JPS58161712A - Method and device for relining of wall of blast furnace - Google Patents

Method and device for relining of wall of blast furnace

Info

Publication number
JPS58161712A
JPS58161712A JP4168482A JP4168482A JPS58161712A JP S58161712 A JPS58161712 A JP S58161712A JP 4168482 A JP4168482 A JP 4168482A JP 4168482 A JP4168482 A JP 4168482A JP S58161712 A JPS58161712 A JP S58161712A
Authority
JP
Japan
Prior art keywords
deck
furnace
fixed
operating
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4168482A
Other languages
Japanese (ja)
Other versions
JPS6037165B2 (en
Inventor
Yoichi Watanabe
洋一 渡辺
Reizo Murakami
村上 礼三
Koichi Kobayashi
孝一 小林
Hiroshi Kanetani
弘 金谷
Hiromasa Kitabayashi
北林 博正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUGOKU KAKO KK
JFE Steel Corp
Original Assignee
CHUGOKU KAKO KK
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUGOKU KAKO KK, Kawasaki Steel Corp filed Critical CHUGOKU KAKO KK
Priority to JP4168482A priority Critical patent/JPS6037165B2/en
Publication of JPS58161712A publication Critical patent/JPS58161712A/en
Publication of JPS6037165B2 publication Critical patent/JPS6037165B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

PURPOSE:To reline the walls of a blast furnace easily and safely in relining the walls of the blast furnace in the stage of blowing out, by leaving a top charger intact, installing supporting beams horizontally in the furnace port with the materials inserted through the manhole, and inserting a working deck into the furnace through the tuyere opening. CONSTITUTION:In relining the walls of a blast furnace in the stage of blowing out, a raw material charger 1 at the furnace top is held intact and a stationary deck 2 is installed in the furnace port with the materials brought therein through the manhole at the furnace top. Assembling members for an operating deck 6 and a gnodola 9 are mounted to a working deck 11 and are introduced into the furnace through the opening 17 at the tuyere level. The deck 11 is hoisted with the deck 2 and is stopped temporary thereto, then the deck 6 mounted on the deck 11 is fixed to the deck 2. The gondola 9 is also suspended from the deck 2 freely movably upward and downward. Finally, the deck 11 is mounted to the deck 2 movably upward and downward, and the temporary stopping is released. The workers ride on the deck 11 and reline the walls in the blast furnace.

Description

【発明の詳細な説明】 本発明は高炉炉壁の改修方法と改修装置に係り、特に高
炉吹卸し時における1蛍改修期間の短縮と作業の簀全保
7持を目的とする改修方法と装置゛に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method and device for repairing blast furnace walls, and in particular, the method and device are aimed at shortening the repair period during blast furnace blowdown and maintaining the integrity of the work. Regarding ゛.

高炉の吹卸し時における炉−の改修に際しては。When repairing a blast furnace during blowdown.

吹止め後の高炉羽口レベルに諸口部を設け、上部の内容
物を掻き出して空炉状態にされるが、このような状態で
は炉内−には付着物や損傷れんがなどが一般に不安定な
状態で残るのが常態である。
After blowing off, holes are installed at the level of the blast furnace tuyeres, and the contents at the top are scraped out to leave the furnace in an empty state. However, under such conditions, the inside of the furnace is generally unstable due to deposits, damaged bricks, etc. It is normal for it to remain in this state.

従って改修に際して、これら不安定な残存物が突然に落
下して改修作業を危険にするおそれがあるので、炉内の
冷却装置、れんがの取り換えまたは補修を安全な状態の
もとで行なうためには、元ず従来−このような場合には
、炉頂装入装置を撤去するか、tUtf体上方の鉄皮を
開口して、炉内に足場を吊り下げて付層物やれんがを解
体する方法か、あるい祉鉄皮内の残存れんがや付着物に
火薬を装填して、火薬の破壊力を利用した解体方法など
が実施されていた。しかしこのような方法では装入装置
の撤去は大仕掛けな工事となり、それにけ改修期間が長
くなり、また従来の足場組はとかく不安定であったため
、炉憶に付着した付層物やれんがを完全に撤去すること
が出来なかった。
Therefore, during renovation, there is a risk that these unstable remnants may suddenly fall and make the renovation work dangerous, so in order to replace or repair the cooling system and bricks inside the furnace, it is necessary to , the conventional method - In such cases, the method is to remove the furnace top charging device, or open the steel shell above the tUtf body, suspend scaffolding inside the furnace, and dismantle the extra materials and bricks. Alternatively, demolition methods were used, such as loading gunpowder into the remaining bricks and deposits inside the steel shell and utilizing the destructive power of gunpowder. However, with this method, removing the charging equipment would be a major undertaking, which would require a long repair period, and the conventional scaffolding was unstable, so it was difficult to remove the extra material and bricks that had adhered to the reactor memory. It was not possible to remove it completely.

