JPH11350522A - Excavation method of pipe embedding trench - Google Patents

Excavation method of pipe embedding trench

Info

Publication number
JPH11350522A
JPH11350522A JP15638198A JP15638198A JPH11350522A JP H11350522 A JPH11350522 A JP H11350522A JP 15638198 A JP15638198 A JP 15638198A JP 15638198 A JP15638198 A JP 15638198A JP H11350522 A JPH11350522 A JP H11350522A
Authority
JP
Japan
Prior art keywords
trench
groove
excavated
excavation
digging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15638198A
Other languages
Japanese (ja)
Inventor
Shunichi Kamezaki
俊一 亀崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP15638198A priority Critical patent/JPH11350522A/en
Publication of JPH11350522A publication Critical patent/JPH11350522A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily and safely convey excavated soil to a conveying device from an excavation device. SOLUTION: A back-hoe 6 as an excavtion device for a trench 5 and a truck 7 as a conveying device of excavated soil are arranged in a row along the direction of excavation of the trench 5, the trench 5 is excavated with the back-hoe 7, and excavated soil from the back-hoe 7 is conveyed to another place through the truck 7. In that case, the back-hoe 7 or the truck 7 is mounted on the earth retaining trench 5 excavated in advance, and excavation work is carried out.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、管埋設用溝の掘
削方法、特に、掘削手段から運搬手段への掘削土の搬出
が容易且つ安全に行える、管埋設用溝の掘削方法に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for excavating a trench for burying a pipe, and more particularly to a method for digging a trench for burying a pipe, which can easily and safely carry out excavated soil from a digging means to a transportation means. .

【0002】[0002]

【従来の技術】例えば、ガス管(以下、単に管という)
を地下に埋設する工法の一つに、開削工法がある。この
開削工法は、土留めを行いながら溝を掘削し、掘削した
溝内に管を吊下ろし、溝内において管を接合し、そし
て、埋め戻すことからなるものである。
2. Description of the Related Art For example, gas pipes (hereinafter simply referred to as pipes)
One of the methods of burying underground is open cut method. This excavation method involves excavating a groove while retaining a ground, suspending a pipe in the excavated groove, joining the pipe in the groove, and refilling the pipe.

【0003】即ち、先ず、ブーム型クレーンを搭載した
トラックによって、各種工事機材を管埋設現地まで運搬
し、クレーンによって機材を現地に下ろす。次に、作業
帯を準備した後、バックホー等によって地面を掘削す
る。掘削した溝は、崩れないように土留めを施して、管
を吊り下ろす準備をする。次に、トラックにより埋設す
べき管を現地まで運搬し、大型クレーン等よって溝内に
吊り下ろす。次に、溝内において、管同士を溶接によっ
て互いに接合し、溶接後、溶接部の検査を行う。次い
で、埋戻し用の土砂をダンプトラックによって、溝内に
投入して溝を埋め戻す。次に、埋め戻した土砂を均した
後に転圧機によって締め固め、そして、掘削後の路面を
舗装する。
That is, first, various construction equipment is transported to a site where pipes are buried by a truck equipped with a boom type crane, and the equipment is lowered to the site by a crane. Next, after preparing the work zone, the ground is excavated with a backhoe or the like. The excavated ditch is to be earth-retained so that it does not collapse, and be prepared to suspend the pipe. Next, the pipes to be buried are transported to the site by truck and suspended in the ditch by a large crane or the like. Next, in the groove, the pipes are joined to each other by welding, and after welding, a weld is inspected. Then, the earth and sand for backfilling is put into the trench by a dump truck, and the trench is backfilled. Next, after the backfilled soil is leveled, it is compacted by a compactor, and the excavated road surface is paved.

