JPH11200484A - Balcony structure and method for constructing the same - Google Patents

Balcony structure and method for constructing the same

Info

Publication number
JPH11200484A
JPH11200484A JP10004741A JP474198A JPH11200484A JP H11200484 A JPH11200484 A JP H11200484A JP 10004741 A JP10004741 A JP 10004741A JP 474198 A JP474198 A JP 474198A JP H11200484 A JPH11200484 A JP H11200484A
Authority
JP
Japan
Prior art keywords
balcony
opening
floor
stair
staircase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP10004741A
Other languages
Japanese (ja)
Inventor
Kiyoshi Hirai
清 平井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP10004741A priority Critical patent/JPH11200484A/en
Publication of JPH11200484A publication Critical patent/JPH11200484A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a balcony structure which allows efficient use of a building site and a method for constructing the same. SOLUTION: To form a balcony 6 on the outside part of a building and a staircase 7 leading to the balcony 6, an opening connected to a space below the balcony 6 is formed in the floor face of the balcony 6, and the staircase 7 supported in the opening is placed within the plane of the balcony 6 and below the balcony 6. Therefore, because the staircase 7 is placed within the plane of the balcony 6 and below the balcony 6, it does not need to use the site of the building more than does a conventional staircase mounted on the side face or front face of the balcony 6, whereby the site of the building can be utilized efficiently.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建物の屋外部分に
形成されるバルコニとこのバルコニに繋がる階段とを備
えたバルコニ構造およびその施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a balcony structure having a balcony formed in an outdoor part of a building and a staircase connected to the balcony, and a method of constructing the balcony.

【0002】[0002]

【背景技術】従来より、建物の屋外部分に形成されるバ
ルコニにおいて、地上とバルコニとを連絡するために階
段を併設することがある。通常、階段は、バルコニの側
面または正面に取り付けられ、バルコニと隣接する平面
位置に配置される。
2. Description of the Related Art Conventionally, in a balcony formed in an outdoor part of a building, a staircase is sometimes provided in order to connect the ground and the balcony. Typically, the stairs are mounted on the side or front of the balcony and are located in a planar position adjacent to the balcony.

【0003】[0003]

【発明が解決しようとする課題】しかし、階段がバルコ
ニと隣接配置されると、その分建物の敷地を使ってしま
い無駄になってしまうという問題がある。
However, if the stairs are arranged adjacent to the balcony, there is a problem that the site of the building is used for that and the use is wasted.

【0004】本発明の目的は、建物の敷地を効率的に活
用することができるバルコニ構造およびその施工方法を
提供することにある。
[0004] It is an object of the present invention to provide a balcony structure and a method for constructing the same, which can efficiently utilize the site of a building.

【0005】[0005]

【課題を解決するための手段】本発明のバルコニ構造
は、図面を参照して説明すると、建物の屋外部分に形成
されるバルコニ6とこのバルコニ6に繋がる階段7とを
備えたバルコニ構造において、前記バルコニ6の床面に
は、バルコニ6下部の空間と連通する開口部17が形成
されるとともに、前記バルコニ6の平面内でかつバルコ
ニ6の下方に前記開口部17に支持される階段7が配置
され、この階段7は、前記開口部17近傍の床構造材1
9に支持される階段用支柱21を含んで構成されている
ことを特徴とする。このような本発明においては、階段
7は、バルコニ6の平面内でかつバルコニ6の下方に配
置されているので、従来におけるバルコニの側面または
正面に取り付けられる階段に比べ、建物の敷地を余分に
使う必要がなくなり、建物の敷地を効率的に活用するこ
とができる。また、開口部17近傍の床構造材19は、
階段用支柱21により支持されているので、安定してバ
ルコニ6を支持することができ、大きなバルコニを形成
することができる。
The balconi structure of the present invention will be described with reference to the drawings. In the balconi structure having a balconi 6 formed in an outdoor part of a building and a stair 7 connected to the balconi 6, An opening 17 communicating with the space below the balcony 6 is formed in the floor of the balcony 6, and a step 7 supported by the opening 17 in the plane of the balcony 6 and below the balcony 6 is formed. The stairs 7 are arranged on the floor structural material 1 near the opening 17.
9 is characterized by including a stair post 21 supported by the stairs 9. In the present invention, since the stairs 7 are arranged within the plane of the balcony 6 and below the balcony 6, the stairs 7 require extra space on the building as compared with the conventional steps mounted on the side or front of the balcony. There is no need to use it, and the building site can be used efficiently. The floor structural material 19 near the opening 17 is
Since it is supported by the stair post 21, the balcony 6 can be stably supported, and a large balcony can be formed.

