JPS5819516B2 - Cargo handling systems and vessels used in locations without port facilities - Google Patents

Cargo handling systems and vessels used in locations without port facilities

Info

Publication number
JPS5819516B2
JPS5819516B2 JP51074721A JP7472176A JPS5819516B2 JP S5819516 B2 JPS5819516 B2 JP S5819516B2 JP 51074721 A JP51074721 A JP 51074721A JP 7472176 A JP7472176 A JP 7472176A JP S5819516 B2 JPS5819516 B2 JP S5819516B2
Authority
JP
Japan
Prior art keywords
cargo
boat
barge
port facilities
cargo handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP51074721A
Other languages
Japanese (ja)
Other versions
JPS53589A (en
Inventor
根岸昇
三宅一馬
志水熊雄
若林喬之
信岡啓
森章次
冨田幸雄
平谷嘉雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP51074721A priority Critical patent/JPS5819516B2/en
Publication of JPS53589A publication Critical patent/JPS53589A/en
Publication of JPS5819516B2 publication Critical patent/JPS5819516B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は港湾設備がない場所での荷役システム及びこれ
に用いる船舶に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a cargo handling system in a place without port facilities and a ship used therein.

港湾設備が貧弱であったり、該設備が全くない場所での
荷役作業は困難を極め、先行船舶の荷揚げを待って沖待
ちする船舶が多い地域がある。
Cargo handling operations are extremely difficult in locations with poor or no port facilities, and there are regions where many ships wait offshore waiting for preceding ships to unload their cargo.

このように港湾設備が充分でなく、あるいは全くない場
所での荷役作業は、従来貨物を積載したパージを多数積
載可能な母船を、荷役場所の沖合に停泊させ、この母船
からパージを砂浜などに航行させて荷役することが行わ
れているが、これの方法は母船からパージを海上に卸す
までは作業を迅速化できるが、即ち母船側においては作
業を迅速化できるが、パージから貨物を陸上げするため
にはやはりクレーン等の岸壁設備が必要となり、全体的
にみると余り効率の良い方法とはいえない。
Cargo handling work in places like this where port facilities are insufficient or not available at all is conventionally carried out by anchoring a mother ship that can carry a large number of purges loaded with cargo off the coast of the cargo handling area, and then distributing purges from this mother ship onto a sandy beach or the like. This method speeds up the work until the purge is unloaded from the mother ship to the sea; In order to raise it, quayside equipment such as a crane is required, so overall it is not a very efficient method.

したがって沖待ちを余儀なくされる船舶が続出する。As a result, many ships are forced to wait offshore.

またこのような目的に合致させるための船としてトレー
ラ等を直接出入できるようにした所謂ロールオフ・ロー
ルオン船があるが、これは容積効率が悪く得策とはいえ
ない。
In addition, there are so-called roll-off/roll-on ships that are designed to allow trailers and the like to enter and exit directly as ships that meet this purpose, but this is not a good idea as it has poor volumetric efficiency.

本発明はかかる点に鑑み成されたもので港湾設備が全く
ない砂浜などにおいても効率良く荷役作業が行なえ、同
時に既存の船舶を有益に利用できる荷役システム及びこ
れに用いる船舶を提案するものである。
The present invention has been made in view of these points, and it is an object of the present invention to propose a cargo handling system and a ship used therein, which can efficiently carry out cargo handling work even on sandy beaches where there are no port facilities, and at the same time make advantageous use of existing ships. .

以下その実施例を図面に基づき説明する。Examples thereof will be described below based on the drawings.

第1図において1は荷役作業が行われる港湾設備がない
砂浜、2はこの砂浜1の沖合に停泊している母船、3は
母船2に積載されたコンテナ等の貨物、4は砂浜1に仮
棧橋を形成させるためのバージ、5は前記仮棧橋に接岸
可能な貨物ボート、6は前記バージ4及び貨物ボート5
を海上に浮べまたは母船2に格納するクレーン設備、7
は貨物ボート5にコンテナ3等の貨物を積卸しする積卸
し手段、8は道路、9はトレーラである。
In Figure 1, 1 is a sandy beach with no port facilities where cargo handling work is carried out, 2 is a mother ship anchored offshore of this sandy beach 1, 3 is cargo such as containers loaded on mother ship 2, and 4 is a temporary beach on sandy beach 1. A barge for forming a bridge, 5 a cargo boat that can dock on the temporary bridge, 6 the barge 4 and the cargo boat 5.
Crane equipment for floating on the sea or storing on the mother ship 2, 7
numeral 8 represents a road, and numeral 9 represents a trailer.

