JPS5616734A - Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil - Google Patents

Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil

Info

Publication number
JPS5616734A
JPS5616734A JP9310379A JP9310379A JPS5616734A JP S5616734 A JPS5616734 A JP S5616734A JP 9310379 A JP9310379 A JP 9310379A JP 9310379 A JP9310379 A JP 9310379A JP S5616734 A JPS5616734 A JP S5616734A
Authority
JP
Japan
Prior art keywords
pillar
steel pipe
steel
pile
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9310379A
Other languages
Japanese (ja)
Inventor
Shorokuro Suzuki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP9310379A priority Critical patent/JPS5616734A/en
Publication of JPS5616734A publication Critical patent/JPS5616734A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE: To enable to build a rigid plate on the floors above the ground employing a steel pipe pillar prior to the formation of the foundamental topographic features so that a hinge foundation is formed on the steel pillar base projecting from the surface of the plate to receive the hinge terminal of the pillar base for the floors above the ground.
CONSTITUTION: The working subsurface 1 is formed within the site of the sheathing steel sheet pile S. The steel pile P is erected through the eccentricity preventor g having the pillar core fixed thereon and then, pressed down discharging sand and soil in the pipe. Subsequently, the steel pipe pillar C is joined thereon. The steel pipe pile is driven down to the gravel layer 6 and then, the steel pipe pillar C thus driven is cut so flush at the beam forming portion of the first floor that the beam receiving connection B is mounted thereon. After the hinge carrier 5 is mounted to receive the hinge terminal 4, concrete is cast to form a steel pipe-concrete compound pillar. Thereafter, the floor is formed supported by the sheathing steel pile S and the steel pipe pillar piles P,C. The construction is performed for the basement and floors above the ground with said floor as the working base.
COPYRIGHT: (C)1981,JPO&Japio
JP9310379A 1979-07-21 1979-07-21 Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil Pending JPS5616734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9310379A JPS5616734A (en) 1979-07-21 1979-07-21 Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9310379A JPS5616734A (en) 1979-07-21 1979-07-21 Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil

Publications (1)

Publication Number Publication Date
JPS5616734A true JPS5616734A (en) 1981-02-18

Family

ID=14073180

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9310379A Pending JPS5616734A (en) 1979-07-21 1979-07-21 Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil

Country Status (1)

Country Link
JP (1) JPS5616734A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299019A (en) * 1997-04-28 1998-11-10 Ohbayashi Corp Joining method for permanent sub-structural column and main steel in inverted construction method
CN109826190A (en) * 2019-02-15 2019-05-31 深圳市市政工程总公司 The construction method of pile integral structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299019A (en) * 1997-04-28 1998-11-10 Ohbayashi Corp Joining method for permanent sub-structural column and main steel in inverted construction method
CN109826190A (en) * 2019-02-15 2019-05-31 深圳市市政工程总公司 The construction method of pile integral structure

Similar Documents

Publication Publication Date Title
US4570398A (en) Sprayed concrete basement structure
CN105735354A (en) Covered-excavation full-top-down construction method of municipal underground engineering
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
JP3107716B2 (en) Soil retaining wall
JPS5616734A (en) Construction of multistoried building employing hinge base topographic feature on alluvium deposit subsoil
JP3150612B2 (en) Foundation for low-rise buildings
JPS62288269A (en) Method for extending underground stair of building
JP3702435B2 (en) How to build the foundation
JPS5774435A (en) Construction method for basement
JP2508852B2 (en) How to build an underground structure
JPH0721196B2 (en) Reverse construction method of underground structure
JP3099040B2 (en) Embankment culvert
JPS5919204B2 (en) Underground excavation method
SU1788151A1 (en) Method of erecting retaining wall
JPS5530039A (en) Method for constructing underground structures
DeJong et al. Heave and settlement of two tall building foundations in Edmonton, Alberta
RU2056478C1 (en) Method for reinforcing bases and foundations on sagging ground in hindered conditions
JPH0156215B2 (en)
JP3567387B2 (en) How to build an underground skeleton
JPH08291529A (en) Underground floor construction method
JPS6160928A (en) Method of preventing uneven sinking of housing
JP3593752B2 (en) Retaining wall structure and built flat land structure or built road structure on steep slopes
JPS61261528A (en) Retaining wall with sheathing plate
JP2810602B2 (en) Foundation construction method
JP3108898B2 (en) Construction method of underground structure by reverse construction method