JPH1071356A - Coating equipment - Google Patents

Coating equipment

Info

Publication number
JPH1071356A
JPH1071356A JP22953296A JP22953296A JPH1071356A JP H1071356 A JPH1071356 A JP H1071356A JP 22953296 A JP22953296 A JP 22953296A JP 22953296 A JP22953296 A JP 22953296A JP H1071356 A JPH1071356 A JP H1071356A
Authority
JP
Japan
Prior art keywords
work
hanger
conveyor
overhead conveyor
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22953296A
Other languages
Japanese (ja)
Other versions
JP3615876B2 (en
Inventor
Masaru Okubo
優 大久保
Tetsuya Yoshida
田 哲 也 吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Trinity Industrial Corp
Original Assignee
Trinity Industrial Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Trinity Industrial Corp filed Critical Trinity Industrial Corp
Priority to JP22953296A priority Critical patent/JP3615876B2/en
Publication of JPH1071356A publication Critical patent/JPH1071356A/en
Application granted granted Critical
Publication of JP3615876B2 publication Critical patent/JP3615876B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce a space and equipment for storing works to enhance the utilizing efficiency of the space and to reduce equipment cost at the same time and to further reduce the running cost of a drying furnace. SOLUTION: A work W seat from a previous process is hang to each of the hanger H of an overhead conveyor 2 at an hanging position P1 to be pretreated and coated and this work is transferred to the truck T of a floor conveyor 9 at a transfer position P2 to be dried and the dried work W is again transferred to the overhead conveyor 2 at a re-transfer position and detached from each hanger H at a unloading position P4 to be fed to a next process. When the feed lines between respective processes are stopped, the pretreatment, coating and drying of all of works W during transportation by the respective conveyors 2, 9 are completed and, thereafter, a required number of preceding works W are re-transferred to the hangers H transferred to the circulating track 3 of the overhead conveyor 2 to be stored on a first storage track 13 and the succeeding words W are transferred to preparatory hangers Hs to be stored on a second storage track 14.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、自動車ボディなど
のワークをオーバーヘッドコンベアで搬送しながら前処
理, 塗装を行った後、これをフロアコンベアに載せ換え
て乾燥させ、乾燥終了後に次工程へ搬送するように成さ
れた塗装設備に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pretreatment and a coating performed on a work such as an automobile body while conveying the work on an overhead conveyor, and then transferring the work to a floor conveyor for drying. A coating facility adapted to

【0002】[0002]

【従来の技術】図3及び図4は電着塗装を行う従来の塗
装設備のレイアウトとそのランニング状態及びストレー
ジ状態を示すもので、循環軌道41に形成されたオーバ
ーヘッドコンベア42に沿って、前工程から搬送されて
くるワークWを所定の着荷位置P1 でハンガHに着荷す
る着荷装置43と、当該着荷装置43で着荷されたワー
クWの表面に洗浄処理,脱脂処理,化成皮膜処理などの
前処理を施す前処理装置44と、当該前処理装置44で
前処理の終了したワークWの表面に電着塗膜を形成する
電着塗装装置45と、電着塗装装置45で電着塗装が終
了したワークWを所定の載換え位置P2 でハンガHから
外して乾燥炉46内を走行するフロアコンベア47の台
車Tに載せ換える載換装置48が順に配設されて成る。
2. Description of the Related Art FIGS. 3 and 4 show the layout of a conventional coating equipment for performing electrodeposition coating, its running state and storage state, and along a overhead conveyor 42 formed on a circulation track 41, a preceding process. A loading device 43 for loading the work W conveyed from the hanger H at a predetermined loading position P 1 , and a surface of the workpiece W loaded by the loading device 43 before cleaning, degreasing, chemical conversion coating, etc. A pretreatment device 44 for performing the treatment, an electrodeposition coating device 45 for forming an electrodeposition coating film on the surface of the work W which has been subjected to the pretreatment by the pretreatment device 44, and the electrodeposition coating completed by the electrodeposition coating device 45 consisting No換device 48 to change on a cart T of the floor conveyor 47 traveling on the workpiece W within a predetermined mounting repositioned P 2 in removed from the hanger H drying furnace 46 are arranged in this order.

【0003】前記フロアコンベア47は、前記載換え位
置P2 でワークWを載せ換た台車Tを乾燥炉46内に搬
入し、乾燥終了したワークWを台車Tに載せたまま次工
程へ搬送し、次工程で空になった台車Tを再び前記載換
え位置P2 まで戻す循環軌道47aが形成されている。
また、フロアコンベア47の次工程から載換え位置P2
に戻る循環軌道47aには、前記オーバーヘッドコンベ
ア42で搬送中であり未だ乾燥炉46に搬送されていな
いワークWの台数分の台車Tを空の状態でストレージす
る予備台車ストレージ軌道47bが分岐して形成される
と共に、乾燥炉46の出口から次工程へ至るまでの循環
軌道47aには、前記オーバーヘッドコンベア42及び
フロアコンベア47で搬送されている全てのワークWを
台車Tに載せた状態でストレージする台車ストレージ軌
道47cが分岐して形成されている。
[0003] The floor conveyor 47, the trolley T was conversion placing the workpiece W before described repositioned P 2 is transferred into the drying furnace 46, the dried finished workpiece W is conveyed to the next step while on a cart T , circulation track 47a for returning the truck T emptied in the next step to again before described repositioned P 2 is formed.
In addition, from the next process of the floor conveyor 47, the transfer position P 2
In the circulation track 47a, a spare truck storage track 47b that stores the trucks T for the number of works W that are being conveyed by the overhead conveyor 42 and not yet conveyed to the drying furnace 46 in an empty state branches off. While being formed, all the workpieces W conveyed by the overhead conveyor 42 and the floor conveyor 47 are stored in a circulating path 47a from the outlet of the drying furnace 46 to the next step while being placed on the carriage T. The bogie storage track 47c is branched and formed.

【0004】そして、この台車ストレージ軌道47c
は、ワークWの前工程からの搬送及び次工程への搬送が
停止された時点で、フロアコンベア47で搬送されてい
るワークWを乾燥終了させて台車Tに載せたままストレ
ージすると共に、オーバーヘッドコンベア42で搬送さ
れているワークWを前処理し、電着塗装を終了させ、予
備台車ストレージ軌道47bにストレージされていた台
車Tに載せ換えて乾燥炉46まで順次搬送して乾燥終了
させた後、台車Tに載せたままストレージするようにな
されている。
The truck storage track 47c is
When the conveyance of the work W from the previous process and the conveyance to the next process are stopped, the work W being conveyed by the floor conveyor 47 is finished drying, is stored on the carriage T, and is stored on the overhead conveyor. After pre-treating the workpiece W conveyed at 42, terminating the electrodeposition coating, replacing the carriage T stored in the spare carriage storage track 47b with the carriage T and sequentially carrying it to the drying furnace 46 to finish drying, The storage is carried on the carriage T.