バージ4は通常の上陸用舟艇に類似する空船であり、船
首扉12及び船尾扉15を有する。
The barge 4 is an empty vessel similar to a normal landing craft, and has a bow door 12 and a stern door 15.

11は船首扉12開閉用のヒンジ機構であり、該船首扉
12は母船2から砂浜1までの航行中は閉じられ、砂浜
1に第2図の如く着底後ヒンジ11を介して外側に全開
後、同時にヒンジ13を介して設けられている連絡ブリ
ッジ14を収納状態(仮想線)から砂浜1側に回動させ
、バージ4内部の床部16と砂浜1とを連絡する。
Reference numeral 11 denotes a hinge mechanism for opening and closing the bow door 12. The bow door 12 is closed during navigation from the mother ship 2 to the beach 1, and is fully opened outward via the hinge 11 after landing on the beach 1 as shown in FIG. Thereafter, at the same time, the connecting bridge 14 provided via the hinge 13 is rotated from the stored state (imaginary line) toward the beach 1 side, thereby connecting the floor 16 inside the barge 4 and the beach 1.

一方船尾扉15はヒンジ10を介して開閉可能な構成と
なっており、前記着底時には全開され(実線)、後述す
る貨物ボート5が接岸するのに備えられる。
On the other hand, the stern door 15 is configured to be openable and closable via the hinge 10, and is fully opened (solid line) when the ship touches the bottom, in preparation for the cargo boat 5 to be described later to come ashore.

17はエンジン、18はスクリューで、かかる推進設備
を有することで自刃航行が可能であると共に、図示して
いないが、アンカーの揚卸し用の索体巻取装置を有し、
第1図から明らかなように荷役作業終了後この巻取装置
を巻込むことにより、着底状態が解除され、容易に母船
2に帰航することができる。
17 is an engine, 18 is a screw, and by having such a propulsion equipment, it is possible to navigate by self-sawing, and although not shown, it has a rope winding device for lifting and lowering the anchor,
As is clear from FIG. 1, by winding up the winding device after the cargo handling operation is completed, the bottomed state is released and the ship can easily return to the mother ship 2.

また前記連絡ブリッジ14はトレーラ9が通行可能な該
トレーラ9の車輪幅を保持して配設された左右一対の連
絡ブリッジ14a、14bとすることが有益である。
Further, it is advantageous that the communication bridge 14 is a pair of left and right communication bridges 14a and 14b arranged to maintain the wheel width of the trailer 9 through which the trailer 9 can pass.

貨物ボート5は第4図〜第6図に示す如く船首扉21、
該船首扉21に連続する床部19、エンジン25及びス
クリュー26からなる推進設備、及びコンテナ3を適宜
高さに保持する保持装置20を有する。
The cargo boat 5 has a bow door 21, as shown in FIGS.
It has a floor 19 continuous to the bow door 21, propulsion equipment consisting of an engine 25 and a screw 26, and a holding device 20 for holding the container 3 at an appropriate height.

船首扉21は通常は閉止されており、前述のバージ4が
着底して仮棧橋を形成した後、該仮棧橋(バージ)4の
船尾にその船首を接岸すると共に、前記船首扉21をバ
ージ4の船尾扉15(開放状態)の上に開放載置し、バ
ージ4の床部16と該貨物ボート5の床部19とを連絡
する。
The bow door 21 is normally closed, and after the aforementioned barge 4 lands on the bottom and forms a temporary bridge, the bow is moored to the stern of the temporary bridge (barge) 4, and the bow door 21 is closed to the barge. The barge 4 is placed open on the stern door 15 (in an open state), and the floor 16 of the barge 4 and the floor 19 of the cargo boat 5 are connected.

