JPH11193542A - Construction machinery front device, boom used therefor, and building method thereof - Google Patents

Construction machinery front device, boom used therefor, and building method thereof

Info

Publication number
JPH11193542A
JPH11193542A JP36891997A JP36891997A JPH11193542A JP H11193542 A JPH11193542 A JP H11193542A JP 36891997 A JP36891997 A JP 36891997A JP 36891997 A JP36891997 A JP 36891997A JP H11193542 A JPH11193542 A JP H11193542A
Authority
JP
Japan
Prior art keywords
boom
working device
construction machine
work
end side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP36891997A
Other languages
Japanese (ja)
Inventor
Akio Iwasaki
章夫 岩崎
Motohiro Ishii
基寛 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP36891997A priority Critical patent/JPH11193542A/en
Publication of JPH11193542A publication Critical patent/JPH11193542A/en
Pending legal-status Critical Current

Links

Landscapes

  • Shovels (AREA)

Abstract

PROBLEM TO BE SOLVED: To change specifications of a front device corresponding to the contents of work within a short time and to enable the promotion of work efficiency thereof. SOLUTION: An excavation work sub-assembly 14 corresponding to the contents of work is connected to the front end side of a common boom 8 always mounted to a swing-frame 3 of an upper swing body 2 in a changeable manner. By the constitution, the change of specifications of a front device 7 corresponding to the contents of work can be made within a short time, and one hydraulic shovel can be used for different works such as excavation work, dismantlement work, etc. Since a positioning mechanism 22 is provided between the common boom 8 and a joint boom 16 of the excavation work sub-assembly 14, positioning between the common boom 8 and joint boom 16 can be easily made, and work efficiency can be promoted when the common boom 8 is connected to the excavation work sub-assembly 14 with a joint pin 15.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば土砂の掘削
作業、建造物の解体作業等に好適に用いられる建設機械
用フロント装置及びそれに用いるブーム並びにその組立
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a front apparatus for a construction machine suitably used for excavation work of earth and sand, demolition work of a building, and the like, a boom used therefor, and a method of assembling the same.

【0002】[0002]

【従来の技術】一般に、土砂等の掘削作業、建造物の解
体作業に好適に用いられる油圧ショベル等の建設機械
は、下部走行体上に旋回可能に搭載された建設機械本体
としての上部旋回体と、上部旋回体に設けられたフロン
ト装置とから大略構成されている。
2. Description of the Related Art In general, a construction machine such as a hydraulic shovel, which is suitably used for excavation work of soil and the like and demolition work of a building, includes an upper revolving structure as a construction machine body rotatably mounted on a lower traveling structure. And a front device provided on the upper swing body.

【0003】そして、フロント装置は、上部旋回体に俯
仰動可能に取付けられたブームと、ブームの先端側に俯
仰動可能に取付けられたアーム、作業具等とからなり、
土砂等の掘削作業を行うときにはバケット等の作業具が
用いられ、建造物の解体作業を行うときにはカッター等
の作業具が用いられる。
[0003] The front device includes a boom mounted on the upper swing body so as to be able to move upward and downward, and an arm, a working tool, etc., which is mounted on the distal end side of the boom so as to be able to move upward and downward.
A work implement such as a bucket is used when excavating work such as earth and sand, and a work implement such as a cutter is used when performing dismantling work of a building.

【0004】ところで、油圧ショベルを用いて建造物の
解体作業を行う場合には、建造物の高所でカッター等に
よる解体作業を行う必要があるため、フロント装置全体
の長さ寸法を大きくする必要がある。
[0004] When a building is dismantled using a hydraulic excavator, it is necessary to perform a dismantling operation using a cutter or the like at a high place of the building, so that it is necessary to increase the length of the entire front device. There is.

【0005】従って、1台の油圧ショベルを土砂の掘削
作業、建造物の解体作業等に兼用して用いる場合には、
掘削作業時に適用するフロント装置と解体作業に適用す
る長さ寸法の大きなフロント装置とを用意しておき、こ
の2種類のフロント装置を作業内容に応じて上部旋回体
に交換して取付ける方法が考えられる。
[0005] Therefore, when one hydraulic excavator is used also for excavation work of earth and sand, demolition work of a building, and the like,
A method of preparing a front device to be applied during excavation work and a front device having a large length to be used for demolition work, and replacing the two types of front devices with the upper revolving structure according to the work content, and mounting the same. Can be

【0006】しかし、上部旋回体とフロント装置とは、
フロント装置を構成するブームの基端側を上部旋回体を
構成する旋回フレームのブームフート部に大径の連結ピ
ンを介して回動可能に取付ける構成となっているため、
掘削作業用のフロント装置と解体作業用のフロント装置
とを交換するときの作業が非常に煩雑である。特に、大
型のキャブを搭載した油圧ショベルでは、旋回フレーム
のブームフート部とキャブとの間の隙間が狭小となるた
め、十分な作業スペースが確保できず、この隙間内での
連結ピンの着脱作業が非常に困難であるという問題があ
る。
However, the upper revolving superstructure and the front device are:
Because the base end side of the boom that constitutes the front device is rotatably attached to the boom foot portion of the revolving frame that constitutes the upper revolving structure via a large-diameter connection pin,
The work when exchanging the front apparatus for excavation work and the front apparatus for dismantling work is very complicated. In particular, in the case of a hydraulic shovel equipped with a large cab, the gap between the boom foot portion of the revolving frame and the cab is narrow, so that sufficient working space cannot be secured, and the work of attaching and detaching the connecting pin in this gap is not possible. There is a problem that it is very difficult.

【0007】これに対し、例えば例えば実開平1−28
452号公報等には、長さ方向に分割可能となったブー
ムを用い、このブームの中間部に1個または複数個の中
継ブームを介在させることにより、フロント装置全体の
長さ寸法を作業内容に応じて調整できるようにした油圧
ショベルが提案されている。
[0007] On the other hand, for example, Japanese Utility Model Laid-Open No. 1-28
Japanese Patent No. 452,452 discloses the use of a boom that can be split in the length direction and one or more relay booms interposed in the middle of the boom to determine the overall length of the front device. There has been proposed a hydraulic excavator that can be adjusted according to the pressure.

【0008】[0008]

【発明が解決しようとする課題】しかし、上述した従来
技術による油圧ショベルでは、例えば掘削作業から解体
作業に転用する場合に、ブームの中間部に中継ブームを
取付ける作業と、アームの先端側に掘削作業用のバケッ
トに代えて解体作業用のカッター等を取付ける作業とを
行う必要があり、これらの取付け作業に多大な作業時間
が費やされるという問題がある。
However, in the above-mentioned hydraulic excavator according to the prior art, when the excavating work is diverted to the dismantling work, for example, the work of attaching the relay boom to the middle part of the boom and the excavation of the extremity of the arm are performed. It is necessary to perform a work of mounting a cutter for dismantling work or the like in place of the work bucket, and there is a problem that a great amount of work time is required for the mounting work.

【0009】また、上述のブームと中継ブームとは連結
ピンを介して着脱可能に連結されているため、ブームと
中継ブームとを連結するときにブーム側に設けたピン挿
通穴と中継ブーム側に設けたピン挿通穴とを互いに位置
合わせする作業が煩雑で、ブームと中継ブームとを連結
するときの作業性が悪いという問題がある。
Further, since the above-mentioned boom and the relay boom are detachably connected via connecting pins, when connecting the boom and the relay boom, the pin insertion hole provided on the boom side and the relay boom side are connected to each other. There is a problem that the work of aligning the provided pin insertion holes with each other is complicated, and the workability when connecting the boom and the relay boom is poor.

【0010】本発明は上述した従来技術の問題に鑑みな
されたもので、フロント装置をブームと作業装置とから
構成し、作業装置をブームの先端側に選択的に連結する
ことにより、作業内容に応じた仕様変更を短時間で行う
ことができるようにした建設機械用フロント装置及びそ
れに用いるブーム並びにその組立方法を提供することを
目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems of the prior art, and comprises a front device composed of a boom and a working device, and selectively connecting the working device to a tip end of the boom to improve the work content. It is an object of the present invention to provide a front apparatus for a construction machine, a boom used for the front apparatus, and a method of assembling the front apparatus, the specification being capable of performing a specification change in a short time.

【0011】[0011]

【課題を解決するための手段】上述した課題を解決する
ため、本発明は、建設機械本体に俯仰動可能に取付けら
れた建設機械用フロント装置に適用される。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention is applied to a construction machine front device mounted on a construction machine main body so as to be able to move up and down.

【0012】そして、請求項1の発明が採用する手段の
特徴は、フロント装置は、基端側が建設機械本体に俯仰
動可能に取付けられたブームと、作業内容に応じてブー
ムの先端側に対して選択的に連結される作業装置とから
なり、ブームと作業装置との間には、両者を連結すると
きに作業装置に対してブームの先端側を位置合わせする
位置合わせ手段と、位置合わせ手段により作業装置とブ
ームとを位置合わせした状態で、作業装置をブームの先
端側に連結する連結手段とを設けたことにある。
A feature of the means adopted by the invention of claim 1 is that the front device has a boom whose base end side is attached to the construction machine main body so as to be able to move up and down, and a front end side of the boom according to work contents. And a work device selectively connected to the boom and the work device. Positioning means for positioning the front end side of the boom with respect to the work device when connecting the boom and the work device; And a connecting means for connecting the working device to the end of the boom in a state where the working device and the boom are aligned.

【0013】このように構成したことにより、建設機械
本体に取付けられたブームの先端側に作業装置を選択的
に連結するだけで、掘削作業、解体作業等の作業内容に
応じたフロント装置を組立てることができる。また、位
置合わせ手段によって作業装置とブームの先端側とを位
置合わせした状態で、連結手段によって作業装置をブー
ムに連結することができる。
[0013] With this configuration, the front device can be assembled according to the work content such as excavation work and demolition work only by selectively connecting the work device to the tip end of the boom attached to the construction machine body. be able to. Further, the working device can be connected to the boom by the connecting device in a state where the working device and the tip end side of the boom are positioned by the positioning device.

