JPS5936610Y2 - Hole forming device for temporary concrete crushing - Google Patents

Hole forming device for temporary concrete crushing

Info

Publication number
JPS5936610Y2
JPS5936610Y2 JP842980U JP842980U JPS5936610Y2 JP S5936610 Y2 JPS5936610 Y2 JP S5936610Y2 JP 842980 U JP842980 U JP 842980U JP 842980 U JP842980 U JP 842980U JP S5936610 Y2 JPS5936610 Y2 JP S5936610Y2
Authority
JP
Japan
Prior art keywords
pipe
forming device
hole forming
concrete
crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP842980U
Other languages
Japanese (ja)
Other versions
JPS56110245U (en
Inventor
忠士 城戸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP842980U priority Critical patent/JPS5936610Y2/en
Publication of JPS56110245U publication Critical patent/JPS56110245U/ja
Application granted granted Critical
Publication of JPS5936610Y2 publication Critical patent/JPS5936610Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【考案の詳細な説明】 本案は下端にキャンプ1を着脱自在に嵌合し、内部に砂
袋3を収容し得るパイプ2の上端部に横向ピン4を挿着
し、同横向ピン4の両端部と上記キャンプ1とを線材5
で接続するよう構成した仮設コンクリート破砕用孔形成
装置に関するものである。
[Detailed description of the invention] In the present invention, a camp 1 is removably fitted to the lower end, a horizontal pin 4 is inserted into the upper end of the pipe 2 which can accommodate the sand bag 3 inside, and both ends of the horizontal pin 4 are inserted into the upper end of the pipe 2. section and the above camp 1 to the wire rod 5
This invention relates to a hole forming device for temporary concrete crushing that is configured to be connected by.

キャンプ1は逆円錐形でありその上面にパイプ嵌合部1
′を有する。
The camp 1 has an inverted conical shape and has a pipe fitting part 1 on its top surface.
′.

パイプ2は第1図に示すように長さ調節用継ぎパイプ2
/、 2IIを接続して長く形成しても良いし、又第4
図に示すように継ぎパイプ2′、2“を省略した短いも
のでも良い。
The pipe 2 is a connecting pipe 2 for length adjustment as shown in Fig. 1.
/, 2II may be connected to form a long one, or the fourth
As shown in the figure, a short one may be used in which the connecting pipes 2' and 2'' are omitted.

同パイプ2は金属又は合成樹脂製であり薄肉に形成する
The pipe 2 is made of metal or synthetic resin and has a thin wall.

砂袋3は細長い円筒状のビニール袋に細目砂を充填し、
同ビニール袋の上端部を紐等で縛って閉鎖したものであ
る。
Sand bag 3 is a long and narrow cylindrical plastic bag filled with fine sand.
The plastic bag is closed by tying the top end with a string or the like.

同砂袋3の径は上記パイプ2の径よりも若干小さくシ、
パイプ2の内部に同砂袋3を収容した際にパイプ2面と
の間に若干の間隙が出来るようにしてビニール袋の損傷
を防止する。
The diameter of the sand bag 3 is slightly smaller than the diameter of the pipe 2,
When the sand bag 3 is housed inside the pipe 2, a slight gap is created between the sand bag 3 and the surface of the pipe 2 to prevent damage to the plastic bag.

横向ピン4はパイプ2の上端部に穿設したピン孔に両端
を突出して挿着する。
The horizontal pin 4 is inserted into a pin hole drilled in the upper end of the pipe 2 with both ends protruding.

線材5は番線を用い上記キャンプに横向きに穿設した透
孔6内に挿通し、同線材50両端を上記ピン40両端に
それぞれ巻回して接続し、キャンプ1がパイプ2から脱
落することのないようにする。
The wire rod 5 is inserted into a through hole 6 made horizontally in the camp using a thick wire, and both ends of the wire rod 50 are wound around both ends of the pin 40 and connected, so that the camp 1 will not fall off from the pipe 2. Do it like this.

尚図中7で示すものは粘土パンキン、8は上記ピン4に
下部を挿通して設けたバイブレータ−1s、ioは長さ
調節用ピン孔、11.12は継ぎピンである。
In the figure, 7 indicates a clay pankin, 8 a vibrator 1s whose lower part is inserted through the pin 4, io a pin hole for length adjustment, and 11.12 a connecting pin.

従って中高層ビルの基礎杭として使用されていルヘノト
杭の杭頭、或は上下水道の構築にあたり、立坑(ピント
)に形成する反力壁(管をジヤツキで横方向に圧入推進
させる場合に形成する。
Therefore, when constructing water and sewage systems, there is a reaction wall (formed when a pipe is forced in laterally with a jack) that is formed in a vertical shaft (pinto) when building water and sewage systems.

)等の仮設コンクリートに破砕用の孔を形成するには次
の要領による。
), etc. To form holes for crushing in temporary concrete, follow the steps below.

