JPH11117294A - Connecting method of pile - Google Patents

Connecting method of pile

Info

Publication number
JPH11117294A
JPH11117294A JP28520897A JP28520897A JPH11117294A JP H11117294 A JPH11117294 A JP H11117294A JP 28520897 A JP28520897 A JP 28520897A JP 28520897 A JP28520897 A JP 28520897A JP H11117294 A JPH11117294 A JP H11117294A
Authority
JP
Japan
Prior art keywords
pile
steel pipe
piles
joining
knotted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28520897A
Other languages
Japanese (ja)
Inventor
Hideaki Kishida
英明 岸田
Shigeo Kanai
重夫 金井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotop Corp
Original Assignee
Geotop Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotop Corp filed Critical Geotop Corp
Priority to JP28520897A priority Critical patent/JPH11117294A/en
Publication of JPH11117294A publication Critical patent/JPH11117294A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a connecting method of a pile free to speedily construct and economical as well as excellent in workability at a working site and not requiring a special skill. SOLUTION: A section pile 1 as a lower pile is made to sink and provided to specified depth in a drilled hole 10 filled with a hardenable filler 11 of soil mortar, etc. A steel pipe 2 for connection is put on a section part 1b on the top part of the section pile 1 in a sate where an upper end part of the lower pile is in the neighbourhood of a hole opening of the drilled hole 10, a wedge 6 is driven between a barrel part 1a of the section pile 1 and an inner surface of the steel pipe 2, and the section pile 1 and the steel pipe 2 are fixed. Continuously, the lower end barrel part 1a of the section pile 1 as an upper pile is inserted to an upper part of the steel pipe 2. At this time, an adhesive 4 of resin, etc., is applied on a connecting end part of the upper and lower section piles 1, and the upper and lower section piles 1 are temporarily connected to each other in the inside of the steel pipe 2. They are further made to sink and provided to specified depth in a state where the upper and lower section piles 1 are connected to each other. As the hardenable filler 11 flown in a clearance of the steel pipe 2 and the section pile 1 is hardened, the upper and lower section piles 1 and the steel pipe 2 are integrated, and necessary rigidity is secured.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本願発明は、埋込み杭を構成
する既成杭の上下方向の接合方法に関するものである。
本願発明では、下杭として節杭を用い、上杭について
は、下杭と同じ節杭の他、円柱状のコンクリート杭、鋼
管コンクリート複合杭(SC杭)、鋼管杭等でもよい。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for vertically joining existing piles constituting an embedded pile.
In the present invention, a knotted pile is used as the lower pile, and the upper pile may be a columnar concrete pile, a steel pipe / concrete composite pile (SC pile), a steel pipe pile, or the like, in addition to the same knotted pile as the lower pile.

【0002】[0002]

【従来の技術】従来、節杭どうしを上下方向に継ぎ足す
場合、図5に示すように、杭端部に予め溶接用端板を取
り付けておき、上下の節杭1の端板3どうしを現場突き
合わせ溶接により接合するのが一般的である。
2. Description of the Related Art Conventionally, when adding knots in the vertical direction, as shown in FIG. 5, welding end plates are previously attached to the ends of the piles, and the end plates 3 of the knot piles 1 are joined together. It is common to join by field butt welding.

【0003】なお、図5は、節杭1が埋め込み杭として
施工された場合であり、掘削孔10にソイルモルタルあ
るいはセメントミルク等の硬化性充填材11が充填され
ており、その中に節杭1が沈設され、硬化性充填材11
の硬化により周面支持力の大きな基礎杭を形成してい
る。
FIG. 5 shows a case where the knotted pile 1 is constructed as a buried pile, in which a drilling hole 10 is filled with a hardening filler 11 such as soil mortar or cement milk. 1 is deposited and the curable filler 11
The foundation pile with large bearing capacity is formed by hardening.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記従来の接
合方法には以下のような課題がある。
However, the above-mentioned conventional joining method has the following problems.

【0005】突き合わせ溶接のため、現場で精度の高
い施工が求められる。
For butt welding, high-precision construction is required on site.

【0006】溶接は小口径杭の場合、特に熟練が必要
であり、時間がかかる。
[0006] In the case of small-diameter piles, welding requires special skill and is time-consuming.

