JPS584042A - Construction of dome type large roof - Google Patents
Construction of dome type large roofInfo
- Publication number
- JPS584042A JPS584042A JP10238881A JP10238881A JPS584042A JP S584042 A JPS584042 A JP S584042A JP 10238881 A JP10238881 A JP 10238881A JP 10238881 A JP10238881 A JP 10238881A JP S584042 A JPS584042 A JP S584042A
- Authority
- JP
- Japan
- Prior art keywords
- gantry
- roof
- movable gantry
- movable
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
本発明は、全天候型の球場等におけるドーム型大屋根の
構築方法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a large dome-shaped roof in an all-weather stadium or the like.
直径約−(’ Om s高さto〜20調といった大規
模な鉄骨造のドーム型大屋根は、国内で社未だ施工例が
なく、国外においてわずかの施工例を見るに過ぎない、
そして0、これらのドーム型大屋根は、大屋根全域にわ
九る大規模な支保工を構築し、その上にクレーンで鉄骨
を揚重して組立てるといつ友方法によって構−されてい
たものである。A large-scale steel-framed dome-shaped roof with a diameter of approximately - ('0m s to 20 degrees) has not yet been constructed in Japan, and there are only a few examples of construction outside of Japan.
0.These large dome-shaped roofs were constructed using the Tomo method, which involved constructing large-scale shoring across the entire area of the roof, and then lifting and assembling the steel frame with a crane. It is.
従って、大型の仮設支杆が数多く必要で、膨大な資材、
労務及び工費を要し、且つ、重量物を高い位置まで揚重
するため大型のクレーンが必要であり、しかも、大規模
な仮設工事となるため、これが他の作業の進行に障害と
なって全体工期が長くなシ、また高所作業が多いため、
大規模な養生(落下に対する安全対策)が必要であるば
かシでなく、施工能率、品質確保の面でも大いに問題が
あった。Therefore, many large temporary supports are required, and a huge amount of materials and
This requires labor and construction costs, requires a large crane to lift heavy objects to a high position, and is also a large-scale temporary construction work, which obstructs the progress of other works and disrupts the overall work. Because the construction period is long and there is a lot of work at heights,
Not only did it require extensive curing (safety measures against falling), but there were also major problems in terms of construction efficiency and quality assurance.
本発明は、これらの問題を解決できるドーム。The present invention provides a dome that can solve these problems.
型大屋根の構築方法を提案するものである。This paper proposes a method for constructing a large-sized roof.
即ち、本発明によるドーム型大屋根の構築方法は、構築
場所の中央部に、タワークレーンを備えた中央構台を、
外局部には、円鳴上に所定間隔で位置する柱を備えた外
局スタンドを、またこれら両者間には、中央構台を中心
にして旋回可能で、且つ、放射状に#4w!される大ト
フス間の角質に対応する平面形伏略覇形の移動構台を夫
々組立てると共に、中央構台上にドーム型大屋根鉄骨の
コンプレツVヨンリングを組立てた後、大トフスを移動
構台上で組立てて前記コンプレッションリングと柱間に
架設し、以下、を
次々と移動構台か所定角度ずつ移動しては大トフスを同
様に架設して移動構台の7回目の旋回によシ全部の大ト
フスを放射状に構築し、次に、隣り合う大トフス間をテ
ンションリングの単位体で連結すると共に、これら両穴
トラフ間の下方に移動構台を配置した伏頗で、前記タワ
ークレーン、移動構台上に搭載されたクレーン、地上を
走行するクレーンを用いて前記大トフス間に屋根トフス
を構築し、以下次々とテンションリングの継足し、移動
構台の所定角度の移動、屋根トフスの構築を#!シ返し
て参勤構台のコ回目の旋回により全局にわたるテンショ
ンリング及び屋根トラスの構築を行ない、移動構台の3
回目以降の旋回によシ屋根下面の仕上げ工事及び設備工
事を行なう点に特徴がある。That is, the method for constructing a large dome-shaped roof according to the present invention includes a central gantry equipped with a tower crane in the center of the construction site.