【0006】上記構成において、前記階段は、どのよう
な構造でもよいが、例えば、螺旋階段7であることが望
ましい。また、前記螺旋階段7の直径は、バルコニ6の
建物の外壁面からの突出量と同じ寸法あるいは僅かに小
さい寸法であることが望ましい。このようにすれば、階
段部分の占める割合が小さいので、バルコニ6の真下に
位置する一階部分のスペースを十分に確保することがで
きる。また、螺旋階段7の直径は、バルコニ6の突出量
と同じ寸法あるいは僅かに小さい寸法に形成されている
ので、バルコニ6の床面に形成される開口部17を小さ
くでき、バルコニ床を十分に確保することができる。
In the above structure, the stairs may have any structure, but for example, a spiral staircase 7 is preferable. Further, it is desirable that the diameter of the spiral staircase 7 is the same as or slightly smaller than the amount of projection of the balcony 6 from the outer wall surface of the building. In this manner, the proportion of the staircase portion is small, so that a sufficient space for the first floor portion located directly below the balcony 6 can be secured. Also, since the diameter of the spiral staircase 7 is formed to be the same as or slightly smaller than the amount of projection of the balcony 6, the opening 17 formed on the floor of the balcony 6 can be reduced, and the floor of the balcony can be sufficiently provided. Can be secured.

【0007】上記構成において、前記階段7は、下端が
地表面、上端がバルコニ6の床構造材19下面に接続さ
れる階段用支柱21を備えていることが望ましい。この
ようにすれば、バルコニ6の床構造材19下面が階段用
支柱21により支持されているので、キャンティバルコ
ニにおいても、建物の外壁面からの突出量を拡大するこ
とができ、バルコニ6の床面積を大きくすることができ
る。
In the above configuration, the stairs 7 preferably include a stair post 21 having a lower end connected to the ground surface and an upper end connected to the lower surface of the floor structural member 19 of the balcony 6. In this way, since the lower surface of the floor structure member 19 of the balcony 6 is supported by the stairs 21, the amount of projection from the outer wall surface of the building can be increased even in Chianti balcony, and the floor of the balcony 6 can be enlarged. The area can be increased.

【0008】上記構成において、バルコニ6床面に形成
された開口部17には、当該開口部17を塞ぐ蓋30が
設けられていることが望ましい。このようにすれば、普
段は開口部17が蓋30により塞がれているので、バル
コニ6の床面の有効活用を図ることができ、また、火災
の際には蓋30を開口して非常階段として利用すること
ができる。
In the above configuration, it is desirable that the opening 17 formed on the floor surface of the balcony 6 be provided with a lid 30 for closing the opening 17. By doing so, the opening 17 is usually closed by the lid 30, so that the floor surface of the balcony 6 can be effectively used. Can be used as stairs.

【0009】上記構成において、前記バルコニ6は、前
記開口部17を有する床パネル14と、この床パネル1
4の周縁に立設された立上り壁15とを備えた片持ち支
持のバルコニユニット10により構成されていることが
望ましい。このようにすれば、予め工場で、床パネル1
4に開口部17を形成することができるので、建設現場
での作業を軽減できる。
In the above configuration, the balcony 6 includes a floor panel 14 having the opening 17 and the floor panel 1.
It is desirable to be constituted by a cantilever-supported balconi unit 10 having a rising wall 15 erected on the peripheral edge of the unit 4. If this is done, the floor panel 1 will be
Since the opening 17 can be formed in 4, the work at the construction site can be reduced.

【0010】本発明のバルコニ構造の施工方法は、建物
の屋外部分に形成されるバルコニ6とこのバルコニ6に
繋がる階段7とを備え、前記バルコニ6の床面には、バ
ルコニ6下部の空間と連通する開口部17が形成される
とともに、前記バルコニ6の平面内でかつバルコニ6の
下方に前記開口部17に支持される階段7が配置され、
この階段7は、前記開口部17近傍の床構造材19に支
持される階段用支柱21を含んで構成されるバルコニ構
造の施工方法において、少なくとも一本の階段用支柱2
1を設置した後、その階段用支柱21の上方に前記バル
コニ6を吊り上げ、前記階段用支柱の上端に前記バルコ
ニの床構造材19を接続してバルコニ6を組み立てるこ
とを特徴とする。このような方法によれば、階段用支柱
21の上端でバルコニ6を支持した状態でバルコニ6を
建物の外壁に取付けできるので、安定してバルコニ6を
建物に取付けることができる。また、階段用支柱21が
複数本設置されていれば、より安定してバルコニ6を支
持でき、より大きなバルコニを設置することができる。
The method for constructing a balcony structure according to the present invention includes a balcony 6 formed in an outdoor part of a building and a stair 7 connected to the balcony 6. The floor of the balcony 6 has a space below the balcony 6 and An opening 17 communicating with the opening 17 is formed, and a stair 7 supported by the opening 17 is arranged in a plane of the balcony 6 and below the balcony 6.
This staircase 7 is provided with at least one staircase support 2 in the construction method of the balcony structure including the staircase support 21 supported by the floor structure material 19 near the opening 17.
After installing 1, the balcony 6 is lifted above the stair post 21, and the balcony structural member 19 is connected to the upper end of the stair post to assemble the balcony 6. According to such a method, since the balcony 6 can be attached to the outer wall of the building while the balcony 6 is supported at the upper end of the stair post 21, the balcony 6 can be stably attached to the building. Also, if a plurality of stair columns 21 are provided, the balcony 6 can be supported more stably, and a larger balcony can be installed.

