JPH11166393A - Concrete injection port block plug of tunnel - Google Patents

Concrete injection port block plug of tunnel

Info

Publication number
JPH11166393A
JPH11166393A JP9348647A JP34864797A JPH11166393A JP H11166393 A JPH11166393 A JP H11166393A JP 9348647 A JP9348647 A JP 9348647A JP 34864797 A JP34864797 A JP 34864797A JP H11166393 A JPH11166393 A JP H11166393A
Authority
JP
Japan
Prior art keywords
plug
concrete
injection port
tunnel
washer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9348647A
Other languages
Japanese (ja)
Inventor
Kiichi Hoashi
紀一 帆足
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okabe Co Ltd
Original Assignee
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okabe Co Ltd filed Critical Okabe Co Ltd
Priority to JP9348647A priority Critical patent/JPH11166393A/en
Publication of JPH11166393A publication Critical patent/JPH11166393A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To compress and deform the plug body of a block plug so as to be pressed onto the inner surface of a concrete injection port and firmly mount the block plug by inserting a fastening bolt device to the plug body center part of the blocking plug made of an elastic body. SOLUTION: When a block plug (b) having a plug body 10 formed of an elastic body is inserted into a concrete injection port 5 after injecting concrete, and both side contact pieces of a locking plate 16 are touched to the inner surface of a tunnel segment 4, the outer part is protruded outward from the injection port 5. A fastening bolt 18 is inserted to the center holes of the locking plate 16, an inner washer 15, the plug body 10 and an outer washer 11, and screwed to a nut 13. When the fastening bolt 18 of the block plug (b) is fastened, the inner washer 15 and the outer washer 11 are compressed, whereby the plug body 10 is expanded and deformed in all directions, and pressed onto the inner surface of the injection port 5, and the outward protruding part is swollen from the injection port 5. Thus, the block plug (b) is firmly mounted by the pressing of the plug body 10 to the inner surface of the injection port 5 and the catching of the swollen body 19 by the tunnel segment even if a pressure is added from the concrete successively injected through the upper concrete injection port 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、トンネル用セグメント
のコンクリート注入孔を閉塞するトンネルのコンクリー
ト注入孔用閉塞栓に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a plug for a concrete injection hole of a tunnel for closing a concrete injection hole of a tunnel segment.

【0002】[0002]

【従来の技術】従来のこの種のトンネルのコンクリート
注入孔用閉塞栓は、木又はゴムにより作製し、トンネル
のコンクリート注入作業において、下部のコンクリート
注入孔より所定の高さまでコンクリートを注入し終った
ら、そのコンクリート注入孔内に閉塞栓を打込み、次い
で、順次上部のコンクリート注入孔よりのコンクリート
の注入を行い、そのコンクリート注入孔内に閉塞栓を打
込んでコンクリートの注入作業を行っている。
2. Description of the Related Art A conventional plug for a concrete pouring hole of a tunnel of this type is made of wood or rubber. In the concrete pouring operation of a tunnel, when concrete is poured to a predetermined height from a concrete pouring hole at a lower portion. A plug is inserted into the concrete injection hole, and concrete is sequentially injected from the upper concrete injection hole, and concrete is injected by inserting the plug into the concrete injection hole.

【0003】従って、トンネルのコンクリート注入孔の
閉塞栓は、コンクリート注入孔の内面との摩擦によって
固定しているだけであるから、順次上部のコンクリート
注入孔よりのコンクリートの注入を行ってゆくときに、
先きに打込んだ下部の閉塞栓がコンクリートの圧力に押
されて抜け出し脱落してしまうおそれがある。
[0003] Therefore, since the plug of the concrete pouring hole of the tunnel is fixed only by friction with the inner surface of the concrete pouring hole, when the concrete is sequentially injected from the upper concrete pouring hole. ,
There is a risk that the lower stopper plug that was previously driven in will be pushed out by the pressure of the concrete and fall out.

【0004】[0004]

【発明が解決しようとする課題】トンネルのコンクリー
ト注入孔の閉塞栓を簡易に操作してコンクリート注入孔
に堅固に固定し、その閉塞栓が注入したコンクリートの
圧力に押されても閉塞栓の抜け出しを確実に防止する点
である。
The plug of the concrete injection hole of the tunnel is easily operated and firmly fixed to the concrete injection hole, and the plug is pulled out even if the plug is pushed by the pressure of the injected concrete. The point is to surely prevent this.