また火薬の破壊力による方法では、火薬の爆発時に鉄皮
や冷却装置を破損する欠点がある。
In addition, methods that rely on the destructive power of gunpowder have the disadvantage that the iron shell and cooling device are damaged when the gunpowder explodes.

本発明は上記従来方法の欠点・問題点を解決する丸めに
なされたものであって、炉頂開口S(以下炉口部と称す
。)に支持梁な横架し、この支持梁からワイヤにより作
業デツキを吊り下し、作業員がその作業デツキ上からブ
レーカなどの破砕機を使用して、炉頂部から羽口レベル
へと順次デーの付着物や損傷れんがを取り除き、上部か
らの落下物のない安全な状況下で引きつづ龜上記作業デ
ツキによって改修作業が出来るようにすることによって
1本発明の目的が達成されるに至つ九のである。
The present invention has been developed to solve the drawbacks and problems of the above-mentioned conventional method, and a support beam is installed horizontally at the furnace top opening S (hereinafter referred to as the furnace mouth), and a wire is connected to the furnace top opening S (hereinafter referred to as the furnace mouth). The work deck is suspended, and workers use a crusher such as a breaker from the top of the work deck to remove debris and damaged bricks from the top of the furnace to the tuyere level, and remove debris that has fallen from the top. One of the objects of the present invention is achieved by making it possible to carry out refurbishment work with the above-mentioned work deck under safe conditions.

本発明を実施するには、炉頂部の装入装置を撤去して改
修装置を設置することは勿論可能であり作業も容易であ
るが、装入装置を撤去すれば復旧にそれだけの時間と経
費を要することは当然であって、しかも操業の遅延によ
る損失も大きいので、本発明において装入装置fは撤去
せずに羽口レベルにおける開口部より作業デツキを挿入
して設置する方法と、そのための作業デツキの構造に新
規な機構が組冬入れられている〇 すなわち本発明では、炉頂装入装置はそのまま存置し、
マンホールから挿入される部材によって炉口部に支持梁
を横架して固定デツキを設置し、作業−デツキは折りた
たみ式の伸縮自任の構造にしては埋完成され友ものを、
縮小して羽口レベル開口部から炉内に挿入し、上部の固
定デツキに巻き上げて設置する方法と、この方法に適応
した装置を提供するものである。
In order to carry out the present invention, it is of course possible and easy to remove the charging device at the top of the furnace and install a repair device, but if the charging device is removed, it will take more time and cost to restore the furnace. It is natural that this is necessary, and furthermore, the loss due to the delay in operation is also large. Therefore, in the present invention, a method is proposed in which the charging device f is installed by inserting a working deck through the opening at the tuyere level without removing it. In other words, in the present invention, a new mechanism is incorporated into the structure of the working deck.In other words, in the present invention, the furnace top charging device remains as it is,
A fixed deck was installed by horizontally supporting a support beam at the furnace mouth using members inserted through the manhole.
The present invention provides a method of reducing the size, inserting it into the furnace through the tuyere-level opening, rolling it up and installing it on the upper fixed deck, and a device adapted to this method.

本発明の要旨は次の通りである。The gist of the invention is as follows.

(i)  炉口部に支持梁を横架して固定デツキを設置
する工m。
(i) Work to install a fixed deck by horizontally suspending support beams at the furnace mouth.

(2)作業デツキに操作デツキ組立部材およびゴンドラ
をi載し、羽口レベル開口部より炉内に挿入する工程、 (ロ)挿入さnた作業デツキを、炉頂部に設けられた固
定デツキに巻き上げて仮止めする工程、(ト)作業デツ
キに搭載して巻き上げられた操作デツキを、固定デツキ
の支持梁に固設する工程、(V′)同ゴンドラを、固定
デツキ支持梁に昇降可能に吊下げ設置する工@。
(2) Loading the operating deck assembly members and gondola onto the working deck and inserting them into the furnace through the tuyere level opening, (b) Place the inserted working deck onto the fixed deck provided at the top of the furnace. The process of hoisting and temporarily fixing the gondola, (g) the process of fixing the hoisted operation deck mounted on the work deck to the support beam of the fixed deck, (V') the gondola can be raised and lowered to the support beam of the fixed deck. Hanging installation work @.

(vL)  最後に作業デツキを固Sデツキに昇降可能
に取付けた後、前記仮止めを解除する工程、上記の工程
によって、固定デツキ支持梁に支持された操作デツキ、
作業デツキおよびゴンドラが。
(vL) Finally, after attaching the working deck to the fixed S deck so that it can be raised and lowered, the temporary fixing is released, and the operating deck supported by the fixed deck support beam is
Working deck and gondola.

空炉状態の高炉内に設置され、ついで操作デツキにおい
て、作業デツキの昇降手段な操作して作業デツキを所定
位置に移動し1作業員はゴンドラによって作業デツキに
移乗し1作業デツキを安定させた後、改修作業を行ない
、ついでゴンドラによって再び操作デツキに帰り1作業
デツキを次の所定位置に移動させて、上述のような改修
作業を繰返し実施する方法である。
It was installed in the blast furnace in an empty furnace state, and then on the operating deck, the working deck was moved to a predetermined position by operating the elevating means for the working deck, one worker was transferred to the working deck by a gondola, and the first working deck was stabilized. After that, the repair work is carried out, and then the gondola returns to the operating deck, moves one work deck to the next predetermined position, and repeats the above-mentioned repair work.

