Method of controlling data concerning construction waste disposal

Info

Publication number
JPH1110127A
JPH1110127A JP16131297A JP16131297A JPH1110127A JP H1110127 A JPH1110127 A JP H1110127A JP 16131297 A JP16131297 A JP 16131297A JP 16131297 A JP16131297 A JP 16131297A JP H1110127 A JPH1110127 A JP H1110127A
Authority
JP
Japan
Prior art keywords
slip
disposal
construction waste
company
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16131297A
Other languages
Japanese (ja)
Inventor
Yutaka Beniya
裕 紅谷
Shinsuke Kashiwagi
伸介 柏木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP16131297A priority Critical patent/JPH1110127A/en
Publication of JPH1110127A publication Critical patent/JPH1110127A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To graspe accurately the issue and return states of construction waste slip. SOLUTION: At least four divisions of completion of input into a computer, noncompletion of input, return of nonuse, and extinction are determined as a slip division of a construction waste slip. When the slip is issued by a discharge enterpriser, a slip number is given to each slip to be stored in the computer, and the noncompletion of input is stored as the slip division. After return of the slip from a collection and transport enterpriser, for a used slip, the disposal amount of each class of the construction waste is inputted into the computer to be stored, and the slip division is changed to the completion of input. For a nonuse slip, the slip division is changed to the return of nonuse. For an extinct slip, the slip division is changed to the extinction.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建設廃棄物の種類及び
処分量等を記載する建設廃棄物伝票(マニフェスト)の
発行及び返却状況等に関するデータをコンピュータに記
憶させて管理するようにした建設廃棄物処理に関するデ
ータ管理方法に係るものである。
BACKGROUND OF THE INVENTION The present invention relates to construction in which data relating to the issuance and return of construction waste slips (manifests) describing the types and disposal amounts of construction waste are stored in a computer and managed. It relates to a data management method for waste disposal.

【0002】[0002]

【従来の技術】産業廃棄物の一種である建設廃棄物は、
汚でい、廃プラスチック類、木くず、金属くず、ガラス
及び陶磁器くず、コンクリート破片等の6種類に分類さ
れる。このような建設廃棄物は、建物の新築、解体等を
行う工事現場で収集運搬業者が収集して処分業者の有す
る処分施設へと運搬し、処分業者が焼却、埋め立て等の
処理を行うのが通例である。
2. Description of the Related Art Construction waste, which is a type of industrial waste, is:
It is classified into six types: dirty, waste plastics, wood chips, metal chips, glass and ceramics chips, concrete debris, etc. Collecting and transporting such construction waste at construction sites where new construction and demolition of buildings are carried out, transports it to disposal facilities owned by the disposal company, and the disposal company performs incineration, landfill, etc. It is customary.

【0003】そして、建設廃棄物の不法投棄等を防止し
て各業者間での建設廃棄物の受渡し状況を正確に把握す
るため、建設廃棄物の種類及び処分量等のデータの記入
欄を有する複数枚綴りの建設廃棄物伝票(以下、単に伝
票という)を建設廃棄物と共に排出事業者から収集運搬
業者、処分業者へと順次受け渡して各業者が各々上記伝
票を保管するとともに、処分完了後に処分量等の記入済
の伝票を排出事業者に返却することが法令で義務付けら
れている。
In order to prevent illegal dumping of construction waste and to accurately grasp the status of delivery of construction waste between contractors, there is a column for entering data such as the type of construction waste and the amount of disposal. A multi-spelled construction waste slip (hereinafter, simply referred to as a slip) is sequentially transferred from the discharging company to the collection / transportation company and the disposal company together with the construction waste, and each company stores the slip and disposes of it after the disposal is completed. It is required by law to return the completed slips to the discharger.

【0004】上記伝票は、新築工事であれば、排出事業
者が定期的(例えば、毎月1回)に所定枚数(ここで
は、複数枚綴りの伝票全体を1枚と数えている)を収集
運搬業者に交付し、解体工事であれば、排出事業者が予
め所定枚数を収集運搬業者に交付するのが通例であり、
交付時には、通常、排出事業者が伝票に排出事業者名、
工事現場名、収集運搬業者名、処分業者名等の基本的な
事項を記入しておくものである。そして、収集運搬業者
は工事現場から処分施設へ建設廃棄物を運搬する度に1
枚の伝票を使用し、当該伝票に必要により建設廃棄物の
種類や収集量等のデータを記入するとともに、処分業者
は上記伝票に建設廃棄物を処分した日付等を記入し、収
集運搬業者を介して排出事業者に返却する。
[0004] In the case of a new construction, the discharge company periodically (for example, once a month) collects and transports a predetermined number of sheets (here, a plurality of slips are counted as one sheet). In the case of dismantling work, it is customary for the discharge company to issue a predetermined number of sheets to collection and transportation companies in advance,
At the time of issuance, the emission company usually includes the name of the emission company,
Basic information such as the construction site name, collection / transportation company name, disposal company name, etc. is entered. Each time the collection and transportation company transports construction waste from the construction site to the disposal facility,
Using the slips, enter data such as the type of construction waste and the amount of collection as necessary, and the disposal company fills in the slip with the date of disposal of the construction waste, Returned to the emission business via

【0005】[0005]

【発明が解決しようとする課題】ところで、上記伝票
は、通常、排出事業者が余裕をみて、予想される使用枚
数より多めに収集運搬業者に交付しているのが実状であ
るが、その場合、余剰の伝票が収集運搬業者等によって
悪用される不具合が生じ得る。係る不具合を回避するた
めには、未使用の伝票を収集運搬業者から排出事業者に
返却させるのが好適であるが、収集運搬業者が伝票の一
部を紛失または破損したり、返却後に排出事業者が伝票
を紛失したような場合、伝票の発行及び返却状況が把握
できなくなり、ひいては、使用済の伝票と未使用の伝票
との区別ができなくなって、建設廃棄物の処分量が正確
に把握できなくなる問題があった。
In the meantime, the above-mentioned slip is usually given to a collection and transportation company by the discharge company with a margin and more than the expected number of sheets to be used. There is a possibility that a surplus slip is misused by a collection and transportation company. In order to avoid such a problem, it is preferable to return unused slips from the collection and transportation company to the discharge company.However, the collection and transportation company may lose or damage some of the slips, In the event that a worker loses a slip, it is no longer possible to determine the status of issuance and return of the slip, and as a result, it is no longer possible to distinguish between used and unused slips, and the amount of construction waste disposal can be accurately determined. There was a problem that could not be done.

