JPH11322221A JP13356998A JP13356998A JPH11322221A JP H11322221 A JPH11322221 A JP H11322221A JP 13356998 A JP13356998 A JP 13356998A JP 13356998 A JP13356998 A JP 13356998A JP H11322221 A JPH11322221 A JP H11322221A
Authority
JP
Japan
Prior art keywords
main rope
rope
main
brake
wire drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13356998A
Other languages
Japanese (ja)
Inventor
Kazuo Kunito
和夫 国藤
Toshimitsu Murano
利光 村野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP13356998A priority Critical patent/JPH11322221A/en
Publication of JPH11322221A publication Critical patent/JPH11322221A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a main rope hanging method for a 2:1 roping elevator which can reduce cost and allow high efficient replacement of a main rope. SOLUTION: This elevator is provided with a rope brake 13 engaged with a main rope 2 tensed between a wire drum 1 and a hoist sheave 5, and while the frictional force of the rope brake 13 is being adjusted, the main rope 2 is drawn from the wire drum 1 to be hung downward in a hoistway 3. The frictional force generated between the hoist sheave 5, the outer-periphery surface of a deflector wheel 6, and the main rope 2 can cancel part of the dead load of a U-shaped part of the main rope 2, or reduce a load imposed on the rope brake 13, thus it is possible to minimize the strength of the rope brake 13 for downsizing. The other end of the main rope 2 can be retained by relatively small effort, thus it is also possible to fine-adjust the amount for drawing the main rope 2 from the wire drum 1, and determine the appropriate length of the main rope 2 easily.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、2:1ローピング
エレベータの主ロープ掛け作業方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a main rope hanging method for a 2: 1 roping elevator.

【0002】[0002]

【従来の技術】図4は2:1ローピングエレベータの主
ロープ掛け作業方法の従来例を説明する図、図5は従来
の主ロープ掛け作業方法に用いられるロープブレーキを
示す図である。
2. Description of the Related Art FIG. 4 is a view for explaining a conventional example of a main rope hanging work method of a 2: 1 roping elevator, and FIG. 5 is a view showing a rope brake used in a conventional main rope hanging work method.

【0003】図4に示すエレベータでは、主ロープ2を
引出し可能に巻回したワイヤドラム1が最上階乗場12
に設置されており、昇降路3頂部に設けられる機械室4
に、主ロープ2が巻き掛けられる巻上機シーブ5および
そらせ車6が設置されている。機械室4の床4a上に
は、主ロープ2の両端をそれぞれ固定する一対のロープ
止め7a、7bと、そらせ車6の近傍に位置し、主ロー
プ2に所定の摩擦力を加えるロープブレーキ8とが設置
されている。乗りかご9は主ロープ2が巻き掛けられる
かごプーリ9aを有し、つり合いおもり10も主ロープ
2が巻き掛けられるカウンタプーリ10aを有してい
る。
In the elevator shown in FIG. 4, a wire drum 1 on which a main rope 2 is wound so as to be able to be pulled out has a top floor landing 12.
Machine room 4 provided at the top of the hoistway 3
In addition, a hoisting sheave 5 around which the main rope 2 is wound and a deflecting wheel 6 are installed. On the floor 4a of the machine room 4, a pair of rope stoppers 7a and 7b for fixing both ends of the main rope 2 respectively, and a rope brake 8 located near the deflector 6 and applying a predetermined frictional force to the main rope 2 And is installed. The car 9 has a car pulley 9a around which the main rope 2 is wound, and the counterweight 10 also has a counter pulley 10a around which the main rope 2 is wound.

【0004】そして従来の主ロープ掛け作業方法として
は、まず乗りかご9を図示しない揚重機により吊上げる
とともに、この乗りかご9を仮保持具11により機械室
4の床4aに仮保持させて、次いで、最上階乗場12に
ワイヤドラム1を設置し、このワイヤドラム1より主ロ
ープ2の一端側を引出してかごプーリ9a、巻上機シー
ブ5およびそらせ車6に巻き掛けた後、主ロープ2の一
端をつり合いおもり側ロープ止め7bに固定する。
[0004] As a conventional main rope hanging work method, first, the car 9 is lifted by a hoist (not shown), and the car 9 is temporarily held on the floor 4 a of the machine room 4 by the temporary holder 11. Next, the wire drum 1 is installed on the top floor landing 12, and one end of the main rope 2 is pulled out from the wire drum 1 and wound around the car pulley 9a, the hoisting sheave 5 and the deflector wheel 6, and then the main rope 2 Is fixed to the weight-side rope stopper 7b.

