JPS5865898A - Start and arrival method of pipe embedding method - Google Patents

Start and arrival method of pipe embedding method

Info

Publication number
JPS5865898A
JPS5865898A JP16223481A JP16223481A JPS5865898A JP S5865898 A JPS5865898 A JP S5865898A JP 16223481 A JP16223481 A JP 16223481A JP 16223481 A JP16223481 A JP 16223481A JP S5865898 A JPS5865898 A JP S5865898A
Authority
JP
Japan
Prior art keywords
pipe
wall
leading
reaching
leading pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16223481A
Other languages
Japanese (ja)
Inventor
竹谷 由樹
小亀 信介
勝 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAGATAGUMI KK
Original Assignee
KAGATAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAGATAGUMI KK filed Critical KAGATAGUMI KK
Priority to JP16223481A priority Critical patent/JPS5865898A/en
Publication of JPS5865898A publication Critical patent/JPS5865898A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 見・地盤に対する管理設工法の発進および到達万〃二M
.ljAする〇 道路や鉄道の@道下を横田「して上)水道管や−各柚ケ
ーブルの保護管を地中に埋設するに際し地十を開掘てろ
ことなく管を埋設する工法として道路等ケ挾んで地上か
ら竪坑を掘削しその竪坑の周囲を土(¥/数により土留
馨行い、その土留板に発進口および到達口を穿設して、
竪坑内から水平オーカースクリユー等の水平掘削装置を
用いて地中を掘削しつつ管を押進他殺する王tFが実施
されている。
[Detailed description of the invention] Starting and reaching 2M of controlled construction method for inspection and ground
.. ljA〇Roads and railways @ Yokota under the road and above) When burying water pipes and protection pipes for each Yuzu cable underground, it is a method of burying the pipes without digging up the ground. Excavate a shaft from the ground, excavate a shaft from the ground, surround the shaft with earth (by ¥/number), and drill a starting port and a destination port in the retaining plate.
A method called tF is carried out in which a horizontal excavation device such as a horizontal ocher screw is used to excavate underground from within a shaft while pushing the pipe forward.

その場合、掘削地盤が地下水の水位より上位で水を含ま
ない地盤であれば格別間項ケ生じないが、滞、水砂層等
の地下水を含む地)寝では、発進、到達時に発進口およ
び到達口から訛出しようとてる土砂、地下水を阻止する
為にグラウト等によろ池盤改θ−工法や地)水位低下工
d、等の煩雑な袖1J7JJl法乞必要とし、これが工
期の艮期化および工費高の原因になって(・た。
In that case, if the excavated ground is above the groundwater level and does not contain water, no special problems will occur, but if the excavated ground is ground that contains groundwater such as stagnation, water and sand layers, the starting point and the ground at the time of arrival will be In order to prevent the soil and ground water from coming out of the mouth, it was necessary to use grouting, etc., to make the pond board modification method, water level lowering method, etc., and this caused the construction period to change. and caused high construction costs.

本発明はかかる従来性われていた抽助工法乞−掃し得ろ
管埋設f法の発進および到達方法を提供することを目的
とする。
It is an object of the present invention to provide a method for starting and arriving at the conventional traction method, sweep-out method, and buried pipe method.

すなわち本発明の特徴とする発J尾方法は、竪+;A’
、(1)内の土留板(2)の直前にパツキン(3)を周
縁にトえた肯発進(](4)を有する堕体(5)を設け
、前記バソキ/(3)ケ押圧しながら先導管(6)ン管
発進口へ (2)を適当長さ引上げて彎発進口(4)を開いた後埋
設管(7)の押進埋設を行うことにある。
In other words, the J-tailing method that characterizes the present invention is vertical +; A'
Immediately before the earth retaining board (2) in (1), a fallen body (5) having a positive start (] (4) with a padskin (3) attached to the periphery is provided, and while pressing the base plate (3), After the lead pipe (6) (2) is pulled up to an appropriate length to open the curved start port (4), the buried pipe (7) is pushed and buried.