【0006】[0006]

【課題を解決するための手段】本発明は、上記の課題を
解決し、建設廃棄物伝票の発行及び返却状況を正確に把
握し、建設廃棄物の処分量を正確に把握することのでき
る建設廃棄物処理に関するデータ管理方法を提供するこ
とを目的とする。そのため、請求項1の建設廃棄物処理
に関するデータ管理方法は、建設廃棄物を汚でい、廃プ
ラスチック類、木くず、金属くず、ガラス及び陶磁器く
ず、コンクリート破片等を含む少なくとも6種類に分類
し、建設廃棄物の種類及び処分量等の記載欄を有する複
数枚綴りの伝票を建設廃棄物と共に排出事業者から順次
収集運搬業者、処分業者へと受け渡し、処分完了後に処
分量の記載済の伝票を排出事業者に返却するようにした
建設廃棄物処理に関するデータ管理方法において、伝票
区分としてコンピュータへの入力完了、入力未完了、未
使用返却、滅失の少なくとも4つの区分を定めておき、
排出事業者による上記伝票の発行時に各伝票に伝票番号
を付与してこの伝票番号をコンピュータに記憶させると
ともに伝票区分として入力未完了を記憶させ、上記伝票
返却後に使用済の伝票については建設廃棄物の種類別の
処分量を上記コンピュータに入力して記憶させるととも
に伝票区分を入力完了に変更し、未使用の伝票について
は伝票区分を未使用返却に変更し、滅失した伝票につい
ては伝票区分を滅失に変更することを特徴とするもので
ある。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems and provides a construction capable of accurately grasping the status of issuance and return of construction waste slips and accurately determining the disposal amount of construction waste. An object of the present invention is to provide a data management method for waste treatment. Therefore, the data management method for construction waste treatment according to claim 1 classifies construction waste into at least six types including waste plastics, wood chips, metal chips, glass and ceramics chips, concrete fragments, and the like, A multi-sheet spelling sheet with columns for the type of construction waste and the disposal amount etc. is sequentially delivered together with the construction waste from the discharging company to the collection and transportation company and the disposal company, and after the disposal is completed, the form with the disposal amount is described. In the data management method related to construction waste treatment that is to be returned to the waste disposal company, at least four categories of entry completion, entry incomplete, unused return, and loss to the computer have been defined as slip types.
When the above-mentioned voucher is issued by the discharge company, a voucher number is assigned to each voucher, and this voucher number is stored in the computer and the incomplete entry is stored as a voucher classification. Enter the amount of disposal by type into the above computer and store it, change the voucher classification to completed, change the voucher classification to unused return for unused vouchers, and lose the voucher classification for lost vouchers It is characterized by changing to.

【0007】[0007]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。まず、建設廃棄物伝票(建設廃棄
物マニフェスト)について説明すると、図1に示すよう
に、この建設廃棄物伝票M(以下、単に伝票Mという)
は互いに分離可能な複数枚、例えば、5枚綴りの構成で
あり、最も上方のA票Ma以外のB1、B2、C、Dの
各票Mb乃至Meは炭酸紙等の複写紙で形成されてい
て、最も上方の伝票に印刷または手書き等で記入された
内容が下方の各票に複写されるようになっている。
Embodiments of the present invention will be described below with reference to the drawings. First, the construction waste slip (construction waste manifest) will be described. As shown in FIG. 1, this construction waste slip M (hereinafter, simply referred to as slip M).
Is a configuration of a plurality of sheets that can be separated from each other, for example, five sheets, and each of the votes Mb to Me of B1, B2, C, and D other than the top A vote Ma is formed of copy paper such as carbonated paper. Thus, the contents written or printed on the uppermost slip are copied to each lower slip.

【0008】図2に伝票Mをより詳細に示す。この伝票
Mの各票には、伝票作成(発行)年月日及び伝票番号を
記載する記載欄X1、排出事業者の所在地、名称等を記
載する記載欄X2、工事現場の所在地、名称等を記載す
る記載欄X3、建設廃棄物の種類別の処分量を記載する
記載欄X4、工事種別を記載する記載欄X5、収集運搬
業者の所在地、名称等を記載する記載欄X6、処分業者
の処分施設の所在地及び処分業者の名称等を記載する記
載欄X7、取扱上の注意事項等を記載する記載欄X8等
が設けられている。
FIG. 2 shows the slip M in more detail. In each form of this form M, a form column X1 for describing the form creation (issue) date and form number, a form field X2 for describing the location and name of the discharge company, a location and name of the construction site, etc. A description column X3 to describe, a description column X4 to describe the amount of disposal by type of construction waste, a description column X5 to describe the type of construction, a description column X6 to describe the location and name of the collection and transportation company, a disposal of the disposal company A description column X7 that describes the location of the facility and the name of the disposal company, a description column X8 that describes handling precautions, and the like are provided.