【0014】また、請求項2の発明は、位置合わせ手段
は、ブームの先端側と作業装置のうちいずれか一方の部
材側に設けられた係合突起と、他方の部材側に設けられ
係合突起に係合する凹溝を有した掛止め部と、係合突起
を掛止め部の凹溝に係合させた状態でブームと作業装置
とを相対的に回転し両者が位置決めされたときに当接す
る当接部とから構成し、連結手段は、ブームの先端側と
作業装置とにそれぞれ形成されたピン穴と、各ピン穴内
に挿通され作業装置をブームに対して一体に連結する連
結ピンとから構成したことにある。
According to a second aspect of the present invention, the positioning means includes an engaging projection provided on one end of the boom and one of the working devices and an engaging projection provided on the other member. When the boom and the working device are rotated relative to each other by rotating the boom and the working device in a state in which the engaging protrusion is engaged with the concave groove of the engaging portion, The connecting means is constituted by a contact portion that abuts, and the connecting means includes a pin hole formed in the tip end side of the boom and the working device, and a connecting pin that is inserted into each pin hole and integrally connects the working device to the boom. It consists of.

【0015】このように構成したことにより、ブームの
先端側と作業装置のうちいずれか一方の部材側に設けら
れた係合突起を、他方の部材側に設けられた掛止め部の
凹溝に係合させ、ブームと作業装置とを相対回転させる
と、ブームと作業装置とが位置決めされたときに当接部
が当接し両者の相対回転が停止する。この状態でブーム
の先端側と作業装置とに形成された各ピン穴内に連結ピ
ンを挿通することにより、ブームの先端側に作業装置を
連結することができる。
[0015] With this configuration, the engaging protrusion provided on the distal end side of the boom and one of the working devices can be engaged with the concave groove of the engaging portion provided on the other member side. When the engagement is performed and the boom and the working device are relatively rotated, the abutting portion abuts when the boom and the working device are positioned, and the relative rotation of the two stops. In this state, the working device can be connected to the front end of the boom by inserting the connecting pin into each of the pin holes formed in the front end of the boom and the working device.

【0016】そして、請求項3の発明は、ブームと作業
装置との間には、作業装置をブームに着脱可能に連結す
るための連結機構を設け、連結機構は、ブームと作業装
置のうちいずれか一方の部材に設けられた取付ブラケッ
トと、他方の部材に設けられた複数の固定ピンと、取付
ブラケットに固定して設けられ、各固定ピンのうち少な
くとも一方の固定ピンに係合する固定爪と、取付ブラケ
ットに回動可能に枢支され、各固定ピンのうち他方の固
定ピンに係合する移動爪とから構成したことにある。
According to a third aspect of the present invention, a connecting mechanism for detachably connecting the working device to the boom is provided between the boom and the working device, and the connecting mechanism may be any one of the boom and the working device. A mounting bracket provided on one of the members, a plurality of fixing pins provided on the other member, and fixing claws provided fixed to the mounting bracket and engaged with at least one of the fixing pins. And a movable claw rotatably supported by the mounting bracket and engaged with the other of the fixed pins.

【0017】このように構成したことにより、ブームと
作業装置のうちいずれか一方の部材に設けられた固定爪
を、他方の部材に設けられた複数の固定ピンの一方に係
合させた状態で、移動爪を回動させて各固定ピンの他方
に係合させるだけで、ブームの先端側に作業装置を連結
することができる。
With this configuration, the fixed claw provided on one of the boom and the working device is engaged with one of the plurality of fixed pins provided on the other member. By simply rotating the movable claw to engage the other of the fixing pins, the working device can be connected to the tip end of the boom.

【0018】さらに、請求項4の発明は、ブームの先端
側には、ブームシリンダの先端側を選択的に取付けるた
めのシリンダ取付用ボスを複数個設け、ブームシリンダ
の最伸長時または最縮小時におけるブームの俯仰動角度
を変化させる構成としたことにある。
Further, according to the present invention, a plurality of cylinder mounting bosses for selectively mounting the front end side of the boom cylinder are provided on the front end side of the boom, so that the boom cylinder can be extended or contracted at the maximum. In this configuration, the angle of the elevation of the boom is changed.

【0019】このように構成したことにより、ブームシ
リンダの先端側を、各シリンダ取付用ボスのうちいずれ
かに選択的に取付けるだけで、例えば掘削作業、解体作
業等の作業内容に応じてブームの俯仰動角度を変化させ
ることができる。
With this configuration, the boom cylinder can be selectively mounted on any one of the cylinder mounting bosses at the tip end of the boom cylinder. The elevation angle can be changed.

【0020】また、請求項5の発明は、作業装置は基端
側に継ぎブームを備え、作業装置は継ぎブームを介して
ブームの先端側に連結する構成としたことにある。
Further, the invention according to claim 5 is characterized in that the working device is provided with a joint boom on the base end side, and the working device is connected to the distal end side of the boom via the joint boom.

【0021】このように構成したことにより、ブームの
先端側に作業装置の継ぎブームを連結するだけで、ブー
ムの先端側に作業装置を連結することができる。
With this configuration, the working device can be connected to the distal end of the boom simply by connecting the connecting boom of the working device to the distal end of the boom.

【0022】そして、請求項6の発明は、箱状の製缶構
造体からなり、基端側が建設機械本体に俯仰動可能に取
付けられ、先端側に作業内容に応じて選択的に作業装置
が連結される建設機械用フロント装置に用いるブームに
おいて、製缶構造体の先端側には、作業装置との位置合
わせを行うための位置合わせ手段と、位置合わせ手段に
よって位置合わせされた作業装置を連結するための連結
手段とを備えたことにある。
The invention according to claim 6 comprises a box-shaped can-making structure, the base end of which is attached to the construction machine main body so as to be able to move up and down, and the working device is selectively provided at the front end according to the work content. In the boom used for the front device for the construction machine to be connected, a positioning device for performing positioning with the working device and the working device positioned by the positioning device are connected to the tip end side of the can making structure. And connection means for performing the connection.

【0023】このように構成したことにより、建設機械
本体に取付けられたブームの先端側に作業装置を連結す
るときに、製缶構造体に設けられた位置合わせ手段によ
って作業装置とブームの先端側とを位置合わせした状態
で、連結手段によって作業装置を連結することができ
る。
With this configuration, when the working device is connected to the distal end of the boom attached to the construction machine main body, the working device and the distal end of the boom are positioned by the positioning means provided on the can-making structure. The working device can be connected by the connecting means in a state where the positions are aligned.

【0024】また、請求項7の発明は、基端側が建設機
械本体に俯仰動可能に取付けられたブームと、作業内容
に応じて前記ブームの先端側に対して選択的に連結され
る作業装置とからなる建設機械用フロント装置の組立方
法であって、作業装置の基端側に対してブームの先端側
を位置合わせする位置合わせ工程と、位置合わせされた
ブームの先端側と作業装置の基端側とを連結する連結工
程とからなる。
According to a seventh aspect of the present invention, there is provided a working device in which a base end is attached to a construction machine main body so as to be able to move up and down, and a working device selectively connected to a tip end of the boom in accordance with work contents. A method for assembling a front device for a construction machine, comprising: a positioning step of positioning a front end side of a boom with respect to a base end side of a working device; And a connecting step of connecting the end side.

【0025】このような組立方法を採用したことによ
り、位置合わせ工程において、作業装置の基端側と建設
機械本体に取付けられたブームの先端側とを位置合わせ
し、連結工程においてブームの先端側と作業装置の基端
側とを連結するだけで、掘削作業、解体作業等の作業内
容に応じたフロント装置を組立てることができる。
By adopting such an assembling method, in the positioning step, the base end side of the working device is aligned with the distal end side of the boom attached to the construction machine main body, and in the connecting step, the distal end side of the boom is positioned. The front device can be assembled according to the work content such as excavation work and demolition work only by connecting the work device and the base end side of the work device.

【0026】[0026]

【発明の実施の形態】以下、本発明による建設機械のフ
ロント装置の実施の形態を油圧ショベルに適用した場合
を例に挙げ、図1ないし図13を参照しつつ説明する。
まず、図1ないし図8は本発明による第1の実施の形態
を示している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a front apparatus for a construction machine according to the present invention applied to a hydraulic shovel will be described with reference to FIGS. 1 to 13.
First, FIGS. 1 to 8 show a first embodiment according to the present invention.

【0027】図1および図2において、1は履帯式の下
部走行体、2は下部走行体1上に旋回可能に搭載された
建設機械本体としての上部旋回体を示している。そし
て、上部旋回体2は、旋回フレーム3と、旋回フレーム
3の前部左側に設けられたキャブ4と、キャブ4の後側
に位置して旋回フレーム3上に設けられ、原動機、油圧
ポンプ等を収容した機械室5と、機械室5の後側に位置
して旋回フレーム3の後端側に搭載されたカウンタウエ
イト6とから大略構成されている。
1 and 2, reference numeral 1 denotes a crawler-type lower traveling body, and reference numeral 2 denotes an upper revolving body as a construction machine main body which is mounted on the lower traveling body 1 so as to be pivotable. The upper revolving superstructure 2 is provided on the revolving frame 3, a cab 4 provided on the front left side of the revolving frame 3, and on the revolving frame 3 behind the cab 4, and includes a motor, a hydraulic pump, and the like. And a counterweight 6 mounted on the rear end side of the revolving frame 3 at the rear side of the machine room 5.

【0028】7は上部旋回体2の前部中央に設けられた
フロント装置を示し、このフロント装置7は、旋回フレ
ーム3の前部中央に俯仰動可能に取付けられた共通ブー
ム8と、この共通ブーム8の先端側に交換可能に連結さ
れた後述の掘削作業用サブアセンブリ14とからなって
いる。
Reference numeral 7 denotes a front device provided at the front center of the upper revolving unit 2. The front device 7 has a common boom 8 attached to the front center of the revolving frame 3 so as to be able to move up and down. It comprises a sub-assembly 14 for excavation work described below, which is exchangeably connected to the tip end side of the boom 8.

