RU1793752C - Method for erection of shell piles - Google Patents

Method for erection of shell piles Download PDF

Info

Publication number
RU1793752C
RU1793752C SU4764981A SU4764981A RU1793752C RU 1793752 C RU1793752 C RU 1793752C SU 4764981 A SU4764981 A SU 4764981A SU 4764981 A SU4764981 A SU 4764981A RU 1793752 C RU1793752 C RU 1793752C
Authority
RU
Russia
Prior art keywords
section
casing
soil
pipe
pile
Prior art date
Application number
SU4764981A
Other languages
Russian (ru)
Inventor
Юрий Михайлович Орлов
Original Assignee
Юрий Михайлович Орлов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Юрий Михайлович Орлов filed Critical Юрий Михайлович Орлов
Priority to SU4764981A priority Critical patent/RU1793752C/en
Application granted granted Critical
Publication of RU1793752C publication Critical patent/RU1793752C/en

Links

Images

Abstract

FIELD: civil engineering. SUBSTANCE: method involves section-by-section driving-in of tubular column and making a ground core inside. Before driving tubular column into ground, the first section of casing pipe is driven in along the pile axis, the diameter of said pipe being smaller than that of the tubular column. Then the first section of the tubular column is installed on the ground surface. The lower end of said first section is provided with an expendable cutter ring which overlaps the circular gap between the column sections and the casing pipe. The sections of the casing pipe and those of the tubular column are driven-in concurrently with extending the section and driving-in each following pipe section before the corresponding column section. After the column section has been driven-in to the design level, the casing pipe is withdrawn section-by-section and the ground core is transferred intact from the pipe cavity into the tubular column. EFFECT: higher bearing capacity and reduced erection time of shell pile. 3 cl, 4 dwg

Description

Изобретение относится к строительству и может быть применено для погружения свай-оболочек, возводимых без заполнения их бетоном. The invention relates to the construction and can be used for immersion piles-shells, erected without filling them with concrete.

Целью изобретения является повышение несущей способности сваи-оболочки и ускорение ее возведения. The aim of the invention is to increase the bearing capacity of the pile-shell and accelerate its construction.

На фиг. 1 изображен первый этап осуществления описываемого способа установка теряемого кольца; на фиг. 2 установка второй секции и погружения сваи-оболочки; на фиг. 3 извлечение обсадной трубы; на фиг. 4 подача связующего материала. In FIG. 1 shows a first step in the implementation of the described method of installing a lost ring; in FIG. 2 installation of the second section and the immersion of the pile-sheath; in FIG. 3 casing extraction; in FIG. 4 supply of binder material.

Способ осуществляют в следующем порядке. The method is carried out in the following order.

В грунт основания 1 одним из известных способов погружается секция обсадной трубы 2 с образованием грунтового сердечника 3, после чего коаксиально обсадной трубе 2 устанавливается теряемое кольцо 4 и секция сваи-оболочки 5 и затем осуществляется их совместное погружение с образованием при этом кольцевой воздушной полости 6 (фиг. 1). После этого устанавливается вторая секция обсадной трубы с ее присоединением к первой и осуществляется ее погружение (фиг. 2), после погружения которой вновь погружается секция сваи-оболочки и т.д. После завершения погружения сваи-оболочки приступают к извлечению обсадной трубы, осуществляемому под вибровоздействием сопровождаемому в несвязных грунтах, уплотнением грунта сердечника и его прижатием к внутренней поверхности сваи-оболочки (фиг. 3), что обеспечивает включение грунтового сердечника и внутренней поверхности сваи в несущую способность. Для повышения эффективности уплотнения грунта сердечника его влажность перед извлечением обсадной трубы может быть известным способом приведена близкой к оптимальной. One of the known methods immerses the casing section 2 into the soil of the base 1 by forming a soil core 3, after which a lost ring 4 and a pile-casing section 5 are installed coaxially with the casing 2 and then they are immersed together to form an annular air cavity 6 ( Fig. 1). After this, the second section of the casing pipe is installed with its attachment to the first and its immersion is carried out (Fig. 2), after the immersion of which the pile section is again immersed, etc. After completion of the dive, the pile piles begin to remove the casing, which is carried out under vibration, accompanied in incoherent soil, compaction of the core soil and its pressing against the inner surface of the pile pile (Fig. 3), which ensures the inclusion of the soil core and the inner surface of the pile in the bearing capacity . To increase the efficiency of compaction of the soil of the core, its moisture content can be brought close to optimal before removing the casing.