【0005】[0005]

【課題を解決するための手段】トンネルのコンクリート
注入孔の閉塞栓の栓本体を弾性体により作製し、該閉塞
栓の中心部に締付ボルト装置を挿通して設け、その締付
ボルト装置により弾性体の栓本体を挟圧変形してコンク
リート注入孔の内面に圧着させると共に引掛る膨出体を
形成し、コンクリート注入孔の閉塞栓の取付けが堅固
で、その閉塞栓が注入したコンクリートの圧力に押され
ても閉塞栓の抜け出しを確実に防止するトンネルのコン
クリート注入孔用閉塞栓を提供することを目的とする。
Means for Solving the Problems A plug body of an obturator plug for a concrete injection hole of a tunnel is made of an elastic body, and a tightening bolt device is inserted through a center portion of the obturator plug, and is provided by the tightening bolt device. The elastic plug body is squeezed and deformed to be pressed against the inner surface of the concrete pouring hole and to form a bulging body that is caught. An object of the present invention is to provide a plug for a concrete injection hole of a tunnel, which reliably prevents the plug from coming out even when pressed.

【0006】すなわち、トンネル用セグメントのコンク
リート注入孔内に嵌合して外方へ突出する弾性体の栓本
体の外方端面にナット付き外方座金を、内方端面に内方
座金と上記トンネル用セグメントの内方面に当てる係止
板をそれぞれ配置し、締付ボルトを内方より上記係止
板,内方座金,栓本体,外方座金の中心孔に挿通し上記
ナットに螺通してトンネルのコンクリート注入孔用閉塞
栓を構成し、トンネルのコンクリート注入孔の閉塞栓を
簡易に操作してコンクリート注入孔に堅固に固定し、そ
の閉塞栓が注入したコンクリートの圧力に押されても閉
塞栓の抜け出しを確実に防止する目的を、弾性体より成
る栓本体の内外端面に座金をそれぞれ当て、それらの中
心孔に挿通したボルト・ナットにより挟圧してその栓本
体を変形し、トンネルのコンクリート注入孔の内面に圧
着させると共に、該コンクリート注入孔の外方において
膨出させることにより実現した。
That is, an outer washer with a nut is provided on an outer end face of an elastic plug body which is fitted into a concrete injection hole of a tunnel segment and protrudes outward, and an inner washer and the above-mentioned tunnel are provided on an inner end face. A locking plate to be applied to the inner surface of the segment is arranged, and a tightening bolt is inserted from the inside into the center hole of the locking plate, the inner washer, the plug body, and the outer washer. The concrete plug of the concrete injection hole is constructed, and the plug of the concrete injection hole of the tunnel is easily operated and firmly fixed to the concrete injection hole. In order to reliably prevent the falling out of the plug body, washers are respectively applied to the inner and outer end faces of the plug body made of an elastic body, and the plug body is deformed by being pressed by bolts and nuts inserted into the center holes thereof, and the tunnel is deformed. With pressure bonding to the inner surface of the concrete injection hole of it was achieved by swelling the outside of the concrete casting hole.

【0007】[0007]

【実施例】図面は、本発明の一実施態様を示し、その構
成を図面について説明すれば、(1)は地盤、(2)は
地盤(1)に掘削された円形トンネル内に環状に組立て
た一次覆工セグメントである。
BRIEF DESCRIPTION OF THE DRAWINGS The drawings show one embodiment of the present invention, and the structure will be described with reference to the drawings. (1) is ground and (2) is assembled in a circular tunnel in a circular tunnel excavated on the ground (1). This is the primary lining segment.