【0004】上述した開削工法における一つの工程であ
る管埋設用溝の掘削方法について、更に説明する。図2
示すように、設計による溝幅になるように、地面をバッ
クホー2によって掘削し、掘削により発生した土砂をバ
ックホー2によって溝1内からトラック3に搬出する。
掘削後の溝は、崩れないように、矢板と腹おこしとによ
る土留め4を施す。通常、管は道路下に埋設することが
多いので、作業帯は細長くなり、作業帯の幅は、交通へ
の影響を考慮して1車線程度の幅しか確保できない。し
かも、バックホー2およびトラック3は、何れも、掘削
中または掘削直後の土留めが施されていない溝上に進入
することができない。従って、バックホー2とトラック
3とは、何れも、未掘削地面上に一列に、掘削方向上流
側からこの順序で配置する必要があった。
A method of excavating a trench for burying a pipe, which is one of the steps in the above-mentioned open-cutting method, will be further described. FIG.
As shown in the figure, the ground is excavated by the backhoe 2 so as to have the designed groove width, and the earth and sand generated by the excavation is carried out from the inside of the groove 1 to the truck 3 by the backhoe 2.
The trench after excavation is provided with earth retaining 4 made of sheet pile and belly to prevent collapse. In general, pipes are often buried under roads, so that the working belt is elongated, and the width of the working belt can be as small as about one lane in consideration of the influence on traffic. In addition, neither the backhoe 2 nor the truck 3 can enter a groove that has not been earthed during or immediately after excavation. Therefore, both the backhoe 2 and the truck 3 need to be arranged in a line on the unexcavated ground in this order from the upstream in the excavation direction.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上述し
た管埋設用溝の掘削方法は、以下のような問題点を有し
ていた。 バックホー2は、掘削した土砂をトラック3に搬送
するために、必ず180°旋回させる必要がある。従っ
て、旋回に時間を要していた。 狭い作業帯内からはみ出さないように旋回させる必
要があるために、ブーム、アームおよびバケットを微調
整する必要がある。従って、旋回操作が面倒であった。 構造上、狭い範囲で旋回させるには、バケットを操
作室に接近させる必要があるので、操作を誤ると、バケ
ットが作業室に衝突する危険があった。
However, the above-mentioned method for excavating the trench for burying pipes has the following problems. The backhoe 2 must be turned 180 ° in order to transport the excavated earth and sand to the truck 3. Therefore, it took time to turn. The boom, arm, and bucket need to be fine-tuned because they need to be swiveled out of the narrow work zone. Therefore, the turning operation was troublesome. Due to the structure, it is necessary to move the bucket close to the operation room in order to make a turn in a narrow range. Therefore, if the operation is erroneously performed, there is a risk that the bucket collides with the work room.

【0006】従って、この発明の目的は、掘削手段から
運搬手段への掘削土の搬出が容易且つ安全に行える、管
埋設用溝の掘削方法を提供することにある。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a method for excavating a trench for burying a pipe, in which excavated soil can be easily and safely carried out from an excavating means to a transportation means.

【0007】[0007]

【課題を解決するための手段】請求項1記載の発明は、
溝の掘削手段と掘削土の運搬手段とを、溝の掘削方向に
沿って一列に配置し、前記掘削手段により溝を掘削し、
掘削により生じた掘削土を前記運搬手段によって別の場
所に運搬することからなる、管埋設用溝の掘削方法にお
いて、前記掘削手段または前記運搬手段を、既に掘削さ
れ、土留めが施された溝上に乗せて掘削することに特徴
を有するものである。
According to the first aspect of the present invention,
Excavating means of the groove and the means of transporting excavated soil are arranged in a line along the direction of excavating the groove, and excavating the groove by the excavating means,
A method of excavating a trench for burying pipes, comprising transporting excavated soil generated by excavation to another place by the transporting means, wherein the excavating means or the transporting means is mounted on a groove which has already been excavated and has been earthed. It is characterized in that it is excavated by putting it on the ground.

【0008】請求項2記載の発明は、前記土留めは、袋
体を溝内に設置し、前記袋体内に流体を圧入して前記袋
体を膨らませることからなることに特徴を有するもので
ある。
[0008] The invention according to claim 2 is characterized in that the earth retaining means comprises placing a bag body in a groove and injecting a fluid into the bag body to inflate the bag body. is there.

