JPH1181242A - Precast block installation device - Google Patents

Precast block installation device

Info

Publication number
JPH1181242A
JPH1181242A JP25433097A JP25433097A JPH1181242A JP H1181242 A JPH1181242 A JP H1181242A JP 25433097 A JP25433097 A JP 25433097A JP 25433097 A JP25433097 A JP 25433097A JP H1181242 A JPH1181242 A JP H1181242A
Authority
JP
Japan
Prior art keywords
truss
support
precast block
bridge
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP25433097A
Other languages
Japanese (ja)
Inventor
Tadahiko Tawara
忠彦 田原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Original Assignee
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Miike Machinery Co Ltd, Mitsui Miike Engineering Corp filed Critical Mitsui Miike Machinery Co Ltd
Priority to JP25433097A priority Critical patent/JPH1181242A/en
Publication of JPH1181242A publication Critical patent/JPH1181242A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To eliminate the need to provide a rail along the overall length of a bridge surface, for running a truck provided at a rear support, when moving an installation truss forward; to prevent lifting of the rear support of the truss during movement; and to eliminate the need to reinforce a bridge body for receiving the reaction of the rear support traveling on the bridge surface during movement. SOLUTION: A precast block installation device includes: a truss 5, which has a longitudinally extending track 4 provided on its lower surface and which has a front support 2 and a rear support 3 suspended, respectively, from the front and rear ends of the lower surface; a first moving support 5 suspended over the track 4 in such a way as to be able to travel; and a second moving support 7 hungs on a trolley and suspended over the track 4 in such a way as to be able to travel. The precast block installation device has a rail 10 arranged on a bridge surface 8 and on which a truck 9 provided below the rear support 3 travels.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明が属する技術分野】本発明は、プレキャストブロ
ック橋におけるプレキャストブロック架設装置に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast block erection apparatus for a precast block bridge.

【0002】[0002]

【従来の技術】従来、工事の簡略化と工期の短縮化とを
図る目的で所定の間隔で立設された複数の橋脚間にプレ
キャストブロックを順次、継ぎ合わせて橋を形成するプ
レキャストブロック橋が構築されている。
2. Description of the Related Art Conventionally, there has been a precast block bridge in which precast blocks are sequentially joined to form a bridge between a plurality of piers erected at predetermined intervals for the purpose of simplifying construction and shortening the construction period. Has been built.

【0003】そして、プレキャストブロックを架設する
手段の一つとして、架設用トラスを用いたものが知られ
ている。
[0003] As one of means for erection of the precast block, one using a truss for erection is known.

【0004】この方法は、例えば図3(a)に示すよう
に、架設用トラス1aは、ブロックが通過可能な後方支
柱2aおよび中央支柱3aが備えられているとともに、
前方には仮支柱4aが備えられており、後方支柱2a、
新しく施工された張出し部先端近くの中央支柱3aおよ
び次の橋脚5aの前端にある仮支柱4a上の支持具6a
に取り付けられてプレキャストブロックを架設する。
In this method, as shown in FIG. 3A, for example, the erection truss 1a includes a rear support 2a and a central support 3a through which blocks can pass.
A temporary support 4a is provided at the front, and a rear support 2a,
The newly installed support 6a on the central column 3a near the tip of the overhang and the temporary column 4a at the front end of the next pier 5a
Is mounted on a precast block.