【0008】(a)は一次覆工セグメント(2)の内方
に環状に組立てた内型枠を示し、(3)は内型枠(a)
の円環状本体で、数個のトンネル用セグメント(4)を
組立てて構成し、そのトンネル用セグメント(4)の要
所要所にはコンクリート注入孔(5)を設ける。(6)
及び(7)は円環状本体(3)の外方に組立筋(8)に
よって取付けた主筋及び配力筋、(9)は一次覆工セグ
メント(2)と内型枠(a)の円環状本体(3)の間の
空間部内にコンクリート注入孔(5)より注入したコン
クリートである。
[0008] (a) shows the inner mold that is assembled annularly inside the primary lining segment (2), (3) is the inner mold (a)
In this annular body, several tunnel segments (4) are assembled and constructed, and a concrete pouring hole (5) is provided at a required portion of the tunnel segment (4). (6)
And (7) are the main reinforcing bars and the distribution bars attached to the outer side of the annular body (3) by the assembling bars (8), and (9) is the annular shape of the primary lining segment (2) and the inner formwork (a). Concrete injected from the concrete injection hole (5) into the space between the main bodies (3).

【0009】(b)はトンネル用セグメント(4)のコ
ンクリート注入孔(5)の閉塞栓を示し、(10)は閉
塞栓(b)の栓本体で、ゴム,弾性プラスチック等の弾
性体より成り、コンクリート注入孔(5)の内径よりも
若干小径の円柱状に形成する。(11)は外方座金で、
該外方座金(11)の周縁内方側には栓本体(10)内
に喰込む数個の爪(12)を適当間隔に形成し、外面中
央部にナット(13)を溶接(14)する。(15)は
内方座金、(16)は係止板で、帯状鉄板の中央部を外
方へ台形に押込み、両側部に当て片(17)を形成して
成る。(18)は締付ボルトである。
(B) shows an obstruction plug for the concrete pouring hole (5) of the tunnel segment (4), and (10) shows a main body of the obstruction plug (b), which is made of an elastic material such as rubber or elastic plastic. Is formed into a cylindrical shape having a diameter slightly smaller than the inside diameter of the concrete injection hole (5). (11) is the outer washer,
On the inner side of the outer washer (11), several claws (12) are formed at appropriate intervals to bite into the plug body (10), and a nut (13) is welded to the center of the outer surface (14). I do. (15) is an inner washer, and (16) is a locking plate, which is formed by pushing a central portion of a strip-shaped iron plate outward in a trapezoidal shape, and forming contact pieces (17) on both sides. (18) is a fastening bolt.

【0010】そして、図5に示すように栓本体(10)
の外方端面にナット(13)付き外方座金(11)を、
内方端面に順次内方座金(15),係止板(16)をそ
れぞれ当て、締付ボルト(18)を内方より係止板(1
6),内方座金(15),栓本体(10),外方座金
(11)の中心孔に挿通しナット(13)に螺通して閉
塞栓(b)を構成する。
Then, as shown in FIG. 5, the plug body (10)
Outer washer (11) with nut (13) on the outer end face of
An inner washer (15) and a locking plate (16) are sequentially applied to the inner end surface, respectively, and a tightening bolt (18) is applied from the inner side to the locking plate (1).
6), the inner washer (15), the plug body (10), and the outer washer (11) are inserted into the central holes and screwed through the nut (13) to form the closing plug (b).

【0011】(19)は閉塞栓(b)の栓本体(10)
の挟圧によって発生する栓本体(10)の外方部の膨出
体、(20)は閉塞栓(b)の取付け後、コンクリート
注入孔(5)の内方空所の孔埋めをするモルタルであ
る。
(19) is the plug body (10) of the plug (b).
(20) is a mortar that fills an inner space of the concrete injection hole (5) after the plug (b) is attached after the plug body (10) is generated by the pinching pressure. It is.

【0012】その作用を説明する。一次覆工セグメント
(2)と内型枠(a)の円環状本体(3)の間の空間部
内にコンクリート(9)を、先ず、下部のコンクリート
注入孔(5)より注入する。
The operation will be described. Concrete (9) is first injected into the space between the primary lining segment (2) and the annular body (3) of the inner formwork (a) from the lower concrete injection hole (5).

【0013】その下部のコンクリート注入孔(5)より
所定の高さまでコンクリート(9)を注入し終ったら、
図5に示すように閉塞栓(b)を内方より上記コンクリ
ート注入孔(5)内に挿入して該閉塞栓(b)の係止板
(16)の両側当て片(17)をトンネル用セグメント
(4)の内方面に当てる。そうすると、その閉塞栓
(b)の外方部はコンクリート注入孔(5)より外方へ
所定に突出する。
When the concrete (9) has been poured to a predetermined height from the concrete pouring hole (5) at the bottom thereof,
As shown in FIG. 5, an obturator plug (b) is inserted into the concrete injection hole (5) from the inside, and both-side contact pieces (17) of the locking plate (16) of the obturator plug (b) are used for tunneling. Apply to the inward side of segment (4). Then, the outside of the plug (b) protrudes outward from the concrete injection hole (5).

