Japan
Prior art keywords
tip
anchor
casing
drain
drain material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP10963579A
Other languages
Japanese (ja)
Other versions
JPS5634816A (en
Inventor
直樹 陣内
攻 大島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aoki Construction Co Ltd
Original Assignee
Aoki Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aoki Construction Co Ltd filed Critical Aoki Construction Co Ltd
Priority to JP10963579A priority Critical patent/JPS5836688B2/en
Publication of JPS5634816A publication Critical patent/JPS5634816A/en
Publication of JPS5836688B2 publication Critical patent/JPS5836688B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 本発明は軟弱地盤にドレン材を挿入して地中の水分を除
去することにより軟弱地盤を圧密して改良するドレンエ
法におけるドレン打設方法およびそのドレン打設装置に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a drain pouring method and a drain pouring device in the drain method, which consolidates and improves soft ground by inserting a drain material into the soft ground and removing underground moisture. It is something.

ドレン材としてはカードボードおよびロード状ドレン材
等があるが,これらのドレン材はバーチカルドレン用と
しては広く用いられているけれども,ホリゾンタルドレ
ン用としては,施工が困難であるため.敷設使用する以
外は従来はほとんど用いられていなかった。
Drain materials include cardboard and road-shaped drain materials, but although these drain materials are widely used for vertical drains, they are difficult to install for horizontal drains. In the past, it was rarely used except for laying.

従来のバーチカルドレンエ法としては大別すると次の2
種類がある。
The conventional vertical drainage method can be roughly divided into the following two types.
There are different types.

(イ) ドレン材をマンドレルで保護しながら打設し,
ドレン材のみを地中に残してマンドレルを引き抜く方法
(b) Place the drain material while protecting it with a mandrel,
A method of pulling out the mandrel while leaving only the drain material in the ground.

(ロ)ロンドの先端にドレン材を掛止する治具を取りつ
けてロンドを貫入させる方法。
(b) A method of attaching a jig for hooking the drain material to the tip of the rond and penetrating the rond.

この方法によれば土とドレン材とが接触して打ち込まれ
る裸打ちとなる。
This method results in bare pouring, where the soil and drain material come into contact with each other.

そして前記(イ)の方法はドレン材の残置方法によって
つぎのように分けられる。
The method (a) is divided into the following types depending on the method of leaving the drain material.

(イー1) 使い捨てアンカーを用いるもの。(E1) One that uses a disposable anchor.

(イー2) マンドレル壁面とドレン材との間の摩擦抵
抗を小さくするため空気を吹き込むもの。
(E2) A device that blows air to reduce the frictional resistance between the mandrel wall and the drain material.

また後者の(口)の方法はつぎのように分けられる。The latter (mouth) method can be divided into the following.

(ロー1) ロンドとドレン材とを離して両者の接触を
防ぐもの。
(Row 1) Separates the iron and drain material to prevent contact between the two.

(ロー2) ロンドとドレン材との接触面に水を流下さ
せて摩擦抵抗を小さくするもの。
(Row 2) Water flows down onto the contact surface between the iron and the drain material to reduce frictional resistance.

しかし、上記のいずれの方法もマンドレル ロツドの貫
入杆は回転させることなく,スラストカのみによって地
中に貫入していたため、地表から改良すべき深度までの
間に硬い挾み層がある場合は、貫入が妨害されてドレン
材打設の目的を達成することが困難となる。
However, in all of the above methods, the penetration rod of the mandrel rod was not rotated and penetrated into the ground only by thrust force, so if there is a hard interstitial layer between the ground surface and the depth to be improved, it is difficult to penetrate the ground. This makes it difficult to achieve the purpose of placing drain material.

このような場合にはウオータジェットを併用することも
考えられるが,この方法も水を使用できない場所では施
工できないという不具合がある。
In such cases, it may be possible to use a water jet, but this method also has the disadvantage that it cannot be used in locations where water cannot be used.

またドレン材の打込機としては、小型のものは打設力が
小さく打設可能深度が劣るため、従来使用されているド
レン材の打込機はほとんどがかなり犬型である。
Furthermore, most of conventional drain material driving machines are quite dog-shaped, since small-sized ones have a small driving force and are inferior in the depth that can be driven.

このため機械搬入の困難な山中や,道路未整備地域では
打込機の使用が不可能であった。
For this reason, it was impossible to use driving machines in the mountains, where it was difficult to transport machines, or in areas with undeveloped roads.

