JPS59150847A - Construction of concrete floor - Google Patents

Construction of concrete floor

Info

Publication number
JPS59150847A
JPS59150847A JP2294783A JP2294783A JPS59150847A JP S59150847 A JPS59150847 A JP S59150847A JP 2294783 A JP2294783 A JP 2294783A JP 2294783 A JP2294783 A JP 2294783A JP S59150847 A JPS59150847 A JP S59150847A
Authority
JP
Japan
Prior art keywords
formwork
concrete
concrete floor
construction method
floor construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2294783A
Other languages
Japanese (ja)
Other versions
JPH0260819B2 (en
Inventor
瀧森 清一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudou Technical Kk
Original Assignee
Fudou Technical Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudou Technical Kk filed Critical Fudou Technical Kk
Priority to JP2294783A priority Critical patent/JPS59150847A/en
Publication of JPS59150847A publication Critical patent/JPS59150847A/en
Publication of JPH0260819B2 publication Critical patent/JPH0260819B2/ja
Granted legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 i発明はコンクリート床施工方法の改良に係るものであ
る。
[Detailed Description of the Invention] The invention relates to an improvement of a concrete floor construction method.

本発明は嚢に昭和5ダ年特許願第1A70gダ号(特開
昭5t−trqtss  号)発明を為しコンクリート
床の施工に大きな利益を斎したのであるが、木発8AF
i之を更に改良したものである。
The present invention was made in Patent Application No. 1A70g in 1930 (Japanese Patent Application No. 5T-TRQTSS) in 1932, and brought great benefits to the construction of concrete floors.
This is a further improvement of i.

本発明の実施例を図面につき説明する。Embodiments of the invention will be described with reference to the drawings.

図中、+11は第一実施例の型枠であって、該型枠(1
)は略々四角形で所要の面積を有するもので、水平板(
2)の下面側に下方に拡開する両側壁(31(3+と底
面(41とから成る断面三角形状の補強リブ(51(5
1・・・を所要数、相平行ゼしめて折シ曲け、而かも該
三角形状の補強リプ(5)の頂点に於ては前記両1lI
l壁+31 (31の頂上部が相接触して閉塞頂点0.
31が形成され、るようにする。
In the figure, +11 is the formwork of the first embodiment, and the formwork (1
) is approximately rectangular and has the required area, and the horizontal plate (
2) Reinforcement ribs (51 (5
1... by the required number of parallel lines and fold them, and at the apex of the triangular reinforcing lip (5),
l wall +31 (the tops of 31 are in contact with each other and the closed vertex 0.
31 is formed.

図示の辿シ、補強リプ(51と平行する一方の側辺部に
接続片(6)を折シ下げる。(7)は型枠filの両端
に所要の巾(3)に亘って形成した掛止部であって、補
強リプの底面(4)の端部をプレス機にて押し潰してそ
の最先部(8)を水平板(2)の裏面に重合し、最先部
(8)の後辺(9)K続いて補強リプの底面(4)と接
続する斜面(10)を形成し、又接続片(61の端部を
切断して掛止5(7)の後辺(9)を始点とする斜面(
10+と同一の傾斜度を為す傾斜辺(111を形成せし
める。なお、掛止部を型枠の両端部に形成するだけでな
く、第六図に示す如く・全長の長い型枠にあっては中央
部に前記と略ド1形の凹陥部azを形成することも可能
である。第八図と第六図に図示のように、載置して橋設
し、相隣接する型枠の接続片(6)を最外側の補強リプ
(5)の隙間に嵌合して多数の型枠を敷設し、必要に応
じて型枠と鉄骨梁(7)又は凹陥部(121に於て、補
強リプ(51の底面(4)の端部を押し潰したその最先
部(81と(8)との間の中間平和部a41(又は補強
リプ(5)と(5)との間の中間平担部(141)に所
要の幅@〔又はd〕と所要の長さくLl (又は巳))
の四角形の切欠部o9(又は切欠窓Q51 ) ’に穿
設する。
Fold the connecting piece (6) down on one side parallel to the reinforcing lip (51) as shown in the figure. At the stop part, the end of the bottom surface (4) of the reinforcing lip is crushed using a press machine, and its tip (8) is superimposed on the back surface of the horizontal plate (2). Rear side (9) The slope starting from (
An inclined side (111) having the same inclination as 10+ is formed.In addition, in addition to forming the hooks at both ends of the formwork, as shown in Figure 6, if the formwork has a long overall length, It is also possible to form a concave part az approximately in the shape of a dome in the central part.As shown in Figures 8 and 6, it is placed and bridged to connect adjacent formworks. The piece (6) is fitted into the gap between the outermost reinforcing lip (5) and a number of formworks are laid, and if necessary, reinforcement is applied between the formwork and the steel beam (7) or the recessed part (121). The tip of the lip (51) where the end of the bottom surface (4) is crushed (the intermediate peaceful part a41 between 81 and (8) (or the intermediate flat part between reinforcing lips (5) and (5)) The required width @ [or d] and the required length Ll (or Sn) for the shoulder section (141)
A rectangular notch o9 (or notch window Q51)' is bored.