次に上記の方法を実施するための本発明の装置の骨子は
、炉口部に横架し九支持梁よりなる固定デツキと、その
固定デツキ支持梁に固定して吊設さn+操作デツキと、
その操作デツキの下方に。
Next, the gist of the device of the present invention for carrying out the above method consists of a fixed deck horizontally placed at the furnace mouth and consisting of nine support beams, and an n+ operation deck fixed and suspended from the fixed deck support beams. ,
Below the operating deck.

固定デツキ支持梁に昇降可能に吊下げ支持され。It is suspended from a fixed deck support beam so that it can be raised and lowered.

炉径方向に折りたたみかつ伸縮自在の張り出し部材を具
備した作業デツキと、操作デツキと作業デツキの間を連
絡するための昇降可能に吊設され九ゴンドラとで構成さ
れた炉壁改修装置である。
This furnace wall repair device is composed of a working deck equipped with an overhanging member that can be folded and expanded in the furnace radial direction, and nine gondolas that are suspended so that they can be raised and lowered to communicate between the operating deck and the working deck.

次に本発明を具体的な実j11111様に基づいて、図
面により詳細に説明する。
Next, the present invention will be explained in detail with reference to the drawings based on a concrete example of the present invention.

第1図は実施例の概略図、第2図は断面説明1図、第8
図は第3図におけるムーム視図である。図中1は大ベル
、1ila高炉鉄皮、6はアーマリングウェアリングプ
レートを示し、固定デツキ2は支持主梁1B(第4図参
照)によりマンホール部Mに固定して設けられている。
Fig. 1 is a schematic diagram of the embodiment, Fig. 2 is a cross-sectional diagram 1, and Fig. 8 is a schematic diagram of the embodiment.
The figure is a Moom's view in FIG. 3. In the figure, 1 is a large bell, 1ila is a blast furnace shell, 6 is an armor ring wear ring plate, and a fixed deck 2 is fixed to a manhole part M by a main support beam 1B (see FIG. 4).

固定デツキ2の下には操作デツキ6が固定して設置され
、作業デツキlit!作業デツキ吊ワイヤ1でチェンブ
ロック4を介して4個所(第8図4a参照)で固定デツ
キ3に昇降可能に吊り下げられている。またゴンドラ9
はゴンドラ昇降用ワイヤ8によって、固定デツキ8に昇
降可能に吊り下げらn1操作デツキ6と作業デツキ11
の間を昇降して作業員を運搬する。なお作業デツキll
上の作業員は作業デツキ廻りに設けられた手摺lOで保
護されている0また14は1作業デツキ11を固定デツ
キ2に仮吊りするための仮設のハンガで(第5図参照)
、作業デツキ11がチエンブロック4および作業デツキ
吊ワイヤ7によって吊り下げら詐るまでの間、作業デツ
キを支持する九めに溶接固定され、吊下げ完了時点で撤
去されるものである。
An operating deck 6 is fixedly installed under the fixed deck 2, making it a working deck! The working deck is suspended from a fixed deck 3 via a chain block 4 at four locations (see FIG. 8, 4a) using work deck hanging wires 1 so as to be movable up and down. Gondola 9 again
is suspended from the fixed deck 8 so that it can be raised and lowered by the gondola lifting wire 8.N1 operation deck 6 and work deck 11
Transport workers by going up and down between them. In addition, the work deck ll
The workers above are protected by handrails 10 installed around the work deck. 0 and 14 are temporary hangers for temporarily suspending the work deck 11 from the fixed deck 2 (see Figure 5).
Until the work deck 11 is suspended by the chain block 4 and the work deck suspension wire 7, it is welded and fixed to the ninth part that supports the work deck, and is removed when the suspension is completed.

次に本発明の装置における主要構成である作業デツキに
ついて、その動作・構造を以下に説明する0 作業デツキが具備しなければならない機能としては、先
ず作業員が作業デツキ上に搭乗し、プレーカー等によっ
て炉壁に付着している付着物やれんがを撤去する動作が
容易でなければならないし、また作業デツキは高炉炉内
を炉°口部から羽口レベルまで昇降するので、下部に降
りて行くにつれて次第に炉一方向に拡大する必要がある
。そして、本発明の特徴の1つは、炉頂装入装置を撤去
することなくデー改修装置を設置するものであるが、羽
口レベルでの炉内組立ては、上部から付着物中損傷れん
がが落下する危険があり、また炉口部の固定デツキ上で
の組立ては大ベルがあって、ソロパン玉のマンホールy
′からの材料取込みでは全くの小部材からの組立てにな
り、実際的でないので、羽口レベルから作業デツキを挿
入することになる。
Next, the operation and structure of the work deck, which is the main component of the device of the present invention, will be explained below. It must be easy to remove deposits and bricks adhering to the furnace wall, and since the work deck moves up and down inside the blast furnace from the furnace mouth to the tuyere level, it must be easy to remove it from the bottom. As you go, you need to gradually expand the furnace in one direction. One of the features of the present invention is that the day repair equipment can be installed without removing the furnace top charging equipment, but the furnace assembly at the tuyere level requires removing the damaged bricks in the deposits from the top. There is a risk of falling, and there is a large bell when assembling on the fixed deck at the furnace mouth, and there is a risk of falling off the manhole of the solo bread ball.
Since taking in material from '' requires assembly from entirely small parts and is impractical, a working deck must be inserted from the tuyere level.