夕到達方法は、竪坑(/a)内の土渭依(ユa)の直う 目りに先導管(6)の推進により破壊しる材料で壁体へ (8)を形成I7、その壁体(8)のMu面に鋼板(9
)を設けIIi!設管(7)を押進′埋設して先導管(
6)が土留板(スa)に達した後、土留板(2a)を適
当長さ引上げるとともに埋設管(7)をさらに押進して
先jJ管(6)を壁ハ 達箇所にパツキン(、?a)を設けるとともvc ;1
1達口(4’a)を形成せしめて、そのバソキ7(3a
 )’r Jlil Ihして水密状C乞形、成しなが
ら先導管(6)および埋設管(7)を到達口(ダa)よ
り進出することにある。
The method of reaching the end of the day is to form a wall (8) with the material to be destroyed by the propulsion of the leading pipe (6) directly in front of the ground I7 in the shaft (/a), and the wall. A steel plate (9) is attached to the Mu surface of the body (8).
) is established IIi! Push the installation pipe (7) and bury it to install the lead pipe (
6) reaches the retaining plate (a), pull up the retaining plate (2a) to an appropriate length, push the buried pipe (7) further, and attach the tip JJ pipe (6) to the place where it reaches the wall. (,?a) and vc ;1
Form the first opening (4'a) and open the opening 7 (3a).
)'r Jlil Ih The leading pipe (6) and buried pipe (7) are advanced through the access port (daa) while forming a watertight shape.

次に本発明発進順序を第1図〜第を図により説明する。Next, the starting sequence of the present invention will be explained with reference to FIGS.

第1図は準fliif状態乞示し、発進側竪坑(1)内
の土留、m (2+、の直iffに埋設管(7)より径
大な管発血0(4)を有する佃1面り形コノクリート壁
体(5)を1ヴげその管発進口(,1)の周縁に埋設管
(7)の直径より径小す孔(3b )Y有するエントラ
ンスパツキン(3)が設けられている。図中(10)は
上水板である。。
Figure 1 shows a quasi-fliif state, with a pipe 0 (4) larger in diameter than the buried pipe (7) located directly at the earth retaining m (2+) in the starting shaft (1). An entrance gasket (3) having a hole (3b) Y whose diameter is smaller than the diameter of the buried pipe (7) is provided at the periphery of the pipe starting port (,1) of the conocrete wall (5). In the figure (10) is the water supply board.

第2図は水平掘削装置(11)の先導管(6)がパツキ
ン(3)の孔(3b)に圧入して水W5υぐ態ン形成し
さらに発進口(4)内に水等の液体(イlを満杯させて
t留取(2)の背面の地下水圧と同等若)Q<はそれ息
子の?r’i rhとした状態を示している。なお、液
体(イ)は壁体(5)に設けられた1ン1示しな(・注
入口又はスクリューオーガーから圧入する。
Figure 2 shows that the leading pipe (6) of the horizontal excavation device (11) is press-fitted into the hole (3b) of the packing (3), forming water W5υ, and further liquid such as water ( Is it the same as the groundwater pressure at the back of the distillation tank (2) when the tank is full? This shows a state where r'i rh is set. Note that the liquid (A) is press-fitted from the injection port or screw auger provided in the wall (5).

第3図は土留#j、(2)を引上げて管発進口(4)7
開いた状態を示している。この場合土留板(2)の下端
はコ/り11  )壁体(5)より引上げないこととす
る。
Figure 3 shows earth retention #j, (2) pulled up and pipe starting port (4) 7
Shows open state. In this case, the lower end of the retaining plate (2) shall not be raised above the wall (5).

4)17図はかかるパツキン(3)による水晋状態で土
留板(2)ケ引上げた後埋設管(7)乞押進埋設してい
る状態て゛ある。
4) Figure 17 shows a state in which the retaining plate (2) has been pulled up and the buried pipe (7) is pushed and buried in a water-dry state using the packing (3).

次に本発明到達順序を第5図〜第g図により説明する。Next, the order of arrival according to the present invention will be explained with reference to FIGS. 5-g.

第5図は先導管(6)が到達側竪坑(/a)の土留板(
2−a)(fc到達した状態であり゛、側面り形壁体(
ga)の車直都壁体(8)はベントナイトモルクル等ニ
χより形成さす]ており、水平部壁体(gb)はコンク
リ − ト 桔!であ る 。
Figure 5 shows that the leading pipe (6) reaches the retaining plate (/a) of the shaft (/a)
2-a) (fc has been reached), the side wall (
The car vertical wall (8) of ga) is made of bentonite morkle, etc., and the horizontal wall (gb) is made of concrete. It is.