第三図に於て、(1)は第二実施例の型枠であって、略
々四角形の水平板())の下面側に下方に拡開する両1
111壁(3(<s’(と底面(7とから放る断面三角
形状の補強リフt51 (,51・・・を所要数、相平
行せしめて折り曲げ、而かも該三角形状の補強リプ(5
)の頂点に於ては、前記両仰1壁(3+ +31の頂上
部が相接触して閉塞頂点部(1イが形成されるようにす
る。図示の通シ、補強リプ(5)と平行する一方の倶1
辺部に接続片(61を折シ下げる。
In Figure 3, (1) is the formwork of the second embodiment, with both 1 extending downward on the lower surface side of the approximately rectangular horizontal plate (2).
111 wall (3 (<s')) and the bottom surface (7).
), the tops of both raised walls (3+ +31) should come into contact with each other to form a closed apex (1a). On the other hand 1
Fold down the connection piece (61) on the side.

(7)は型枠fi+の両端に所要の幅(資)に亘って形
成した掛止部であって、水平板(2)の表面と補強リプ
(51の底面(4)との両面の双方からプレス機にて押
し潰して両面の中間部に水平に形成しkものである。(
81は掛止部(71の後辺から水平板12+および補強
リプ(5)の底面(4)と接続する斜面である。19′
)は切欠部であって、接続片(61の両端部を掛止部(
ケ)および斜面(8′)と節々等しい長さに亘シ切断し
て形成する。なお、掛止部を型枠の両端部に形成するだ
けで欧く、第九′図に示す如く、全長の長い型枠にあっ
ては中央部に前記と略同形の凹陥部(1)を形成するこ
とも可能である。
(7) is a hook formed over the required width at both ends of the formwork fi+, and is attached to both sides of the surface of the horizontal plate (2) and the bottom surface (4) of the reinforcing lip (51). This is then crushed using a press and formed horizontally in the middle of both sides. (
Reference numeral 81 denotes a slope connecting the rear side of the hook portion (71) to the horizontal plate 12+ and the bottom surface (4) of the reinforcing lip (5). 19'
) is a notch, and both ends of the connection piece (61) are connected to the hook part (
f) and the slope (8') by cutting the joints into equal lengths. It is convenient to simply form the hooks at both ends of the formwork, but as shown in Figure 9', if the formwork has a long overall length, a concave part (1) of approximately the same shape as described above may be formed in the center. It is also possible to form

第八図、第九図に図示のように、型枠(1髄掛止部(7
)又は凹陥部(1dw鉄骨梁(支)の上面に直接載置し
、必要に応じて点溶接等を施して固定する。
As shown in Figures 8 and 9, formwork (1 pith hanging part (7
) or recessed part (1dw), and place it directly on the top surface of the steel beam (support) and fix it by spot welding, etc., as necessary.