即ち第5図に示すようにベット用生コンクリート13を
打設後同生コンクリート13上面から上述の砂袋3を収
容したパイプ2をバイブレータ−8を動作させかつ水平
器で所定圧入深さを測りながら同生コンクリート13中
に圧入する。
That is, as shown in FIG. 5, after pouring the ready-mixed concrete 13 for the bed, the pipe 2 containing the above-mentioned sand bags 3 is inserted from the top of the ready-mixed concrete 13 by operating the vibrator 8 and measuring the predetermined press-in depth with a level. Press-fit into the homogeneous concrete 13 while doing so.

この際パイプ2および同パイプ2内の砂袋3の上部が打
設生コンクIJ−113上面から若干突出した状態で圧
入を止める。
At this time, the press-fitting is stopped with the upper part of the pipe 2 and the sand bag 3 inside the pipe 2 slightly protruding from the upper surface of the poured concrete IJ-113.

パイプ2の圧入が所定の深さで終了した後、上記ピン4
に巻付けた線材5をピン4から取外す。
After the pipe 2 is press-fitted to a predetermined depth, the pin 4 is
Remove the wire rod 5 wound around the pin 4 from the pin 4.

次に打設コンクリート13が硬化しないうちに第7図に
示すようにバイフレーター8を動作させながらパイプ2
のみを引き抜くと硬化前の打設コンクリート13は同図
矢印で示すように砂袋3に向って流動し、打設コンクリ
ート13中に砂袋3による砂柱が形成されるものである
(第8図)。
Next, before the poured concrete 13 has hardened, as shown in FIG. 7, while operating the biflator 8, the pipe 2
When the chisel is pulled out, the poured concrete 13 before hardening flows toward the sand bag 3 as shown by the arrow in the figure, and a sand column is formed by the sand bag 3 in the poured concrete 13 (No. 8 figure).

そして生コンクリート13が硬化しないうちに所定の本
数のパイプ2を上述同様の要領で圧入かつ引き抜き第8
図に示すように複数本の砂柱を生コンクリート13中に
形成する。
Then, before the fresh concrete 13 hardens, a predetermined number of pipes 2 are press-fitted and pulled out in the same manner as described above.
As shown in the figure, a plurality of sand pillars are formed in fresh concrete 13.

その後硬化したコンクリートの上面より若干突出した砂
袋3上部の縛り部を解き、真空吸引機14で砂袋3内の
細目砂を吸引排出して破砕用の長孔15を形成するもの
である。
Thereafter, the binding part of the upper part of the sand bag 3 that slightly protrudes from the upper surface of the hardened concrete is untied, and the fine sand in the sand bag 3 is sucked and discharged by a vacuum suction machine 14 to form a long hole 15 for crushing.

尚第4図に示すように孔形成装置のパイプ2が短い場合
にはベット杭形成用穴16内に足場(図示していない)
を設けることにより圧入することができる。
If the pipe 2 of the hole forming device is short as shown in FIG.
Press-fitting can be performed by providing the following.

そして上述の要領で形成した複数の孔15のうち第11
図に示されるように平行斜線で示す孔15内に静的破砕
剤(商品名プライスター・・・・・・・・・小野田セメ
ント株式会社製)を充填すると反応熱により硬化コンク
リート13は膨張圧により第12図および第13図に示
されるように亀裂が発生し常法により解体する。
Then, the 11th hole among the plurality of holes 15 formed in the above-described manner.
As shown in the figure, when a static crushing agent (trade name: Plystar, manufactured by Onoda Cement Co., Ltd.) is filled into the holes 15 indicated by parallel diagonal lines, the hardened concrete 13 will expand to the expansion pressure due to the heat of reaction. As a result, cracks occur as shown in FIGS. 12 and 13, and the product is dismantled by conventional methods.

上記静的破砕剤に代ってガス焔を用いることもある。A gas flame may be used instead of the static crushing agent.

従来上記ベット杭頭、或は反力壁等の仮設コンクリート
に破砕用孔を形成するにあたっては、凝結した仮設コン
クリートに機械的穿孔即ちコンプレッサーや電動モータ
ーを動力源とし、超硬ピントで毎分1000回以上の打
撃を加えると同時に数百回の回転を与えて穿孔するもの
であったから騒音、粉塵が発生し、又穿孔費用が高くつ
くという欠陥があった。
Conventionally, when forming crushing holes in temporary concrete such as bed pile caps or reaction walls, mechanical drilling was performed in the solidified temporary concrete, that is, using a compressor or electric motor as the power source, and using a carbide pinto at a speed of 1000 per minute. Since drilling was performed by applying multiple blows and at the same time rotating hundreds of times, there were drawbacks such as noise, dust generation, and high drilling costs.