第4図は土留板(,2a)を引上げた状1事、第7図は
埋設も・(7)をさらに押進して先導・び((3)をベ
ン/トナイトモルタル等の壁体(8)にけ挿せしめた状
態、および先導管(6)が壁体(8)を1挿して面数(
9)K達した後、→l荷第27(9) Fm面の光導電
、f!I達潴M「・υパツキン(3a)v 、r+>げ
、到達口(lla)′fX−形成シたqgqを示してい
る。
Figure 4 shows the state in which the earth retaining plate (, 2a) has been pulled up, and Figure 7 shows the state in which the retaining plate (, 2a) has been pulled up. 8) The state in which the leading pipe (6) is inserted into the wall (8) and the number of surfaces (
9) After reaching K, →l charge 27th (9) Photoconductivity of Fm plane, f! Idatsuma M ``·υ Patsukin (3a) v, r+>ge, reaching opening (lla)'fX-formation Shita qgq.

第g図はパツキン(3a)’Y押IEシて水′f状即を
形成しな、がら先導管(6)を到達口(4’a)から1
1シ出している状態を示して℃)る。
Fig. g shows the guide pipe (6) being pushed 1-1 from the reach port (4'a) while pressing the seal (3a)'Y to form a water 'f' shape.
℃)

本発明は上記のl!I+ (パツキン(:’A 3 a
 )による水密状態の形成と」;苗根t2](,2a)
の引上げによって水密状態での5j:萌オ6よび到達か
容易f= Ill fj!となろ発進および到達方法で
あるから?;r゛米行われていたグラウト等による地盤
改良工法、地下水1\゛f低−ト王法等の補助工法が一
掃されて工期の短節と下行の削減が計られろ。
The present invention is based on the above l! I+ (Patsukin (:'A 3 a
) to form a watertight state and the seedling root t2] (, 2a)
5j in a watertight state by raising: Moe 6 and easy to reach f = Ill fj! Because this is the starting and reaching method? The existing auxiliary methods such as ground improvement methods such as grouting and groundwater lowering method should be eliminated to shorten the construction period and reduce the amount of work required.

したがってグラウトの桑液注中による数丁7にの汚染お
よび地下水位低下工t1による地盤沈下の心配が無い。
Therefore, there is no need to worry about contamination of the grout 7 due to mulberry solution injection or ground subsidence due to the groundwater level lowering work t1.

然も土留板を切断して発+’IP、口、到達ロン形成し
、その]方の上留敬乞埋殺しするといった従来方法と異
なり、本発明では土留板を切断する。
However, unlike the conventional method in which the earth retaining board is cut to form a starting point, an opening, and a final line, and then the upper part is buried, the present invention involves cutting the earth retaining board.

ことなく引上げて全て回収出来ろから経済的であり、埋
殺し土留板か後11何等かの障害になる・し・配も無い
等その効果は大きい。
It is economical because it can be pulled up and collected without any problems, and its effects are great, such as there is no need to disturb the earth retaining board or the rear 11.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の実施例であり、・れ/図〜・λ)g図は
工程のIlf〔j序を示”f説明図である。 (IK/a1.、竪坑 f2)(,2a)−、土留板 
(3)(3aン。 、パツキン (4)81発進口 (4Za)、 、到達
[](!″1)1.壁体 (6)1.先導管 (71,
、埋設ゞ#’i’  +810.峙・体 (9)、  
会11!板 特  許  出  願  人     株式会 社 1
f(1躍 111,141(第1図 第2図
The drawings are examples of the present invention, and the diagrams are explanatory diagrams showing the Ilf[j order of the process. (IK/a1., shaft f2) (,2a)- , retaining board
(3) (3a), Patsukin (4) 81 Launch Gate (4Za), , Arrival [] (!″1) 1. Wall (6) 1. Leading pipe (71,
, buriedゞ#'i' +810. Face/body (9),
Meeting 11! Board patent applicant Co., Ltd. 1
f (1 jump 111,141 (Figure 1 Figure 2

Claims (1)

