JPS58138823A - Lateral compaction for underground continuous wall - Google Patents

Lateral compaction for underground continuous wall

Info

Publication number
JPS58138823A
JPS58138823A JP2188982A JP2188982A JPS58138823A JP S58138823 A JPS58138823 A JP S58138823A JP 2188982 A JP2188982 A JP 2188982A JP 2188982 A JP2188982 A JP 2188982A JP S58138823 A JPS58138823 A JP S58138823A
Authority
JP
Japan
Prior art keywords
concrete
wall
tension
horizontal
continuous wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2188982A
Other languages
Japanese (ja)
Other versions
JPS6240485B2 (en
Inventor
Akira Hoshino
星野 彰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2188982A priority Critical patent/JPS58138823A/en
Publication of JPS58138823A publication Critical patent/JPS58138823A/en
Publication of JPS6240485B2 publication Critical patent/JPS6240485B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Abstract

PURPOSE:To simplify the construction work of an underground continuous wall by a method in which horizontal holes are drilled in projections formed on one sides of concrete unit walls, tension members are inserted and set, and concrete is placed. CONSTITUTION:Vertical projections 2a are formed on one side of a concrete unit wall 2 to make up a continuous wall, and plural horizontal holes 2b are drilled in almost horizontal direction on a straight line. Then, tension members 4 of PC wires, etc., are pierced through sheathes 3 passing through the holes 2 of plural walls 2, one ends of the tension members are fixed by a fixing means 5 and the other ends are attached to a tension means 6, and the port of the means 6 is removed and concrete is placed. Then, after the concrete has hardened, a tension is given to the tension member 4 by the means 6 in such a way as to give a lateral compaction force to the continuous wall.

Description

【発明の詳細な説明】 本発明は、地中に複数枚のコンクリート単位壁体を連続
的に打ち継いだり或いは縦列状に連接して形成する地中
連続壁の横締め方法に関するもの2− である。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a horizontal tightening method for an underground continuous wall formed by continuously pouring a plurality of concrete unit walls into the ground or by connecting them in a column. be.

−・般に、この種の地中連続壁は1−留壁、11−氷壁
或いは地下構造物木本の一部として利用されるものであ
るか、地中に複数枚のコンクリ−)・1社位11x体を
連続的に打ち継いで形成した地中連続壁は、該打継部の
強度か弱く、例えばし4.N、(:、地下タンク等にみ
られるように膨大な費用を要゛するにもかかわらず、ば
らばらの直立した壁としか見なされておらず、その改善
が要請されていた。
- Generally, this kind of underground continuous wall is used as 1-retaining wall, 11-ice wall, or as part of underground structure wood, or it is made of multiple concrete layers underground. An underground continuous wall formed by continuously splicing 11x structures has a weak strength at the spliced parts, for example, 4. N. (:) Despite requiring huge costs, such as underground tanks, they were seen as nothing more than separate upright walls, and improvements were requested.

従来、L記コンクリート単位壁本の打継部を補強するも
のとして、継目部にがj断鉄筋や11−水根を設けたも
のがあるか、施1−か複雑で手間がかが1)高価となる
割(二は、部分的な補強の域を出ず、継1]部分を含め
lこ連続壁全体を−・本化して従来強度的にばらばらで
あった連続壁を構造体の一部として使用し得るまで【こ
は至らず、また壁体内に緊張祠を挿設して連続壁全体に
プレストレスを−与えるものも開発されているか、緊張
材の挿設や緊張作業か田川(で高度の技術を要する等の
問題があった。
Conventionally, methods for reinforcing the joints of concrete unit walls have included cutting reinforcing bars or water roots at the joints, which are complicated and time-consuming. Although it is expensive, the entire continuous wall, including the joint 1 part, is not limited to partial reinforcement. It is not yet possible to use it as a section, and there have also been some developments in which tensioning holes are inserted into the wall to apply prestress to the entire continuous wall. There were problems such as the need for advanced technology.

