JPS5810103A - Turbine controller - Google Patents

Turbine controller

Info

Publication number
JPS5810103A
JPS5810103A JP10709981A JP10709981A JPS5810103A JP S5810103 A JPS5810103 A JP S5810103A JP 10709981 A JP10709981 A JP 10709981A JP 10709981 A JP10709981 A JP 10709981A JP S5810103 A JPS5810103 A JP S5810103A
Authority
JP
Japan
Prior art keywords
turbine
speed
valve
pressure turbine
warming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10709981A
Other languages
Japanese (ja)
Other versions
JPS642762B2 (en
Inventor
Naganobu Honda
本田 永信
Hidesumi Kuwajima
桑島 英純
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP10709981A priority Critical patent/JPS5810103A/en
Publication of JPS5810103A publication Critical patent/JPS5810103A/en
Publication of JPS642762B2 publication Critical patent/JPS642762B2/ja
Granted legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith
    • F01D19/02Starting of machines or engines; Regulating, controlling, or safety means in connection therewith dependent on temperature of component parts, e.g. of turbine-casing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)

Abstract

PURPOSE:To enable to appropriately perform warming-up of a high-pressure turbine, by a method wherein the minute opening of a regulating valve for the warming-up of a high-pressure turbine is controlled on the basis of turbine speed, in starting an intermediate-pressure turbine in a thermo-electric power plant. CONSTITUTION:The controller 13 detects the turbine speed by a detector and controlls the regulating valve 2 and an intercept valve 5. Namely, at the time of starting the turbine, the opening of the regulating valve 2 is maintained to be constant when the turbine speed reaches a speed corresponding to the steam flow rate for warming-up. The turbine speed is so controlled as to reach a warming speed of 1000 rpm through the intercept valve 5 and the intermediate- pressure turbine 6. After the warming-up for the high-pressure turbine 3 is completed, the regulating valve 2 is opened. The intercept valve 5 is gradually opened by the deviation of speed, thereby maintaing the turbine speed to be constant.

Description

【発明の詳細な説明】 本発明はタービンバイパス系統を有した火力発電設備に
係り、特に中圧タービン起動を行なう場合に好適な高圧
タービンのウオーミング手法を提供することにある。中
圧タービンは、高圧タービンと比較し圧力の低い蒸気の
流入を可能としているため、中圧タービン起動はボイラ
の圧力が低いうちにタービンを起動出来、プラントの短
時間起動を実現するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a thermal power generation facility having a turbine bypass system, and an object of the present invention is to provide a high-pressure turbine warming method suitable for starting an intermediate-pressure turbine. Since intermediate pressure turbines allow the inflow of steam with lower pressure than high pressure turbines, intermediate pressure turbine startup allows the turbine to be started while the boiler pressure is low, achieving plant startup in a short time. .

高圧タービンのウオーミングを実施するには、高圧ター
ビンに流入する蒸気流量を微小量に保つこと、即ち、加
減弁を1%以下の微小開度に保つことが必要となるが、
加減弁の開き始め雇は蒸気条件等によシ変動するため、
弁開度を検出して微小流量を得る方式は起動のたびに同
一あ微小流量を安定して確保出来ないという欠点があっ
た。弁開度がずれて流量が少ない場合には高圧タービン
を充分に暖機することが出来ず、また、流量が流れ過ぎ
た場合には、中圧タービンへの流入蒸気を零にしても、
所定のタービン速度を超えてしまうことがある。
In order to warm the high-pressure turbine, it is necessary to keep the flow rate of steam flowing into the high-pressure turbine at a minute amount, that is, to keep the regulating valve at a minute opening of 1% or less.
The time at which the control valve begins to open varies depending on steam conditions, etc.
The method of obtaining a minute flow rate by detecting the valve opening has the disadvantage that it is not possible to stably secure the same minute flow rate each time the system is started. If the valve opening is off and the flow rate is low, the high-pressure turbine cannot be warmed up sufficiently, and if the flow rate is too high, even if the steam flowing into the intermediate-pressure turbine is reduced to zero,
The predetermined turbine speed may be exceeded.

一方、高圧タービイの出口圧力等を検出して流量を直接
検出する方式があるが、真空に近い圧力下での微小圧力
の変化を求めるのは定格負荷運転時はぼ定格圧力まで上
昇する場所であるため圧力検出器の精度面から困難であ
る。
On the other hand, there is a method that directly detects the flow rate by detecting the outlet pressure of a high-pressure turbine, but it is necessary to measure minute pressure changes under near-vacuum pressure at locations where the pressure rises to almost the rated pressure during rated load operation. This is difficult due to the accuracy of the pressure detector.