また前記接岸時の衝撃を避けるために船首に緩衝材21
aが配設されている。
In addition, a cushioning material 22 is installed at the bow of the ship to avoid the impact when docking.
a is arranged.

またこの貨物ボート5、貨物室側壁22にはリンク機構
23により支持されたコンテナ3等の貨物保持装置20
を有するものであって、前記リンク機構23は床部19
との間に設置されたシリンダ24により駆動される。
Further, in this cargo boat 5, a cargo holding device 20 for holding a container 3 or the like supported by a link mechanism 23 is provided on the side wall 22 of the cargo compartment.
The link mechanism 23 has a floor portion 19.
It is driven by a cylinder 24 installed between.

23Aは上部が互に外向きに反り返り、下部に鍵部23
aを有し且つ前記リンク機構23の一リンクを構成する
コンテナ保持リンクである。
23A has an upper part that is bent outward and a key part 23 at the lower part.
This is a container holding link that has a and constitutes one link of the link mechanism 23.

この保持リンク23Aは前記シリンダ24を出退させる
ことにより同一姿勢関係を保持したままその間隔が調整
さね、コンテナ3の大きさに応じて任意に調整すること
ができる。
The interval between the holding links 23A can be adjusted as desired depending on the size of the container 3 by moving the cylinder 24 in and out, while maintaining the same posture relationship.

そしてコンアナ3ど床部19との間には常時トレーラ9
が侵入できる隙間を有すると共に、コンテナ3を保持装
置20とトレーラ9との間で受継ぎ又は受渡す装置が有
せしめられている。
And there is always a trailer 9 between the Con Ana 3 and the floor 19.
It has a gap through which the container 3 can enter, and also has a device for transferring or transferring the container 3 between the holding device 20 and the trailer 9.

なお19aはトレーラ9の進路を規制するガイドであり
、トレーラ9の入口(船首)側は幅広部19bとされて
いる。
Note that 19a is a guide that regulates the course of the trailer 9, and the entrance (bow) side of the trailer 9 is a wide portion 19b.

以上説明したバージ4及び貨物ボート5は母船2の船尾
側に設けられた格納部27に搭載可能である。
The barge 4 and cargo boat 5 described above can be loaded in the storage section 27 provided on the stern side of the mother ship 2.

第7図、第8図の如くこの格納部21は居住区2Aに隣
接して設けられると共に、該格納部21の床部27aの
後部には開閉扉28がヒンジ機構28aを介して取付け
られており、母船2が沖合に停泊したのちこの開閉扉2
8を図の如く全開し、そのとき形成される開口からバー
ジ4、貨物ボート5A〜5Dを順次クレーン設備により
下降させて海上に浮べ、その後これらはそれぞれの役割
に応じて自刃航行する。
As shown in FIGS. 7 and 8, this storage section 21 is provided adjacent to the living area 2A, and an opening/closing door 28 is attached to the rear part of the floor section 27a of the storage section 21 via a hinge mechanism 28a. After the mother ship 2 was anchored offshore, this opening/closing door 2
8 is fully opened as shown in the figure, and the barge 4 and cargo boats 5A to 5D are sequentially lowered by crane equipment through the opening formed at that time and floated on the sea, after which they navigate under their own blades according to their respective roles.

クレーン設備6は通常、工場等で用いられている天井ク
レーンに類似するものであり、支柱29aと前記居住区
2Aとの間に配設されたレール29及び該レール29に
沿って走行し且つバージ4等の保持具31が連結された
ワイヤー30の巻込み繰出し手段を有する移動枠32と
から成る。
The crane equipment 6 is normally similar to an overhead crane used in a factory, etc., and runs along a rail 29 disposed between the support column 29a and the living area 2A, and is attached to a barge. It consists of a moving frame 32 having means for winding in and feeding out a wire 30 to which a holder 31 such as No. 4 is connected.

またこの格納部21にはバージ4、貨物ボー1−5A〜
5Dを移動させるときの保護ガイド等が設けられている
In addition, this storage section 21 includes barges 4, cargo boats 1-5A~
A protective guide and the like are provided when moving the 5D.