【0011】[0011]

【発明の実施の形態】以下、本発明の一実施形態を図面
に基づいて説明する。図1には、本実施形態に係るバル
コニ構造が適用されたユニット式建物1が示されてい
る。このユニット式建物1は、現場打ちされた基礎2
と、この基礎2上に形成され、複数の建物ユニット4を
上下、水平方向に配列した建物本体3と、この建物本体
3上に形成される屋根5と、前記建物本体3の二階の建
物ユニット4に接合されるとともに、ユニット式建物1
の外壁面に沿って並設されるバルコニ6とを含んで構成
されている。また、バルコニ6の下方には、そのバルコ
ニ6の平面内に螺旋階段7が設けられている。なお、建
物ユニット4は、図示を略したが、四隅に立設される柱
と、これらの柱の上端間、下端間を連絡する梁からなる
フレームを備えた軸組構造の建物ユニットである。この
ような建物ユニット4の内部に工場で、壁材、床材、そ
の他の設備物を予め組み込んでおき、建設現場に搬送
し、組合わせることにより現場作業の軽減と工期短縮を
図ることができる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. FIG. 1 shows a unit-type building 1 to which a balcony structure according to the present embodiment is applied. This unit-type building 1 has a foundation 2
A building body 3 formed on the foundation 2 and having a plurality of building units 4 arranged vertically and horizontally, a roof 5 formed on the building body 3, and a building unit on the second floor of the building body 3 4 and unit-type building 1
And the balconies 6 arranged side by side along the outer wall surface. A spiral staircase 7 is provided below the balcony 6 in the plane of the balcony 6. Although not shown, the building unit 4 is a building unit having a framed structure including columns that are erected at four corners and a frame that includes beams connecting between upper ends and lower ends of these columns. At the factory, wall materials, floor materials, and other equipment are installed in advance in such a building unit 4 and then transported to the construction site and combined with each other, so that site work can be reduced and the construction period can be shortened. .

【0012】図2には、バルコニ6を構成するバルコニ
ユニット10が示されている。このバルコニユニット1
0は、床パネル14と、この床パネル14の周縁に立設
された立上り壁15と、この立上り壁15の上面に取り
付けられた手摺16(図1参照)とを備えている。前記
床パネル14は、床の骨組みを構成する床構造材19
と、この床構造材19の上面に取り付けられた床面材1
3とから構成され、その一側にバルコニユニット10の
下部の空間と連通するL字形の開口部17を備えてい
る。
FIG. 2 shows a balcony unit 10 constituting the balcony 6. This Balconi unit 1
Numeral 0 includes a floor panel 14, a rising wall 15 erected on the periphery of the floor panel 14, and a handrail 16 (see FIG. 1) attached to the upper surface of the rising wall 15. The floor panel 14 is a floor structural material 19 constituting a floor framework.
And the floor member 1 attached to the upper surface of the floor structural member 19.
And an L-shaped opening 17 communicating with the space below the balcony unit 10 on one side.

【0013】また、前記床構造材19は、複数本の縦梁
11と、これらの縦梁11に跨って架け渡された横梁1
2と、前記開口部17を形成するために真ん中の縦梁1
1に固着されたL字形の中間梁18とを備えている。
The floor structural member 19 includes a plurality of vertical beams 11 and the horizontal beams 1 bridged over these vertical beams 11.
2 and the middle longitudinal beam 1 to form the opening 17
1 and an L-shaped intermediate beam 18 fixed to the base member 1.

【0014】前記開口部17には、図3(A),(B)に示
すように、この開口部17を塞ぐ蓋30が設けられてい
る。この蓋30は、一方端および真ん中の縦梁11とL
字形の中間梁18と横梁12の上面に載せられており、
ヒンジ31を介して回動自在に形成されている。前記蓋
30の上面には、把手32が設けられている。なお、蓋
30の厚さは、前記床面材13と同一の厚さ寸法に形成
されているので、蓋30の上面は、床の上面と面一とな
っている。
As shown in FIGS. 3A and 3B, the opening 17 is provided with a lid 30 for closing the opening 17. This lid 30 is connected to one end and the middle vertical beam 11 and L
It is placed on the upper surface of the middle beam 18 and the cross beam 12 of the character shape,
It is formed rotatably via a hinge 31. A handle 32 is provided on the upper surface of the lid 30. In addition, since the thickness of the lid 30 is formed to the same thickness dimension as the floor surface material 13, the upper surface of the lid 30 is flush with the upper surface of the floor.