【特許請求の範囲】 / 竪坑内力士留板の直前にパツキンを周縁に具えた管
発進口を有する壁体な設け、前記パツキンを押IF、シ
ながら先導管乞管発進口に進当長さ引上げて管光進口を
開いた後埋設管の押進埋設を行うことケ特徴とする管理
設工法の発進方法。 λ 竪坑内の土留板の直前に先導管の推進によう り切削しる材料で壁体を形醒し、その壁体の011面に
鋼板を設け、埋設・gを押進埋設して先導管が土留板に
達した後、土留板を適当j)さ引上げるとともに埋設管
をさらに押進して先導管を壁体に貫挿させ、次いで鋼板
前面の先導管到達箇所ギバソキンを設けるとともに到達
ロン形成せしめて、そのパッキンケ押1’E して水蜜
状態を彬成しながら先導管および1111設管を到達口
より進出することを特徴とする管理設工法の到達方法。
[Scope of Claims] / A wall body having a pipe starting port with a gasket on the periphery is provided immediately before the retaining plate for sumo wrestlers in the shaft, and while pushing the gasket IF, the length of the pipe is advanced to the leading pipe starting port while pushing the gasket. A method for starting a controlled construction method characterized by pushing the buried pipe and burying it after pulling it up and opening the pipe opening. λ Immediately before the earth retaining plate in the shaft, shape the wall with material that will be cut as the leading pipe is propelled, install a steel plate on the 011 side of the wall, bury it, and push and bury the leading pipe. After reaching the earth retaining board, the earth retaining board is pulled up to an appropriate height and the buried pipe is pushed further to allow the leading pipe to penetrate the wall. Next, a guide pipe is installed on the front of the steel plate where the leading pipe will reach, and the reaching length is A method of controlled construction method, which is characterized in that the leading pipe and the 1111 installation pipe are advanced from the reaching port while forming and pressing the packing to create a watery state.
JP16223481A 1981-10-12 1981-10-12 Start and arrival method of pipe embedding method Pending JPS5865898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16223481A JPS5865898A (en) 1981-10-12 1981-10-12 Start and arrival method of pipe embedding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16223481A JPS5865898A (en) 1981-10-12 1981-10-12 Start and arrival method of pipe embedding method

Publications (1)

Publication Number Publication Date
JPS5865898A true JPS5865898A (en) 1983-04-19

Family

ID=15750515

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16223481A Pending JPS5865898A (en) 1981-10-12 1981-10-12 Start and arrival method of pipe embedding method

Country Status (1)

Country Link
JP (1) JPS5865898A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009235775A (en) * 2008-03-27 2009-10-15 Alpha Civil Engineering:Kk Wellhead system for vertical shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009235775A (en) * 2008-03-27 2009-10-15 Alpha Civil Engineering:Kk Wellhead system for vertical shaft

Similar Documents

Publication Publication Date Title
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN106088099B (en) A kind of subway foundation pit anchor cable processing method
CN110219654A (en) The leading construction method of mud stone multiple-arch tunnel side pilot tunnel
CN101906787B (en) Construction and processing method of great deep vertical inclinometer pipe in stratum containing gravels
CN201103127Y (en) Water stop locking notch tube of underground continuous wall
JPS5865898A (en) Start and arrival method of pipe embedding method
CN205475205U (en) Dig bored concrete pile soon and meet hole backfill device that collapses
KR101494314B1 (en) Laying method of grout tube for geothermal exchanger
CN217681768U (en) Ultra-long communication channel frozen wall melting and sinking grouting system
CN107130610A (en) A kind of construction method of deep foundation pit support
CN208152064U (en) One-way is shoved artificial digging pile precipitation system in shale geology
CN208815550U (en) A kind of rich water powder land floor precipitation and recharge construction system
Abramson et al. Predicted and actual risks in construction of the Mercer Street Tunnel
Terzaghi et al. Design and performance of Vermilion Dam
JPS6213449B2 (en)
JPH11182737A (en) Pipe burying construction method
Lyle et al. Gilman Drive Sewer Improvement Project
JP3069822B2 (en) Installation method of intake water discharge pipe
Hall An Archaeological Watching Brief in the Master's Garden and Archaeological Recording in the Chimney, Jesus College, Cambridge
JPH0256432B2 (en)
JP3110927B2 (en) Backfill injection method in propulsion method
CN110080210A (en) Cast-in-place pile construction method in discarded ground
JP3568860B2 (en) Underground passage formation method
SE et al. SEIKAN PILOT TUNNEL OPENS'±'M~ WAY FOR JAPAN'S 23KM UNDERSEA RAIL LINK
Sutherland Archaeological Recording Brief at High Street Farm, West Wratting