【0009】排出事業者が収集運搬業者と処分業者の組
合せを選択した上で伝票Mを発行する際には、上記の各
記載欄X1乃至X8に予め所定の事項を、いわゆるパー
ソナルコンピュータ(コンピュータ)の印刷部で印刷し
ておく。その場合、上記記載欄X4には、法令で規定さ
れた汚でい、廃プラスチック類、木くず、金属くず、ガ
ラス及び陶磁器くず、コンクリート破片等の6種類の建
設廃棄物の他に、第7の種類として、汚でい以外の5種
類の建設廃棄物(廃プラスチック類、木くず、金属く
ず、ガラス及び陶磁器くず、コンクリート破片等)が混
合された混合廃棄物を表記しておくこともできる。
When the discharge company issues a slip M after selecting a combination of a collection / transportation company and a disposal company, a predetermined item is entered in each of the above-mentioned entry fields X1 to X8 in advance by a so-called personal computer (computer). Print it out in the printing section. In this case, in addition to the six types of construction waste such as dirty, waste plastics, wood chips, metal chips, glass and ceramics chips, concrete debris, etc. specified in laws and regulations, the seventh column, As a type, a mixed waste in which five types of construction waste other than dirty (waste plastics, wood chips, metal chips, glass and ceramics chips, concrete fragments, and the like) are mixed can be described.

【0010】記載欄X4における建設廃棄物の各種類別
の処分量は、収集運搬業者または処分業者が記入するも
のであるから、排出事業者が伝票を発行する際には空欄
にしておく。記載欄X5の工事種別としては、1.新
築、2.解体、3.その他(増改築等)のいずれかを記
入する。また、記載欄X8には、処分量は容積(m3)で
記入すべき旨のコメントと共に、同一の伝票を用いて複
数の工事現場で建設廃棄物の収集を行った場合、記載欄
X3に記載された以外の各工事現場の名称等を記入する
ための欄を設けておく。
[0010] The disposal amount of each type of construction waste in the description column X4 is entered by a collection / transportation company or a disposal company, and thus is left blank when the discharging company issues a slip. As the construction type in the entry column X5, 1. New construction, 2. Dismantling, 3. Enter any of the other (extension, renovation, etc.). In addition, in the entry column X8, if the construction waste was collected at multiple construction sites using the same slip, with a comment that the disposal amount should be entered in volume (m 3 ), the entry column X3 Provide a column for entering the name of each construction site other than those described.

【0011】次に、図3により、排出事業者、収集運搬
業者、処分業者間での建設廃棄物伝票の受渡し手順を説
明する。排出事業者は、新築工事であれば、例えば、毎
月1回程度、定期的に所定枚数(ここでは、5枚綴りの
伝票全体を1枚と数えている)の伝票Mを発行して収集
運搬業者に交付し、解体工事であれば、工事開始時に所
定枚数の伝票Mを収集運搬業者に交付する(矢印Y
1)。
Next, referring to FIG. 3, a description will be given of a procedure for delivering a construction waste slip between a discharge company, a collection and transportation company, and a disposal company. In the case of a new construction, the discharge company issues, for example, once a month, periodically issues a predetermined number of sheets M (here, the entire five-sheet spelling sheet is counted as one sheet) and collects and transports it. If it is a demolition work, a predetermined number of slips M are delivered to the collection and transportation company at the start of the work (arrow Y).
1).

【0012】収集運搬業者は、工事現場から処分業者の
処分施設に建設廃棄物を自らの運搬車輛で運搬する度に
1枚の伝票Mを使用し、この伝票Mに建設廃棄物の各種
類別の容量と総容量を記入した上で、A票のみを自らが
保管する一方、B1票、B2票、C票、D票を建設廃棄
物と共に処分業者に引き渡す(矢印Y2)。なお、建設
廃棄物の種類別の容量は、処分業者が記入するようにし
てもよい。
The collection and transportation company uses one slip M each time the construction waste is transported by the transport vehicle from the construction site to the disposal facility of the disposal company, and the slip M is used for each type of the construction waste. After filling in the capacity and the total capacity, only the A sheet is kept by himself, and the B1, B2, C, and D sheets are handed over to the disposal company together with the construction waste (arrow Y2). The capacity of each type of construction waste may be entered by a disposal company.

【0013】処分業者は、処分業者完了後、必要により
処分完了日の日付等を記載した後、C票を自らが保管す
る一方、B1票、B2票、D票を収集運搬業者に返却す
る(矢印Y3)。収集運搬業者は、返却されたB1票、
B2票を自らが保管する一方、それまで保管していたA
票とD票とを、排出事業者の指定する期日に排出事業者
に返却する(矢印Y4)。排出事業者はA票とD票とを
照合した後、これらを所定期間保管する。
After completing the disposal company, the disposal company writes the date of the disposal completion date and the like, if necessary, and then keeps the C form by itself and returns the B1, B2, and D forms to the collection and transportation company ( Arrow Y3). Collection hauler returns B1 vote,
A keeps B2 vote by himself while A keeps it until then
The vote and the D-sheet are returned to the discharge company on a date designated by the discharge company (arrow Y4). After comparing the A and D votes, the discharge company stores them for a predetermined period.

【0014】図4に示すように、伝票Mに関するデータ
管理に用いるパーソナルコンピュータCは、キーボード
及び/またはマウス等からなる入力部1と、制御部2
と、記憶部3と、表示部4と、印刷部5とを備えた一般
的な構成である。このパーソナルコンピュータによる各
種処理項目を図5に示す。情報の登録としては、P1の
行政地域の登録、P2の業者の許可情報の登録、P3の
ルート情報の登録、つまり、収集運搬業者と処分業者と
の可能な組合せに関する情報の登録等を行う。また、通
常運用では、Q1の伝票発行、Q2の処分量等の実績値
入力、Q3の伝票区分の更新等を行う。更に、管理帳票
印刷としては、R1の伝票管理資料の印刷、R2の実績
報告資料の印刷、R3の邸別管理資料の印刷等を行う。
As shown in FIG. 4, a personal computer C used for data management on a slip M includes an input unit 1 including a keyboard and / or a mouse, and a control unit 2.
, A storage unit 3, a display unit 4, and a printing unit 5. FIG. 5 shows various processing items by the personal computer. The registration of information includes registration of the administrative area of P1, registration of permission information of the trader of P2, registration of route information of P3, that is, registration of information on possible combinations of collection and transportation traders and disposal traders. In the normal operation, a slip is issued in Q1, an actual value such as a disposal amount in Q2 is input, and a slip classification in Q3 is updated. Further, as the management form printing, printing of the slip management material of R1, printing of the result report material of R2, printing of the house-specific management material of R3, and the like are performed.