【0007】溶接による施工能率の低下で、コスト増
が避けられない。
[0007] Due to the reduction in the work efficiency due to welding, an increase in cost is inevitable.

【0008】上記課題は、節杭に上述した他の丸杭等を
継ぎ足す場合も同様である。
[0008] The above-mentioned problem is the same when the above-mentioned other round pile or the like is added to the node pile.

【0009】本願発明は上述のような従来技術における
課題の解決を図ったものであり、現場における作業性に
優れ、特殊な技能を要することなく、迅速な施工が可能
で経済的な杭の接合方法を提供することを目的としてい
る。
The present invention has been made to solve the above-mentioned problems in the prior art, and is excellent in workability on site, can be rapidly constructed without special skills, and can be economically connected with piles. It is intended to provide a way.

【0010】[0010]

【課題を解決するための手段】本願の請求項1に係る発
明は、埋込み杭として掘削孔内に施工される節杭からな
る下杭と少なくとも下端部の断面外形が円形である上杭
の接合方法であって、上下の杭の接合端部外周に、下杭
としての節杭の胴部の外径より大きくかつ節部の外径よ
り小さい内径を有する接合用の鋼管を、節杭の上端胴部
およびこれに接続される上杭下端に被さるように設置
し、この鋼管内面と上下の杭の接合端部との間にスペー
サーを介在させ、掘削孔内に充填された硬化性充填材を
スペーサーによって保持された上下の杭の接合端部と鋼
管との間に浸入させ、鋼管内外における硬化性充填材の
硬化により上下の杭どうしを接合することを特徴とする
ものである。
The invention according to claim 1 of the present application is a joint between a lower pile composed of a knotted pile constructed as an embedded pile in an excavation hole and an upper pile having at least a lower end having a circular cross section. In the method, a steel pipe for joining having an inner diameter larger than the outer diameter of the trunk of the knotted pile as the lower pile and smaller than the outer diameter of the knotted part is provided on the outer periphery of the joint end of the upper and lower piles, It is installed so as to cover the trunk and the lower end of the upper pile connected to it, a spacer is interposed between the inner surface of this steel pipe and the joint end of the upper and lower piles, and the hardening filler filled in the drill hole is filled. It is characterized in that it penetrates between the joint ends of the upper and lower piles held by the spacers and the steel pipe, and joins the upper and lower piles by hardening of the hardening filler inside and outside the steel pipe.

【0011】なお、接合用の鋼管を設置する際、上下の
杭どうしの接合端部を接着剤で仮付けしておくことによ
り(請求項2に対応)、鋼管およびスペーサーを用いた
接合作業をスムーズに行うことができる。また、接合強
度として接着剤の接着力を加えることができる。なお、
仮付けの方法としては、接着剤に限らず、接着テープを
巻くなど、種々の方法が考えられる。
In addition, when installing the steel pipe for joining, by temporarily attaching the joining ends of the upper and lower piles with an adhesive (corresponding to claim 2), the joining operation using the steel pipe and the spacer can be performed. It can be done smoothly. Further, the adhesive strength of the adhesive can be added as the bonding strength. In addition,
The method of the temporary attachment is not limited to the adhesive, and various methods such as winding an adhesive tape can be considered.

【0012】このように、ほぼ、節部外径>鋼管径>胴
部外径といった関係の下、接合用の鋼管を下杭の最上部
の節部と上杭の最下部との間に設置し、杭周を固める硬
化性充填材を接合部の鋼管の内側にも導入することで、
上下の杭を一体化させるものである。
As described above, the joining steel pipe is installed between the uppermost node of the lower pile and the lowermost part of the upper pile under the relationship of approximately the node outer diameter> the steel pipe diameter> the trunk outer diameter. By introducing a hardening filler that solidifies the pile circumference to the inside of the steel pipe at the joint,
The upper and lower piles are integrated.