従って1羽口レベルの鉄皮開口部を大きくしないために
は、作業デツキは可能な限り小形化しなければならない
。このような機能を作業デツキに具備させる丸めに、次
のような手段が講じられているO すなわち作業デツキ11は第8図に示すように、開脚し
た状態で梁11’で形成される六角形状をしているが、
炉内に挿入時には、第4.5.8図に示すように梁11
’で形成される8辺を折りたたんだ状態で炉内に取込む
。炉口部固定デツキ2の主支持梁18に、作業デツキ1
1上に仮設さnたハンガ14にW部で仮spa後、第5
図に示すように折りたたんである部分1it−、置部を
中心に内側にliI自、五部を溶接固定して六角形状に
する。なお0B−1、li 、8はチエンブロックであ
る。
Therefore, in order to avoid increasing the size of the shell opening at the level of one tuyere, the working deck must be made as small as possible. The following measures have been taken to provide the work deck with such a function. In other words, the work deck 11 has a hexagonal shape formed by beams 11' when its legs are opened, as shown in FIG. Although it has a shape,
When inserted into the furnace, the beam 11 is inserted as shown in Figure 4.5.8.
The eight sides formed by ' are folded and taken into the furnace. The work deck 1 is attached to the main support beam 18 of the furnace opening fixing deck 2.
After a temporary spa was installed in the W part on the hanger 14 that was temporarily installed on the 5th
As shown in the figure, the folded parts 1 and 5 are welded and fixed on the inner side centering on the holder part to form a hexagonal shape. Note that 0B-1, li, and 8 are chain blocks.

例えば、1845m″の高炉においては、炉口部の内径
は7200鴎程度であるので、作業デツキ11の六角形
の1辺の大きさは第8図に示すように$1000〜80
00M程fr% PKト作業テア*tt 500〜60
0m(D@’CMトtK6゜次に作業デツキ11が炉口
部より下方に降りるに従って、当初の六角形では1蝋と
作業デツキの距嘔が次第に慝れるので(高炉炉腹部では
内儀が10000騙以上となる)、炉蝋の付着物をブレ
ーカで除去する作業が困難となる◇そこで作業デッキ1
111第8図に示すように、獲りmlし部II。
For example, in a blast furnace of 1,845 m'', the inner diameter of the furnace mouth is approximately 7,200 mm, so the size of one side of the hexagon of the work deck 11 is approximately 1,000 to 80 mm, as shown in Figure 8.
00M fr% PK work tare *tt 500~60
0m (D@'CMtotK6゜Next, as the working deck 11 descends from the furnace mouth, the distance between 1 wax and the working deck in the original hexagonal shape gradually decreases (in the belly of the blast furnace, the internal diameter is 10,000 m). ), it becomes difficult to remove the deposits of furnace wax with a breaker.
111 As shown in FIG. 8, the catch section II.

16’をボックス16′に収納し良状態で作業デツキ1
1上に取り付け、操作デツキ6上で円周方向に張り出す
ことが出来るような構造となっている。
16' is stored in box 16' and in good condition on work deck 1.
It has a structure that allows it to be attached on top of the operating deck 6 and to extend in the circumferential direction on the operating deck 6.

張り出し部16.16’の骨は、ボックス構造16′。The rib of the overhang 16.16' is a box structure 16'.

の中にHビーム16.16’が入っており(第8図0参
照)%スライド完了後、ボックス上部に取付けたナツト
Kにより、完全に固定することが出来る。
There is an H beam 16.16' inside the box (see Figure 8, 0), and after the slide is completed, it can be completely fixed with the nut K attached to the top of the box.

このようにして円周方向にHビームl 6 、 l 6
’を張り出した後、上面に厚鋼板を張ることにより、作
業デツキ11を炉内径より4僅かに小さくなるようにし
ながら、徐々に降下させてゆくことが出来る。
In this way, H beams l 6 , l 6 in the circumferential direction
By extending a thick steel plate to the upper surface of the work deck 11, the work deck 11 can be gradually lowered while making it slightly smaller than the inner diameter of the furnace.