【0005】なお、オーバーヘッドコンベア42には、
前工程からのワークWの搬送が停止されたときに、ワー
クWをフロアコンベア47の台車Tに載せ換えて空にな
ったハンガHをストレージしておくループ状の空ハンガ
ストレージ軌道41aが前記載換え位置P2 から前記着
荷位置P1 に戻る循環軌道41から分岐して形成され、
空ハンガHを前処理装置44や電着装置45内に放置す
ることによる腐食を防止すると共に、前工程からのワー
クWの搬送が開始されたときに空ハンガHを着荷位置P
1 にすぐ送り出せるようになされている。
The overhead conveyor 42 includes:
When the conveyance of the work W from the previous process is stopped, the work W is mounted on the carriage T of the floor conveyor 47 and the empty hanger storage track 41a for storing the empty hanger H is previously described. is formed from a modified position P 2 branches from the circulation track 41 back to the arrival position P 1,
Corrosion caused by leaving the empty hanger H in the pretreatment device 44 or the electrodeposition device 45 is prevented, and when the transfer of the work W from the previous process is started, the empty hanger H is moved to the loading position P.
It can be sent to 1 immediately.

【0006】これによれば、各工程間の搬送ラインが稼
動されている間は、各ハンガHをオーバーヘッドコンベ
ア42上で循環走行させて、着荷装置43で着荷したワ
ークWを搬送しながら、前処理装置44で前処理を行
い、電着塗装装置45で電着塗装を行った後、載換装置
48でワークWフロアコンベア47の台車Tに載せ換え
て空になったハンガHは再び着荷位置P1 に戻されて、
後続のワークWを着荷し連続的に処理する。そして、フ
ロアコンベア47では、次工程から循環軌道47aを戻
ってくる空の台車T、または、予備台車ストレージ軌道
47bにストレージされていた予備の台車Tが載換え位
置P2 まで搬送され、載換装置48で当該台車Tに載せ
換えられたワークWを乾燥炉46内に搬入して、乾燥終
了後にそのまま次工程へ搬送するように成されている。
According to this, while the transfer line between the respective processes is operating, each hanger H is circulated and run on the overhead conveyor 42, and the work W arrived by the loading device 43 is conveyed while being forwarded. After the pre-processing is performed by the processing device 44 and the electrodeposition coating is performed by the electrodeposition coating device 45, the hangers H that have been emptied by being mounted on the carriage T of the work W floor conveyor 47 by the transfer device 48 are returned to the loading position. is returned to P 1,
The subsequent work W is received and processed continuously. Then, the floor conveyor 47, the empty bogie T returning the circulation track 47a from the next step, or spare truck T which had been storage in pre truck storage track 47b is conveyed to Nokae position P 2, No換The work W reloaded on the carriage T by the device 48 is carried into the drying furnace 46, and is conveyed to the next process as it is after drying is completed.

【0007】ここで、一日の作業が終了し、各工程間の
搬送ラインが停止し、ワークWの前工程からの搬送及び
次工程への搬送が停止されると、乾燥炉46内にあるワ
ークWは台車Tに載せられたまま台車ストレージ軌道4
7cにストレージされ、前処理装置44及び電着塗装装
置45内にあるワークWは、前処理及び電着塗装を終了
して、載換装置48でフロアコンベア47の予備の台車
Tに載せ換えられ、乾燥炉46で乾燥された後、予備の
台車Tに載置したままの状態で台車ストレージ軌道47
cにストレージされ、ワークWを台車Tに載せ換えて空
になったハンガHは空ハンガストレージ軌道41aにス
トレージされる。そして、翌朝、ワークWの前工程から
の搬送及び次工程への搬送が開始されると、空ハンガス
トレージ軌道41aにストレージされている空ハンガH
をオーバーヘッドコンベア42の循環軌道41上に送り
出して着荷位置P1 で待機させ、前工程から搬送されて
くるワークWを順次着荷して塗装作業を開始すると同時
に、台車ストレージ軌道47cにストレージされている
ワークWを台車Tごと次工程へ順次搬送し、オーバーヘ
ッドコンベア42で搬送される先頭のワークWが載換え
位置P2 に到来するまで、次工程から戻されてきた空の
台車Tを予備台車ストレージ軌道47bに送り込み順次
ストレージする。
Here, when the work of the day is completed, the transfer line between each process is stopped, and the transfer of the work W from the previous process and the transfer to the next process are stopped, the work W is in the drying furnace 46. The work W remains on the trolley T and the trolley storage track 4
The work W stored in the pretreatment device 44 and the electrodeposition coating device 45 is stored in the pretreatment device 44 and the electrodeposition coating device 45, and the preprocessing and the electrodeposition coating are completed. After being dried in the drying furnace 46, the carriage storage track 47 is kept in a state of being placed on the spare carriage T.
The hanger H which is stored in the storage c and becomes empty after the work W is mounted on the carriage T is stored in the empty hanger storage track 41a. Then, the next morning, when the transfer of the work W from the previous process and the transfer to the next process are started, the empty hangers H stored in the empty hanger storage track 41a.
Is sent out onto the circulation track 41 of the overhead conveyor 42 and waits at the loading position P 1 , the work W conveyed from the previous process is sequentially loaded to start the painting operation, and at the same time, the work W is stored in the carriage storage track 47 c. successively conveying the workpiece W to a truck T by the next step, to the beginning of the work W to be conveyed by an overhead conveyor 42 arrives at Nokae position P 2, pre truck storage empty truck T that has been returned from the next step It is sent to the track 47b and stored sequentially.

【0008】このような塗装設備によれば、ワークWの
前工程からの搬送及び次工程への搬送が停止されても、
オーバーヘッドコンベア42及びフロアコンベア47で
搬送されている全てのワークWについて、塗装を終了し
てその塗膜を乾燥させた状態でストレージすることがで
きるので、ワークWが前処理中や前処理終了時点で放置
されたり、電着塗装中や塗装終了時点で放置されたり、
さらに、乾燥中に乾燥未了のまま放置されることがな
く、塗装品質が一定に維持される。
According to such a coating equipment, even if the conveyance of the work W from the previous process and the conveyance to the next process are stopped,
With respect to all the works W conveyed by the overhead conveyor 42 and the floor conveyor 47, the coating can be completed and the coating film can be stored in a dried state. Or during electrodeposition coating or at the end of painting,
Further, the coating quality is maintained constant without being left unfinished during drying.