【0013】埋込み杭は、基本的には既製杭をほぼその
全長に等しい深さまで掘削した地盤中に埋め込むことに
よって設けられるものであり、掘削時に掘削土と混合し
た硬化性充填材(ソイルモルタル等)、あるいはセメン
トミルク等単独の硬化性充填材の中に、下杭を沈設して
行き、上杭を接続してさらに沈設して行く。なお、場合
によっては、予め下杭と上杭を接続した後に沈設するこ
とも考えられる。
The embedding pile is basically provided by embedding a ready-made pile in a ground excavated to a depth substantially equal to the entire length thereof, and a hardening filler (such as soil mortar or the like) mixed with excavated soil at the time of excavation. ), Or in a single hardening filler such as cement milk, the lower pile is sunk, and the upper stake is connected and further sunk. In some cases, it is conceivable that the lower pile and the upper pile are connected in advance and then laid.

【0014】請求項3〜5は、それぞれスペーサーの形
態の一態様を限定したものである。
Claims 3 to 5 each limit one aspect of the form of the spacer.

【0015】請求項3は、スペーサーが節杭接合端部と
鋼管の内面との間に複数設置されたくさび状治具の場合
であり、このくさび状治具を現場で打ち込むことによ
り、間隔をほぼ一定に保った状態で、上下の杭どうしを
接続することができる。
A third aspect of the present invention is a wedge-shaped jig in which a plurality of spacers are provided between the joint end of the knotted pile and the inner surface of the steel pipe. The upper and lower stakes can be connected while keeping them almost constant.

【0016】請求項4は、スペーサーが節杭接合端部の
胴部外面または接合用の鋼管の内面より複数突出する突
起物である場合を限定したものである。
Claim 4 limits the case where the spacer is a plurality of protrusions projecting from the outer surface of the trunk at the joint end of the knotted pile or the inner surface of the steel pipe for joining.

【0017】請求項5は、スペーサーが接合用の鋼管の
管壁を貫通して複数設けられたねじ状のガイドピンの場
合であり、鋼管内側への貫入量をねじ式に調整できるよ
うになっている。
A fifth aspect is a case where the spacer is a plurality of screw-shaped guide pins provided through the pipe wall of the steel pipe for joining, and the amount of penetration into the inside of the steel pipe can be adjusted in a threaded manner. ing.

【0018】なお、スペーサーの態様は、これらに限定
されるものではなく、例えば、この他、形状記憶合金を
くさび的に用い、その形状記憶特性を利用したスペーサ
ーの使用等が考えられる。
The mode of the spacer is not limited to these. For example, a spacer using a shape memory alloy in a wedge shape and utilizing the shape memory characteristic can be considered.

【0019】本願の請求項6に係る発明は、埋込み杭と
して掘削孔内に施工される節杭からなる下杭と少なくと
も下端部の断面外形が円形である上杭の接合方法であっ
て、上下の杭の接合端部外周に、下杭としての節杭の胴
部の外径よりわずかに大きい内径を有する鋼管を、節杭
の上端胴部および上杭の下端に被さるように設置し、掘
削孔内に充填された硬化性充填材の硬化により上下の杭
を接合することを特徴とする節杭と丸杭の接合するもの
である。
The invention according to claim 6 of the present application is a method for joining a lower pile composed of a knotted pile constructed as an embedded pile in an excavation hole and an upper pile having at least a lower end having a circular cross section, A steel pipe with an inside diameter slightly larger than the outside diameter of the body of the knotted pile as the lower pile is installed on the outer periphery of the joint end of the pile to cover the upper body of the knotted pile and the lower end of the upper pile, and excavated. A joint between a knotted pile and a round pile, wherein the upper and lower piles are joined by hardening of a curable filler filled in the hole.

【0020】すなわち、上述した請求項1におけるスペ
ーサーを用いず、接合用の鋼管の内径を下杭としての節
杭の胴部の外径よりわずかに大きい程度に設定すること
で、係合状態に接合し、接合部周囲の硬化性充填材の硬
化により上下の杭および鋼管を一体化させるものであ
る。
That is, the inner diameter of the joining steel pipe is set to be slightly larger than the outer diameter of the trunk of the knotted pile as the lower pile without using the spacer in the above-mentioned claim 1, so that the engagement state is achieved. The upper and lower piles and the steel pipe are integrated by hardening the hardening filler material around the joint.