【0029】ここで、共通ブーム8は、図3に示すよう
に上面板8A、下面板8B、左,右の側面板8C,8C
によって囲まれた箱状の製缶構造体として形成され、そ
の基端側が旋回フレーム3の前部中央に設けられたブー
ムフート部に連結ピン(いずれも図示せず)によって取
付けられている。そして、共通ブーム8の基端側は上部
旋回体2に常時取付けられており、共通ブーム8の先端
側には、作業内容に応じて、掘削作業用サブアセンブリ
14の他に、後述の側溝掘作業用サブアセンブリ31、
解体作業用サブアセンブリ41等の種類の異なる作業装
置を選択的に連結することができる構成となっている。
Here, as shown in FIG. 3, the common boom 8 includes an upper plate 8A, a lower plate 8B, left and right side plates 8C, 8C.
And a base end side thereof is attached to a boom foot provided at the center of the front part of the revolving frame 3 by connecting pins (both not shown). The base end of the common boom 8 is always attached to the upper revolving superstructure 2, and the distal end of the common boom 8 is provided with not only a sub-assembly 14 for digging work but also a below- Work subassembly 31,
It is configured such that different types of working devices such as the disassembling work subassembly 41 and the like can be selectively connected.

【0030】9は共通ブーム8の先端側に設けられたシ
リンダ取付用ボスで、シリンダ取付用ボス9の軸方向両
端部は、共通ブーム8を構成する左,右の側面板8Cか
ら外部に突出している。そして、シリンダ取付用ボス9
の軸方向両端部には、共通ブーム8を挟んで左,右両側
に設けられた各ブームシリンダ10(一方のみ図示)の
ロッド10A先端側がピン結合され、このブームシリン
ダ10のチューブ10Bは、その基端側が旋回フレーム
3にピン結合されている。従って、共通ブーム8は、ブ
ームシリンダ10のロッド10Aを伸縮させることによ
り、旋回フレーム3に対して俯仰動する構成となってい
る。
Numeral 9 denotes a cylinder mounting boss provided on the distal end side of the common boom 8, and both axial ends of the cylinder mounting boss 9 protrude to the outside from the left and right side plates 8 C constituting the common boom 8. ing. And the boss 9 for mounting the cylinder
The ends of the rods 10A of the boom cylinders 10 (only one is shown) provided on both the left and right sides of the common boom 8 are pin-connected to both ends in the axial direction, and the tube 10B of the boom cylinder 10 is The base end is pin-connected to the turning frame 3. Therefore, the common boom 8 is configured to move up and down with respect to the turning frame 3 by extending and contracting the rod 10A of the boom cylinder 10.

【0031】11はシリンダ取付用ボス9の近傍に位置
して共通ブーム8に設けられた他のシリンダ取付用ボス
で、このシリンダ取付用ボス11は、共通ブーム8の下
面板8Bにブラケット等を介して固着されている。
Numeral 11 designates another cylinder mounting boss provided on the common boom 8 in the vicinity of the cylinder mounting boss 9. The cylinder mounting boss 11 is provided with a bracket or the like on the lower surface plate 8 B of the common boom 8. Is fixed through.

【0032】ここで、各シリンダ取付用ボス9,11
は、図6に示すように、例えば共通ブーム8の俯仰動中
心8Dを中心とする半径Rの円周上に設けられている。
そして、これらシリンダ取付用ボス9,11のいずれか
一方にブームシリンダ10のロッド10A先端側を選択
的にピン結合することにより、ブームシリンダ10の最
伸長時または最縮小時における共通ブーム8の俯仰動角
度を変化させ、例えばブームシリンダ10の最伸長時に
おけるフロント装置7の作業姿勢を、図6中に実線で示
す姿勢と二点鎖線で示す姿勢とに変化させる構成となっ
ている。
Here, each cylinder mounting boss 9, 11
As shown in FIG. 6, for example, is provided on the circumference of a radius R centered on the center 8D of elevation of the common boom 8.
By selectively pin-connecting the distal end of the rod 10A of the boom cylinder 10 to one of the cylinder mounting bosses 9 and 11, the common boom 8 can be raised and lowered when the boom cylinder 10 is fully extended or retracted. By changing the moving angle, for example, the working posture of the front device 7 when the boom cylinder 10 is fully extended is changed between the posture indicated by the solid line and the posture indicated by the two-dot chain line in FIG.

【0033】12,12は共通ブーム8の先端側に設け
られた左,右の取付ブラケットを示し、各取付ブラケッ
ト12は、共通ブーム8の左,右の側面板8Cに溶接等
によって固着され、左,右方向で互いに対向している。
そして、各取付ブラケット12には、上,下に離間して
2個のピン挿通穴13,13がそれぞれ穿設されてい
る。また、各取付ブラケット12の外側面には、これら
ピン挿通穴13,13の中間部に位置して後述の掛止め
板23が固着されている。
Reference numerals 12 and 12 denote left and right mounting brackets provided on the distal end side of the common boom 8, respectively. The mounting brackets 12 are fixed to the left and right side plates 8C of the common boom 8 by welding or the like. They face each other in the left and right directions.
Each of the mounting brackets 12 is provided with two pin insertion holes 13, 13 which are separated from each other upward and downward. On the outer surface of each mounting bracket 12, a latch plate 23 described later is fixedly located at an intermediate portion between the pin insertion holes 13, 13.

【0034】14は共通ブーム8の先端側に連結ピン1
5,15によって着脱可能に連結された作業装置として
の掘削作業用サブアセンブリを示し、この掘削作業用サ
ブアセンブリ14は、継ぎブーム16と、継ぎブーム1
6の先端側に俯仰動可能に取付けられ、アームシリンダ
17によって駆動されるアーム18と、アーム18の先
端側に回動可能に取付けられ、バケットシリンダ19に
よって駆動されるバケット20とから大略構成されてい
る。
Reference numeral 14 denotes a connecting pin 1 on the tip side of the common boom 8.
5 shows a subassembly for excavation work as a working device detachably connected by 5, 5;
An arm 18 is mounted on the distal end side of the arm 6 so as to be able to move up and down, and is driven by an arm cylinder 17. A bucket 20 is rotatably mounted on the distal end side of the arm 18 and driven by a bucket cylinder 19. ing.

【0035】ここで、継ぎブーム16は、図3に示すよ
うに、上面板16A、下面板16B、左,右の側面板1
6C,16C(一方のみ図示)、端面板16D等によっ
て囲まれた箱状の製缶構造体として形成され、その基端
側には、共通ブーム8の先端側に設けられた取付ブラケ
ット12の各ピン挿通穴13と対応する位置に、内周側
がピン挿通穴21Aとなった2個のボス筒体21,21
が固着されている。
Here, as shown in FIG. 3, the joint boom 16 includes an upper surface plate 16A, a lower surface plate 16B, and left and right side plates 1A.
6C, 16C (only one is shown), a box-shaped can-made structure surrounded by an end plate 16D and the like, and a base end of each of the mounting brackets 12 provided on the tip end of the common boom 8. Two boss cylinders 21 and 21 having pin insertion holes 21A on the inner peripheral side at positions corresponding to the pin insertion holes 13.
Is fixed.

【0036】そして、共通ブーム8の取付ブラケット1
2に設けた各ピン挿通穴13と、継ぎブーム16に設け
た各ピン挿通穴21Aとに連結ピン15を挿通すること
により、掘削作業用サブアセンブリ14の継ぎブーム1
6が共通ブーム8の先端側に連結される構成となってい
る。
Then, the mounting bracket 1 of the common boom 8
By inserting the connecting pin 15 into each of the pin insertion holes 13 provided in the base 2 and the respective pin insertion holes 21A provided in the connection boom 16, the connection boom 1 of the subassembly 14 for excavation work is provided.
6 is connected to the distal end side of the common boom 8.

【0037】22は共通ブーム8の先端側と継ぎブーム
16の基端側との間に設けられ、共通ブーム8側のピン
挿通穴13と継ぎブーム16側のピン挿通穴21Aとを
位置合わせする位置合わせ機構を示し、この位置合わせ
機構22は、図3ないし図5に示すように、後述する掛
止め板23、ストッパ24、係合ピン25等から構成さ
れている。
Reference numeral 22 is provided between the distal end side of the common boom 8 and the base end side of the joint boom 16, and aligns the pin insertion hole 13 on the common boom 8 side with the pin insertion hole 21A on the joint boom 16 side. 3 to 5, the positioning mechanism 22 includes a latch plate 23, a stopper 24, an engagement pin 25, and the like, which will be described later.

【0038】23,23は共通ブーム8の各取付ブラケ
ット12に設けられた掛止め板で、各掛止め板23は矩
形の鋼板材からなり、ピン挿通穴13,13のほぼ中間
部に位置して取付ブラケット12の外側面に溶接等によ
って固着されている。そして、取付ブラケット12から
前方に突出した掛止め板23の突出端側には、係合ピン
25が係合する台形状の凹溝23Aが形成されている。
Reference numerals 23, 23 denote latch plates provided on the respective mounting brackets 12 of the common boom 8. Each latch plate 23 is made of a rectangular steel plate, and is located substantially in the middle of the pin insertion holes 13, 13. And is fixed to the outer surface of the mounting bracket 12 by welding or the like. A trapezoidal groove 23A with which the engaging pin 25 is engaged is formed on the projecting end side of the latch plate 23 projecting forward from the mounting bracket 12.

【0039】24,24は継ぎブーム16の左,右の側
面板16Cに溶接等によって固着されたストッパ(1個
のみ図示)を示し、ストッパ24の下端側には、共通ブ
ーム8側の取付ブラケット12に設けた当板12Aに当
接する衝合面24Aが設けられ、取付ブラケット12の
当板12Aとストッパ24の衝合面24Aとによって当
接部が構成されている。
Reference numerals 24, 24 denote stoppers (only one is shown) fixed to the left and right side plates 16C of the joint boom 16 by welding or the like, and a lower end of the stopper 24 has a mounting bracket on the common boom 8 side. An abutment surface 24A is provided to abut against the abutment plate 12A provided on the base 12, and an abutment portion is formed by the abutment plate 12A of the mounting bracket 12 and the abutment surface 24A of the stopper 24.

【0040】25,25はストッパ24の上端側に固着
された係合ピン(1個のみ図示)で、各係合ピン25
は、共通ブーム8の各取付ブラケット12に設けた掛止
め板23の凹溝23Aと対応する位置で、継ぎブーム1
6の左,右の側面板16Cから突出している。
Reference numerals 25, 25 denote engagement pins (only one is shown) fixed to the upper end side of the stopper 24.
The joint boom 1 is located at a position corresponding to the concave groove 23A of the latch plate 23 provided on each mounting bracket 12 of the common boom 8.
6 protrudes from the left and right side plates 16C.