【0009】[0009]

【発明の実施の形態】この発明の、管埋設用溝の掘削方
法の一実施態様を、図面を参照しながら説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of a method for excavating a trench for burying a pipe according to the present invention will be described with reference to the drawings.

【0010】図1は、この発明の、管埋設用溝の掘削方
法の一実施態様を示す部分概略断面図である。図1にお
いて、6は、溝5を掘削するための掘削手段としてのバ
ックホーであり、後述する袋体8上に乗っている。7
は、バックホー6によって掘削した土を受け、他の場所
に運搬するための運搬手段としてのトラックであり、バ
ックホー6の溝掘削方向下流側に配置されている。8
は、溝5の崩れを防止するための土留めとしての袋体で
あり、空気または水等の流体の圧入によって膨らむよう
になっている。そして、9は、袋体8の溝掘削方向上流
側の溝5内に構築された、矢板と腹おこしとによる土留
めである。
FIG. 1 is a partial schematic sectional view showing an embodiment of a method for excavating a trench for burying a pipe according to the present invention. In FIG. 1, reference numeral 6 denotes a backhoe as an excavating means for excavating the groove 5, which rides on a bag 8 described later. 7
Is a truck as a transportation means for receiving the soil excavated by the backhoe 6 and transporting the soil to another place, and is disposed on the downstream side of the backhoe 6 in the groove excavation direction. 8
Is a bag as an earth retaining member for preventing collapse of the groove 5, and is inflated by press-fitting a fluid such as air or water. Reference numeral 9 denotes an earth retaining structure constructed with a sheet pile and a belly raised in the groove 5 on the upstream side of the bag body 8 in the groove excavation direction.

【0011】この発明によれば、以下のようにして、管
埋設用溝が掘削される。先ず、バックホー6によって溝
5の掘削を開始する。トラック7は、バックホー6の溝
掘削方向下流側に配置しておく。所定長さまで溝5を掘
削したところで、溝5内に袋体8を入れ、袋体8内に空
気または水等の流体を圧入して膨らませて、土留めを行
う。土留め後、必要に応じて鉄 板を溝5上に敷けば、
転落事故を防止できる。この後、バックホー6を袋体8
により土留めが終了した溝5上に移動させて、溝5の掘
削を進行する。以下、この作業を繰り返し行う。上流側
の既設の袋体を順次、回収し、矢板と腹おこしとによる
土留め9を行っても良い。
According to the present invention, a pipe burying groove is excavated as follows. First, excavation of the groove 5 by the backhoe 6 is started. The truck 7 is arranged downstream of the backhoe 6 in the trench excavation direction. When the groove 5 is excavated to a predetermined length, the bag body 8 is put into the groove 5, and a fluid such as air or water is pressed into the bag body 8 to inflate the soil, thereby retaining the soil. After earth retaining, if necessary, lay an iron plate on the groove 5,
Fall accidents can be prevented. Thereafter, the backhoe 6 is attached to the bag 8
And the excavation of the groove 5 is advanced. Hereinafter, this operation is repeated. Existing bags on the upstream side may be sequentially collected, and earth retaining 9 may be performed by sheet piles and abdomen.

【0012】この発明によれば、掘削手段としてのバッ
クホー6を既に掘削した溝1上に乗せ、掘削土の運搬手
段としてのトラック7をバックホー6の溝掘削方向下流
側に配置することによって、バックホー6によって掘削
された掘削土をトラック7に搬出する際に、従来のよう
に、バックホー6を180°旋回させる必要がなく、そ
のままトラック7に搬出することができる。従って、狭
い作業帯であっても掘削土の搬出が容易且つ安全に行え
る。
According to the present invention, the backhoe 6 as the excavating means is placed on the already excavated groove 1, and the truck 7 as the means for transporting excavated soil is arranged downstream of the backhoe 6 in the direction of excavating the groove. When the excavated soil excavated by 6 is carried out to the truck 7, the backhoe 6 does not need to be turned 180 ° as in the related art, and can be carried out to the truck 7 as it is. Therefore, it is possible to carry out the excavated soil easily and safely even in a narrow work zone.