【0021】なお、以上の各請求項に係る接合方法にお
いて、上杭は、下杭としての節杭と同径の節杭でも(請
求項7に対応)、あるいは円柱状のコンクリート杭、鋼
管コンクリート複合杭、鋼管杭等の丸杭でも(請求項8
に対応)、少なくとも下端部の断面外形が円形であれば
よい。
In the joining method according to each of the above claims, the upper pile may be a node pile having the same diameter as the node pile as the lower pile (corresponding to claim 7), or a columnar concrete pile, steel pipe concrete Even round piles such as composite piles, steel pipe piles, etc.
It suffices that at least the cross-sectional shape of the lower end is circular.

【0022】[0022]

【実施の形態】図1は本願発明の一実施形態を示したも
ので、スペーサーとしてくさび6を用いた場合である。
FIG. 1 shows an embodiment of the present invention, in which a wedge 6 is used as a spacer.

【0023】代表的な施工手順としては、まず、ソイル
モルタルあるいはセメントミルク等の硬化性充填材11
が充填されている掘削孔10内に下杭としての節杭1を
所定深さまで沈設する。
As a typical construction procedure, first, a hardening filler 11 such as soil mortar or cement milk is used.
A knotted pile 1 as a lower pile is sunk to a predetermined depth in an excavation hole 10 filled with.

【0024】下杭の上端部が掘削孔10の孔口付近にあ
る状態で、節杭1の最上部の節部1b上に接合用の鋼管
2を被せ、節杭1の上端の胴部1aと鋼管2の内面との
間にくさび6(4〜6箇所)を打ち込むことにより、節
杭1と鋼管2を固定する。
In a state where the upper end of the lower pile is near the opening of the excavation hole 10, the joining steel pipe 2 is put on the uppermost joint 1 b of the joint pile 1, and the trunk 1 a of the upper end of the joint pile 1 is provided. By inserting a wedge 6 (4 to 6 places) between the steel pipe 2 and the inner surface of the steel pipe 2, the knotted pile 1 and the steel pipe 2 are fixed.

【0025】鋼管2としては、内径が節杭1の胴部1a
の外径より大きい、長さ数十cmから1m程度の鋼管を
用いる。
As the steel pipe 2, the inside diameter of the trunk 1 a of the nodal pile 1 is used.
Use a steel pipe with a length of several tens of cm to about 1 m, which is larger than the outer diameter of

【0026】続いて、鋼管2の上部に上杭として、この
例では下杭と同じ節杭1の下端胴部1aを挿入する。な
お、このとき、上下の節杭1の接合端部の一方または両
方に樹脂系等の接着剤4を塗布しておき、上下の節杭1
どうしを鋼管2内で仮付けすることで、作業性を向上さ
せることができる。
Subsequently, as the upper pile, the lower body 1a of the knot 1 which is the same as the lower pile in this example is inserted into the upper part of the steel pipe 2. At this time, one or both of the joint ends of the upper and lower knots 1 are coated with an adhesive 4 such as a resin, and the upper and lower knots 1 are joined.
The workability can be improved by temporarily attaching the members in the steel pipe 2.

【0027】このようにして、上下の節杭1を接続した
状態で、さらに所定深さまで沈設して行き、その際、硬
化性充填材11が、鋼管2と節杭1の隙間に流入し、硬
化性充填材11の固化により、上下の節杭1と鋼管2が
一体化し、必要な剛性が確保される。
In this way, with the upper and lower knots 1 connected to each other, the knots 1 are further sunk to a predetermined depth. At this time, the hardening filler 11 flows into the gap between the steel pipe 2 and the knots 1, By solidification of the hardening filler 11, the upper and lower knots 1 and the steel pipe 2 are integrated, and required rigidity is secured.

【0028】なお、沈設および接合の手順としては、上
述のように途中まで沈設した下杭としての節杭1の上部
に接合用の鋼管2を被せ、上杭としての節杭1を接続し
て、さらに所定深さまで沈設するといった手順が一般的
であるが、先に上下の節杭1どうしを鋼管2や必要に応
じ接着剤4等を用いて接続した後、沈設することも可能
である。
The procedure of laying and joining is as follows. A steel pipe 2 for joining is put on an upper part of a knot pile 1 as a lower pile which has been sunk halfway as described above, and a knot pile 1 as an upper pile is connected. In general, the procedure of submerging to a predetermined depth is also common. However, it is also possible to connect the upper and lower knots 1 using the steel pipe 2 or the adhesive 4 if necessary, and then to submerge.