ホリゾンタルドレンの打設方法のうち早くから提案され
ている先行穿孔を伴わないものは、作用水平力が大きい
ため、打込機を固定するのが難しいという問題があり、
実用化されていない。
Among the methods for placing horizontal drains, methods that do not involve preliminary drilling, which were proposed early on, have the problem that it is difficult to fix the driving machine because the horizontal force acting is large.
Not put into practical use.

一方先行掘削を行いつXロツドの一部にドレン材掛止用
突起を有するベアリングブロックを設けて打設する方法
(実願昭52−75783号)が提案されているが,こ
の方法では地盤中に礫等の障害があれば,ドレン材が切
断したり、係医用突起が障害に当って打設不能となる場
合が多いという問題がある。
On the other hand, a method has been proposed (Utility Application No. 75783/1983) in which a bearing block with a projection for hooking the drain material is installed in a part of the X-rod while performing preliminary excavation. If there is an obstacle such as gravel in the drain, there is a problem that the drain material may be cut or the medical projection may hit the obstacle and become impossible to cast.

本発明は上述の従来工法の問題点を解決するためになさ
れたもので,バーチカルドレンおよびホリゾンタルドレ
ンを問わず、従来工法では困難であったドレン材の打設
を容易にすることを目的とするものである。
The present invention was made to solve the problems of the conventional method described above, and its purpose is to facilitate the installation of drain material, which was difficult with the conventional method, regardless of whether it is a vertical drain or a horizontal drain. It is something.

以下図面について本発明の実施例をホリゾンタルドレン
打設の場合について説明する。
Embodiments of the present invention will be described below with reference to the drawings in the case of horizontal drain installation.

図中1は連続したカードボード状のドレン材、2はこの
ドレン材1を打設しようとする地山である。
In the figure, 1 is a continuous cardboard-shaped drain material, and 2 is a ground on which the drain material 1 is to be placed.

本発明においてはまず第3図に示すように、中空円筒状
のビット(メタルクラウン)3を先端部に固定した中空
円筒状のケーシング4をポーリングマシン(図示せず)
により回転させながら掘進させて地山2中に押し込み、
ドレン材1を打設すべき所定の深度よりや\浅い深度ま
で掘削する。
In the present invention, first, as shown in FIG. 3, a hollow cylindrical casing 4 having a hollow cylindrical bit (metal crown) 3 fixed to the tip thereof is placed in a poling machine (not shown).
excavate while rotating and push it into the ground 2,
The excavation is carried out to a depth shallower than the predetermined depth at which the drain material 1 is to be cast.

なおこのケーシング4による掘削は空掘りの他、圧縮空
気を噴射するエア掘り,および圧力水の噴射を併用する
水掘り等いずれの方法でもよい。
Note that the excavation using the casing 4 may be performed by any method other than dry excavation, such as air excavation in which compressed air is injected, water excavation in which pressurized water is injected.

本実施例ではエア掘りを実施した。In this example, air digging was performed.

ケーシング4による掘削が所定の深度に達したならば,
このケーシング4を地山2中に残したまま、ポーリング
マシンのチャック(図示せず)をケーシング4から外し
,ケーシング4内に挿通できる管状のロツド5を前記チ
ャックによって把持する。
When the excavation by the casing 4 reaches a predetermined depth,
A chuck (not shown) of a polling machine is removed from the casing 4 while leaving the casing 4 in the earth 2, and a tubular rod 5 that can be inserted into the casing 4 is gripped by the chuck.

そしてこのロソド5の先端にはドレン材1を固定したア
ンカー6を着脱自在に嵌装しておく。
An anchor 6 to which the drain material 1 is fixed is removably fitted to the tip of the rod 5.

すなわちアンカー6は先端部6aを円錐状にとがらせる
と共に円筒状胴部6bの中間にくびれ部6cを有し、か
つ後端シャンク部6dをロソド5に嵌脱自在に形或した
ものである。
That is, the anchor 6 has a conically pointed tip 6a, a constriction 6c in the middle of a cylindrical body 6b, and a rear end shank 6d that can be fitted into and removed from the rod 5.

モしてドレン材1の固定は、ドレン材1の先端部をアン
カー6のくびれ部6cにあてがい,針金7等によって固
縛して行う。
The drain material 1 is fixed by applying the tip of the drain material 1 to the constriction 6c of the anchor 6 and securing it with a wire 7 or the like.