【0015】また、前記蓋30をヒンジ31を介して回
動すると、図3(A)に示すように、蓋30は、立上り壁
15の内側面に対して平行に立てられ、開口部17の下
方、つまりは、バルコニユニット10の下方には、開口
部17に支持される前記螺旋階段7が配置されている。
なお、前記開口部17は、通常、図3(B)に示すよう
に、蓋30により塞がれた状態にしてもよい。
When the lid 30 is rotated via the hinge 31, the lid 30 is set up parallel to the inner surface of the rising wall 15 as shown in FIG. The spiral staircase 7 supported by the opening 17 is disposed below, that is, below the balcony unit 10.
Note that the opening 17 may be normally closed by a lid 30 as shown in FIG.

【0016】前記螺旋階段7は、図4(A),(B)に示す
ように、下端が地表面、上端が前記開口部17近傍の床
構造材19下面、すなわち、下端が現場打ちされた基礎
8、上端が前記中間梁18の下面に接続される階段用支
柱21と、この階段用支柱21に一端が接続され、階段
用支柱21を中心に上下方向に螺旋状に配置された段板
22と、この段板22の他端に接続されたささら桁23
と、前記段板22の上面に立設された手摺24とを備え
た階段ユニット20により構成されている。前記ささら
桁23の上端は、バルコニユニット10の下面に、その
下端は基礎8に固着されている。なお、前記螺旋階段7
の直径は、バルコニユニット10の建物本体3の外壁面
からの突出量より僅かに小さく形成されている。
As shown in FIGS. 4 (A) and 4 (B), the spiral staircase 7 has a lower end that is ground, and an upper end that is the lower surface of the floor structural material 19 near the opening 17, that is, the lower end is hit in place. A base 8, a stair post 21 having an upper end connected to the lower surface of the intermediate beam 18, and a step plate connected at one end to the stair post 21 and spirally arranged vertically around the stair post 21. 22 and a sasara girder 23 connected to the other end of the step board 22.
And a handrail 24 erected on the upper surface of the step board 22. The upper end of the slab girder 23 is fixed to the lower surface of the balcony unit 10, and the lower end is fixed to the foundation 8. The spiral staircase 7
Is formed slightly smaller than the amount of projection of the balcony unit 10 from the outer wall surface of the building body 3.

【0017】このような構成からなる本実施形態の製造
方法を説明する。バルコニユニット10の床の下方に螺
旋階段7である階段ユニット20を形成するには、予め
工場において、バルコニユニット10の下部空間と連通
する開口部17を備えた骨組みを有するバルコニユニッ
ト10を形成する。また、前記開口部17にこの開口部
17を塞ぐ蓋30を設け、この蓋30をヒンジ31を介
して回動自在に形成し、階段用支柱21を中心に上下方
向に螺旋状に段板22等を備えた階段ユニット20を形
成する。その後、これらのバルコニユニット10および
階段ユニット20を建物本体3が建てられている建設現
場へトラック等により運搬する。
The manufacturing method of this embodiment having the above-described configuration will be described. In order to form the staircase unit 20 which is the spiral staircase 7 below the floor of the balcony unit 10, the balcony unit 10 having a framework having an opening 17 communicating with the lower space of the balcony unit 10 is formed in a factory in advance. . Further, a cover 30 for closing the opening 17 is provided in the opening 17, the cover 30 is formed rotatably via a hinge 31, and the step board 22 is spirally formed in the vertical direction around the stair post 21. The staircase unit 20 including the above is formed. After that, the balcony unit 10 and the stair unit 20 are transported by truck or the like to the construction site where the building body 3 is built.

【0018】建設現場において、バルコニユニット10
をクレーン等により建物本体3の外壁に取り付ける。次
に、バルコニユニット10の平面内でかつバルコニユニ
ット10の下方に螺旋階段7である階段ユニット20を
配置するにあたっては、階段用支柱21の下端を基礎8
に、その上端を中間梁18の下面に接合する。
At the construction site, the balcony unit 10
Is attached to the outer wall of the building body 3 by a crane or the like. Next, in arranging the stair unit 20 which is the spiral staircase 7 within the plane of the balcony unit 10 and below the balcony unit 10, the lower end of the stair column 21 is fixed to the foundation 8
Then, the upper end is joined to the lower surface of the intermediate beam 18.

【0019】前述のような本実施形態によれば、次のよ
うな効果が得られる。すなわち、バルコニユニット10
の床面にバルコニユニット10の下部空間と連通する開
口部17が形成されるとともに、バルコニユニット10
の平面内で、かつ、バルコニユニット10の下方に螺旋
階段7が配置されているので、従来におけるバルコニユ
ニット10の側面または正面に取り付けられる階段に比
べ、建物の敷地を余分に使う必要がなくなり、建物の敷
地を効率的に活用することができる。
According to the above-described embodiment, the following effects can be obtained. That is, the balcony unit 10
An opening 17 communicating with the lower space of the balcony unit 10 is formed on the floor surface of the balcony unit 10.
Since the spiral staircase 7 is arranged in the plane of and below the balcony unit 10, there is no need to use an extra site of the building as compared with a conventional staircase attached to the side or front of the balcony unit 10, The building site can be used efficiently.

