JPH1150470A - Block for hot water device for foundation setting and its execution - Google Patents

Block for hot water device for foundation setting and its execution

Info

Publication number
JPH1150470A
JPH1150470A JP22316997A JP22316997A JPH1150470A JP H1150470 A JPH1150470 A JP H1150470A JP 22316997 A JP22316997 A JP 22316997A JP 22316997 A JP22316997 A JP 22316997A JP H1150470 A JPH1150470 A JP H1150470A
Authority
JP
Japan
Prior art keywords
block
hole
lower prefabricated
water heater
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22316997A
Other languages
Japanese (ja)
Other versions
JP3079422B2 (en
Inventor
Toshio Nakamura
寿雄 中村
Shigeyoshi Yokogawa
繁好 横川
Hajime Taniguchi
一 谷口
Takeshi Ishikawa
猛 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Kinki Concrete Industry Co Ltd
Original Assignee
Kansai Electric Power Co Inc
Kinki Concrete Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Electric Power Co Inc, Kinki Concrete Industry Co Ltd filed Critical Kansai Electric Power Co Inc
Priority to JP09223169A priority Critical patent/JP3079422B2/en
Publication of JPH1150470A publication Critical patent/JPH1150470A/en
Application granted granted Critical
Publication of JP3079422B2 publication Critical patent/JP3079422B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten a construction period by overlapping an upper prefabricated block and a lower prefabricated block at least two-divided in the direction in which mutual contact faces are orthogonal, and connecting and integrating the blocks of the upper and lower parts by a bolt. SOLUTION: An excavation hole is excavated in the ground, an earth rod is driven in the center part of the excavation hole, and an earth wire and electric piping are laid. Next, after a cobble stone is put in the bottom part of the excavation hole and compacted therein, sand is put in. After a block 1b after a lower prefabricated block 1 is put in the bottom part of the excavation hole and sand is adjusted while it is made horizontal by a level tube, a front block 1a is set on an opposite position. The left block 2a and the right block 2b of the upper prefabricated block 2 are mounted in the direction in which they are orthogonal to the contact face 1c of the block 1, and connected and integrated by a bolt. Furthermore, after remaining soil is half back-filled in a through hole 5, a cover body is fitted in the through hole 5, an earth wire and electric piping are drawn from the through hole of the cover body, and a space between the cover body and the through hole is filled with mortar and the like. Thereby a construction period can be shortened.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、屋外の地上面に設
置する電気温水器やガス温水器等を載置する基礎ブロッ
クおよびその施工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation block on which an electric water heater, a gas water heater and the like are installed outdoors on a ground surface, and a method of constructing the same.

【0002】[0002]

【従来の技術】従来、電気温水器やガス温水器等を一戸
建ての住宅に設置する時には、貯水タンクに300〜4
50リットルの水が貯水され、重量が600kgになるこ
とから、温水器を載置するための特別のコンクリート基
台を設置している。そのコンクリート基台は、設置場所
の地面を掘削して掘削孔を堀り、その掘削孔に直接コン
クリートを流し込む現場打ちコンクリートによる基台で
あった。
2. Description of the Related Art Conventionally, when an electric water heater, a gas water heater, or the like is installed in a single-family house, 300 to 4 water storage tanks are required.
Since 50 liters of water is stored and weighs 600 kg, a special concrete base for installing the water heater is installed. The concrete base was a cast-in-place concrete base that excavated the ground at the installation site, dug a drill hole, and poured concrete directly into the drill hole.

【0003】しかしながら、この現場打ちコンクリート
による基台は、基礎工事と電気工事に1日、コンクリー
ト乾燥期間に7〜8日、温水器据付けと配管工事に1日
かかり、工事期間が10日程かかるため、設置作業に相
当な日数を要していた。また、基礎工事中の期間、工事
区域を占有されることになり、通行ができない不便があ
るばかりか、工事区域の周囲が汚れ、設置場所の近くに
庭木等があれば悪影響を与えると言った問題があった。
[0003] However, the base made of cast-in-place concrete requires one day for foundation work and electric work, seven to eight days for concrete drying, one day for water heater installation and plumbing, and the work period is about 10 days. The installation took a considerable number of days. In addition, he said that the construction area would be occupied during the foundation work, which would cause inconvenience not being able to pass, and that the surroundings of the construction area would be dirty, and if there were garden trees near the installation area, it would have an adverse effect. There was a problem.