【0015】以下、各処理項目毎に説明する。P1の行
政地域の登録は、図示しないが、パーソナルコンピュー
タの入力部1と表示部4とを用いて、都道府県別、市町
村別等、各行政地域毎に地域番号を付与して記憶部3に
登録しておくものである。P2の業者の許可情報の登録
は、図6に示すように、表示部4に許可情報登録画面G
1aを表示させ、入力部1を用いて、収集運搬業者の業
者番号N3、名称(例えば、収集運搬業者A)、郵便番
号、電話番号、住所(所在地)等の情報を入力するとと
もに、図7に示す次頁の許可情報登録画面G1bに、収
集運搬の許可を受けている行政地域を上記地域番号N2
を用いて入力し、これらの内容を記憶部3に登録するも
のである。
Hereinafter, each processing item will be described. Although not shown, the registration of the administrative area of P1 is performed by using the input unit 1 and the display unit 4 of the personal computer to assign an area number to each administrative area such as for each prefecture and for each municipalities and to store it in the storage unit 3. It is to be registered. As shown in FIG. 6, the registration of the permission information of the P2 trader is performed by displaying the permission information registration screen G
1a is displayed, and information such as a collection carrier number N3, a name (for example, collection carrier A), a postal code, a telephone number, and an address (location) is input using the input unit 1, and FIG. In the permission information registration screen G1b on the next page shown in FIG.
, And these contents are registered in the storage unit 3.

【0016】なお、上記収集運搬業者Aは、全ての種類
の建設廃棄物の収集運搬の許可を受けた業者であり、こ
の場合、取扱可能な建設廃棄物の種類については特記し
ないが、一部の建設廃棄物の取扱の許可のみを受けた業
者の場合は、図6の名称欄(業者名)等に取扱の可能な
建設廃棄物の種類を記入する。図8及び図9は処分業者
について上記と同様の入力を行った例であり、処分業者
に関しては、図9の混合比率欄に、予め排出事業者と各
処分業者との間で取り決めた、混合廃棄物の混合比率を
記入しておく。
The collection and transportation company A is a company that has been authorized to collect and transport all types of construction waste. In this case, the types of construction waste that can be handled are not specified, but some In the case of a contractor who has only been authorized to handle construction waste, enter the type of construction waste that can be handled in the name column (contractor name) in FIG. 8 and 9 are examples in which the same input as above was performed for the disposal company. For the disposal company, the mixing ratio column of FIG. Enter the mixing ratio of the waste.

【0017】この混合比率は、汚でい以外の5種類の建
設廃棄物を未分別のまま混合廃棄物として排出する場合
の、混合廃棄物全体の容積中に占める各種建設廃棄物の
容積比率を、予め蓄積したデータに基づいて、工事種別
毎に取り決めたものであり、例えば、新築工事の場合、
廃プラスチック類が40%、金属くずが5%等となって
いる。
This mixing ratio is the volume ratio of various types of construction waste in the total volume of mixed waste when five types of construction waste other than dirty are discharged as unsorted mixed waste. Based on the data accumulated in advance, it is decided for each construction type, for example, in the case of new construction,
Waste plastics account for 40% and metal scraps account for 5%.

【0018】次に、図5中P3のルート情報の登録は、
予め登録した収集運搬業者と処分業者との全ての可能な
組合せ(収集運搬業者から処分業者に至るルート)を記
憶部3に登録しておくものである。ある収集運搬業者と
ある処分業者とを組み合わせることが可能なためには、
これらの収集運搬業者と処分業者とが同一の行政地域内
で同一種類の建設廃棄物を取り扱う許可を受けている必
要がある。そのため、各収集運搬業者及び処分業者に関
する許可情報を登録した後、制御部2に収集運搬業者と
処分業者間の全ての可能なルートを求めさせ、図10に
示すように、表示部4に各ルートを構成する収集運搬業
者名と処分業者名をルート番号N4とともに表示させ
る。
Next, the registration of the route information of P3 in FIG.
All possible combinations of the collection carrier and the disposal company registered in advance (the route from the collection carrier to the disposal company) are registered in the storage unit 3. To be able to combine a collection carrier and a disposal company,
These collection and transportation companies and disposal companies need to be licensed to handle the same type of construction waste in the same administrative area. For this reason, after registering permission information on each collection carrier and disposal company, the control unit 2 is asked for all possible routes between the collection carrier and the disposal company, and as shown in FIG. The names of the collection carriers and disposal companies that constitute the route are displayed together with the route number N4.

【0019】そして、このルート情報登録画面G2にお
いて、当該ルートで取り扱うことのできる建設廃棄物の
種類、種類毎の処理方法(使用する処分施設により定ま
っている処理方法)、処分施設の所在地等を入力し、制
御部2に記憶させる。
On the route information registration screen G2, the type of construction waste that can be handled by the route, the disposal method for each type (the disposal method determined by the disposal facility used), the location of the disposal facility, and the like are displayed. It is input and stored in the control unit 2.