【0020】また、螺旋階段7の直径は、バルコニユニ
ット10の建物本体3の外壁面からの突出量より僅かに
小さい寸法に形成されているので、階段部分の占める割
合が小さくすることができる。そのため、一階部分の、
例えば南側のスペースを十分に確保することができる。
また、バルコニユニット10の床面に形成される開口部
17を小さくできるので、バルコニユニット10の床を
十分に確保することができる。
Further, since the diameter of the spiral staircase 7 is formed to be slightly smaller than the projecting amount of the balcony unit 10 from the outer wall surface of the building body 3, the proportion of the staircase portion can be reduced. Therefore, on the first floor,
For example, a space on the south side can be sufficiently secured.
Further, since the opening 17 formed on the floor surface of the balcony unit 10 can be reduced, the floor of the balcony unit 10 can be sufficiently secured.

【0021】また、螺旋階段7を構成する階段用支柱2
1は、下端が現場打設された基礎8に、上端が開口部1
7の周縁に形成された中間梁18の下面に接続されてい
るので、階段用支柱21がバルコニユニット10を支持
することになり、安定してバルコニユニット10を支持
することができ、バルコニユニット10を大きくするこ
とができる。さらに、片持ち支持のバルコニユニット1
0においても、建物本体3の外壁面からの突出量を拡大
することができ、バルコニユニット10の床面積を大き
くすることができる。
Further, the stair support 2 constituting the spiral staircase 7
1 is a base 8 having a lower end cast in place and an upper end having an opening 1.
7 is connected to the lower surface of the intermediate beam 18 formed on the periphery of the staircase 7, so that the stair post 21 supports the balcony unit 10, so that the balcony unit 10 can be stably supported, and the balcony unit 10 can be stably supported. Can be increased. In addition, a cantilevered Balconi unit 1
Even at 0, the amount of protrusion from the outer wall surface of the building body 3 can be increased, and the floor area of the balcony unit 10 can be increased.

【0022】また、バルコニユニット10の床面に形成
された開口部17には、この開口部17を塞ぐヒンジ3
1を介して回動自在に形成された蓋30が設けられてい
るので、普段は、開口部17を塞いだ状態にしておけ
ば、バルコニユニット10の床を有効に活用することが
でき、また、火災等の際には、蓋30をヒンジ31を介
して開口すれば、非常階段として利用することができ
る。
An opening 17 formed in the floor of the balcony unit 10 has a hinge 3 for closing the opening 17.
Since the lid 30 is provided so as to be rotatable via 1, the floor of the balcony unit 10 can be effectively used if the opening 17 is normally closed, and In the event of a fire or the like, if the lid 30 is opened via the hinge 31, it can be used as an emergency staircase.

【0023】また、螺旋階段7は、予め工場で、製造さ
れる階段ユニット20により構成されているので、建設
現場においては、階段用支柱21を接続するだけでよ
く、建設現場における作業を軽減することができる。
Further, since the spiral staircase 7 is constituted by a staircase unit 20 which is manufactured in advance in a factory, it is only necessary to connect the stair support 21 at the construction site, and the work at the construction site is reduced. be able to.

【0024】なお、本発明は前記実施形態に限定される
ものではなく、本発明の目的を達成できる他の構成等を
含み、以下に示すような変形なども本発明に含まれる。
すなわち、前記実施形態では、階段は、螺旋階段7であ
るが、これに限らず、図5に示すように、バルコニユニ
ット10の平面内において、前記バルコニユニット10
の長手方向に沿って斜めに架けた直線状の階段ユニット
40であってもよい。この階段ユニット40は、下端が
基礎8Aに、上端がバルコニユニット10の床構造材に
接続された二本の階段用支柱41と、上端が前記階段用
支柱41に接続された一対のささら桁42と、これらの
ささら桁42間に架け渡された複数の段板43と、これ
らの段板43の上面に立設された手摺44とを備えてい
る。
It should be noted that the present invention is not limited to the above-described embodiment, but includes other configurations capable of achieving the object of the present invention, and also includes the following modifications.
That is, in the above-described embodiment, the staircase is the spiral staircase 7, but is not limited to this. As shown in FIG.
May be a linear staircase unit 40 that is diagonally extended along the longitudinal direction of the staircase. The stair unit 40 has two stair columns 41 having a lower end connected to the foundation 8A and an upper end connected to the floor structural material of the balcony unit 10, and a pair of sasari beams 42 each having an upper end connected to the stair column 41. And a plurality of step plates 43 spanned between the slab beams 42, and handrails 44 erected on the upper surfaces of the step plates 43.