【0004】さらに、地震に対する強度も現場打ちコン
クリートの場合は、180kgf/cm2が限度で震度の大き
い地震には耐えられなかった。また、基礎工事業者と温
水器の据付け業者が異なるため、二度も立ち会わなけれ
ばならないばかりでなく、買替え時において脚部の寸法
が変われば基台に載らない場合があり、その場合には改
修ができないと言った問題点があった。
[0004] In addition, the strength against earthquakes of cast-in-place concrete is limited to 180 kgf / cm2, and it cannot withstand an earthquake having a large seismic intensity. In addition, since the foundation contractor and the water heater installation contractor are different, not only must you attend twice, but if the dimensions of the legs change at the time of replacement, it may not be mounted on the base, in which case There was a problem that it could not be repaired.

【0005】[0005]

【発明が解決しようとする課題】本発明は、上記の課題
を解決することを課題として開発されたもので、略1日
で全工事を完了でき工期の短縮化が図れて、即日に給湯
が開始可能となり、また運搬時や施工時においては軽量
化され、取り扱いやすくなって作業性に富み、かつ耐震
性にも優れた温水器設置用基礎ブロックおよびその施工
法を提供することを目的とするものである。
SUMMARY OF THE INVENTION The present invention has been developed with the object of solving the above-mentioned problems. The entire construction can be completed in approximately one day, the construction period can be shortened, and hot water can be supplied on the same day. The purpose of the present invention is to provide a water heater installation base block which is lightweight, easy to handle, easy to handle, and excellent in seismic resistance during transportation and construction, and its construction method. Things.

【0006】[0006]

【課題を解決するための手段】上記の課題を解決し、そ
の目的を達成する手段として、本発明では、少なくとも
2分割された上部プレハブブロックと下部プレハブブロ
ックを互いの接合面が直交する方向に積み重ね、上下両
ブロックをボルトで接合一体化してなる温水器設置用基
礎ブロックを開発し採用した。
According to the present invention, at least two divided upper and lower prefabricated blocks are arranged in such a manner that their joint surfaces are orthogonal to each other. We have developed and adopted a foundation block for water heater installation, which consists of stacking, upper and lower blocks joined together by bolts.

【0007】また、本発明では上記のように構成した温
水器設置用基礎ブロックにおいて、上部プレハブブロッ
クと下部プレハブブロックの中心部には、アース線、電
気配管を取り出すための透孔が形成されている温水器設
置用基礎ブロック、および透孔は、アース線、電気配管
用の通孔を穿設した蓋体と嵌合して閉鎖するように構成
されている温水器設置用基礎ブロックを開発し、採用し
た。
According to the present invention, in the water heater installation base block constructed as described above, a through hole for taking out a ground wire and an electric pipe is formed in the center of the upper prefabricated block and the lower prefabricated block. The water heater installation basic block and the through-hole have been developed so that the water heater installation basic block is configured to be fitted and closed with a lid body that has a perforated hole for ground wire and electric piping. , Adopted.

【0008】さらに、本発明では、下部プレハブブロッ
クの外形よりも若干大きい孔を掘削し、該孔内の中心部
にアース線、電気配管を布設した後、底部に少なくとも
2分割された一方のブロックを置き、その側面に他方の
ブロックを配設して下部プレハブブロックを設け、その
下部プレハブブロックの上面に下部プレハブブロックと
同一の少なくとも2分割された上部プレハブブロック
を、下部プレハブブロックの接合面と直交する方向に重
合させ、上下部のプレハブブロックに穿設されたボルト
孔にボルトを螺合させて接合一体化した後、上下部のプ
レハブブロックの中心部の透孔に蓋体を嵌合させて施工
することを特徴とする温水器設置用基礎ブロックの施工
法を開発し、採用した。
Further, according to the present invention, a hole slightly larger than the outer shape of the lower prefabricated block is excavated, a ground wire and an electric pipe are laid in the center of the hole, and at least one of the two blocks is divided at the bottom. The lower prefabricated block is provided by arranging the other block on the side surface, and the upper prefabricated block, which is at least divided into the same as the lower prefabricated block, is provided on the upper surface of the lower prefabricated block. After polymerizing in the orthogonal direction, screwing bolts into bolt holes drilled in the upper and lower prefabricated blocks and joining and integrating them, the lid is fitted into the through hole in the center of the upper and lower prefabricated blocks. We have developed and adopted a construction method of a foundation block for installing a water heater, which is characterized by being constructed with water.