Виброизвлечение обсадной трубы, например, в связных грунтах может сопровождаться подачей в зазор 6 связующего материала 7, например песка, что обеспечивает связь сформированного грунта сердечника 3 через уплотненный (или отвердевший) связующий материал 7 с внутренней поверхностью сваи-оболочки (фиг. 4). Vibration of the casing, for example, in cohesive soils may be accompanied by the supply of a binder material 7, for example sand, to the gap 6, which ensures that the formed soil of the core 3 is connected through a compacted (or hardened) bonding material 7 to the inner surface of the pile pile (Fig. 4).

Предлагаемый способ позволяет исключить многодельную операцию по извлечению грунта из полости сваи, что в среднем на 25% повышает темпы работ по возведению сваи-оболочки, исключает необходимость транспорта этого грунта. The proposed method eliminates the busy operation of extracting soil from the cavity of the pile, which on average increases by 25% the pace of work on the construction of the pile-shell, eliminates the need for transport of this soil.

Claims (3)

1. СПОСОБ ВОЗВЕДЕНИЯ СВАЙ-ОБОЛОЧЕК, включающий посекционное погружение в грунт трубчатого ствола с образованием в его полости грунтового сердечника и его разработкой, отличающийся тем, что, с целью повышения несущей способности сваи оболочки и ускорения ее возведения, перед погружением трубчатого ствола в грунт по оси возводимой сваи погружают первую секцию обсадной трубы диаметром, меньше диаметра трубчатого ствола, с образованием в ее полости грунтового сердечника, после чего на поверхности грунта устанавливают первую секцию трубчатого ствола с присоединенным к ее нижнему торцу теряемым ножевым кольцом, перекрывающим кольцевой зазор между секциями ствола и обсадной трубой, и погружают секции обсадной трубы и трубчатого ствола совместно с последующим наращиванием секции и опережающим погружением каждой последующей секции обсадной трубы относительно соответствующей секции ствола, а после погружения секции ствола до проектной отметки осуществляют посекционное извлечение обсадной трубы с перемещением грунтового сердечника без разуплотнения из ее полости в полости трубчатого ствола. 1. THE METHOD OF CONSTRUCTION OF PILES-SHELLS, including sectional immersion in the soil of a tubular trunk with the formation of an earth core in its cavity and its development, characterized in that, in order to increase the bearing capacity of the pile piles and accelerate its construction, before immersing the tubular trunk in the soil by the axis of the pile being built immerses the first section of the casing pipe with a diameter smaller than the diameter of the tubular shaft, with the formation of a soil core in its cavity, after which the first section of the pipe is installed on the soil surface of the barrel with a lost knife ring attached to its lower end, overlapping the annular gap between the barrel sections and the casing, and the sections of the casing and the tubing are immersed together with the subsequent extension of the section and leading immersion of each subsequent section of the casing relative to the corresponding section of the barrel, and after immersion of the trunk section to the design level performs sectional extraction of the casing with the movement of the soil core without decompression from its cavity into the cavity and tubular trunk. 2. Способ по п. 1, отличающийся тем, что обсадную трубу извлекают с вибрированием. 2. The method according to p. 1, characterized in that the casing is removed with vibration. 3. Способ по пп.1 и 2, отличающийся тем, что одновременно с вибрированием обсадной трубы в кольцевой зазор между секциями трубчатого ствола и обсадной трубой подают связывающий материал. 3. The method according to claims 1 and 2, characterized in that at the same time as the casing is vibrated, a bonding material is supplied into the annular gap between the sections of the tubular shaft and the casing.
SU4764981A 1987-12-05 1987-12-05 Method for erection of shell piles RU1793752C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4764981A RU1793752C (en) 1987-12-05 1987-12-05 Method for erection of shell piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4764981A RU1793752C (en) 1987-12-05 1987-12-05 Method for erection of shell piles