本発明の型枠を用いて一部に段差を有する(191 成する部mは前記第−実施例に示す如く榊強リブ(5)
ヲ水平板(21側に押し、潰して水平板(2)と水平を
為す掛止部(7)全形成した型枠(11?敷設し、該型
枠却みの上面にコンクリート(Lnヲ打設して表面が平
らな床版を形成する。
The formwork of the present invention is used to partially form a step (191).
Place the fully formed formwork (11?) on the horizontal plate (21) and crush it to make it horizontal with the horizontal plate (2), and pour concrete (Ln) on the top surface of the formwork. to form a floor slab with a flat surface.

押し潰しに世(分の間の中間平和部al(又は補強リプ
(5)と(菌との間の中間平担部aj”)の所要る。前
記のように、コンクリート床施工に当シ、掛止部(71
(7i附近に穿設さfた切欠部(151(151(又は
、凹陥部(121又は(101附近に穿設さ九た切欠窓
(151(151)の存在によυ、型枠間1)の上方部
と下方部とのコンクリートが相連続するものであって2
掛止部(71(71(又け、凹陥部(121又はα0)
)の装置される鉄骨梁伍)の土面部の幅の大いさを考慮
して切欠部(151(151の幅卸卸(ylFi。
It is necessary to crush the intermediate peace part al (or the intermediate flat part aj" between the reinforcing lip (5) and the bacterium) for crushing. As mentioned above, when constructing a concrete floor, Latch part (71
(Due to the presence of the notch (151 (151) or recess (121) or (9) cutout window (151 (151) drilled near 7i), between the formwork 1) The upper part and the lower part of the concrete are continuous, and 2
Latching part (71 (71 (straddle, concave part (121 or α0)
) The width of the notch (151 (151) was calculated in consideration of the width of the soil surface of the steel beam (5) to be installed.

切欠窓a4 ai’の幅<昂祁’ >の大いさを決める
ものとする。このために、切欠部(151(15jの幅
卸()DC又は5切欠窓(151(151の@0卸)の
寸法は掛止部(71(q’+ o g vr+cn’r
 r 又ケ、凹[H21又U(101o111itA 
)よpも大となることもあシ得る。
The width of the cutout window a4 ai' shall be determined. For this purpose, the dimensions of the notch (151 (15j width width () DC) or 5 notch window (151 (151 @0 width) are as follows: 71 (q'+ o g vr + cn'r
r Mataga, concave [H21 Mata U (101o111itA
) It is also possible for the p to become large.