In the outer part, there is an outer stand with pillars positioned at predetermined intervals above the ring, and between these two stands there are #4w! After assembling the movable gantry with a planar rectangular hexagonal shape corresponding to the cornice between the large tofus, and assembling the complete V-yon ring of the dome-shaped large roof steel frame on the central gantry, the large tofus were assembled on the movable gantry. Then, move the movable gantry one after another by a predetermined angle and erect the large tofus in the same way, and by the seventh rotation of the movable gantry, all the large tofus are radially installed. Next, adjacent large troughs are connected by a unit of tension ring, and a movable gantry is placed below between these two hole troughs, and the tower crane is mounted on the movable gantry. Build a roof top between the large tops using a crane that travels on the ground, then add tension rings one after another, move the movable gantry to a predetermined angle, and construct the roof top! Returning, the tension ring and roof truss for the entire station were constructed by making the third turn of the visiting gantry, and the third rotation of the movable gantry was completed.
It is unique in that finishing work on the underside of the roof and equipment work are carried out during the subsequent turns.
以下、本発明の実施例を図面に基づいて説明する。Embodiments of the present invention will be described below based on the drawings.
先ず、第1図、第2図(イ)及び第8図(イ)に示すよ
うに、構築場所の中央部にセルフクライミング式のタワ
ークレーン1を備えた中央構台2を、外周部には円鴫上
に所定間隔で位置する本設の柱3m及びそれらの内側に
位置する仮設の柱3条を備えた外周スタンド4を、また
これら両者2.4間には、中央構台2を中心にして旋回
可能で、且つ、放射状に構築される大トフス5・・・間
の角度(この実施例では、1本の大トフス5・・・を放
射状に構築しておシ、大トフス5・・・間の角墳はyj
度であるが、本発明はこれに限られるものではない、)
に対応する平面形伏略扇形の移動構台6を夫々組立てる
と共に、中央構台2上にドーム型大屋根鉄骨の一部とな
るコンプレツVヨンリング7を組立てる。First, as shown in Figures 1, 2 (a), and 8 (a), a central gantry 2 equipped with a self-climbing tower crane 1 is installed in the center of the construction site, and a circular structure is installed on the outer periphery. An outer stand 4 with 3 meters of permanent pillars located at predetermined intervals on the ground and 3 temporary pillars located inside them, and a stand 4 between these two, with the central gantry 2 as the center. The angle between the large tofus 5 that can be rotated and is constructed radially (in this embodiment, one large tofu 5 is constructed radially, and the large tofus 5... The square tomb in between is yj
(However, the present invention is not limited to this.)
A movable gantry 6 having a flat planar shape and a generally fan-like shape corresponding to the gantry 6 is assembled respectively, and a complex V-shaped ring 7 which becomes a part of the dome-shaped large roof steel frame is assembled on the central gantry 2.
尚、具体的には、中央構台2、コンプレッションリング
7、移動構台6、外局スタンド4の順に組立てられてい
るが、この組立順序は適宜選択できる。移動構台6の内
端部は中央構台2に反力をとるものであり、中央構台2
の周囲に設けたリング伏のレーfi/8に、表面をテフ
ロン(商品名)で加工したシューを介して支持されてい
る。また、移動構台6の外端脚部は本設構造に反力をと
るもので、床面に敷設したリング伏のレール9に同様な
シューを介して支持されている。10は移動構台6上に
解体自在に組立てられた大トフス受サポート、11は移
動構台6上に搭載されたクローツクレーンである。外周
スタンド4のうち、移動構台6の旋回に障害となる部分
(第1図に仮想線で示す、)4′は、移動構台6の解体
後、増築される。本設の柱6mは温度変化によるドーム
型大屋根のり俵収細を吸収できるよう大トフス5を大屋
根半径方向に移動可能な状態に支持するものであり、仮
設の柱3hは、鉄骨建方時における上記の移動t−阻止
するために設けられたものである。Specifically, the central gantry 2, compression ring 7, movable gantry 6, and external station stand 4 are assembled in this order, but this assembly order can be selected as appropriate. The inner end of the movable gantry 6 takes a reaction force to the central gantry 2.
It is supported via a shoe whose surface is treated with Teflon (trade name) on a ring-shaped lay fi/8 provided around the ring. Further, the outer end leg portion of the movable gantry 6 takes a reaction force against the main structure, and is supported by a ring-shaped rail 9 laid on the floor via a similar shoe. The reference numeral 10 designates a large tonnage support that is assembled on the movable gantry 6 in a manner that allows it to be disassembled freely, and the reference numeral 11 designates a cloetz crane mounted on the movable gantry 6. A portion 4' of the outer peripheral stand 4 that poses an obstacle to the rotation of the movable gantry 6 (shown by a phantom line in FIG. 1) is expanded after the movable gantry 6 is dismantled. The permanent pillar 6m supports the large tofu frame 5 so that it can be moved in the radial direction of the large dome roof in order to absorb the shrinkage of glue bales for the dome-shaped large roof due to temperature changes, and the temporary pillar 3h supports the steel frame construction. It is provided to prevent the above-mentioned movement at the time of t-.