【0009】[0009]

【発明が解決しようとする課題】しかしながら、この場
合は、ワークWを搬送しながら前処理し,電着塗装し,
乾燥するランニング時に使用されない空の台車Tをスト
レージしておくスペースと、ワークWの前工程からの搬
送及び次工程への搬送が停止された時点でオーバーヘッ
ドコンベア42及びフロアコンベア47で搬送されてい
る全てのワークWを台車Tに載せてストレージするスペ
ースと、空ハンガHをストレージしておくスペースを限
られた工場敷地内に別途確保しなければならないという
問題があった。例えば、前処理装置44と電着塗装装置
45に49台のワークWが搬入され、乾燥炉46内に2
4台のワークWが搬入され、ハンガH及び台車Tのスト
レージピッチが約7mだとすると、空ハンガストレージ
軌道42aの全長は49×7≒350m,予備台車スト
レージ軌道47bの全長は49×7≒350m,台車ス
トレージ軌道47cの全長は(49+24)×7≒52
0mにもなり、全てのストレージ軌道42a,47b,
47cの総延長は、1200〜1300mに達する。また、オー
バーヘッドコンベア42及びフロアコンベア47で搬送
されている全てのワークWを台車Tに載せた状態でスト
レージするように成されているので、乾燥炉46内でワ
ークWを搬送する台車Tと、前処理装置44及び電着塗
装装置45内を搬送されている台数分のワークWを載せ
る予備の台車Tとで、少なくとも49+24=73台も
の台車Tが必要となる。このように、全てのワークWを
ストレージするための多数の台車Tと、広いストレージ
スペースが必要になるので、設備費が嵩むという問題が
あった。
However, in this case, the workpiece W is pre-treated while being transported, electrodeposition-coated,
A space for storing an empty carriage T that is not used at the time of running for drying, and the work W is conveyed by the overhead conveyor 42 and the floor conveyor 47 when the conveyance from the previous process and the conveyance to the next process are stopped. There is a problem that a space for storing all the works W on the cart T and a space for storing the empty hangers H must be separately provided in a limited factory site. For example, 49 workpieces W are carried into the pretreatment device 44 and the electrodeposition coating device 45, and 2
Assuming that four works W are carried in and the storage pitch of the hanger H and the bogie T is about 7 m, the total length of the empty hanger storage track 42a is 49 × 7 ≒ 350 m, and the total length of the spare bogie storage track 47b is 49 × 7 ≒ 350 m. The total length of the truck storage track 47c is (49 + 24) × 7 ≒ 52.
0m, and all storage tracks 42a, 47b,
The total length of 47c reaches 1200-1300m. Further, since all the works W conveyed by the overhead conveyor 42 and the floor conveyor 47 are stored in a state of being mounted on the cart T, the cart T for conveying the work W in the drying furnace 46; At least 49 + 24 = 73 trolleys T are required for the spare trolleys T on which the works W are transported in the pretreatment device 44 and the electrodeposition coating device 45. As described above, since a large number of carts T for storing all the works W and a large storage space are required, there has been a problem that equipment costs are increased.

【0010】さらに、これらの台車Tは次工程へワーク
Wを搬送する際に、乾燥炉46の熱を外へ持ち出し、次
工程へワークWを受け渡した後に室温まで冷却されて戻
ってくるので、乾燥炉46内に搬入されたときに再び加
熱されて炉内の熱を大量に奪うこととなり、乾燥炉46
の消費熱量が多く、ランニングコストが嵩むという問題
があった。
Further, when transporting the work W to the next step, these carts T take out the heat of the drying furnace 46, cool down to room temperature after transferring the work W to the next step, and return. When it is carried into the drying furnace 46, it is heated again, so that a large amount of heat in the furnace is taken away.
However, there is a problem that a large amount of heat is consumed and the running cost increases.

【0011】そこで本発明は、同じ台数分のワークをス
トレージする際に、そのストレージスペース及び設備を
縮小してスペース利用効率を向上させると同時に、設備
費を軽減し、さらに、乾燥炉の消費熱量を節約してラン
ニングコストを軽減することを技術的課題としている。
Therefore, the present invention reduces the storage space and equipment to improve the space utilization efficiency when storing the same number of works, reduces the equipment cost, and further reduces the heat consumption of the drying furnace. It is a technical task to reduce running costs by saving energy.

【0012】[0012]

【課題を解決するための手段】この課題を解決するため
に、本発明は、循環軌道に形成されたオーバーヘッドコ
ンベアに沿って、前工程から搬送されてくるワークを所
定の着荷位置で前記オーバーヘッドコンベアのハンガに
着荷する着荷装置と、当該着荷装置で着荷されたワーク
の表面を前処理する前処理装置と、当該前処理装置で前
処理の終了したワークを塗料に浸漬してその表面に塗料
を付着させる塗装装置と、当該塗装装置で塗料が付着さ
れたワークを所定の載換え位置でオーバーヘッドコンベ
アのハンガから降ろして乾燥炉内を走行するフロアコン
ベアの台車に載せ換えるエレベータ装置が順に配設され
て成り、ワークをオーバーヘッドコンベアで搬送しなが
ら前処理及び塗装を行った後、当該ワークをフロアコン
ベアの台車に載せ換えて搬送しながら乾燥させ、乾燥終
了後に次工程へ搬送するように成された塗装設備におい
て、前記フロアコンベアは、乾燥炉内を走行して乾燥炉
出口から前記載換え位置を通り乾燥炉入口に戻る循環軌
道に形成されると共に、乾燥炉出口から載換え位置に至
るフロアコンベアの循環軌道に沿って、前記乾燥炉で乾
燥終了したワークを所定の載返し位置で当該フロアコン
ベアの台車から再びオーバーヘッドコンベアのハンガに
載せ返すエレベータ装置が配設され、前記載返し位置か
ら前記着荷位置に戻るオーバーヘッドコンベアの循環軌
道に沿って、前記載返し位置でハンガに載せ返されたワ
ークを所定の脱荷位置でオーバーヘッドコンベアから降
ろして次工程へ移送するコンベアに載せ換える脱荷装置
が順に配設され、前記オーバーヘッドコンベアの循環軌
道上を移送されるハンガの所定台数分のワークをハンガ
に懸吊した状態でストレージするループ状の第一のスト
レージ軌道が、その引込側及び送出側を前記オーバーヘ
ッドコンベアの載返し位置と脱荷位置の間で当該循環軌
道に分岐及び合流するように敷設され、前記フロアコン
ベアの循環軌道を走行する台車の所定台数分の予備ハン
ガを備え、当該予備ハンガにワークを懸吊した状態でス
トレージするループ状の第二のストレージ軌道が、その
引込側を前記オーバーヘッドコンベアの載返し位置と脱
荷位置の間で当該循環軌道から分岐させると共に、その
送出側を前記オーバーヘッドコンベアの載返し位置の手
前で当該循環軌道に合流させるように敷設され、ワーク
の前工程からの搬入及び次工程への搬出が停止した時点
で、前記オーバーヘッドコンベア及びフロアコンベアで
搬送中の全てのワークについて、前処理,塗装及び乾燥
を終了させて、先頭側の所要台数のワークを前記載返し
位置でハンガに載せ返した後、当該ハンガに懸吊した状
態で前記第一のストレージ軌道にストレージすると共
に、残りのワークを予備ハンガに載せ返した後、当該予
備ハンガに懸吊した状態で状態で前記第二のストレージ
軌道にストレージするように成されたことを特徴とす
る。
In order to solve this problem, the present invention relates to an overhead conveyor formed on a circulating orbit, which moves a workpiece conveyed from a previous process at a predetermined loading position to the overhead conveyor. A loading device that arrives at the hanger, a pretreatment device that pretreats the surface of the workpiece that has arrived at the loading device, and a workpiece that has been pretreated by the pretreatment device is immersed in paint to paint the surface. A coating device to be adhered and an elevator device for lowering the work to which the paint is applied by the coating device from a hanger of an overhead conveyor at a predetermined transfer position and mounting the work on a truck of a floor conveyor running in a drying furnace are sequentially arranged. After pre-processing and painting while transporting the work on an overhead conveyor, the work is placed on a truck on a floor conveyor. In the coating equipment configured to be conveyed to the next step after the drying is completed, the floor conveyor travels in the drying furnace, passes from the drying furnace outlet to the drying furnace inlet through the replacement position described above. Along the return trajectory, along the trajectory of the floor conveyor from the drying furnace outlet to the transfer position, the workpieces that have been dried in the drying furnace are again overhead from the truck of the floor conveyor at a predetermined return position. An elevator device for returning the work to the hanger of the conveyor is disposed, and the work returned to the hanger at the return position is returned to the predetermined unloading position along the circulation path of the overhead conveyor returning from the return position to the loading position. The unloading device that moves down from the overhead conveyor and transfers it to the conveyor to be transferred to the next process is arranged in order. A loop-shaped first storage track for storing a predetermined number of hangers transferred on a conveyor circulating track while suspending the hangers on the hanger has a draw-in side and a send-out side where the overhead conveyor is placed back and forth. A state in which a predetermined number of spare hangers of a truck traveling on the circulation track of the floor conveyor is provided, and the work is suspended from the spare hanger. A second storage track in the form of a loop for storing at the same time branches the drawing side from the circulation track between the return position of the overhead conveyor and the unloading position, and sets the delivery side of the overhead conveyor to the return position of the overhead conveyor. When the work is laid in such a way that it joins the circulating path before the work, and loading of the work from the previous process and unloading to the next process are stopped. After finishing the pretreatment, painting and drying for all the works being conveyed on the overhead conveyor and the floor conveyor, the required number of works on the head side are put on the hanger at the return position described above, and After the remaining work is placed back on the spare hanger and stored in the second storage track while being suspended on the spare hanger, the work is stored on the first storage track while suspended on the spare hanger. It is characterized by being made to.