Publications (1)

Publication Number Publication Date
RU1793752C true RU1793752C (en) 1995-04-10

Family

ID=30441560

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4764981A RU1793752C (en) 1987-12-05 1987-12-05 Method for erection of shell piles

Country Status (1)

Country Link
RU (1) RU1793752C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2429229A (en) * 2005-08-18 2007-02-21 Seacore Ltd Methods and apparatus for the installation of foundation piles
WO2008091173A1 (en) * 2007-01-23 2008-07-31 Robert Miassarovitch Khafizov Method for pitching a pile into a permanently frozen ground
WO2015147676A1 (en) * 2014-03-28 2015-10-01 Открытое Акционерное Общество "Акционерная Компания По Транспорту Нефти" "Транснефть" Method for installing metal piles in permafrost soil
RU2645325C2 (en) * 2015-10-06 2018-02-20 Юрий Михайлович Орлов Method of establishing a casing pillow of shell
RU204251U1 (en) * 2020-10-19 2021-05-17 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" REINFORCED SHELL STRUCTURE
US11530574B2 (en) 2017-11-17 2022-12-20 Comrod As Method for generating a freeroom for a mast element

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР N 996830, кл. E 02D 5/65, 1981. *
Новожилов Т.Ф. Бездефектное погружение свай в талых и вечномерзлых грунтах. Л.: СИ., 1987, с.42. *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2429229A (en) * 2005-08-18 2007-02-21 Seacore Ltd Methods and apparatus for the installation of foundation piles
WO2008091173A1 (en) * 2007-01-23 2008-07-31 Robert Miassarovitch Khafizov Method for pitching a pile into a permanently frozen ground
WO2015147676A1 (en) * 2014-03-28 2015-10-01 Открытое Акционерное Общество "Акционерная Компания По Транспорту Нефти" "Транснефть" Method for installing metal piles in permafrost soil
RU2645325C2 (en) * 2015-10-06 2018-02-20 Юрий Михайлович Орлов Method of establishing a casing pillow of shell
US11530574B2 (en) 2017-11-17 2022-12-20 Comrod As Method for generating a freeroom for a mast element
RU204251U1 (en) * 2020-10-19 2021-05-17 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" REINFORCED SHELL STRUCTURE

Similar Documents

Publication Publication Date Title
RU1793752C (en) Method for erection of shell piles
EP0560867B1 (en) Method for manufacturing a tubular foundation in the ground
CA2003376C (en) A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile
RU1819309C (en) Method for construction of cast-in-place pile and reinforcing cage of cast-in-place pile
US5122013A (en) Reinforced concrete load-bearing pile with multi-branches and enlarged footings, and means and method for forming the pile
SU649789A1 (en) Method of erecting filling pile-casting
GB2064625A (en) Method of Hole Forming for Miniature Piles
RU2181410C2 (en) Method for manufacture of cast-in-place reinforced piles
GB2132667A (en) Method of installing precast concrete piles
US5219249A (en) Reinforced concrete load-bearing pile forming device
SU1677180A1 (en) Method of manufacturing reinforced cast-in-place pile
RU2244066C1 (en) Combined method for cast-in-place pile production
SU1719541A1 (en) Method for erecting cast-in-place shell piles
JPH0280710A (en) Preparing cast-in-place concrete pile
GB2157750A (en) Improvements relating to cast-in-situ concrete pile construction
JPS5929738B2 (en) Shallow foundation method
SU1622527A1 (en) Method of erecting pile
JPS5939008B2 (en) Foundation pile construction method
JPS5941520A (en) Construction of foundation pile and excavator therefor
RU2037602C1 (en) Method to manufacture club-footed piles
JPH0579265A (en) Discharged soil free execution device for foundation pile and execution method for foundation pile
SU1386704A1 (en) Method of erecting pile in saturated sandy soils
RU2006551C1 (en) Tubular filling pile erection method
SU1481324A1 (en) Apparatus for constructing a cast-in-place shell pile
SU1719540A1 (en) Method to erect cast-in-place shell piles