【0041】そして、共通ブーム8の先端側に継ぎブー
ム16の基端側を連結するときには、図5に示すよう
に、共通ブーム8側に設けた掛止め板23の凹溝23A
に各係合ピン25を係合させた状態で共通ブーム8を持
上げることにより、継ぎブーム16の基端側を係合ピン
25を支点として僅かに回転させる。そして、図4に示
すように、共通ブーム8側のピン挿通穴13と継ぎブー
ム16側のピン挿通穴21Aとが位置決めされたとき
に、ストッパ24の衝合面24Aが共通ブーム8に設け
た各取付ブラケット12の当板12Aに当接する構成と
なっている。
When the base end of the joint boom 16 is connected to the distal end of the common boom 8, the concave groove 23A of the latch plate 23 provided on the common boom 8 side, as shown in FIG.
By raising the common boom 8 in a state where the engaging pins 25 are engaged with each other, the base end side of the joint boom 16 is slightly rotated with the engaging pin 25 as a fulcrum. Then, as shown in FIG. 4, when the pin insertion hole 13 on the common boom 8 side and the pin insertion hole 21A on the joint boom 16 side are positioned, the abutment surface 24A of the stopper 24 is provided on the common boom 8. Each mounting bracket 12 is configured to be in contact with the corresponding plate 12A.

【0042】本実施の形態によるフロント装置7は上述
の如き構成を有するもので、以下、共通ブーム8の先端
側に掘削作業用サブアセンブリ14を連結する作業につ
いて説明する。
The front apparatus 7 according to the present embodiment has the above-described configuration. Hereinafter, the operation of connecting the excavation sub-assembly 14 to the distal end side of the common boom 8 will be described.

【0043】まず、図2に示すように、共通ブーム8を
ほぼ水平に保持した状態で下部走行体1を走行させ、地
面上に折畳み状態で置かれた掘削作業用サブアセンブリ
14の継ぎブーム16基端側を、共通ブーム8の先端側
に設けた各取付ブラケット12間に挿入する。
First, as shown in FIG. 2, the lower traveling body 1 is run while the common boom 8 is held substantially horizontally, and the joint boom 16 of the excavating sub-assembly 14 placed on the ground in a folded state. The base end is inserted between the mounting brackets 12 provided on the distal end of the common boom 8.

【0044】このとき、図5に示すように、共通ブーム
8側に設けた掛止め板23の凹溝23Aを、継ぎブーム
16側に設けた各係合ピン25に係合させた状態で、ブ
ームシリンダ10によって共通ブーム8を僅かに持上げ
る。これにより、各係合ピン25を支点として継ぎブー
ム16が僅かに下向きに回転し、共通ブーム8側のピン
挿通穴13と継ぎブーム16側のピン挿通穴21Aとが
同心上に位置合わせされたときに、継ぎブーム16に設
けたストッパ24の衝合面24Aが、共通ブーム8に設
けた各取付ブラケット12の当板12Aに当接し、継ぎ
ブーム16の回転が停止する(位置合わせ工程)。
At this time, as shown in FIG. 5, with the concave groove 23A of the latch plate 23 provided on the common boom 8 side engaged with each engagement pin 25 provided on the joint boom 16 side, The common boom 8 is slightly lifted by the boom cylinder 10. As a result, the joint boom 16 rotates slightly downward with each engagement pin 25 as a fulcrum, and the pin insertion hole 13 on the common boom 8 side and the pin insertion hole 21A on the joint boom 16 side are aligned concentrically. At this time, the abutment surface 24A of the stopper 24 provided on the joint boom 16 comes into contact with the abutment plate 12A of each mounting bracket 12 provided on the common boom 8, and the rotation of the joint boom 16 stops (positioning step).

【0045】かくして、位置合わせ機構22によって共
通ブーム8側のピン挿通穴13と継ぎブーム16側のピ
ン挿通穴21Aとを容易に位置合わせでき、この状態
で、共通ブーム8側のピン挿通穴13と継ぎブーム16
側のピン挿通穴21Aとに連結ピン15を挿通すること
により、共通ブーム8の先端側に掘削作業用サブアセン
ブリ14を連結することができる(連結工程)。
Thus, the pin insertion hole 13 on the common boom 8 side and the pin insertion hole 21A on the joint boom 16 side can be easily aligned by the positioning mechanism 22, and in this state, the pin insertion hole 13 on the common boom 8 side is set. And joint boom 16
By inserting the connection pin 15 into the pin insertion hole 21A on the side, the excavation work subassembly 14 can be connected to the tip end side of the common boom 8 (connection step).

【0046】ここで、掘削作業用サブアセンブリ14を
用いて地面等の掘削作業を行うときには、図1に示すよ
うに、ブームシリンダ10のロッド10A先端側をシリ
ンダ取付用ボス9にピン結合するが、例えば建造物の解
体作業等を行うときには、図6に示すように、ブームシ
リンダ10のロッド10A先端側をシリンダ取付用ボス
11にピン結合する。
Here, when excavating the ground or the like using the excavating sub-assembly 14, the distal end side of the rod 10A of the boom cylinder 10 is pin-connected to the cylinder mounting boss 9, as shown in FIG. For example, when a building is dismantled or the like, as shown in FIG. 6, the distal end side of the rod 10A of the boom cylinder 10 is pin-connected to the cylinder mounting boss 11.

【0047】これにより、ロッド10Aの最伸長時にお
ける共通ブーム8の地面に対する起伏角度が変化し、掘
削作業用サブアセンブリ14を起立させたときの作業姿
勢が、シリンダ取付用ボス9にロッド10Aをピン結合
したときの二点鎖線で示す作業姿勢から、実線で示す作
業姿勢へと変化する。
As a result, the undulation angle of the common boom 8 with respect to the ground when the rod 10A is fully extended changes, and the working posture when the subassembly 14 for digging work is erected, the rod 10A is attached to the boss 9 for cylinder mounting. The working posture shown by the two-dot chain line when the pins are connected is changed to the working posture shown by the solid line.

【0048】従って、シリンダ取付用ボス11にロッド
10A先端側をピン結合した場合には、シリンダ取付用
ボス9にロッド10A先端側をピン結合した場合に比較
して、バケット20をより高い位置に移動させることが
でき、このバケット20を用いて建造物の解体等を行う
場合の作業性を向上することができる。また、これとは
逆に、シリンダ取付用ボス9にロッド10A先端側をピ
ン結合した場合には、シリンダ取付用ボス11にロッド
10A先端側をピン結合した場合に比較して、バケット
20をより低い位置に移動させることができ、このバケ
ット20を用いて地面を深く掘削することができる。
Therefore, when the rod 10A tip is pin-connected to the cylinder mounting boss 11, the bucket 20 is moved to a higher position than when the rod 10A tip is pin-connected to the cylinder mounting boss 9. The bucket 20 can be moved, and the workability when dismantling a building or the like using the bucket 20 can be improved. Conversely, when the rod 10A distal end is pin-connected to the cylinder mounting boss 9 in comparison with the case where the rod 10A distal end is pin-connected to the cylinder mounting boss 11, the bucket 20 is The bucket 20 can be moved to a lower position, and the ground can be deeply excavated using the bucket 20.

【0049】次に、図7は側溝掘作業仕様の油圧ショベ
ルを示し、この油圧ショベルは、図1等に示す掘削作業
用サブアセンブリ14に代えて、共通ブーム8の先端側
に作業装置としての側溝掘作業用サブアセンブリ31を
連結したものである。
Next, FIG. 7 shows a hydraulic excavator of a trench excavation work specification. This hydraulic excavator is provided on the distal end side of the common boom 8 as a working device instead of the excavation sub-assembly 14 shown in FIG. The sub-assembly 31 for guttering work is connected.

【0050】図7において、31は共通ブーム8の先端
側に連結ピン15,15によって固定された側溝掘作業
用サブアセンブリを示し、この側溝掘作業用サブアセン
ブリ31は、継ぎブームとしてのアッパブーム32と、
アッパブーム32の先端側に左,右方向に揺動可能に取
付けられ、オフセットシリンダ33により駆動されるロ
アブーム34と、ロアブーム34の先端側に左,右方向
に揺動可能に取付けられたアーム連結体35と、アーム
連結体35の先端側に俯仰動可能に取付けられ、アーム
シリンダ36によって駆動されるアーム37と、アーム
37の先端側に回動可能に取付けられ、バケットシリン
ダ38によって駆動されるバケット39とから大略構成
されている。
In FIG. 7, reference numeral 31 denotes a sub-groove work sub-assembly fixed to the distal end side of the common boom 8 by the connecting pins 15, 15. The sub-groove work sub-assembly 31 is an upper boom 32 as a joint boom. When,
A lower boom 34, which is mounted on the distal end of the upper boom 32 so as to swing left and right, and is driven by an offset cylinder 33, and an arm connected body, which is mounted on the distal end of the lower boom 34 so as to swing left and right. 35, an arm 37 mounted on the distal end side of the arm connector 35 so as to be able to move up and down and driven by an arm cylinder 36, and a bucket mounted rotatably on the distal end side of the arm 37 and driven by a bucket cylinder 38 39 is roughly constituted.

【0051】そして、アッパブーム32の基端側には、
上述した掘削作業用サブアセンブリ14の継ぎブーム1
6と同様に、共通ブーム8の各ピン挿通穴13と対応す
る位置に連結ピン15が挿通されるピン挿通穴(図示せ
ず)が形成されている。また、アッパブーム32の基端
側には、共通ブーム8の先端側に設けた掛止め板23と
共に位置合わせ機構22を構成するストッパ24、係合
ピン25等が設けられている。
Then, on the base end side of the upper boom 32,
Joint boom 1 of subassembly 14 for excavation work described above
Similarly to 6, a pin insertion hole (not shown) through which the connecting pin 15 is inserted is formed at a position corresponding to each pin insertion hole 13 of the common boom 8. On the base end side of the upper boom 32, a stopper 24, an engagement pin 25, and the like that constitute the positioning mechanism 22 together with a latch plate 23 provided on the distal end side of the common boom 8 are provided.