【0014】その後、上記閉塞栓(b)の締付ボルト
(18)の頭にスパナ等を係合してその締付ボルト(1
8)を回転すれば、図6に示すように閉塞栓(b)の栓
本体(10)が内方座金(15)と外方座金(11)に
挟圧されて四方に膨脹変形し、その栓本体(10)のコ
ンクリート注入孔(5)内に位置する部分がコンクリー
ト注入孔(5)の内面に圧着すると共に、外方突出部は
コンクリート注入孔(5)より膨出(19)する。
Thereafter, a wrench or the like is engaged with the head of the tightening bolt (18) of the obstruction plug (b), and the tightening bolt (1) is engaged.
When 8) is rotated, the plug body (10) of the plug (b) is sandwiched between the inner washer (15) and the outer washer (11) and expands and deforms in four directions as shown in FIG. The portion of the plug body (10) located in the concrete pouring hole (5) is pressed against the inner surface of the concrete pouring hole (5), and the outwardly protruding portion bulges (19) from the concrete pouring hole (5).

【0015】その下部の閉塞栓(b)の取付けが終る
と、順次上部のコンクリート注入孔(5)よりコンクリ
ート(9)の注入を行った後、そのコンクリート注入孔
(5)内に閉塞栓(b)を上記と同様に操作し取付けて
コンクリート(9)の注入作業を終了する。
After the lower plug (b) is attached, concrete (9) is poured from the upper concrete pouring hole (5), and then the plug (5) is inserted into the concrete pouring hole (5). b) is mounted and operated in the same manner as described above to complete the concrete (9) pouring operation.

【0016】而して、下部等の閉塞栓(b)は、順次上
部のコンクリート注入孔(5)より注入されるコンクリ
ート(9)の圧力に押されても、閉塞栓(b)の栓本体
(10)のコンクリート注入孔(5)の内面との圧着、
及び膨出体(19)のトンネル用セグメント(4)への
引掛りによりトンネル用セグメント(4)に堅固に固定
してコンクリート注入孔(5)から抜け出ることは無
い。
Thus, even if the plug (b) such as the lower part is pushed by the pressure of the concrete (9) which is sequentially injected from the concrete injection hole (5) at the upper part, the plug body of the plug (b) can be used. (10) crimping with the inner surface of the concrete injection hole (5),
And the swelling body (19) is firmly fixed to the tunnel segment (4) by being hooked on the tunnel segment (4) and does not come out of the concrete injection hole (5).

【0017】一方、作業終了後は、図2に示すように閉
塞栓(b)の係止板(16)の両側部を切断して除去
し、コンクリート注入孔(5)の内方空所内にモルタル
(20)を充填して孔埋めをする。
On the other hand, after the work is completed, as shown in FIG. 2, both sides of the stopper plate (16) of the plug (b) are cut off and removed, and the inside of the concrete pouring hole (5) is left inside. The mortar (20) is filled to fill the hole.

【0018】[0018]

【発明の効果】本発明のトンネルのコンクリート注入孔
用閉塞栓は、下記のような利点がある。
The obstruction plug for a concrete injection hole of a tunnel according to the present invention has the following advantages.

【0019】(1) 閉塞栓の栓本体を弾性体により作
製し、その栓本体の外方端面にナット付き外方座金を、
内方端面に内方座金及び係止板をそれぞれ当て、締付ボ
ルトを上記係止板,内方座金,栓本体,外方座金の中心
孔に挿通して上記ナットに螺通する。従って、
(1) A plug main body of an obstruction plug is made of an elastic body, and an outer washer with a nut is provided on an outer end surface of the plug main body.
An inner washer and a locking plate are respectively applied to the inner end surface, and a tightening bolt is inserted through the center hole of the locking plate, the inner washer, the plug body, and the outer washer and screwed into the nut. Therefore,