本考案は上述のように構成したので仮設コンクリート構
築の際に予め破砕用孔15を形成し得るから従来のよう
に機械的穿孔による騒音や粉塵が発生するおそれがなく
公害問題を解消し得るし、本案の装置によると機械的穿
孔によるよりも破砕用孔形成時間を短縮し得るし、かつ
孔形成費用を削減し得る実益がある。
Since the present invention is constructed as described above, the crushing holes 15 can be formed in advance when constructing temporary concrete, so there is no risk of noise or dust being generated due to mechanical drilling as in the past, and the problem of pollution can be solved. According to the device of the present invention, the time required to form holes for crushing can be shortened compared to mechanical drilling, and there are practical benefits in that the cost for forming holes can be reduced.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本案の仮設コンクリート破砕用孔形成装置を示
す縦断面図、第2図および第3図はそれぞれ継ぎパイプ
の縦断面図、第4図は同装置の他側を示す縦断面図、第
5図は第1図に示す装置の圧入状態図、第6図は第5図
の拡大縦断面図、第7図はパイプ引き抜き状態縦断面図
、第8図はパイプ抜き取り後のベット杭頭の縦断面図、
第9図は砂吸引状態図、第10図は破砕剤充填図、第1
1図は第10図の平面図、第12図は亀裂発生状態図、
第13図は第12図の平面図である。 1・・・・・・キャンプ、2・・・・・・パイプ、3・
・・・・・砂袋、4・・・・・・横向ピン、5・・・・
・・線材。
Fig. 1 is a longitudinal sectional view showing the temporary concrete crushing hole forming device of the present invention, Figs. 2 and 3 are longitudinal sectional views of the connecting pipe, respectively, and Fig. 4 is a longitudinal sectional view showing the other side of the device. Figure 5 is a diagram of the press-in state of the device shown in Figure 1, Figure 6 is an enlarged longitudinal sectional view of Figure 5, Figure 7 is a longitudinal sectional view of the pipe being pulled out, and Figure 8 is the bed pile head after the pipe is pulled out. Longitudinal cross-sectional view of
Figure 9 is a sand suction state diagram, Figure 10 is a crushing agent filling diagram,
Figure 1 is a plan view of Figure 10, Figure 12 is a diagram of the state of crack occurrence,
FIG. 13 is a plan view of FIG. 12. 1... Camp, 2... Pipe, 3.
...Sand bag, 4...Horizontal pin, 5...
··wire.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 下端にキャンプ1を着脱自在に嵌合し、内部に砂袋3を
収容し得るパイプ2の上端部と上記キャンプ1とを線材
5で接続するよう構成した仮設コンクリート破砕用孔形
成装置。
A hole forming device for temporary concrete crushing, in which a camp 1 is removably fitted to the lower end, and the upper end of a pipe 2 capable of accommodating a sand bag 3 inside is connected to the camp 1 by a wire 5.
JP842980U 1980-01-25 1980-01-25 Hole forming device for temporary concrete crushing Expired JPS5936610Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP842980U JPS5936610Y2 (en) 1980-01-25 1980-01-25 Hole forming device for temporary concrete crushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP842980U JPS5936610Y2 (en) 1980-01-25 1980-01-25 Hole forming device for temporary concrete crushing

Publications (2)

Publication Number Publication Date
JPS56110245U JPS56110245U (en) 1981-08-26
JPS5936610Y2 true JPS5936610Y2 (en) 1984-10-08

Family

ID=29605109

Family Applications (1)

Application Number Title Priority Date Filing Date
JP842980U Expired JPS5936610Y2 (en) 1980-01-25 1980-01-25 Hole forming device for temporary concrete crushing

Country Status (1)

Country Link
JP (1) JPS5936610Y2 (en)

Also Published As

Publication number Publication date
JPS56110245U (en) 1981-08-26

Similar Documents

Publication Publication Date Title
US2146645A (en) Foundation construction
JPS5936610Y2 (en) Hole forming device for temporary concrete crushing
CN214940168U (en) High-efficient cementer of pile foundation
RU1793752C (en) Method for erection of shell piles
JPS5850219A (en) Treatment of head of pile
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
CN207211766U (en) A kind of vibrating spear suitable for built with ribbed bricks shear wall core grouted concrete
JP3218358B2 (en) Ground improvement method
RU2097489C1 (en) Process of placing concrete into cast-in-place piles and installation for its implementation
JPS56163327A (en) Repairing method for embedded concrete pipe
JPH0430014A (en) Forming method for pile and forming construction method for foundation
CN205476502U (en) Multi -functional wall telephone of building
JPS5945065B2 (en) Temporary concrete crushing agent filling hole construction method
US3827208A (en) Finishing method
JP2005126945A (en) Static press-in construction method for steel pipe pile
JPH0432166B2 (en)
JPH05163841A (en) Concrete structure and constructing and crushing thereof
JPS5929738B2 (en) Shallow foundation method
JPS6132454B2 (en)
JP2973334B2 (en) Manufacturing method of steel pipe concrete column
SU1411373A1 (en) Method of constructing cast-in-place hollow pile
CN110878633A (en) Grouting improvement method
JPS621047B2 (en)
JPS61290119A (en) Placer for foundation concrete
JPH01187225A (en) Centering base frame and casing or steel tubular pile penetrating work therewith