JPS5927097A - Tunnel backfill grout execution method - Google Patents
Tunnel backfill grout execution methodInfo
- Publication number
- JPS5927097A JPS5927097A JP57138222A JP13822282A JPS5927097A JP S5927097 A JPS5927097 A JP S5927097A JP 57138222 A JP57138222 A JP 57138222A JP 13822282 A JP13822282 A JP 13822282A JP S5927097 A JPS5927097 A JP S5927097A
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- concrete wall
- wall
- hole
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
側壁の背面に排水装置を設けてなるトンネルにおいて、
上記側壁の上部コンクリート壁に透孔を穿設し、同透孔
からモルタルと急結剤との混合物を上記側壁の背面上部
に挿入し同背面上部にこれを硬化させた後、同側壁の上
部コンクリート壁の背面に裏込めグラウトを施すことを
特徴とするトンネル裏込めグラウト施工法に関するもの
であって、裏込めグラウトに際し側壁背面排水装置の閉
塞を防止することを目的とするものである。[Detailed description of the invention] In a tunnel provided with a drainage device on the back side of the side wall,
A through hole is drilled in the upper concrete wall of the side wall, and a mixture of mortar and quick-setting agent is inserted into the upper part of the back of the side wall through the through hole, and after hardening at the upper part of the back, the mixture is poured into the upper part of the side wall. This invention relates to a tunnel backfill grouting method characterized by applying backfill grout to the back surface of a concrete wall, and the purpose is to prevent blockage of side wall back drainage devices during backfill grouting.
本発明を図面に示す実施例について説明するとトンネル
3を掘削し掘削面の内面にアーチ形コンクリ−1・壁1
を施工し囲壁1の両側下部に側壁la、laを形成する
。この側壁1a、laの背面には排水装置2を設けこれ
をトンネル床6に形成した排水溝7に連通孔8により接
続するものである。」−記側壁1a、1aの」二部コン
クリート壁lにはドリフクーにより透孔4を穿設し、同
透孔4にノズル9を挿入し同ノズル9には分岐管10を
設はノズル9にはエヤモルタル圧送装置11をホース1
2で接続し、分岐管10には急結剤(珪酸ソーダ)圧送
装置13をホース14で接続する。」二部排水装置2に
はフィルターマット又はドレーンパイプが用いられる。To explain the embodiment of the present invention shown in the drawings, a tunnel 3 is excavated and an arch-shaped concrete 1 and a wall 1 are formed on the inner surface of the excavated surface.
are constructed to form side walls la and la at the lower parts of both sides of the surrounding wall 1. A drainage device 2 is provided on the back side of the side walls 1a, la and is connected to a drainage groove 7 formed in the tunnel floor 6 through a communication hole 8. A through hole 4 is bored in the two-part concrete wall l of the side walls 1a and 1a using a drift pipe, a nozzle 9 is inserted into the through hole 4, and a branch pipe 10 is installed in the nozzle 9. The air mortar pressure feeding device 11 is connected to the hose 1.
2, and a quick setting agent (sodium silicate) pressure feeding device 13 is connected to the branch pipe 10 via a hose 14. ” The two-part drainage system 2 uses a filter mat or a drain pipe.
尚図中15で示すものはアーチ形コンクリート壁1に穿
設したグラウト孔である。Note that the reference numeral 15 in the figure is a grout hole drilled in the arch-shaped concrete wall 1.
本発明ではエヤモルタル圧送装置11および急結剤圧送
装置13を動作して上記ノズル9内にエヤモルタルおよ
び急結剤を圧入4昆合し同ノズル9から透孔4を経てエ
ヤモルタルと急結剤との混合物を上記側壁1’a、1a
の背面上部に挿入し同背面」二部にこれを急速硬化5さ
せることができる。In the present invention, the air mortar and quick setting agent are pressed into the nozzle 9 by operating the air mortar feeding device 11 and the quick setting agent feeding device 13, and the air mortar and quick setting agent are fed from the nozzle 9 through the through hole 4. The mixture is applied to the side walls 1'a, 1a.
This can be quickly cured by inserting it into the upper part of the back surface of the same back surface.
この急速硬化混合物5は第2図に拡大して示すように流
下することなく岩盤16と上記コンクリート壁1との間
に結着し硬化するものでありその程度の硬化速度と粘性
とにエヤモルタルおよび急結剤を調節するものである。As shown in an enlarged view in FIG. 2, this rapid hardening mixture 5 hardens by adhering between the bedrock 16 and the concrete wall 1 without flowing down. This adjusts the quick setting agent.