【0029】図2は本願発明の他の実施形態を示したも
ので、スペーサーとしてガイドピン5を用いた場合であ
る。この例においても、上杭として、下杭と同じ節杭1
を用いている。
FIG. 2 shows another embodiment of the present invention, in which a guide pin 5 is used as a spacer. Also in this example, the same pile 1 as the lower pile is used as the upper pile.
Is used.

【0030】ガイドピン5は、予め鋼管2の下部および
上部に、その管壁を貫通してそれぞれ2〜4箇所設けら
れており、管壁に雌ねじを切っておき、ねじ式に回転さ
せることで、その貫入量を調整することができる。
The guide pins 5 are provided in advance at lower and upper portions of the steel pipe 2 at two to four places, respectively, penetrating the pipe wall. , The amount of penetration can be adjusted.

【0031】下杭および上杭としての節杭1どうしを接
続する際には、ガイドピン5を緩めた状態(貫入量を少
なくした状態)で、下側の節杭1の最上部の節部1b上
に、鋼管2の下端を被せ、ガイドピン5をねじ込むこと
により節杭1と鋼管2を固定する。その際、各ガイドピ
ン5の貫入量を調整することにより、鋼管2の位置決め
を行うことができる。
When connecting the lower pile 1 and the upper pile 1 to each other, with the guide pin 5 loosened (the amount of penetration is reduced), the uppermost node of the lower pile 1 is connected. The lower end of the steel pipe 2 is put on 1b, and the pin 1 and the steel pipe 2 are fixed by screwing the guide pins 5. At that time, by adjusting the amount of penetration of each guide pin 5, the steel pipe 2 can be positioned.

【0032】続いて、上側の節杭1の下端胴部1aを鋼
管2の内側に挿入し、同様にガイドピン5をねじ込むこ
とにより上側の節杭1と鋼管2を固定する。なお、この
とき、節杭1の接合端部に樹脂系の接着剤4を塗布して
おくことで、上下の節杭1どうしを仮付けした状態でよ
りスムーズに接合作業を行うことができる。
Subsequently, the lower end body 1a of the upper knot 1 is inserted into the inside of the steel pipe 2, and the guide pin 5 is screwed in the same manner to fix the upper knot 1 and the steel pipe 2. At this time, by applying the resin-based adhesive 4 to the joining end of the knot pile 1, the joining work can be performed more smoothly with the upper and lower knot piles 1 temporarily attached.

【0033】上下の節杭1を接続した状態で、ソイルモ
ルタルあるいはセメントミルク等の硬化性充填材11が
充填されている掘削孔10内で、埋め込み杭としての沈
設を行うことにより、ガイドピン5を介在させた節杭1
と鋼管2の接合部内の空間に硬化性充填材11が浸入
し、沈設完了後、硬化性充填材11が硬化することによ
り、上下の節杭1の接合が完了する。
While the upper and lower knots 1 are connected, the guide pins 5 are laid as buried piles in the excavation holes 10 filled with the hardening filler 11 such as soil mortar or cement milk. Knotted pile 1
The hardening filler 11 enters the space in the joint portion between the steel pipe 2 and the steel pipe 2, and after the sedimentation is completed, the hardening filler 11 hardens, whereby the joining of the upper and lower knots 1 is completed.

【0034】図3は本願発明のさらに他の実施形態を示
したもので、図1の場合と同様、スペーサーとしてくさ
び6を用いた場合であり、この例では、上杭として、節
杭1の代わりに鋼管コンクリート複合杭(SC杭)21
を用いている。
FIG. 3 shows still another embodiment of the present invention, in which a wedge 6 is used as a spacer similarly to the case of FIG. 1, and in this example, a knotted pile 1 is used as an upper pile. Instead, steel-pipe concrete composite pile (SC pile) 21
Is used.

【0035】接合手順、方法は、図1の場合と同様であ
り、その他、上杭として、既成コンクリート杭や鋼管杭
等を用いる場合も同様に考えることができる。
The joining procedure and method are the same as in the case of FIG. 1. In addition, the case where an existing concrete pile, a steel pipe pile, or the like is used as the upper pile can be similarly considered.

【0036】また、スペーサーとして、図2のガイドピ
ン5、突起物その他を適用することもできる。
Further, the guide pins 5, protrusions and the like shown in FIG. 2 can be applied as spacers.