一方母船2の船首側にはコンテナ等の貨物積載部33が
設けられている。
On the other hand, a cargo loading section 33 such as a container is provided on the bow side of the mother ship 2.

この積載部33に積載されている貨物(コンテナ)3は
付設の積卸し手段34により、前記海上の貨物ボート5
上に積み込まれる。
The cargo (container) 3 loaded on this loading section 33 is transferred to the cargo boat 5 on the sea by an attached loading/unloading means 34.
loaded on top.

この積卸し手段34は母船2の長さ方向に車輪35を介
して走行する枠体36と、該枠体36の走行方向と直交
方向に走行可能な本体(図示せず)とから成り、これに
より前記載置部33内のコンテナ3をすべて搬送するこ
とが可能となる。
This loading/unloading means 34 consists of a frame 36 that runs in the longitudinal direction of the mother ship 2 via wheels 35, and a main body (not shown) that can run in a direction orthogonal to the running direction of the frame 36. This makes it possible to transport all the containers 3 in the storage section 33.

さらに母船2はフォークリフト、トレーラ等をも必要に
応じて搭載していることが必要であるカスこれは目的地
の陸上設備によっては省略できる。
Furthermore, it is necessary that the mother ship 2 is equipped with a forklift, a trailer, etc. as necessary; however, this may be omitted depending on the land facilities of the destination.

以下第1図、第10図を中心に荷投手順を説明する。The loading procedure will be explained below with reference to FIGS. 1 and 10.

なお以下の説明では目的地へのコンテナ陸揚げ手順につ
いて説明するが、母船へのコンテナ積み込み手順はこの
逆の手順で実施することができる。
In the following explanation, the procedure for unloading a container to a destination will be explained, but the procedure for loading a container onto a mother ship can be carried out in the reverse order.

まず母船2を目的地の港湾設備がない砂浜1の沖合に停
泊させ、該母船2の船尾開閉扉28を全開すると共に、
格納部27からバージ4をクレーン設備6を用いて海上
に浮べ、このバージ4を砂浜1に向って航行させ、砂浜
の手前でアンカーを降ろした後、その船底が砂浜1に乗
り上げた状態で船首扉12及び船尾扉15を開、放し、
同時に連絡ブリッジ14を回動じ砂浜1に設置して仮棧
橋を形成する。
First, the mother ship 2 is anchored off the coast of the sandy beach 1 where there are no port facilities at the destination, and the stern door 28 of the mother ship 2 is fully opened.
The barge 4 is floated on the sea from the storage section 27 using the crane equipment 6, the barge 4 is sailed toward the beach 1, and the anchor is lowered in front of the beach. Open and release the door 12 and the stern door 15,
At the same time, the connecting bridge 14 is rotated and installed on the sandy beach 1 to form a temporary bridge.

次に母船2から順次貨物ボート5A〜5Dを海上に降ろ
し、これを母船2の積卸し手段7の下方に移動させ、該
積卸し手段7によってコンテナ3を所定個数だけ貨物ボ
ート5に積み込む。
Next, the cargo boats 5A to 5D are sequentially unloaded onto the sea from the mother ship 2, moved below the loading/unloading means 7 of the mother ship 2, and a predetermined number of containers 3 are loaded onto the cargo boat 5 by the loading/unloading means 7.

このとき必要な陸上施設としてフォークリフト、トレー
ラ、クレーン等がない場合はいずれから貨物ボー)5A
を用いて予めこれらの設備を陸揚げしておく。
At this time, if there are no forklifts, trailers, cranes, etc. as necessary land facilities, then the cargo boat will start) 5A
These facilities will be unloaded in advance using a

前記コンテナ3が積み込まれた貨物ボー)5Bは前記仮
棧橋に向って航行し、仮棧橋に到着したらその船首を仮
棧橋(バージ)4の船尾に突き当て、船首扉21を開放
してトレーラ9侵入用の通路を形成する。
The cargo boat 5B loaded with the container 3 sails toward the temporary bridge, and when it arrives at the temporary bridge, its bow hits the stern of the temporary bridge (barge) 4, the bow door 21 is opened, and the trailer 9 Create a passageway for entry.