なお第1図および第2図に示すように,0′ノド5とア
ンカー6との間には必要に応じて空気噴射管8を介挿し
てもよい。
As shown in FIGS. 1 and 2, an air injection pipe 8 may be inserted between the 0' throat 5 and the anchor 6 if necessary.

この空気噴射管8は、アンカー6の後端シャンク部6d
を先端部8aに嵌脱自在に嵌入できるようにすると共に
,後端部にロツド5の先端部と螺合するねじ部8bを有
し、内部に隔壁8cを設け,この隔壁8cの後方の管壁
に斜前方に指向する空気噴射孔8dを設けて形成する。
This air injection pipe 8 is connected to the rear end shank portion 6d of the anchor 6.
The rod 5 can be removably inserted into the tip 8a, and has a threaded portion 8b at the rear end to be screwed into the tip of the rod 5. A partition 8c is provided inside, and a pipe behind the partition 8c is provided. Air injection holes 8d directed diagonally forward are provided in the wall.

つぎに先端にアンカー6を嵌装したロソド5を第4図に
示すように、ケーシング4内に押し込みアンカー6がケ
ーシング4の先端より更に深い所定の深度に到達するよ
うにする。
Next, the rod 5 with the anchor 6 fitted at its tip is pushed into the casing 4 so that the anchor 6 reaches a predetermined depth deeper than the tip of the casing 4, as shown in FIG.

この押し込みは本実施例の場合,ケーシング4の押し込
み深度に近い深度15m程度まではポーリングのジャッ
キを使用せず,人力のみで挿入が可能であった。
In the case of this embodiment, this insertion could be performed by hand alone, without using a Pauling jack, to a depth of about 15 m, which is close to the depth at which the casing 4 was pushed.

なおこの際,第1図に示すようにケーシング4による掘
削の終了後、切羽前面の崩落のため,土砂2aがビット
3およびケーシング4の内部に充満して、ジャッキによ
る圧入をもってしても所定深度までアンカー6およびロ
ツド5を挿入できない場合は、前記した空気噴射管8を
ロツド5の先端とアンカー6との間に介装し,ロツド5
を通じて空気噴射管8の空気噴射孔8dより斜前方に圧
力空気を噴射することによって土砂2aを排除しアンカ
ー6を所定の深度まで挿入することができる。
At this time, as shown in Fig. 1, after the excavation with the casing 4 is completed, the front surface of the face collapses, so the inside of the bit 3 and the casing 4 are filled with earth and sand 2a, and even when press-fitted with a jack, the specified depth cannot be reached. If it is not possible to insert the anchor 6 and rod 5 up to the
By injecting pressurized air diagonally forward from the air injection hole 8d of the air injection pipe 8 through the air injection pipe 8, the earth and sand 2a can be removed and the anchor 6 can be inserted to a predetermined depth.

つぎにロツド5をジャッキで押しつけながらポーリング
マシンのウインチ(図示せず)で,第5図に示すように
ケーシング4を引き抜く。
Next, while pressing the rod 5 with a jack, the casing 4 is pulled out using a winch (not shown) of a polling machine as shown in FIG.

なおウインチのみでは抵抗が大きすぎてケーシング4を
引き抜けない場合は,ロツド5を押し込んだジャッキを
ケーシング4に掴み変えて,ジャッキによリケーシング
4を引き抜く。
If the casing 4 cannot be pulled out using the winch alone because the resistance is too great, use the jack that pushed the rod 5 to grip the casing 4, and use the jack to pull out the recasing 4.

ついでポーリングマシンのウインチまたはジャツツキで
ロツド5を引き抜けば,ドレン材1は第6図に示すよう
にアンカー6につながれたま5地山2中に残置される。
When the rod 5 is then pulled out using the winch or jack of the polling machine, the drain material 1 is left in the ground 2 connected to the anchor 6 as shown in FIG.

なお、対象の地山の条件によっては,又はーケーシング
4の直径が、ロツド5の直径よりかなり大きな場合など
は,ケーシング4を残置したま\先ずロツド5を引き抜
き、次いでケーシング4を引き抜いた方が,ロツドから
ケーシングヘチャックの把み変えの必要がないので,能
率がよくなる。
Depending on the conditions of the target ground, or if the diameter of the casing 4 is considerably larger than the diameter of the rod 5, it may be better to leave the casing 4 in place and pull out the rod 5 first, then pull out the casing 4. There is no need to change the chuck from the rod to the casing, improving efficiency.