本発明は上記点に鑑みてなされたもので、その3− 目的とするところは、コンクリ−1・11位壁体の−1
1111に突起部を形成し1、−れ【二穿設した水平穴
に緊張材を挿設すると共(二該−側面に新tこにフンク
リ−)を打設して、地中連続壁に横力向の締Lj力を与
えて構造市川本化を図り、上水圧に月抗し得る構造物本
体の一部として利用出来ると共に、施工かttt’i単
で迅速+1.j)安1i11iに構築出来る地中連続壁
の横締め方法を提供するにある1゜ 以下、本発明の実施例について図面を参照しながら説明
する。第1図はクラムシェルバケットやビット等により
地中に掘削した堅溝孔〕にフンクリ−1・、!、ii位
壁木2を連続的1こ打ち継いで、連続壁l\を形成する
途中の状態を示すもので、該コンクリ−1・11″L位
壁体2の−・側面には必要な深さまで上下方向に所要の
良さを有する1条の突起部2aが一体的(こ突設されて
いる。該突起部2aは、第6図に例示すようにコンクリ
ート単位壁体2の一端部(L、型)或いは両端部(型)
に形成するようにしても良く、その位置及び本数は必要
に応して選定すればよい。また、連続壁Δは図示のよう
に直線=4= 状に形成する場合に限らず、例えば1.、 、N 、(
1,地トタンク等を構築する場合のように円形に形+A
tfでも良い1.尚、本実施例のコ5・クリ−1・j)
l、 l、’7壁困2は、堅l1li、fL l内1こ
適宜鉄筋を建込、7れl’l;、いは鉄筋′jなしでコ
ンクリートを打設して形成したらので、F。
The present invention has been made in view of the above points, and its 3rd purpose is to
A protrusion is formed at 1111, and a tension material is inserted into the horizontal hole drilled (2) and a new tension member is placed on the side of the wall. By applying a tightening force in the direction of the lateral force, the structure can be used as a part of the main body of the structure that can withstand water pressure, and the construction is simple and quick +1. j) To provide a method for laterally tightening an underground continuous wall that can be constructed with ease.Embodiments of the present invention will now be described with reference to the drawings. Figure 1 shows a hard trench hole drilled into the ground with a clamshell bucket or bit, etc. , shows the state in the middle of forming a continuous wall \\ by continuously splicing one wall lumber 2 of size ii, and the - side of the concrete wall 2 of size 1.11''L has the necessary parts. A single protrusion 2a having the required depth and vertical direction is integrally provided.The protrusion 2a is formed at one end of the concrete unit wall 2 (as illustrated in FIG. 6). L, type) or both ends (type)
They may be formed, and the position and number may be selected as necessary. In addition, the continuous wall Δ is not limited to the case where it is formed in a straight line =4= shape as shown in the figure, for example, 1. , ,N,(
1.Circular shape +A like when building a ground tank etc.
tf is also fine1. In addition, in this example, 5.Cree.1.j)
l, l, '7 wall problem 2 is formed by placing reinforcing bars as appropriate in one part of the hard l1li, fL l, or by pouring concrete without reinforcing bars, so F .

るが、二1−場等であらかじめコンクリ−1壁木ユニツ
1を形成したちのをコンクリート11i位壁木2として
−に記堅溝孔1内に挿入して縦列状に連接してち゛  
 良い。
However, the concrete 1 wall wood unit 1 was formed in advance in a field 21, etc., and then the concrete 11i wall wood unit 2 was inserted into the groove hole 1 and connected in a vertical line.
good.

次に、以1−1のようにして構築した連続壁Aの一側部
、即ち突起部2aを形成した壁面側の−1−を掘削し、
第2図に示すように突起部2aに複数の水平穴21)を
ドリル等であける。該水平穴21〕け、1−記コンクリ
ート打設時に鉄筋にシース等を取イ・1けてあらカルめ
形成しておいてもよく、またプレキ■ス1のフンクリ−
1・壁木ユニッ1では既に穿設しておくのか良い。各水
平穴21〕は相互に略水平方向に−11(線りに整列す
るように配列しておく1、次に、1−記のように配列し
た水平穴21)に第:)図に示すようにシース3を挿通
する。該シース:)5− は複数枚のコンクリ−)・1)を侍壁木2の水平穴21
〕を杭・)にうに挿通さ一部、また各シース3は図示の
ように一段ず−〕順次(鞘:)゛らぜtこり或いは千鳥
状に配置して、後述の1(1を締め力が連続壁A全体に
平均し、て世1<j:うに゛・)−るのが良い。続いて
、該シース:3内にPC線又は1)0鋼棒等の緊張月4
を通し、その両端部を突起部2aの水平穴2+1端面か
ら突出させる。緊張材4の一端部は定着金物等の定着手
1文5にて固定し、It!’端部にはジヤツキ等の緊張
手段〔(を取イ・lける。
Next, excavate one side of the continuous wall A constructed as described in 1-1 below, that is, the wall surface side -1- where the protrusion 2a is formed,
As shown in FIG. 2, a plurality of horizontal holes 21) are drilled in the projection 2a using a drill or the like. When pouring the horizontal hole 21], a sheath or the like may be pre-formed on the reinforcing bar at the time of pouring the concrete as described in 1-1.
1. It is a good idea to have already drilled the holes in wall wood unit 1. The horizontal holes 21] are arranged approximately horizontally to each other in the -11 (line 1, and then the horizontal holes 21 arranged as shown in 1) are shown in Figure 1. Insert the sheath 3 as shown. The sheath:) 5- is a plurality of concrete sheets) ・1) is inserted into the horizontal hole 21 of the samurai wall wood 2
] are inserted into the sea urchins through the stakes, and each sheath 3 is placed one by one in sequence as shown in the figure. It is good that the force is averaged over the entire continuous wall A and is 1<j:Uni゛・)-. Then, put a PC wire or 1) tension of a steel rod etc. into the sheath: 3
is passed through, and its both ends protrude from the end surface of the horizontal hole 2+1 of the protrusion 2a. One end of the tension material 4 is fixed with a fixing device 5 such as fixing hardware, and it! ``Tension means such as jacks should be attached to the ends.