次に、第2図(ロ)及び第8図(ロ)に示すように、地
組された大トフス単位体5#を地上にNllたクローツ
クレーン12で移動構台6上に吊り込み、該クレーン1
2、前記タワークレーン1及び移動構台6とのクローラ
クレーン11を用いて、移動構台6上で大トラス5に組
立て、と3−間に架設し、大トラス受サポート10を解
体撤去する。そして、移動構台6を所定角変移動して次
の大トラス5を同様な手順により′架設し、次々と同じ
工程を1#シ返して移動構台6の/@1目の旋回により
全部の大計ラス5・・・を放射状に構築する。Next, as shown in Fig. 2 (b) and Fig. 8 (b), the assembled large tofu unit 5# is lifted onto the movable gantry 6 by the Kroetz crane 12 on the ground. Crane 1
2. Using the crawler crane 11 of the tower crane 1 and the mobile gantry 6, assemble the large truss 5 on the mobile gantry 6, install it between and 3, and dismantle and remove the large truss support 10. Then, the movable gantry 6 is moved by a predetermined angle and the next large truss 5 is erected by the same procedure, and the same process is repeated 1# one after another, and the entire large truss is erected by turning the movable gantry 6 /@1. A total of laths 5... are constructed radially.
次に、第2図(ハ)及び第8図C→に示すように、隣り
合う大トラス5・・・間を、柱5m、5hのト方近傍部
においてテンションリングの単位体16#で連結(この
作業には地上のクローラクレーン12を用いる。)し、
しかる後(又はこれに先立って)移動構台6を前記両人
トラス5・・・間の下方、つtシ、屋根トラス構築位置
の直下に配置し、地組された屋根トラス単位体14#・
・・全前記タワークレーン1、クローラクレーン11.
12で吊り込み、移動構台6を作業床として使用しつつ
平面形伏略扇形に屋根トラス14−71による建方範囲
、hは移動構台6によるyk+鎮開 rk+坂隙のクロ
ーラクレーン12による建方範囲を示す。Next, as shown in Fig. 2 (C) and Fig. 8 C→, the adjacent large trusses 5 are connected by a tension ring unit 16# in the vicinity of the columns 5m and 5h on the to side. (A ground crawler crane 12 is used for this work.)
After that (or prior to this), the movable gantry 6 is placed below between the two trusses 5, directly below the roof truss construction position, and the assembled roof truss unit 14#.
...All of the above tower crane 1, crawler crane 11.
12 is suspended, and while the movable gantry 6 is used as a work floor, the range of construction is by the roof truss 14-71 in a flat fan shape. Indicates a range.
そして、第2図に)、(ホ)及び第8図に)、(へ)に
示すように、次々とテンションリング単位体13iの継
足し、移動構台6の所定角度の移動、扇形屋根トラス1
4の構築を繰り返して移動構台6の2回目の旋回により
全部にわたるテンションリング13及び屋根トラス14
・・・の構築を行ない、移動構台6の3回目の旋回によ
シ屋根下面の仕上げ工事及び設備工事を行ない、しかる
後、移動構台6の解体、外煽スタンド4の後施工部4′
の増築工事、中央構台2のジヤツキダウン及び解体、外
周スタンド4及び場内の仕上げ工事を行なうのである。Then, as shown in FIGS. 2), (e) and 8) and (f), the tension ring units 13i are successively added, the movable gantry 6 is moved by a predetermined angle, and the fan-shaped roof truss 1 is moved.
4 is repeated and the movable gantry 6 turns for the second time to completely cover the tension ring 13 and roof truss 14.
..., and after the third rotation of the movable gantry 6, finish work on the lower surface of the roof and equipment work are carried out, and after that, the movable gantry 6 is dismantled and the rear construction section 4' of the outside fanning stand 4 is constructed.
The project will include expansion work, jacking down and dismantling the central gantry 2, and finishing work on the outer stand 4 and the grounds.
