JPH11131858A - Method of constructing tank - Google Patents

Method of constructing tank

Info

Publication number
JPH11131858A
JPH11131858A JP31269297A JP31269297A JPH11131858A JP H11131858 A JPH11131858 A JP H11131858A JP 31269297 A JP31269297 A JP 31269297A JP 31269297 A JP31269297 A JP 31269297A JP H11131858 A JPH11131858 A JP H11131858A
Authority
JP
Japan
Prior art keywords
side plate
side wall
tank
constructing
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP31269297A
Other languages
Japanese (ja)
Inventor
Akira Wakabayashi
晃 若林
Shinya Sagawa
慎也 寒川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP31269297A priority Critical patent/JPH11131858A/en
Publication of JPH11131858A publication Critical patent/JPH11131858A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To facilitate the quality management by carrying a side plate piece assembled in a factory to a constructing site to set it, and constructing a side wall by use of the side plate piece. SOLUTION: A side plate 7 is bent according to the curvature radius of a side wall 3 in a factory, and three side plates 7 are arranged in protruding state and welded to constitute a side plate piece 6. Side plate pieces 6A, 6B and a side plate 7A are arranged in a prescribed position for constructing a side wall 3, and mutually connected by field welding to annularly construct the bottom part of the side wall 3. Then, a side plate 7B is arranged on the side plate 7A, and the side plate pieces 6A, 6B and the side plate 7A are field- welded to the side plate 7B to construct the lower half of the side wall 3. A side plate piece 6C is arranged in a position shifted to the right by the length L1 for one side plate 7 on the upper part of the side plate pieces 6A, 6B, and a side plate pieces 6D and side plates 7C, 7D are arranged on the right side and welded, respectively, to construct the side wall 3. Thus, the field welding work can be reduced, and the quality management can be facilitated.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、石油等の液体タン
クを構築する際に適用するに好適なタンクの構築方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a tank suitable for constructing a liquid tank for petroleum or the like.

【0002】[0002]

【従来の技術】従来、この種のタンクの側壁を構築する
際には、長方形の鋼板を曲げ加工して形成された側板を
一枚ずつ現場溶接で組み立ててゆく方法が用いられてい
た。
2. Description of the Related Art Heretofore, when constructing a side wall of a tank of this type, a method has been used in which side plates formed by bending a rectangular steel plate are assembled one by one by field welding.

【0003】[0003]

【発明が解決しようとする課題】しかし、これでは、側
板一枚一枚を現場で溶接する必要が生じ、風等の影響に
より溶接部の品質に大きなバラツキが生じやすく、品質
管理が困難であるばかりか、現場溶接であることから、
天候に左右されやすく、工程管理上も困難な問題が多か
った。
However, in this case, it is necessary to weld each side plate on site, and the quality of the welded portion tends to vary greatly due to the influence of wind or the like, and quality control is difficult. Not only that, because it is field welding,
There were many problems that were easily affected by the weather and difficult in process management.

【0004】本発明は、上記事情に鑑み、施工現場での
溶接作業を減らすことが出来、品質管理及び工程管理を
容易化することの出来るタンクの構築方法に関する。
[0004] In view of the above circumstances, the present invention relates to a method for constructing a tank capable of reducing welding work at a construction site and facilitating quality control and process control.

【0005】[0005]

【課題を解決するための手段】即ち、本発明は、側壁
(3)及び該側壁上に形成される天板(5)からなるタ
ンク(1)において、該タンクの側壁を構築する際に、
所定の曲率で長方形状に形成された側板(7)を複数
枚、工場溶接により接合して組み立てた側板ピース
(6)を予め準備し、それら工場で組み立てられた側板
ピース(6)をタンクの施工現場に運搬して設置し、施
工現場での側壁の構築を前記側板ピース(6)を用いて
行なうようにして構成される。なお、括弧内の番号等
は、図面における対応する要素を示す便宜的なものであ
り、従って、本記述は図面上の記載に限定拘束されるも
のではない。
That is, according to the present invention, when a tank (1) including a side wall (3) and a top plate (5) formed on the side wall is constructed, the side wall of the tank is constructed.
A plurality of side plates (6) formed in a rectangular shape at a predetermined curvature are assembled by welding at a factory, side plate pieces (6) are prepared in advance, and the side plate pieces (6) assembled at the factory are placed in a tank. It is configured to be transported and installed at the construction site, and to construct the side wall at the construction site using the side plate pieces (6). Note that the numbers and the like in parentheses are for convenience showing the corresponding elements in the drawings, and therefore, this description is not limited to the description on the drawings.