【0052】従って、側溝掘作業を行うときには、上述
した掘削作業用サブアセンブリ14と同様に、共通ブー
ム8の先端側に連結ピン15,15によって側溝掘作業
用サブアセンブリ31を連結することにより、速やかに
油圧ショベルを側溝掘作業に対応した仕様に変更するこ
とができる。また、共通ブーム8と側溝掘作業用サブア
センブリ31とを連結ピン15によって連結する作業
を、位置合わせ機構22によって短時間で行うことがで
きる。
Therefore, when performing the trenching work, the trenching work subassembly 31 is connected to the distal end side of the common boom 8 by the connecting pins 15, similarly to the above-described drilling work subassembly 14. The excavator can be quickly changed to a specification suitable for guttering work. In addition, the work of connecting the common boom 8 and the sub-groove work subassembly 31 by the connection pin 15 can be performed in a short time by the positioning mechanism 22.

【0053】次に、図8は解体作業仕様の油圧ショベル
を示し、この油圧ショベルは、図1等に示す掘削作業用
サブアセンブリ14に代えて、共通ブーム8の先端側に
作業装置としての解体作業用サブアセンブリ41を連結
したものである。
Next, FIG. 8 shows a hydraulic excavator of a dismantling work specification. This excavator is dismantled as a working device on the tip end side of the common boom 8 instead of the excavating work subassembly 14 shown in FIG. The work subassembly 41 is connected.

【0054】図8において、41は共通ブーム8の先端
側に連結ピン15,15によって連結された解体作業用
サブアセンブリを示し、この解体作業用サブアセンブリ
41は、継ぎブーム42と、継ぎブーム42の先端側に
俯仰動可能に取付けられ、中間アームシリンダ43によ
って駆動される中間アーム44と、中間アーム44の先
端側に俯仰動可能に取付けられ、アームシリンダ45に
よって駆動されるアーム46と、アーム46の先端側に
回動可能に取付けられ、作業具シリンダ47によって駆
動される作業具としてのカッター48とから大略構成さ
れている。
In FIG. 8, reference numeral 41 denotes a disassembly work subassembly connected to the distal end side of the common boom 8 by connecting pins 15, 15. The disassembly work subassembly 41 includes a joint boom 42 and a joint boom 42. An intermediate arm 44 mounted on the distal end of the intermediate arm 44 and driven by an intermediate arm cylinder 43; an arm 46 mounted on the distal end of the intermediate arm 44 and driven by an arm cylinder 45; A cutter 48 as a working tool, which is rotatably attached to the distal end side of the working tool 46 and is driven by a working tool cylinder 47, is roughly constituted.

【0055】そして、継ぎブーム42の基端側には、上
述した掘削作業用サブアセンブリ14の継ぎブーム16
と同様に、共通ブーム8の各ピン挿通穴13と対応する
位置に連結ピン15が挿通されるピン挿通穴(図示せ
ず)が形成されている。また、継ぎブーム42の基端側
には、共通ブーム8の先端側に設けた掛止め板23と共
に位置合わせ機構22を構成するストッパ24、係合ピ
ン25等が設けられている。
At the base end side of the joint boom 42, the joint boom 16 of the above-described subassembly 14 for excavation work is provided.
Similarly to the above, a pin insertion hole (not shown) through which the connecting pin 15 is inserted is formed at a position corresponding to each pin insertion hole 13 of the common boom 8. In addition, a stopper 24 and an engaging pin 25 that constitute the positioning mechanism 22 together with a latch plate 23 provided on the distal end side of the common boom 8 are provided on the base end side of the joint boom 42.

【0056】従って、建造物の解体作業を行うときに
は、上述した掘削作業用サブアセンブリ14と同様に、
共通ブーム8の先端側に連結ピン15,15によって解
体作業用サブアセンブリ41を連結することにより、速
やかに油圧ショベルを解体作業に適応した仕様に変更す
ることができる。また、共通ブーム8と解体作業用サブ
アセンブリ41とを連結ピン15によって連結する作業
を、位置合わせ機構22によって短時間で行うことがで
きる。
Therefore, when the building is dismantled, similar to the excavation subassembly 14 described above,
By connecting the dismantling subassembly 41 to the distal end side of the common boom 8 by the connecting pins 15, 15, the hydraulic shovel can be quickly changed to a specification adapted to the dismantling work. In addition, the work of connecting the common boom 8 and the dismantling work subassembly 41 with the connecting pins 15 can be performed in a short time by the positioning mechanism 22.

【0057】さらに、共通ブーム8に設けられたシリン
ダ取付用ボス9,11のうち、シリンダ取付用ボス11
にブームシリンダ10のロッド10A先端側をピン結合
した場合には、シリンダ取付用ボス9にロッド10A先
端側をピン結合した場合に比較して、ロッド10Aが最
伸長したときにカッター48をより高い位置まで移動さ
せることができ、高い位置での解体作業を行うことがで
きる。
Further, of the cylinder mounting bosses 9 and 11 provided on the common boom 8, the cylinder mounting boss 11
When the rod 10A distal end side of the boom cylinder 10 is pin-connected, the cutter 48 is higher when the rod 10A is fully extended than when the rod 10A distal end side is pin-connected to the cylinder mounting boss 9. It can be moved to a position, and dismantling work can be performed at a high position.

【0058】かくして、本実施の形態によれば、上部旋
回体2に常時取付けられた共通ブーム8の先端側に、上
述した掘削作業用サブアセンブリ14、側溝掘作業用サ
ブアセンブリ31、解体作業用サブアセンブリ41等の
うち作業内容に対応したものを選択的に連結することに
より、1台の油圧ショベルを土砂の掘削作業、側溝掘作
業、建造物の解体作業等に兼用して用いることができ
る。
Thus, according to the present embodiment, the sub-assembly 14 for excavation work, the sub-assembly 31 for guttering work, and the sub-assembly for demolition work are provided on the distal end side of the common boom 8 always attached to the upper swing body 2. By selectively connecting the sub-assemblies 41 and the like corresponding to the work content, one hydraulic excavator can be used also for excavation work of earth and sand, excavation work of trenches, demolition work of buildings, and the like. .

【0059】次に、図9ないし図12は本発明による第
2の実施の形態を示し、本実施の形態では、共通ブーム
と作業装置との間に後述の連結機構51を設けたことを
特徴としている。なお、本実施の形態では、上述した第
1の実施の形態と同一の構成要素に同一の符号を付し、
その説明を省略するものとする。
FIGS. 9 to 12 show a second embodiment of the present invention. This embodiment is characterized in that a connecting mechanism 51 described later is provided between the common boom and the working device. And Note that, in the present embodiment, the same components as those in the above-described first embodiment are denoted by the same reference numerals,
The description is omitted.

【0060】図において、51は共通ブーム8と掘削作
業用サブアセンブリ14の継ぎブーム16との間に設け
られた連結機構を示し、この連結機構51は、共通ブー
ム8の先端側に設けられた各取付ブラケット12と、後
述する各固定ピン53と、固定爪54と、移動爪55と
から構成されている。
In the drawing, reference numeral 51 denotes a connecting mechanism provided between the common boom 8 and the joint boom 16 of the subassembly 14 for excavation work. The connecting mechanism 51 is provided on the distal end side of the common boom 8. Each mounting bracket 12, each fixing pin 53 described later, a fixing claw 54, and a moving claw 55 are configured.

【0061】52,52は継ぎブーム16の基端側に設
けられた左,右の取付ブラケットを示し、各取付ブラケ
ット52は、継ぎブーム16の左,右の側面板16Cに
溶接等によって固着され、左,右方向で互いに対向して
いる。そして、各取付ブラケット52間には、上,下に
離間して2本の固定ピン53,53が固着されている。
Reference numerals 52, 52 denote left and right mounting brackets provided on the base end side of the connecting boom 16, respectively. The mounting brackets 52 are fixed to the left and right side plates 16C of the connecting boom 16 by welding or the like. , Left and right. Two fixing pins 53 are fixed between the mounting brackets 52 so as to be separated upward and downward.

【0062】54は共通ブーム8側の取付ブラケット1
2に連結ピン15,15によって固定され、継ぎブーム
16側に向けて突出した固定爪で、この固定爪54の突
出端側には、半円形の断面形状を有する円弧溝54Aが
下向きに開口するように形成されている。そして、固定
爪54の円弧溝54Aは、継ぎブーム16側に設けられ
た各固定ピン53のうち下側の固定ピン53に係合する
構成となっている。
Reference numeral 54 denotes the mounting bracket 1 on the common boom 8 side.
2 are fixed by connecting pins 15 and 15 and protrude toward the joint boom 16 side. On the protruding end side of the fixed claw 54, an arc groove 54A having a semicircular cross-sectional shape is opened downward. It is formed as follows. The arc groove 54 </ b> A of the fixing claw 54 is configured to engage with the lower fixing pin 53 of the fixing pins 53 provided on the joint boom 16 side.

【0063】55は共通ブーム8側の取付ブラケット1
2に継ぎブーム16側に向けて突出するように設けられ
た移動爪を示し、この移動爪55は、連結ピン15によ
って取付ブラケット12に枢支され、連結ピン15を中
心として回動可能となっている。ここで、移動爪55の
突出端側には、半円形の断面形状を有する円弧溝55A
が上向きに開口するように形成されている。そして、移
動爪55は、固定爪54との間に設けられたねじ機構
(図示せず)を駆動することにより、図11中に実線で
示す係合位置と二点鎖線で示す離脱位置との間で移動
し、係合位置に移動したときに、継ぎブーム16側に設
けられた各固定ピン53のうち上側の固定ピン53に円
弧溝55Aを係合させる構成となっている。
Reference numeral 55 denotes a mounting bracket 1 on the common boom 8 side.
Reference numeral 2 denotes a moving claw provided so as to protrude toward the joint boom 16 side. The moving claw 55 is pivotally supported by the mounting bracket 12 by the connecting pin 15 and is rotatable around the connecting pin 15. ing. Here, an arc-shaped groove 55 </ b> A having a semicircular cross-sectional shape is formed on the protruding end side of the movable claw 55.
Are formed so as to open upward. Then, by driving a screw mechanism (not shown) provided between the movable claw 55 and the fixed claw 54, the movable claw 55 is moved between an engagement position indicated by a solid line and a disengagement position indicated by a two-dot chain line in FIG. When it moves to the engaging position, the arc groove 55A is engaged with the upper fixing pin 53 of the fixing pins 53 provided on the joint boom 16 side.