本発明は、加減弁の微小開度を蒸気条件の変動にかかわ
らず、確保する方式を提供することにある。
An object of the present invention is to provide a method for ensuring a minute opening of a control valve regardless of fluctuations in steam conditions.

本発明では、加減弁の微小開度に相当する流量をタービ
ン速度により検出して、蒸気条件などの変動による加減
弁開き始め点のずれ等が悪影響を与えないよう考慮して
いる。
In the present invention, the flow rate corresponding to the minute opening of the regulating valve is detected based on the turbine speed, and consideration is given to preventing a shift in the opening start point of the regulating valve due to fluctuations in steam conditions, etc. from having an adverse effect.

第1図はタービンバイパス系統を有する火力発電設備の
一例を示す。ボイラlにより発生した蒸気は加減弁2を
経て高圧タービン3に流入する。
FIG. 1 shows an example of a thermal power generation facility having a turbine bypass system. Steam generated by the boiler l flows into the high pressure turbine 3 via the control valve 2.

高圧タービン3で仕事した蒸気は再熱器4で再度加熱さ
れ、インターセプト弁5を経て中圧タービン6に流入す
る。蒸気は中圧タービン6、低圧タービン7で仕事をし
復水器8で水となる。タービンで仕事したエネルギは回
転トルクに変換され発電機9に送′られ、電力を発生さ
せる。バイパス系統としては高圧タービンを゛バイパス
させる高圧タービンバイパス弁10と中低圧タービンを
バイパスさせる低圧タービンバイパス弁11を設けてい
る。タービン制御装置13はタービンの速度を速度検出
器12で検出してタービン起動を制御するため加減弁2
.インターセプト弁5を開閉するものである。
The steam worked in the high pressure turbine 3 is heated again in the reheater 4 and flows into the intermediate pressure turbine 6 via the intercept valve 5. The steam performs work in an intermediate pressure turbine 6 and a low pressure turbine 7, and becomes water in a condenser 8. The energy worked by the turbine is converted into rotational torque and sent to the generator 9 to generate electric power. The bypass system includes a high-pressure turbine bypass valve 10 that bypasses the high-pressure turbine and a low-pressure turbine bypass valve 11 that bypasses the medium and low pressure turbines. The turbine control device 13 detects the speed of the turbine with a speed detector 12 and controls the startup of the turbine using a regulating valve 2.
.. It opens and closes the intercept valve 5.

タービン起動時は、加減弁2は全閉、インターセプト弁
は開となり、インターセプト弁の開度を調節することに
よジタービン速度を制御する。この場合高圧タービンバ
イパス弁10.中低圧タービンバイパス弁11は開状態
となっている。このようなタービン起動をコールド起動
で実施する場合には、加減弁2を微開して高圧タービン
3にわずかな蒸気を流して高圧タービンを暖ためる必要
がある。本発明ではこの加減弁2の微開状態を確認する
ためタービン速度をとらえている。第2図に以上のター
ビン起動時の加減弁、インターセプト弁の弁開度とター
ビン速度の関係を表わした。
When the turbine is started, the regulator valve 2 is fully closed and the intercept valve is open, and the turbine speed is controlled by adjusting the opening degree of the intercept valve. In this case high pressure turbine bypass valve 10. The medium and low pressure turbine bypass valve 11 is in an open state. When such a turbine startup is performed by cold startup, it is necessary to slightly open the regulating valve 2 to allow a small amount of steam to flow into the high-pressure turbine 3 to warm the high-pressure turbine. In the present invention, the turbine speed is measured in order to confirm the slightly open state of the regulating valve 2. FIG. 2 shows the relationship between the valve openings of the control valve and intercept valve and the turbine speed at the time of starting the turbine.

タービン起動時は最初加減弁2を開く。タービン速度が
ウオーミングに相当する蒸気流量の速度に達すると、加
減弁2による速度制御を止め、加減弁2の開度を一定に
保つ。一方、タービン速度はインターセプト弁を開する
ことによシ上昇する。
When starting the turbine, the regulator valve 2 is first opened. When the turbine speed reaches a steam flow rate corresponding to warming, speed control by the regulator valve 2 is stopped and the opening degree of the regulator valve 2 is kept constant. Meanwhile, the turbine speed is increased by opening the intercept valve.