なお作業デツキ11は、固定デツキ8から吊り下げられ
た状態で1蝋から500〜aOO閤#IIt′L物をブ
レーカで破砕する時には1作業デツキが左右に振れるお
それがあるので、H7レーム収納ボックス16’の側面
に設けた営体15’に、第2図に示す振れ止めIIが摺
動可能に取り付けられているO 次に第1.1図に示すように、炉内に設置さ扛る固定デ
ツキ3、操作デツキ6、ゴンドラ9、作業デツキllの
各デツキを炉内へ取込み設置する手順について説明する
In addition, when the work deck 11 is suspended from the fixed deck 8 and the breaker is used to crush 500 ~ aOO yen #IIt'L objects from 1 wax, the work deck 11 may swing from side to side, so the H7 frame storage box is used. The steady rest II shown in Figure 2 is slidably attached to the support body 15' provided on the side of the furnace 16'. The procedure for taking and installing the decks 3, operating deck 6, gondola 9, and working deck 11 into the furnace will be explained.

(手l1l)  先ずソロパン玉下部にあるマンホール
麗から、固定デツキ2の主梁18を炉口部に取り込み、
これをメイン支持梁にして、炉口部に固定デツキ8を設
置する。
(Hand 11) First, take the main beam 18 of the fixed deck 2 into the furnace mouth from the manhole at the bottom of the solo bread ball.
Using this as the main support beam, a fixed deck 8 is installed at the furnace mouth.

(手lulり  作業デツキ11を折りたたんだ状態で
ボンド′79、操作デツキ6の機材を搭載して、羽ロレ
ベル開口部lテから炉内に挿入する。
(By hand) With work deck 11 folded, bond '79 and equipment on operating deck 6 are loaded and inserted into the furnace through the blade level opening l.

(手I[8)  次に1作業デツキ11を固定デツキ2
の主梁18の下面迄、ウィンチ18で引き上げて一旦固
定し、ハンガ14を固定デツキ主梁18に掛けた後#1
接固定WするO(第4.Is図参照)(手順4) 折り
たたんだ状態の作業デツキ11を第5図に示すように、
チェ/ブロックOB1〜8を用いて両側に開き、開い九
後ム部を溶接固定することにより、第8図に示す入角形
状の作業デツキ11とする0 (手順5) 固定デツキ8および作業デツ命上で、ゴン
ドラ9と操作デツキ6とを組立て夫々固定デツキに取り
付ける0 以上で固定デツΦ2、操作デツキ6、ゴンドラ9、作業
デツキ11が炉口部に設置され九ことになる。そして、
これら各デツキは次のような機能を持っている。
(Hand I [8) Next, move 1 working deck 11 to fixed deck 2.
#1
(See Figure 4.Is) (Step 4) As shown in Figure 5, the work deck 11 in the folded state is
By opening on both sides using the check/blocks OB1 to OB8 and welding and fixing the open back arm portions, the work deck 11 in the angle shape shown in Fig. 8 is created.0 (Step 5) Fixed deck 8 and work deck At the moment of death, the gondola 9 and the operating deck 6 are assembled and attached to the fixed deck respectively.With the above, the fixed deck Φ2, the operating deck 6, the gondola 9, and the working deck 11 are installed at the furnace mouth. and,
Each of these decks has the following functions:

固定デツキト・・・・・  ソロパン玉iンホールX′
より出入する作業員は固定デツキ2の上に、仮設階段1
9を使用して降りる0このデツキは主梁18によって、
操作デツキ6、ゴンドラ9、作業・デツキ1.1を吊り
下げている0 操作デツキ6・・・・・・固定デツキ3より支柱をとり
吊設固定されている0作業デツキ11の吊り下し作業は
、すべてこの操作デツキ上でチエンブロック番を操作し
て行なう0陶この時ハンガ14の俗接部を外し、ワイヤ
ー7に吊りかえておく。20は昇降タラップである。
Fixed Detsukito... Solo pan ball in hole X'
Workers entering and exiting from the fixed deck 2 have temporary stairs 1
Use 9 to get off this deck.
Operation deck 6, gondola 9, and work deck 1.1 are suspended.O operation deck 6... A support is taken from the fixed deck 3 and the suspended work deck 11 is suspended. This is all done by operating the chain block number on this operating deck. At this time, remove the common connection part of the hanger 14 and replace it with the wire 7. 20 is a lift ramp.

ゴンドラ9・・・・・・操作デツキ6と作業デツキ11
との間を作業員を乗せて昇降する。
Gondola 9... Operation deck 6 and work deck 11
A worker is lifted up and down between the two.

作業デツキ11・・・・・・操作デツキ6上で操作して
、所定の位置まで移動して固定した時点で、操作デツキ
6からゴンドラ9で作業デツキ11に乗り移り作業を行
なう。
Work deck 11: When operated on the operating deck 6 and moved to a predetermined position and fixed, the gondola 9 is transferred from the operating deck 6 to the working deck 11 to perform work.