尚、屋根葺作業は、扇形屋根トラス14を構築する都實
行なわれる。また、1紀の寮掩例では、移動構台6の3
回目の旋回時に、屋根下面の仕上げ工事と設備工事を同
時に行なっているが、これらの工事は移動構台6の3回
目とダ回Hの旋回時に分けて行なってもよく、あるいは
、それ以上に旋回させて行なってもよい。It should be noted that the roofing work is carried out at the same time as constructing the fan-shaped roof trusses 14. In addition, in the dormitory bunker example of the 1st generation, 3 of the movable gantry 6
At the time of the first turn, finishing work on the underside of the roof and equipment work are performed at the same time, but these works may be done separately when the movable gantry 6 turns for the third time and for the first turn H. You may let them do it.
第4図(イ)乃至(ホ)は、別のsj!施例を示し、中
央構台2及び移動構台6の高さを低くして、できるだけ
低位置で、先の実施例と同様な工程により大屋根鉄骨の
建方、屋根下面の仕1げ工事及び設備工事を行ない、中
央構台2及び移動構台6の解体後、ドーム型大屋根全体
を所定の高さまでリフトアップする点に特徴があるO本
発明は、と述した構成よりなるため、次の如き効果があ
る。Figure 4 (A) to (E) are different sj! An example will be shown, in which the height of the central gantry 2 and the movable gantry 6 are lowered, and the construction of the large roof steel frame, finishing work on the underside of the roof, and equipment are carried out in the same process as in the previous example, by lowering the height of the central gantry 2 and the movable gantry 6. The present invention is characterized in that the entire large dome-shaped roof is lifted up to a predetermined height after the construction work is carried out and the central gantry 2 and the movable gantry 6 are dismantled. There is.
■ 省力化が可能である。■ Labor saving is possible.
即ち、平面形伏略扇形の移動構台を中央構台判りに所定
角度ずつ旋回させてドーム型大屋根の鉄骨工事を行なう
ため、鉄骨工事用の仮設支柱が少なくて済み、合理的で
ある。That is, since the steel frame work for the large dome-shaped roof is carried out by rotating the planar, generally fan-shaped movable gantry at predetermined angles around the central gantry, the number of temporary supports for the steel frame work can be reduced, which is rational.
移動構台を中央構台と外周スタンド間に組立てるため、
中央構台及び本設構造(外周スタンド)の凰礎を利用で
き、移動構台のための特別な基礎が不要である。To assemble the movable gantry between the central gantry and the outer stand,
The foundations of the central pedestal and permanent structure (outer stand) can be used, and a special foundation for the movable pedestal is not required.
大屋根全植にわたる大規模な作業足場や落下養生などの
安全対策が不要である。There is no need for safety measures such as large-scale work scaffolding or fall protection over the entire roof.
大屋根構築位置に近接した移動構台上で大トラス、屋根
トラス等の組立てを行なうため、大型のクレーンが不要
でお夛、中央構台に設けたタワークレーン、移動構台に
搭載したクレーン、地上を走行するクレーンといった小
型のクレーンで大屋根全埴にわたる組立て作業を行なう
ことができる。As the large truss, roof truss, etc. are assembled on a movable gantry close to the large roof construction location, there is no need for a large crane. It is possible to assemble the entire large roof using a small crane such as a small crane.
移動構台の7回目の旋回によシ放射伏の大トラスを構築
し、コ回目の旋回により屋根トラス及びテンションリン
グを構築し、3回目以降゛の旋回によシ屋根下向の仕上
げ工事、設備工事を行なうので、各工程の作業に必要な
工具、資材尋を移動構台に搭載するだけで済み、移動構
台の上面を有効に利用でき、且つ、同じ作業の繰返しと
なるため作業能率が高く、ま゛た、異@種の作業員を同
時に必要とせず、合理的である。The 7th turn of the movable gantry builds the large radial truss, the 7th turn builds the roof truss and tension ring, and the 3rd and subsequent turns complete the downward finishing work and equipment for the roof. Since the construction work is carried out, it is only necessary to load the tools and materials required for each process on the movable gantry, and the top surface of the movable gantry can be used effectively.In addition, work efficiency is high because the same work is repeated. Also, it is rational as it does not require different types of workers at the same time.
移動一台を設備工事や仕上げ工事の作業床として利用す
るため、仮設工事が大幅に低減される。Since one mobile unit is used as a work floor for equipment construction and finishing work, the amount of temporary construction work is greatly reduced.