【0013】バックホー6が乗る土留めは、袋体8以外
に矢板と腹おこしとによる通常の土留め9により行って
も良い。また、上述したように、バックホー6を土留め
された溝5上に配置する以外に、トラック7を土留めさ
れた溝5上に乗せても同様な効果が得られる。
The earth retaining on which the backhoe 6 rides may be performed by a normal earth retaining 9 made of a sheet pile and a belly other than the bag body 8. Further, as described above, other than arranging the backhoe 6 on the grooved groove 5, a similar effect can be obtained by placing the truck 7 on the grooved groove 5.

【0014】袋体8を土留めとして使用した場合には、
以下のような掘削方法を採用することができる。上述し
たようにして、袋体8上のバックホー6により掘削作業
をして、新たな袋体を入れるだけの掘削が終了したら、
最後尾の袋体から流体を抜き取って、袋体を回収し、最
先端の溝5内に入れて土留めに使用する。このようにし
て、袋体8を循環使用すれば、使用する袋体の数を減ら
すことができる。
When the bag 8 is used as a soil retaining,
The following excavation methods can be adopted. As described above, when the excavation work is performed by the backhoe 6 on the bag body 8 and the excavation for merely inserting a new bag body is completed,
The fluid is withdrawn from the last bag, and the bag is collected and placed in the most advanced groove 5 to be used for earth retaining. In this way, if the bags 8 are used in circulation, the number of bags to be used can be reduced.

【0015】袋体6を土留めに使用する場合、空気を圧
入するのが手軽で一番好ましいが、地下水位が高く、溝
5に湧水が出る場合には、袋体6に大きな浮力が作用し
て、袋体6が溝5内から押し出される恐れがある。この
場合には、袋体6に圧入する流体として水を使用するの
が良い。
When the bag 6 is used for soil retaining, it is convenient and most preferable to inject air. However, when the groundwater level is high and spring water flows out in the groove 5, large buoyancy is applied to the bag 6. There is a possibility that the bag body 6 is pushed out of the groove 5 by acting. In this case, it is preferable to use water as the fluid to be pressed into the bag body 6.

【0016】水を袋体6内に圧入する場合には、以下の
ような掘削方法を採用することができる。上述したよう
にして、袋体8上のバックホー6により掘削作業をし
て、新たな袋体を入れるだけの掘削が終了したら、空の
袋体を最先端の溝5内に入れ、新たな袋体内に既設の袋
体6内の水を入れ替える。このように水を循環使用する
ことによって、水の有効利用を図ることができる。
When water is pressed into the bag 6, the following excavation method can be employed. As described above, the excavation work is performed by the backhoe 6 on the bag body 8, and when the excavation for merely inserting a new bag body is completed, the empty bag body is put into the frontmost groove 5 and a new bag is inserted. The water in the existing bag body 6 is replaced in the body. By thus circulating and using water, effective use of water can be achieved.

【0017】[0017]

【発明の効果】以上説明したように、この発明によれ
ば、掘削手段または運搬手段を、既に掘削され、土留め
が施された溝上に乗せて掘削作業を行うことによって、
掘削手段から運搬手段への掘削土の搬出が容易且つ安全
に行えるといった有用な効果がもたらされる。
As described above, according to the present invention, the digging operation is carried out by placing the digging means or the transporting means on the already excavated and earth retaining groove.
There is provided a useful effect that the excavated soil can be easily and safely carried out from the excavation means to the transportation means.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の、管埋設用溝の掘削方法の一実施態
様を示す部分概略断面図である。
FIG. 1 is a partial schematic cross-sectional view showing one embodiment of a method for excavating a trench for burying a pipe according to the present invention.