【0064】本実施の形態は上述の如き連結機構51を
有するもので、この連結機構51を用いて共通ブーム8
の先端側に継ぎブーム16の基端側を連結する場合に
は、まず、移動爪55を二点鎖線で示す離脱位置に保持
した状態で、図12に示すように、固定爪54と移動爪
55とを継ぎブーム16側の各取付ブラケット52間に
挿入する。
The present embodiment has the connecting mechanism 51 as described above.
When the base end of the joining boom 16 is connected to the distal end of the moving claw, first, while the moving claw 55 is held at the detached position shown by the two-dot chain line, as shown in FIG. 55 is inserted between the respective mounting brackets 52 on the joint boom 16 side.

【0065】そして、固定爪54の円弧溝54Aを下側
の固定ピン53に係合させた後、固定爪54と移動爪5
5との間に設けられたねじ機構を駆動し、移動爪55を
離脱位置から係合位置へと移動させることにより、移動
爪55の円弧溝55Aを上側の固定ピン53に係合させ
る。
After the arc groove 54A of the fixed claw 54 is engaged with the lower fixed pin 53, the fixed claw 54 and the movable claw 5
By driving the screw mechanism provided between the movable claw 5 and the movable claw 55 to move the movable claw 55 from the disengaged position to the engagement position, the arc groove 55A of the movable claw 55 is engaged with the upper fixed pin 53.

【0066】かくして、本実施の形態によれば、固定爪
54の円弧溝54Aと移動爪55の円弧溝55Aとが、
継ぎブーム16側に設けた各固定ピン53に係合するこ
とにより、連結機構51を用いて共通ブーム8の先端側
に掘削作業用サブアセンブリ14の継ぎブーム16を容
易に連結することができる。従って、例えば連結ピンを
用いて共通ブーム8と継ぎブーム16とを連結する場合
に比較して、共通ブーム8に設けたピン挿通穴と継ぎブ
ーム16に設けたピン挿通穴とを互いに位置合わせする
といった煩雑な作業を不要とすることができ、共通ブー
ム8に継ぎブーム16を連結するときの作業性を大幅に
向上することができる。
Thus, according to the present embodiment, the arc groove 54A of the fixed claw 54 and the arc groove 55A of the movable claw 55 are
By engaging with the fixing pins 53 provided on the joint boom 16 side, the joint boom 16 of the excavation work subassembly 14 can be easily connected to the distal end side of the common boom 8 using the connecting mechanism 51. Therefore, the pin insertion hole provided in the common boom 8 and the pin insertion hole provided in the joint boom 16 are aligned with each other, as compared with a case where the common boom 8 and the joint boom 16 are connected by using a connecting pin, for example. Such a complicated operation can be eliminated, and the workability when connecting the joint boom 16 to the common boom 8 can be greatly improved.

【0067】なお、上述した第1の実施の形態では、掘
削作業用サブアセンブリ14を共通ブーム8の先端側に
連結するときに、図2に示すように、掘削作業用サブア
センブリ14を地面上に折畳み状態に置いた場合を例に
挙げたが、例えば図13に示すように、後述の姿勢保持
装置61を用いて掘削作業用サブアセンブリ14を支持
してもよい。
In the first embodiment described above, when the excavating work sub-assembly 14 is connected to the distal end side of the common boom 8, as shown in FIG. Although the example in which the sub-assembly 14 is placed in a folded state is described as an example, as shown in FIG. 13, the sub-assembly 14 for excavation work may be supported by using a posture holding device 61 described later.

【0068】ここで、姿勢保持装置61は、掘削作業用
サブアセンブリ14が載置される載置台62と、載置台
62上に立設され、継ぎブーム16を左,右方向から挟
む2本(1本のみ図示)の支柱63と、各支柱63間に
ブラケット64を介して設けられ、継ぎブーム16を下
側から支持する横梁65とからなっている。そして、姿
勢保持装置61は、掘削作業用サブアセンブリ14を図
示の如く支持したときに、継ぎブーム16の基端側に設
けたピン挿通穴21Aの高さ位置が、載置台62の底面
から距離Aとなるように、継ぎブーム16の姿勢を保持
する構成となっている。
Here, the posture holding device 61 is provided with a mounting table 62 on which the subassembly 14 for excavation work is mounted, and two mounting units 61 which stand on the mounting table 62 and sandwich the joining boom 16 from the left and right directions. (Only one is shown) and a cross beam 65 provided between the columns 63 via a bracket 64 and supporting the joint boom 16 from below. When supporting the excavating sub-assembly 14 as shown in the figure, the posture holding device 61 moves the height position of the pin insertion hole 21A provided on the base end side of the joint boom 16 to a distance from the bottom surface of the mounting table 62. The configuration is such that the posture of the joint boom 16 is maintained so as to be A.

【0069】従って、上述の姿勢保持装置61を用いて
掘削作業用サブアセンブリ14を支持することにより、
この掘削作業用サブアセンブリ14の継ぎブーム16に
共通ブーム8の先端側を取付けるときに、継ぎブーム1
6等が不用意に揺れ等を生じることがなく、掘削作業用
サブアセンブリ14を共通ブーム8の先端側に連結する
ときの作業性を向上することができる。
Therefore, by supporting the excavation work sub-assembly 14 by using the above-described posture holding device 61,
When attaching the distal end side of the common boom 8 to the joint boom 16 of the subassembly 14 for excavation work, the joint boom 1
The workability when the excavation work sub-assembly 14 is connected to the distal end side of the common boom 8 can be improved without inadvertently shaking the 6 and the like.

【0070】また、上述した第1の実施の形態では、位
置合わせ機構22を構成する掛止め板23を共通ブーム
8側に設け、ストッパ24および係合ピン25を継ぎブ
ーム16側に設けた場合を例に挙げたが、本発明はこれ
に限るものではなく、例えば掛止め板23を継ぎブーム
16側に設け、ストッパ24および係合ピン25を共通
ブーム8側に設ける構成としてもよい。
In the first embodiment described above, the case where the latch plate 23 constituting the positioning mechanism 22 is provided on the common boom 8 side, and the stopper 24 and the engaging pin 25 are provided on the joint boom 16 side However, the present invention is not limited to this. For example, a configuration in which the latch plate 23 is provided on the joint boom 16 side and the stopper 24 and the engagement pin 25 are provided on the common boom 8 side may be adopted.

【0071】また、上述した第2の実施の形態では、連
結機構51の固定爪54、移動爪55を共通ブーム8側
の取付ブラケット12に設け、固定爪54、移動爪55
が係合する各固定ピン53を継ぎブーム16側の取付ブ
ラケット52に設けた場合を例に挙げたが、本発明はこ
れに限るものではなく、例えば固定爪54、移動爪55
を継ぎブーム16側に設け、各固定ピン53を共通ブー
ム8側に設ける構成としてもよい。
In the above-described second embodiment, the fixing claw 54 and the moving claw 55 of the connecting mechanism 51 are provided on the mounting bracket 12 on the common boom 8 side.
Although the example in which the fixing pins 53 with which are engaged are provided on the mounting bracket 52 on the joint boom 16 side has been described as an example, the present invention is not limited to this. For example, the fixing claws 54 and the moving claws 55
May be provided on the joint boom 16 side, and the fixing pins 53 may be provided on the common boom 8 side.

【0072】さらに、上述した各実施の形態では、建設
機械としてクローラ式の油圧ショベルを例に挙げて説明
したが、本発明はこれに限らず、例えばホイール式の油
圧ショベル、継ぎブームを有する油圧クレーン等の他の
建設機械にも適用することができる。
Further, in each of the above-described embodiments, the crawler-type hydraulic excavator has been described as an example of a construction machine. However, the present invention is not limited to this, and for example, a hydraulic excavator of a wheel type, The present invention can be applied to other construction machines such as cranes.

【0073】[0073]

【発明の効果】以上詳述した如く、請求項1の発明によ
れば、建設機械本体に俯仰動可能に取付けられたブーム
と、作業内容に応じてブームの先端側に対して選択的に
連結される作業装置とからフロント装置を構成し、ブー
ムと作業装置との間には、作業装置に対してブームの先
端側を位置合わせする位置合わせ手段と、位置合わせさ
れた作業装置とブームの先端側とを連結する連結手段と
を設けたから、建設機械本体に取付けられたブームの先
端側に作業装置を選択的に連結するだけで、掘削作業、
解体作業等の作業内容に応じたフロント装置を組立てる
ことができる。また、位置合わせ手段によって作業装置
とブームの先端側とを位置合わせすることができるか
ら、連結手段によって作業装置をブームに連結するとき
の作業性を向上させることができる。
As described in detail above, according to the first aspect of the present invention, the boom mounted on the construction machine main body so as to be able to move up and down is selectively connected to the tip end side of the boom according to the work content. A front device is constituted by the working device to be installed, and a positioning means for positioning the front end side of the boom with respect to the working device between the boom and the working device; and the aligned working device and the tip of the boom. Since the connecting means for connecting the side and the side is provided, only by selectively connecting the working device to the tip side of the boom attached to the construction machine main body, excavation work,
It is possible to assemble a front device according to work contents such as dismantling work. Further, since the position of the working device and the distal end side of the boom can be adjusted by the positioning means, the workability when the working device is connected to the boom by the connecting means can be improved.

【0074】また、請求項2の発明によれば、ブームの
先端側と作業装置のうちいずれか一方の部材側に設けら
れた係合突起を、他方の部材側に設けられた掛止め部の
凹溝に係合させることにより、ブームと作業装置とを相
対的に回転させ、両者が位置決めされたときに当接部が
当接して両者の相対回転が停止する構成としたから、ブ
ームの先端側と作業装置とに形成されたピン穴を短時間
で容易に位置合わせすることができ、連結ピンを用いて
ブームと作業装置とを連結するときの作業性を向上させ
ることができる。
According to the second aspect of the present invention, the engaging protrusion provided on one end of the boom and one of the working devices is connected to the engaging portion provided on the other member. By engaging with the concave groove, the boom and the working device are relatively rotated, and when both are positioned, the abutting portion abuts and the relative rotation of both is stopped. The pin holes formed in the side and the working device can be easily aligned in a short time, and the workability when connecting the boom and the working device using the connecting pin can be improved.

【0075】さらに、請求項3の発明によれば、ブーム
と作業装置のうちいずれか一方の部材に設けられた固定
爪を、他方の部材に設けられた複数の固定ピンの一方に
係合させた状態で、移動爪を各固定ピンの他方に係合さ
せることにより、煩雑な位置合わせ作業を伴う連結ピン
等を用いることなく、ブームの先端側に作業装置を容易
に連結することができる。
Further, according to the third aspect of the present invention, the fixed claw provided on one of the boom and the working device is engaged with one of the plurality of fixed pins provided on the other member. In this state, the movable claw is engaged with the other of the fixing pins, so that the working device can be easily connected to the distal end side of the boom without using a connecting pin or the like that involves a complicated positioning operation.