【0009】[0009]

【発明の実施の形態】以下に、本発明の実施の形態を添
付図面に基づいて説明すれば、本発明に係る温水器設置
用基礎ブロックは、少なくとも2分割された下部プレハ
ブブロック1と、同じく少なくとも2分割された上部プ
レハブブロック2と、その上下部のプレハブブロック
1、2を接合一体化させるボルト3とから構成されてい
る。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a water heater installation base block according to the present invention. An upper prefabricated block 2 is divided into at least two parts, and a bolt 3 for joining and integrating the upper and lower prefabricated blocks 1 and 2 is formed.

【0010】そして、上記の下部プレハブブロック1
は、図3に示すように、正方形状に形成されていて、横
方向の中央部から2分割された前のブロック1aと後の
ブロック1bが接合面1cで接合して構成されている。
前のブロック1aと後のブロック1bの内側面にはそれ
ぞれ半円形状の切欠部4、4が形成されていて、前後の
両ブロック1a、1bを接合すると中央部に円形の透孔
5が形成される。
The lower prefabricated block 1
As shown in FIG. 3, is formed in a square shape, and is formed by joining a front block 1a and a rear block 1b, which are divided into two parts from a center in the horizontal direction, at a joint surface 1c.
Semicircular cutouts 4 and 4 are formed on the inner surfaces of the front block 1a and the rear block 1b, respectively, and when the front and rear blocks 1a and 1b are joined, a circular through hole 5 is formed at the center. Is done.

【0011】前後の両ブロック1a、1bには、両側辺
の近傍の2個所の位置に上面から下面に貫通するボルト
孔6、6が穿設されていると共に、そのボルト孔6、6
よりやや上方内側面側の位置に図7で示ように、運搬用
吊環8の螺軸9が螺合するボルト孔7、7が穿設されて
いる。この吊環8によって吊り上げて運搬移送を便利に
してある。この吊環は所定の位置に配設された後取り外
す。
The front and rear blocks 1a, 1b are provided with bolt holes 6, 6 penetrating from the upper surface to the lower surface at two positions near the both sides, respectively.
As shown in FIG. 7, bolt holes 7, 7 into which the screw shaft 9 of the transport suspension ring 8 is screwed are formed at a slightly upper inner surface side. It is lifted up by the suspension ring 8 to facilitate transportation. This suspension ring is removed after being arranged at a predetermined position.

【0012】また、上部プレハブブロック2は、縦方向
の中央部から2分割された左ブロック2aと右ブロック
2bが接合面2cで接合されたもので、前記下部プレハ
ブブロック1の前のブロック1aと後のブロック1bの
接合面1cと直交する方向に左ブロック2aと右ブロッ
ク2bを上面に載置される。またボルト孔6、7は、前
記の下部プレハブブロック1の前のブロック1aと後の
ブロック1bの同じ位置に穿設されていて、ボルト孔6
の頭部が座ぐり孔6aに形成されている。
The upper prefabricated block 2 is formed by joining a left block 2a and a right block 2b, which are divided into two parts from the center in the vertical direction, at a joint surface 2c. The left block 2a and the right block 2b are placed on the upper surface in a direction orthogonal to the joining surface 1c of the subsequent block 1b. The bolt holes 6 and 7 are drilled at the same position in the block 1a in front of the lower prefabricated block 1 and in the block 1b in the rear.
Is formed in the counterbore 6a.