【0025】また、図6に示すように、下端が基礎8B
に、上端がバルコニユニット10の床構造材に接続され
た二本の階段用支柱51と、これらの階段用支柱51間
に架け渡された段板52を含む梯子状の階段ユニット5
0であってもよい。このようにすると、前記螺旋階段7
よりも僅かに開口部が小さくなり、上述した同様の効果
が得られる。さらに、階段は、予め工場で製造される階
段ユニット20により構成されているが、これに限ら
ず、建設現場で組み立てられる階段であってもよい。
Further, as shown in FIG.
A ladder-shaped stair unit 5 including two stair posts 51 having upper ends connected to the floor structural material of the balcony unit 10 and a step board 52 bridged between these stair posts 51.
It may be 0. By doing so, the spiral staircase 7
The opening is slightly smaller than in this case, and the same effect as described above can be obtained. Furthermore, the stairs are configured by the stair unit 20 manufactured in advance in the factory, but are not limited thereto, and may be stairs assembled at a construction site.

【0026】また、前記実施形態では、建設現場におい
て、バルコニユニット10を外壁に取り付けた後、バル
コニユニット10の床構造材19下面に階段用支柱21
を接続してバルコニユニット10の下方に階段ユニット
20を設置しているが、これに限らず、少なくとも一本
の階段用支柱21を設置した後、その階段用支柱21の
上方に前記バルコニユニット10を吊り上げ、前記階段
用支柱21の上端に前記バルコニユニット10の床構造
材19を接続してバルコニユニット10を組み立て、前
記階段用支柱21に階段7を設けてもよい。
In the above embodiment, after the balcony unit 10 is attached to the outer wall at the construction site, the stair pillars 21 are placed on the lower surface of the floor structural member 19 of the balcony unit 10.
The stair unit 20 is installed below the balcony unit 10 by connecting the stairs. However, the invention is not limited to this. After installing at least one pillar 21 for stairs, the balcony unit 10 is placed above the pillar 21 for stairs. And the floor structure material 19 of the balcony unit 10 may be connected to the upper end of the stair column 21 to assemble the balcony unit 10, and the stair 7 may be provided on the stair column 21.

【0027】例えば、図7に示すように、バルコニユニ
ット10の取付位置に合わせて、バルコニユニット10
の左端に階段用支柱21を、この右端に支柱61を設置
する。そして、階段用支柱21および支柱61の上方に
バルコニユニット10を吊り上げ、前記階段用支柱21
および支柱61の上端にバルコニユニット10の床構造
材19をそれぞれ接続した後、前記バルコニユニット1
0を建物本体3の外壁に取付け、前記階段用支柱21に
段板等を取り付けて階段ユニット20を形成する。な
お、ここでは、一本の階段用支柱21を設置している
が、複数本であってもよい。また、図5、図6に示した
バルコニ構造においても、図7で示した方法と同様に、
先に二本の階段用支柱41,51を設置し、これらの階
段用支柱41,51の上端にバルコニユニット10の床
構造材19をそれぞれ接続した後、前記バルコニユニッ
ト10を建物本体3の外壁に取付け、前記階段用支柱4
1,51に段板等を取り付けて階段ユニット40,50
を形成してもよい。
[0027] For example, as shown in FIG.
Is installed on the left end of the stairs, and the support 61 is installed on the right end. Then, the balcony unit 10 is lifted above the stair support 21 and the support 61, and the stair support 21 is lifted.
And the floor structural members 19 of the balcony unit 10 are connected to the upper ends of the columns 61, respectively.
0 is attached to the outer wall of the building body 3, and a stair plate or the like is attached to the stair post 21 to form a stair unit 20. Here, one stair post 21 is installed, but a plurality of stair posts 21 may be provided. Also, in the balcony structure shown in FIGS. 5 and 6, similarly to the method shown in FIG. 7,
First, the two columns 41, 51 for stairs are installed, and the floor structural members 19 of the balcony unit 10 are connected to the upper ends of the columns 41, 51, respectively. Then, the balcony unit 10 is connected to the outer wall of the building body 3. Attached to the stair post 4
Attach a step board or the like to the stair units 40, 50
May be formed.

【0028】このようにすれば、階段用支柱21および
支柱61の上端にバルコニユニット10の床構造材19
を接続してからバルコニユニット10を建物本体3の外
壁に取り付けているので、安定してバルコニユニット1
0を建物本体3に取付けることができる。また、バルコ
ニユニット10が階段用支柱21および支柱61に支持
されていれば、より安定してバルコニユニット10を支
持することができ、前記実施形態よりも大きなバルコニ
ユニットを設置することが可能となる。
In this way, the floor structural members 19 of the balcony unit 10 are provided on the upper ends of the stair columns 21 and the columns 61.
Is connected, and then the balcony unit 10 is attached to the outer wall of the building body 3, so that the balcony unit 1 is stably mounted.
0 can be attached to the building body 3. Further, if the balcony unit 10 is supported by the columns 21 and 61 for stairs, the balcony unit 10 can be more stably supported, and a larger balcony unit than in the above embodiment can be installed. .

