JPS5622817A - Highly strong prestressed concrete pile - Google Patents
Highly strong prestressed concrete pileInfo
- Publication number
- JPS5622817A JPS5622817A JP9955779A JP9955779A JPS5622817A JP S5622817 A JPS5622817 A JP S5622817A JP 9955779 A JP9955779 A JP 9955779A JP 9955779 A JP9955779 A JP 9955779A JP S5622817 A JPS5622817 A JP S5622817A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- prestressed
- prestressed concrete
- concrete pile
- deformed bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
PURPOSE: To increase the final strength of a prestressed concrete pile after the generation of cracks in the concrete by embedding in the prestressed concrete pile a plurality of deformed bars in parallel with prestressed concrete steel materials.
CONSTITUTION: The highly strong prestressed concrete pile is prepared by the pretensioning system: Prestressed concrete steel material 1..., spiral hoop reinforcement 2, deformed bars 4... are cagelikely arranged, then with tensile forced applied to the prestressed concrete steel materials 1, concrete 3 is placed, and after the concrete 3 has hardened, the tensile force is removed from the prestressed concrete steel materials 1, to allow the concrete 3 to be prestressed. Thereby, since the deformed bars 4... and the concrete 3 are stuck to each other, the deformed bars 4 are also prestressed. Consequently, if the stress previously applied to the concrete 3 has decreased, the prestressed concrete pile still has been sufficiently prestressed as the whole.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9955779A JPS5622817A (en) | 1979-08-03 | 1979-08-03 | Highly strong prestressed concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9955779A JPS5622817A (en) | 1979-08-03 | 1979-08-03 | Highly strong prestressed concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5622817A true JPS5622817A (en) | 1981-03-04 |
Family
ID=14250451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9955779A Pending JPS5622817A (en) | 1979-08-03 | 1979-08-03 | Highly strong prestressed concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5622817A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57100022A (en) * | 1980-12-12 | 1982-06-22 | Takechi Komusho Kk | Composite concrete pile |
JPS61216924A (en) * | 1985-03-22 | 1986-09-26 | Ube Ind Ltd | Superhigh-strength concrete pile |
JPS62196236U (en) * | 1986-05-30 | 1987-12-14 | ||
CN103306282A (en) * | 2013-06-13 | 2013-09-18 | 中铁隧道集团有限公司 | Prestressed concrete pile configured with reinforced bars in sections and construction method |
JP2019073907A (en) * | 2017-10-16 | 2019-05-16 | 日本コンクリート工業株式会社 | Reinforced concrete pile and manufacturing method of the same |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4716541U (en) * | 1971-03-26 | 1972-10-26 | ||
JPS4721926U (en) * | 1971-03-06 | 1972-11-11 | ||
JPS4721927U (en) * | 1971-03-01 | 1972-11-11 | ||
JPS4738004U (en) * | 1971-06-03 | 1972-12-27 | ||
JPS48172U (en) * | 1971-05-22 | 1973-01-05 | ||
JPS4826820U (en) * | 1971-07-31 | 1973-03-31 |
-
1979
- 1979-08-03 JP JP9955779A patent/JPS5622817A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4721927U (en) * | 1971-03-01 | 1972-11-11 | ||
JPS4721926U (en) * | 1971-03-06 | 1972-11-11 | ||
JPS4716541U (en) * | 1971-03-26 | 1972-10-26 | ||
JPS48172U (en) * | 1971-05-22 | 1973-01-05 | ||
JPS4738004U (en) * | 1971-06-03 | 1972-12-27 | ||
JPS4826820U (en) * | 1971-07-31 | 1973-03-31 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57100022A (en) * | 1980-12-12 | 1982-06-22 | Takechi Komusho Kk | Composite concrete pile |
JPH023846B2 (en) * | 1980-12-12 | 1990-01-25 | Takechi Komusho Kk | |
JPS61216924A (en) * | 1985-03-22 | 1986-09-26 | Ube Ind Ltd | Superhigh-strength concrete pile |
JPH0420444B2 (en) * | 1985-03-22 | 1992-04-02 | Ube Industries | |
JPS62196236U (en) * | 1986-05-30 | 1987-12-14 | ||
JPH0545627Y2 (en) * | 1986-05-30 | 1993-11-24 | ||
CN103306282A (en) * | 2013-06-13 | 2013-09-18 | 中铁隧道集团有限公司 | Prestressed concrete pile configured with reinforced bars in sections and construction method |
CN103306282B (en) * | 2013-06-13 | 2015-10-14 | 中铁隧道集团有限公司 | The prestressed concrete pile of subsection reinforcement and construction method |
JP2019073907A (en) * | 2017-10-16 | 2019-05-16 | 日本コンクリート工業株式会社 | Reinforced concrete pile and manufacturing method of the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ladeveze et al. | Damage and fracture of tridirectional composites | |
JPS646442A (en) | Prestressed concrete member using lattice like reinforcing bar and its production | |
JPS5622817A (en) | Highly strong prestressed concrete pile | |
ATA425879A (en) | CONCRETE REINFORCING BAR, ESPECIALLY ANCHOR BAR, AND METHOD FOR THE PRODUCTION THEREOF | |
JPS5774432A (en) | Construction method for sheathing structure | |
EP0115769A2 (en) | Peripherally stressed composite structural units | |
Dahl | Influence of fibre reinforcement on plastic shrinkage and cracking | |
JPS55152226A (en) | Concrete structure and its manufacture | |
JPS5748020A (en) | Removal anchor method and removal anchor | |
JPS554487A (en) | Foundation pile | |
JPS6429552A (en) | Flat slab | |
JPS5712730A (en) | Foundation work employing a precast reinforced concrete foundation beam | |
JPS6433317A (en) | Concrete formwork | |
JPS5774433A (en) | Building method for slope frame and forms for slope frame building | |
GB596678A (en) | Improvements in and relating to the manufacture of reinforced concrete | |
EP0273541A3 (en) | A structure and method for stabilising sloping ground | |
JPS55111528A (en) | Base formation method | |
JPS57209322A (en) | Concrete-steel pipe composite pile | |
SHARPE | Experimental studies of coldworked fastener holes[Final Report, 1 Mar. 1975- 31 Dec. 1977] | |
JPS5520811A (en) | Underground construction and method of building the same | |
FR2381150A1 (en) | Prestressed reinforced curved concrete shell construction - involves continuously stressing rods across spaced abutments on formwork | |
JPS5758724A (en) | In-situ prestressed concrete pile construction work | |
JPS53116604A (en) | Prestressed concrete sleeper | |
JPS55138513A (en) | Built-up anchor | |
Mroz | Damage model for hardening and softening material in general state of stress |