【0006】[0006]

【発明の実施の形態】以下、本発明の実施例を図面に基
づき説明する。図1は本発明が適用されたタンクの一例
を示す斜視図、図2は側板ピースの一例を示す図、図3
は、図1のタンクの側壁の展開図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view showing an example of a tank to which the present invention is applied, FIG. 2 is a view showing an example of a side plate piece, FIG.
FIG. 2 is a development view of a side wall of the tank in FIG. 1.

【0007】本発明が適用されるタンク1は、図1に示
すように、全体が円筒状に形成された本体4を有してお
り、本体4は地盤2上に立設された側壁3を有してい
る。側壁3は全体が筒状に形成されており、側壁3の内
部には石油など液体の貯溜空間3aが形成されている。
貯溜空間3aの上方は天板5により閉塞されており、天
板5はその周囲を側壁3により支持された形で設けられ
ている。側壁3は、側壁3の曲率に合わせて曲げ加工さ
れた、凸状に形成された4枚の側板ピース6と長方形状
に形成された4枚の側板7から形成されており、各側板
ピース6は、図2に示すように、3枚の、側壁3の曲率
に合わせて曲げ加工された側板7を工場溶接して形成さ
れている。
As shown in FIG. 1, the tank 1 to which the present invention is applied has a main body 4 formed entirely in a cylindrical shape, and the main body 4 has a side wall 3 erected on the ground 2. Have. The side wall 3 is entirely formed in a cylindrical shape, and a storage space 3a for liquid such as petroleum is formed inside the side wall 3.
The upper part of the storage space 3a is closed by a top plate 5, and the top plate 5 is provided so that its periphery is supported by the side wall 3. The side wall 3 is formed from four side plate pieces 6 formed in a convex shape and four side plates 7 formed in a rectangular shape, which are bent in accordance with the curvature of the side wall 3. As shown in FIG. 2, three side plates 7 bent in accordance with the curvature of the side wall 3 are formed by factory welding.

【0008】本発明が適用されるタンク1は、以上のよ
うな構成を有するので、タンク1を構築する場合、ま
ず、タンク1の施工現場からはなれた工場内で長方形状
に形成された側板7を、構築すべきタンク1の側壁3の
曲率に合わせて曲げ加工する。次に、図2に示すよう
に、3枚の側板7を凸状に配置して溶接し側板ピース6
を製作する。この溶接作業は、屋内である工場内で行わ
れるので、溶接の品質管理は容易に行なうことが出来
る。
[0008] Since the tank 1 to which the present invention is applied has the above-described configuration, when constructing the tank 1, first, the side plate 7 formed in a rectangular shape in a factory separated from the construction site of the tank 1. Is bent in accordance with the curvature of the side wall 3 of the tank 1 to be constructed. Next, as shown in FIG. 2, the three side plates 7 are arranged in a convex shape and welded to each other.
To produce Since this welding operation is performed in a factory that is indoors, quality control of welding can be easily performed.

【0009】こうして、工場内で予め側板7と側板ピー
ス6を4枚づつ作成し、それら作成した側板7と側板ピ
ース6をトラックなどでタンク1の施工現場に運搬す
る。施工現場では、地盤2上に適宜構築された図示しな
い基礎上に、図3に示すように、まず、側壁3を構成す
る下方部分から構築する。それには、図3に示すよう
に、側板ピース6A(側板ピース6の各板を区別するた
めに部品番号7の後にアルファベットのABCDを付
す。側板7についても同様)を側壁3を構築すべき所定
の位置に配置設置し、配置された側板ピース6Aの図中
右方に同様に側板ピース6Bを配置設置し、側板ピース
6A、6B間を現場溶接で接合する。次に、側板ピース
6Bの図中右方に側板7Aを、側板ピース6Bの図中右
端と側板ピース6Aの図中左端部を接続する形で配置設
置し、その状態で現場溶接し、側壁3の最下部を環状に
構築する。次いで、溶接された側板7Aの図中上部に、
側板7Bを同様に側板ピース6Bの図中右端と側板ピー
ス6Aの図中左端部を接続する形で配置設置し、その状
態で側板ピース6A、6B、側板7Aと側板7Bとの間
を現場溶接し、側壁3の下半分を構築する。
In this way, four side plates 7 and side plate pieces 6 are prepared in advance in the factory, and the prepared side plates 7 and side plate pieces 6 are transported to the construction site of the tank 1 by a truck or the like. At the construction site, first, as shown in FIG. 3, the building is first constructed from a lower portion constituting the side wall 3 on a foundation (not shown) appropriately constructed on the ground 2. As shown in FIG. 3, a side plate piece 6A (a part number 7 is followed by an alphabet ABCD to distinguish each plate of the side plate piece 6; the same applies to the side plate 7) is used for forming the side plate 3 at a predetermined position. , The side plate piece 6B is similarly disposed on the right side of the placed side plate piece 6A in the drawing, and the side plate pieces 6A and 6B are joined by field welding. Next, the side plate 7A is disposed and installed on the right side of the side plate piece 6B in the drawing, so that the right end of the side plate piece 6B in the drawing is connected to the left end of the side plate piece 6A in the drawing. The lowermost part is constructed in an annular shape. Next, on the upper part of the welded side plate 7A in the drawing,
Similarly, the side plate 7B is arranged and installed so as to connect the right end of the side plate piece 6B in the drawing and the left end of the side plate piece 6A in the drawing, and in that state, the side plate pieces 6A and 6B, and the side plate 7A and the side plate 7B are welded in place. Then, the lower half of the side wall 3 is constructed.