【0020】次に、図5中の通常運用において、Q1の
伝票発行に際しては、工事現場の所在地に基づいて、使
用すべきルートを選択する。この場合、表示部4に使用
可能なルートを一覧表示して、それらの中から所望のル
ートを選択するようにしてもよい。ルートの選択が終了
すると、続いて、図11の伝票発行画面G3で、ルート
番号N4を指定するか、或いは収集運搬業者及び処分業
者の各業者番号N3を指定することにより、ルートを指
定するとともに、工事現場の現場名、工事種別、建設廃
棄物の種類、処分業者の処分施設が複数ある場合はその
所在地、建設廃棄物伝票の発行枚数等を入力すると、図
2に示すように、印刷部5によって建設廃棄物伝票に上
記伝票発行画面G3で入力された事項が印刷される。
Next, in the normal operation in FIG. 5, when issuing the slip of Q1, a route to be used is selected based on the location of the construction site. In this case, a list of available routes may be displayed on the display unit 4, and a desired route may be selected from them. After the selection of the route is completed, the route is designated by specifying the route number N4 or the respective carrier numbers N3 of the collection / transportation company and the disposal company on the slip issuing screen G3 in FIG. 2, the site name of the construction site, the type of construction, the type of construction waste, the location of the disposal facility if there are a plurality of disposal facilities, the number of construction waste slips issued, and the like, as shown in FIG. 5 prints the items entered on the slip issuing screen G3 on the construction waste slip.

【0021】なお、伝票Mの発行時に、制御部2は個々
の伝票に伝票番号N1を付与し、この伝票番号N1を記
憶部3に記憶させるとともに、伝票Mの記載欄X1に印
刷する。また、個々の伝票Mの使用、返却状況を把握す
るため、伝票区分として、例えば、1.完了(パーソナ
ルコンピュータPCへの処分量等のデータの入力完
了)、2.未完了、3.当社滅失、4.業者滅失、5.
未使用返却、6.破損返却の6通りの区分を定め、伝票
発行時には、処分量等のパーソナルコンピュータへの入
力は未完了であるから、各伝票Mの伝票区分を自動的に
2の未完了として、伝票番号N1に対応させて記憶部3
に記憶させておく。
When the slip M is issued, the control unit 2 assigns a slip number N1 to each slip, stores the slip number N1 in the storage unit 3, and prints the slip number N1 in the entry column X1 of the slip M. In addition, in order to grasp the use and return status of each slip M, as a slip classification, for example, 1. 1. Completion (completion of input of data such as disposal amount to personal computer PC) Incomplete, 3; 3. Loss of our company; 4. Loss of trader;
Unused return, 6. Six types of damage return are defined, and when the slip is issued, the input of the disposal amount etc. to the personal computer has not been completed yet. Corresponding storage unit 3
To be stored.

【0022】次に、建設廃棄物の処分終了後に伝票Mが
排出事業者に返却された後、この伝票Mの記載内容に基
づいて、各種類別の建設廃棄物の処分量の実績値をパー
ソナルコンピュータPCに入力する(図5のQ2参
照)。すなわち、図12の実績値入力画面G4aで実績
値を入力すべき伝票Mの伝票番号N1を入力すると、当
該伝票Mに印刷された内容が記憶部3から読み出されて
実績値入力画面G4aに表示される。
Next, after the disposal of the construction waste is completed, the slip M is returned to the discharging company. Based on the contents of the slip M, the actual value of the disposal amount of each type of construction waste is calculated by a personal computer. Input to PC (see Q2 in FIG. 5). That is, when the slip number N1 of the slip M to which the actual value is to be input is input on the actual value input screen G4a of FIG. 12, the content printed on the slip M is read from the storage unit 3 and is displayed on the actual value input screen G4a. Is displayed.

【0023】続いて、図13に示す次頁の実績値入力画
面G4bで当該伝票Mの収集運搬業者及び処分業者によ
る受領日並びに処分業者による処分完了日等の日付デー
タを入力するとともに、建設廃棄物の種類別の処分量の
実績値を容積(m3)で入力する。ここでは、建設廃棄物
の種類が混合廃棄物であるので、混合廃棄物の欄に、処
分量として、例えば、容積5.0(m3)を入力すると、
前記混合比率に基づいて、これが制御部2で5種類の建
設廃棄物別の容積に振り分けられ、更に、5種類の各建
設廃棄物の比重(予め、記憶部3に記憶されている)に
基づいて、各建設廃棄物別の重量が算出されて、換算後
重量の欄に表示されるとともに、各建設廃棄物別の重量
が記憶部3に記憶される。
Subsequently, date data such as the date of receipt of the slip M by the collection / transportation company and disposal company and the date of completion of disposal by the disposal company are input on the actual value input screen G4b on the next page shown in FIG. The actual value of the disposal amount for each type of material is entered in volume (m 3 ). Here, since the type of construction waste is mixed waste, if a volume of 5.0 (m 3 ) is input as a disposal amount in the column of mixed waste, for example,
Based on the mixing ratio, the control unit 2 sorts the volumes into five types of construction waste, and further, based on the specific gravity of each of the five types of construction waste (previously stored in the storage unit 3). Then, the weight of each construction waste is calculated and displayed in the column of the converted weight, and the weight of each construction waste is stored in the storage unit 3.

【0024】なお、建設廃棄物が混合廃棄物の形で取り
扱われるのではなく、廃プラスチック類等の各種建設廃
棄物に分別されて取り扱われた場合は、建設廃棄物伝票
の記載に基づいて、各種建設廃棄物の処分量を容積で実
績値入力画面G4bに入力すると、それが重量に換算さ
れて換算後重量の欄に表示されるとともに、記憶部3に
記憶される。
When the construction waste is not handled in the form of a mixed waste but is separated and handled as various construction wastes such as waste plastics, etc., based on the description of the construction waste slip, When the disposal amounts of various construction wastes are input in the actual value input screen G4b by volume, they are converted into weights, displayed in the converted weight column, and stored in the storage unit 3.

【0025】処分量の実績値等を入力すると、当該伝票
Mに関するデータ処理は完了したことになる。ここで
は、図12の伝票区分の欄から明らかなように、実績値
入力画面G4aを呼び出して、伝票番号N1を入力した
時点で、当該伝票Mの伝票区分が前記2の未完了から、
1の完了に自動的に変更されるようになっている。
When the actual value of the disposal amount is input, the data processing for the slip M is completed. Here, as is clear from the slip section column of FIG. 12, when the actual value input screen G4a is called and the slip number N1 is input, the slip classification of the slip M is changed from the incomplete 2 in the above.
1 automatically changes to completion.