【0037】図4は本願発明のさらに他の実施形態とし
てスペーサーを必要としない例を示したものであり、こ
の例では、上杭として節杭1を用いている(ただし、他
の丸杭等、あるいは少なくとも下端の断面外形が円形の
杭の場合も同様に考えることができる)。
FIG. 4 shows another embodiment of the present invention which does not require a spacer. In this embodiment, a knot pile 1 is used as an upper pile (however, another round pile or the like). Or, at least, a pile having a circular cross section at the lower end can be similarly considered).

【0038】すなわち、図4の例は、請求項6、7に対
応するものであり、接合用の鋼管2として、節杭1の胴
部1aの外径よりわずかに大きい内径を有する鋼管を用
いる。
That is, the example shown in FIG. 4 corresponds to claims 6 and 7, in which a steel pipe having an inner diameter slightly larger than the outer diameter of the trunk 1a of the knotted pile 1 is used as the steel pipe 2 for joining. .

【0039】この鋼管2を、掘削孔10内に沈設した下
杭としての節杭1の最上部の節部1bに被せ、続いて、
鋼管2の上部に上杭としての節杭1を挿入し、さらに所
定深さまで沈設して行く。
The steel pipe 2 is placed on the uppermost node 1b of the node pile 1 as a lower pile sunk in the borehole 10.
The knotted pile 1 as an upper pile is inserted into the upper part of the steel pipe 2, and is further sunk to a predetermined depth.

【0040】その後、掘削孔10内の硬化性充填材11
の固化により、上下の節杭1と鋼管2が一体化し、必要
な剛性が確保される。
Thereafter, the hardening filler 11 in the borehole 10 is
By solidification, the upper and lower knots 1 and the steel pipe 2 are integrated, and required rigidity is secured.

【0041】なお、この例のように上下とも節杭1の場
合は、節部1bがあることで、接合用の鋼管2が大きく
ずれるおそれはないが、必要に応じ、何らかのずれ止め
手段を施すことも考えられる。
In the case of the knotted piles 1 at both the upper and lower sides as in this example, there is no possibility that the joining steel pipe 2 is largely displaced due to the presence of the knotted portions 1b. It is also possible.

【0042】また、上杭が節杭以外の場合、例えば鋼管
杭やSC杭の場合には、接合用の鋼管2の内径をできる
だけ上杭の外径に近づけることである程度ずれを抑える
ことができるが、簡単なストッパーを取り付けたり、接
着剤を注入する等して積極的にずれを抑えることも可能
である。
When the upper pile is not a node pile, for example, a steel pipe pile or an SC pile, the displacement can be suppressed to some extent by making the inner diameter of the joining steel pipe 2 as close as possible to the outer diameter of the upper pile. However, it is also possible to positively suppress the displacement by attaching a simple stopper or injecting an adhesive.

【0043】[0043]

【発明の効果】 上下の節杭どうしを、溶接によらず、接着剤や接続用
の鋼管、スペーサー等であるいはスペーサーも用いず接
続できるため、現場での施工が容易である。
[Effects of the Invention] Since the upper and lower knots can be connected to each other by an adhesive, a steel pipe for connection, a spacer, or the like without using a welder or by using a spacer, construction on site is easy.

【0044】接合に特殊な技能が求められず、短時間
で接合できるため、施工コストの大幅低減が可能であ
る。
Since no special skills are required for the joining and the joining can be performed in a short time, the construction cost can be greatly reduced.

【0045】スペーサーとして、ねじ状のガイドピ
ン、くさび状治具、あるいは形状記憶合金等を用いるこ
とで、スペーサー自体による接合部の拘束効果や位置決
め効果も得られる。
By using a screw-shaped guide pin, a wedge-shaped jig, a shape memory alloy, or the like as the spacer, the effect of restraining or positioning the joint by the spacer itself can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本願発明の一実施形態を示したもので、(a) は
鉛直断面図、(b) は水平断面図である。
FIG. 1 shows an embodiment of the present invention, in which (a) is a vertical sectional view and (b) is a horizontal sectional view.