【0013】本発明によれば、前工程から搬送されてき
たワークが、着荷位置でオーバーヘッドコンベアのハン
ガに着荷された後、当該オーバーヘッドコンベアで搬送
されながら、前処理装置でワーク表面が前処理され、塗
装装置でワーク表面に塗膜が形成され、次いで、載換え
位置でフロアコンベアの台車に載せ換えられて、乾燥炉
内に搬入されて乾燥された後、載返し位置で再び前記オ
ーバーヘッドコンベアのハンガに載せ返されて、脱荷位
置でハンガから降ろされて次工程へ搬送される。このと
き、フロアコンベアは、乾燥炉内を走行して乾燥炉出口
から載返し位置,載換え位置を通り乾燥炉入口に戻る循
環軌道に形成され、台車は次工程まで走行されることな
く乾燥炉から出て載返し位置及び載換え位置を通りすぐ
に乾燥炉内に搬入されるので、室温まで冷却される前に
再び乾燥炉内を循環走行されることとなる。したがっ
て、台車によって奪われる乾燥炉内の熱量が少なくラン
ニングコストが低減され、フロアコンベアの全長が短く
台車数も減少されるので設備費を軽減できる。
According to the present invention, after the work conveyed from the preceding process is loaded on the hanger of the overhead conveyor at the loading position, the work surface is pre-processed by the pre-processing device while being conveyed by the overhead conveyor. The coating film is formed on the work surface by the coating device, and then, is replaced on the carriage of the floor conveyor at the transfer position, and is carried into the drying furnace and dried. It is put back on the hanger, unloaded from the hanger at the unloading position, and transported to the next process. At this time, the floor conveyor is formed in a circulation path that travels through the drying furnace, returns from the drying furnace outlet to the loading position, the reloading position, and returns to the drying furnace entrance. And is immediately carried into the drying oven through the loading / unloading position and the loading / unloading position, so that it is circulated through the drying oven again before being cooled to room temperature. Therefore, the amount of heat in the drying furnace taken away by the truck is small, the running cost is reduced, and the total length of the floor conveyor is short and the number of trucks is reduced, so that the equipment cost can be reduced.

【0014】また、一日の作業が終了して、各工程間の
搬送ラインが停止された時点で、各コンベアで搬送中の
全てのワークが、前処理,塗装,乾燥終了後、先行する
所要台数のワークがオーバーヘッドコンベアの循環軌道
を移送されるハンガに載せ返されて当該ハンガに懸吊さ
れた状態で第一のストレージ軌道にストレージされ、後
続のワークが予備ハンガに載せ返されて当該ハンガに懸
吊された状態で第二のストレージ軌道へストレージされ
る。この場合に、第一及び第二のストレージ軌道は、各
工程間の搬送ラインが停止された時点で各コンベアで搬
送中の全てのワークをストレージできる長さを確保すれ
ば足り、また、ハンガもオーバーヘッドコンベアの循環
軌道を移送されるものの他、フロアコンベアの循環軌道
を走行する所定台車数分の予備ハンガを用意すればよ
く、空の台車をストレージしておくスペースや、全ての
ワークを載せた状態で台車をストレージするスペースが
一切無くなり、また、台車数が激減するので、スペース
の利用効率を格段に向上させることができると同時に、
ストレージに必要な設備を縮小して設備費が軽減され
る。
Further, at the time when the work of the day is completed and the transfer line between the respective processes is stopped, all the works being conveyed by the respective conveyors are subjected to the prerequisite processing, coating, and drying. A number of works are returned to the hanger to be transferred along the circulation path of the overhead conveyor and stored in the first storage track while being suspended on the hanger, and the subsequent works are returned to the spare hanger and returned to the hanger. While being suspended in the second storage track. In this case, the first and second storage trajectories only need to secure a length capable of storing all the work being conveyed by each conveyor when the transfer line between the processes is stopped, and the hanger is also used. In addition to being transported along the overhead conveyor's circulation track, it is sufficient to prepare spare hangers for a predetermined number of trucks traveling on the floor conveyor's circulation track, and a space for storing empty trucks and all work were loaded. Since there is no space to store the trolley in the state, and the number of trolleys is drastically reduced, the use efficiency of the space can be dramatically improved,
Equipment costs required for storage are reduced by reducing the equipment required for storage.