【0020】(イ) 閉塞栓をトンネルのトンネル用セ
グメントのコンクリート注入孔内に挿入するとき、閉塞
栓の係止板をトンネル用セグメントの内方面に当てる
と、閉塞栓はその外方部がコンクリート注入孔より所定
に突出した一定の状態に挿入されるから、トンネル用セ
グメントのコンクリート注入孔内への閉塞栓の挿入を簡
易に操作して常に所定に行うことができ、安楽に作業し
て作業能率を向上する。
(A) When inserting the plug into the concrete pouring hole of the tunnel segment of the tunnel, if the locking plate of the plug is brought into contact with the inner surface of the tunnel segment, the plug will have a concrete outer surface. Since it is inserted in a certain state protruding from the injection hole in a predetermined manner, it is possible to easily insert the plug into the concrete injection hole of the tunnel segment and always perform it in a predetermined manner. Improve efficiency.

【0021】(ロ) 閉塞栓を取付けるときは、閉塞栓
をトンネルのトンネル用セグメントのコンクリート注入
孔内に挿入して締付ボルトの頭を回転するだけでよいか
ら、閉塞栓の取付け操作が容易で、作業し易い。
(B) When installing the obstruction plug, it is only necessary to insert the obstruction plug into the concrete injection hole of the tunnel segment of the tunnel and to rotate the head of the tightening bolt. And easy to work.

【0022】(ハ) 閉塞栓の締付ボルトを締付けるこ
とにより栓本体が内方と外方の座金に挟圧されて四方に
膨脹変形し、その栓本体のコンクリート注入孔内に位置
する部分がコンクリート注入孔の内面に圧着すると共
に、外方突出部がコンクリート注入孔よりも膨出するか
ら、注入したコンクリートの圧力によって閉塞栓を押し
ても、閉塞栓はその栓本体のコンクリート注入孔の内面
との圧着、及び栓本体の外方の膨出体のトンネル用セグ
メントへの引掛りにより抜け出るのが防止されて閉塞栓
を常に確実堅固に取付けることができる。
(C) By tightening the bolts of the plug, the plug body is sandwiched between the inner and outer washers and expands and deforms in all directions, and the portion of the plug body located in the concrete pouring hole is removed. The plug is pressed against the inner surface of the concrete injection hole and the outwardly protruding portion swells out of the concrete injection hole. Of the plug body, and the bulging body outside the plug body is prevented from being pulled out by being hooked on the tunnel segment, so that the obstruction plug can always be securely attached firmly.

【0023】(2) 簡単に構成して容易安価に製作で
き、その作動は軽快円滑である。
(2) It can be easily constructed and easily manufactured at low cost, and its operation is light and smooth.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施態様のコンクリート注入孔用閉
塞栓を取付けたトンネルの正断面図である。
FIG. 1 is a front sectional view of a tunnel to which a plug for a concrete injection hole according to an embodiment of the present invention is attached.

【図2】同上要部の拡大正断面図である。FIG. 2 is an enlarged front sectional view of a main part of the same.

【図3】同上平面図である。FIG. 3 is a plan view of the same.

【図4】その閉塞栓の斜視図である。FIG. 4 is a perspective view of the obturator.

【図5】同上閉塞栓をトンネルのトンネル用セグメント
のコンクリート注入孔内に挿入した状態の正断面図であ
る。
FIG. 5 is a front cross-sectional view showing a state where the plug is inserted into a concrete injection hole of a tunnel segment of the tunnel.

【図6】上記閉塞栓をコンクリート注入孔に固定した状
態の正断面図である。
FIG. 6 is a front sectional view showing a state in which the plug is fixed to a concrete pouring hole.