このとき後続の貨物ボー15c、5Dは当該貨物ボー1
−5Bと同様にコンテナ3を積み込まへ または仮棧橋
に向って航行中である。
At this time, the subsequent cargo boats 15c and 5D are
Like -5B, it is proceeding to load Container 3 or to the temporary bridge.

さらにフォークリフト等を陸上げ輸送した貨物ボー)5
Aは母船2に向って帰航する。
In addition, cargo boats transported by forklifts, etc.) 5
A returns to mother ship 2.

前記の如く仮棧橋に貨物ボート5が接岸したらトレーラ
9をコンテナ3の下部に侵入させ適宜これを該トレーラ
9上に受継がせ、目的地に向って走行輸送する。
When the cargo boat 5 docks at the temporary bridge as described above, the trailer 9 is inserted into the lower part of the container 3, and the cargo boat 5 is transferred onto the trailer 9 as appropriate, and then transported toward the destination.

この手順を繰返すことによって効率良く陸揚げ作業が遂
行できる。
By repeating this procedure, landing work can be carried out efficiently.

またコンテナ等を船積みする場合はこの逆であり、さら
に陸揚げ終了後は貨物ボート5、バージ4は母船2内に
格納されるが、バージ4についてはアンカーとバージ4
とを連絡する索体を巻込むことによって容易に砂浜1か
ら離れ、自刃航行に移ることができる。
In addition, when loading containers, etc., the reverse is true, and furthermore, after landing, the cargo boat 5 and barge 4 are stored inside the mother ship 2, but the barge 4 is attached to the anchor and the barge 4.
By winding up the cable that connects the ship, it is possible to easily leave the sandy beach 1 and shift to self-sawing navigation.

以上の説明から明らかなように本発明に係る方法及びこ
れに用いる船舶は港湾設備が全くない砂浜等でも、荷役
作業が効率良く行われ、従来のように沖待ちの必要はな
くなり、経済性にも優れるものである。
As is clear from the above explanation, the method according to the present invention and the ships used therein can carry out cargo handling work efficiently even on sandy beaches where there are no port facilities, eliminating the need for waiting offshore as in the past, and improving economic efficiency. It is also excellent.

また港湾設備が充分に整備された場所での荷役作業は従
来通り行うことができることは勿論である。
In addition, it goes without saying that cargo handling operations can be carried out as usual in areas where port facilities are sufficiently developed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明実施例の全体斜視図、第2図はバージ4
の側面図、第3図は同要部平面図、第4図は貨物ボート
5の側面図、第5図は同正面図、第6図は同要部平面図
、第7図は母船2の船尾側側面図、第8図は同平面図、
第9図は船首側側面図、第10図は第1図の要部側面図
である。 2・・・・・・母船、3・・・・・・コンテナ等の貨物
、4・・・・・・バージ(仮棧橋)、5・・・・・・貨
物ボート、6・・・・・・クレーン設備、7・・・・・
・積卸し手段。
FIG. 1 is an overall perspective view of an embodiment of the present invention, and FIG. 2 is a barge 4.
FIG. 3 is a side view of the same, FIG. 4 is a side view of the cargo boat 5, FIG. 5 is a front view of the same, FIG. 6 is a plan view of the main part, and FIG. Aft side side view, Figure 8 is the same plan view,
FIG. 9 is a side view of the bow side, and FIG. 10 is a side view of the main part of FIG. 1. 2...Mother ship, 3...Cargo such as containers, 4...Barge (temporary bridge), 5...Cargo boat, 6...・Crane equipment, 7...
・Loading and unloading means.