【0013】さらに、前記ボルト3は、上部プレハブブ
ロック2と下部プレハブブロック1が重ねられて合致す
る4個のボルト孔6、6、6、6に螺合して接合一体化
してある。
Further, the bolt 3 is screwed and joined to four bolt holes 6, 6, 6, 6 in which the upper prefabricated block 2 and the lower prefabricated block 1 are overlapped and coincide with each other.

【0014】このように構成された本発明の温水器設置
用基礎ブロックを設置する施工例を図8〜図19に基づ
いて説明する。まず、温水器設置場所の地面Gにブロッ
クの外形より若干大きい掘削孔11を掘り、掘削孔11
の中心部にアース棒12を打ち込み、アース線13と電
気配管14を布設する。(図8、9)
An example of installation of the water heater installation base block of the present invention thus constructed will be described with reference to FIGS. First, an excavation hole 11 slightly larger than the outer shape of the block is dug in the ground G at the installation location of the water heater.
A grounding rod 12 is driven into the center of the wire, and a grounding wire 13 and an electric pipe 14 are laid. (FIGS. 8, 9)

【0015】つぎに、掘削孔11の底部に栗石15を入
れ、突き固め底面を水平にした後、砂16を入れてブロ
ックとの接地を安定させる。(図10、11)
Next, a rock stone 15 is put into the bottom of the excavation hole 11 and the bottom is leveled, and then sand 16 is put in to stabilize the grounding of the block. (FIGS. 10 and 11)

【0016】その後、下部プレハブブロック1を構成す
る後のブロック1bを掘削孔11の底部に入れ、水準器
で水平を見ながら砂16を調整して置く。つづいて、前
のブロック1aも同様に水平を確認しながら対向位置に
置く。(図12、13)
Thereafter, the block 1b, which constitutes the lower prefabricated block 1, is placed in the bottom of the excavation hole 11, and the sand 16 is adjusted and placed while looking horizontal with a level. Subsequently, the previous block 1a is similarly placed at the opposing position while checking the level. (FIGS. 12 and 13)

【0017】さらに、上部プレハブブロック2を構成す
る左のブロック2aと右のブロック2bを下部プレハブ
ブロック1の接合面1cと直交する方向に載置し、ボル
ト挿通孔6を合致させてボルト3を螺合して接合一体化
する。(図14、15)
Further, the left block 2a and the right block 2b constituting the upper prefabricated block 2 are placed in a direction orthogonal to the joining surface 1c of the lower prefabricated block 1, and the bolt insertion holes 6 are matched to each other so that the bolts 3 are removed. Threaded and joined and integrated. (FIGS. 14, 15)

【0018】ひきつづいて、中心部の円形の透孔5に残
土17を半分埋め戻した後、その円形の透孔5に嵌合す
る蓋体18を嵌め、蓋体18に穿設された通孔19から
アース線13、電気配管14を出し、蓋体18と透孔5
との間をコンクリート、モルタル等で埋めて温水器設置
用基礎ブロックが施工される。(図16、17)
Subsequently, after half of the remaining soil 17 is backfilled in the circular through hole 5 at the center, a cover 18 fitted into the circular through hole 5 is fitted, and the through hole formed in the cover 18 is formed. 19, the ground wire 13 and the electric pipe 14 are drawn out, and the lid 18 and the through-hole 5 are formed.
Is filled with concrete, mortar, etc., and a foundation block for installing a water heater is constructed. (FIGS. 16, 17)

【0019】その温水器設置用基礎ブロックの端部から
50mm以内の所に温水器のアンカー20を打ち込んで温
水器21を設置する。(図18、19)
The water heater 21 is installed by driving the anchor 20 of the water heater into a position within 50 mm from the end of the base block for installing the water heater. (FIGS. 18, 19)

【0020】なお、前記実施の形態においては、上下部
のプレハブブロックを2等分した例で説明したが、必ず
しもこれらの実施の形態に限定されるものではなく、本
発明の目的を達成でき、且つ発明の要旨を逸脱しない範
囲内で種々の設計変更が可能であることは当然である。
In the above-described embodiment, an example has been described in which the upper and lower prefabricated blocks are divided into two equal parts. However, the present invention is not necessarily limited to these embodiments, and the object of the present invention can be achieved. It goes without saying that various design changes can be made without departing from the spirit of the invention.