【図2】本願発明の他の実施形態を示したもので、(a)
は鉛直断面図、(b)は水平断面図である。
FIG. 2 shows another embodiment of the present invention, in which (a)
Is a vertical sectional view, and (b) is a horizontal sectional view.

【図3】本願発明のさらに他の実施形態を示したもの
で、(a) は鉛直断面図、(b) は水平断面図である。
FIGS. 3A and 3B show still another embodiment of the present invention, wherein FIG. 3A is a vertical sectional view and FIG. 3B is a horizontal sectional view.

【図4】本願発明のさらに他の実施形態を示したもの
で、(a) は鉛直断面図、(b) は水平断面図である。
FIGS. 4A and 4B show still another embodiment of the present invention, wherein FIG. 4A is a vertical sectional view and FIG. 4B is a horizontal sectional view.

【図5】従来の現場突き合わせ溶接による節杭どうしの
接合方法を示す断面図である。
FIG. 5 is a cross-sectional view showing a conventional method of joining knotted piles by butt welding on site.

【符号の説明】[Explanation of symbols]

1…節杭、1a…胴部、1b…節部、2…鋼管、3…端
板、4…接着剤、5…ガイドピン、6…くさび、10…
掘削孔、11…硬化性充填材、21…鋼管コンクリート
複合杭
DESCRIPTION OF SYMBOLS 1 ... Knotted pile, 1a ... Body, 1b ... Knot, 2 ... Steel pipe, 3 ... End plate, 4 ... Adhesive, 5 ... Guide pin, 6 ... Wedge, 10 ...
Drilling hole, 11: hardening filler, 21: steel pipe concrete composite pile

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 埋込み杭として掘削孔内に施工される節
杭からなる下杭と少なくとも下端部の断面外形が円形で
ある上杭の接合方法であって、上下の杭の接合端部外周
に、下杭としての節杭の胴部の外径より大きくかつ節部
の外径より小さい内径を有する鋼管を、前記下杭の上端
胴部および上杭の下端に被さるように設置し、前記鋼管
内面と上下の杭の接合端部との間にスペーサーを介在さ
せ、掘削孔内に充填された硬化性充填材を前記スペーサ
ーによって保持された上下の杭の接合端部と鋼管との間
に浸入させ、鋼管内外における硬化性充填材の硬化によ
り上下の杭を接合することを特徴とする杭の接合方法。
1. A method of joining a lower pile consisting of a knotted pile constructed as a buried pile in an excavation hole and an upper pile having at least a lower end having a circular cross-sectional shape, wherein the upper pile has upper and lower piles having a circular outer periphery. A steel pipe having an inner diameter greater than the outer diameter of the trunk of the knotted pile as the lower pile and having an inner diameter smaller than the outer diameter of the knotted part is installed so as to cover the upper end trunk of the lower pile and the lower end of the upper pile, A spacer is interposed between the inner surface and the joint end of the upper and lower piles, and the hardening filler filled in the drill hole penetrates between the joint end of the upper and lower piles held by the spacer and the steel pipe. And joining the upper and lower piles by hardening the hardening filler inside and outside the steel pipe.
【請求項2】 前記鋼管を設置する際、上下の杭どうし
の接合端部を接着剤で仮付けする請求項1記載の杭の接
合方法。
2. The method for joining piles according to claim 1, wherein when installing the steel pipe, joining ends of upper and lower piles are temporarily attached with an adhesive.
【請求項3】 前記スペーサーは上下の杭どうしの接合
端部と鋼管との間に複数設置されたくさび状治具である
請求項1または2記載の杭の接合方法。
3. The method for joining piles according to claim 1, wherein the spacer is a plurality of wedge-shaped jigs provided between a joint end of the upper and lower piles and a steel pipe.
【請求項4】 前記スペーサーは下杭としての節杭接合
端部の胴部外面および上杭の接合端部外面または前記鋼
管の内面より複数突出する突起物である請求項1または
2記載の杭の接合方法。
4. The pile according to claim 1, wherein the spacer is a plurality of protrusions protruding from the outer surface of the trunk portion at the joint end of the knot pile as the lower pile, the outer surface of the joint end of the upper pile, or the inner surface of the steel pipe. Joining method.
【請求項5】 前記スペーサーは前記鋼管の管壁を貫通
して複数設けられたねじ状のガイドピンである請求項1
または2記載の杭の接合方法。
5. The spacer according to claim 1, wherein the spacer is a plurality of screw-shaped guide pins provided through the pipe wall of the steel pipe.
Or the method of joining piles according to 2.
【請求項6】 埋込み杭として掘削孔内に施工される節
杭からなる下杭と少なくとも下端部の断面外形が円形で
ある上杭の接合方法であって、上下の杭の接合端部外周
に、下杭としての節杭の胴部の外径よりわずかに大きい
内径を有する鋼管を、前記節杭の上端胴部および上杭の
下端に被さるように設置し、掘削孔内に充填された硬化
性充填材の硬化により上下の杭を接合することを特徴と
する杭の接合方法。
6. A method for joining a lower pile composed of a knotted pile constructed as a buried pile in an excavation hole and an upper pile having at least a lower end having a circular cross-sectional shape, wherein the upper pile is connected to an outer periphery of a joint end of the upper and lower piles. A steel pipe having an inner diameter slightly larger than the outer diameter of the body of the knotted pile as the lower pile is installed so as to cover the upper torso of the knotted pile and the lower end of the upper pile, and the hardening filled in the excavation hole is provided. A method of joining piles, wherein upper and lower piles are joined by hardening of a conductive filler.
【請求項7】 前記上杭が、下杭としての節杭と同径の
節杭である請求項1〜6のいずれか1項に記載の杭の接
合方法。
7. The method of joining piles according to claim 1, wherein the upper pile is a node pile having the same diameter as a node pile as a lower pile.
【請求項8】 前記上杭が、円柱状のコンクリート杭、
鋼管コンクリート杭または鋼管杭である請求項1〜6の
いずれか1項に記載の杭の接合方法。
8. The method according to claim 8, wherein the upper pile is a cylindrical concrete pile,
The pile joining method according to any one of claims 1 to 6, which is a steel pipe concrete pile or a steel pipe pile.
JP28520897A 1997-10-17 1997-10-17 Connecting method of pile Pending JPH11117294A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28520897A JPH11117294A (en) 1997-10-17 1997-10-17 Connecting method of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28520897A JPH11117294A (en) 1997-10-17 1997-10-17 Connecting method of pile