ウオーミング速度1000R,PMに到達すると速度上
昇を止めて一定速度表なるようインターセプト弁を調整
する。高圧タービンが暖められてウオーミングが終了す
ると、加減弁を徐々に全閉方向に閉する。このときイン
ターセプト弁5は速度偏差によシ徐々に関し、タービン
速度を一定に維持する。
When the warming speed reaches 1000R, PM, the speed increase is stopped and the intercept valve is adjusted to maintain a constant speed. When the high-pressure turbine is warmed up and warming is completed, the regulator valve is gradually closed in the fully closed direction. The intercept valve 5 then gradually reacts to the speed deviation and maintains the turbine speed constant.

第3図、第4図は本発明の制御内容を示す制御系統図で
ある。第3図で目標速度発生部30は第2図のタ−ビン
起動を得るよう時間の経過とともに対応する速度相当信
号を出力するものである。
FIGS. 3 and 4 are control system diagrams showing control details of the present invention. In FIG. 3, a target speed generating section 30 outputs a corresponding speed equivalent signal over time so as to obtain the turbine start-up shown in FIG. 2.

タービン速度は速度検出器12で検出され偏差検出部3
1で目標速度発生部3oからの信号とつき合わされ、速
度偏差信号ΔNを得る。PI調節部32では偏差信号Δ
Nに対応した加減弁、インターセプト弁の操作量を決定
する。操作量は接点33.34を経て加減弁開度調節部
35、インターセプト弁開度調節部36に加えられ、加
減弁2、インターセプト弁5を開閉する。第4図のリレ
ー回路でウオーミングを実施する場合にはリレーX1が
励磁され、第3図の接点33がONし接点34flOF
Fする。この結果、加減弁2にてタービン速度を上昇さ
れる。タービン速度が20ORPMに到達すると第4図
の接点Bが0FFL’Jレー・Xlは解磁され、第3図
の接点33はOF F。
The turbine speed is detected by the speed detector 12 and the deviation detector 3
1, it is compared with the signal from the target speed generator 3o to obtain a speed deviation signal ΔN. In the PI adjustment section 32, the deviation signal Δ
Determine the operation amount of the control valve and intercept valve corresponding to N. The manipulated variable is applied to the control valve opening adjustment section 35 and the intercept valve opening control section 36 through contacts 33 and 34, thereby opening and closing the control valve 2 and the intercept valve 5. When performing warming with the relay circuit shown in Fig. 4, relay X1 is excited, contact 33 shown in Fig. 3 is turned on, and contact 34flOF
F. As a result, the turbine speed is increased by the regulator valve 2. When the turbine speed reaches 20 ORPM, contact B in FIG. 4 is demagnetized, and contact 33 in FIG. 3 is OFF.

接点34はONとなシ、タービン速度はインターセプト
弁5により制御され、加減弁2は一定開度に保たれる。
The contact point 34 is kept ON, the turbine speed is controlled by the intercept valve 5, and the regulating valve 2 is kept at a constant opening.

インターセプト弁によシ昇速しでウオーミング速度11
000RPに達すると速度は保持される。タービンのメ
タ次が暖ま・る時間を経過するとウオーミング完了条件
が成立し第4図の接点CがONしてリレーX2が励磁さ
れる。X2が励磁されると第3図の接点38がoNし、
閉信号発生部37からの閉操作信号が加減弁調節部35
に印加し、加減弁を閉する。この間、加減弁が閉じたこ
とによる速度の低下を検出し、その低下を補償するため
PI調節部j2、インターセプト弁開度調節部36を経
てインターセプト弁5を開する。加減弁2が全閉すると
第4図の接点りがOFFしリレーX2が解磁され、第3
図の接点38がOFFして加減弁の閉操作は完了する。
Warming speed 11 by increasing speed by intercept valve
Once 000RP is reached, the speed is maintained. When the time for the turbine to warm up has elapsed, the warming completion condition is satisfied, contact C in FIG. 4 is turned on, and relay X2 is energized. When X2 is excited, the contact 38 in FIG. 3 turns on,
A closing operation signal from the closing signal generating section 37 is sent to the control valve adjusting section 35.
and close the control valve. During this time, a decrease in speed due to the closing of the control valve is detected, and in order to compensate for the decrease, the intercept valve 5 is opened via the PI adjustment section j2 and the intercept valve opening adjustment section 36. When the regulator valve 2 is fully closed, the contact shown in Fig. 4 turns OFF, the relay X2 is demagnetized, and the third
The contact 38 shown in the figure turns OFF and the closing operation of the control valve is completed.

