS. 4 to 8 are explanatory diagrams showing the condolence money of the device related to the present invention. FIG. Fig. 5 is a cross-sectional view showing the state in which the jacks are fully installed. Fig. 5 is a cross-sectional view of the cylinder 4 of the intermediate jack in a state where it has been stretched due to extension. Fig. 6 is a cross-sectional view showing the state in which the top of each short pipe is cut 7 is a cross-sectional view of the gold stone with the backing ring attached to the four short pipes, and Figure 8 is a cross-sectional view of the gold stone with the end face of each short pipe after cutting and the welding sound at the core has been completed. It is. Pl... Leading propulsion tube, P2... Trailing propulsion tube 55°6... Short tube, 52... Ring, 53... Distance Piece, 54...
... Color, 55 ... Sediment inflow prevention zone, 56
,66...Attaching ring,57,67...
・Reinforcement riff, 62, 63...Stopper, 64
゜65...Patsukin, 7...Backing money,
8... Intermediate jack, 21... Welded part.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 後行推進管の管端に固着された第1の短管と、この第1
の短管の外面に設けられた第1と第2のストッパーと、
先行推進管の後端に固着された第2の短管と、この第2
の短管の外測にリング合弁して装着され、かつ前記第1
.第2のストッパ−4十分カバーする長さえ有するカラ
ーと、前記第1、第2ストツパーと前記カラーの内側に
介装された第1.第2のパツキンと、前記第1パツキン
と前記カラー基部との間隙に装着された帯環状の裏当金
と全具備する鋼管推進中中間ジヤツキステーション。
a first short tube fixed to the tube end of the trailing propulsion tube;
first and second stoppers provided on the outer surface of the short tube;
a second short tube fixed to the rear end of the leading propulsion tube;
The ring is jointly attached to the outer diameter of the short pipe, and the first
.. a collar having a length sufficient to cover the second stopper 4, and a first stopper interposed inside the first and second stoppers and the collar. An intermediate jacking station during steel pipe propulsion, which is completely equipped with a second packing and a ring-shaped backing metal installed in a gap between the first packing and the base of the collar.
JP6066080U 1980-05-06 1980-05-06 Intermediate jack station for steel pipe propulsion Expired JPS5941270Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6066080U JPS5941270Y2 (en) 1980-05-06 1980-05-06 Intermediate jack station for steel pipe propulsion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6066080U JPS5941270Y2 (en) 1980-05-06 1980-05-06 Intermediate jack station for steel pipe propulsion

Publications (2)

Publication Number Publication Date
JPS56163193U JPS56163193U (en) 1981-12-04
JPS5941270Y2 true JPS5941270Y2 (en) 1984-11-27

Family

ID=29655086

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6066080U Expired JPS5941270Y2 (en) 1980-05-06 1980-05-06 Intermediate jack station for steel pipe propulsion

Country Status (1)

Country Link
JP (1) JPS5941270Y2 (en)

Also Published As

Publication number Publication date
JPS56163193U (en) 1981-12-04

Similar Documents

Publication Publication Date Title
AU611631B2 (en) Welding apparatus
US3720069A (en) Pipeline laying operation with explosive joining of pipe sections
GB1366191A (en) Method and apparatus for constructing and connecting underwater risers
JPS5941270Y2 (en) Intermediate jack station for steel pipe propulsion
US3750928A (en) Vacuum seal for internal pipeline line-up clamp
US3985279A (en) Method for explosive welding tubular members using a mandrel
JPS6051295A (en) Internal pushing construction method of pipe body
JP2001108147A (en) Sheath pipe system jacking method and propulsion force transmitting device
JPS5938476B2 (en) Intermediate pushing method using steel pipes
JPS622396Y2 (en)
JPH0236758B2 (en)
JP2003232467A (en) Pipe inserting construction method and pipe joint structure used therefor
JP2719299B2 (en) Forward conduit
JPH023028Y2 (en)
JPH0144622Y2 (en)
JPH0112050Y2 (en)
JPH0220306Y2 (en)
JP2006336272A (en) Propelling pipe for advancing along curve
JPH05346095A (en) Propulsion double steel pipe
JPS6030840B2 (en) Propulsion tube injection material injection device
JP3393545B2 (en) Method of connecting buried pipe in excavation propulsion device and propulsion device
JPS54114821A (en) Rapid laying construction method for large-diameter steel pipe
JP3093883B2 (en) Propulsion method
JP2982843B2 (en) Double propulsion pipe for burial
JPS583479B2 (en) How to connect piping