次に、連続壁への掘削側、IJI+ %緊張材・1を配
置した壁面側に適宜型枠(図示せず)を組んで、コンク
リート7を打設する。尚、該フンクリ−1・7の4′]
設時には、上記緊張手段Gの部分は箱抜きしておく、、
該コンクリート7が硬化したら、緊張手段6にLり緊張
+A4を緊張して張力を与えると共にシース3内にグラ
ウチングを施して、−1−記連続壁l\に横締め力を−
りえる。
Next, appropriate formwork (not shown) is constructed on the side where the continuous wall is excavated and on the side of the wall where the IJI+% tension material 1 is placed, and concrete 7 is poured. In addition, the said Funkri-1.7-4']
At the time of installation, leave the tension means G part unboxed.
When the concrete 7 hardens, tension is applied to the tensioning means 6 by applying tension L + A4, and the inside of the sheath 3 is grouted to apply lateral tightening force to the -1- continuous wall l\.
Rieru.

−1−記実施例では、コンクリート7の打設硬化後にシ
ース;)内の緊張祠11を緊張して連続壁A(こ横−〇
− 締め力をりえるようにしたか、第5図に示1.1:うに
水平穴21〕に直接緊張拐4を挿通して、その−・端部
に取伺けた緊張手段6により該緊張材4を緊張した状態
で、第4図に示すようにコンクリート7を打設し、該コ
ンクリ−1・7が硬化し所定の強度に達した後、−に記
緊張手段6を開放して、−に記コンクリート7にプレス
トレスを11−えて、連続壁Aに横締め力を与えるJ:
うにしても良い。
In the embodiment described in -1-, after the concrete 7 was poured and hardened, the tensioning force 11 in the sheath was tightened to increase the tightening force on the continuous wall A (as shown in Fig. 5). Figure 1.1: Insert the tension member 4 directly into the sea urchin horizontal hole 21 and tension the tension member 4 with the tension means 6 attached to the end, as shown in Fig. 4. After the concrete 7 is poured and the concrete 1 and 7 harden and reach a predetermined strength, the tensioning means 6 described in - is released, and the concrete 7 is prestressed 11 - as described in - to form a continuous wall. J to give horizontal tightening force to A:
You can do it as well.