【0005】そして、プレキャストブロックの架設に伴
って架設用トラス1aを前方に移動させるには、後方支
柱2aと、橋脚5aの頂部に固定されている移動用の鋼
製フレーム7aに剛結されている運搬用トロリーと橋面
に配置されたレール上を走行する後方支柱2aに備えた
台車に載せて図3(b)から図3(c)に示すように進
ませ、新たなプレキャストブロックの架設を行うもので
ある。
In order to move the erection truss 1a forward with the erection of the precast block, the truss 1a is rigidly connected to the rear strut 2a and the moving steel frame 7a fixed to the top of the pier 5a. 3 (b) to 3 (c) on a carriage provided on a rear trolley 2a running on rails arranged on a bridge surface and a transport trolley, and erection of a new precast block Is what you do.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、前記従
来のプレキャストブロックの架設手段によれば、架設用
トラス1aを前方に移動させる際に、後方支柱2aに備
えた台車を走行させるためのレールを橋面の全長に亙っ
て設ける必要があり作業が煩雑であるとともに、移動時
に架設用トラス1aの後方支柱2aに浮き上がりが生じ
て不安定であり、また、移動の際に橋面を走行する後方
支柱2aの反力が橋体の全長に亙って作用するので橋体
における架設用荷重を考慮する結果、橋体の断面積を増
加させるなどして橋体の強度を高めなければならず経済
的にも問題がある。
However, according to the conventional precast block erection means, when the erection truss 1a is moved forward, the rail for moving the bogie provided on the rear support 2a is connected to the bridge. The truss must be provided over the entire length of the surface and the work is complicated, and at the time of movement, the rear support 2a of the erection truss 1a rises up and is unstable. Since the reaction force of the column 2a acts over the entire length of the bridge, the load for erection of the bridge is taken into account, and as a result, the strength of the bridge must be increased by increasing the cross-sectional area of the bridge. There is also a problem.

【0007】[0007]

【課題を解決するための手段】本発明は、前記従来の架
設用トラスを用いたプレキャストブロックを架設する手
段が有する問題点を解決するためになされたものであっ
て、下面に長さ方向へ延びる軌道が設けられているとと
もに前記下面の前後端部に前方支柱および後方支柱がそ
れぞれ垂設されたトラスと、前記軌道に走行可能に懸装
された第1の移動支柱および前記軌道に走行可能に懸装
されたトロリーに吊り下げられた第2の移動支柱と、橋
面に配置されて前記後方支柱の下方に備えられた台車が
走行するレールとを有することを特徴とする
SUMMARY OF THE INVENTION The present invention has been made in order to solve the problems of the conventional means for erection of a precast block using an erection truss. A truss provided with an extending track and having a front support and a rear support provided at front and rear ends of the lower surface, respectively; a first movable support suspended on the track and capable of running on the track; A second moving support suspended from a trolley suspended in the vehicle, and a rail arranged on a bridge surface and provided with a bogie provided below the rear support on which the truck travels.

【0008】また、前記構成において第1および第2の
移動支柱が、旋回可能且つトラスの幅方向に移動可能で
あると更に好ましい。
[0008] In the above structure, it is further preferable that the first and second movable struts are pivotable and movable in the width direction of the truss.

【0009】[0009]

【発明の実施の形態】次に本発明の実施の形態を図面に
基づいて説明する。
Embodiments of the present invention will now be described with reference to the drawings.

【0010】図1および図2は本発明の実施の形態の一
つを示すものであり、プレキャストブロック架設装置1
は、図1に示すように主として、下面の前端部および後
端部には前方支柱2および後方支柱3がそれぞれ垂設さ
れているとともに下面に長さ方向に延びる軌道4を有す
るトラス5と、軌道4に走行可能に懸装される第1の移
動支柱6と軌道4に走行可能に懸装されるトロリー(図
示せず)に吊り下げられる第2の移動支柱7と、橋面8
に配置されて前記後方支柱3の下方に備えられた台車9
が走行するレール10とから構成される。
FIGS. 1 and 2 show one embodiment of the present invention.
As shown in FIG. 1, a truss 5 mainly having a front strut 2 and a rear strut 3 respectively suspended at a front end and a rear end of a lower surface, and having a track 4 extending in a length direction on the lower surface, A first moving post 6 movably suspended on the track 4, a second moving post 7 suspended on a trolley (not shown) movably suspended on the track 4, and a bridge surface 8
Truck 9 arranged below and provided below the rear support 3
The rail 10 travels.

【0011】また、第1の移動支柱6は、軌道4の下面
に長さ方向に亙って設けられたラックに噛合うピニオン
を有する駆動装置を有している(図示せず)。
The first moving support 6 has a drive unit (not shown) having a pinion that meshes with a rack provided on the lower surface of the track 4 over the length thereof.

【0012】更に、第1の移動支柱6の下端には橋脚へ
の仮止装置が選択的に連結可能とされる。
Further, a temporary fixing device to the pier can be selectively connected to the lower end of the first movable support column 6.