従って、これらによシ省力化が可能になったのである。Therefore, it has become possible to save labor.
■ 短工規で施工できる。■ Can be constructed with short construction regulations.
大屋根鉄骨工事の準備〒亭が比較的少なくて済むので、
早く大屋根鉄骨工事に着手でき、しかも、大規模な仮設
工事を必要としない丸め、平向的な場所の制約が小さく
、他の工事と併行作業にできる割合が高い。従って、工
期を短縮できるのである。Preparation for large roof steel frame construction: Relatively little space is required, so
Large roof steel frame work can be started quickly, and there are fewer restrictions on rounded and flat areas, which do not require large-scale temporary construction work, and there is a high probability that the work can be carried out concurrently with other construction work. Therefore, the construction period can be shortened.
■ 管理が容易で、品質を確保しやすく、安全性本大き
い。■ Easy to manage, easy to ensure quality, and has great safety standards.
即ち、作業位置近くに作業床(移動構台)があるので、
検査、確認及び調整などが容易であり、且つ、高所作条
が少なくて安全性が大きい。In other words, since there is a work floor (mobile gantry) near the work position,
Inspection, confirmation, adjustment, etc. are easy, and there are few high places, so safety is high.
■ コストダウンが可能である。■ Cost reduction is possible.
即ち、省力化、工期短縮、仮設資材の低減、小型クレー
ンの使用等により、総合的にコストダウンが可能である
。In other words, it is possible to reduce costs overall by saving labor, shortening the construction period, reducing temporary construction materials, using small cranes, etc.
図面は本発明の実施例を示し、第1図は概略側面図、第
2Na)、(ロ)、(ハ)、に)、(へ)は工程を示す
概略平面図、第8図G() 、 6ff) 、(ハ)、
に)、(へ)は工程を示す概略側面図、第4図はG()
、 u) 、(ハ)、に)。
(ホ)は他の実施例における工程を示す概略側面図であ
る。
1・・・タワークレーン、 2・・・中央構台、 5
−93ト・・柱、 4・・・外喝スタンド、 5・・・
木トラス、 6・・・移動構台、 7・・・コンブ
レツVヨンリング、 11.12・・・クレーン、1
3(−
・・・テンションリング、 115g−・・テンショ
ンリング単位体、 14・・・屋根トラス、 14
1−・・屋根トラス単位体。
手続補正書(5発)
特許庁長官 殿”
1 事件の表示
11R和5f1年 特許 111glogsss号2°
発明0名称 ドーム型大屋根の構築方法3 、補正を
する者
事件との関係 特許用麗人
4、代理人
5 補正命令の日付
6、 補正により増加する発明の数
(2)願書に添付すべき委任状を補充します。The drawings show an embodiment of the present invention, and FIG. 1 is a schematic side view, FIG. 2 is a schematic plan view showing the steps, and FIG. , 6ff) , (c),
) and (f) are schematic side views showing the process, and Figure 4 is G().
, u), (c), ni). (E) is a schematic side view showing steps in another example. 1... Tower crane, 2... Central gantry, 5
-93...Pillar, 4...Outdoor stand, 5...
Wood truss, 6...Movable gantry, 7...Combretsu V-yon ring, 11.12...Crane, 1
3 (-... Tension ring, 115g-... Tension ring unit, 14... Roof truss, 14
1- Roof truss unit. Procedural amendments (5) Mr. Commissioner of the Patent Office” 1 Case indication 11R sum 5f 1 year Patent 111glogsss No. 2°
Title of invention 0 Method of constructing a large dome-shaped roof 3, Relationship with the case of the person making the amendment 4 Patent agent 5 Date of amendment order 6 Number of inventions increased by amendment (2) Commission to be attached to the application replenish the status.