【0026】一方、未使用状態或いは破損状態で返却さ
れた伝票等については、図14に示すように、表示部4
に伝票区分変更画面G5を呼び出して、伝票区分を変更
する必要がある(図5のQ3参照)。この伝票区分変更
画面G5で、変更後の区分と、当該区分に変更すべき伝
票の伝票番号区間(当該区間の伝票番号の最小値と最大
値)を指定すると、制御部2は記憶部3に変更後の新た
な伝票区分を記憶させる。なお、伝票区分の内、3の当
社滅失は、排出事業者内で伝票を紛失または廃棄処分等
したことを意味し、4の業者滅失は、収集運搬業者また
は処分業者が伝票を紛失等したことを意味する。
On the other hand, for a slip returned in an unused state or a damaged state, as shown in FIG.
It is necessary to call the slip classification change screen G5 to change the slip classification (see Q3 in FIG. 5). When the changed section and the slip number section of the slip to be changed to the corresponding section (the minimum value and the maximum value of the slip number in the section) are designated on the slip section change screen G5, the control section 2 stores the information in the storage section 3. The new slip classification after the change is stored. In the slip classification, the loss of our company of 3 means that the slip was lost or discarded in the discharger, and the loss of 4 means that the collection / transporter or the disposal company lost the slip. Means

【0027】上述のように、伝票発行時に個々の伝票の
伝票番号をパーソナルコンピュータPCに記憶させると
ともに、伝票区分として未完了を記憶しておき、建設廃
棄物の処分完了後に収集運搬業者から伝票が返却された
段階で、個々の伝票の状況に応じて伝票区分を変更する
ようにしたので、発行済の個々の伝票の使用或いは返却
状況を正確に把握することができ、ひいては建設廃棄物
の処分量を正確に把握できるようになる。
As described above, at the time of issuing a slip, the slip number of each slip is stored in the personal computer PC, and the incomplete status is stored as a slip classification. At the stage of return, the voucher classification is changed according to the status of each voucher, so that the use or return status of each issued voucher can be accurately grasped, and the disposal of construction waste You will be able to accurately determine the amount.

【0028】上記伝票区分に関するデータは適当な時期
に消去することができる。すなわち、図15に示すよう
に、表示部4に伝票データ削除画面G6を呼び出し、削
除したい伝票区分、収集運搬業者名及び伝票番号区間を
指定すると、当該伝票番号区間内で指定された伝票区分
を有する伝票番号がピックアップされて、それらの伝票
番号及び伝票区分が記憶部3から削除される。なお、削
除すべき伝票区分として1の完了を指定した場合、伝票
番号、伝票区分ばかりでなく、当該伝票の記載内容に基
づいて入力された建設廃棄物の処分量等のデータも同時
に削除される。
The data relating to the slip classification can be deleted at an appropriate time. That is, as shown in FIG. 15, when the form data deletion screen G6 is called on the display section 4 and the form section, collection carrier name and form number section to be deleted are designated, the form section specified within the form number section is displayed. The slip numbers having the slips are picked up and the slip numbers and the slip classifications are deleted from the storage unit 3. When the completion of 1 is designated as the slip type to be deleted, not only the slip number and the slip type but also data such as the disposal amount of construction waste input based on the contents of the slip are deleted at the same time. .

【0029】図5中R1の伝票管理資料の印刷は、発行
済の伝票の使用または返却状況を一覧表として印刷する
もので、伝票番号区間をパーソナルコンピュータの入力
部1によって入力すると、図16に示すように、当該伝
票番号区間に含まれる伝票群に関する各種情報が伝票区
分とともに印刷される。
Printing of the slip management material R1 in FIG. 5 prints a list of the use or return status of issued slips as a list. When a slip number section is input by the input unit 1 of the personal computer, FIG. As shown, various information related to the slip group included in the slip number section is printed together with the slip classification.

【0030】図5中R2の実績報告資料の印刷は、例え
ば、行政官庁への報告時に行うもので、所望の行政地域
を地域番号で指定するとともに処分完了時期等のデータ
を入力すると、図17に示すように、当該行政地域内の
各工事現場から排出された建設廃棄物の種類と量が、個
々の伝票毎に分類されて印刷される。なお、行政地域毎
に分類して実績報告資料を印刷する以外に、ルート別ま
たは収集運搬業者別等に分類した上で実績報告資料を印
刷したり、或いは図5中R3に示したように、邸別、つ
まり、工事現場別に実績報告資料を印刷することも可能
である。
Printing of the result report data of R2 in FIG. 5 is performed, for example, at the time of reporting to the administrative agency. When the desired administrative area is designated by the area number and data such as the disposal completion time is input, FIG. As shown in (1), the type and amount of construction waste discharged from each construction site in the administrative area are classified and printed for each slip. In addition, besides printing the performance report materials by classifying each administrative area, printing the performance report materials after classifying by route or by collection carrier, or as shown in R3 in FIG. 5, It is also possible to print performance report materials by house, that is, by construction site.

【0031】更に、個々の伝票毎の明細を印刷する以外
に、図18に示すように、例えば、所定期間内の各ルー
ト別の各種建設廃棄物の処分量の合計量を集計して印刷
したり、図19に示すように、所定期間内の行政地域別
の各種建設廃棄物の処分量の合計量を集計して印刷する
ことも可能である。
Further, in addition to printing the details of each slip, as shown in FIG. 18, for example, the total amount of the disposal amount of various construction wastes for each route within a predetermined period is counted and printed. Alternatively, as shown in FIG. 19, it is possible to print the total amount of disposal of various types of construction waste by administrative area within a predetermined period.