【0013】一方、第2の移動支柱7は、軌道4の下面
に長さ方向に亙って設けられたラックに噛合うピニオン
を有する駆動装置を有するトロリー(図示せず)に吊り
下げられており、下端にプレキャストブロックの吊下げ
装置または橋脚への仮止装置が連結可能とされている。
On the other hand, the second moving column 7 is suspended from a trolley (not shown) having a drive unit having a pinion that meshes with a rack provided on the lower surface of the track 4 over the length thereof. At the lower end, a suspension device for the precast block or a temporary fixing device to the pier can be connected.

【0014】以上の構成を有する発明の実施の形態を用
いてプレキャストブロック橋を構築するには、図2
(a)に示すように、前方支柱2および第1の移動支柱
6をそれぞれ橋脚13および12に仮止めした状態でト
ラス2の後端にトレーラーにより搬送したプレキャスト
ブロック15を第2の移動支柱7の下端に連結した吊下
げ装置16を用いて吊下げるとともにトラス5の先方の
接合箇所に搬送して、所定の接合位置に配置することに
より順次、接合していく。
In order to construct a precast block bridge using the embodiment of the present invention having the above configuration, FIG.
As shown in (a), the precast block 15 transported by a trailer to the rear end of the truss 2 with the front support 2 and the first moving support 6 temporarily fixed to the piers 13 and 12, respectively, is transferred to the second moving support 7. The truss 5 is suspended by using the suspension device 16 connected to the lower end of the truss 5 and transported to the joint portion at the front of the truss 5 to be sequentially joined by being arranged at a predetermined joint position.

【0015】そして、プレキャストブロックの架設に伴
って架設用トラス5を前方に移動させるには、図2
(b)に示すように、下端に仮止装置16が連結された
第1の移動支柱6を橋脚13に仮止した状態で完成され
た径間の橋面8上に配置されたレール10上を走行する
後方支柱3に備えた台車9に載せて前進させる。
In order to move the erection truss 5 forward with the erection of the precast block, FIG.
As shown in (b), on a rail 10 arranged on a bridge surface 8 of a completed span with a first moving column 6 to which a temporary fixing device 16 is connected at a lower end temporarily fixed to a pier 13. On the carriage 9 provided on the rear support 3 for traveling.

【0016】このとき、第2の移動支柱7をトラス5の
後方に位置させておくことにより第2の移動支柱7がカ
ウンターウエイトの役目をして後方支柱3における浮き
上がりの発生を防止して安定した状態でトラス5を移動
させることができる。
At this time, the second movable support 7 is positioned behind the truss 5 so that the second movable support 7 serves as a counterweight to prevent the rear support 3 from being lifted up and to be stable. In this state, the truss 5 can be moved.

【0017】即ち、図2に示すように、第2の移動支柱
7の重心(W1)+トラス5の重心(W2)の位置と橋
脚13に仮止した前方移動支柱との間の距離L2と、前
方支柱2と前方の橋脚14との間の距離L1との間には
L2>L1の関係が生じることからトラス5を移動させ
た際に後方支柱3が浮き上がることなく安定した状態を
保つことができるものである。
That is, as shown in FIG. 2, the distance L2 between the position of the center of gravity (W1) of the second moving support 7 + the center of gravity (W2) of the truss 5 and the forward moving support temporarily fixed to the pier 13 is determined. Since the relationship L2> L1 occurs between the distance L1 between the front strut 2 and the front pier 14, the rear strut 3 must be kept stable without lifting when the truss 5 is moved. Can be done.

【0018】また、図2(d)に示すように前方支柱2
が更に前方の橋脚14に移動したならばトラス5は前方
支柱2、第1の移動支柱6および後方支柱3の3点によ
り支持されるので安定した状態で第2の移動支柱7を移
動することができ、更に、第1の移動支柱6の固定後に
トラス5の重心(W2)が中間点を過ぎれば後方支柱3
を開放することが可能であり、そのためレール10は図
示する距離L1の長さのものでよく、これを完成された
径間の橋脚12近辺における橋面8において配置すれば
よい。
Further, as shown in FIG.
If the truss 5 is further moved to the front pier 14, the truss 5 is supported by three points of the front support 2, the first support 6 and the rear support 3, so that the second support 7 is moved in a stable state. Further, if the center of gravity (W2) of the truss 5 passes through the middle point after the first moving support 6 is fixed, the rear support 3
Can be opened, so that the rails 10 can be of the length L1 shown, which can be placed on the bridge surface 8 near the completed span pier 12.