【0021】[0021]

【発明の効果】以上のように、本発明は、少なくとも2
分割された上部プレハブブロックと下部プレハブブロッ
クを互いの接合面が直交する方向に積み重ね、上下部の
プレハブブロックをボルトで接合一体化してなる温水器
設置用基礎ブロックに係るものであるから、次のような
優れた効果を達成できるものである。
As described above, the present invention provides at least 2
Since the divided upper prefabricated block and lower prefabricated block are stacked in a direction where their joint surfaces are orthogonal to each other and the upper and lower prefabricated blocks are joined together by bolts, the present invention relates to a water heater installation base block. Such excellent effects can be achieved.

【0022】 プレハブブロックを用いているので、
現場に運び組み合わすだけの作業であるから、全工事が
一日で完了し、従来の現場打ちコンクリートよりも大幅
に工事期間が短縮できる。また、品質管理された工場で
製作されたプレハブブロックを用いているので、強度が
均一化され、耐震性に富むものである。 上下部のプレハブブロックの接合面を互いに直交す
る方向に配設されているので、外力がかかった場合に、
強度の異方性がなく補強強化されていて破損する虞れが
少ない。 上下部のプレハブブロックは少なくとも2分割され
ているので、軽量化され運搬時や施工時の取扱いが容易
となり作業性が良くなる。 プレハブブロックを用いているので、外観が美し
く、設置した場合の地上に露出する外面が美麗であるの
で、コンクリート等での仕上げ工事等する必要がなくな
る。
Since a prefabricated block is used,
Since the work is only carried on the site and combined, the entire construction is completed in one day, and the construction period can be significantly reduced compared to the conventional cast-in-place concrete. In addition, since a prefabricated block manufactured at a factory whose quality is controlled is used, the strength is made uniform and the earthquake resistance is high. Since the joint surfaces of the upper and lower prefabricated blocks are arranged in directions orthogonal to each other, when an external force is applied,
Since there is no anisotropy in strength, reinforcement is reinforced and there is little possibility of breakage. Since the upper and lower prefabricated blocks are divided into at least two parts, the weight is reduced, handling during transportation and construction is facilitated, and workability is improved. Since the prefabricated block is used, the appearance is beautiful and the external surface exposed to the ground when installed is beautiful, so that there is no need to perform finishing work with concrete or the like.

【0023】また、請求項2の温水器設置用基礎ブロッ
クによれば、アース線、電気配管を取り出すことが簡易
となり、作業を速やかに行うことができる。
Further, according to the water heater installation base block of the second aspect, it is easy to take out the ground wire and the electric pipe, and the work can be performed quickly.

【0024】さらに、請求項3の温水器設置用基礎ブロ
ックによれば、透孔に蓋体が嵌着して上面ブロックの平
面が均一となり外観が優美になる。また、アース線、電
気配管を傷めることなく外部に取り出すことができる。
Further, according to the third aspect of the present invention, the lid is fitted into the through-hole, so that the upper block is made uniform and the appearance is elegant. In addition, the ground wire and the electric pipe can be taken out without damaging them.

【0025】また、請求項4の温水器設置用基礎ブロッ
クの施工法によれば、プレハブブロックを用いているの
で、作業工程がスムーズで全工事を1日で完了させるこ
とができると共に、アース線や電気配管時の作業が簡易
にでき、かつ安全で迅速に行うことができる。
Further, according to the construction method of the foundation block for installing a water heater according to the fourth aspect, since the prefabricated block is used, the work process is smooth, the whole construction can be completed in one day, and the ground wire is provided. And the work at the time of electric piping can be simplified, and can be performed safely and quickly.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の温水器設置用基礎ブロックの斜視図で
ある。
FIG. 1 is a perspective view of a water heater installation base block according to the present invention.

【図2】要部の断面図である。FIG. 2 is a sectional view of a main part.

【図3】下部プレハブブロックの平面図である。FIG. 3 is a plan view of a lower prefabricated block.

【図4】図3のA−A線断面図である。FIG. 4 is a sectional view taken along line AA of FIG. 3;

【図5】上部プレハブブロックの平面図である。FIG. 5 is a plan view of an upper prefabricated block.