つぎに従来法と本発明工法とを比較するためにゅ行った
試験について説明する。
Next, a test conducted to compare the conventional method and the method of the present invention will be explained.

場所:鹿児島県大口市牛尾牛尾鉱山第2堆積場使用ポー
リングマシン:重量1.2トン,原動機11.5KW 使用ケーシング:85關ψ 使用ロンド :40.5mmψ 使用ドレン材 :キャツスルボード巾100mmズリ排
出方法 :エア 使用アンカー :50間ψ,全長7001n7ft使用
コンプレツサ:吐出圧7 kg/cr!吐出量1 0.
5 m3/mvr 以上の試験結果より本発明が従来法では施工が困難な場
合でも有効であり,また従来法と併用すればドレン性能
をさらに向上させることが可能であることがわかる。
Location: Kagoshima Prefecture, Oguchi City, Ushio Ushio Mine 2nd Depot Polling machine used: Weight 1.2 tons, prime mover 11.5KW Casing used: 85 mm φ Rondo used: 40.5 mm φ Drain material used: Cattle board width 100 mm for waste removal Method: Anchor using air: 50 ψ, total length 7001n7ft Compressor used: Discharge pressure 7 kg/cr! Discharge amount 1 0.
5 m3/mvr From the above test results, it can be seen that the present invention is effective even in cases where conventional methods are difficult to construct, and that when used in combination with conventional methods, it is possible to further improve drain performance.

また本発明をバーチカルドレンエ法に適用する場合は、
ポーリングマシンのスピンドルを上下方向に立てX使用
すれば,ホリゾンタルドレン打設の場合と同様に打設で
きる。
Furthermore, when applying the present invention to the vertical drainage method,
If the spindle of the polling machine is set vertically and used in the X direction, pouring can be done in the same way as horizontal drain pouring.

その他,例えば法面の背面水排出に有効と言われている
水平よりやX上り勾配でドレン材を打設することも本発
明工法で可能であるから、本発明はドレンエ法を容易に
すると共に、その適用範囲も広いというすぐれた効果が
ある。
In addition, it is also possible to use the method of the present invention to install drain material from the horizontal or at an upward slope of X, which is said to be effective for draining water from the back of a slope. , it has an excellent effect in that it has a wide range of application.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明ドレン打設装置の先端部の縦断面図,第
2図はその空気噴射管のA−A線による横断面図一第3
図〜第6図は本発明ドレン打設方法の工程説明図である
。 1・・・・・・ドレン材,2・・・・・・地山、3・・
・・・・ビット、4・・・・・・ケーシングー5・・・
・・・ロンド,6・・・・・・アンカー、6a・・・・
・・先端部、6b・・・・・・胴部、6C・・・・・・
くびれ部Jd・・・・・・後端シャンク部、7・・・・
・・針金、8・・・・・・空気噴射管、8a・・・・・
・先端部−8b・・・・・・ねじ部−8c・・・・・・
隔壁、8d・・・・・・噴射孔。
Fig. 1 is a vertical sectional view of the tip of the drain casting device of the present invention, and Fig. 2 is a cross sectional view taken along line A-A of the air injection pipe.
6 to 6 are process explanatory views of the drain installation method of the present invention. 1... Drain material, 2... Earth, 3...
...Bit, 4...Casing-5...
...Rondo, 6...Anchor, 6a...
...Tip, 6b...Body, 6C...
Neck part Jd... Rear end shank part, 7...
...Wire, 8...Air injection pipe, 8a...
・Tip part -8b...Threaded part -8c...
Partition wall, 8d... injection hole.

Claims (1)