次に、これらのデツキ、ゴンドラを使用してデーの付着
物・れんがを、−4下の危険のない安全な状態まで撤去
する作業の方法手順を以下に説明するO (千l[6)  固定デツキ2に、ハンガ14で吊り下
げてあった作業デツキ11を、第2.6.7図に示す吊
り点(7X7’X7’)にワイヤロープ、手巻チェーン
ブロックにより吊り換え、ハンガ14を撤去する。
Next, the method and procedure for removing the deposits and bricks on the deck using these decks and gondolas to a safe condition below -4 is explained below. The work deck 11, which was suspended from the deck 2 by the hanger 14, was resuspended from the hanging point (7X7'X7') shown in Figure 2.6.7 using a wire rope and a hand-wound chain block, and the hanger 14 was removed. do.

(十l[7)  固定デツキ2よりワイヤロープで吊り
下げられた作業デツキ111%4台の手巻チェーンブロ
ック4を操作デツキ上から操作して、1鳳ピツチで下降
させ吊りワイヤーロープ1点を緊張させる。次にチェノ
ブロック4台はゆるめ、計4点のワイヤロープで固定す
る0このようにしてワイヤロープ7 、 ?’、−7’
15!互に使用−取り換えの操作を繰返して、所定のピ
ッチで下降してゆく方法の詳細は、第6.7図から容易
に知ることが出来る。所定の場所まで下降し安定した時
点で、作業員は操作デツキ6からゴンドラ9で作業デツ
キ11に移乗する。まず作業デツキll上から炉頂に向
け90°方向に4個所の振れ止め15を伸し。
(111%) Working deck 111% suspended from fixed deck 2 with wire ropes Operate four hand-wound chain blocks 4 from above the operating deck to lower them in one pitch and attach one point of hanging wire rope. Make me nervous. Next, loosen the four Cheno blocks and fix them with wire ropes at four points in total. In this way, wire ropes 7, ? ', -7'
15! The details of the method of descending at a predetermined pitch by repeating the operation of using and replacing each other can be easily seen from FIG. 6.7. After descending to a predetermined location and becoming stable, the worker transfers from the operating deck 6 to the working deck 11 using the gondola 9. First, extend the steady rests 15 at four locations in a 90° direction from above the work deck ll toward the top of the furnace.

安定した状態にしてから炉壁面に付着している付着物・
破損nんがを撤去する。
After stabilizing the furnace wall, remove any deposits and
Remove the damaged item.

同以上は、炉櫨面の付着物ゆれんが除去などの改修工事
について記載したが、改修時におけるれんが構築や冷却
器交換などの場合にも適用出来るのは首うまでもない。
The above description has been about repair work such as removing deposits and sway from the furnace wood surface, but it goes without saying that it can also be applied to cases such as building bricks and replacing coolers during renovation.

本発明は1以上に説明したような構成であるので、固定
デツキから4ケ所の吊りワイヤで吊り下の吊り点を交互
に換えることにより(第7図参照)、徐々に炉口部から
羽口レベルまで降ろし、炉内径が広がるにつれて作業デ
ツキを拡張してゆく事およびゴンドラに作業員が退避で
きるので、炉内壁に付着している付着物やれんがなどを
完全に撤去することが出来る。従って、それ以後の炉底
掻き出し工事、れんが、冷却装置の改修工事を、上方か
ら付着物、れんが額の落下の心配なしに、安全に進める
ことが出来る。
Since the present invention has the configuration as described above, by alternating the hanging points of the four hanging wires from the fixed deck (see Fig. 7), the wires are gradually moved from the furnace mouth to the tuyere. By lowering the furnace to the same level and expanding the working deck as the inner diameter of the furnace expands, and by allowing workers to evacuate to the gondola, it is possible to completely remove deposits and bricks adhering to the inner walls of the furnace. Therefore, the subsequent work of scraping out the hearth bottom and repairing the bricks and cooling system can be carried out safely without worrying about deposits or bricks falling from above.