【0010】次に、設置された側板ピース6Aと6Bの
上部に、図3に示すように、側板7の1枚分の長さL1
だけ図中右方にずれた位置に新たな側板6Cを配置設置
し、側板ピース6A、6Bと側板ピース6C間を現場溶
接で接合する。側板ピース6Cが設置されたところで、
側板ピース6Cの図中右方に、同様に側板ピース6Dを
配置設置し、同様に側板ピース6B、6C、側板7Bと
側板ピース6Dの間を現場溶接で接合する。次に、側板
ピース6Dの図中右方の側板7Bの上部に側板7Cを、
側板ピース6Dの図中右端と側板ピース6Cの図中左端
部を接続する形で配置設置し、その状態で現場溶接し、
次いで、溶接された側板7Cの図中上部に、側板7Dを
同様に側板ピース6Dの図中右端と側板ピース6Cの図
中左端部を接続する形で配置設置し、その状態で側板ピ
ース6C、6D、側板7Cと側板7Dとの間を現場溶接
し、側壁3の構築を完了する。
Next, as shown in FIG. 3, the length L1 of one side plate 7 is placed on the installed side plate pieces 6A and 6B.
A new side plate 6C is arranged and installed only at a position shifted to the right in the drawing, and the side plate pieces 6A, 6B and the side plate piece 6C are joined by field welding. When the side plate piece 6C is installed,
Similarly, the side plate piece 6D is disposed and installed on the right side of the side plate piece 6C in the drawing, and the side plate pieces 6B and 6C, and the side plate 7B and the side plate piece 6D are similarly joined by field welding. Next, a side plate 7C is placed above the right side plate 7B of the side plate piece 6D in the drawing.
The right end of the side plate piece 6D in the figure and the left end of the side plate piece 6C in the figure are connected and installed, and in that state, field welding is performed.
Next, the side plate 7D is similarly arranged and installed on the upper side of the welded side plate 7C in the figure so as to connect the right end of the side plate piece 6D in the figure and the left end of the side plate piece 6C in the figure. 6D, field welding is performed between the side plate 7C and the side plate 7D, and the construction of the side wall 3 is completed.

【0011】側壁3の構築が完了したところで、天板7
を側壁3上に載置する形で構築し、タンク1の構築は完
了する。なお、側板ピース6は、工場溶接で複数の側板
7を接合して形成する限り、その形状は、図2に示す凸
状に限らず、任意の形状が可能である。
When the construction of the side wall 3 is completed, the top plate 7
On the side wall 3 to complete the construction of the tank 1. In addition, as long as the side plate piece 6 is formed by joining a plurality of side plates 7 by factory welding, the shape thereof is not limited to the convex shape shown in FIG.

【0012】[0012]

【発明の効果】以上説明したように、本発明によれば、
側壁3及び該側壁上に形成される天板5からなるタンク
1において、該タンクの側壁を構築する際に、所定の曲
率で長方形状に形成された側板7を複数枚、工場溶接に
より接合して組み立てた側板ピース6を予め準備し、そ
れら工場で組み立てられた側板ピース6をタンクの施工
現場に運搬して設置し、施工現場での側壁の構築を前記
側板ピース6を用いて行なうようにして構成したので、
施工現場での現場溶接を、工場溶接の分だけ少なくする
ことが可能となり、施工が風や雨などの天候に影響され
ることを極力排除することが出来、品質管理及び工程管
理を容易化することが出来る。
As described above, according to the present invention,
In the tank 1 composed of the side wall 3 and the top plate 5 formed on the side wall, when constructing the side wall of the tank, a plurality of side plates 7 formed in a rectangular shape with a predetermined curvature are joined by factory welding. The side plate pieces 6 assembled in advance are prepared in advance, and the side plate pieces 6 assembled in the factories are transported to the construction site of the tank and installed, and the side walls are constructed on the construction site using the side plate pieces 6. So that
On-site welding at the construction site can be reduced by the amount of factory welding, and it is possible to eliminate as much as possible that the construction is affected by weather such as wind and rain, and to facilitate quality control and process control. I can do it.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は本発明が適用されたタンクの一例を示す
斜視図、
FIG. 1 is a perspective view showing an example of a tank to which the present invention is applied;