【図6】図5のB−B線断面図である。FIG. 6 is a sectional view taken along line BB of FIG. 5;

【図7】プレハブブロックの1部の簡略図である。FIG. 7 is a simplified diagram of a part of a prefabricated block.

【図8〜図19】施工例を示す説明図である。8 to 19 are explanatory diagrams showing examples of construction.

【符号の説明】[Explanation of symbols]

1 下部プレハブブロック 1c 下部プレハブブロック接合面 2 上部プレハブブロック 2c 上部プレハブブロック接合面 3 ボルト 5 透孔 13 アース線 14 電気配管 18 蓋体 19 通孔 DESCRIPTION OF SYMBOLS 1 Lower prefabricated block 1c Lower prefabricated block joint surface 2 Upper prefabricated block 2c Upper prefabricated block joint surface 3 Bolt 5 Through hole 13 Ground wire 14 Electrical piping 18 Lid 19 Through hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷口 一 大阪市北区西天満5丁目14番10号 近畿コ ンクリート工業株式会社内 (72)発明者 石川 猛 大阪市北区西天満5丁目14番10号 近畿コ ンクリート工業株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Kazu Taniguchi 5-14-10 Nishitenma, Kita-ku, Osaka City Inside Kinki Concrete Industry Co., Ltd. (72) Inventor Takeshi Ishikawa 5- 14-10 Nishitenma, Kita-ku, Osaka-shi Kinki Concrete Industry Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも2分割された上部プレハブブ
ロックと下部プレハブブロックを互いの接合面が直交す
る方向に積み重ね、上下部のプレハブブロックをボルト
で接合一体化してなる温水器設置用基礎ブロック。
1. A water heater installation base block in which at least two divided prefabricated blocks and a lower prefabricated block are stacked in a direction in which their joining surfaces are orthogonal to each other, and upper and lower prefabricated blocks are joined and integrated with bolts.
【請求項2】 上部プレハブブロックと下部プレハブブ
ロックの中心部には、アース線、電気配管を取り出すた
めの透孔が形成されている請求項1に記載の温水器設置
用基礎ブロック。
2. The water heater installation base block according to claim 1, wherein a through hole for taking out a ground wire and an electric pipe is formed in a central portion of the upper prefabricated block and the lower prefabricated block.
【請求項3】 透孔は、アース線、電気配管用の通孔を
穿設した蓋体と嵌合して閉鎖するように構成されている
請求項2に記載の温水器設置用基礎ブロック。
3. The water heater installation base block according to claim 2, wherein the through hole is configured to be fitted and closed with a lid body having a through hole for an earth wire and an electric pipe.
【請求項4】 下部プレハブブロックの外形よりも若干
大きい孔を掘削し、該孔内の中心部にアース線、電気配
管を布設した後、底部に少なくとも2分割された一方の
ブロックを置き、その側面に他方のブロックを配設して
下部プレハブブロックを設け、その下部プレハブブロッ
クの上面に下部プレハブブロックと同一の少なくとも2
分割された上部プレハブブロックを、下部プレハブブロ
ックの接合面と直交する方向に重合させ、上下部のプレ
ハブブロックに穿設されたボルト孔にボルトを螺合させ
て接合一体化した後、上下部のプレハブブロックの中心
部の透孔に蓋体を嵌合させて施工することを特徴とする
温水器設置用基礎ブロックの施工法。
4. Excavating a hole slightly larger than the outer shape of the lower prefabricated block, laying a ground wire and an electric pipe in the center of the hole, and placing at least one of the two divided blocks at the bottom. The lower prefabricated block is provided by disposing the other block on the side surface, and at least two of the same as the lower prefabricated block are provided on the upper surface of the lower prefabricated block.
The divided upper prefabricated blocks are superimposed in a direction perpendicular to the joining surface of the lower prefabricated blocks, and bolts are screwed into bolt holes formed in the upper and lower prefabricated blocks. A method for constructing a foundation block for installing a water heater, characterized in that the construction is carried out by fitting a lid into a through hole in the center of a prefabricated block.
JP09223169A 1997-08-04 1997-08-04 Foundation block for water heater installation and its construction method Expired - Fee Related JP3079422B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09223169A JP3079422B2 (en) 1997-08-04 1997-08-04 Foundation block for water heater installation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09223169A JP3079422B2 (en) 1997-08-04 1997-08-04 Foundation block for water heater installation and its construction method