【0029】また、前記実施形態では、階段ユニット2
0は、バルコニユニット10の隅に形成されているが、
これに限らず、バルコニユニット10の中央に形成され
ていてもよい。このようにすれば、バルコニユニット1
0を安定して支持することができる。
In the above embodiment, the stair unit 2
0 is formed at the corner of the balcony unit 10,
The present invention is not limited to this, and may be formed at the center of the balcony unit 10. By doing so, the balcony unit 1
0 can be stably supported.

【0030】また、前記実施形態では、バルコニは、予
め工場で製造されるバルコニユニット10により構成さ
れているが、これに限らず、建設現場で組み立てられる
バルコニであってもよい。
Further, in the above embodiment, the balcony is constituted by the balcony unit 10 manufactured in advance in the factory, but the invention is not limited to this, and the balcony may be assembled at a construction site.

【0031】また、前記実施形態では、開口部17の直
径は、バルコニユニット10の建物本体3の外壁面から
の突出量より僅かに小さい寸法に形成されているが、こ
れに限らず、前記突出量と同じ寸法に形成されていても
よい。要するに、開口部17の直径は、適宜応じた寸法
にすればよい。
In the above-described embodiment, the diameter of the opening 17 is formed to be slightly smaller than the projecting amount of the balcony unit 10 from the outer wall surface of the building main body 3. However, the present invention is not limited to this. It may be formed in the same size as the quantity. In short, the diameter of the opening 17 may be appropriately determined.

【0032】また、前記実施形態では、蓋30は、ヒン
ジ31を介して開閉しているが、これに限らず、取り外
し可能な蓋であってもよい。
In the above embodiment, the lid 30 is opened and closed via the hinge 31, but is not limited to this, and may be a removable lid.

【0033】[0033]

【発明の効果】本発明のバルコニ構造およびその施工方
法によれば、建物の敷地を効率的に活用することができ
る。
According to the balcony structure and the construction method of the present invention, the site of a building can be used efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係るバルコニ構造が適用
されたユニット式建物を示す斜視図である。
FIG. 1 is a perspective view showing a unit-type building to which a balcony structure according to an embodiment of the present invention is applied.

【図2】同上実施形態に係るバルコニユニットの骨組み
を示す斜視図である。
FIG. 2 is a perspective view showing a framework of the balcony unit according to the embodiment.

【図3】同上実施形態に係る蓋の開閉状態を示す平面図
である。
FIG. 3 is a plan view showing an open / closed state of a lid according to the embodiment.

【図4】同上実施形態に係る螺旋階段を示す斜視図であ
る。
FIG. 4 is a perspective view showing a spiral staircase according to the embodiment.

【図5】本発明に係るバルコニ構造の他の例を示す斜視
図である。
FIG. 5 is a perspective view showing another example of the balcony structure according to the present invention.

【図6】本発明に係るバルコニ構造のさらに他の例を示
す斜視図である。
FIG. 6 is a perspective view showing still another example of a balcony structure according to the present invention.

【図7】本発明に係るバルコニ構造の施工方法の他の例
を示す斜視図である。
FIG. 7 is a perspective view showing another example of a method of constructing a balcony structure according to the present invention.

【符号の説明】[Explanation of symbols]

6 バルコニ 7 階段(螺旋階段) 10 バルコニユニット 14 床パネル 15 立上り壁 17 開口部 19 床構造材 21 階段用支柱 30 蓋 6 Balconi 7 Stairs (spiral staircase) 10 Balconi unit 14 Floor panel 15 Rising wall 17 Opening 19 Floor structural material 21 Stair column 30 Lid