Claims (1)

【特許請求の範囲】 1 港湾設備がない場所に仮棧橋を形成するパージを着
底させ、この仮棧橋に貨物搭載可能な貨物ボートを接岸
させたのち前記貨物を前記貨物ボートに積卸しすること
を特徴とする港湾設備がない場所での荷役システム。 2 港湾設備がない場所に仮棧橋を形成可能なパージと
、該パージに前記仮棧橋を形成させたときこれに接岸可
能な貨物ボートと、扱い貨物と、前記パージ及び貨物ボ
ートを海上に浮べ又は海上から収納する運搬手段と、前
記扱い貨物を海上の貨物ボートに積卸しする積卸し手段
とを搭載可能としたことを特徴とする港湾設備がない場
所での荷役に用いる船舶。
[Scope of Claims] 1. A purge forming a temporary bridge is brought to the bottom in a place where there is no port facility, a cargo boat capable of loading cargo is docked on the temporary bridge, and the cargo is unloaded onto the cargo boat. A cargo handling system for locations without port facilities. 2. A purge capable of forming a temporary bridge in a place where there is no port facilities, a cargo boat that can dock on the temporary bridge when the purge is formed, a cargo to be handled, and a method for floating the purge and the cargo boat on the sea or A ship used for cargo handling in a place without port facilities, characterized in that it is capable of carrying a transport means for storing cargo from the sea and a loading/unloading means for loading and unloading the handled cargo onto a cargo boat on the sea.
JP51074721A 1976-06-23 1976-06-23 Cargo handling systems and vessels used in locations without port facilities Expired JPS5819516B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP51074721A JPS5819516B2 (en) 1976-06-23 1976-06-23 Cargo handling systems and vessels used in locations without port facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP51074721A JPS5819516B2 (en) 1976-06-23 1976-06-23 Cargo handling systems and vessels used in locations without port facilities

Publications (2)

Publication Number Publication Date
JPS53589A JPS53589A (en) 1978-01-06
JPS5819516B2 true JPS5819516B2 (en) 1983-04-18

Family

ID=13555358

Family Applications (1)

Application Number Title Priority Date Filing Date
JP51074721A Expired JPS5819516B2 (en) 1976-06-23 1976-06-23 Cargo handling systems and vessels used in locations without port facilities

Country Status (1)

Country Link
JP (1) JPS5819516B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6665376B2 (en) * 2015-11-26 2020-03-13 三井E&S造船株式会社 Landing ship and cargo handling method using landing ship
JP6531294B2 (en) * 2015-11-27 2019-06-19 三井E&S造船株式会社 Landing ship and design method of ship for landing

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5174722A (en) * 1974-12-23 1976-06-28 Hiroshi Ise JOGI

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5174722A (en) * 1974-12-23 1976-06-28 Hiroshi Ise JOGI

Also Published As

Publication number Publication date
JPS53589A (en) 1978-01-06

Similar Documents

Publication Publication Date Title
US4158416A (en) System for handling container cargo and a novel ship and lifting device
US4043285A (en) Container ship
US3823681A (en) Barge carrying transport vessel
US3508510A (en) Lighter hydrolift device
US6516737B2 (en) Autonomous container ship
US20080107505A1 (en) Container transportation system and method
CA2322574A1 (en) Container transfer terminal system and method
JP2003525170A (en) Submerged heavy lift catamaran
JPS62103292A (en) Ship
JPS5941435B2 (en) Methods of transporting passengers, cargo, etc. by ship and their transport equipment
US6863484B2 (en) Catamaran transfer vessel
JPS5819516B2 (en) Cargo handling systems and vessels used in locations without port facilities
JPS5858275B2 (en) Vessels with built-in cargo handling auxiliary craft
JPS5832076B2 (en) Small vessel for container off-shore fishing
JPS588488A (en) Transport ship
US3469716A (en) System for handling cargo lighters and cargo hatch covers aboard ship
US6334401B1 (en) Floating structure for the transfer of cargo
EP0101171A1 (en) Barge carrying vessel
KR101263247B1 (en) Mobile harbor
US3540399A (en) Timber carrying vessel
USRE30040E (en) Vessel for flotation loading and unloading and partial buoyancy support of barges and other floating cargoes
JPS59318Y2 (en) cargo ship
JPH0115448B2 (en)
GB2123354A (en) Barge carrying vessel
JP2001315685A (en) Arriving/leaving port assistance device for floating body type harbor facilities