本発明は1′:J、1−のよう(こ、コンクリート1′
L位壁体の一側面に突起部を形成するようにし、これに
穿設した水平穴1こ緊張年4を挿通するようbこしたの
で、緊張材の配置及び緊張手段の取イ・1けが極めて簡
肇n、っ迅速に出来るだけでなく、該緊張材を安定且つ
強力に支持し得ると共にその目的に応じて上記突起部の
数及び位置だけでなく長さをも自由に選択小米、また緊
張材の配置側の壁面に新たなコンクリートを打設して該
緊張材の張力に11)連続壁に横締め力を与えてこれを
一体化することにより、例えは土、N、G、地下タンク
あ如く該地中連続壁を構造体の−・部として利用出来、
全体として廂J−7− か簡単、迅速ηつ安価である等の効果がある。
The present invention is as follows: 1':J, 1- (this, concrete 1'
A protrusion was formed on one side of the L-position wall, and a horizontal hole was drilled in the protrusion so that the tension member 4 could be inserted through the protrusion, so it was easy to arrange the tension material, take care of the tension means, and avoid any injuries. Not only can this be done extremely easily and quickly, it can also support the tension member stably and strongly, and the number and position of the protrusions as well as the length can be freely selected depending on the purpose. By pouring new concrete on the wall surface on the side where the tendons are placed and applying lateral tightening force to the continuous wall and integrating it, for example, soil, N, G, underground Like a tank, the underground continuous wall can be used as a part of the structure,
Overall, the process is simple, quick, and inexpensive.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は地中に掘削した堅溝孔にコンクリ−1・単位壁
体を形成している状態を示す斜視図、第2図は突起部(
こ水平穴を穿設しtこ状態を示す斜視図、第3図は緊張
材を通したシ・−スを水平穴に挿通して配置しすこ状態
を示す第)発明の実施例の斜視図、第4図は新たなコン
クリートを打設した状態を示す斜視図、第5し1は緊張
+1を水平穴に挿通して配置した状態を示す第2発明の
実施例の斜視図、第6図はコンクリ−1−、!Jj位壁
体の突起部の別の実施例を示す端面図である。 1・・・・堅溝孔、2・・・・コンクリ−トリを位壁体
、2a・・・・突起部、21川・・水平穴、3・・・・
シース、4・・・・緊張材、6・・・・緊張手段、7・
・・・コンクリート、 8−
Figure 1 is a perspective view showing the formation of a concrete unit wall in a trench hole drilled underground, and Figure 2 is a perspective view of the protrusion (
FIG. 3 is a perspective view of the embodiment of the present invention showing a state in which a sheath with tension material inserted through the horizontal hole is inserted and placed. , FIG. 4 is a perspective view showing a state in which new concrete has been poured, and FIG. Concrete 1-,! It is an end view which shows another Example of the protrusion part of the Jj wall body. 1...Surface hole, 2...Concrete wall, 2a...Protrusion, 21 River...Horizontal hole, 3...
sheath, 4... tension material, 6... tension means, 7.
・・・Concrete, 8-

Claims (1)

【特許請求の範囲】 1)地中に複数枚のフンクリ−1単(1γ壁体を連続的
に打札継ぎ又は縦列状に連接して連続壁を形成すると共
に各コンクリートlit位壁体の一側面に干、下方向に
所要の長さを有する少なくとも1条の突起部を一体的に
突設形成し、該突起部に複数の水平穴を穿設すると共1
.−少なくとも相隣I)介ろコンクリート単位壁体の水
平穴が相互に略水平方向に整列するように配列せしめ、
これらの整列した水平穴にシースを挿設すると共に該シ
ー入内に1〕0鋼相等の緊張材を挿通してその両端部を
前記突起部に設けた定着及び緊張手段に各々取イ;1(
t′1、−の緊張材配置側壁面にコンクリートを打設し
、−れが硬化した後−に記緊張手段により緊張材に張力
をりえ、最後に−に記シー入内にグラウチングを施して
連続壁に横締め力を与えるようにしたことを特徴とする
地中連続壁の横締め方法。 1− 2)地中に複数枚のコ/クリ−1・単位壁体を連続的0
打ち継ぎ又は縦列状1こ連接して連続壁を形成すると共
に各コンクリー目11位壁体の一側面に上下方向に所要
の長さを有する少なくとも1条の突起部を一体的に突設
形成し該突起部に複数の水11L穴を穿設すると1(に
少なくとも相隣管)合うコンクリ−1・11i位壁体の
水平穴が相11−に略水平方向に整列するように配列せ
しめ、これらの整列した水平穴にPC@材等の緊張材を
挿通すると共にその両端部を上記突起部に設けた定着及
び緊張手段に各々取ト1け、該緊張手段により緊張材に
張力を!jえた状態でこの緊張材配置側壁面にコンクリ
ートを打設し、該フンクリ−1・が硬化した後−1−記
緊張手段を開放して連続壁に横締め力を与えるよう【こ
しすこことを特徴とケーる111u中連続壁の横締め方
[Scope of Claims] 1) A continuous wall is formed by connecting a plurality of Funkli-1 (1γ) walls in the ground in a continuous manner or in a column, and at the same time forming one concrete lit wall. At least one protrusion having a required length in the downward direction is integrally formed on the side surface, and a plurality of horizontal holes are bored in the protrusion.
.. - at least adjacent I) horizontal holes in the intervening concrete unit walls are arranged so as to be aligned with each other in a substantially horizontal direction;
A sheath is inserted into these aligned horizontal holes, and a tensioning material such as 1]0 steel is inserted into the sheath, and both ends of the tensioning material are attached to the fixing and tensioning means provided on the protrusion.
t'1, Concrete is placed on the side wall surface where the tendons are placed at -, and after the concrete has hardened, the tension is applied to the tendons using the tensioning means, and finally, grouting is carried out within the sheath at - and the concrete is continuous. A horizontal tightening method for an underground continuous wall characterized by applying horizontal tightening force to the wall. 1-2) Continuously install multiple co/cry-1 unit walls underground.
A continuous wall is formed by pouring or connecting one wall in a column, and at least one protrusion having a required length in the vertical direction is integrally formed on one side of each concrete wall. When a plurality of water holes 11L are drilled in the protrusion, horizontal holes in the concrete wall 1 and 11i that match 1 (at least adjacent pipes) are arranged so that they are aligned approximately horizontally with phase 11-. Insert a tensioning material such as PC@ material into the aligned horizontal holes, and attach both ends to the fixing and tensioning means provided on the projection, and use the tensioning means to apply tension to the tensioning material! Concrete is placed on the side wall surface where the tension material is placed in a state where the concrete is placed, and after the concrete has hardened, the tension means is released to apply horizontal tightening force to the continuous wall. Features and horizontal tightening method for 111u medium continuous wall
JP2188982A 1982-02-13 1982-02-13 Lateral compaction for underground continuous wall Granted JPS58138823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2188982A JPS58138823A (en) 1982-02-13 1982-02-13 Lateral compaction for underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2188982A JPS58138823A (en) 1982-02-13 1982-02-13 Lateral compaction for underground continuous wall