Publications (2)

Publication Number Publication Date
JPH1150470A true JPH1150470A (en) 1999-02-23
JP3079422B2 JP3079422B2 (en) 2000-08-21

Family

ID=16793890

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09223169A Expired - Fee Related JP3079422B2 (en) 1997-08-04 1997-08-04 Foundation block for water heater installation and its construction method

Country Status (1)

Country Link
JP (1) JP3079422B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005240479A (en) * 2004-02-27 2005-09-08 Tokyo Electric Power Co Inc:The Installation article base
JP2007198716A (en) * 2006-01-30 2007-08-09 Denso Corp Hot water storage tank unit and hot water storage type water heater
JP2008223399A (en) * 2007-03-15 2008-09-25 Toyo-Base Co Ltd Foundation structural body for facility
JP2010024727A (en) * 2008-07-18 2010-02-04 Kansai Electric Power Co Inc:The Simple foundation for installation of water heater and its construction method
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
JP2015175111A (en) * 2014-03-13 2015-10-05 大阪瓦斯株式会社 Foundation structure
CN107614814A (en) * 2015-09-07 2018-01-19 建筑原点株式会社 Assemble block
JP2021193329A (en) * 2020-06-09 2021-12-23 積水化学工業株式会社 Water heater support structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005240479A (en) * 2004-02-27 2005-09-08 Tokyo Electric Power Co Inc:The Installation article base
JP2007198716A (en) * 2006-01-30 2007-08-09 Denso Corp Hot water storage tank unit and hot water storage type water heater
JP2008223399A (en) * 2007-03-15 2008-09-25 Toyo-Base Co Ltd Foundation structural body for facility
JP2010024727A (en) * 2008-07-18 2010-02-04 Kansai Electric Power Co Inc:The Simple foundation for installation of water heater and its construction method
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
JP2015175111A (en) * 2014-03-13 2015-10-05 大阪瓦斯株式会社 Foundation structure
CN107614814A (en) * 2015-09-07 2018-01-19 建筑原点株式会社 Assemble block
CN107614814B (en) * 2015-09-07 2019-10-18 建筑原点株式会社 Assemble block
JP2021193329A (en) * 2020-06-09 2021-12-23 積水化学工業株式会社 Water heater support structure

Also Published As

Publication number Publication date
JP3079422B2 (en) 2000-08-21

Similar Documents

Publication Publication Date Title
JP3079422B2 (en) Foundation block for water heater installation and its construction method
KR100462236B1 (en) panel for external underground wall of building, structure and construction method using the same
KR200384474Y1 (en) Prefabricated Precast Concrete Culvert
JP2842722B2 (en) Construction method of multi-way tunnel body
JPS63167814A (en) Basement and its construction
JPS5811754Y2 (en) Earthquake-resistant steel underground tank
JPH077386Y2 (en) Foundation structure for building columns
KR200266585Y1 (en) panel for external underground wall of building and external underground wall- structure using the same
JP2561970B2 (en) Panel structure for underground wall and construction method of underground wall
JP2534138B2 (en) Piping trench and its construction method
JP3025214B2 (en) Concrete fence
JP3074319B2 (en) Precast concrete foundation
JPS63300124A (en) Wall panel of basement and the like
JP2011043027A (en) Foundation structure for equipment
JP3588523B2 (en) Construction method of underground storage
JP3040514U (en) Rock wall
JPH04128433A (en) Construction method of foundation
JPH0313630A (en) Construction method for basement
JPH01315519A (en) Underground outer wall constructing method for superstructure
JPS61191727A (en) Method and apparatus for self-supported preventer for settlement of pole
JPH08260491A (en) Rock wall
JP2005054428A (en) Inspection pit
JPH10145952A (en) Concrete block for common ditch
JPH0833017B2 (en) Concrete assembling basement skeleton structure
JPH09158210A (en) Foundation and construction method for setting it

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees