JPH11272749A - Development management system - Google Patents

Development management system

Info

Publication number
JPH11272749A
JPH11272749A JP7071098A JP7071098A JPH11272749A JP H11272749 A JPH11272749 A JP H11272749A JP 7071098 A JP7071098 A JP 7071098A JP 7071098 A JP7071098 A JP 7071098A JP H11272749 A JPH11272749 A JP H11272749A
Authority
JP
Japan
Prior art keywords
information
task
development
input
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7071098A
Other languages
Japanese (ja)
Inventor
Noriyuki Haga
憲行 芳賀
Kazuhiro Sugino
和宏 杉野
Hideki Ito
秀樹 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP7071098A priority Critical patent/JPH11272749A/en
Publication of JPH11272749A publication Critical patent/JPH11272749A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a development management system which enables a user to easily and properly make a plan of development stages, examine the plan again, and update it. SOLUTION: A means which accepts input of lower subjects obtained by dividing the subject of development into plural elements divisionally as resolved subjects 902 and unresolved subjects 903 and accepts input of information designating whether examination items required to resolve each unresolved should be extracted or not and repeats this information acquisition with respect to subjects for which it is indicated not to extract examination items, a means which accepts input of examination items 904 with respect to each of subjects 903 for which it is indicated to extract the examination items, a means where information acquired in this manner is stored together with link information indicating positional relations on a hierarchical structure, and an input/output means used for input and display of information are provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、新製品の開発や新
技術の研究開発などにおける開発工程の管理を支援する
ためのシステムに関し、特に、開発の進行に伴い開発工
程の変更や追加がなされるプロジェクトを管理すること
に好適なシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for supporting development process management in the development of new products and the research and development of new technologies. In particular, the development process is changed or added as the development progresses. The present invention relates to a system suitable for managing a project.

【0002】[0002]

【従来の技術】コンピュータを用いて、ガントチャート
等の工程計画表を作成し、各工程の実施状況を管理する
工程管理システムがある。このシステムの多くは、PE
RT/TIMEメソッドと呼ばれる工程計画技法を採用
している。PERT/TIMEメソッドによれば、工程
計画や、作業工数の見積もり、作業間の先行・後続関係
等を、予め正確に定義することに、合理的な工程計画を
行うことができる。
2. Description of the Related Art There is a process management system that creates a process plan table such as a Gantt chart using a computer and manages the execution status of each process. Many of these systems use PE
A process planning technique called an RT / TIME method is employed. According to the PERT / TIME method, a rational process plan can be performed by accurately defining in advance a process plan, estimating the number of man-hours, and preceding / succeeding relationships between works.

【0003】しかし、実際の開発プロジェクトの中に
は、工程計画の立案時に全ての作業項目を適切に抽出す
ることが難しいものがある。特に、新規のソフト開発や
システム開発等のプロジェクトでは、計画した工程を実
際に進めていくに従って、段々とその後の作業内容や作
業工数が明確になっていく場合が多い。
[0003] However, in some actual development projects, it is difficult to properly extract all the work items when drafting a process plan. In particular, in projects such as new software development and system development, as the planned process is actually advanced, the subsequent work content and man-hours often become clearer.

【0004】このようなプロジェクトを管理できるよう
にするシステムとして、特開平7−325860号公報
記載のシステムがある。このシステムでは、PERT/
TIMEメソッドを拡張した手法を用い、計画立案段階
ではPERT/TIMEメソッドにより工程の試算を行
い、試算した工程の実施状況を計画に反映させることが
できる。
As a system for managing such a project, there is a system described in Japanese Patent Application Laid-Open No. Hei 7-325860. In this system, PERT /
At the planning stage, a trial calculation of the process is performed by the PERT / TIME method using a method that is an extension of the TIME method, and the execution status of the estimated process can be reflected in the plan.

【0005】[0005]

【発明が解決しようとする課題】開発作業の進行に伴っ
て具体的な作業項目(工程)や工数が段々と決まってく
るプロジェクトでは、例えば新製品の開発プロジェクト
のように、作業項目に未知のものが多く含まれ、作業項
目間の関係が複雑となることがる。このような場合、作
業項目の追加や更新は、既に実施した作業の結果等が適
切に反映されるように行う必要がある。
In a project in which specific work items (processes) and man-hours are gradually determined as the development work progresses, for example, as in a new product development project, unknown work items are unknown. There are many things, and the relationship between work items may be complicated. In such a case, it is necessary to add or update the work item so that the result of the work already performed or the like is appropriately reflected.

【0006】しかしながら、上記従来のシステムでは、
作業項目の決定を支援するための機能がないため、ある
作業項目を実施した結果、開発計画における作業項目の
変更や追加が必要となった場合、開発計画全体における
作業項目の位置付けや、当所の目的などを、ユーザが再
度検討しなおさなければならない。これは、ユーザにと
って面倒な作業であり、開発が遅れる原因となる。
However, in the above-mentioned conventional system,
Since there is no function to support the determination of work items, if it is necessary to change or add a work item in the development plan as a result of performing a certain work item, position the work item in the overall development plan, The user must reconsider the purpose and the like. This is a troublesome operation for the user, and causes a delay in development.

【0007】また、上記従来のシステムでは、開発工程
の計画立案および計画変更がどの程度適正になされるか
が、ユーザの経験や能力により、大きく変わってしま
う。このため、適切でない作業項目が決定されて、無駄
な作業項目に多くの時間を費やしてしまう事態が起りや
すい。
[0007] In the above-mentioned conventional system, the degree to which the planning and the change of the development process are properly performed greatly changes depending on the experience and ability of the user. For this reason, a situation in which an inappropriate work item is determined and a lot of time is spent on useless work items is likely to occur.

【0008】そこで、本発明の目的は、開発工程の計画
立案や、計画の再検討および更新をユーザが容易かつ適
切に行うことを可能とする開発管理システムを提供する
ことにある。
It is an object of the present invention to provide a development management system that enables a user to easily and appropriately plan a development process and review and update a plan.

【0009】[0009]

【課題を解決するための手段】上記課題を解決するた
め、本発明は、開発工程の管理を行うための開発管理シ
ステムにおいて、開発の課題を複数の要素に分けたもの
である下位の課題を表す情報を、解決済みの課題と、未
解決の課題とに分けて取得し、未解決の各課題につい
て、該課題を解決するのに必要となる検討項目が抽出で
きるか否かを表す情報を取得し、検討項目が抽出できな
い未解決の課題がある場合、該課題について前記情報取
得を繰り返すための課題詳細化手段と、検討項目が抽出
できる各課題について、検討項目を表す情報を取得する
ための課題具体化手段と、課題詳細化手段および課題具
体化手段により取得された情報が、上位の課題から下位
の課題および検討項目にかけて、階層構造上の位置関係
を表すリンク情報と共に記憶される記憶手段と、情報の
取得、および、前記記憶手段の記憶している情報の表示
に用いられる入出力手段とを有することを特徴とする開
発管理システムを提供する。
In order to solve the above-mentioned problems, the present invention provides a development management system for managing a development process, wherein a lower-level problem in which a development problem is divided into a plurality of elements is provided. The obtained information is divided into the resolved issues and the unresolved issues, and the obtained information is obtained. For each unresolved issue, the information indicating whether the examination items necessary for solving the issues can be extracted or not. When there is an unresolved issue that cannot be obtained and an examination item cannot be extracted, an issue detailing unit for repeating the information acquisition for the issue, and for each issue from which an examination item can be extracted, to acquire information representing the examination item And the information obtained by the task detailing means and the task detailing means are shared with the link information indicating the hierarchical relationship from the higher level tasks to the lower level issues and study items. Storage means to be stored, the acquisition of information, and provides a development management system and having input and output means used to display information stored in said storage means.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施形態につい
て、図面を用いて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0011】本実施形態は、本発明による開発管理シス
テムを、新製品の技術開発の工程管理に適用した例であ
る。新製品開発では、新製品の機能、性能、サイズ、コ
スト、信頼性等の製品主要仕様を実現するために必要な
技術課題が決まった後、その技術課題を解決する技術開
発プロジェクトが発足する。
The present embodiment is an example in which the development management system according to the present invention is applied to process management of technology development of a new product. In the development of new products, after the technical issues necessary to realize the main specifications of the product, such as the functions, performance, size, cost, and reliability of the new products, are determined, then a technology development project is set up to solve the technical issues.

【0012】本発明による開発管理システムでは、開発
工程全体の管理プロセスを、図2に示す3つの基本プロ
セス、すなわち、課題詳細化プロセス121と、課題具
体化プロセス122と、検討プロセス123とに分けて
支援する。まず、課題詳細化プロセス121および課題
具体化プロセス122において、開発の初期の計画立案
がなされ、これに従った検討作業が開始される。そし
て、検討プロセス123において、検討作業と検討結果
の評価とがなされ、評価結果に応じてプロセス121〜
123が繰返され、計画変更がなされる。そして、プロ
セス121〜123が繰返されることで、開発が進んで
行く。
In the development management system according to the present invention, the management process of the entire development process is divided into three basic processes shown in FIG. 2, namely, a problem detailing process 121, a problem realizing process 122, and a study process 123. To help. First, in an issue detailing process 121 and an issue realization process 122, an initial plan for development is made, and a study operation according to the plan is started. Then, in the examination process 123, the examination work and the evaluation of the examination result are performed, and the processes 121 to 121 are performed according to the evaluation result.
Step 123 is repeated to change the plan. Then, by repeating the processes 121 to 123, the development proceeds.

【0013】図1は、本実施形態の開発管理システムの
全体構成を示すブロック図である。図示のように、開発
管理システム100は、コンピュータ120、ディスプ
レイ110、キーボード111、および、マウス112
を有する。
FIG. 1 is a block diagram showing the overall configuration of the development management system according to the present embodiment. As shown, the development management system 100 includes a computer 120, a display 110, a keyboard 111, and a mouse 112.
Having.

【0014】コンピュータ120は、図示しないプロセ
ッサ、各種メモリ、ディスク記憶装置(例えば磁気記憶
装置)、および、各種インタフェース回路を有し、プロ
セッサによるプログラム処理により複数の機能を実現す
る。また、このコンピュータ120の機能は、ネットワ
ークを介して接続された他のコンピュータが利用するこ
とができる。
The computer 120 includes a processor (not shown), various memories, a disk storage device (for example, a magnetic storage device), and various interface circuits, and realizes a plurality of functions by program processing by the processor. The functions of the computer 120 can be used by another computer connected via a network.

【0015】コンピュータ120は、機能ブロックとし
て、主に管理詳細化プロセス121の管理を支援する課
題詳細化部101、主に課題具体化プロセス122の管
理を支援する課題具体化部102、主に検討プロセス1
23の管理を支援する検討結果取得部103、課題関連
生成部104、課題関連表示部105、工程計画生成部
106、工程情報表示部107、課題構成データベース
108、および、工程情報データベース109を実現す
る。
The computer 120 has, as functional blocks, an issue detailing section 101 which mainly supports the management of the management detailing process 121, an issue detailing section 102 which mainly supports the management of the issue detailing process 122, and mainly studies. Process 1
A study result acquisition unit 103, an assignment-related generation unit 104, an assignment-related display unit 105, a process plan generation unit 106, a process information display unit 107, an assignment configuration database 108, and a process information database 109 that support management of the 23 are realized. .

【0016】データベース108および109は、コン
ピュータ120内のディスク記憶装置を利用して、デー
タの記録および読み出しを行う機能である。課題詳細化
部101、課題具体化部102、検討結果取得部10
3、課題関連表示部105、および、工程情報表示部1
07は、グラフィックユーザインタフェース(GUI)
の機能を備え、各種入出力装置110〜112を用いて
データの取得や表示を行う。データの取得では、ディス
プレイ110の表示画面上でユーザがキーボード111
を用いて入力したデータを取込む。また、表示画面上で
ユーザがマウス112を用いて指定した位置・範囲やボ
タンの情報を取込む。
The databases 108 and 109 have a function of recording and reading data using a disk storage device in the computer 120. Assignment detailing unit 101, assignment specification unit 102, examination result acquisition unit 10
3. Task related display unit 105 and process information display unit 1
07 is a graphic user interface (GUI)
And acquires and displays data using various input / output devices 110 to 112. In obtaining data, the user operates the keyboard 111 on the display screen of the display 110.
The input data is captured using. Further, information on a position, a range, and a button designated by the user using the mouse 112 on the display screen is captured.

【0017】開発管理システム100の各機能について
説明する。
Each function of the development management system 100 will be described.

【0018】課題詳細化部101は、開発プロジェクト
で決定された技術課題を表す情報をユーザより取得する
ための部分である。技術課題は、開発プロジェクト全体
の課題(主課題)から、その下位の課題(サブ課題)に
かけて順次詳細化され、階層構造(ツリー構造)を持つ
情報として取得される。サブ課題は、解決済みのもの
と、未解決のものとに分けて取得される。そして、詳細
化が可能な未解決のサブ課題については、詳細化が繰返
される。課題詳細化部101の取得する情報には、さら
に、その課題の検討作業で達成すべき目標仕様などの情
報が含まれる。
The task detailing section 101 is a section for acquiring information representing a technical task determined in a development project from a user. The technical tasks are sequentially detailed from the tasks (main tasks) of the entire development project to the tasks (sub tasks) at lower levels, and are acquired as information having a hierarchical structure (tree structure). Sub-tasks are acquired separately for those that have been resolved and those that have not been resolved. Then, for the unresolved sub-tasks that can be refined, the refinement is repeated. The information acquired by the task detailing unit 101 further includes information such as a target specification to be achieved in a study on the task.

【0019】課題具体化部102は、未解決のサブ課題
を解決するのに必要となる具体的な検討項目を表す情報
をユーザより取得するための部分である。取得する情報
には、検討名称、検討項目(および検討条件)、検討担
当者名、検討期限、などの情報が含まれる。
The task embodying unit 102 is a section for acquiring information representing specific examination items necessary for solving an unsolved sub-task from a user. The information to be acquired includes information such as a study name, a study item (and a study condition), a study person in charge, and a study deadline.

【0020】検討結果取得部103は、検討項目の作業
後に検討結果を表す情報をユーザより取得するための部
分である。取得する結果情報には、検討結果、検討結果
に対する考察、作業終了日、などの情報が含まれる。
The examination result acquisition unit 103 is a part for acquiring information representing the examination result from the user after the work on the examination item. The acquired result information includes information such as a study result, a study on the study result, and a work end date.

【0021】課題関連生成部104は、課題詳細化部1
01、課題具体化部102、および、検討結果取得部1
03により取得された各種情報を互いに関連付けたもの
である課題関連データを生成するための部分である。生
成された課題関連データは、階層構造を有し、課題情報
データベース108に登録される。また、この課題関連
データは、課題関連表示部105によって表示される。
The task-related generating section 104 includes the task detailing section 1
01, the task embodying unit 102, and the examination result obtaining unit 1
This is a part for generating assignment-related data in which the various pieces of information acquired in step 03 are associated with each other. The generated task-related data has a hierarchical structure and is registered in the task information database 108. The assignment-related data is displayed by the assignment-related display unit 105.

【0022】工程計画生成部106は、課題情報データ
ベース108内の課題関連データに含まれる情報を元
に、工程管理データを生成する部分である。工程管理デ
ータは、開発作業の期限、開発作業間の先行・後続関
係、開発作業に割り当てる作業者などの情報からなる。
生成された工程管理データは、工程情報データベース1
09に登録される。また、工程管理データは、工程情報
表示部107によって表示される。
The process plan generation section 106 is a section for generating process management data based on information included in the task-related data in the task information database 108. The process management data includes information such as a deadline of the development work, a preceding / succeeding relationship between the development works, and an operator assigned to the development work.
The generated process management data is stored in the process information database 1
09 is registered. Further, the process management data is displayed by the process information display unit 107.

【0023】以下、開発管理システム100の動作につ
いて説明する。
Hereinafter, the operation of the development management system 100 will be described.

【0024】図3に、開発管理システム100の処理フ
ローの概略を示す。開発管理システム100では、ま
ず、課題詳細化部101および課題具体化部102が、
プロジェクトの技術課題の詳細化および具体化をユーザ
に促し、各種課題および検討項目の情報を取得する(ス
テップ401:課題情報取得処理)。次に、取得した情
報を基に、課題関連生成部104が、階層構造の課題関
連データを生成し、課題情報データベース108に登録
する(ステップ402:課題関連生成処理)。この課題
関連データは、ユーザからの要求があった時に、課題関
連表示部105により表示される。次に、工程計画生成
部106が、課題情報データベース108の課題関連デ
ータを元に、工程管理データを生成し、工程情報データ
ベース109に登録する(ステップ403:工程計画生
成処理)。登録された情報は、工程情報表示部107に
より表形式で表示される(ステップ404:工程情報表
示処理)。次に、検討結果取得部103が、検討結果お
よびその評価の情報を取得して、課題情報データベース
108に追加登録し、その評価情報に対応する処理を行
う(ステップ405:検討結果取得処理)。この処理で
は、全ての課題が解決されていれば処理を終了する。課
題の変更や追加が必要ならば、ステップ401に処理を
戻し、新たに課題詳細化や課題具体化の処理を行う。そ
して、以上の処理(401〜405)が開発の進行に伴
い繰り返されることで、プロジェクトに合った検討項目
が抽出され、開発が効率よく進んでいく。
FIG. 3 shows an outline of a processing flow of the development management system 100. In the development management system 100, first, the task detailing unit 101 and the task realizing unit 102
The user is urged to refine and embody the technical issues of the project, and information on various issues and study items is acquired (step 401: issue information acquisition processing). Next, based on the acquired information, the task-related generating unit 104 generates hierarchically-related task-related data, and registers the hierarchically-related data in the task information database 108 (Step 402: task-related generation processing). The assignment-related data is displayed by the assignment-related display unit 105 when there is a request from the user. Next, the process plan generation unit 106 generates process management data based on the task-related data in the problem information database 108 and registers the process management data in the process information database 109 (step 403: process plan generation process). The registered information is displayed in a table format by the process information display unit 107 (step 404: process information display processing). Next, the examination result acquisition unit 103 acquires the examination result and the information of the evaluation, additionally registers the information in the assignment information database 108, and performs processing corresponding to the evaluation information (step 405: examination result acquisition processing). In this process, if all the problems have been solved, the process ends. If the assignment needs to be changed or added, the process returns to step 401, and a process for refining the assignment or realizing the assignment is newly performed. Then, the above processes (401 to 405) are repeated as the development progresses, whereby examination items suitable for the project are extracted, and development proceeds efficiently.

【0025】以上の各処理について、表示画面の例を用
いて詳しく説明する。
Each of the above processes will be described in detail using an example of a display screen.

【0026】図4に、課題情報取得処理(401)の詳
細フローを示す。
FIG. 4 shows a detailed flow of the task information acquisition processing (401).

【0027】課題情報取得処理(401)では、まず、
図5に示す形態の課題名称入力画面を表示し、ユーザか
ら主課題名称201を取得する(ステップ501)。次
に、図6に示す課題具体化確認画面を表示し、具体化を
行うかどうかの指示情報をユーザから取得する(ステッ
プ502)。そして、この指示情報に応じて処理の切替
を行い(ステップ503)、具体化を行うと指示された
場合は課題具体化処理(ステップ504)に進み、他の
場合は課題詳細化処理(ステップ510)に進む。な
お、課題名称入力画面上でプロジェクトの責任者名な
ど、他の情報を取得するようにしてもよい。
In the task information acquisition process (401), first,
The task name input screen of the form shown in FIG. 5 is displayed, and the main task name 201 is obtained from the user (step 501). Next, the task materialization confirmation screen shown in FIG. 6 is displayed, and instruction information as to whether or not materialization is performed is obtained from the user (step 502). Then, the process is switched in accordance with the instruction information (step 503), and when it is instructed to perform the materialization, the process proceeds to the problem materializing process (step 504), and in other cases, the problem detailed process (step 510). Proceed to). Note that other information such as the name of the person in charge of the project may be acquired on the assignment name input screen.

【0028】図5および図6の例は、複数の部品を一括
して研磨する技術の開発に関するものであり、主課題名
称201として「部品一括高精度研磨技術の開発」が取
得される。また、この段階では主課題に対する具体的な
検討項目を挙げることができないため、マウス112に
より「いいえ」ボタン802が選択され、処理は課題詳
細化処理(510)に進む。
The examples of FIGS. 5 and 6 relate to the development of a technique for polishing a plurality of components at once, and “Development of Component Batch High-Precision Polishing Technology” is acquired as the main subject name 201. Further, at this stage, since a specific examination item for the main task cannot be listed, the “No” button 802 is selected by the mouse 112, and the process proceeds to a task detailing process (510).

【0029】課題詳細化処理(510)では、まず、図
7に示す形態の課題詳細化画面を表示する(ステップ5
05)。そして、その表示画面において、解決済みのサ
ブ課題名称301と、未解決のサブ課題名称302とを
ユーザより取得する(ステップ506、507)。ここ
で、解決済み課題には、過去の技術開発で解決されてい
る課題や、社外からの技術導入で解決されている課題
等、新たな開発作業を要さない課題が含まれる。また、
課題詳細化処理(510)では、課題詳細化画面で取得
された情報を、主課題504の下位の情報として位置付
けるためのリンク情報を生成する。
In the task detailing process (510), first, a task detailing screen in the form shown in FIG. 7 is displayed (step 5).
05). Then, on the display screen, a resolved sub-task name 301 and an unresolved sub-task name 302 are obtained from the user (steps 506 and 507). Here, the solved issues include issues that do not require new development work, such as issues that have been solved by past technology development and issues that have been solved by introducing technology from outside. Also,
In the task detailing process (510), link information for positioning information acquired on the task detailing screen as lower-level information of the main task 504 is generated.

【0030】図7の例では、詳細化したサブ課題301
および302として、それぞれ、「部品切断技術の開
発」と「研磨量不均一の低減」とが取得される。ここ
で、「部品切断技術の開発」は、従来からある切断技術
で対応可能なため、解決済みの課題とされている。一括
研磨では研磨面積が増えることから、各部品における面
内の研磨量が不均一となる。その課題を示す「研磨量不
均一の低減」は、従来なかった課題であるため、未解決
のサブ課題とされている。
In the example shown in FIG.
As “302” and “302,” “development of component cutting technology” and “reduction of non-uniform polishing amount” are acquired. Here, "development of a component cutting technique" is considered to be a solved problem because it can be handled by a conventional cutting technique. Since the polishing area increases in the batch polishing, the in-plane polishing amount of each component becomes non-uniform. “Reduction of non-uniform polishing amount”, which indicates the problem, is an unsolved sub-problem because it is not a conventional problem.

【0031】課題詳細化処理(510)または課題詳細
化処理(504)が終了すると、これまでの処理で得た
未解決サブ課題に対して、課題具体化処理(504)が
なされているかどうかを判定する(ステップ508)。
判定の結果、全ての未解決サブ課題に対して課題具体化
処理(504)が完了しているときは、課題情報取得処
理(401)を終了する。課題具体化処理(504)の
行われていない未解決サブ課題があるときは、上記ステ
ップ502に戻り、課題詳細化処理(510)や課題具
体化処理(504)を行う。
When the task detailing processing (510) or the task detailing processing (504) is completed, it is determined whether or not the task realization processing (504) has been performed on the unresolved sub-tasks obtained in the processing so far. A determination is made (step 508).
If the result of the determination is that the task realization processing (504) has been completed for all unresolved sub-tasks, the task information acquisition processing (401) ends. If there is an unresolved sub-task that has not been subjected to the task embodying process (504), the process returns to step 502, and the task refining process (510) and the task embodying process (504) are performed.

【0032】図7の例では、未解決サブ課題「研磨量不
均一の低減」についての課題具体化処理(504)をま
だ行っていないため、処理はステップ508からステッ
プ502に戻り、課題名称803を「研磨量不均一の低
減」とする課題具体化確認画面(図6)が表示される。
ここでは、課題「研磨量不均一の低減」について具体的
な検討項目を列挙できるため、「はい」ボタン801が
選択され、処理は課題具体化処理(504)に進む。
In the example of FIG. 7, since the task embodying process (504) for the unresolved sub-task “reducing uneven polishing amount” has not been performed yet, the processing returns from step 508 to step 502, and the task name 803. Is displayed as “Reduce uneven polishing amount” (FIG. 6).
Here, since specific examination items can be listed for the problem “reduction of nonuniform polishing amount”, the “Yes” button 801 is selected, and the process proceeds to the problem realization process (504).

【0033】図8に、課題具体化処理(504)の詳細
フローを示す。課題具体化処理では、まず、図9に示す
課題具体化画面を表示する(ステップ601)。この
際、主課題名称704および目標仕様707には、前の
処理で取得されたものを表示する。次に、課題具体化画
面上で、ユーザから検討名称705と、課題解決に必要
な実験やシミュレーションの条件や測定対象を示す検討
項目701とを取得する(ステップ602)。次に、こ
の検討項目の期限702および担当者703の情報を取
得する(ステップ603)。課題具体化画面では、開発
の開始予定日、終了予定日、開発に必要な機器の名称、
他の検討項目の作業との先行・後続関係などの情報も取
得される。検討期限702の代わりに、検討工数の入力
を求めるようにしてもよい。また、課題具体化処理(5
04)では、課題具体化画面で取得された情報を、主課
題名称704の下位の情報として位置付けるためのリン
ク情報を生成する。
FIG. 8 shows a detailed flow of the task embodying process (504). In the task realization process, first, the task realization screen shown in FIG. 9 is displayed (step 601). At this time, the main task name 704 and the target specification 707 display those acquired in the previous process. Next, on the task realization screen, a study name 705 and a study item 701 indicating an experiment or simulation condition and a measurement object necessary for solving the task are acquired from the user (step 602). Next, the information of the deadline 702 and the person in charge 703 of this examination item is acquired (step 603). On the issue specification screen, the scheduled start date and end date of the development, the name of the equipment required for development,
Information such as the leading / succeeding relationship with the work of other examination items is also acquired. Instead of the study deadline 702, an input of study man-hour may be required. In addition, the task embodying process (5
In 04), link information for positioning the information acquired on the task realization screen as information below the main task name 704 is generated.

【0034】図9の例では、検討名称705として「部
品押さえ材 材質と研磨量不均一の関連究明」が取得さ
れ、検討項目701としては、検討対象となる「部品押
え材」と材料名(「シリコンゴム」等)とが取得され
る。
In the example of FIG. 9, “Research on the relationship between the material of the component presser and the unevenness of the polishing amount” is acquired as the study name 705, and the “component presser” to be examined and the material name ( "Silicon rubber") is acquired.

【0035】次に、課題関連生成処理(図3の402)
について説明する。
Next, the task related generation processing (402 in FIG. 3)
Will be described.

【0036】課題関連生成処理(402)では、課題情
報取得処理(401)および後述する検討結果取得処理
(405)で取得された情報およびリンク情報を元に、
階層構造を持つ課題関連データを生成し、課題情報デー
タベース108に登録する。ここで、課題関連データ
は、プロジェクトの単位で管理される。すなわち、主課
題に繋がる全ての情報が1グループとして管理される。
また、課題関連データは、ネットワークを介して接続さ
れた他のコンピュータから参照することができる。
In the assignment related generation processing (402), based on the information and link information acquired in the assignment information acquisition processing (401) and the examination result acquisition processing (405) described later,
The task-related data having a hierarchical structure is generated and registered in the task information database 108. Here, the task-related data is managed on a project basis. That is, all information that leads to the main task is managed as one group.
The task-related data can be referred to from another computer connected via a network.

【0037】図10に、課題関連データのデータ構造お
よび表示形態の概略を示す。図中、各データブロック9
01〜906の各々は、課題情報取得処理(401)で
取得した情報に対応する。この内、ブロック901〜9
03の各々は、課題詳細化処理(510)で得られた個
々の課題の情報に対応する。ブロック904〜906の
各々は、課題具体化処理(504)で得られる個々の検
討項目の情報に対応する。課題関連データには、課題情
報取得処理(401)と後述する検討結果取得処理(4
05)とで取得された全ての情報が含まれる。図10中
に示されていない情報は無表示情報として含まれる。例
えば、図9の課題具体化画面で取得した期限702、担
当者703などは、データブロック904の無表示情報
として記録される。
FIG. 10 schematically shows the data structure and display form of the task-related data. In the figure, each data block 9
Each of 01 to 906 corresponds to the information acquired in the assignment information acquisition process (401). Among them, blocks 901-9
Each of 03 corresponds to information on an individual task obtained in the task detailing process (510). Each of the blocks 904 to 906 corresponds to information of an individual examination item obtained in the task embodying process (504). The assignment-related data includes assignment information acquisition processing (401) and examination result acquisition processing (4) described later.
05) is included. Information not shown in FIG. 10 is included as non-display information. For example, the deadline 702, the person in charge 703, and the like acquired on the assignment specifying screen in FIG. 9 are recorded as non-display information of the data block 904.

【0038】ここで、図中のより左側に位置するデータ
ブロックほど、上位の課題または検討項目を表す。デー
タブロックは、詳細化および具体化が進につれて、左上
側に位置する上位ものから、右下側に位置する下位もの
にかけて順次生成されることになる。ここで、例えば、
検討項目に対応するブロック904を基準にすると、一
階層上の課題はブロック903、二階層上の課題はブロ
ック901、同位の検討項目はブロック905および9
06にそれぞれ対応する。
Here, a data block located further to the left in the figure represents a higher-order problem or a study item. The data blocks are sequentially generated from higher-order ones located at the upper left to lower-order ones located at the lower right as the detailing and embodying progress. Where, for example,
Based on the block 904 corresponding to the study item, the task on the first hierarchy is block 903, the task on the second hierarchy is block 901, and the study items of the same rank are blocks 905 and 9
06 respectively.

【0039】データブロック間を結ぶ線は、データブロ
ック間の階層関係を示すものであり、リンク情報として
別途登録される。例えば、図10のブロック903のリ
ンク情報としては、上位のブロック901、同位のブロ
ック902、および、下位のブロッ904〜906の、
課題情報データベース108における各先頭アドレスが
含まれる。このリンク情報により、課題関連データ内の
全てのデータブロックの階層構造上の位置関係がわか
る。
The lines connecting the data blocks indicate the hierarchical relationship between the data blocks, and are separately registered as link information. For example, as the link information of the block 903 in FIG. 10, the upper block 901, the peer block 902, and the lower blocks 904 to 906
Each head address in the assignment information database 108 is included. From this link information, the positional relationship in the hierarchical structure of all data blocks in the task-related data can be known.

【0040】次に、課題関連データの表示処理について
説明する。
Next, display processing of the task-related data will be described.

【0041】課題関連表示部105は、図3の各処理時
点において、ユーザから表示要求を受付け、課題情報デ
ータベース108内の課題関連データを、予め定めた規
則に従い、図10に示す態様で表示する。具体的には、
メモリ上で、上位の課題(901)から下位の課題(9
02,903)、検討項目(904)、検討結果(90
7)にかけて、表示座標を変えつつ、各データブロック
を順次グラフィックデータに展開していき、下位および
同位のデータブロックを接続するリンク線を追加して、
その結果を表示する。表示座標は、下位のデータブロッ
クほど、表示画面の右下方向となるように決める。表示
要求は、各画面上に設けられた表示ボタン(図示せず)
の選択によりなされる。
The task-related display unit 105 receives a display request from the user at each processing point in FIG. 3, and displays the task-related data in the task information database 108 in a manner shown in FIG. 10 according to a predetermined rule. . In particular,
On the memory, the upper task (901) is changed to the lower task (9).
02, 903), examination items (904), examination results (90
Through 7), while changing the display coordinates, each data block is sequentially developed into graphic data, and link lines connecting lower-level and same-level data blocks are added.
Display the result. The display coordinates are determined such that the lower the data block is, the lower the right is on the display screen. The display request is made by a display button (not shown) provided on each screen.
Is made by the selection of

【0042】課題関連データを参照する他のコンピュー
タでも、同様の表示がなされる。なお、ここでは、表示
座標およびリンク線により階層関係を表すようにしてい
るが、表示色など、別の要素を用いて階層関係を表すよ
うにしてもよい。
Similar displays are made on other computers that refer to the task-related data. Here, the hierarchical relationship is represented by the display coordinates and the link lines, but the hierarchical relationship may be represented by another element such as a display color.

【0043】課題関連データの表示により、ユーザは、
課題の詳細化がどのようになされているか、各検討項目
がどのような課題を元に決定されたのか、検討項目間の
関係がどのようになっているか、どうような検討結果が
得られたか、を任意の段階で容易に知ることができる。
By displaying the task-related data, the user can:
How the issues were refined, what issues each item was determined on, the relationship between the items, and what results were obtained , Can be easily known at any stage.

【0044】次に、工程計画生成処理(403)につい
て説明する。
Next, the process plan generation process (403) will be described.

【0045】工程計画生成処理(403)では、工程管
理データの生成を行い、生成した工程管理データを表示
する。工程管理データは、ネットワークを介して接続さ
れた他のコンピュータから参照することができる。
In the process plan generation process (403), process management data is generated, and the generated process management data is displayed. The process management data can be referred to from another computer connected via a network.

【0046】図11に、工程計画生成処理(403)に
より生成される工程管理データの構造および表示形態の
概要を示す。工程管理データは、複数のサマリータスク
情報(1401および1402)と、複数のタスク情報
(1402)とからなる。これらの情報も階層構造を持
ち、図中でより左側に位置する情報が、上位の課題や検
討項目に対応する。サマリータスク情報およびタスク情
報の各々には、タスク名1410、作業の開始予定日1
411、終了予定日1412、担当者名1413、作業
が終了した日付である終了実績日1414、および、開
発作業の進捗1415が含まれる。進捗1415は、作
業の進行度合を示す値であり、作業終了時に100%と
なる。
FIG. 11 shows an outline of the structure and display form of the process management data generated by the process plan generation process (403). The process management data includes a plurality of summary task information (1401 and 1402) and a plurality of task information (1402). These pieces of information also have a hierarchical structure, and the information located on the left side in the figure corresponds to a higher-level problem or a study item. Each of the summary task information and the task information includes a task name 1410, a scheduled work start date 1
411, a scheduled end date 1412, a person in charge 1413, an actual end date 1414, which is a date when the work has been completed, and a progress 1415 of the development work. The progress 1415 is a value indicating the degree of progress of the work, and becomes 100% at the end of the work.

【0047】タスク情報1403は、各検討項目毎に実
施する作業の内容を認識可能とする情報であり、課題具
体化処理(504)で得られた課題関連データから抽出
される(図10のブロック904〜906)。タスク情
報1403において、タスク名1410は課題関連デー
タ内の検討名称である。開始予定日1411、終了予定
日1412、および、担当者1413は、課題具体化画
面(図9)において取得されたデータである。進捗14
15は、後述する工程情報表示処理(404)の表示画
面上でユーザにより入力される。なお、開始予定日14
11、終了予定日1412、および、担当者1413に
ついても、表示画面から取得するようにしてもよい。
The task information 1403 is information that enables the contents of the work to be performed for each examination item to be recognized, and is extracted from the task-related data obtained in the task embodying process (504) (block in FIG. 10). 904-906). In the task information 1403, a task name 1410 is a study name in the task-related data. The scheduled start date 1411, the scheduled end date 1412, and the person in charge 1413 are data acquired on the assignment specific screen (FIG. 9). Progress 14
15 is input by the user on a display screen of a process information display process (404) described later. The scheduled start date is 14
11, the scheduled end date 1412, and the person in charge 1413 may also be acquired from the display screen.

【0048】サマリータスク情報は、実施する作業のグ
ループを認識可能とする見出し情報であり、課題詳細化
処理(510)で得られるデータから抽出される(図1
0のブロック901〜903)。サマリータスク情報に
おいて、タスク名は課題関連データの課題名称である。
開始予定日は全てのサブタスク情報に含まれる開始予定
日のうちの最送の日、終了予定日は全てのサブタスク情
報に含まれる終了予定日のうちの最遅の日である。担当
者名は、課題詳細化画面(図7)において取得したデー
タである。なお、担当者名は、表示画面においてユーザ
から取得するようにしてもよい。終了実績日は開発の初
期には値を持たず、終了時の日時とされる。進捗141
5は、対応する全てのサブタスク情報内の進捗の平均値
となる。
The summary task information is heading information that makes it possible to recognize the group of work to be performed, and is extracted from data obtained in the task detailing process (510) (FIG. 1).
0 blocks 901-903). In the summary task information, the task name is the task name of the task-related data.
The scheduled start date is the latest date among the scheduled start dates included in all the subtask information, and the scheduled end date is the latest date among the scheduled end dates included in all the subtask information. The name of the person in charge is data acquired on the assignment detail screen (FIG. 7). The name of the person in charge may be obtained from the user on the display screen. The actual end date has no value in the early stage of development, but is the date and time at the end. Progress 141
5 is the average value of the progress in all the corresponding subtask information.

【0049】次に、工程情報表示処理(404)につい
て説明する。
Next, the process information display processing (404) will be described.

【0050】工程情報表示処理(404)は、工程情報
データベース109に登録されている工程管理データを
図11に示した形態で表示する。具体的には、上述した
課題関連データの表示と同様に、メモリ上で、表示座標
の変更を行いつつ、上位の階層から下位の階層にかけて
工程管理データをグラフィックデータに展開していく。
開発担当者は、表示された期限に従い、机上検討や、シ
ミュレーション、実験、試作等の、開発作業を実施す
る。そして、開発作業の進行に応じて、工程管理データ
の表示画面上で、進捗1415の設定・更新を行う。表
示画面上でデータの更新がなされると、工程情報データ
ベース109内の対応するデータが更新される。工程管
理データを参照する他のコンピュータでも、同様の表示
がなされる。
The process information display process (404) displays the process management data registered in the process information database 109 in the form shown in FIG. Specifically, similarly to the display of the task-related data described above, the process control data is expanded into graphic data from the upper hierarchy to the lower hierarchy while changing the display coordinates on the memory.
The developer in charge performs development work such as desk study, simulation, experiment, and trial production in accordance with the displayed deadline. Then, according to the progress of the development work, the progress 1415 is set and updated on the display screen of the process management data. When data is updated on the display screen, the corresponding data in the process information database 109 is updated. Similar displays are made on other computers that refer to the process management data.

【0051】なお、工程管理データの表示を、ガントチ
ャート様式の図として表示するようにしてもよい。これ
により、ユーザが各検討項目や課題の開始予定日、終了
予定日、先行・後続関係を容易に把握できるようにな
る。ガントチャートの表示対象(工程)は、課題や、個
々の検討項目から選択するようにする。この際、開発の
先行・後続関係を持つ検討項目は全て選択し、他のもの
はより上位の課題を選択するようにする。これにより、
内容の整理されたチャート表示がなされる。チャートに
対応付けて進捗1415の値を表示するようにしてもよ
い。
The display of the process management data may be displayed as a Gantt chart style diagram. As a result, the user can easily grasp the scheduled start date, the scheduled end date, and the preceding / succeeding relationship of each study item and the assignment. The display target (process) of the Gantt chart is selected from issues and individual examination items. At this time, all the study items having the leading / succeeding relationship of the development are selected, and the other items are selected from the higher-ranking issues. This allows
A chart display with organized contents is made. The value of the progress 1415 may be displayed in association with the chart.

【0052】工程管理データの表示からユーザは、現時
点におけるプロジェクト全体の進行状態を容易に知るこ
とができる。また、これにより、遅れている検討項目の
作業担当者を増員したり、検討項目の見直しを行うこと
により、プロジェクトで大きな問題が生じることを未然
に防ぐことができるようになる。
From the display of the process management data, the user can easily know the progress of the entire project at the present time. In addition, this makes it possible to prevent a major problem from occurring in the project by increasing the number of workers in charge of the delayed examination items or by reviewing the examination items.

【0053】次に、検討結果取得処理(405)につい
て説明する。検討結果取得処理(405)では、開発作
業により得られた実験や試作の結果を取得する。
Next, the examination result acquisition processing (405) will be described. In the examination result acquisition process (405), the results of experiments and trial production obtained by the development work are acquired.

【0054】図12に、検討結果取得処理(405)の
処理フローを示す。検討結果取得処理(405)では、
まず、ユーザから検討項目の指定を受け付け、指定され
た検討項目に関連するデータを課題情報データベース1
08から読み出す。そして、図13に示す形態の検討結
果入力画面を表示する(ステップ1001)。この際、
検討結果入力画面内の検討名称1101、目標仕様11
02、検討項目1103には、開発課題データから抽出
したものが表示される。
FIG. 12 shows a processing flow of the examination result acquisition processing (405). In the examination result acquisition process (405),
First, a designation of a study item is received from a user, and data relating to the designated study item is stored in the assignment information database 1.
08. Then, the examination result input screen in the form shown in FIG. 13 is displayed (step 1001). On this occasion,
Examination name 1101 and target specification 11 in the examination result input screen
02, an examination item 1103 displays an item extracted from the development problem data.

【0055】続いて、検討結果取得処理(405)で
は、検討結果1104、考察1105、および、評価1
106の各データをユーザから取得する(ステップ10
02)。ここで、検討結果1104は、実験やシミュレ
ーションの結果得られた検討項目と値との関係を示すデ
ータである。考察1105は、ユーザが検討結果を考察
した結果を示すデータである。評価結果1106は、課
題解決の可否等の評価結果であり、4個の評価結果項目
「1.」〜「4.」の中から1つ選択される。
Subsequently, in the examination result acquisition processing (405), the examination result 1104, the examination 1105, and the evaluation 1
106 is obtained from the user (step 10).
02). Here, the examination result 1104 is data indicating the relationship between examination items and values obtained as a result of experiments and simulations. The consideration 1105 is data indicating the result of the examination of the examination result by the user. The evaluation result 1106 is an evaluation result such as whether the problem can be solved, and one of the four evaluation result items “1.” to “4.” is selected.

【0056】検討結果入力画面で取得された情報は、そ
の情報を検討名称1101の下位の情報として位置付け
るリンク情報と共に、課題関連生成部104に渡され
る。課題関連生成部104では、渡された取得情報を、
リンク情報と共に、課題情報データベース108に追加
登録する。
The information acquired on the examination result input screen is passed to the assignment-related generating section 104 together with link information that positions the information as information below the examination name 1101. In the assignment-related generating unit 104, the passed acquired information is
It is additionally registered in the assignment information database 108 together with the link information.

【0057】評価結果1106の項目「1.」は課題が
解決された場合に選択される。項目「2.」は例えば実
験での数値の幅の不足等で十分な測定結果を得られず、
値を変えた検討が必要な場合に選択される。項目
「3.」は具体化した検討項目以外の項目の影響がある
場合に選択される。項目「4.」は目標仕様を達成する
ことができず、課題を解決することは不可能と考えられ
る場合に選択される。
The item “1.” of the evaluation result 1106 is selected when the problem is solved. For item “2.”, sufficient measurement results could not be obtained due to, for example, lack of numerical range in the experiment.
It is selected when it is necessary to change the value. Item “3.” is selected when there is an effect of an item other than the concrete examination item. Item "4." is selected when the target specification cannot be achieved and it is considered impossible to solve the problem.

【0058】続いて、検討結果取得処理(405)で
は、取得したデータを課題関連生成部104に渡して、
課題情報データベース108に追加登録し(図10のブ
ロック907)、検討結果評価1106の選択項目に従
い処理の分岐を行う(ステップ1003)。
Subsequently, in the examination result acquisition process (405), the acquired data is passed to the assignment-related generation unit 104, and
Additional registration is made in the assignment information database 108 (block 907 in FIG. 10), and the process branches according to the selected item of the examination result evaluation 1106 (step 1003).

【0059】項目「1.」が選択されたときは、検討終
了処理(ステップ1004)を行う。この検討終了処理
では、この検討項目の課題が解決されたことを示す情報
を、工程情報データベース109内に登録し、登録され
ている全ての課題が解決されている場合は、プロジェク
トの技術開発が完了した旨の表示を行って、処理を終了
する。未解決の課題が残っている場合には、工程情報表
示処理(404)に処理を移す。これにより、工程管理
データが表示され、ユーザは次の開発作業に移る。な
お、この際、完了した検討作業の進捗1415は自動的
に100%とされ、終了実績日1414は現在の日付と
される。
When the item "1." is selected, a review end process (step 1004) is performed. In this examination end processing, information indicating that the issue of this examination item has been solved is registered in the process information database 109, and if all the registered issues have been solved, the technical development of the project is stopped. A message indicating completion is displayed, and the process ends. If an unsolved problem remains, the process proceeds to a process information display process (404). As a result, the process management data is displayed, and the user proceeds to the next development work. At this time, the progress 1415 of the completed examination work is automatically set to 100%, and the end actual date 1414 is set to the current date.

【0060】項目「2.」が選択されたときは、検討項
目の値を変えて検討作業を継続させるようにする。この
ため、図8の課題具体化処理(504)へ処理を移し、
本検討項目の詳細化の元になった一階層上の課題につい
ての課題具体化画面(図9)を表示して、検討項目70
1の条件(値)の変更を求める(ステップ1005)。
これにより、図2に示した検討プロセス123がやり直
されることになる。この時に、検討項目701の条件
(値)の変更を求めるメッセージを課題具体化画面に表
示するようにしてもよい。
When item "2." is selected, the value of the examination item is changed to continue the examination work. For this reason, the process is shifted to the task embodying process (504) in FIG.
The task embodying screen (FIG. 9) for the task one level higher from which the study item was refined is displayed, and the study item 70 is displayed.
A change in condition (value) 1 is requested (step 1005).
Thereby, the examination process 123 shown in FIG. 2 is redone. At this time, a message requesting a change in the condition (value) of the examination item 701 may be displayed on the assignment specifying screen.

【0061】項目「3.」が選択されたときは、一階層
上の課題から本検討項目への詳細化に不足があったと考
えられる。このため、図4の課題詳細化処理(510)
へ処理を移し、一階層上の課題についての課題詳細化画
面(図7)を表示して、未解決サブ課題302の追加を
求める(ステップ1006)。これにより、図2の具体
化プロセス122がやり直されることになる。
When item "3." is selected, it is considered that there was insufficient detail in this study item due to the problem of one level higher. Therefore, the task detailing process (510) in FIG.
Then, the process is moved to and the task detail screen (FIG. 7) for the task one level higher is displayed, and the addition of the unsolved sub-task 302 is requested (step 1006). This will cause the embodiment process 122 of FIG. 2 to be redone.

【0062】項目「4.」が選択されたときは、本検討
項目の上位の課題の解決は困難であるので、本検討項目
の二階層上の課題から、一階層上の課題への詳細化に不
足があったと考えられる。このため、課題詳細化処理
(510)へ処理を移し、二階層上の課題についての課
題具体化画面を表示して、ユーザに未解決サブ課題の追
加を求める(ステップ1007)。これにより、図2の
詳細化プロセス121がやり直されることになる。
When the item “4.” is selected, it is difficult to solve the upper problem of the present examination item. Is thought to have been lacking. For this reason, the process is shifted to the task detailing process (510) to display a task materializing screen for the task in the second hierarchy, and request the user to add an unresolved sub-task (step 1007). This will cause the detailing process 121 of FIG. 2 to be redone.

【0063】図13の例では、課題「研磨量不均一の低
減」から検討名称「部品押さえ材材質と研磨量不均一の
関連究明」への具体化において検討項目が不足している
と判断され、項目「3.」が選択されている。これによ
り、図14に示す課題具体化画面が表示され、ユーザは
新たな検討名称1305および検討項目1301を入力
する。
In the example of FIG. 13, it is determined that there are not enough items to be considered in the implementation of the study name “reduction of the unevenness in the amount of polishing” from the problem “reduction of unevenness in the amount of polishing” to the “examination of the relationship between the material of the component holder and the unevenness in the amount of polishing”. , Item “3.” is selected. As a result, the task specific screen shown in FIG. 14 is displayed, and the user inputs a new study name 1305 and study item 1301.

【0064】以上の検討結果取得処理(405)によ
り、検討をなり直すべきプロセスの入力画面が自動的に
表示され、必要な情報の入力や更新が促されるため、ユ
ーザは、ユーザは検討項目の追加や変更を適正かつ容易
に行えるようになる。
By the above-described examination result acquisition process (405), the input screen of the process to be re-examined is automatically displayed, and the user is prompted to input or update necessary information. Additions and changes can be made appropriately and easily.

【0065】なお、検討結果入力画面の構成および取得
情報は、上述の内容に限定されるものではない。例え
ば、図13の例では、検討結果1104を表形式の入力
欄から取得しているが、グラフ形式の入力欄から部品高
さや研磨時間等の値を取得するようにしてもよい。例え
ば、マウス112の移動に伴い長さが変化する棒グラフ
を表示して、その長さが表す値を取得するようにする。
また、考察1105の情報は、図形および文章を混在さ
せた形式で取得するようにしてもよい。これにより、検
討結果の内容がより理解しやすいものとなる。
The structure of the examination result input screen and the obtained information are not limited to the contents described above. For example, in the example of FIG. 13, the examination result 1104 is obtained from the input column in the form of a table. However, values such as the component height and the polishing time may be obtained from the input column in the form of a graph. For example, a bar graph whose length changes with the movement of the mouse 112 is displayed, and a value represented by the length is obtained.
Further, the information of the consideration 1105 may be obtained in a form in which graphics and sentences are mixed. This makes the contents of the examination result easier to understand.

【0066】以上で説明したように、開発管理システム
100によれば、開発の課題を、階層的な構造のデータ
に詳細化して、取得および管理するため、ユーザが、開
発工程の計画立案を容易に行えるようになる。また、検
討項目および検討結果についても、課題との階層関係が
わかるように取得および管理するため、各検討項目のプ
ロジェクトにおける位置付けや、他の課題や検討項目と
の対応関係が明確となり、ユーザが問題発生時の検討を
容易に行えるようになる。また、取得したデータを課題
関連データに整理して、階層的に表示するため、ユーザ
が詳細化や、具体化、検討結果の内容を容易に調べられ
るようになる。また、取得したデータを工程管理データ
に整理して、階層的にチャート表示するため、ユーザが
プロジェクト全体の進行状況を容易に管理できるように
なる。
As described above, according to the development management system 100, a user can easily plan a development process because the development issues are detailed and acquired and managed in hierarchically structured data. Will be able to do it. In addition, the examination items and examination results are acquired and managed so that the hierarchical relationship with the issues can be understood, so the position of each examination item in the project and the correspondence relationship with other issues and examination items become clear, and the user Examination when a problem occurs can be easily performed. In addition, since the acquired data is arranged into the task-related data and displayed in a hierarchical manner, the user can easily check the details, the details, and the contents of the examination result. In addition, since the acquired data is organized into process management data and displayed in a hierarchical chart, the user can easily manage the progress of the entire project.

【0067】このように、開発管理システム100によ
れば、開発工程の計画立案、計画の実施、実施結果に基
づく計画更新といった管理サイクル全体を管理でき、計
画立案や計画更新が適切になされるように支援すること
ができる。
As described above, according to the development management system 100, the entire management cycle such as the planning of the development process, the execution of the plan, and the update of the plan based on the execution result can be managed, so that the planning and the update of the plan are appropriately performed. Can help.

【0068】また、ネットワークを介して開発管理シス
テム100に接続される他のコンピュータから、課題関
連データにアクセスを行うことができるため、開発プロ
ジェクトの参加者により多角的な視点から検討が加えら
れ、課題詳細化や画題具体化を適切なものとすることが
できるようになる。
Further, since it is possible to access the task-related data from another computer connected to the development management system 100 via the network, the participants of the development project examine from various viewpoints, It becomes possible to make the assignment details and the subject matter appropriate.

【0069】次に、本発明の他の実施形態について説明
する。
Next, another embodiment of the present invention will be described.

【0070】この実施形態に係る開発管理システム10
0は、上述の構成に加え、課題詳細化作業の信頼性を向
上させるための課題詳細化チェック部、過去または現在
の他のプロジェクトの課題関連データを有効に利用する
ための課題関連検索部、変更・追加した課題や検討項目
の影響をユーザに確認させるための課題干渉チェック部
を備える(以上、図示せず)。これらの部分は個別に機
能するため、いずれか1つの部分を備えるようにしても
よい。この実施形態によれば、プロジェクト管理の経験
の少ないユーザでも、容易かつ適切に課題の詳細化や具
体化を行えるようになる。
The development management system 10 according to this embodiment
0 is, in addition to the above-described configuration, an assignment detailing check unit for improving the reliability of the assignment detailing work, an assignment related search unit for effectively using assignment related data of another past or current project, An issue interference check unit is provided to allow the user to confirm the influence of the changed / added issues and the examination items (not shown). Since these parts function individually, any one of them may be provided. According to this embodiment, even a user with little experience in project management can easily and appropriately detail and embody an issue.

【0071】まず、詳細化チェック部について説明す
る。
First, the detail checking section will be described.

【0072】課題詳細化部101を用いた課題詳細化の
作業は、開発を効率よく進める上で重要な作業となる。
詳細化チェック部は、課題詳細化作業の信頼性を向上さ
せるため、課題情報データベース108内の課題関連デ
ータを元に生成した質問メッセージをユーザに提示し、
その応答により、課題詳細化作業の信頼性をチェックす
る。
The task refining operation using the task refining unit 101 is an important task for efficiently developing.
The detailing check unit presents the user with a question message generated based on the task-related data in the task information database 108 in order to improve the reliability of the task detailing work,
Based on the response, the reliability of the task detailing work is checked.

【0073】図15に示すように、課題詳細化チェック
部は、課題詳細化の信頼性をレベル1〜3に分類する。
ここで、信頼性は、レベル0が最も低く、レベル3が最
も高い。
As shown in FIG. 15, the task detailing check section classifies the reliability of task detailing into levels 1 to 3.
Here, the reliability is lowest at level 0 and highest at level 3.

【0074】レべル0(L0)は、課題を検討するため
に必要な、検討すべき対象の範囲さえもわかっていない
状態で、何をやってよいかわからないような状態であ
る。
Level 0 (L0) is a state in which even the range of the object to be examined necessary for examining the problem is not known, and what to do is not known.

【0075】レべル1(L1)は、検討の対象範囲はわ
かっているが、課題を解決するために検討の対象となる
構成要素の組合わせがわかっていない状態である。例え
ば、単純に、電気自動車の高速性能向上を実現するため
に、バッテリーおよびモータの性能向上だけでよいかど
うかわからない状態である。
Level 1 (L1) is a state in which the range to be studied is known, but the combination of components to be studied to solve the problem is not known. For example, it is simply unclear whether it is sufficient to simply improve the performance of the battery and the motor in order to achieve the high-speed performance improvement of the electric vehicle.

【0076】レべル2(L2)は、構成する要素はわか
っているが、要素間の基本関係が分かっていない状態で
ある。例えば、ある計算プログラムでの高速化を実現す
るときに、データ量が増加すると計算処理時聞も増加す
る関係は分かっているが、比例して増加するのか、指数
的に増加するのかがわからないような態状態のことであ
る。数学的に言うと、定式化ができていない状態であ
る。
Level 2 (L2) is a state in which the constituent elements are known, but the basic relationship between the elements is not known. For example, when realizing high-speed processing in a certain calculation program, it is known that the amount of data processing increases when the amount of data increases, but it is difficult to tell whether it increases in proportion or exponentially. It is a state of state. Mathematically speaking, it has not been formulated yet.

【0077】レべル3(L3)は、式の形はわかってい
るが、その式の係数がわからない状態である。例えば、
ある製品の性能yとその製品の寸法xの間に、y=ax
+bという関係があることは分かっているが、その係数
aとbをどうような値に設定すればよいかわからない状
態である。
Level 3 (L3) is a state in which the form of the equation is known, but the coefficient of the equation is unknown. For example,
Between the performance y of a certain product and the dimension x of the product, y = ax
Although it is known that there is a relationship of + b, it is not clear what values the coefficients a and b should be set.

【0078】信頼性レべルを判定するための質問は、課
題関連データ内から抽出した情報を組み合せて生成す
る。そして、質問の回答(「はい」,「いいえ」)によ
りレベルが判定される。質問に用いる情報の抽出は、課
題関連データ内の階層で上位から下位にかけて順次行
う。上位の抽象的な質問から下位の具体的な質問にかけ
て、多くの肯定的な回答が得られるほど、高い信頼性で
あると判定する。
The question for determining the reliability level is generated by combining information extracted from the task-related data. Then, the level is determined based on the answer to the question (“Yes”, “No”). The extraction of the information used for the question is performed sequentially from the upper level to the lower level in the hierarchy in the task related data. The more positive answers are obtained from the upper abstract question to the lower specific question, the higher the reliability is determined.

【0079】例えば、図7の課題詳細化画面で行われた
詳細化をチェックする場合には、図10のデータブロッ
ク901、902、903を元に、「部品一括高精度研
磨技術の開発は、部品切断技術の開発と、研磨量不均一
の低減とを実現することで、達成できますか?」といっ
た質問を生成し、これを図6と同様の表示画面に表示す
る。これに対し、「はい」が選択されればレべル1以上
(L1〜L3)と判定し、「いいえ」が選択されればレ
べル0と判定する。次に、「研磨量不均一の低減を実現
するためには、部品高さと、研磨時間との、関係を理解
していますか?」という質問を表示し、「はい」ならレ
べル2以上と判定し、「いいえ」ならレべル1であると
判定する。さらに、「研磨量不均一の低減を実現するた
めには、部品高さと、研磨時間との、関係式はわかって
いますか?」という質問を表示し、「はい」ならレべル
3、「いいえ」ならレベル2と判定する。
For example, when checking the refinement performed on the problem refinement screen of FIG. 7, based on the data blocks 901, 902, and 903 of FIG. Is it possible to achieve by realizing the development of the part cutting technology and the reduction of the non-uniform polishing amount? ", Which is displayed on the same display screen as in FIG. On the other hand, if "Yes" is selected, it is determined that the level is 1 or more (L1 to L3), and if "No" is selected, it is determined that the level is 0. Next, a question is displayed, "Do you understand the relationship between component height and polishing time in order to reduce non-uniform polishing amount?", And if "Yes", level 2 or higher Is determined, and if “No”, it is determined that the level is 1. In addition, the following question is displayed, "Do you know the relational expression between component height and polishing time in order to reduce non-uniform polishing amount?", And if "Yes", level 3, " If no, it is determined to be level 2.

【0080】詳細化チェック部の判定結果は、課題情報
データベース108に追加登録される。課題関連データ
の表示のときに、この判定結果は対応する位置に表示さ
れる。例えば、上述した図7の例で信頼性がレベル2で
あると判定された場合には、図10のブロック904に
つながるリンク線の脇に、レベル2を示す「L2」が表
示される。
The result of the judgment by the detailing check section is additionally registered in the assignment information database 108. When the task-related data is displayed, this determination result is displayed at a corresponding position. For example, when the reliability is determined to be level 2 in the example of FIG. 7 described above, “L2” indicating level 2 is displayed beside the link line connected to the block 904 in FIG.

【0081】以上のように、詳細化チェック部によれ
ば、質問メッセージを表示することにより、課題詳細化
の内容に対するユーザの再確認が促されるため、課題の
入力漏れや誤りなどに気付かせることができる。これに
より、課題がより適切なものに修正されれば、詳細化作
業の信頼性は向上することになる。また、課題関連デー
タと共に、課題詳細化の信頼性レベルを表示することに
より、問題のある課題詳細化作業がどこの部分にあるか
をユーザが知ることができる。
As described above, according to the detailing check section, displaying the question message prompts the user to reconfirm the details of the task detailing. Can be. As a result, if the problem is corrected to a more appropriate one, the reliability of the detailing work is improved. Also, by displaying the reliability level of the task detailing together with the task-related data, the user can know where the problem detailing work in question is located.

【0082】次に、課題関連検索部について説明する。Next, the task related search section will be described.

【0083】課題情報データベース108の登録には、
過去に他の開発プロジェクトの課題関連データや、現在
並行して実施されている他の開発プロジェクトの課題関
連データが登録されている。過去または現在の他のプロ
ジェクトの課題関連データを有効活用するため、課題関
連検索部は、課題情報取得処理(401)において取得
された各種データと類似する内容のデータを、課題情報
データベース108において検索し、検索結果を示すメ
ッセージを表示する。検索は、ユーザの検索要求に応じ
て開始される。課題名称入力画面(図5)、課題詳細化
画面(図7)、課題具体化画面(図9)、および、課題
関連データ表示画面(図10)には、検索要求のための
検索ボタン(図示せず)が設けられる。
The registration of the task information database 108
The problem-related data of another development project in the past and the problem-related data of another development project currently being executed in parallel are registered. In order to effectively use the past or current assignment data of another project, the assignment related search unit searches the assignment information database 108 for data having contents similar to the various data acquired in the assignment information acquisition process (401). Then, a message indicating the search result is displayed. The search is started in response to a search request of the user. A search button (FIG. 5) for a search request is displayed on the assignment name input screen (FIG. 5), the assignment detail screen (FIG. 7), the assignment specific screen (FIG. 9), and the assignment-related data display screen (FIG. 10). (Not shown).

【0084】検索時、ユーザは、各表示画面上で、マウ
ス112を用いて検索対象の文字列を選択し、検索ボタ
ンをクリックする。これに応じて、課題関連検索部は、
検索対象の文字列と部分一致する文字列を含む課題関連
データを、課題情報データベース108で検出する。そ
して、部分一致する文字列がある場合には、その文字列
を含んでいる課題関連データの所在を特定可能とする内
容(例えば、プロジェクト名、課題名など)のメッセー
ジを表示する。ユーザは、このメッセージ表示を基に、
対応する課題関連データを図10の形態で表示させ、参
考資料として利用する。
At the time of search, the user selects a character string to be searched on each display screen using the mouse 112 and clicks a search button. In response, the assignment-related search unit:
The assignment information database 108 detects assignment-related data including a character string that partially matches the search target character string. Then, when there is a partially matching character string, a message (for example, a project name, an assignment name, or the like) that allows the location of the assignment-related data including the character string to be specified is displayed. The user can use this message display to
The corresponding task-related data is displayed in the form of FIG. 10 and used as reference data.

【0085】この課題関連検索部により、ユーザは、設
定した課題や検討項目が別のプロジェクトで設定されて
いるかどうか調べ、例えば、同じ内容の課題が他のプロ
ジェクトで設定されている場合、その課題に対し、他の
プロジェクトでどのような課題詳細化や課題具体化が行
われたかや、どのような検討結果が得られたかを容易に
知ることができる。これにより、他のプロジェクトの課
題関連データを参考にして課題詳細化や課題具体化を効
率よく行うことが可能となり、また、設定した課題や検
討項目の問題点を事前に知ることができるようになる。
[0086] By using the problem related search unit, the user checks whether the set problem or the examination item is set in another project. For example, when the same content is set in another project, On the other hand, it is possible to easily know what kind of task refinement or materialization was performed in other projects and what kind of examination results were obtained. This makes it possible to efficiently refine and detail issues with reference to the issue-related data of other projects, and to be able to know in advance the issues of the set issues and study items. Become.

【0086】次に、課題干渉チェック部について説明す
る。
Next, the problem interference check unit will be described.

【0087】図10の例では、「部品切断技術の開発」
と同位の課題となる「研磨量不均一の低減」には、検討
項目として「部品押さえ材」と「研磨時間」とが設定さ
れている。この例の製造工程では、部品の研磨工程の次
に切断工程に入るため、研磨工程後の部品の状態は、切
断工程に影響を与える。例えば、研磨工程で使用される
部品押さえ材が粘性を持ち、研磨後に部品に付着するも
のである場合には、切断時の部品の寸法が付着物により
増加し、切断精度の低下が起りやすくなる。このような
影響は、実際に製造ラインの運転を開始した時に、初め
て気付くことが多く、量産開始を遅らせる原因となる。
このように、「部品押さえ材」の材質を変更する場合に
は、部品切断への影響を考慮する必要がある。
In the example of FIG. 10, “Development of component cutting technology”
For “reduction of non-uniform polishing amount”, which is the same problem as the above, “part holding material” and “polishing time” are set as examination items. In the manufacturing process of this example, since the cutting process is started after the component polishing process, the state of the component after the polishing process affects the cutting process. For example, if the component pressing material used in the polishing process has viscosity and adheres to the component after polishing, the size of the component at the time of cutting increases due to the adhered substance, and the cutting accuracy tends to decrease. . Such an influence is often noticed for the first time when the operation of the production line is actually started, and causes a delay in the start of mass production.
As described above, when changing the material of the “component holding member”, it is necessary to consider the influence on the component cutting.

【0088】この影響をユーザに確認させるため、課題
干渉チェック部は、検討結果取得処理(405)から課
題情報取得処理(401)に処理が戻された時に、課題
詳細化画面(図7)や課題具体化画面(図9)で、課題
や検討項目(検討条件)の変更や追加がなされたことを
検出する。検出がなされると、変更や追加のなされた課
題や検討項目に対し、干渉する可能性のある課題の名称
を含む干渉警告メッセージを同じ画面内に表示して、ユ
ーザに確認を促す。ここで、干渉する可能性のある課題
は、課題詳細化画面や課題具体化画面に本来表示されな
い情報であり、例えば、変更のなされた課題または検討
項目の上位の課題と同位となる課題である。なお、上位
の課題には、一階層上の課題や、二階層上の課題が含ま
れる。
In order to allow the user to confirm this effect, the task interference checking unit returns to the task detail screen (FIG. 7) when the process is returned from the examination result acquisition processing (405) to the task information acquisition processing (401). On the assignment materialization screen (FIG. 9), it is detected that the assignment or the examination item (examination condition) has been changed or added. When the detection is performed, an interference warning message including the name of the problem that may interfere with the changed or added problem or the examination item is displayed on the same screen to prompt the user to confirm. Here, the problem that may cause interference is information that is not originally displayed on the problem detail screen or the problem specific screen, and is, for example, a problem that has been changed or a problem that is at the same rank as a higher-ranking problem in the study item. . It should be noted that the higher-ranked tasks include one-level tasks and two-level tasks.

【0089】図10の例では、「部品押さえ材」の内容
が変更または追加されると、課題「研磨量不均一の低
減」の一階層上の課題「研磨量不均一の低減」と同位と
なる課題「部品切断技術の開発」が抽出され、それを含
む干渉警告メッセージ、例えば「部品押さえ材は、部品
切断技術の開発に干渉します。」が表示される。
In the example shown in FIG. 10, when the content of the “part holding member” is changed or added, the content of the problem “reducing the non-uniform polishing amount” is on the same level as the problem “reducing the non-uniform polishing amount”. The problem "development of component cutting technology" is extracted, and an interference warning message including the problem is displayed, for example, "a component presser interferes with the development of component cutting technology."

【0090】課題干渉チェック部により、ユーザは、課
題や検討項目に対して行った新規の変更や追加が、どの
ような課題に干渉するかを容易に知ることができる。こ
れにより、他の開発に悪影響を与えるような課題や検討
項目(検討条件)が設定されることが少なくなる。
The problem interference check section allows the user to easily know what kind of problem the new change or addition made to the problem or the examination item interferes with. As a result, problems or examination items (examination conditions) that adversely affect other developments are less likely to be set.

【0091】[0091]

【発明の効果】以上で説明したように、本発明によれ
ば、開発工程の計画立案や、計画の再検討および更新を
ユーザが容易かつ適切に行うことを可能とする開発管理
システムを提供することができる。
As described above, according to the present invention, there is provided a development management system which enables a user to easily and appropriately plan a development process, and review and update a plan. be able to.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の開発管理システムの全体構成を示す図
である。
FIG. 1 is a diagram showing an overall configuration of a development management system according to the present invention.

【図2】本発明における開発工程のプロセスを示す図で
ある。
FIG. 2 is a diagram illustrating a development process according to the present invention.

【図3】開発管理システムの全体処理フローを示す図で
ある。
FIG. 3 is a diagram showing an overall processing flow of a development management system.

【図4】課題情報取得処理の処理フローを示す図であ
る。
FIG. 4 is a diagram showing a processing flow of a task information acquisition processing.

【図5】課題名称入力画面の例を示す図である。FIG. 5 is a diagram showing an example of an assignment name input screen.

【図6】課題具体化確認画面の例を示す図である。FIG. 6 is a diagram showing an example of an assignment confirmation screen.

【図7】課題詳細化画面の例を示す図である。FIG. 7 is a diagram illustrating an example of a task detailing screen.

【図8】課題具体化処理の処理フローを示す図である。FIG. 8 is a diagram showing a processing flow of a task specificification processing;

【図9】課題具体化画面の例を示す図である。FIG. 9 is a diagram showing an example of a task specific screen.

【図10】課題関連データのデータ構造および表示形態
の例を示す図である。
FIG. 10 is a diagram showing an example of a data structure and display form of assignment-related data.

【図11】工程管理データのデータ構造および表示形態
の例を示す図である。
FIG. 11 is a diagram showing an example of a data structure and a display form of process management data.

【図12】検討結果取得処理の処理フローを示す図であ
る。
FIG. 12 is a diagram illustrating a process flow of a study result acquisition process.

【図13】検討結果入力画面の例を示す図である。FIG. 13 is a diagram showing an example of an examination result input screen.

【図14】課題具体化画面の例を示す図である。FIG. 14 is a diagram showing an example of a task specifying screen.

【図15】詳細化チェック部において判定される課題詳
細化の信頼性レベルを示す図である。
FIG. 15 is a diagram showing a reliability level of the task detailing determined by the detailing checking unit.

【符号の説明】[Explanation of symbols]

101 課題詳細化部 102 課題具体化部 103 検討結果取得部 104 課題関連生成部 105 課題関連表示部 106 工程計画生成部 107 工程情報表示部 108 課題構成データベース 109 工程情報データベース 110 ディスプレイ 111 キーボード 112 マウス 101 Assignment Detailing Unit 102 Assignment Materialization Unit 103 Examination Result Acquisition Unit 104 Assignment-Related Generation Unit 105 Assignment-Related Display Unit 106 Step Plan Generation Unit 107 Step Information Display Unit 108 Assignment Configuration Database 109 Step Information Database 110 Display 111 Keyboard 112 Mouse

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】開発工程の管理を行うための開発管理シス
テムにおいて、 開発の課題を複数の要素に分けたものである下位の課題
を表す情報の入力を、解決済みの課題と、未解決の課題
とに分けて受付け、入力された課題を上位の課題に対応
付けるリンク情報を生成し、未解決の各課題について、
該課題を解決するのに必要となる検討項目を抽出するか
否かを指示する情報の入力を受付け、検討項目を抽出し
ないことを指示された課題について前記入力の受付けを
繰り返すための課題詳細化手段と、 検討項目を抽出することを指示された各課題について、
検討項目を表す情報の入力を受付け、入力された検討項
目を前記課題に対応付けるリンク情報を生成するための
課題具体化手段と、 課題詳細化手段および課題具体化手段で入力された各情
報が、階層構造上の位置関係を表すリンク情報と共に記
憶される記憶手段と、 情報の入力、および、前記記憶手段の記憶している情報
の表示に用いられる入出力手段とを有することを特徴と
する開発管理システム。
In a development management system for managing a development process, an input of information representing a lower-level problem, which is a result of dividing a development problem into a plurality of elements, is performed by using a solved problem and an unsolved problem. Generates link information that accepts input issues and assigns input issues to higher-level issues. For each unresolved issue,
Task detailing for accepting input of information instructing whether or not to extract study items necessary to solve the problem, and repeating the acceptance of the input for a task instructed not to extract study items For the means and for each task that was instructed to extract considerations,
An input of information representing an examination item is accepted, and the task materializing means for generating link information for associating the input study item with the task, and information input by the task detailing means and the task materializing means, Development comprising: storage means for storing together with link information indicating a hierarchical positional relationship; and input / output means for inputting information and displaying information stored in the storage means. Management system.
【請求項2】請求項1記載の開発管理システムにおい
て、 前記課題具体化手段で取得された各検討項目の検討結果
を表す情報、および、該検討結果の評価を表す情報の入
力を受付け、入力された情報を前記検討項目に対応付け
るリンク情報を生成するための検討結果取得手段を、さ
らに有し、 前記記憶手段には、さらに、前記検討結果取得手段で取
得された情報が、階層構造上の位置関係を表すリンク情
報と共に記憶されることを特徴とする開発管理システ
ム。
2. The development management system according to claim 1, wherein information representing the examination result of each examination item acquired by the task embodying means and information representing the evaluation of the examination result are received and input. Further comprising a study result acquiring means for generating link information for associating the obtained information with the study item, wherein the storage means further stores information acquired by the study result acquiring means in a hierarchical structure. A development management system stored with link information indicating a positional relationship.
【請求項3】請求項2記載の開発管理システムにおい
て、 前記検討結果の評価の情報は、予め定めた複数の評価レ
ベルの内の1つを選択的に示す情報であり、 前記検討結果取得手段は、さらに、入力された情報の階
層構造上の位置と、評価レベルとを基に、新たに入力の
受付けを行うべき階層構造上の位置を決定し、対応する
課題詳細化手段もしくは課題具体化手段に処理を移行す
ることを特徴とする開発管理システム。
3. The development management system according to claim 2, wherein the information on the evaluation of the examination result is information selectively indicating one of a plurality of predetermined evaluation levels. Further determines, based on the hierarchical structure position of the input information and the evaluation level, a hierarchical structure position at which a new input is to be accepted, and assigns a corresponding task detailing means or task materializing means. A development management system characterized by shifting processing to a means.
【請求項4】請求項1または2記載の開発管理システム
において、 前記記憶手段に記憶している情報を、予め定めた、階層
構造上の位置関係と表示態様との対応規則に従って、階
層的に表示するための手段を、さらに有することを特徴
とする開発管理システム。
4. The development management system according to claim 1, wherein the information stored in said storage means is hierarchically stored in accordance with a predetermined rule corresponding to a positional relationship in a hierarchical structure and a display mode. A development management system further comprising means for displaying.
【請求項5】請求項1または2記載の開発管理システム
において、 前記課題具体化手段は、各検討項目の作業期間を表す情
報の入力をさらに受付け、 前記記憶手段の記憶している情報を元に、各課題および
検討項目の作業期間を、予め定めた、階層構造上の位置
関係と表示態様との対応規則に従って、階層的に表示す
るための手段を、さらに有することを特徴とする開発管
理システム。
5. The development management system according to claim 1, wherein the task embodying unit further receives an input of information indicating a work period of each study item, and based on the information stored in the storage unit. The development management method further comprises means for hierarchically displaying the work periods of the respective tasks and study items in accordance with a predetermined correspondence rule between the positional relationship in the hierarchical structure and the display mode. system.
【請求項6】請求項1または2記載の開発管理システム
において、 前記記憶手段から、階層構造上で予め定めたリンク関係
となる情報を順次抽出し、抽出した情報を用いて、前記
課題詳細化手段および課題具体化手段で入力された情報
の妥当性の確認を促す質問メッセージを表示するための
手段と、 質問メッセージに対する応答情報を取得して、該応答情
報を基に、課題から検討項目に至る入力情報の信頼性を
判定するための手段とを、さらに有することを特徴とす
る開発管理システム。
6. The development management system according to claim 1, wherein information having a predetermined link relationship in a hierarchical structure is sequentially extracted from the storage means, and the task refining is performed using the extracted information. Means for displaying a question message that prompts the user to confirm the validity of the information input by the means and the task embodying means; and acquiring response information to the question message; Means for determining the reliability of the input information.
【請求項7】請求項1または2記載の開発管理システム
において、 前記記憶手段には、前記リンク情報により一つながりの
グループとなる情報群が、1グループ以上記憶され、 前記課題詳細化手段および課題具体化手段で入力された
情報に対し、予め定めた規則により類似しているとされ
る情報を、前記記憶手段の記憶する情報において検索す
るための手段と、 検索により得た類似する情報の所在を特定可能とするメ
ッセージを表示するための手段を、さらに有することを
特徴とする開発管理システム。
7. The development management system according to claim 1, wherein the storage unit stores one or more groups of information that are linked by the link information. Means for searching the information stored in the storage means for information assumed to be similar to the information input by the specification means according to a predetermined rule; and location of similar information obtained by the search. A development management system further comprising: means for displaying a message that allows the user to specify a message.
【請求項8】請求項1または2記載の開発管理システム
において、 前記課題詳細化手段もしくは課題具体化手段で新たな入
力の受付けがなされた時に、入力された情報に対する階
層構造上の位置が予め定めた規則により定まる位置とな
る課題の情報を、前記記憶手段から抽出し、抽出した情
報を含む干渉警告メッセージを表示するための手段を、
さらに有することを特徴とする開発管理システム。
8. The development management system according to claim 1, wherein when a new input is received by the task detailing means or the task specifying means, the position of the input information in the hierarchical structure is determined in advance. Means for extracting the information of the task at the position determined by the determined rule from the storage means, and displaying an interference warning message including the extracted information,
A development management system, further comprising:
【請求項9】開発工程の管理を支援するための開発管理
システムに用いられる記録媒体において、 開発における課題を、上位の課題から、該課題を複数の
要素に分けたものである下位の課題にかけて、階層的に
表現する複数の情報と、 前記各課題が解決済みか否かかを表す情報と、 未解決の課題の解決に必要となる検討項目を表す情報
と、 前記各課題および検討項目の階層構造上の位置関係を表
すリンク情報とが記録されることを特徴とする記録媒
体。
9. A recording medium used in a development management system for supporting management of a development process, wherein a problem in development is divided into a high-order problem and a low-order problem in which the problem is divided into a plurality of elements. A plurality of pieces of information expressed hierarchically, information indicating whether or not each of the issues has been solved, information indicating a study item necessary for solving an unresolved issue, and A recording medium in which link information indicating a positional relationship in a hierarchical structure is recorded.
【請求項10】請求項9記載の記録媒体において、 各検討項目の検討結果を表す情報、および、該検討結果
の評価を表す情報と、該情報の階層構造上の位置関係を
表すリンク情報とが、さらに記録されることを特徴とす
る記録媒体。
10. The recording medium according to claim 9, wherein information representing the examination result of each examination item, information representing an evaluation of the examination result, and link information representing a positional relationship of the information in a hierarchical structure. Is further recorded.
JP7071098A 1998-03-19 1998-03-19 Development management system Pending JPH11272749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7071098A JPH11272749A (en) 1998-03-19 1998-03-19 Development management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7071098A JPH11272749A (en) 1998-03-19 1998-03-19 Development management system

Publications (1)

Publication Number Publication Date
JPH11272749A true JPH11272749A (en) 1999-10-08

Family

ID=13439419

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7071098A Pending JPH11272749A (en) 1998-03-19 1998-03-19 Development management system

Country Status (1)

Country Link
JP (1) JPH11272749A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009187206A (en) * 2008-02-05 2009-08-20 Toshiba Mach Co Ltd Apparatus for supporting decision of optimum machining condition for precision machining
JP2020042704A (en) * 2018-09-13 2020-03-19 株式会社日立製作所 Material development assistance system, material development assistance method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009187206A (en) * 2008-02-05 2009-08-20 Toshiba Mach Co Ltd Apparatus for supporting decision of optimum machining condition for precision machining
JP2020042704A (en) * 2018-09-13 2020-03-19 株式会社日立製作所 Material development assistance system, material development assistance method

Similar Documents

Publication Publication Date Title
JP6025154B2 (en) System, method and program for managing a project
US6984198B2 (en) Experiment management system, method and medium
US20110295634A1 (en) System and Method for Dynamic Optimal Resource Constraint Mapping in Business Process Models
JPH03180963A (en) Plan formation supporting system and scheduling system based upon the supporting system
JPH08137899A (en) Information management system
US6345270B1 (en) Data management system
JP2000039904A (en) Project management system
JP2005148901A (en) Job scheduling system
JPH11272749A (en) Development management system
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP4678770B2 (en) Sequence diagram creation method and apparatus
CN114185987A (en) Data development visualization method, device, equipment and storage medium
JP6371981B2 (en) Business support system, program for executing business support system, and medium recording the same
JP7380696B2 (en) Personnel arrangement equipment, arrangement methods and programs
CN114503140A (en) Production simulation device
JPH0816639A (en) Data base for integrated management of product data and development management framework
JP3245635B2 (en) Standardization and analysis of software products
JP6442139B2 (en) Work support device, work support method, and work support program
US20240134361A1 (en) Use resource setting method and use resource setting device
JP2001188673A (en) Software reuse assisting device
JPH07134648A (en) System for automatically estimating software maintenance operation man-hour
EP3901862A1 (en) Process management assistance system, process management assistance method, and process management assistance program
JP4758279B2 (en) Data registration apparatus, data registration program, data output apparatus and control program therefor
CN112988576A (en) Method and device for determining software project research and development process
WO2024107212A1 (en) Automatically trigger workorders on a site in a wireless network