この硬化l昆合物5はさらに凝結するが凝結を待ち又は
待たずにグラウト孔15から岩盤16とコンクリ−1,
11との間に注入材(エヤセメントミルク、エヤモルタ
ル等)を圧入充填し上記側壁1a、laの」二部コンク
リート壁1の背面に裏込めグラウトを施すものである。This hardened lubricant 5 further solidifies, but without waiting for the solidification, it passes through the grout hole 15 to the bedrock 16 and the concrete 1.
A grouting material (air cement milk, air mortar, etc.) is press-filled between the concrete walls 11 and 11, and backfill grout is applied to the back side of the two-part concrete wall 1 of the side walls 1a and 1a.
上記エヤモルタルに代えてモルタルでも良い。Mortar may be used instead of the above-mentioned Eya mortar.
従来内面にコンクリート壁を施工し凹壁の側壁の背面に
排水装置を設けてなるトンネルにおいてコンクリート壁
の背面に央込めグラウトを施すと側壁1a、1aの背面
の排水装置2をグラウトにより閉塞しトンネルの排水機
能が活されず、トンネル背面の湧水がコンクリート打継
目よりの漏水となって現われる。これはコンクリートの
耐久性、トンネルの機能、美観を損じ補修工事の原因と
なるものである。Conventionally, in a tunnel in which a concrete wall is constructed on the inner surface and a drainage device is provided on the back side of the concave side wall, when central filling grout is applied to the back side of the concrete wall, the drainage device 2 on the back side of the side walls 1a and 1a is closed with grout and the tunnel is closed. The drainage function of the tunnel is not utilized, and spring water at the back of the tunnel appears as water leakage from the concrete joints. This impairs the durability of the concrete, the functionality and aesthetics of the tunnel, and causes repair work.
本発明は上記欠陥に鑑みなされたものであって、本発明
は上述のように内面にコンクリート壁を施工し凹壁の側
壁の背面に排水装置を設けてなるトンネルにおいて、上
記側壁の上部コンクリート壁に透孔を穿設し、同透孔か
らモルタルと急結剤との混合物を上記側壁の背面上部に
挿入し同背面上部にこれを硬化Sせた後、同側壁の上部
コンクリ−1・壁の背面に裏込めグラウトを施す方法で
あるから内面にコンクリート壁を施工し凹壁の側壁の背
面に排水装置を設けてなるトンネルにおいてコンクリー
ト壁の背面に裏込めグラウトを施しても側壁1a、la
の背面の排水装置2をグラウトにより閉塞するおそれが
なく、トンネルの排水機能か阻害されず、トンネル背面
の湧水がコンクリ−1・打継目よりの漏水となるおそれ
がなく、トンネルの耐久性、トンネルの機能、美観を損
じるおそれがなく補修工事の原因を軽減し得る効果があ
る。The present invention has been made in view of the above-mentioned defects, and the present invention provides a tunnel in which a concrete wall is constructed on the inner surface and a drainage device is provided on the back side of the concave side wall as described above. A through hole is drilled in the hole, and a mixture of mortar and quick-setting agent is inserted into the upper part of the back of the side wall through the through hole, and after hardening on the upper part of the back, the upper concrete 1 of the side wall is This method applies backfill grout to the back of the concrete wall, so in a tunnel where a concrete wall is constructed on the inner surface and a drainage device is provided on the back of the concave side wall, even if backfill grout is applied to the back of the concrete wall, the side walls 1a, la
There is no risk of the drainage device 2 on the back of the tunnel being blocked by grout, the drainage function of the tunnel is not obstructed, there is no risk of spring water on the back of the tunnel leaking from the concrete 1 or the concrete joints, and the durability of the tunnel is improved. There is no risk of damaging the functionality or aesthetics of the tunnel, and it has the effect of reducing the causes of repair work.