【0019】このように、後方支柱3の反力は橋脚の部
分にしか作用することがなく、完成系の構造物への影響
が少ないばかりか、従来のプレキャストブロックの架設
装置のように後方支柱が橋面上を走行する際に後方支柱
の反力が橋体に作用することがないので架設荷重のため
に橋体の強度を高める必要もない。
As described above, the reaction force of the rear column 3 acts only on the pier portion, not only has little effect on the structure of the completed system, but also the rear column 3 like a conventional precast block erection apparatus. Since the reaction force of the rear strut does not act on the bridge body when traveling on the bridge surface, it is not necessary to increase the strength of the bridge body due to the erection load.

【0020】また、第1の移動支柱6および第2の移動
支柱7が、旋回可能且つトラス5の幅方向に移動可能で
ある場合には、トラス5の移動方向を変えることにより
平面曲線状の橋にも対処することができる。
When the first moving support 6 and the second moving support 7 are pivotable and movable in the width direction of the truss 5, the moving direction of the truss 5 is changed to change the plane curved shape. Bridges can also be addressed.

【0021】[0021]

【発明の効果】以上述べたように、本発明によれば、ト
ラスを前進させる際に、作業が簡単であるとともに、第
2の移動支柱が錘の役目をして移動時に後方支柱に生じ
る浮き上がりを防止して安定した状態で移動することが
できる。
As described above, according to the present invention, when the truss is advanced, the work is simple, and the second moving support acts as a weight, and the lift generated on the rear support when moving. , And can move in a stable state.

【0022】また、移動時にトラスはそれぞれ橋脚また
は橋脚付近に支持された第1の移動支柱および第2の移
動支柱に保持された状態にあり、従来のプレキャストブ
ロックの架設装置のように後方支柱が橋面上を走行する
際に後方支柱が橋面上を広範囲に亙って走行することが
ないので橋体全体に架設用荷重がかかることがなくその
ために橋体全体の強度を高める必要がないばかりか、ト
ラスはいつでも橋脚またはその近傍で支持されているた
め常に安定した状態で作業を行宇ことができる。
When the truss is moved, the truss is held by a first moving column and a second moving column supported near the pier or near the pier, respectively. When traveling on the bridge surface, the rear strut does not travel over a wide area on the bridge surface, so that the load for erection is not applied to the entire bridge body, so that it is not necessary to increase the strength of the entire bridge body Not only that, the truss is always supported at or near the pier, so that the work can always be performed in a stable state.

【0023】更に、第1の移動支柱および第2の移動支
柱が、旋回可能且つトラスの幅方向に移動可能である場
合には、平面曲線状の橋にも対処することができる。
Further, when the first moving column and the second moving column are pivotable and movable in the width direction of the truss, it is possible to cope with a flat curved bridge.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態に使用されるトラスを示す
側面図である。
FIG. 1 is a side view showing a truss used in an embodiment of the present invention.

【図2】図1に示した本発明の実施の形態の使用の説明
図である。
FIG. 2 is an illustration of the use of the embodiment of the invention shown in FIG.

【図3】従来例を示す説明図である。FIG. 3 is an explanatory diagram showing a conventional example.

【符号の説明】[Explanation of symbols]

1 プレキャストブロック架設装置 2 前方支柱 3 後方支柱 5 トラス 6 第1の移動支柱 7 第2の移動支柱 9 台車 10 レール DESCRIPTION OF SYMBOLS 1 Precast block erection apparatus 2 Front support 3 Back support 5 Truss 6 First movable support 7 Second movable support 9 Dolly 10 Rail