以上の一連の操作によシ高圧タービンウオーミングに必
要な加減弁の微小開度を確保し、ウオーミング完了後は
速やかに加減弁を全閉出来る。
Through the above series of operations, the minute opening degree of the regulator valve necessary for high-pressure turbine warming is ensured, and the regulator valve can be fully closed immediately after warming is completed.

一方、本発明はコンピュータを活用しても同様に実施出
来る。コンピュータを使用した実施例のフローチャート
を第5図に示す。同図でPcv  。
On the other hand, the present invention can be similarly implemented using a computer. A flowchart of an embodiment using a computer is shown in FIG. In the same figure, Pcv.

PICVは各々、加減弁、インターセプト弁の開度信号
、ΔN+は今回サンプリングの速度偏差、ΔN+−1は
前回サンプリングの速度偏差、KP。
PICV is the opening signal of the control valve and intercept valve, ΔN+ is the speed deviation of the current sampling, ΔN+-1 is the speed deviation of the previous sampling, and KP.

Ktはそれぞれ、比例、積分のゲインを示す。またΔP
は閉操作量を示す。
Kt indicates proportional and integral gains, respectively. Also ΔP
indicates the closing operation amount.

本発明は、インターセプト弁によるタービン速度制御時
、高圧タービンのウオーミングのために要する微小流量
に相当する加減弁の微小開度を得るため、その微小流量
に相当するタービン速度を検出することによシ開度を求
める方式をとっている。このため蒸気条件の変動、ある
いは加減弁の開き始め位置がずれても確実に加減弁の弁
開度を求めることが出来る効果がある。
When controlling the turbine speed using an intercept valve, the present invention detects the turbine speed corresponding to the minute flow rate in order to obtain a minute opening of the regulator valve that corresponds to the minute flow rate required for warming the high-pressure turbine. A method is used to determine the degree of opening. Therefore, even if the steam conditions change or the opening position of the control valve shifts, the opening degree of the control valve can be determined reliably.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明のシステム構成を、第2図はタービン起
動曲線を示す。第3図は本発明の一実施例を示す制御系
統図、第4図は一実施例を示すリレー回路、第5図は計
算機を使用したフローチャートの例を示す。 1・・・ボイラ、2・・・加減弁、3・・・高圧タービ
ン、4再熱器、5・・・インターセプト弁、6・・・中
圧タービン、7・・・低圧タービン、8・・・復水器、
9・・・発電機、10・・・高圧タービンバイパス弁、
11・・・中低圧タービンバイパス弁、12・・・速度
検出器、13・・・タービン制御装置、30・・・目標
速度発生部、31・・・偏差検出部、32・・・PI調
節部、33,34゜38・・・接点、35・・・加減弁
開度調節部、36・・・イ茅2躬 ′113図
FIG. 1 shows the system configuration of the present invention, and FIG. 2 shows the turbine startup curve. FIG. 3 is a control system diagram showing one embodiment of the present invention, FIG. 4 is a relay circuit showing one embodiment, and FIG. 5 is an example of a flowchart using a computer. DESCRIPTION OF SYMBOLS 1...Boiler, 2...Adjustment valve, 3...High pressure turbine, 4...Reheater, 5...Intercept valve, 6...Intermediate pressure turbine, 7...Low pressure turbine, 8...・Condenser,
9... Generator, 10... High pressure turbine bypass valve,
DESCRIPTION OF SYMBOLS 11... Medium and low pressure turbine bypass valve, 12... Speed detector, 13... Turbine control device, 30... Target speed generation part, 31... Deviation detection part, 32... PI adjustment part , 33, 34゜38...Contact, 35...Adjustment valve opening adjustment part, 36...I-2'113

Claims (1)