【図2】従来の管埋設用溝の掘削方法示す部分概略断面
図である。
FIG. 2 is a partial schematic cross-sectional view showing a conventional method for excavating a pipe burying groove.

【符号の説明】[Explanation of symbols]

1:溝 2:バックホー 3:トラック 4:土留め 5:溝 6:バックホー 7:トラック 8:袋体 1: groove 2: backhoe 3: truck 4: earth retaining 5: groove 6: backhoe 7: truck 8: bag

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 溝の掘削手段と掘削土の運搬手段とを、
溝の掘削方向に沿って一列に配置し、前記掘削手段によ
り溝を掘削し、掘削により生じた掘削土を前記運搬手段
によって別の場所に運搬することからなる、管埋設用溝
の掘削方法において、 前記掘削手段または前記運搬手段を、既に掘削され、土
留めが施された溝上に乗せて掘削を行うことを特徴とす
る、管埋設用溝の掘削方法。
1. A method for excavating a ditch and a means for transporting excavated soil,
A method for digging a trench for burying pipes, comprising arranging in a row along the direction of digging of the trench, digging the trench by the digging means, and transporting excavated soil generated by digging to another place by the transporting means. A method for digging a trench for burying pipes, wherein the digging means or the transporting means is mounted on a groove which has already been digged and which has been earthed, and digging is performed.
【請求項2】 前記土留めは、袋体を溝内に設置し、前
記袋体内に流体を圧入して前記袋体を膨らませることか
らなることを特徴とする、請求項1記載の掘削方法。
2. The excavation method according to claim 1, wherein said earth retaining means comprises placing a bag body in a groove, and injecting a fluid into said bag body to inflate said bag body. .
JP15638198A 1998-06-04 1998-06-04 Excavation method of pipe embedding trench Pending JPH11350522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15638198A JPH11350522A (en) 1998-06-04 1998-06-04 Excavation method of pipe embedding trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15638198A JPH11350522A (en) 1998-06-04 1998-06-04 Excavation method of pipe embedding trench

Publications (1)

Publication Number Publication Date
JPH11350522A true JPH11350522A (en) 1999-12-21

Family

ID=15626519

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15638198A Pending JPH11350522A (en) 1998-06-04 1998-06-04 Excavation method of pipe embedding trench

Country Status (1)

Country Link
JP (1) JPH11350522A (en)

Similar Documents

Publication Publication Date Title
JP2842855B2 (en) Long-distance propulsion method and equipment in semi-shield method
RU2434172C2 (en) Method to install pipelines in soil
JPH0686729B2 (en) Drilling rig for continuous underground wall
US2757514A (en) Method of forming an impermeable wall in the terrain
US4861199A (en) Slit trencher
CN105387273A (en) Method for constructing natural gas pipelines in mountain environment
JPH11350522A (en) Excavation method of pipe embedding trench
JPH11152986A (en) Protection method for shielding excavation in section covered with thin soil layer
CN209654048U (en) A kind of water discharge tunnel tunnel shielding portal pre-buried structure
JP5115456B2 (en) Laying and burying pipelines on steep slopes
JPH08319618A (en) Civil engineering work device, excavator, sheathing device and civil engineering work method
KR100333024B1 (en) Grouting Horizontal directional drilling method
JP3093937B2 (en) Pipe laying method
JP3886646B2 (en) Ground excavation backfill equipment
JP2876274B2 (en) Pipe burial method and apparatus
JP3753647B2 (en) Open-cut construction method for buried works such as pipes and markers for existing buried objects
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP2000065250A (en) Pipe laying method
WO2006046324A1 (en) Method for laying buried matter
JP3110927B2 (en) Backfill injection method in propulsion method
JPH09156881A (en) Crane for pipe burying construction
JPH09242082A (en) Underground water shielding wall and method of forming same
JP4621443B2 (en) Drainage culvert formation method
JP2003055950A (en) Compaction device of earth under pipe
JPH03241196A (en) Earthwork for underground piping