【0032】[0032]

【発明の効果】以上のように、本発明の請求項1の建設
廃棄物処理に関するデータ管理方法は、建設廃棄物を汚
でい、廃プラスチック類、木くず、金属くず、ガラス及
び陶磁器くず、コンクリート破片等を含む少なくとも6
種類に分類し、建設廃棄物の種類及び処分量等の記載欄
を有する複数枚綴りの伝票を建設廃棄物と共に排出事業
者から順次収集運搬業者、処分業者へと受け渡し、処分
完了後に処分量の記載済の伝票を排出事業者に返却する
ようにした建設廃棄物処理に関するデータ管理方法にお
いて、伝票区分としてコンピュータへの入力完了、入力
未完了、未使用返却、滅失の少なくとも4つの区分を定
めておき、排出事業者による上記伝票の発行時に各伝票
に伝票番号を付与してこの伝票番号をコンピュータに記
憶させるとともに伝票区分として入力未完了を記憶さ
せ、上記伝票返却後に使用済の伝票については建設廃棄
物の種類別の処分量を上記コンピュータに入力して記憶
させるとともに伝票区分を入力完了に変更し、未使用の
伝票については伝票区分を未使用返却に変更し、滅失し
た伝票については伝票区分を滅失に変更するものである
から、必要に応じて、上記コンピュータに記憶されてい
る伝票区分を伝票番号に対照させて参照することによっ
て、個々の伝票の発行、使用または返却等の状況を正確
に把握することができ、これにより、使用済の伝票と未
使用の伝票とを明確に区別できる。
As described above, the data management method relating to construction waste treatment according to the first aspect of the present invention is a method for managing construction waste, which comprises the steps of soiling construction waste, waste plastics, wood waste, metal waste, glass and ceramic waste, concrete waste. At least 6 including debris
Classified by type, multiple-spelled slips with columns for the type of construction waste and the amount of disposal, etc., are passed along with construction waste from collection companies to collection and transportation companies and disposal companies sequentially, and after the disposal is completed, In the data management method related to construction waste treatment, in which written slips are returned to the waste disposal company, at least four types of slips are defined for the slips: computer completed, input not completed, unused returned, and lost. At the time of the issuance of the above-mentioned voucher by the discharge company, a voucher number is assigned to each voucher, this voucher number is stored in the computer, and the incomplete input is stored as a voucher classification. Enter the amount of waste for each type of waste into the above computer and store it, change the voucher classification to "completed", and enter the voucher for unused vouchers. Change the minutes to unused return, and for lost slips, change the slip classification to lost.If necessary, refer to the slip classification stored in the above computer against the slip number. This makes it possible to accurately grasp the status of issuance, use, return, etc. of each slip, thereby making it possible to clearly distinguish a used slip from an unused slip.

【0033】また、使用済の伝票に記載された各種建設
廃棄物の処分量等のデータはコンピュータに記憶されて
いるので、建設廃棄物の種類別の処分量等のデータは必
要により、コンピュータの表示部に表示させたり、印刷
させることができる。
Further, since the data such as the disposal amount of various construction wastes described in the used slip is stored in the computer, the data such as the disposal amount for each type of construction waste is necessary. It can be displayed on the display unit or printed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態で使用する建設廃棄物伝票
を示す概略説明図である。
FIG. 1 is a schematic explanatory view showing a construction waste slip used in an embodiment of the present invention.

【図2】上記建設廃棄物伝票を詳細に示す説明図であ
る。
FIG. 2 is an explanatory diagram showing the construction waste slip in detail.

【図3】上記建設廃棄物伝票の受渡し手順を示す説明図
である。
FIG. 3 is an explanatory diagram showing a procedure for delivering the construction waste slip.

【図4】本実施の形態で使用するパーソナルコンピュー
タの構成を示す説明図である。
FIG. 4 is an explanatory diagram illustrating a configuration of a personal computer used in the present embodiment.

【図5】上記パーソナルコンピュータによる各種処理項
目を示す説明図である。
FIG. 5 is an explanatory diagram showing various processing items by the personal computer.

【図6】上記パーソナルコンピュータの表示部に表示さ
れる許可情報登録画面を示す説明図である。
FIG. 6 is an explanatory diagram showing a permission information registration screen displayed on a display unit of the personal computer.

【図7】上記許可情報登録画面の2頁目を示す説明図で
ある。
FIG. 7 is an explanatory diagram showing a second page of the permission information registration screen.

【図8】他の許可情報登録画面を示す説明図である。FIG. 8 is an explanatory diagram showing another permission information registration screen.

【図9】上記他の許可情報登録画面の2頁目を示す説明
図である。
FIG. 9 is an explanatory diagram showing a second page of the other permission information registration screen.

【図10】上記表示部に表示されるルート情報登録画面
を示す説明図である。
FIG. 10 is an explanatory diagram showing a route information registration screen displayed on the display unit.

【図11】上記表示部に表示される伝票発行画面を示す
説明図である。
FIG. 11 is an explanatory diagram showing a slip issuance screen displayed on the display unit.

【図12】上記表示部に表示される実績値入力画面を示
す説明図である。
FIG. 12 is an explanatory diagram showing a result value input screen displayed on the display unit.

【図13】上記実績値入力画面の2頁目を示す説明図で
ある。
FIG. 13 is an explanatory diagram showing a second page of the result value input screen.

【図14】上記表示部に表示される伝票区分変更画面を
示す説明図である。
FIG. 14 is an explanatory diagram showing a slip classification change screen displayed on the display unit.

【図15】上記表示部に表示される伝票データの削除画
面を示す説明図である。
FIG. 15 is an explanatory diagram showing a slip data deletion screen displayed on the display unit.

【図16】上記パーソナルコンピュータの印刷部で発行
伝票一覧表を印刷する様子を示す説明図。
FIG. 16 is an explanatory diagram showing a state in which an issuance slip list is printed by a printing unit of the personal computer.