本発明は前記のようにして、水平板(21の下面佃に下
方に拡開する両側壁(31(31と底面(4)とから成
る断面三角形状の補強リプ(51+51・・・を所要数
、相平行せしめて折シ曲げ、而かも該三角形状の補強リ
プ(5)の頂点に於ては前記両側壁(31(31の頂上
部が相接触して閉塞頂点部(131が形成されるように
した型枠全使用するコンクリート床施工方法を於て、補
強リプ(5)の底面の端部全ブレ7機にて押し潰してそ
の最先面(4)の端部を押し潰したその最先部との間の
中間平和部に所太の幅と所要の長さの切欠部α5)全穿
設するか、又は、型枠+11の両端を、水平板(2)の
表面と補強リプ(5)の底面どの両面の双方からのプレ
ス機にて押し潰して両面の中を押し潰した部分との間の
中間平和部(141に所要の幅、と所要の長さの切欠部
aル;を穿設して、コンクリート床施工に当υ型枠tl
H11の上方部と下方部とのコンクリートが相連続して
コンクリート床が形成されるように型枠(11<11+
の掛止部(71(71梁に横架したンクリートヲ打ち込
むものであるようにしたので、コンクリート床の補強を
著しくして増大せしめると共にコンクリート床施工に当
シ作秦件の向上を計シ得たと云うλきな効果を奏するも
のである。
In the present invention, as described above, the required number of reinforcing ribs (51+51... , are parallel to each other and bent, and at the apex of the triangular reinforcing lip (5), the tops of the both side walls (31 (31) contact each other to form a closed apex portion (131). In the concrete floor construction method that uses all of the formwork, the bottom edge of the reinforcing lip (5) was crushed with seven shakers, and the edge of the topmost surface (4) was crushed. Either make a full cutout α5) of the required width and length in the middle peaceful part between the tip and the top part, or connect both ends of the formwork +11 to the surface of the horizontal plate (2) and the reinforcing lip. (5) The intermediate peaceful part (141) of the notch a of the required width and required length between the bottom surface of the bottom surface and the part where the insides of both sides were crushed by pressing with a press machine from both sides. ; is used for concrete floor construction by drilling
Formwork (11<11+
Since the hanging part (71) is made of concrete that is placed horizontally on the beam, it is possible to significantly increase the reinforcement of the concrete floor and to improve the efficiency of concrete floor construction. It has the effect of λ.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明に係るコンクリート床施工方法の実施例を
示したものであって、 第一図Fi第一実施例のものN一部切欠した型枠の斜視
図、 第二図は同士型枠のA−A断面図・ 第三図は第二実施例のもの\−一部切欠た型枠の斜視図
、 第四図Fi同上の仰1面図、 第五図は型枠の端面図、 第六図は前記ツー実施例の型枠を鉄骨梁上に橋架した状
態を示す側面図。 第七図は同上の一部切欠した平面図、 第八図は第一と第二実施例の型枠を鉄骨梁上に橋架して
コンクリートを打設した状態を示す断面図、 第九図は第二実施例の型枠を鉄骨梁i:に橋架した状態
の側面図、 第十図は同上の一部切欠した平面図・ である。 +11 (11は型枠 (21(メは水平板 (31+3(は側壁 +41 <41は底面 +51 (51は補強IJプ +61 (61Fi接続片 (71(71け掛止部 (8)は最先部 (8)は斜面図 (9)は後辺 (9)は切欠部 (101ij斜面 01)は傾斜面 (121(12+け凹陥部 (131(131は閉塞頂点部 (151(15+は切欠部 (17)はコンクリート (18)は薄い部処 09)は厚い部処 発   明   渚   瀧   森   消   −
特許出願人  株式会社 不動テクニカル図面の(I’
+只内′11に変更なし)第5図      第9図 第6図 第7図 手続補正書(方痴 昭和sg年乙月14日 特許庁長官 若 杉 和 夫 殿 1、事件の表示 昭和sg年特許願第、2.29グク号 2、発 明の名称 コンクリート床施工方法 株式会社 不動テクニカル 4、代理人 5、補正命令のト1伺 昭和57年S月′7日 6、補正の対象 適正な図面 7、補正の内容 別紙の通シ 手続補正書(自発) 昭和!fざ年を月−3日 特許庁長官  若 杉 和 夫 殿 1、事件の表示 昭和Sg年特許願第ココ9ダク号 2、発 明の名称 コンクリート床施工方法 株式会社 不動テクニカル 4、代理人 5、補正命令の1j付 昭和 年 月 日 6、補正の対象 コ特訂ト求の師団 +11  水平板の下面側1に下方に拡開する両側壁と
底面とから成る断面三角形状の補強リブ會所碧砂、相平
行ゼしめて折シ曲け、面カム(、該三角形状の補% ’
)ブの頂点に於ては前記両側壁の頂上部が相接触して閉
塞頂点部が形成されるようにした型枠を使用するコンク
リート床加工力法に於て、補強リブの底mIの端部l・
プレス機にて押し潰してそのの端部全弁し潰し1こその
最先部との間の中間平和部に所要の幅と所要の長さの切
欠部を穿設してコンクリート床施工に自り、型枠の上方
部と下万部どのコンク11)、が相連続してコンクリー
ト床が形成されるように型枠の掛止部?梁に橋架Lコン
クリートを打ち込む (もの′cおることを特徴とする
コンクリート床施工方法 (21特許請求の範曲第1項のコンクリート床施工方法
に於て、前記型枠(1)の中間部分で補強!1プ(5)
の底面(4)をプレス機にて押し潰して水平板(2)の
裏面に1合して、前記掛止部+71と向平和@ (14
1に所要の幅([(1と所要の長さくL’lの切欠窓(
151i穿設しコン名−リート床施工に当り型枠11’
lの上方部のコンクリートと下方剖のコンクリートとか
相連続してコンクリート床が形成されるようにしたこと
を特徴とするコンクリート床版用型枠 31  水平板の下面側に下方に拡開する両側壁と底面
とから成る断面三角形状の補強リブケ所要砂、相平行せ
しめて折p曲打、而かも該三角形状の補強リブめ頂点に
於ては前記、+111壁の頂上部が相接触して閉塞頂点
部が形成されるようにした型枠1使用するコンクリート
床施工方法に於て、型枠の両端?、水平板の表面ト補強
リブの底面との両面の双方かラブレス間の中間平和部に
所俊の幅と所要の長さの切公称(會貸設してコンクリー
ト床施工に当!+型枠の上方部と下方部とのコンクリー
トが相避続してコンクリート床が形成されるように型枠
の掛止部を梁に横架しコンクリートを打ち込むものであ
ることを特徴とするコンクリート床施工方法 (41特許請求の範囲第3項のコンクリート床施工方法
に於て、前記型枠(1)の中flJ1 部分で水平板(
2)の表面と補強リフ(5)の底面! 14’lとの両
面の双′y5からプレス機にて押し潰して両面の中間ト
床施工に当シ型枠(1(の上方部のコンクリートと下方
部のコンク11−トとが相連続してコンクリート床が形
成さnるように型枠の掛止!F[lを梁に橋架しコンク
リート全灯ち込むものであることを特徴とするコンクリ
ート床加工方法 (51特許請求の範囲第1項に記−〇コンク17−ト床
施工方法に於て、%許請求e〕範囲第3項に1釘のコン
クリート床施工方法が併用されるものであることを%徴
とするコンクリート床施工方法 手続補正書(自発) 昭和3g年g月コ3L 特許庁長官  若 杉 和 夫 殿 1、事件の表示 昭和sg年特許願第ム2iり号 2、発 明の名称 コンクリート床施工方法 株式会社 不動テクニカル 4、代理人 5、補正命令の11伺 m−, 7、補正の内容 願書の第6行の「コンクリート床施工方法」と第7行の
「2発明者」との間に「特許請求の範囲に記載された発
明の数・・・ユ」を加入する。
The drawings show an embodiment of the concrete floor construction method according to the present invention, and Fig. 1 is a partially cutaway perspective view of the formwork of the first embodiment, and Fig. 2 is a perspective view of the formwork of the first embodiment. A-A sectional view / Figure 3 is a partially cutaway perspective view of the formwork of the second embodiment; Figure 4 is a top view of the same as above; Figure 5 is an end view of the formwork; Figure 5 is an end view of the formwork; Figure 6 is a side view showing the formwork of the second embodiment bridged over a steel beam. Figure 7 is a partially cutaway plan view of the same as above, Figure 8 is a sectional view showing the formwork of the first and second embodiments bridged over steel beams and concrete is poured, Figure 9 is Fig. 10 is a side view of the formwork of the second embodiment bridged over the steel beam i:, and Fig. 10 is a partially cutaway plan view of the same as above. + 11 (11 is the formwork (21 (8) is the slope view (9) is the rear side (9) is the notch (101ij slope 01) is the slope (121 (12 + recessed part) (131 (131 is the closed apex part (151 (15+ is the notch (17 ) is concrete (18) is thin part 09) is thick part Invented by Nagisa Takimori -
Patent applicant Fudo Technical Drawing Co., Ltd. (I'
+ Tadanai '11 (No change) Figure 5 Figure 9 Figure 6 Figure 7 Procedure amendment (14th month of the 1st month, Showa SG) Commissioner of the Patent Office Kazuo Wakasugi 1, Indication of the case Patent Application No. 2.29 Guku No. 2, Name of Invention Concrete Floor Construction Method Co., Ltd. Fudo Technical 4, Agent 5, Request for Amendment Order No. 1, S/7/1980 6, Appropriate Subject of Amendment Drawing 7, contents of the amendment Written amendment to the attached document (spontaneous) Showa!Fza, February 3, 2013 Commissioner of the Japan Patent Office Kazuo Wakasugi 1, Indication of the case Showa Sg year patent application No. 9 Dak No. 2 , Name of the invention Concrete floor construction method Co., Ltd. Fudo Technical 4, Agent 5, Amendment order 1j, Showa year, Month, Day 6, Subject of amendment Special request for division + 11 Downward on the lower side of the horizontal plate 1 A reinforcing rib with a triangular cross section consisting of expanding both side walls and a bottom surface.