更に、本発明では羽口レベルにおける鉄皮開口部から改
修装置を炉内へ挿入することが出来るので、炉頂装入装
置の撤去が不要で、冷却装置や余分な鉄皮の破損などの
発生もなく、短期間の改修で、速やかな火入れ操業が可
能となる効果は絶大である0
Furthermore, in the present invention, since the repair device can be inserted into the furnace through the shell opening at the tuyere level, there is no need to remove the furnace top charging device, which eliminates the possibility of damage to the cooling device or excess shell. The effect of being able to start burning operations quickly with a short period of repair is enormous.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は実施例の全体説明図、 第sIi!は装置の1面概略図、 第8図は嬉3WJにおけるムーム視図、第41!(2)
は作業デツキを固定デツキ下方に巻き上げた状態の斜視
図の)はノーンガ詳細図、第6図(4)、■)は作業デ
ツキ折りたたみ部を闘し1て組立てる順序の説明図、 第6図は装置の正面断面図、 第7図は第6図における作業デツキ移動方法の詳細説明
図、 第8図(4)は作業デツキ最大槙平園、(6)はムーム
視、(0)はD部の詳細図面であるO l・・・大ペル     2・・・固定デツキ8・・・
シャックル   番・・・チエンブロック5・・・アー
マリングウェアリングプレート6・・・操作デツキ 7.7’、?’・・・作業デツキ吊ワイヤ8・・・ゴン
ドラ昇降用ワイヤ 9・・・ゴンドラ    lO・・・手摺11、il’
、lピ・・・作業デツキ tg・・・鉄皮      1ト・・固定デツキ主梁1
4°゛°ノゝンカ15・・・作業デツキ振れ止メ16 
、16’、16’、 16 a 、 16 b−・・作
業デツキ張出し部17・・・羽口レベル開口部 18・・・ウィンチ    19・・・階段sO・・・
タラップ    M 、 )41・・・マン、ホールW
・・・溶接部     N・・・ナット0特許出願人 
川崎製鉄株式会社 同 出願人 中国化工株式会社 第1図 第2図 第3図 第4図 1 1B) 第5図 (A) <B) 第7図 (イ)           (ハ、)30)    
     (二1 第8図 へ ・ B ・ C・
FIG. 1 is an overall explanatory diagram of the embodiment, sIi! Figure 8 is a schematic diagram of one side of the device, Figure 8 is a Mumu view of Uki 3WJ, Figure 41! (2)
Figure 6 is a perspective view of the working deck rolled up below the fixed deck, Figure 6 (4), ■) is an explanatory diagram of the order of assembly by folding the folding part of the working deck. Front sectional view of the device, Figure 7 is a detailed explanatory diagram of the method of moving the working deck in Figure 6, Figure 8 (4) is the maximum working deck, Makitairaen, (6) is the Moom view, and (0) is the D section. Detailed drawing of O l...Large pel 2...Fixed deck 8...
Shackle number...Chain block 5...Armor ring wear ring plate 6...Operation deck 7.7',? '... Working deck hanging wire 8... Gondola lifting wire 9... Gondola lO... Handrail 11, il'
, L pi...Working deck tg...Steel shell 1t...Fixing deck main beam 1
4°゛° linker 15... work deck steady rest 16
, 16', 16', 16 a, 16 b--Working deck overhang 17... Tuyere level opening 18... Winch 19... Stairs sO...
Gangway M, ) 41...Man, Hall W
...Welded part N...Nut 0 Patent applicant
Kawasaki Steel Co., Ltd. Applicant Chugoku Kako Co., Ltd. Figure 1 Figure 2 Figure 3 Figure 4 Figure 1 1B) Figure 5 (A) <B) Figure 7 (A) (C) 30)
(21 Go to Figure 8・B・C・

Claims (1)

【特許請求の範囲】 L 減尺吹却しの操業によって空炉状態にした高炉の炉
−改修に当り、 (イ)炉頂装入装置を撤去することなく炉頂開口部に支
持梁を横架して固定デツキを組立設置する工程、 (ロ)羽ロレペルに開口部を設ける工程。 (ハ)操作デツキ組立部材およびゴンドラを搭載した作
業デツキを上記羽ロレペル開口部より炉内へ挿入する工
程、 に)炉内に挿入された上記作業デツキを巻き上げて前記
固定デツキ下方に仮止めする工程、 (ホ)作業デツキに搭載されて巻き上げられた前記操作
デツキを固定デツキ下方に固設する工程、 (へ) 同様にして巻き上げられた前記ゴンドラを固定
デツキに昇降可能に吊り下げて設置する工l!。 (ト)  前記作業デツキを固定デツキに昇降可能に吊
り下げ取付けた後、前記仮止めを撤去する工程。 上記の゛これら工程によって固定デツキ、操作デツキ、
ゴンドラおよび作業デツキが空炉状態の炉内に設置され
、 −上記操作デツキにおいて1作業デツキの昇降手段と張
出し部材の調節手段とを操作して作業デツキを所定の位
置に安定させ、(IJ)作業員はゴンドラに搭乗し作業
デツキに移行して改修作業を行ない、 伸)上記改修作業完了後に、作業員はゴンドラによって
操作デツキに復帰し、 に)作業デツキを次の所定位置に移動させて改修作業を
続行する このような手順を繰り返すことを特徴とする高炉炉壁改
修方法。 亀 減尺吹卸しの操業によって空炉状*にした高炉炉−
の改修において、炉頂部に横架した支持梁よりなる固定
デツΦと、上記固定デツキの支持梁に固定して吊下げら
れた操作デツキと、該操作デツキ下方に支持梁に昇降可
能に吊下げ支持され炉径方向に折りたたみかつ伸縮自伝
の張出し部を具備した作業デツキと。 前記操作デツキと作業デツキとの間を昇降可能に前記支
持梁に吊下げて設置されたゴンドラとで構成されたこと
を特徴とする高炉1置改修装置。
[Scope of Claims] L: When refurbishing a blast furnace that has been brought into an empty state through reduced-scale blowing operations, (a) A support beam is placed horizontally at the top opening without removing the top charging device. (2) The process of assembling and installing the fixed deck, (b) The process of creating an opening in the wing roll. (c) Inserting the working deck carrying the operating deck assembly members and the gondola into the furnace through the above-mentioned wing roll opening, and (2) Hoisting up the working deck inserted into the furnace and temporarily fixing it below the fixed deck. (e) A step of fixing the operating deck mounted on the working deck and hoisted up below the fixed deck; (f) Suspending and installing the gondola hoisted up in the same way on the fixed deck so that it can be raised and lowered. Engineering! . (G) A step of removing the temporary fixing after the working deck is suspended and attached to the fixed deck so that it can be raised and lowered. Through these processes, the fixed deck, operating deck,
a gondola and a working deck are installed in the furnace in an empty furnace state; - the working deck is stabilized at a predetermined position by operating the elevating means of one working deck and the adjusting means of the overhang member on the operating deck; (IJ); The workers board the gondola and move to the work deck to carry out the repair work. (b) After the above repair work is completed, the workers return to the operating deck by the gondola, and (2) move the work deck to the next predetermined position. A blast furnace furnace wall renovation method characterized by repeating such steps to continue the renovation work. Kame A blast furnace made into an empty furnace* by operating a reduced-scale blowdown system.
In the renovation of , a fixed deck Φ consisting of a support beam suspended horizontally on the top of the furnace, an operating deck fixed and suspended from the supporting beam of the fixed deck, and a support beam suspended below the operating deck so that it can be raised and lowered. A work deck that is supported, folds in the radial direction of the furnace, and is equipped with a telescopic overhang. A blast furnace single-station refurbishment device comprising a gondola suspended from the support beam so as to be movable up and down between the operation deck and the work deck.
JP4168482A 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device Expired JPS6037165B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4168482A JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4168482A JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Publications (2)