【0015】そして、翌朝、各工程間の搬送ラインが稼
動されると、第一のストレージ軌道にストレージされて
いるハンガをその送出側からオーバーヘッドコンベアの
循環軌道上に順次送り出して脱荷位置まで移送し、脱荷
装置でオーバーヘッドコンベアのハンガからワークを降
ろして次工程へ搬送するコンベアに載せ換えると同時
に、第二のストレージ軌道にストレージされているハン
ガをその送出側からオーバーヘッドコンベアの循環軌道
上に順次送り出し、そのハンガを直接又は前記第一のス
トレージ軌道を経由して脱荷位置まで移送する。脱荷位
置でワークをおろして空になったハンガは着荷位置まで
移送され、着荷位置P1 で、前工程から搬送されてきた
ワークを順次着荷して、前処理,塗装作業を開始する。
そして、ハンガが載換え位置に到来すると、ワークをフ
ロアコンベアの台車に載せ換えた後、空になったハンガ
を第二ストレージ軌道に順次送り込んで、予備ハンガの
台数分の空ハンガを予備ハンガとしてストレージし、そ
れ以降の後続のハンガは、載換え位置でフロアコンベア
の台車に載せ換えた後、載返し位置で乾燥炉から搬出さ
れたワークが載せ返されて脱荷位置へ移送され、再び着
荷位置で前工程から搬送されてきたワークを着荷する。
[0015] Then, the next morning, when the transfer line between the processes is operated, the hangers stored in the first storage track are sequentially sent out from the sending side to the circulation track of the overhead conveyor and transferred to the unloading position. At the same time, the work is unloaded from the overhead conveyor hanger by the unloading device and replaced on the conveyor to be transported to the next process.At the same time, the hanger stored in the second storage track is moved from its sending side to the overhead conveyor circulation track. The hangers are sequentially sent out and transferred to the unloading position either directly or via the first storage track. Hanger which emptied down the workpieces and unloading position is transferred to the arrival position, at the arrival position P 1, before the work that has been transported sequentially arrival from step, pretreatment, starting the coating operation.
Then, when the hanger arrives at the transfer position, the work is mounted on the truck of the floor conveyor, and the empty hangers are sequentially sent to the second storage track, and empty hangers for the number of spare hangers are used as spare hangers. After storage, subsequent hangers are transferred to the truck on the floor conveyor at the transfer position, and then the work carried out of the drying furnace at the transfer position is returned, transferred to the unloading position, and loaded again. At the position, the work conveyed from the previous process arrives.

【0016】[0016]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて具体的に説明する。図1は本発明に係る塗装
設備のレイアウトとそのランニング状態を示す平面図、
図2はそのストレージ状態を示す平面図である。
Embodiments of the present invention will be specifically described below with reference to the drawings. FIG. 1 is a plan view showing the layout of a coating facility according to the present invention and its running state,
FIG. 2 is a plan view showing the storage state.

【0017】本例に係る塗装設備1は、ワークWをハン
ガHで階上に懸吊して搬送するオーバーヘッドコンベア
2が所定の循環軌道3に形成され、当該オーバーヘッド
コンベア2に沿って、前工程から搬送されてくるワーク
Wを着荷位置P1 でハンガHに着荷する着荷装置4と、
当該着荷装置4で着荷されたワークWの表面に洗浄処
理,脱脂処理,化成皮膜処理などの前処理を施す前処理
装置5と、当該前処理装置5で前処理の終了したワーク
Wの表面に電着塗膜を形成する電着塗装装置6と、電着
塗装装置6で電着塗装が終了したワークWを載換え位置
2 でオーバーヘッドコンベア2から階下に降ろすエレ
ベータ装置7が配設されている。
In the coating equipment 1 according to the present embodiment, an overhead conveyor 2 for suspending and transporting a work W on a floor with a hanger H is formed on a predetermined circulating track 3, and a pre-process is performed along the overhead conveyor 2. A loading device 4 for loading the work W conveyed from the hanger H at the loading position P 1 ,
A pre-processing device 5 for performing a pre-treatment such as a cleaning process, a degreasing process, or a chemical conversion coating process on the surface of the workpiece W received by the loading device 4; electrodeposition and electrodeposition coating device 6 to form a coating film, electrodeposition coating device elevator device 7 down from the overhead conveyor 2 downstairs in Nokae position P 2 a workpiece W which electrodeposition coating is completed by 6 is arranged I have.

【0018】階下には、ワークWを載せる台車Tを所定
間隔で走行させるフロアコンベア9が、乾燥炉8内を走
行して乾燥炉出口8out から前記エレベータ装置7の周
囲を回って乾燥炉入口8inに戻る循環軌道10に形成さ
れ、前記エレベータ装置7は、その正面側が載換え位置
2 となって前記電着塗装装置6で電着塗装が終了した
ワークWを階上のオーバーヘッドコンベア2のハンガH
から降ろして階下に敷設されたフロアコンベア9の台車
Tに載せ換え、その背面側が載返し位置P3 となって前
記乾燥炉8で乾燥終了したワークWを階下のフロアコン
ベア9の台車Tからリフトアップして階上のオーバーヘ
ッドコンベア2のハンガHに載せ返すようになされてい
る。
Downstairs, a floor conveyor 9 for moving a carriage T on which a work W is loaded at a predetermined interval travels in the drying furnace 8 and turns around the elevator device 7 from a drying furnace outlet 8out to a drying furnace inlet 8in. It is formed on the circulation track 10 back to the elevator unit 7, hanger of a front side Nokae position P 2 and turned in the electrodeposition coating device 6 in electrodeposition coating finished upstairs workpiece W overhead conveyor 2 H
Place on a cart T of the floor conveyor 9 laid downstairs drop off from the lift the workpiece W and dry ends in the drying furnace 8 becomes the back side of the mounting flashing position P 3 from the truck T downstairs floors conveyor 9 It is configured to be raised and put back on the hanger H of the overhead conveyor 2 on the floor.

【0019】また、前記オーバーヘッドコンベア2の循
環軌道3は、エレベータ装置7の周囲を回って前記載換
え位置P2 及び載返し位置P3 を通り着荷位置P1 に戻
るように形成されると共に、載返し位置P3 と着荷位置
1 の間には、前記載返し位置P3 でハンガHに載せ返
されたワークWを所定の脱荷位置P4 でオーバーヘッド
コンベア2から降ろして次工程へ移送するコンベア11
に載せ換える脱荷装置12が順に配設されている。
Further, circulation track 3 of the overhead conveyor 2 is formed so as to return the description repositioned P 2 and the mounting barbs position P 3 before around the periphery of the elevator apparatus 7 as arrival position P 1, Between the return position P 3 and the arrival position P 1 , the work W returned on the hanger H at the return position P 3 is lowered from the overhead conveyor 2 at a predetermined unload position P 4 and transferred to the next process. Conveyor 11
Are sequentially arranged.