【0076】また、請求項4の発明によれば、ブームの
先端側には、ブームシリンダの先端側を選択的に取付け
るためのシリンダ取付用ボスを複数個設け、ブームシリ
ンダの最伸長時または最縮小時におけるブームの俯仰動
角度を変化させる構成としたから、例えば建造物等の解
体作業時には、作業装置の先端側をより高い位置まで移
動させることができ、また、地面等の掘削作業時には、
作業装置の先端側をより地面深くまで移動させることが
できる。
According to the fourth aspect of the present invention, a plurality of cylinder mounting bosses for selectively mounting the front end of the boom cylinder are provided on the front end of the boom. Since the boom raising / lowering angle at the time of reduction is changed, for example, at the time of dismantling work of a building or the like, the tip side of the working device can be moved to a higher position.
The tip side of the working device can be moved deeper into the ground.

【0077】さらに、請求項5の発明によれば、作業装
置は基端側に継ぎブームを備え、作業装置は継ぎブーム
を介してブームの先端側に連結する構成としたから、ブ
ームの先端側に作業装置の継ぎブームを連結するだけで
作業装置を連結することができる。
Further, according to the fifth aspect of the present invention, the working device is provided with a connecting boom on the base end side, and the working device is configured to be connected to the distal end side of the boom via the connecting boom. The working device can be connected only by connecting the connecting boom of the working device to the working device.

【0078】また、請求項6の発明によれば、建設機械
本体に取付けられたブームの先端側に作業装置を連結す
るときに、製缶構造体の先端側に設けられた位置合わせ
手段によって作業装置とブームの先端側とを位置合わせ
した状態で、連結手段によってブームの先端側に連結す
ることができる。
According to the invention of claim 6, when the working device is connected to the tip end of the boom attached to the construction machine main body, the work is performed by the positioning means provided at the tip end of the can-making structure. In a state where the device and the front end side of the boom are aligned, it is possible to connect the front end side of the boom by the connecting means.

【0079】さらに、請求項7の発明にかかる建設機械
用フロント装置の組立方法によれば、位置合わせ工程に
おいて作業装置の基端側と建設機械本体に取付けられた
ブームの先端側とを位置合わせし、連結工程においてブ
ームの先端側と作業装置の基端側とを連結するだけで、
掘削作業、解体作業等の作業内容に応じたフロント装置
を組立てることができる。
Further, according to the method of assembling the front apparatus for construction equipment according to the seventh aspect of the present invention, in the alignment step, the base end side of the working apparatus is aligned with the distal end side of the boom attached to the construction equipment body. Then, in the connection process, just connect the boom distal end and the working device proximal end,
It is possible to assemble a front device according to work contents such as excavation work and demolition work.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による第1の実施の形態を油圧ショベル
に適用して示す外観図である。
FIG. 1 is an external view showing a first embodiment of the present invention applied to a hydraulic shovel.

【図2】図1中の作業装置の共通ブームから掘削作業用
サブアセンブリを取外した状態を示す外観図である。
2 is an external view showing a state where a subassembly for excavation work is removed from a common boom of the work apparatus in FIG. 1;

【図3】図1中の共通ブーム、継ぎブーム、位置合わせ
機構等を拡大して示す分解斜視図である。
FIG. 3 is an exploded perspective view showing, on an enlarged scale, a common boom, a joint boom, a positioning mechanism, and the like in FIG. 1;

【図4】図1中の共通ブーム、継ぎブーム、位置合わせ
機構等を拡大して示す要部拡大図である。
FIG. 4 is an enlarged view of a main part showing a common boom, a joint boom, a positioning mechanism and the like in FIG. 1 in an enlarged manner.

【図5】位置合わせ機構によって共通ブームのピン挿通
穴と継ぎブームのピン挿通穴とを位置合わせする状態を
示す要部拡大図である。
FIG. 5 is an enlarged view of a main part showing a state where the pin insertion hole of the common boom and the pin insertion hole of the joint boom are aligned by the alignment mechanism.

【図6】シリンダ取付用ボスの位置に応じて共通ブーム
の俯仰動角度が変化する状態を示す油圧ショベルの外観
図である。
FIG. 6 is an external view of a hydraulic excavator showing a state in which the elevation angle of the common boom changes according to the position of a cylinder mounting boss.

【図7】共通ブーム先端側に側溝掘作業用サブアセンブ
リが取付けられた油圧ショベルを示す外観図である。
FIG. 7 is an external view showing a hydraulic shovel having a sub-assembly for guttering work attached to a common boom tip side.

【図8】共通ブーム先端側に解体作業用サブアセンブリ
が取付けられた油圧ショベルを示す外観図である。
FIG. 8 is an external view showing a hydraulic excavator having a sub-assembly for dismantling work attached to a distal end side of a common boom.

【図9】本発明による第2の実施の形態を油圧ショベル
に適用して示す外観図である。
FIG. 9 is an external view showing a second embodiment of the present invention applied to a hydraulic shovel.

【図10】図9中の共通ブーム、継ぎブーム、連結機構
等を拡大して示す分解斜視図である。
FIG. 10 is an exploded perspective view showing a common boom, a joint boom, a coupling mechanism, and the like in FIG. 9 in an enlarged manner.

【図11】図9中の共通ブーム、継ぎブーム、連結機構
等を示す一部破断の要部拡大図である。
FIG. 11 is an enlarged view of a main part of a partially broken part showing a common boom, a joint boom, a coupling mechanism, and the like in FIG. 9;

【図12】共通ブームと継ぎブームとが連結機構によっ
て連結された状態を示す一部破断の要部拡大図である。
FIG. 12 is an enlarged view of a partially broken main part showing a state where the common boom and the joint boom are connected by a connecting mechanism.

【図13】姿勢保持装置を用いて掘削作業用サブアセン
ブリを共通ブームに連結する状態を示す連結作業の変形
例を示す外観図である。
FIG. 13 is an external view showing a modification of the connecting operation showing a state in which the excavating operation sub-assembly is connected to the common boom using the posture holding device.

【符号の説明】[Explanation of symbols]

2 上部旋回体(建設機械本体) 7 フロント装置 8 共通ブーム(ブーム) 9,11 シリンダ取付用ボス 10 ブームシリンダ 12 取付ブラケット 12A 当板(当接部) 13,21A ピン挿通穴(連結手段) 14 掘削作業用サブアセンブリ(作業装置) 15 連結ピン(連結手段) 16 継ぎブーム 22 位置合わせ機構(位置合わせ手段) 23 掛止め板(掛止め部) 24 ストッパ(当接部) 25 係合ピン(係合突起) 31 側溝掘作業用サブアセンブリ(作業装置) 32 アッパブーム(継ぎブーム) 41 解体作業用サブアセンブリ(作業装置) 42 継ぎブーム 51 連結機構 53 固定ピン 54 固定爪 55 移動爪 2 Upper revolving superstructure (construction machine main body) 7 Front device 8 Common boom (boom) 9, 11 Cylinder mounting boss 10 Boom cylinder 12 Mounting bracket 12A Abutment plate (contact portion) 13, 21A Pin insertion hole (connection means) 14 Excavation work subassembly (working device) 15 Connecting pin (connecting means) 16 Joint boom 22 Positioning mechanism (Positioning means) 23 Latch plate (Latch part) 24 Stopper (Abutment part) 25 Engagement pin (Length) Sub-assembly for side ditching work (working device) 32 Upper boom (joint boom) 41 Subassembly for dismantling work (working device) 42 Joint boom 51 Connecting mechanism 53 Fixing pin 54 Fixing claw 55 Moving claw