) At the apex of the reinforcing rib, the end of the bottom mI of the reinforcing rib is Part l・
Smash it with a press machine, crush the entire end of it, and drill a notch with the required width and length in the intermediate peaceful part between the tip and the tip of the end to make it easy for automatic concrete floor construction. The upper part of the formwork and the lower part 11) of the formwork should be connected to each other to form a continuous concrete floor. A method for constructing a concrete floor characterized by pouring bridge L concrete into the beam (in the method for constructing a concrete floor according to paragraph 1 of claim 21, in the middle part of the formwork (1) Reinforcement! 1pu (5)
The bottom surface (4) of is crushed with a press machine and placed on the back surface of the horizontal plate (2), and the above-mentioned hooking part +71 and opposite peace @ (14
1 with the required width ([(1 and the required length L'l cutout window (
151i drilling and con name - Formwork 11' for reed floor construction
Formwork 31 for a concrete slab, characterized in that a concrete floor is formed continuously with concrete in the upper part and concrete in the lower part.Both side walls expanding downward on the lower surface side of the horizontal plate. Required sand for reinforcing ribs with a triangular cross section consisting of In the concrete floor construction method used in Formwork 1 where the apex is formed, both ends of the formwork? On both sides of the surface of the horizontal plate and the bottom of the reinforcing ribs, or on the middle peace part between the lovelaces, set the cut nominal width and required length (we will rent it to you for concrete floor construction! + Formwork). A method of constructing a concrete floor, characterized in that the hanging part of the formwork is placed horizontally on a beam and concrete is poured so that the concrete in the upper part and the lower part connect with each other to form a concrete floor. (In the concrete floor construction method according to claim 3 of the 41st patent claim, the horizontal plate (
The surface of 2) and the bottom of the reinforcing riff (5)! The concrete formwork (1) is crushed using a press machine from the twin 'y5 on both sides with 14'l, and the concrete in the upper part and the concrete in the lower part are continuous with each other. A method for processing a concrete floor (as set forth in claim 1 of the 51st claim - 〇 Concrete floor construction method 17-G, % permission request e] Concrete floor construction method procedural amendment document stating that the 1-nail concrete floor construction method is used in conjunction with scope 3 (Voluntary) 1953, 3G, 3L, Commissioner of the Japan Patent Office, Kazuo Wakasugi, 1, Indication of the case, 1959, Patent Application No. 2i, Name of the invention, Concrete Floor Construction Method Co., Ltd. Fudo Technical 4, Agent Person 5, 11th request for the amendment order, 7. Details of the amendment There is an error between the ``concrete floor construction method'' in line 6 of the application and the ``2 inventors'' in line 7 of the application. The number of inventions...