Claims (1)
を、外周部には、円鳩上に所定間隔で位置する柱を備え
た外鳴スタンドを、またこれら両者間には、中央構台を
中心にして旋回可能で、且つ、放射伏に構築される大ト
ラス間の角度に対応する平面形伏略扇形の移動構台を夫
々組立てると共に、中央構台上にドーム型大屋根鉄骨の
コンプレッションリングを組立てた後、大トフスを移動
構台上で組立てて前記コンプレッションリングと柱間に
架設し、以下次々と移動構台を所定角度ずつ移動しては
大トフスを同様に架設して移動構台の7回目の旋回によ
シ全部の大トフスを放射伏に構築し、次に、−り合う大
トラス間をテンションリングの単位体で連結すると共に
、これら陶大トヲス間の下方に移動構台を配置し良状態
で、前記タワークレーン、移動構台上に搭載され九クレ
ーン及び地上を走行するクレーンを用いて、前記大トラ
ス間に屋根トフスを構築し、以下次々とテンstaンり
ングの単位体の継足し、移動構台の所定角度の移動、屋
根トフスの構築を繰シ返して移動構台の一回目の旋回に
よ〉全一にわ九るテンションリング及び屋根トラスの構
築を行ない、移動構台の3回目以降の旋回によ)屋根下
面の仕とげ工事及び設備工事を行なうことを特徴とする
ドーム型大屋根の構築方法。In the center of the construction site, there is a central gantry equipped with a tower crane, and on the outer periphery there are external ringing stands equipped with pillars placed at predetermined intervals on a round pigeon, and between these two, there is a central gantry with a tower crane at the center. Each movable gantry was assembled in the shape of a planar fan shape that could be rotated and corresponded to the angle between the large trusses constructed in a radial manner, and a compression ring with a dome-shaped large roof steel frame was assembled on the central gantry. After that, assemble the large tofu on the movable gantry and install it between the compression ring and the pillars, and then move the movable gantry one after another by a predetermined angle and erect the large tofu in the same way until the seventh rotation of the movable gantry. Build all the large trusses in a radial manner, then connect the large trusses that meet each other with a unit of tension ring, and place a movable gantry below between these large trusses in good condition. Using the tower crane, nine cranes mounted on the movable gantry, and a crane traveling on the ground, a roof frame is constructed between the large trusses, and then tensile tower units are added one after another, and the movable gantry is constructed. By repeating the movement of a predetermined angle and the construction of the roof top for the first turn of the mobile gantry, construct the tension ring and roof truss all at once, and for the third and subsequent turns of the mobile gantry. y) A method for constructing a large dome-shaped roof, which is characterized by performing finishing work on the underside of the roof and equipment work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10238881A JPS584042A (en) | 1981-06-30 | 1981-06-30 | Construction of dome type large roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10238881A JPS584042A (en) | 1981-06-30 | 1981-06-30 | Construction of dome type large roof |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS584042A true JPS584042A (en) | 1983-01-11 |
JPS6262217B2 JPS6262217B2 (en) | 1987-12-25 |
Family
ID=14326059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10238881A Granted JPS584042A (en) | 1981-06-30 | 1981-06-30 | Construction of dome type large roof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS584042A (en) |
-
1981
- 1981-06-30 JP JP10238881A patent/JPS584042A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS6262217B2 (en) | 1987-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102296858B (en) | Cement production line clinker storage warehouse roof steel structure and construction method thereof | |
US4276733A (en) | Method of constructing and erecting a dome-shaped structure | |
JP6736226B2 (en) | Structure and construction method of the structure constructed on the tower-shaped building | |
JPS584042A (en) | Construction of dome type large roof | |
JP2579715B2 (en) | External tower crane | |
JP2002235446A (en) | Demolition method of building | |
JPH04161566A (en) | Constructing apparatus for large space building | |
JPS6262218B2 (en) | ||
JP2869494B2 (en) | Construction method of dome frame | |
JP2003268879A (en) | Method for constructing roof structure | |
JP2858891B2 (en) | Construction method of large span dome roof | |
JPH09256535A (en) | Constructing method of dome type roof | |
CN217232878U (en) | Factory building post aerial supporting structure | |
JPH0718743A (en) | Construction method for large span domelike roof | |
JPS6393943A (en) | Construction of reinforcement bar dome | |
Matsudo et al. | Construction of the Roof of the New National Stadium of Japan Considering Efficiency and Structural Capacity | |
JPH05171817A (en) | Temporary house for all-weather type execution | |
JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
JP2863802B2 (en) | Construction method of dome frame | |
JPH0797867A (en) | Construction method of large-sized roof dome truss | |
JPH03260237A (en) | Erection of dome structure | |
JPS5832252B2 (en) | Roof construction method | |
JPS6035512B2 (en) | Erection equipment for tower-like structures | |
JPH0586723A (en) | Turning type scaffolding device for storage tank roof construction | |
JPH0718246B2 (en) | How to build a frame |