Publication Number Publication Date
JPS58161712A true JPS58161712A (en) 1983-09-26
JPS6037165B2 JPS6037165B2 (en) 1985-08-24

Family

ID=12615246

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4168482A Expired JPS6037165B2 (en) 1982-03-18 1982-03-18 Blast furnace furnace wall repair method and repair device

Country Status (1)

Country Link
JP (1) JPS6037165B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101022715B1 (en) * 2008-12-15 2011-03-22 (주)포스코켐텍 Method for constructing refractories in a blast furnace
CN105108395A (en) * 2015-09-28 2015-12-02 武汉一冶钢结构有限责任公司 Blast furnace shell inner wall welding platform and erecting method thereof
CN113428814A (en) * 2021-08-02 2021-09-24 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62177862A (en) * 1986-01-31 1987-08-04 Shin Kobe Electric Mach Co Ltd Enclosed type lead storage battery

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101022715B1 (en) * 2008-12-15 2011-03-22 (주)포스코켐텍 Method for constructing refractories in a blast furnace
CN105108395A (en) * 2015-09-28 2015-12-02 武汉一冶钢结构有限责任公司 Blast furnace shell inner wall welding platform and erecting method thereof
CN113428814A (en) * 2021-08-02 2021-09-24 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc
CN113428814B (en) * 2021-08-02 2024-02-13 湖南德尚源耐磨工业有限公司 Reducing disc for furnace body construction and assembling method of reducing disc

Also Published As

Publication number Publication date
JPS6037165B2 (en) 1985-08-24

Similar Documents

Publication Publication Date Title
US3672649A (en) Shaft or stack furnace and method and apparatus for lining same
CN105177202B (en) A kind of blast furnace overhaul method
CN106522581A (en) Method for demolish chimney manually
CN108678422A (en) The method for dismounting of steel stack
JPS58161712A (en) Method and device for relining of wall of blast furnace
CN108529526A (en) Extra large work module tilt lacing wire lifts technique in place
CN110409803B (en) Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN207812983U (en) A kind of encircling operating deck
JP3017655B2 (en) Hot stove dismantling method
CN110077963B (en) Installation method of large tank
JP5378043B2 (en) Steel tower supported chimney dismantling method
CN209974174U (en) Steel coal scuttle prefabricated component hoisting structure
CN106477350B (en) The method for dismounting of bridge ship loader-unloader
CN1250745C (en) Disassembling method for blast-furnace bottom
JP2002081202A (en) Lift type falsework and its assembling/disassembling method
RU2031127C1 (en) Platform for carrying out inside blast furnace
JPH092774A (en) Heavy object suspending device
JPH068989Y2 (en) Replacement device for inner wall cooling device of bellless blast furnace
CN115109888A (en) Converter skirt cover spanning installation and disassembly method
JPH0634358Y2 (en) Replacement device for inner wall cooling device of bellless blast furnace
RU2087669C1 (en) Device for handling well tubes
CN111392453B (en) Method for replacing chute of ship loader and ship loader
JP2001003111A (en) Method for dismantling furnace bottom part in blast furnace
PL118497B1 (en) Apparatus for visually examining and repairing tapering chimneysskhodjahhikhsja dymovych trub
JPS5848335Y2 (en) Device to prevent debris from falling on blast furnace inner walls