【符号の説明】[Explanation of symbols]

a 内型枠 b 閉塞栓 1 地盤 2 一次覆工セグメント 3 円環状本体 4 トンネル用セグメント 5 コンクリート注入孔 6 主筋 7 配力筋 8 組立筋 9 コンクリート 10 栓本体 11 外方座金 12 爪 13 ナット 14 溶接 15 内方座金 16 係止板 17 当て片 18 締付ボルト 19 膨出体 20 モルタル a Inner form b Closure plug 1 Ground 2 Primary lining segment 3 Toroidal body 4 Tunnel segment 5 Concrete pouring hole 6 Main reinforcement 7 Distributor 8 Assembling reinforcement 9 Concrete 10 Plug body 11 Outer washer 12 Claw 13 Nut 14 Welding 15 Inner washer 16 Locking plate 17 Patch 18 Tightening bolt 19 Bulging body 20 Mortar

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 トンネル用セグメントのコンクリート注
入孔内に嵌合して外方へ突出する弾性体の栓本体の外方
端面にナット付き外方座金を、内方端面に内方座金と上
記トンネル用セグメントの内方面に当てる係止板をそれ
ぞれ配置し、締付けボルトを内方より上記係止板,内方
座金,栓本体,外方座金の中心孔に挿通して上記ナット
に螺通したことを特徴とするトンネルのコンクリート注
入孔用閉塞栓。
1. An outer washer with a nut on an outer end face of an elastic plug body which fits into a concrete injection hole of a tunnel segment and protrudes outward, and an inner washer and an inner washer are provided on an inner end face. The locking plate is placed on the inner surface of the segment, and the tightening bolt is inserted from the inside into the center hole of the locking plate, inner washer, plug body and outer washer and screwed into the nut. An obturator plug for a concrete injection hole of a tunnel, characterized by:
JP9348647A 1997-12-03 1997-12-03 Concrete injection port block plug of tunnel Pending JPH11166393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9348647A JPH11166393A (en) 1997-12-03 1997-12-03 Concrete injection port block plug of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9348647A JPH11166393A (en) 1997-12-03 1997-12-03 Concrete injection port block plug of tunnel

Publications (1)

Publication Number Publication Date
JPH11166393A true JPH11166393A (en) 1999-06-22

Family

ID=18398416

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9348647A Pending JPH11166393A (en) 1997-12-03 1997-12-03 Concrete injection port block plug of tunnel

Country Status (1)

Country Link
JP (1) JPH11166393A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008021790A (en) * 2006-07-12 2008-01-31 Mitsubishi Electric Corp Resin mold transformer
JP2010084497A (en) * 2008-10-03 2010-04-15 Metro Kaihatsu Kk High shut-off performance stop cock for backfill material injection hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008021790A (en) * 2006-07-12 2008-01-31 Mitsubishi Electric Corp Resin mold transformer
JP2010084497A (en) * 2008-10-03 2010-04-15 Metro Kaihatsu Kk High shut-off performance stop cock for backfill material injection hole

Similar Documents

Publication Publication Date Title
MXPA01010484A (en) Post-tension anchor seal cap.
US6588169B2 (en) Universal mounting plate
JPH11166393A (en) Concrete injection port block plug of tunnel
KR200386818Y1 (en) Soil Nailing Consthuction use Pressuring Milk Crouting
US3927856A (en) Internal spreader means for use with a reusable tie rod
US3858993A (en) Reusable tie assembly for concrete forms
JPH029125B2 (en)
JPH07286317A (en) Cut-off connecting device of concrete block and cut-off connection method using the device
JP2547088B2 (en) Method for manufacturing concrete pile with PC joint and manufacturing form
JP4162822B2 (en) Connector / mortar adhesion aid
KR200292891Y1 (en) liner screw of reninforcing rod
JP2694622B2 (en) Mounting device
JPH0799031B2 (en) Concrete block joining method, concrete block used in the method, and mold device for forming joining recess of the concrete block
JPH06341226A (en) Cone for concrete form and form fastening metal fitting used for this cone
KR200271180Y1 (en) Socket for reinforcing soil nailing by D29 reinforcing bar
JP3784140B2 (en) Building foundation
JP4344466B2 (en) Tightening structure and method of concrete products
JP2514126Y2 (en) Water-blocking joint device for concrete block
JP4041932B2 (en) Manhole step mounting structure and step and step cover
JP3004639B1 (en) Injection resin anchor method
JP3479497B2 (en) Concrete formwork with rubber mold, and this rubber mold
JPH07216901A (en) Cut-off slope surface reinforcing construction method
JPS595068Y2 (en) Assembly type waterway
KR200271179Y1 (en) Socket for reinforcing soil nailing by D25 reinforcing bar
JP4903958B2 (en) Jig for forming mortar injection path and air discharge path