JPS5487380A - Fuel rod manufacturing method - Google Patents
Fuel rod manufacturing methodInfo
- Publication number
- JPS5487380A JPS5487380A JP15355677A JP15355677A JPS5487380A JP S5487380 A JPS5487380 A JP S5487380A JP 15355677 A JP15355677 A JP 15355677A JP 15355677 A JP15355677 A JP 15355677A JP S5487380 A JPS5487380 A JP S5487380A
- Authority
- JP
- Japan
- Prior art keywords
- cladding tube
- pellets
- fuel rod
- inspection
- effected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
PURPOSE: To inspect the whole outer diameters of UO2 pellets and the whole inner diameters of a cladding tube, by means of inserting into the cladding tube previously before an inspecting tool which meansures the outer diameter of the pellets is inserted into an opening end of the cladding tube.
CONSTITUTION: An empty fuel rod which is welded with a lower end plug 7 and a cladding tube 8, is first put on the UO2 pellet inserting stand. Then, a coil spring 5 is inserted and thereafter an inspection tool 40 is mounted on the upper step of the cladding tube. At this time, the inspection of the inner diameter of the cladding tube is effected. Thereafter, UO2 pellet 3 whose weight measurement was finished, is inserted into the cladding tube. At this time, the inspection of the outer diameters of the UO2 pellets is effected on the total pellets to be inserted into the cladding tube. After the pellets loading being finished, an inner spring 4 and getters are inserted into the fuel rod, and the fuel rod is completed by means of welding the upper end plug.
COPYRIGHT: (C)1979,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15355677A JPS5487380A (en) | 1977-12-22 | 1977-12-22 | Fuel rod manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15355677A JPS5487380A (en) | 1977-12-22 | 1977-12-22 | Fuel rod manufacturing method |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5487380A true JPS5487380A (en) | 1979-07-11 |
Family
ID=15565074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15355677A Pending JPS5487380A (en) | 1977-12-22 | 1977-12-22 | Fuel rod manufacturing method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5487380A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0294888U (en) * | 1989-01-12 | 1990-07-27 | ||
JP2011047745A (en) * | 2009-08-26 | 2011-03-10 | Nuclear Fuel Ind Ltd | Orifice mask |
CN103280246A (en) * | 2013-05-23 | 2013-09-04 | 中国科学院合肥物质科学研究院 | Liquid heavy metal cooling reactor fuel element |
-
1977
- 1977-12-22 JP JP15355677A patent/JPS5487380A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0294888U (en) * | 1989-01-12 | 1990-07-27 | ||
JP2011047745A (en) * | 2009-08-26 | 2011-03-10 | Nuclear Fuel Ind Ltd | Orifice mask |
CN103280246A (en) * | 2013-05-23 | 2013-09-04 | 中国科学院合肥物质科学研究院 | Liquid heavy metal cooling reactor fuel element |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0361891A3 (en) | Apparatus for assembling and welding end plugs to nuclear fuel cladding tubes and inspecting the end plug welds on an automated basis | |
ZA200602341B (en) | Method and device for the conditioning of unsealed nuclear fuel rods for the transport and long-term storage or ware-housing thereof | |
JPS56650A (en) | Method and device for inspecting fuel rod for nuclear reactor | |
JPS5487380A (en) | Fuel rod manufacturing method | |
GB2003778B (en) | Apparatus for welding an end plug in a nuclear fuel tube | |
JPS6222877Y2 (en) | ||
ES2007833A6 (en) | Apparatus for loading fuel rods into grids of nuclear fuel assemblies | |
JP3310098B2 (en) | Apparatus and method for loading nuclear fuel pellets into cladding | |
DE68920203D1 (en) | Device for welding an end plug with a reduced diameter shoulder to the tube of a combustible neutron absorber rod. | |
JPH0536140B2 (en) | ||
陈国兴 et al. | Advances in Soil Liquefaction Triggering Procedures during Earth-quakes: Retrospect and Prospect | |
CN109521034B (en) | X-ray detection compensation block and detection method for welding line at end part of fuel rod | |
JPS6319036B2 (en) | ||
JP2619196B2 (en) | Inspection system for pressurized hole of nuclear fuel rod end plug | |
JPS5595802A (en) | Method and device for measurement of effective inner diameter of tube buried under ground | |
JPS5340184A (en) | Manufacturing method of fuel rod | |
JPS5438489A (en) | Fuel rod | |
JPS54124186A (en) | Fuel element | |
CN210374816U (en) | Device for testing tensile property of nonel detonator | |
JPS5554293A (en) | Assembling method of nuclear fuel rod | |
JPS5487391A (en) | Detecting method of fuel rod sealed with tugged gas | |
JPS5447085A (en) | Manufacturing method of end plug of nuclear fuel rod | |
JPH06160580A (en) | Upper end plug for simulated fuel rod | |
JP2975360B1 (en) | Irradiated test piece spacer | |
JPS5438488A (en) | Fuel rod of reactor |