【0020】そして、前記オーバーヘッドコンベア2の
循環軌道3上を移送されるハンガHの所定台数分(例え
ば49台)のワークWをハンガHに懸吊した状態でスト
レージ可能な長さに形成されたループ状の第一のストレ
ージ軌道13が、その引込側13a及び送出側13bを
前記オーバーヘッドコンベア2の載返し位置P3 と脱荷
位置P4 の間で当該循環軌道3に分岐及び合流させるよ
うに敷設されている。また、フロアコンベア9の台車T
の台数分(例えば24台)の予備ハンガHsを備え、当
該予備ハンガHsにワークWを懸吊した状態でストレー
ジ可能な長さに形成されたループ状の第二のストレージ
軌道14が、その引込側14aを前記オーバーヘッドコ
ンベア2の載返し位置P3 と脱荷位置P4 の間で当該循
環軌道3から分岐させると共に、その送出側14bを前
記オーバーヘッドコンベア2の載返し位置P2 の手前で
当該循環軌道3に合流させるように敷設されている。
The work W of a predetermined number (for example, 49) of hangers H transferred on the circulating track 3 of the overhead conveyor 2 is formed to have a length capable of being stored while being hung on the hangers H. first storage track 13 looped is, so as to branch and merge in the circulation track 3 between the pull side 13a and the delivery side 13b of the mounting flashing position P 3 of the overhead conveyor 2 and Datsuni position P 4 Has been laid. The cart T of the floor conveyor 9
(For example, 24 units) of spare hangers Hs, and the loop-shaped second storage track 14 formed to have a length capable of storing the work W suspended on the spare hangers Hs is drawn in. the side 14a between the mounting flashing position P 3 of the overhead conveyor 2 and Datsuni position P 4 along with branches from the circulation track 3, the the delivery side 14b in front of the mounting barbs position P 2 the overhead conveyor 2 It is laid so as to join the circulation track 3.

【0021】以上が本発明の一例構成であって、次にそ
の作用について説明する。例えば、オーバーヘッドコン
ベア2の循環軌道3上を移送されるハンガHの台数が4
9台であり、フロアコンベア9の循環軌道10上を走行
する台車Tの台数が24台であり、ストレージピッチが
約7mの場合について説明する。まず、工場の各工程間
の搬送ラインが稼動されて、ワークWが前工程から搬送
されると共に次工程へ搬送されている間は、着荷位置P
1 でオーバーヘッドコンベア2のハンガHに着荷された
ワークWが階上を搬送されながら、前処理装置5でワー
クWの表面が前処理され、電着塗装装置6でワークWの
表面に電着塗膜が形成される。次いで、載換え位置P2
に到来すると、エレベータ装置7でオーバーヘッドコン
ベア2のハンガHから降ろされて、階下のフロアコンベ
ア9の台車Tに載せ換えられ、乾燥炉8内に搬入されて
乾燥された後、乾燥炉8から搬出され載返し位置P3
エレベータ装置7によりワークWがリフトアップされ
て、再び前記オーバーヘッドコンベア2のハンガHに載
せ返された後、脱荷位置P4 に移送されて脱荷装置12
でオーバーヘッドコンベア2から降ろされて次工程へ搬
送するコンベア11に載せ換えられる。
The above is an example of the configuration of the present invention, and its operation will now be described. For example, the number of hangers H transferred on the circulation track 3 of the overhead conveyor 2 is 4
There will be described a case where the number of the vehicles T is 9 and the number of the vehicles T traveling on the circulation track 10 of the floor conveyor 9 is 24 and the storage pitch is about 7 m. First, the transfer line between each process of the factory is operated, and while the work W is transferred from the previous process and transferred to the next process, the arrival position P
While the work W loaded on the hanger H of the overhead conveyor 2 is transported upstairs in 1, the surface of the work W is pre-treated by the pre-processing device 5, and the surface of the work W is A film is formed. Next, the transfer position P 2
, The elevator device 7 lowers the hangers H of the overhead conveyor 2, replaces the trolley T on the floor conveyor 9 below the floor, is carried into the drying furnace 8, dried, and then unloaded from the drying furnace 8. by which the workpiece W by the elevator unit 7 in the mounting flashing position P 3 is lifted up again after said returned placed on hanger H overhead conveyor 2, and unloading position P 4 has been and unloading device transferred to 12
Is transferred from the overhead conveyor 2 to the conveyor 11 to be transported to the next process.

【0022】このとき、フロアコンベア9は、乾燥炉8
内を走行して乾燥炉出口8out から前記エレベータ装置
7を回ってすぐに乾燥炉入口8inに戻る循環軌道10に
形成され、台車Tはほとんど乾燥炉8内を走行し、オー
バーヘッドコンベア2とワークWの載換え/載返しを行
うためだけに乾燥炉8外に搬出され、台車Tが次工程ま
で走行されることはなく、乾燥炉8外に敷設される循環
軌道10を短く形成することができるので、台車Tが室
温まで冷却される前に再び乾燥炉8内を走行することに
なる。したがって、台車Tによって奪われる乾燥炉8内
の熱量が少なくランニングコストが軽減され、台車Tの
数もフロアコンベア9の短い循環軌道10を走行する台
数分だけで済むので設備費を軽減できる。
At this time, the floor conveyor 9 is
The carriage T is formed on a circulation track 10 which travels through the inside of the drying furnace 8 and immediately returns to the drying furnace inlet 8in from the drying furnace outlet 8out and immediately returns to the drying furnace inlet 8in. Is carried out of the drying furnace 8 only for performing the transfer / reloading of the carriage, and the carriage T is not moved to the next step, and the circulation track 10 laid outside the drying furnace 8 can be formed short. Therefore, before the carriage T is cooled down to room temperature, it travels in the drying furnace 8 again. Therefore, the amount of heat in the drying furnace 8 taken away by the truck T is small and the running cost is reduced, and the number of the trucks T can be reduced to the number of vehicles traveling on the short circulating track 10 of the floor conveyor 9, so that the equipment cost can be reduced.