Publications (1)

Publication Number Publication Date
JPH11117294A true JPH11117294A (en) 1999-04-27

Family

ID=17688510

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28520897A Pending JPH11117294A (en) 1997-10-17 1997-10-17 Connecting method of pile

Country Status (1)

Country Link
JP (1) JPH11117294A (en)

Similar Documents

Publication Publication Date Title
JP6702128B2 (en) Foundation structure, pile head structure of steel pipe pile, and construction method of foundation structure
JP4185870B2 (en) Pile head joint structure and pile construction method
JP2003232033A (en) Foundation pile structure
JPH11181790A (en) Execution method of building foundation
CN108678042A (en) Miniature steel pipe pile for foundation stabilization and the method using its progress foundation stabilization
JP2003119775A (en) Construction of foundation pile
JP5456627B2 (en) Connection structure and method of connection between pile and steel column
JP3236541B2 (en) Joint method between knotted pile and steel pipe pile
JPH1054031A (en) Pre-stress concrete pile and its positioning method of pile
JP4724879B2 (en) Foundation pile structure
JP6757003B2 (en) Construction method of double pipe pile and double pipe pile
JPH11117294A (en) Connecting method of pile
JPH09111758A (en) Cast-in-place concrete pile and construction method thereof
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
JP4503387B2 (en) Pile head joint structure and construction method
JP3338387B2 (en) Joint of foundation pile
JP2002138486A (en) Head rigidly-coupling member for landslide suppressing combined pile group composed of steel pipe
JP3681270B2 (en) Joint method of joint pile and SC pile
JP3115809U (en) Building foundation pile
JP4473400B2 (en) Foundation of construction and construction method
JPS61216914A (en) Method of fitting steel tubular pile with diagonal member or beam
KR20130066300A (en) The connection structure between high-strength and large size phc pile and steel beam and top down method using it
JPH11256569A (en) Foundation pile structure and composite pile
JPH0612036Y2 (en) Fixing material for earth anchor
JP2005171480A (en) Joint structure of pile head part and method of constructing pile body

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20011002