Publications (2)

Publication Number Publication Date
JPS58138823A true JPS58138823A (en) 1983-08-17
JPS6240485B2 JPS6240485B2 (en) 1987-08-28

Family

ID=12067670

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2188982A Granted JPS58138823A (en) 1982-02-13 1982-02-13 Lateral compaction for underground continuous wall

Country Status (1)

Country Link
JP (1) JPS58138823A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61242219A (en) * 1985-04-17 1986-10-28 Ohbayashigumi Ltd Construction of underground continuous wall
CN102943482A (en) * 2012-11-07 2013-02-27 中交第二航务工程局有限公司 Prefabricate abutment pre-tightening type sealing up cofferdam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS457170Y1 (en) * 1965-05-26 1970-04-08

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS457170Y1 (en) * 1965-05-26 1970-04-08

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61242219A (en) * 1985-04-17 1986-10-28 Ohbayashigumi Ltd Construction of underground continuous wall
CN102943482A (en) * 2012-11-07 2013-02-27 中交第二航务工程局有限公司 Prefabricate abutment pre-tightening type sealing up cofferdam

Also Published As

Publication number Publication date
JPS6240485B2 (en) 1987-08-28

Similar Documents

Publication Publication Date Title
JP2957779B2 (en) Construction method of precast structure and precast concrete member used for the construction
WO2016005941A1 (en) Structural strengthening system with internally anchored reinforcements by adherence
KR101356724B1 (en) Retaining walls and construction method thereof
JP2634381B2 (en) Split type box culvert and method of assembling the same
KR100815174B1 (en) Pipe Roof Tunnel and Constructing Method thereof
JPS58138823A (en) Lateral compaction for underground continuous wall
JP3676441B2 (en) Pit and construction method of basement using it
US5871307A (en) Pre-cast concrete panel wall
JP3251698B2 (en) Tunnel lining element and tunnel construction method using the same
JP2002061296A (en) Structure of joint and construction method therefor
JPH0610420A (en) Method for connecting precast concrete member
KR860003391A (en) Concrete wall forming method of underground structure using composite sheet pile and composite sheet pile as barrier plate
KR102586998B1 (en) Underground continuous wall panel with reinforced connection part and its construction method
KR100382300B1 (en) A fireproof reinforcement method by burying steel strand
NL1008594C2 (en) Building a floor by pouring concrete into foundation pit enclosed by dam walls
JPH0477764B2 (en)
JPH073777A (en) Method for constructing self-supporting land slide protection wall
JP2011099250A (en) Retaining wall using precast concrete member
KR100507729B1 (en) Process for setting up structures for excavation of underground
JPH1136334A (en) Cut-off structure in connection part of pc wall and floor slab concrete
JPH0931972A (en) Construction of underground continuous wall
JP3608175B2 (en) Yamadome method
JPS63261012A (en) Construction of joint of underground continuous wall
JPH0328414A (en) Execution method for joint part in continuous subterranean wall construction method
JPH0681352A (en) Connecting method for precast concrete member