【0023】そして、一日の作業が終了し、各工程間の
搬送ラインが停止されて、ワークの前工程からの搬送及
び次工程への搬送が停止されると、各コンベア2及び9
で搬送されている全てのワークWは、乾燥炉8内で乾燥
中のものは乾燥終了した後に、電着塗装装置6で電着塗
装中のものは載換え位置P2 でフロアコンベア9の台車
Tに載せ換えられて乾燥炉8で乾燥終了した後に、前処
理装置5で前処理中のものは電着塗装装置6で電着塗装
を終了して載換え位置P2 でフロアコンベア9の台車T
に載せ換えられて乾燥炉8で乾燥終了した後に、載返し
位置P3 でオーバーヘッドコンベア2のハンガH又は予
備ハンガHsに載せ換えられ、前処理,塗装,乾燥終了
後、第一及び第二のストレージ軌道13及び14にスト
レージされる。このとき、第一のストレージ軌道13に
は、フロアコンベア9及びオーバーヘッドコンベア2で
搬送されている全73台のワークのうち、乾燥終了した
先行する49台分のワークWが、載返し位置P3 でオー
バーヘッドコンベア2のハンガHに順次載せ返され、そ
のハンガHに懸吊された状態で、引込側13aから送り
込まれてストレージされる。また、第二のストレージ軌
道14には、その送出側14bから循環軌道3の載返し
位置P3 に送り出された予備ハンガHsに乾燥終了した
後続の24台分のワークWが載せ返されて当該予備ハン
ガHsに懸吊された状態で引込み側14aから送り込ま
れてストレージされる。
When the work of the day is completed, the transfer line between the processes is stopped, and the transfer of the work from the previous process to the next process is stopped.
In all of the work W being conveyed, after those in drying in the drying furnace 8 ended drying, electrodeposition truck floor conveyor 9 Nokae position P 2 are those in electrodeposition coating with coating device 6 after recombination is dried terminated in a drying oven 8 placed on T, pretreatment apparatus 5 that in the pretreatment in the finished electrodeposition coating in the electrodeposition coating device 6 in Nokae position P 2 truck floor conveyor 9 T
To be replaced loaded after completion of drying in a drying oven 8, is replaced placed on the placing flashing position P 3 in hanger H or pre hanger Hs overhead conveyor 2, pretreatment, painting, After drying, the first and second It is stored in storage tracks 13 and 14. At this time, among the 73 works transported by the floor conveyor 9 and the overhead conveyor 2, the first storage track 13 holds the preceding 49 works W, for which drying has been completed, in the return position P 3. Are sequentially put back on the hanger H of the overhead conveyor 2 and are sent from the draw-in side 13a and stored while being suspended on the hanger H. Further, on the second storage track 14, the subsequent 24 works W for which drying has been completed are placed on the spare hanger Hs sent from the sending side 14 b to the loading position P 3 of the circulation track 3, and are returned. While being suspended from the spare hanger Hs, it is sent from the drawing side 14a and stored.

【0024】この場合において、ストレージピッチが約
7mだとすると、第一のストレージ軌道13は49台分
のワークWをストレージするために49台×7m≒35
0mの距離が必要であり、第二のストレージ軌道14は
24台分のワークWをストレージするために24台×7
m≒170mの距離が必要となるので、その総延長で約
520m確保すれば足り、全ワークWを台車に載せてス
トレージする場合に必要な空の台車をストレージしてお
くスペースや、全てのワークを載せた状態で台車をスト
レージするスペースが一切無くなるので、従来の塗装設
備に比してストレージ軌道の総延長は1/2程度にな
り、スペースの利用効率を格段に向上させることができ
る。また、ハンガHが49台分、予備ハンガHsが24
台分必要となるが、ワークWを前処理,電着塗装するた
めに49台のハンガHを使用しているので、ストレージ
するために増加するハンガ数は予備ハンガHsの24台
分だけであり、また、ワークWを乾燥させるために24
台の台車Tがあれば足り、全ワークWを台車に載せたス
トレージする塗装設備に比して、ハンガ数が24台分増
えるものの、台車数が49台分減るので、全体として設
備費が軽減される。
In this case, assuming that the storage pitch is about 7 m, the first storage track 13 is 49 × 7 m ≒ 35 in order to store 49 works W.
A distance of 0 m is required, and the second storage track 14 has 24 × 7 in order to store 24 works W.
Since a distance of m ≒ 170m is required, it is sufficient to secure a total length of about 520m, and if all the workpieces W are to be stored on a trolley, the space for storing empty trolleys and all work Since there is no space for storing the truck with the vehicle loaded thereon, the total length of the storage track is reduced to about 1/2 as compared with the conventional coating equipment, and the space utilization efficiency can be significantly improved. Also, the hanger H for 49 vehicles and the spare hanger Hs for 24
Although 49 hangers H are used for pre-treatment and electrodeposition coating of the workpiece W, the number of hangers to increase for storage is only 24 spare hangers Hs. And 24 for drying the workpiece W.
It is sufficient if there are two trolleys T, and the number of hangers increases by 24 units, but the number of trolleys decreases by 49 units compared to the painting equipment that stores all work W on the trolleys, so the overall equipment cost is reduced. Is done.

【0025】そして、翌朝、各工程間の搬送ラインが稼
動されると、第一のストレージ軌道13にストレージさ
れているハンガHをその送出側13bからオーバーヘッ
ドコンベア2の循環軌道3上に順次送り出して脱荷位置
4 まで移送し、脱荷装置P 4 でオーバーヘッドコンベ
ア2のハンガHからワークWを降ろして次工程へ搬送す
るコンベア11に載せ換え、次いで,第二のストレージ
軌道14にストレージされているハンガHをその送出側
14bからオーバーヘッドコンベア2の循環軌道3上に
順次送り出し、そのハンガHを直接又は前記第一のスト
レージ軌道13を経由して脱荷位置P4 まで移送してワ
ークWを降ろした後、着荷位置P1 へ移送する。着荷位
置P1 では、先頭のハンガHが着荷位置P1 に達する
と、前工程から搬送されてきたワークWを順次着荷し
て、前処理,塗装作業を開始する。そして、載換え位置
2 でフロアコンベア9の台車Tに載せ換えた後、空に
なったハンガHを第二ストレージ軌道14に順次送り込
んで、予備ハンガHsの台数分の空ハンガHを予備ハン
ガHsとしてストレージし、それ以降の後続のハンガH
は、載換え位置P2 でフロアコンベア9の台車Tに載せ
換えた後、載返し位置P3 で乾燥炉8から搬出されたワ
ークWが載せ返されて脱荷位置P4 へ移送され、さらに
着荷位置P1 へ移送されて前工程から搬送されてきたワ
ークを着荷し、塗装作業を継続して行う。
The next morning, the transfer line between each process is
When it is moved, it is stored in the first storage track 13.
The hanger H from the sending side 13b.
Unloading position by sending out sequentially on circulation track 3 of conveyor 2
PFourTo the unloading device P FourWith overhead conveyor
(A) The work W is dropped from the hanger H and transported to the next process.
To the conveyor 11 and then the second storage
Transfer the hanger H stored in the track 14 to its sending side
14b on the circulation track 3 of the overhead conveyor 2
Sequentially and feed the hanger H directly or in the first strike.
Unloading position P via storage orbit 13FourTransfer to
After unloading the workpiece W, the arrival position P1Transfer to Arrival position
Place P1Then, the first hanger H is the arrival position P1Reach
And the workpieces W transported from the previous process arrive sequentially
Then, pretreatment and painting work are started. And the transfer position
PTwoAfter loading on the truck T of the floor conveyor 9 in the empty
Hangers H are sequentially sent to the second storage track 14
Then, empty hangers H for the number of spare hangers Hs are reserved
Hs is stored as Hs, and subsequent hanger H
Is the transfer position PTwoAnd put it on the cart T of the floor conveyor 9
After replacement, return position PThreeIn the drying furnace 8
Ark W is put back and unloading position PFourTransferred to
Arrival position P1That has been transported to
Work, and continue painting.