Claims (1)

【特許請求の範囲】 (1)水平板の下?1lii仰1に下方に拡開する両側
壁と底面とから成る断面三角形状の補強LJプを/v′
r要数、相平行ゼし−めて□折シ曲げ、面かも該三角形
状の補強リグの頂点に於ては前記両4II+壁の頂上部
が相接触して閉塞頂点部が形成されるようにした型枠を
使用するコンクリート床施工方法に於て、補強1ノブの
底面の端部會プレス機にて押し潰してそのの端部を押し
潰したその最先部との間の中間平担部に所畏の幅と所要
の長さの切欠部を穿設してコンクリート床施工に自り、
型枠の土方部と下方剖とのコンクリートが相連給してコ
ンクリート床が形成さね、るように型枠の掛止部を梁に
橋架しコンクリートを打ち込むものであることを特命と
するコンクリート床施工方法 (2)  特許請求の範囲第1.LJのコンクリート床
施工力法に於て、前記型枠(11の中間部分で補強LJ
プ(5)の底面(4)をプレス機にて押し潰して水平板
(21の裏面に重合して、前記掛止部(71と同様の目
的のための凹陥部a”;H形Mゼしめ、該々 凹陥部(121於て補強リプ(5)と(51との間の中
間平担部α5)に所乗の幅旧1と所要の長さ−の切欠窓
US+t−穿設しコンクリート床施工に自シ型枠(1)
の上方部のコンクリートと下方部のコンク11−トとが
相連続してコンクリート床が形成されるようにしたこと
を特徴とするコンクリート床版用型枠 (31水平板の下面側に下方に拡開する両側壁と底面と
から成る断面三角形状の補強リブを所要数、相平行せし
めて折シ曲げ、而かも該三角形状の補強リプの頂点に於
ては前83 (I11壁の頂上部が相接触して閉塞頂点
部が形成されるようにした型枠を使用するコンクリート
床施工方法に於て、型枠の両端を、水平板の表面と補強
リブの底面との両面の双方からプレス間の中間平和部に
所要の幅と所要の長さの切欠部を穿設してコンクリート
床施工に当シ型枠の上方部と下方部とのコンク1)−ト
が相連続してコンクリート床が形成されるように型枠の
掛止部を梁に横架しコンクリートを打ち込むものである
ことを特徴とするコンクリート床施工方法 (4)  特許請求の範囲第3項のコンクリート床施工
方法に於て、前記型枠(1)の中間部分で水平板(2)
の表面と補強リブ(5)の底面(4)との両面の双方か
らプレス機にて押し潰して両面の中間リブ(5)と(5
)との間の中間平和部σ4)に所要の幅7 dと所要畏さ−の切欠Jξ穿設し−ンクリート床施工に
当シ型枠(1)の上方部のコンクリートと下方部のコン
ク11−トとが相連続してコンクリート床が形成される
ように型枠の掛止部を梁に橋架しコンクリートを打ち込
むものであること全特徴とするコンクリート床施工方法 (5)  特許請求の範囲第1giに記載のコンクリー
ト床施工方法に於て、特許請求の範囲第3項に記載のコ
ンクリート床施工方法方併用されるものであることを特
徴とするコンクリート床施工方法
[Claims] (1) Under the horizontal board? /v'
r, parallel to each other and □bend, so that at the apex of the triangular reinforcing rig, the tops of both 4II+ walls come into contact with each other to form a closed apex. In the concrete floor construction method using a molded formwork, the end of the bottom of the reinforcement 1 knob is crushed with a press machine, and the intermediate flat plate is formed between the edge of the reinforced knob and the tip of the crushed part. A notch of the desired width and length is drilled in the section to construct the concrete floor.
A concrete floor in which the hanging part of the formwork is bridged over a beam and concrete is poured so that the concrete from the earthward part and the lower part of the formwork is fed together to form a concrete floor. Construction method (2) Claim 1. In the LJ concrete floor construction force method, reinforcement LJ
The bottom surface (4) of the plate (5) is crushed with a press machine and superimposed on the back surface of the horizontal plate (21) to form a recessed portion a'' for the same purpose as the hooking portion (71); Then, drill a cutout window US+t- in the concave part (intermediate flat part α5 between reinforcing lip (5) and (51) at 121) with a square width of 1 and a required length of -, and then drill the concrete. Automated formwork for floor construction (1)
Formwork for concrete slabs characterized by forming a concrete floor in which the concrete in the upper part and the concrete in the lower part 11- are continuous with each other. The required number of reinforcing ribs having a triangular cross section consisting of open side walls and the bottom are arranged in parallel and bent, and at the apex of the triangular reinforcing ribs, the front 83 In a concrete floor construction method that uses formwork that contacts each other to form a closed apex, both ends of the formwork are pressed between both sides of the horizontal plate surface and the bottom surface of the reinforcing ribs. A notch with the required width and length is drilled in the middle peace part of the formwork to form a concrete floor. A concrete floor construction method (4) characterized in that the hanging part of the formwork is placed horizontally on a beam and concrete is poured so as to form a concrete floor construction method according to claim 3. , horizontal plate (2) in the middle part of said formwork (1)
and the bottom surface (4) of the reinforcing rib (5) using a press machine to form intermediate ribs (5) and (5) on both sides.
) A notch Jξ of the required width 7 d and the required depth is drilled in the middle peace part σ4) between the concrete floor and the upper part of the formwork (1) and the lower part of the concrete 11. - Concrete floor construction method (5) characterized in that concrete is poured by bridging the hanging part of the formwork to the beam so that the concrete floor is formed in succession. In the concrete floor construction method described in 1gi, the concrete floor construction method is used in combination with the concrete floor construction method described in claim 3.
JP2294783A 1983-02-16 1983-02-16 Construction of concrete floor Granted JPS59150847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2294783A JPS59150847A (en) 1983-02-16 1983-02-16 Construction of concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2294783A JPS59150847A (en) 1983-02-16 1983-02-16 Construction of concrete floor