【特許請求の範囲】 1 ケーシングを回転させながら所定の深度まで地中に
押し込み、ドレン材の先端部をアンカーに固定し、この
アンカーをロンドの先端部に嵌脱自在に嵌合し.このロ
ンドを前記ケーシング内部に挿通して前記アンカーを所
望の深度まで貫入した後、アンカーを地中に残した状態
で前記ロンドを引き抜くことにより,ドレン材を地中に
残置することを特徴とするドレン打設方法。 2 先端にビットを有する回転掘削用ケーシングと、こ
のケーシング内に挿通して先端部を地中に押し込み得る
ロンドと、先端をとがらせると共に胴部にドレン材を固
定するためのくびれ部を有し、かつ後端シャンク部を前
記ロンドに嵌脱自在に形威したアンカーとを具備してな
るドレン材打設装置。 3 中空円筒体の先端部にドレン材を固定するアンカー
の後端シャンク部を嵌脱自在に嵌入できるようにすると
共に,この中空円筒体の後端部をロンド先端部と接続で
きるようにし,さらにこの中空円筒体の内部に隔壁を設
け.この隔壁の後方の管壁に斜前方に指向する流体噴射
孔を設けて流体噴射管を形成し、この流体噴射管を中空
の前記ロンド先端部に接続した特許請求の範囲第2項記
載のドレン材打設装置。
[Claims] 1. Push the casing into the ground to a predetermined depth while rotating, fix the tip of the drain material to the anchor, and removably fit the anchor to the tip of the iron. The iron is inserted into the inside of the casing to penetrate the anchor to a desired depth, and then the iron is pulled out with the anchor left in the ground, thereby leaving the drain material underground. Drain installation method. 2. A rotary excavation casing with a bit at the tip, a rond that can be inserted into the casing and pushed the tip into the ground, and a constriction for fixing the drain material to the body with a pointed tip. , and an anchor whose rear end shank portion is removably fit into the rond. 3. The rear end shank of the anchor for fixing the drain material to the tip of the hollow cylindrical body can be removably inserted, and the rear end of the hollow cylindrical body can be connected to the tip of the iron, and A partition wall is installed inside this hollow cylinder. A drain according to claim 2, wherein a fluid injection hole is provided in the pipe wall behind the partition wall to form a fluid injection pipe, and the fluid injection pipe is connected to the hollow tip of the iron. Timber pouring equipment.
JP10963579A 1979-08-30 1979-08-30 Drain installation method and equipment Expired JPS5836688B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10963579A JPS5836688B2 (en) 1979-08-30 1979-08-30 Drain installation method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10963579A JPS5836688B2 (en) 1979-08-30 1979-08-30 Drain installation method and equipment

Publications (2)

Publication Number Publication Date
JPS5634816A JPS5634816A (en) 1981-04-07
JPS5836688B2 true JPS5836688B2 (en) 1983-08-11

Family

ID=14515269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10963579A Expired JPS5836688B2 (en) 1979-08-30 1979-08-30 Drain installation method and equipment

Country Status (1)

Country Link
JP (1) JPS5836688B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5974354U (en) * 1982-11-11 1984-05-19 大日本印刷株式会社 Line optical head
GB2606381A (en) * 2021-05-06 2022-11-09 Platipus Anchors Holdings Ltd Ground drainage apparatus and method of installation thereof

Also Published As

Publication number Publication date
JPS5634816A (en) 1981-04-07

Similar Documents

Publication Publication Date Title
JPS5836688B2 (en) Drain installation method and equipment
JPS6119774B2 (en)
JPS5536592A (en) Construction method for cast-in-place differential- diameter pile
JP2549062B2 (en) Pipe rod construction method
JP2631303B2 (en) Foundation pile construction equipment
JP3700160B2 (en) Drain placing method and apparatus
JPS6128770B2 (en)
CN108019211A (en) Waterproof of man and its construction method in a kind of pilot tunnel of rich water sand-pebble layer
JP2578388B2 (en) Ground reinforcement method using large diameter tensile reinforcement
JPH1037650A (en) Drilling device for foundation ground
JPS6012492B2 (en) Root hardening method using ready-made piles
JPS55155823A (en) Burying method for pile
JPH0629510B2 (en) Concrete pile foundation method and equipment used therefor
JPH02140311A (en) Pipe anchor construction for avalanche preventing fence
JP2582724B2 (en) Drilling equipment for foundation ground
JP2002167759A (en) Execution method of foundation pile
JP2002081059A (en) Pile burying method and device therefor
JPS63236813A (en) Formation work of concrete pile by rotational penetration of steel tube into ground
JPS5927805B2 (en) Drainage pipe drilling method
JPH06330520A (en) Ground improvement method of poor subsoil
JPH11303118A (en) Surveying post hole drilling tool
JPS5944421A (en) Method and apparatus for construction of foundation pile
JPH08177365A (en) Soil improvement work for construction and earth auger device therefor
JP2951049B2 (en) Consolidation method of medium excavation pile
JPS6211126B2 (en)