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 下面に長さ方向へ延びる軌道が設けられ
ているとともに前記下面の前端部および後端部に前方支
柱および後方支柱がそれぞれ垂設されたトラスと、前記
軌道に走行可能に懸装された第1の移動支柱および前記
軌道に走行可能に懸装されたトロリーに吊り下げられた
第2の移動支柱と、橋面に配置されて前記後方支柱の下
方に備えられた台車が走行するレールとを有することを
特徴とするプレキャストブロック架設装置。
1. A truss having a track extending in a longitudinal direction provided on a lower surface thereof, and a front strut and a rear strut respectively suspended at a front end and a rear end of the lower face. A first movable column mounted thereon, a second movable column suspended from a trolley suspended to be able to travel on the track, and a bogie provided on the bridge surface and provided below the rear column travels. A precast block erection device, comprising:
【請求項2】 第1の移動支柱および第2の移動支柱
が、旋回可能且つトラスの幅方向に移動可能である請求
項1記載のプレキャストブロック架設装置。
2. The precast block erection apparatus according to claim 1, wherein the first movable support and the second movable support are pivotable and movable in the width direction of the truss.
JP25433097A 1997-09-03 1997-09-03 Precast block installation device Withdrawn JPH1181242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25433097A JPH1181242A (en) 1997-09-03 1997-09-03 Precast block installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25433097A JPH1181242A (en) 1997-09-03 1997-09-03 Precast block installation device

Publications (1)

Publication Number Publication Date
JPH1181242A true JPH1181242A (en) 1999-03-26

Family

ID=17263514

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25433097A Withdrawn JPH1181242A (en) 1997-09-03 1997-09-03 Precast block installation device

Country Status (1)

Country Link
JP (1) JPH1181242A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138416A (en) * 2000-10-30 2002-05-14 Shimizu Corp Method for constructing elevated structure, erecting device and constructing device
JP2004300688A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
CN102433842A (en) * 2011-12-29 2012-05-02 上海市机械施工有限公司 Construction method for erecting thin-wall U-shaped girder of rail transit
CN107988910A (en) * 2017-12-07 2018-05-04 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138416A (en) * 2000-10-30 2002-05-14 Shimizu Corp Method for constructing elevated structure, erecting device and constructing device
JP4619518B2 (en) * 2000-10-30 2011-01-26 清水建設株式会社 Elevated structure construction method, erection device, and construction device
JP2004300688A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
CN102433842A (en) * 2011-12-29 2012-05-02 上海市机械施工有限公司 Construction method for erecting thin-wall U-shaped girder of rail transit
CN107988910A (en) * 2017-12-07 2018-05-04 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method
CN107988910B (en) * 2017-12-07 2019-03-01 中铁二十局集团第六工程有限公司 A kind of upstroke movable framework template overall pulling down method

Similar Documents

Publication Publication Date Title
US4249467A (en) Mobile apparatus for receiving and laying as assembled track switch or crossing section
JP2004232426A (en) Floor panel laying apparatus
CN101324053A (en) Double line box girder downward mobile formwork bridge fabrication machine and construction method thereof
CN110273375B (en) Bridge erecting machine
KR20150108625A (en) Bridge construction method using non-self launching beam launcher
JP3709220B2 (en) crane
JP2001146716A (en) Erection method for bridge beam
JPH1181242A (en) Precast block installation device
JP3718033B2 (en) Precast block erection device
CN113882286B (en) Bridge dismantling and building integrated machine, crossing method thereof, bridge dismantling method and newly-built method
JP2002021024A (en) Erection method of corrugated web bridge
JP4619518B2 (en) Elevated structure construction method, erection device, and construction device
JP3605660B2 (en) Precast block erection equipment
CN111910531B (en) Bridge erecting method
JP2000230206A (en) Elevated track construction method and device
CN2337186Y (en) Hoisting machine for ecrecting bridge flooring
JPS58523B2 (en) The most important thing is the most important thing.
JP2000170122A (en) Erection method of concrete girder and its device
JPS5812894Y2 (en) Assembly bridge for construction site
JP2000199207A (en) Precast block erection device
JPH07102531A (en) Method and device for overhanging installation of bridge
SU781257A1 (en) Sluice crane
CN114622488B (en) Section beam water lifting station and section beam lifting method
CN115387238B (en) Bridge girder erection method suitable for space crossing section
CN213836315U (en) Sideslip platform truck

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20041207