Publications (2)

Publication Number Publication Date
JPS59150847A true JPS59150847A (en) 1984-08-29
JPH0260819B2 JPH0260819B2 (en) 1990-12-18

Family

ID=12096811

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2294783A Granted JPS59150847A (en) 1983-02-16 1983-02-16 Construction of concrete floor

Country Status (1)

Country Link
JP (1) JPS59150847A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01154214U (en) * 1988-04-19 1989-10-24
EP3735500A4 (en) * 2018-01-02 2021-09-15 Patco LLC Metal decking

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525315U (en) * 1991-03-11 1993-04-02 株式会社タイセイヤナセ Environmental measurement recorder

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5582311U (en) * 1978-11-22 1980-06-06
JPS5641012U (en) * 1979-09-08 1981-04-16
JPS5820047A (en) * 1981-07-29 1983-02-05 Yokogawa Hokushin Electric Corp Signal transmitter
JPS5820048A (en) * 1981-07-29 1983-02-05 Hitachi Ltd Data transmission network system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5199253A (en) * 1975-02-27 1976-09-01 Nippon Telegraph & Telephone KAHENTEIKO SOCHI

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5582311U (en) * 1978-11-22 1980-06-06
JPS5641012U (en) * 1979-09-08 1981-04-16
JPS5820047A (en) * 1981-07-29 1983-02-05 Yokogawa Hokushin Electric Corp Signal transmitter
JPS5820048A (en) * 1981-07-29 1983-02-05 Hitachi Ltd Data transmission network system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01154214U (en) * 1988-04-19 1989-10-24
EP3735500A4 (en) * 2018-01-02 2021-09-15 Patco LLC Metal decking

Also Published As

Publication number Publication date
JPH0260819B2 (en) 1990-12-18

Similar Documents

Publication Publication Date Title
US4885884A (en) Building panel assembly
US2142305A (en) Building unit and construction
JPS6073964A (en) Connection anchor
JPS59150847A (en) Construction of concrete floor
GB1522114A (en) Form for casting-in-place a concrete structure
JPH11280178A (en) Reinforcing bar construction for wall beam, wall beam construction, and bearing wall construction of building
JP2510738B2 (en) Reinforcing member for concrete plate and concrete plate using the same
JPS5837255A (en) Synthetic floor panel
US6578815B2 (en) Concrete wall and rib form
JPS6127373Y2 (en)
JPS59126015U (en) Formwork for concrete floor slabs
JPS6134424Y2 (en)
JPS5828028Y2 (en) Reinforcement structure unit
JPH0497052A (en) Deck plate
JPS585764Y2 (en) Concrete composite beam with I-beam with irregular flange and corrugated deck plate
JPS6310021Y2 (en)
JPS60482U (en) Drenfrium
JPH0826600B2 (en) Concrete slab joint structure
JPS6115127Y2 (en)
JPS624586Y2 (en)
JPS63916Y2 (en)
JPH061980Y2 (en) Beam form plate
JPS6378965A (en) Mold frame for executing concrete floor
JPH0735947Y2 (en) Crack prevention tool
JPH0328088Y2 (en)