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 建物の屋外部分に形成されるバルコニと
このバルコニに繋がる階段とを備えたバルコニ構造にお
いて、前記バルコニの床面には、バルコニ下部の空間と
連通する開口部が形成されるとともに、前記バルコニの
平面内でかつバルコニの下方に前記開口部に支持される
階段が配置され、この階段は、前記開口部近傍の床構造
材に支持される階段用支柱を含んで構成されていること
を特徴とするバルコニ構造。
1. A balcony structure comprising a balcony formed in an outdoor part of a building and a staircase connected to the balcony, wherein an opening communicating with a space below the balcony is formed in a floor surface of the balcony. A step supported by the opening is disposed in the plane of the balcony and below the balcony, and the step includes a stair column supported by a floor structural member near the opening. Balconi structure characterized by the following.
【請求項2】 請求項1に記載のバルコニ構造におい
て、前記階段は、螺旋階段であることを特徴とするバル
コニ構造。
2. The balcony structure according to claim 1, wherein said steps are spiral steps.
【請求項3】 請求項2に記載のバルコニ構造におい
て、前記螺旋階段の直径は、バルコニの建物の外壁面か
らの突出量と同じ寸法あるいは僅かに小さい寸法である
ことを特徴とするバルコニ構造。
3. The balcony structure according to claim 2, wherein the diameter of the spiral staircase is the same as or slightly smaller than the projection of the balcony from the outer wall surface of the building.
【請求項4】 請求項1〜3のいずれかに記載のバルコ
ニ構造において、前記階段は、下端が地表面、上端がバ
ルコニの床構造材下面に接続される階段用支柱を備えて
いることを特徴とするバルコニ構造。
4. The barconi structure according to claim 1, wherein the stairs include a stair post having a lower end connected to a ground surface and an upper end connected to a lower surface of a flooring material of the balcony. Characteristic Balconi structure.
【請求項5】 請求項1〜4のいずれかに記載のバルコ
ニ構造において、前記バルコニ床面に形成された開口部
には、当該開口部を塞ぐ蓋が設けられていることを特徴
とするバルコニ構造。
5. The balcony as set forth in claim 1, wherein an opening formed in the floor of the balcony is provided with a lid for closing the opening. Construction.
【請求項6】 請求項1〜5のいずれかに記載のバルコ
ニ構造において、前記バルコニは、前記開口部を有する
床パネルと、この床パネルの周縁に立設された立上り壁
とを備えた片持ち支持のバルコニユニットにより構成さ
れていることを特徴とするバルコニ構造。
6. The barconi structure according to claim 1, wherein the barconi includes a floor panel having the opening, and a rising wall provided on a peripheral edge of the floor panel. Balconi structure characterized by being constituted by a holding and supporting balconi unit.
【請求項7】 建物の屋外部分に形成されるバルコニと
このバルコニに繋がる階段とを備え、前記バルコニの床
面には、バルコニ下部の空間と連通する開口部が形成さ
れるとともに、前記バルコニの平面内でかつバルコニの
下方に前記開口部に支持される階段が配置され、この階
段は、前記開口部近傍の床構造材に支持される階段用支
柱を含んで構成されるバルコニ構造の施工方法におい
て、少なくとも一本の階段用支柱を設置した後、その階
段用支柱の上方に前記バルコニを吊り上げ、前記階段用
支柱の上端に前記バルコニの床構造材を接続してバルコ
ニを組み立てることを特徴とするバルコニ構造の施工方
法。
7. A balcony formed in an outdoor part of a building and a staircase connected to the balcony, wherein an opening communicating with a space below the balcony is formed in a floor of the balcony, and the balcony is provided with an opening. A staircase supported by the opening is disposed in a plane and below the balcony, and the staircase is a method of constructing a balcony structure including a stair column supported by a floor structural material near the opening. In the above, after installing at least one stair post, the vulconi is lifted above the stair post, and the vulconi floor structural material is connected to the upper end of the stair post to assemble the vulconi. Construction method of balconi structure.
JP10004741A 1998-01-13 1998-01-13 Balcony structure and method for constructing the same Withdrawn JPH11200484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10004741A JPH11200484A (en) 1998-01-13 1998-01-13 Balcony structure and method for constructing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10004741A JPH11200484A (en) 1998-01-13 1998-01-13 Balcony structure and method for constructing the same

Publications (1)

Publication Number Publication Date
JPH11200484A true JPH11200484A (en) 1999-07-27

Family

ID=11592352

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10004741A Withdrawn JPH11200484A (en) 1998-01-13 1998-01-13 Balcony structure and method for constructing the same

Country Status (1)

Country Link
JP (1) JPH11200484A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016158024A1 (en) * 2015-03-30 2016-10-06 住友重機械搬送システム株式会社 Gantry crane and crane facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016158024A1 (en) * 2015-03-30 2016-10-06 住友重機械搬送システム株式会社 Gantry crane and crane facility
JP2016188138A (en) * 2015-03-30 2016-11-04 住友重機械搬送システム株式会社 Gantry crane and crane facility

Similar Documents

Publication Publication Date Title
JPH102006A (en) Fence structure of building
JP2843016B2 (en) Folding stair unit box and building using it
JPH11200484A (en) Balcony structure and method for constructing the same
JP7101154B2 (en) Skip floor support structure and construction method
JP3458977B2 (en) Unit type building with balcony and its construction method
JP5934124B2 (en) Unit type building and construction method thereof
JP2000352116A (en) Building unit constructing method and unit building
JPH1193272A (en) Building unit
JP2003074122A (en) Unit building and expansion unit
JP5775333B2 (en) Unit for balcony, unit type building and construction method for unit type building
JPH05202593A (en) Outside staircase unit structure
JP4146576B2 (en) building
JP2002115329A (en) Unit type building
JP3999907B2 (en) Building unit with stairs and unit building
JPH07269138A (en) Multiple dwelling house
JP6371212B2 (en) External wall material holding bracket and unit type building
JP2004324309A (en) Woody building
JPH11181890A (en) Building unit with stairs and unit building using the building unit
JP2000336763A (en) Building unit
JP2879652B2 (en) Box type building structure and its construction method
JP2000073594A (en) Building with solar cell roof
JPH06346517A (en) Unit type building
JP2000336753A (en) Unit building
JPH102014A (en) Main entrance structure of unit building, and its forming method
JP2002070174A (en) Unit building

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20050405