【0005】次いで、そらせ車6の近傍に位置したロー
プブレーキ8に主ロープ2を係合させてロープブレーキ
8の摩擦力を調整することにより、主ロープ2が過大な
速度で垂下することを防止しながら、徐々に主ロープ2
を図4に示すようにU字状に垂下させて、この主ロープ
2のU字部2aを昇降路3の底部に設置したつり合いお
もり10のカウンタプーリ10aに巻き掛けて、最後に
主ロープ2の他端側をワイヤドラム1近傍の所定位置で
切断し、この切断した主ロープ2のかご側端部をかご側
ロープ止め7aに固定して主ロープ掛け作業方法を終了
するようになっている。
Next, the main rope 2 is engaged with the rope brake 8 located near the deflector wheel 6 to adjust the frictional force of the rope brake 8, thereby preventing the main rope 2 from drooping at an excessive speed. While gradually the main rope 2
The U-shaped part 2a of the main rope 2 is wound around a counter pulley 10a of a counterweight 10 installed at the bottom of the hoistway 3 as shown in FIG. Is cut at a predetermined position near the wire drum 1, and the car-side end of the cut main rope 2 is fixed to the car-side rope stopper 7a to complete the main rope hooking method. .

【0006】なお、この種の主ロープ掛け作業方法に関
連する従来技術としては、例えば特開昭52−7104
3号公報に記載されているものが挙げられる。
The prior art relating to this type of main rope hanging work method is disclosed in, for example, Japanese Patent Application Laid-Open No. 52-7104.
No. 3 is cited.

【0007】[0007]

【発明が解決しようとする課題】ところで、上述した従
来の主ロープ掛け作業方法では、主ロープ2のU字部2
aを垂下させるにつれて、このU字部2aの部分の自重
が大きくなり、ロープブレーキ8に掛る負荷が大きくな
ることから、ロープブレーキ8に強度を持たせるためロ
ープブレーキ8を大型化する必要があり、コスト高とな
るという問題があった。
In the above-mentioned conventional main rope hanging method, the U-shaped portion 2 of the main rope 2 is used.
As the "a" hangs down, the weight of the U-shaped portion 2a increases, and the load applied to the rope brake 8 increases. Therefore, it is necessary to increase the size of the rope brake 8 so that the rope brake 8 has strength. However, there is a problem that the cost increases.

【0008】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、コストを低減で
きるとともに、主ロープ交換作業を効率良く行なうこと
のできる2:1ローピングエレベータの主ロープ掛け作
業方法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of such circumstances in the prior art, and has as its object to reduce the cost and to perform the main rope replacement operation efficiently with the main rope of a 2: 1 roping elevator. It is to provide a hanging work method.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、主ロープを引出し可能に巻回したワイヤ
ドラムを最上階乗場に設置し、昇降路頂部の機械室に据
付けた巻上機シーブおよびそらせ車に、前記ワイヤドラ
ムから引出した前記主ロープを掛け回した後、この主ロ
ープの一端を前記機械室の床に設置したつり合いおもり
側ロープ止めに固定し、前記ワイヤドラムから前記主ロ
ープを引出して前記昇降路の下方に向けてU字状に垂下
させる2:1ローピングエレベータの主ロープ掛け作業
方法において、前記ワイヤドラムと前記巻上機シーブと
の間に張設された前記主ロープに係合するとともに、こ
の主ロープに所定の摩擦力を加えるロープブレーキを設
け、このロープブレーキの摩擦力を調整しながら、前記
ワイヤドラムから前記主ロープを引出して前記昇降路の
下方に向けて垂下させる構成にしてある。
In order to achieve the above object, the present invention provides a hoist in which a wire drum on which a main rope is wound so as to be able to be pulled out is installed on a top floor landing and installed in a machine room at the top of a hoistway. After hanging the main rope pulled out from the wire drum on the machine sheave and the deflector, one end of the main rope is fixed to a counterweight weight side rope stop installed on the floor of the machine room, and the In a main rope hooking method for a 2: 1 roping elevator in which a main rope is pulled out and hung downward in a U-shape toward the lower part of the hoistway, the main rope hung work method stretched between the wire drum and the hoist sheave. A rope brake that engages with the main rope and applies a predetermined frictional force to the main rope is provided. Are a configuration to droop downward of the shaft is pulled out of the main rope.

【0010】前記のように構成した本発明では、ワイヤ
ドラムから引出した主ロープを巻上機シーブおよびそら
せ車に掛け回した後、ワイヤドラムと巻上機シーブとの
間に張設された主ロープにロープブレーキを係合させた
ので、主ロープをそらせ車より昇降路内でU字状に垂下
させるにつれて、この主ロープのU字部の自重が大きく
なるが、巻上機シーブおよびそらせ車の外周面と主ロー
プとの間で生じる摩擦力により前記の自重の一部が相殺
される。これにより、ロープブレーキに掛る負荷を軽減
できるので、ロープブレーキの強度が比較的小さくて済
み、ロープブレーキの小型化によりコストを低減でき
る。
In the present invention constructed as described above, after the main rope pulled out from the wire drum is wrapped around the hoist sheave and the deflecting wheel, the main rope stretched between the wire drum and the hoist sheave. Since the rope brake is engaged with the rope, as the main rope deflects and hangs down in a U-shape from the vehicle in the hoistway, the weight of the U-shaped portion of the main rope increases. A part of the self-weight is offset by the frictional force generated between the outer peripheral surface of the main rope and the main rope. As a result, the load on the rope brake can be reduced, so that the strength of the rope brake can be relatively small, and the cost can be reduced by downsizing the rope brake.

【0011】また、主ロープを昇降路内でU字状に垂下
させたときであっても主ロープの他端側を比較的小さな
力で保持できることから、ワイヤドラムから主ロープを
引出す量の微調整が可能であり、すなわち容易に主ロー
プの適切な長さを決めることができ、これにより、主ロ
ープ掛け作業を効率良く行なえる。
Further, even when the main rope is suspended in a U-shape in the hoistway, the other end of the main rope can be held with a relatively small force. Adjustment is possible, that is, an appropriate length of the main rope can be easily determined, so that the main rope hanging operation can be performed efficiently.

【0012】[0012]

【発明の実施の形態】以下、本発明の2:1ローピング
エレベータの主ロープ掛け作業方法の実施の形態を図に
基づいて説明する。図1は本発明の一実施形態に係わる
主ロープ掛け作業方法を用いて2:1ローピングエレベ
ータの主ロープ交換を行なう状態を示す図、図2は本実
施形態の主ロープ掛け作業方法に用いられるロープブレ
ーキおよびその周辺部分の正面図、図3はロープブレー
キおよびその周辺部分の斜視図である。なお、図1〜図
3において前述した図4、図5に示すものと同等のもの
には同一符号を付してある。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of a main rope hanging work method for a 2: 1 roping elevator according to the present invention. FIG. 1 is a diagram showing a state in which a main rope is replaced in a 2: 1 roping elevator using a main rope hanging work method according to an embodiment of the present invention, and FIG. 2 is used in the main rope hanging work method of the present embodiment. FIG. 3 is a front view of the rope brake and its peripheral portion, and FIG. 3 is a perspective view of the rope brake and its peripheral portion. In FIGS. 1 to 3, the same components as those shown in FIGS. 4 and 5 are denoted by the same reference numerals.

【0013】図2に示す巻上機50は、前述した巻上機
シーブ5が取付けられる回転軸51と、この回転軸51
を駆動する駆動部52と、回転軸51の一端を回動可能
に支持する軸受け部53と、これらの駆動部52および
軸受け部53が搭載されるマシンベース54と、床4a
上に載置され、マシンベース54の長手方向と直交する
方向に延設されるとともにマシンベース54が搭載され
るマシンビーム55とを備えている。
A hoisting machine 50 shown in FIG. 2 has a rotating shaft 51 to which the above-described hoisting sheave 5 is attached, and a rotating shaft 51
, A bearing 53 for rotatably supporting one end of the rotary shaft 51, a machine base 54 on which the drive 52 and the bearing 53 are mounted, and a floor 4a.
A machine beam 55 mounted on the top and extending in a direction orthogonal to the longitudinal direction of the machine base 54 and on which the machine base 54 is mounted.

【0014】そして、本実施形態の主ロープ掛け作業方
法では、前述した従来の作業方法と比べて、図1に示す
ように、ワイヤドラム1と巻上機シーブ5との間に張設
された主ロープ2に係合するロープブレーキ13を設け
たことにあり、その他の構成は基本的に同様である。
In the main rope hanging work method of the present embodiment, as shown in FIG. 1, the main rope hanging work method is stretched between the wire drum 1 and the hoisting sheave 5 as shown in FIG. The provision of the rope brake 13 that engages with the main rope 2 is provided, and other configurations are basically the same.

【0015】ロープブレーキ13は、図2、図3に示す
ように、巻上機シーブ5の下方に配置され、一対のマシ
ンビーム55の下面に取付けられるロープ受け部131
と、このロープ受け部131の側面に取付けられる複
数、例えば4個のロープ押え部132とからなってい
る。
As shown in FIGS. 2 and 3, the rope brake 13 is disposed below the hoisting sheave 5 and is attached to a lower surface of a pair of machine beams 55.
And a plurality of, for example, four rope holding portions 132 attached to the side surface of the rope receiving portion 131.

【0016】ロープ受け部131は、クリック131a
により一対のマシンビーム55に固定されている。各ロ
ープ押え部132には、主ロープ2に係合する係合溝1
32bと、取付ボルト132aが挿通される一対の貫通
孔132cとが設けられている。
The rope receiving portion 131 has a click 131a.
Is fixed to the pair of machine beams 55. Each rope holding portion 132 has an engaging groove 1 for engaging with the main rope 2.
32b and a pair of through holes 132c into which the mounting bolts 132a are inserted are provided.

【0017】この実施形態の主ロープ掛け作業方法にあ
っては、まず従来の場合と同様に、乗りかご9を図示し
ない揚重機により吊上げるとともに、この乗りかご9を
仮保持具11により機械室4の床4aに仮保持させて、
次いで、最上階乗場12にワイヤドラム1を設置し、こ
のワイヤドラム1より主ロープ2の一端側を引出してか
ごプーリ9a、巻上機シーブ5およびそらせ車6に巻き
掛けた後、主ロープ2の一端をつり合いおもり側ロープ
止め7bに固定する。
According to the main rope hanging work method of this embodiment, first, as in the conventional case, the car 9 is lifted by a hoist (not shown), and the car 9 is held by the temporary holding tool 11 in the machine room. 4 on the floor 4a,
Next, the wire drum 1 is installed on the top floor landing 12, and one end of the main rope 2 is pulled out from the wire drum 1 and wound around the car pulley 9a, the hoisting sheave 5 and the deflector wheel 6, and then the main rope 2 Is fixed to the weight-side rope stopper 7b.

【0018】次いで、一対のマシンビーム55の下面に
ロープ受け部131を取付けてクリック131aにより
固定した後、ロープ押え部132の係合溝132bを主
ロープ2に係合させた状態で、ロープ押え部132の貫
通孔132cに取付ボルト132aを挿通させるととも
に、各取付ボルト132aをロープ受け部131の貫通
孔131bに螺合させて、ロープ受け部131およびロ
ープ押え部132により主ロープ2をはさみ込む。
Next, after attaching the rope receiving portion 131 to the lower surfaces of the pair of machine beams 55 and fixing the rope receiving portion 131 with the click 131a, the rope holding portion 132 is engaged with the main rope 2 while the engaging groove 132b is engaged with the rope holding portion 132. The mounting bolts 132a are inserted into the through holes 132c of the portion 132, and the mounting bolts 132a are screwed into the through holes 131b of the rope receiving portion 131, and the main rope 2 is clamped by the rope receiving portion 131 and the rope pressing portion 132. .

【0019】次いで、前記の取付ボルト132aを締め
込んだり弛めることによりロープブレーキ8の摩擦力を
調整し、主ロープ2が過大な速度で垂下することを防止
しながら、徐々に主ロープ2を図1に示すようにU字状
に垂下させて、この主ロープ2のU字部2aを昇降路3
の底部に設置したつり合いおもり10のカウンタプーリ
10aに巻き掛けて、最後に主ロープ2の他端側をワイ
ヤドラム1近傍の所定位置で切断し、この切断した主ロ
ープ2のかご側端部をかご側ロープ止め7aに固定して
主ロープ掛け作業方法を終了するようになっている。
Next, by tightening or loosening the mounting bolts 132a, the frictional force of the rope brake 8 is adjusted, and while the main rope 2 is prevented from hanging at an excessive speed, the main rope 2 is gradually drawn. As shown in FIG. 1, the U-shaped portion 2a of the main rope 2 is suspended in a U-shape.
Around the counter pulley 10a of the counterweight 10 installed at the bottom of the main rope 2, and finally cut the other end of the main rope 2 at a predetermined position near the wire drum 1, and cut the car-side end of the cut main rope 2 The main rope hanging work method is finished by fixing to the car side rope stopper 7a.

【0020】このように構成した実施形態では、主ロー
プ2の一端側を引出してかごプーリ9a、巻上機シーブ
5およびそらせ車6に巻き掛けた後、かごプーリ9aと
巻上機シーブ5との間に張設された主ロープ2にロープ
ブレーキ13を係合させたので、主ロープ2をそらせ車
6より昇降路3内でU字状に垂下させるにつれて、この
主ロープ2のU字部2aの自重が大きくなるが、巻上機
シーブ5およびそらせ車6の外周面と主ロープ2との間
で生じる摩擦力によりU字部2aの自重の一部を相殺で
き、ロープブレーキ8に掛る負荷を軽減できる。
In the embodiment constructed as above, one end of the main rope 2 is pulled out and wound around the car pulley 9a, the hoisting sheave 5, and the deflector wheel 6, and then the car pulley 9a and the hoisting sheave 5 Since the rope brake 13 is engaged with the main rope 2 stretched between the main ropes 2, the U-shaped portion of the main rope 2 is Although the own weight of 2a increases, a part of the own weight of the U-shaped portion 2a can be offset by the frictional force generated between the outer peripheral surface of the hoisting sheave 5 and the deflecting wheel 6 and the main rope 2, and the rope brake 8 is applied. The load can be reduced.

【0021】また、本実施形態では、ロープブレーキ1
3を一対のマシンビーム55の下面に取付けられるロー
プ受け部131、およびこのロープ受け部131の側面
に取付けられる4個のロープ押え部132のみからなっ
ており、簡易で小型な構成である。
In this embodiment, the rope brake 1
3 comprises only a rope receiving portion 131 attached to the lower surfaces of the pair of machine beams 55 and four rope holding portions 132 attached to the side surfaces of the rope receiving portion 131, and has a simple and small configuration.

【0022】また、本実施形態では、主ロープ2を昇降
路3内でU字状に垂下させたときであっても主ロープ2
の他端側を比較的小さな力で保持できることから、主ロ
ープ2をワイヤドラム1から引出す量の微調整が可能で
あり、容易に主ロープ2の適切な長さを決めることがで
き、主ロープ2の掛け作業を効率良く行なえる。
In this embodiment, even when the main rope 2 is suspended in a U-shape in the hoistway 3, the main rope 2
Can be held with a relatively small force, the amount of pulling out the main rope 2 from the wire drum 1 can be finely adjusted, and an appropriate length of the main rope 2 can be easily determined. It is possible to carry out the hanging operation of 2 efficiently.

【0023】[0023]

【発明の効果】以上のように構成したので本発明は、主
ロープをそらせ車より昇降路内でU字状に垂下させたと
き、巻上機シーブおよびそらせ車の外周面と主ロープと
の間で生じる摩擦力で主ロープの自重の一部を相殺する
ことにより、ロープブレーキに掛る負荷を軽減できるの
で、ロープブレーキの強度が比較的小さくて済むととも
に、主ロープをワイヤドラムから引出す量の微調整が可
能であり、容易に主ロープの適切な長さを決めることが
できる。したがって、ロープブレーキの小型化を図りコ
ストを低減できるという効果があるとともに、主ロープ
掛け作業を効率良く行なえるという効果がある。
As described above, according to the present invention, when the main rope is suspended from the vehicle in a U-shape in the hoistway, the outer rope of the hoisting sheave and the deflector wheel and the main rope are connected to each other. The load on the rope brake can be reduced by canceling a part of the main rope's own weight with the frictional force generated between the ropes, so that the rope brake can be relatively low in strength and the amount of main rope pulled out from the wire drum can be reduced. Fine adjustment is possible and the appropriate length of the main rope can be easily determined. Therefore, there is an effect that the size of the rope brake can be reduced and the cost can be reduced, and there is an effect that the main rope hanging operation can be performed efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係わる主ロープ掛け作業
方法を用いて2:1ローピングエレベータの主ロープ交
換を行なう状態を示す図である。
FIG. 1 is a diagram showing a state in which a main rope is replaced in a 2: 1 roping elevator using a main rope hanging work method according to an embodiment of the present invention.

【図2】本実施形態の主ロープ掛け作業方法に用いられ
るロープブレーキおよびその周辺部分の正面図である。
FIG. 2 is a front view of a rope brake used in the main rope hanging work method of the present embodiment and a peripheral portion thereof.

【図3】ロープブレーキおよびその周辺部分の斜視図で
ある。
FIG. 3 is a perspective view of a rope brake and a peripheral portion thereof.

【図4】2:1ローピングエレベータの主ロープ掛け作
業方法の従来例を説明する図である。
FIG. 4 is a diagram illustrating a conventional example of a main rope hanging work method of a 2: 1 roping elevator.

【図5】従来の主ロープ掛け作業方法に用いられるロー
プブレーキを示す図である。
FIG. 5 is a view showing a rope brake used in a conventional main rope hanging work method.

【符号の説明】[Explanation of symbols]

1 ワイヤドラム 2 主ロープ 3 昇降路 4 機械室 4a 床 5 巻上機シーブ 6 そらせ車 7a、7b ロープ止め 9 乗りかご 10 つり合いおもり 11 仮保持具 12 最上階乗場 13 ロープブレーキ 131 ロープ受け部 131a クリック 132 ロープ押え部 132a 取付ボルト 132b 係合溝 132c 貫通孔 DESCRIPTION OF SYMBOLS 1 Wire drum 2 Main rope 3 Hoistway 4 Machine room 4a Floor 5 Hoisting sheave 6 Deflector car 7a, 7b Rope stop 9 Riding car 10 Counterweight 11 Temporary holding tool 12 Top floor landing 13 Rope brake 131 Rope receiving part 131a Click 132 Rope holding part 132a Mounting bolt 132b Engagement groove 132c Through hole

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 主ロープを引出し可能に巻回したワイヤ
ドラムを最上階乗場に設置し、昇降路頂部の機械室に据
付けた巻上機シーブおよびそらせ車に、前記ワイヤドラ
ムから引出した前記主ロープを掛け回した後、この主ロ
ープの一端を前記機械室の床に設置したつり合いおもり
側ロープ止めに固定し、前記ワイヤドラムから前記主ロ
ープを引出して前記昇降路の下方に向けてU字状に垂下
させる2:1ローピングエレベータの主ロープ掛け作業
方法において、 前記ワイヤドラムと前記巻上機シーブとの間に張設され
た前記主ロープに係合するとともに、この主ロープに所
定の摩擦力を加えるロープブレーキを設け、このロープ
ブレーキの摩擦力を調整しながら、前記ワイヤドラムか
ら前記主ロープを引出して前記昇降路の下方に向けて垂
下させるようにしたことを特徴とする2:1ローピング
エレベータの主ロープ掛け作業方法。
1. A wire drum on which a main rope is wound so as to be able to be pulled out is installed at a landing on the top floor, and a main drum pulled out from the wire drum is put on a hoisting sheave and a deflector mounted in a machine room at the top of a hoistway. After wrapping the rope, one end of the main rope is fixed to a counterweight-side rope stop installed on the floor of the machine room, and the main rope is pulled out from the wire drum and U-shaped downwardly of the hoistway. In the method of hanging a main rope of a 2: 1 roping elevator, the main rope is engaged with the main rope stretched between the wire drum and the hoisting sheave, and a predetermined friction is applied to the main rope. A rope brake for applying force is provided, and while adjusting the frictional force of the rope brake, the main rope is pulled out from the wire drum and hangs down the hoistway. 1 the main rope threading operation method of roping elevator: 2, characterized in that the the cause.
JP13356998A 1998-05-15 1998-05-15 Main rope hanging for 2:1 roping elevator Pending JPH11322221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13356998A JPH11322221A (en) 1998-05-15 1998-05-15 Main rope hanging for 2:1 roping elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13356998A JPH11322221A (en) 1998-05-15 1998-05-15 Main rope hanging for 2:1 roping elevator

Publications (1)

Publication Number Publication Date
JPH11322221A true JPH11322221A (en) 1999-11-24

Family

ID=15107883

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13356998A Pending JPH11322221A (en) 1998-05-15 1998-05-15 Main rope hanging for 2:1 roping elevator

Country Status (1)

Country Link
JP (1) JPH11322221A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003063753A (en) * 2001-08-23 2003-03-05 Mitsubishi Electric Corp Method for roping elevator main rope
JP2006027903A (en) * 2004-07-17 2006-02-02 Inventio Ag Device for suspending car or balance weight in lift installation, method for mounting and maintenance of suspension means
US9604823B2 (en) 2006-09-28 2017-03-28 Otis Elevator Company Assembly for roping an elevator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003063753A (en) * 2001-08-23 2003-03-05 Mitsubishi Electric Corp Method for roping elevator main rope
JP2006027903A (en) * 2004-07-17 2006-02-02 Inventio Ag Device for suspending car or balance weight in lift installation, method for mounting and maintenance of suspension means
US9604823B2 (en) 2006-09-28 2017-03-28 Otis Elevator Company Assembly for roping an elevator
US10364128B2 (en) 2006-09-28 2019-07-30 Otis Elevator Company Method of installing a vertically extending member in an elevator system

Similar Documents

Publication Publication Date Title
JPH0761745A (en) Hoist type elevator
WO2020035930A1 (en) Construction elevator lifting height extension method and elevator rope lowering jig
JPH11322221A (en) Main rope hanging for 2:1 roping elevator
JPWO2007129408A1 (en) Elevator safety device
WO2000000421A1 (en) Elevator
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP4474306B2 (en) Elevator equipment
JP4443171B2 (en) Elevator rope feeding device for construction
JPH07237852A (en) Hoisting drum type home-use elevator
JP2003089486A (en) Device and method for replacing elevator main rope
JP2003238047A (en) Method and device for replacing main rope of elevator
JP2003128359A (en) Roping method for elevator
JP2001097648A (en) Passenger rescue method of elevator
JPH0791012B2 (en) Driving method of elevator main rope
JP3193643B2 (en) Winding device for elevator main rope
JP2000344440A (en) Method of operation for hanging main rope of 2:1 roping elevator and main rope guide device therefor
JP3340322B2 (en) Elevator main cable entanglement prevention device
JP7417344B1 (en) Elevator car frame lifting device and elevator installation method
JP2815251B2 (en) Elevator main cable replacement method
JP2003146558A (en) Rope terminal regulating device of elevator
JP2001294386A (en) Braking force setting device for elevator, hoisting machine
WO2024069711A1 (en) Elevator main cable replacement method and replacement assisting tool
JP2006168862A (en) Elevator device
JP2912989B2 (en) Main rope hanging method of elevator
JP2001151439A (en) Elevator balancing weight structure