【図17】上記パーソナルコンピュータの印刷部で現場
地区別明細表を印刷する様子を示す説明図。
FIG. 17 is an explanatory diagram showing a manner in which a printing section of the personal computer prints a statement by site area.

【図18】上記パーソナルコンピュータの印刷部でルー
ト別集計表を印刷する様子を示す説明図。
FIG. 18 is an explanatory diagram showing a manner in which a printing unit of the personal computer prints a totaling table for each route.

【図19】上記パーソナルコンピュータの印刷部で現場
地区別集計表を印刷する様子を示す説明図。
FIG. 19 is an explanatory diagram showing a manner in which a printing section of the personal computer prints a tally table by site.

【符号の説明】 PC パーソナルコンピュータ(コンピュータ)[Description of Signs] PC Personal Computer (Computer)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 建設廃棄物を汚でい、廃プラスチック
類、木くず、金属くず、ガラス及び陶磁器くず、コンク
リート破片等を含む少なくとも6種類に分類し、建設廃
棄物の種類及び処分量等の記載欄を有する複数枚綴りの
伝票を建設廃棄物と共に排出事業者から順次収集運搬業
者、処分業者へと受け渡し、処分完了後に処分量の記載
済の伝票を排出事業者に返却するようにした建設廃棄物
処理に関するデータ管理方法において、 伝票区分としてコンピュータへの入力完了、入力未完
了、未使用返却、滅失の少なくとも4つの区分を定めて
おき、排出事業者による上記伝票の発行時に各伝票に伝
票番号を付与してこの伝票番号をコンピュータに記憶さ
せるとともに伝票区分として入力未完了を記憶させ、上
記伝票返却後に使用済の伝票については建設廃棄物の種
類別の処分量を上記コンピュータに入力して記憶させる
とともに伝票区分を入力完了に変更し、未使用の伝票に
ついては伝票区分を未使用返却に変更し、滅失した伝票
については伝票区分を滅失に変更することを特徴とする
建設廃棄物処理に関するデータ管理方法。
1. Construction waste is classified into at least six types including dirty plastics, waste plastics, wood chips, metal scraps, glass and ceramics scraps, concrete debris, etc., and a description of the types and disposal amounts of the construction wastes. Construction waste, in which the multi-spelled slips with columns are sequentially delivered together with the construction waste from the discharging company to the collection and transportation company and the disposal company, and after the disposal is completed, the slip with the stated amount of disposal is returned to the discharging company. In the data management method related to material processing, at least four categories of entry completion, entry incomplete, unused return, and loss have been defined as entry types in the computer, and the entry number is assigned to each entry when the emission operator issues the above entry And store this slip number in the computer and store the incomplete input as a slip classification. Enter the amount of construction waste by type into the above computer and store it in the above computer, change the voucher classification to input completed, change the voucher classification to unused return for unused vouchers, and voucher for lost vouchers A data management method for construction waste disposal, wherein the classification is changed to lost.
JP16131297A 1997-06-18 1997-06-18 Method of controlling data concerning construction waste disposal Pending JPH1110127A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16131297A JPH1110127A (en) 1997-06-18 1997-06-18 Method of controlling data concerning construction waste disposal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16131297A JPH1110127A (en) 1997-06-18 1997-06-18 Method of controlling data concerning construction waste disposal

Publications (1)

Publication Number Publication Date
JPH1110127A true JPH1110127A (en) 1999-01-19

Family

ID=15732715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16131297A Pending JPH1110127A (en) 1997-06-18 1997-06-18 Method of controlling data concerning construction waste disposal

Country Status (1)

Country Link
JP (1) JPH1110127A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006099275A (en) * 2004-09-28 2006-04-13 Nishimatsu Constr Co Ltd Industrial waste treatment management device
KR100767426B1 (en) * 2006-03-16 2007-10-18 엘에스산전 주식회사 Optimal Accel/Decel Operation Method Using Anti-Stall Function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006099275A (en) * 2004-09-28 2006-04-13 Nishimatsu Constr Co Ltd Industrial waste treatment management device
KR100767426B1 (en) * 2006-03-16 2007-10-18 엘에스산전 주식회사 Optimal Accel/Decel Operation Method Using Anti-Stall Function

Similar Documents

Publication Publication Date Title
JP2011164706A (en) Waste product disposal management system
JP4780060B2 (en) Waste treatment management system, waste treatment management method, and waste treatment management program
JP2002073896A (en) Recyclable refuse collecting system
JPH1110127A (en) Method of controlling data concerning construction waste disposal
JPH1110126A (en) Method of controlling data concerning construction waste disposal
CN114255149B (en) Solid hazardous waste one-network management system and garbage supervision system based on waste-free city
JP2003292112A (en) Waste manifest managing device and waste manifest managing program
JP2942699B2 (en) Expense allocation management device
JPH0649992A (en) Treatment system for construction wastes
JP4683799B2 (en) Equipment that provides information on environmental impact
JP3773812B2 (en) Industrial waste manifest data management apparatus and method
JPH10206219A (en) Waste collection-measurement system and method for collecting and measuring waste
JP2000095303A (en) Waste treatment managing system
JP2000246226A (en) Industrial waste administration system and recording medium in which program for industrial waste administration which can be driven by computer
JP2023160999A (en) Contract creation system, contract creation method, and computer program
JP4175218B2 (en) Information processing method and computer system related to intermediate processing of waste
JP2003308418A (en) Chemical substance management system, chemical substance management method and recording medium
JP2001175764A (en) System for managing waste manifest data
JP2002297758A (en) Waste disposal system, waste disposal center, and business controller
JP4129414B2 (en) Temporary materials rental system
JP2002074244A (en) Data processor
JPH08309020A (en) Managing method for scrapped game board and managing information handling device
JP2001117998A (en) Contract information managing system
JPH0768973A (en) Distribution process management table regarding special management industrial waste managing slip stipulated by waste treating law
Haas Evaluating the efficiency of municipal reverse logistics channels: An application of data envelopment analysis