第1図は本発明のトンネル裏込めグラウト施工法による
トンネルを示す図、第2図は第1図の−・部拡大図であ
る。
1・・コンクリート壁、la・・側壁、2・・排水装置
、3・・トンネル、4・・透孔、5・・硬化部。
特許出願人
開発工業株式会社
21国
g/ 7−W22磨
463−FIG. 1 is a diagram showing a tunnel formed by the tunnel backfill grouting method of the present invention, and FIG. 2 is an enlarged view of the part shown in FIG. 1... Concrete wall, LA... Side wall, 2... Drainage system, 3... Tunnel, 4... Through hole, 5... Hardened part. Patent applicant Kaihatsu Kogyo Co., Ltd. 21 countries g/ 7-W22 Ma 463-
Claims (1)
a’、laの背面に排水装置2を設けてなるトンネル3
において、上記側壁1a、1aの上部コンクリート壁1
に透孔4を門設し、同透孔4からモルタルと急結剤との
混合物を上記側壁1a、laの背面上部に挿入し同背面
上部にこれを硬化5させた後、同側壁1a、1aの上部
コンクリート壁lの背面に裏込めグラウトを施すことを
特徴とするトンネル裏込めグラウト施工法。 2)コンクリート壁1がアーチ形コンクリート壁である
特許611J求の範囲第1項記載のトンネル裏込めグラ
ウト施工法。 3)υ1水装置2がフィルターマットである特許請求の
範囲第1項記載のトンネル裏込めグラウト族 工 ン去
。 4)排水装置2がドレーンパイプである特許請求の範囲
第1項記載のトンネル裏込めグラウト施工法。[Claims] l) A concrete wall l is constructed on the inner surface and the side J71 of the surrounding wall l
Tunnel 3 with drainage device 2 installed on the back side of a' and la
In, the upper concrete wall 1 of the side walls 1a, 1a
A through hole 4 is provided in the through hole 4, and a mixture of mortar and quick-setting agent is inserted into the upper back surface of the side walls 1a, la through the through hole 4, and after hardening 5 in the upper back surface of the same side wall 1a, A tunnel backfill grouting method characterized by applying backfill grout to the back side of the upper concrete wall 1a. 2) The tunnel backfill grouting method described in Section 1 of Patent No. 611J, wherein the concrete wall 1 is an arch-shaped concrete wall. 3) Tunnel backfill grouting according to claim 1, wherein the water device 2 is a filter mat. 4) The tunnel backfill grouting method according to claim 1, wherein the drainage device 2 is a drain pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57138222A JPS5927097A (en) | 1982-08-07 | 1982-08-07 | Tunnel backfill grout execution method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57138222A JPS5927097A (en) | 1982-08-07 | 1982-08-07 | Tunnel backfill grout execution method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5927097A true JPS5927097A (en) | 1984-02-13 |
JPS638280B2 JPS638280B2 (en) | 1988-02-22 |
Family
ID=15216939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP57138222A Granted JPS5927097A (en) | 1982-08-07 | 1982-08-07 | Tunnel backfill grout execution method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5927097A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06286780A (en) * | 1992-06-20 | 1994-10-11 | Maruman Sangyo Kk | Tire-binding tool |
-
1982
- 1982-08-07 JP JP57138222A patent/JPS5927097A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS638280B2 (en) | 1988-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2866015B2 (en) | Water stopping method for concrete underground structures | |
CN109629845A (en) | Concrete structure seam areas leakage treatment device and its construction method | |
JP2957779B2 (en) | Construction method of precast structure and precast concrete member used for the construction | |
JPS6286226A (en) | Method and apparatus for arranging assembling member in ground receiving water pressure through sheet pile | |
JPH05247958A (en) | Leak-stopping work for concrete structure | |
JPS5927097A (en) | Tunnel backfill grout execution method | |
JP2001193064A (en) | Anchoring method for ground anchor | |
JP2867204B2 (en) | Construction method of outer pipe for injection under pressurized water | |
JP4047199B2 (en) | Water stop material injection method | |
JPH0468109A (en) | Injection method with horizontal sleeve | |
JPS62276129A (en) | Water-stop work for underground concrete structure | |
JPH027994Y2 (en) | ||
JP3729948B2 (en) | Stable construction method for ground and tool for closing mouth of drilling hole used in the method | |
JP4501311B2 (en) | Grout filling method around buried pipe | |
JP3211004B2 (en) | Water guide plate and its construction method | |
JP2002081052A (en) | Natural ground reinforcing method | |
JPH0411110A (en) | Osmotic tube and propulsion burying process thereof | |
JPH01193494A (en) | Method and auxiliary tool for connecting pipe | |
JPS583095B2 (en) | Drainage pipe installation method and drainage pipe fittings | |
JP2887169B2 (en) | Crack injection waterproofing method | |
JPH0521533Y2 (en) | ||
JPH0259279B2 (en) | ||
JPH01215512A (en) | Back-filling technique of heating, pressurizing and expanding rigid tube lining | |
JPH061498U (en) | Expansion packer for backfill injection | |
JPS61196016A (en) | Joining method for cut-off sheet |