【図2】図2は側板ピースの一例を示す図、FIG. 2 is a view showing an example of a side plate piece;

【図3】図3は、図1のタンクの側壁の展開図である。FIG. 3 is a developed view of a side wall of the tank of FIG. 1;

【符号の説明】[Explanation of symbols]

1……タンク 3……側壁 5……天板 6……側板ピース 7……側板 DESCRIPTION OF SYMBOLS 1 ... Tank 3 ... Side wall 5 ... Top plate 6 ... Side plate piece 7 ... Side plate

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】側壁及び該側壁上に形成される天板からな
るタンクにおいて、 該タンクの側壁を構築する際に、 所定の曲率で長方形状に形成された側板を複数枚、工場
溶接により接合して組み立てた側板ピースを予め準備
し、 それら工場で組み立てられた側板ピースをタンクの施工
現場に運搬して設置し、 施工現場での側壁の構築を前記側板ピースを用いて行な
うようにして構成したタンクの構築方法。
In a tank comprising a side wall and a top plate formed on the side wall, a plurality of rectangular side plates having a predetermined curvature are joined by factory welding when constructing the side wall of the tank. Prepare the side plate pieces assembled in advance, transport the side plate pieces assembled in those factories to the construction site of the tank, install them, and construct the side wall at the construction site using the side plate pieces Tank construction method.
JP31269297A 1997-10-29 1997-10-29 Method of constructing tank Pending JPH11131858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31269297A JPH11131858A (en) 1997-10-29 1997-10-29 Method of constructing tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31269297A JPH11131858A (en) 1997-10-29 1997-10-29 Method of constructing tank

Publications (1)

Publication Number Publication Date
JPH11131858A true JPH11131858A (en) 1999-05-18

Family

ID=18032288

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31269297A Pending JPH11131858A (en) 1997-10-29 1997-10-29 Method of constructing tank

Country Status (1)

Country Link
JP (1) JPH11131858A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6505394B2 (en) 1998-09-01 2003-01-14 Sumitomo Special Metals Co., Ltd. Method for cutting rare earth alloy, method for manufacturing rare earth alloy plates and method for manufacturing rare earth alloy magnets using wire saw, and voice coil motor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6505394B2 (en) 1998-09-01 2003-01-14 Sumitomo Special Metals Co., Ltd. Method for cutting rare earth alloy, method for manufacturing rare earth alloy plates and method for manufacturing rare earth alloy magnets using wire saw, and voice coil motor

Similar Documents

Publication Publication Date Title
JPH11131858A (en) Method of constructing tank
JP2000265479A (en) Foundation structure of structure
JP2001049739A (en) Reinforcement structure of column-to-beam connection part
CN219773720U (en) Steel structure column reinforcing node for high-rise or super high-rise transformation
JP3035205U (en) Column / beam joining device
JPH073891A (en) Dome-shell frame
JP3323593B2 (en) Construction method of large storage container
JPH0520802Y2 (en)
JPH0941564A (en) Steel built-up post and post/beam joint structure thereof
JP2888736B2 (en) Roof structure
JPH05156710A (en) Joining construction of column and beam
JPH1120887A (en) Tank
JP2019120054A (en) Truss frame body, truss frame, wooden building using truss frame, and construction method of wooden building
JPH0447516Y2 (en)
JPH041331A (en) Construction of underground structure
JP2000120170A (en) Concrete charged steel pipe pillar
JPH0640488A (en) Roof structure for divided tank and roofing method
KR20210043393A (en) Pillar of building
JPH09137633A (en) Power-transmission line steel tower reconstruction method
SU767311A1 (en) Prefabricated girderless reinforced concrete ceiling
JP5940359B2 (en) Construction method of vertical tank
JPH0518011A (en) Unit housing
JPH0387452A (en) Pedestal part structure made of steel pipe concrete
JPH0367166B2 (en)
JPH04143343A (en) Subunit for building