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 建設機械本体に俯仰動可能に取付けられ
た建設機械用フロント装置において、 前記フロント装置は、基端側が前記建設機械本体に俯仰
動可能に取付けられたブームと、作業内容に応じて前記
ブームの先端側に対して選択的に連結される作業装置と
からなり、 前記ブームと作業装置との間には、両者を連結するとき
に前記作業装置に対してブームの先端側を位置合わせす
る位置合わせ手段と、前記位置合わせ手段により前記作
業装置とブームとを位置合わせした状態で、前記作業装
置をブームの先端側に連結する連結手段とを設けたこと
を特徴とする建設機械用フロント装置。
1. A front apparatus for a construction machine mounted on a construction machine main body so as to be capable of raising and lowering, wherein the front apparatus has a base end which is mounted on the construction machine main body so as to be capable of raising and lowering and a boom. A working device that is selectively connected to the distal end of the boom, and between the boom and the working device, the distal end of the boom is positioned relative to the working device when both are connected. For a construction machine, comprising: a positioning means for adjusting; and a connecting means for connecting the working device to a tip end of the boom in a state where the working device and the boom are positioned by the positioning means. Front equipment.
【請求項2】 前記位置合わせ手段は、前記ブームの先
端側と作業装置のうちいずれか一方の部材側に設けられ
た係合突起と、他方の部材側に設けられ前記係合突起に
係合する凹溝を有した掛止め部と、前記係合突起を掛止
め部の凹溝に係合させた状態で前記ブームと作業装置と
を相対的に回転し両者が位置決めされたときに当接する
当接部とから構成し、 前記連結手段は、前記ブームの先端側と作業装置とにそ
れぞれ形成されたピン穴と、前記各ピン穴内に挿通され
前記作業装置をブームに対して一体に連結する連結ピン
とから構成してなる請求項1に記載の建設機械用フロン
ト装置。
2. The positioning device according to claim 1, wherein said positioning means engages with an engaging projection provided on one end of said boom and one of the working devices and an engaging projection provided on the other member. The boom and the working device are relatively rotated while the engaging projection is engaged with the concave groove of the engaging portion, and the engaging portion comes into contact with the engaging portion when the both are positioned. And a connecting portion, wherein the connecting means integrally connects the working device to the boom through the pin holes formed in the distal end side of the boom and the working device, and inserted into each of the pin holes. 2. The front device for a construction machine according to claim 1, comprising a connecting pin.
【請求項3】 建設機械本体に俯仰動可能に取付けられ
た建設機械用フロント装置において、 前記フロント装置は、基端側が前記建設機械本体に俯仰
動可能に取付けられたブームと、作業内容に応じて前記
ブームの先端側に対して選択的に連結される作業装置と
からなり、 前記ブームと作業装置との間には、前記作業装置をブー
ムに着脱可能に連結するための連結機構を設け、 前記連結機構は、前記ブームと作業装置のうちいずれか
一方の部材に設けられた取付ブラケットと、他方の部材
に設けられた複数の固定ピンと、前記取付ブラケットに
固定して設けられ、前記各固定ピンのうち少なくとも一
方の固定ピンに係合する固定爪と、前記取付ブラケット
に回動可能に枢支され、前記各固定ピンのうち他方の固
定ピンに係合する移動爪とから構成したことを特徴とす
る建設機械用フロント装置。
3. A construction machine front device mounted on a construction machine main body so as to be capable of elevating movement, wherein the front device has a boom whose base end side is mounted on the construction machine main body so as to be capable of elevating movement and a work content. A working device selectively connected to the tip side of the boom, and a connection mechanism for detachably connecting the working device to the boom is provided between the boom and the working device; The connecting mechanism is provided with a mounting bracket provided on one of the boom and the working device, a plurality of fixing pins provided on the other member, and fixedly provided on the mounting bracket. A fixed claw that is engaged with at least one of the fixed pins, and a movable claw that is rotatably supported by the mounting bracket and that is engaged with the other fixed pin of the fixed pins. A front device for a construction machine, wherein the front device is constituted.
【請求項4】 前記ブームの先端側には、ブームシリン
ダの先端側を選択的に取付けるためのシリンダ取付用ボ
スを複数個設け、ブームシリンダの最伸長時または最縮
小時における前記ブームの俯仰動角度を変化させる構成
としてなる請求項1、2または3に記載の建設機械用フ
ロント装置。
4. A plurality of cylinder mounting bosses for selectively mounting a front end of a boom cylinder is provided on a front end side of the boom, and the boom is raised and lowered when the boom cylinder is fully extended or contracted. 4. The front apparatus for a construction machine according to claim 1, wherein the angle is changed.
【請求項5】 前記作業装置は基端側に継ぎブームを備
え、前記作業装置は該継ぎブームを介して前記ブームの
先端側に連結する構成としてなる請求項1、2、3また
は4に記載の建設機械用フロント装置。
5. The working device according to claim 1, further comprising a joint boom on a base end side, wherein the working device is connected to a distal end side of the boom via the joint boom. Equipment for construction machinery.
【請求項6】 箱状の製缶構造体からなり、基端側が建
設機械本体に俯仰動可能に取付けられ、先端側に作業内
容に応じて選択的に作業装置が連結される建設機械用フ
ロント装置に用いるブームにおいて、 前記製缶構造体の先端側には、前記作業装置との位置合
わせを行うための位置合わせ手段と、前記位置合わせ手
段によって位置合わせされた前記作業装置を連結するた
めの連結手段とを備えたことを特徴とする建設機械用フ
ロント装置に用いるブーム。
6. A construction machine front comprising a box-shaped can-making structure, a base end of which is attached to the construction machine main body so as to be able to move up and down, and a tip end to which a working device is selectively connected in accordance with work contents. In the boom used in the device, a positioning means for performing positioning with the working device, and a connecting device for connecting the working device positioned by the positioning device, to a tip side of the can-making structure. A boom for use in a front device for construction machinery, comprising a connecting means.
【請求項7】 基端側が建設機械本体に俯仰動可能に取
付けられたブームと、作業内容に応じて前記ブームの先
端側に対して選択的に連結される作業装置とからなる建
設機械用フロント装置の組立方法であって、 前記作業装置の基端側に対して前記ブームの先端側を位
置合わせする位置合わせ工程と、位置合わせされた前記
ブームの先端側と作業装置の基端側とを連結する連結工
程とからなる建設機械用フロント装置の組立方法。
7. A construction machine front comprising: a boom having a base end mounted on a construction machine main body so as to be capable of raising and lowering; and a working device selectively connected to a tip end of the boom in accordance with work content. A method of assembling a device, comprising: a positioning step of positioning a distal end side of the boom with respect to a proximal end side of the working device; and A method for assembling a front device for a construction machine, comprising a connecting step of connecting.
JP36891997A 1997-12-27 1997-12-27 Construction machinery front device, boom used therefor, and building method thereof Pending JPH11193542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36891997A JPH11193542A (en) 1997-12-27 1997-12-27 Construction machinery front device, boom used therefor, and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP36891997A JPH11193542A (en) 1997-12-27 1997-12-27 Construction machinery front device, boom used therefor, and building method thereof

Publications (1)

Publication Number Publication Date
JPH11193542A true JPH11193542A (en) 1999-07-21

Family

ID=18493095

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36891997A Pending JPH11193542A (en) 1997-12-27 1997-12-27 Construction machinery front device, boom used therefor, and building method thereof

Country Status (1)

Country Link
JP (1) JPH11193542A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006274589A (en) * 2005-03-28 2006-10-12 Sumitomo (Shi) Construction Machinery Manufacturing Co Ltd End attachment mounting device for construction machine
JP2007203221A (en) * 2006-02-02 2007-08-16 Sumitomo (Shi) Construction Machinery Manufacturing Co Ltd Working device of construction machine
JP2011174287A (en) * 2010-02-24 2011-09-08 Amagasaki Juki Kk Working machine of construction machine
WO2011148601A1 (en) * 2010-05-26 2011-12-01 コベルコ建機株式会社 Work attachment and work machine
CN102363968A (en) * 2011-09-22 2012-02-29 广西大学 Spatial excavator with two-range-of-motion (two-ROM) movable arm, one-ROM bucket rod and two-ROM bucket
WO2013027328A1 (en) * 2011-08-24 2013-02-28 コベルコ建機株式会社 Work machine
EP2130977A3 (en) * 2008-06-04 2013-12-11 Kobelco Construction Machinery Co., Ltd. Working machine with structure for assembling boom thereof
EP2426275A3 (en) * 2006-01-13 2015-03-04 John R. Ramun Modular system for connecting attachments to a construction machine
JP2018040155A (en) * 2016-09-07 2018-03-15 日立建機株式会社 Front device of construction machine
WO2020012858A1 (en) * 2018-07-12 2020-01-16 コベルコ建機株式会社 Attachment for work machine
US11046560B2 (en) * 2018-05-23 2021-06-29 Kobelco Construction Machinery Co., Ltd. Swingable connection structure and crane provided with swingable connection structure

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006274589A (en) * 2005-03-28 2006-10-12 Sumitomo (Shi) Construction Machinery Manufacturing Co Ltd End attachment mounting device for construction machine
EP2426275A3 (en) * 2006-01-13 2015-03-04 John R. Ramun Modular system for connecting attachments to a construction machine
JP2007203221A (en) * 2006-02-02 2007-08-16 Sumitomo (Shi) Construction Machinery Manufacturing Co Ltd Working device of construction machine
EP2130977A3 (en) * 2008-06-04 2013-12-11 Kobelco Construction Machinery Co., Ltd. Working machine with structure for assembling boom thereof
JP2011174287A (en) * 2010-02-24 2011-09-08 Amagasaki Juki Kk Working machine of construction machine
JP2011246931A (en) * 2010-05-26 2011-12-08 Kobelco Contstruction Machinery Ltd Work machine
WO2011148601A1 (en) * 2010-05-26 2011-12-01 コベルコ建機株式会社 Work attachment and work machine
WO2013027328A1 (en) * 2011-08-24 2013-02-28 コベルコ建機株式会社 Work machine
JP2013044162A (en) * 2011-08-24 2013-03-04 Kobelco Contstruction Machinery Ltd Work machine
US9212495B2 (en) 2011-08-24 2015-12-15 Kobelco Construction Machinery Co., Ltd. Work machine
CN102363968A (en) * 2011-09-22 2012-02-29 广西大学 Spatial excavator with two-range-of-motion (two-ROM) movable arm, one-ROM bucket rod and two-ROM bucket
JP2018040155A (en) * 2016-09-07 2018-03-15 日立建機株式会社 Front device of construction machine
US11046560B2 (en) * 2018-05-23 2021-06-29 Kobelco Construction Machinery Co., Ltd. Swingable connection structure and crane provided with swingable connection structure
WO2020012858A1 (en) * 2018-07-12 2020-01-16 コベルコ建機株式会社 Attachment for work machine
JP2020007885A (en) * 2018-07-12 2020-01-16 コベルコ建機株式会社 Attachment for work machine
US12006653B2 (en) 2018-07-12 2024-06-11 Kobelco Construction Machinery Co., Ltd. Attachment for work machine

Similar Documents

Publication Publication Date Title
JP4713516B2 (en) Construction machinery
JP2004116008A (en) Excavation device of revolving working machine
JP2005504198A (en) Attachment coupling device for heavy machinery
JPH11193542A (en) Construction machinery front device, boom used therefor, and building method thereof
JP4677190B2 (en) Movable devices for civil works and other works such as lifting and transferring loads
JP2922778B2 (en) Counterweight removal equipment for work equipment
CN101426981A (en) Arm of excavating work machine
JP4812603B2 (en) Work front attachment / detachment device and attachment / detachment method
KR20030026690A (en) An excavator head for useing back hoe
JP3730551B2 (en) Offset boom type construction machine
KR200493426Y1 (en) Tong attachment for excavator
JPH0941418A (en) Attachment mounting/demounting device
JP5372818B2 (en) Work machine, front device of work machine, and mounting method of front device of work machine
JP2004353396A (en) Front device for work machine, and work machine
JP2003034945A (en) Offset boom tape construction machinery
JP2008202325A (en) Boom cylinder support structure of drilling machine and operation method
JP2806288B2 (en) Hydro phrase excavator
CN221001191U (en) Quick-changing device of backhoe loader
JP4039559B2 (en) Demolition machine
JPH11117345A (en) Working-machine attachment fixture
EP4033033A1 (en) Machine of the earth-moving type, comprising a configurable type operating arm, and related method and adapter group for configuring said operating arm
JP2018178358A (en) Breaker attachment structure to bucket
JP2001173243A (en) Auxiliary tool for changing excavation direction of construction machine
JP2001140575A (en) Anchor executing machine
JPH11336112A (en) Construction machine

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041214

A02 Decision of refusal

Effective date: 20050419