【特許請求の範囲】[Claims] l・ボイラからの蒸気が加減弁を経て高圧タービンに流
入し、さらに再熱器、インターセプト弁を経て中圧ター
ビンに流入する発電設備において、高圧ターヒン、中低
圧タービンをバイパススルバイパス弁をそれぞれ具備し
、タービン起動時はインターセプト弁によジタービン速
度を制御すると同時に、高圧)−ビンのウオーミングの
ための加減弁の微小開度をタービン速度に応じて定める
ことを特徴としたタービン制御装置。
In power generation equipment where steam from the boiler flows into the high-pressure turbine through a control valve, and then into the medium-pressure turbine through the reheater and intercept valve, the high-pressure turbine and medium-low pressure turbine are each equipped with bypass valves. When the turbine is started, the turbine speed is controlled by an intercept valve, and at the same time, the minute opening degree of the control valve for warming the high pressure bottle is determined according to the turbine speed.
JP10709981A 1981-07-10 1981-07-10 Turbine controller Granted JPS5810103A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10709981A JPS5810103A (en) 1981-07-10 1981-07-10 Turbine controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10709981A JPS5810103A (en) 1981-07-10 1981-07-10 Turbine controller

Publications (2)

Publication Number Publication Date
JPS5810103A true JPS5810103A (en) 1983-01-20
JPS642762B2 JPS642762B2 (en) 1989-01-18

Family

ID=14450429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10709981A Granted JPS5810103A (en) 1981-07-10 1981-07-10 Turbine controller

Country Status (1)

Country Link
JP (1) JPS5810103A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61115561A (en) * 1984-11-09 1986-06-03 オ−ジ−技研株式会社 Low temperature air generator built-in type low temperature treatment apparatus
JPH01313605A (en) * 1988-06-10 1989-12-19 Mitsubishi Heavy Ind Ltd Combined power generating set
JPH0346012A (en) * 1989-07-13 1991-02-27 Hitachi Ltd Turbine controller
JP2003535251A (en) * 2000-05-31 2003-11-25 シーメンス アクチエンゲゼルシヤフト Operating method and device for no-load or light-load operation of multi-stage steam turbine

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54102A (en) * 1977-06-03 1979-01-05 Hitachi Ltd Turbine starting system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54102A (en) * 1977-06-03 1979-01-05 Hitachi Ltd Turbine starting system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61115561A (en) * 1984-11-09 1986-06-03 オ−ジ−技研株式会社 Low temperature air generator built-in type low temperature treatment apparatus
JPS6344372B2 (en) * 1984-11-09 1988-09-05 Oji Giken Kk
JPH01313605A (en) * 1988-06-10 1989-12-19 Mitsubishi Heavy Ind Ltd Combined power generating set
JPH0346012A (en) * 1989-07-13 1991-02-27 Hitachi Ltd Turbine controller
JP2003535251A (en) * 2000-05-31 2003-11-25 シーメンス アクチエンゲゼルシヤフト Operating method and device for no-load or light-load operation of multi-stage steam turbine
JP4707927B2 (en) * 2000-05-31 2011-06-22 シーメンス アクチエンゲゼルシヤフト Operation method and apparatus for multi-stage steam turbine during no-load or light-load operation

Also Published As

Publication number Publication date
JPS642762B2 (en) 1989-01-18

Similar Documents

Publication Publication Date Title
JPS5810103A (en) Turbine controller
JPS60222511A (en) Thermal power generating equipment
JP2013217200A (en) Steam turbine plant
JPH04148002A (en) Prewarming method for steam turbine
JPS61145305A (en) Control device for turbine plant using hot water
JP2918743B2 (en) Steam cycle controller
JPS5865910A (en) Turbine controller
JPS63162907A (en) Control for combined power generation plant
JPH0337304A (en) Start of steam turbine generation plant provided with turbine bypass device
JPH03267509A (en) Control method of reheating steam turbine
JPS60228711A (en) Turbine bypass control device for combined cycle electric power plant
JPH0772491B2 (en) Pre-warming device for steam turbine
JP2554704B2 (en) Turbine controller
SU1710788A1 (en) Switching and warm-up method for high-pressure heater of steam-turbine plant
JPH11351503A (en) Pressure control valve for boiler and device therefor
JPH0128202B2 (en)
JPH01190903A (en) Cooling steam temperature controller for steam turbine
JPS5846644B2 (en) Steam turbine control device
JPS6198908A (en) Steam turbine device
JPH0440527B2 (en)
JP2558869B2 (en) Turbine controller
JPH108912A (en) Turbine bypass valve control device
JPS6229602Y2 (en)
JPS6355309A (en) Device for controlling steam turbine
JPS63120806A (en) Turbine control device