【0026】このように本例によれば、ワークWをハン
ガHに懸吊した状態でストレージするようにしたので、
その分スペースを節約することができるだけでなく、空
台車をストレージするスペース及びワークを載せた台車
をストレージするスペースが一切不要となり、また、台
車数が激減するので、スペースの利用効率を格段に向上
させることができると同時に、ストレージに必要な設備
を縮小して設備費が軽減される。また、フロアコンベア
9の台車Tが次工程まで走行されることなく乾燥炉8か
ら出てエレベータ装置7を回ってすぐに乾燥炉8内に搬
入されるので、台車Tが室温まで冷却される前に再び乾
燥炉8内を走行することになる。したがって、台車Tに
よって奪われる乾燥炉8内の熱量が少なくランニングコ
ストが軽減されると同時に、台車Tの数もフロアコンベ
ア9を走行する数分あれば足りるので設備費を軽減でき
る。
As described above, according to this embodiment, the work W is stored while being suspended from the hanger H.
Not only can this save space, but there is no need for space for storing empty trolleys or storage for trolleys with work, and the number of trolleys is drastically reduced, dramatically improving space utilization efficiency. At the same time, the equipment required for storage is reduced to reduce equipment costs. In addition, since the carriage T of the floor conveyor 9 exits the drying furnace 8 without traveling to the next process, and is immediately carried into the drying furnace 8 after rotating around the elevator device 7, the carriage T is cooled before it is cooled to room temperature. Then, the inside of the drying furnace 8 is run again. Therefore, the amount of heat in the drying furnace 8 taken away by the cart T is small and the running cost is reduced, and at the same time, the number of the carts T is enough for traveling on the floor conveyor 9, so that the equipment cost can be reduced.

【0027】なお、上述の説明では、塗装装置として電
着塗装装置を用いた場合の塗装設備について説明した
が、本発明はこれに限らず、例えば、ディップ塗装を行
う塗装装置を用いることもできる。また、本例では、1
台のエレベータ装置7を用いてその正面側の載換え位置
2 でワークWをオーバーヘッドコンベア2のハンガH
からフロアコンベア9の台車Tに載せ換え、背面側の載
返し位置P3 で台車TからハンガHに載せ返しする場合
について説明したが、本発明はこれに限らず、夫々の位
置に別々のエレベータ装置を配してもよい。さらに、ス
トレージ軌道13及び14は別々のループを形成する場
合に限らず、引込側13a及び14aを共通させ、送出
側13b及び14bが分岐して形成されたループに形成
されていてもよい。
In the above description, an electric device is used as the coating device.
Explained coating equipment when using a coating equipment
However, the present invention is not limited to this.
A coating device can also be used. In this example, 1
Transfer position on the front side of the elevator device 7
P TwoWork W is hanger H of overhead conveyor 2
From above to the truck T of the floor conveyor 9 and the loading on the back side
Return position PThreeTo put it back on the hanger H from the trolley T
Although the present invention has been described, the present invention is not limited to this.
Separate elevator devices may be provided in the installation. In addition,
The storage trajectories 13 and 14 are used to form separate loops.
In addition to the above case, the common side 13a and 14a
Sides 13b and 14b formed in a forked loop
It may be.

【0028】[0028]

【発明の効果】以上述べたように、本発明によれば、同
じ台数分のワークをストレージする際に、ハンガのスト
レージスペースが若干拡大するものの、空台車をストレ
ージするスペース及びワークを載せた台車をストレージ
するスペースが無くなり、また、台車数が激減するの
で、スペースの利用効率を格段に向上させることができ
ると同時に、ストレージに必要な設備を縮小して設備費
を軽減することができ、さらに、フロアコンベアは、乾
燥炉内を走行する台車が次工程までワークを搬送するこ
となくすぐに乾燥炉内に戻るように形成されているの
で、乾燥炉の消費熱量を節約してランニングコストを軽
減することができるという大変優れた効果を奏する。
As described above, according to the present invention, when the same number of works are stored, the storage space of the hanger slightly increases, but the space for storing the empty car and the bogie carrying the work are provided. Storage space is eliminated, and the number of bogies is drastically reduced, so that the space utilization efficiency can be significantly improved, and at the same time, the equipment required for storage can be reduced to reduce equipment costs. , The floor conveyor is formed so that the truck traveling in the drying furnace returns immediately to the drying furnace without transporting the work to the next process, so the amount of heat consumed in the drying furnace is reduced and running costs are reduced. It has an excellent effect that it can be performed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る塗装設備のレイアウトとそのラン
ニング状態を示す平面図。
FIG. 1 is a plan view showing a layout of a coating facility according to the present invention and a running state thereof.

【図2】そのストレージ状態を示す平面図。FIG. 2 is a plan view showing the storage state.

【図3】従来設備のレイアウトとそのランニング状態を
示す平面図。
FIG. 3 is a plan view showing a layout of a conventional facility and a running state thereof.

【図4】そのストレージ状態を示す平面図。FIG. 4 is a plan view showing the storage state.

【符号の説明】[Explanation of symbols]

1・・・・塗装設備 W・・・・ワーク 2・・・・オーバーヘッドコンベア H・・・・ハンガ 3・・・・循環軌道 4・・・・着荷装置 5・・・・前処理装置 6・・・・電着塗装装置 7・・・・エレベータ装置 9・・・・フロアコンベア T・・・・台車 8・・・・乾燥炉 8out ・・乾燥炉出口 8in ・・乾燥炉入口 10・・・・循環軌道 11・・・・コンベア 12・・・・脱荷装置 13・・・・第一のストレージ軌道 14・・・・第二のストレージ軌道 13a,14a・・・引込側 13b,14b・・・送出側 P1 ・・・着荷位置 P2 ・・・載換え位置 P3 ・・・載返し位置 P4 ・・・脱荷位置1 ··· Coating equipment W ··· Work 2 ··· Overhead conveyor H ··· Hanger 3 ··· Circulation trajectory 4 ··· Loading device 5 ··· Pretreatment device 6 ··· Electrodeposition coating device 7 ··· Elevator device 9 ··· Floor conveyor T ··· Dolly 8 ··· Drying furnace 8out ··· Drying furnace outlet 8in ··· Drying furnace inlet 10 · Circulation track 11 ··· Conveyor 12 ··· Unloading device 13 ··· First storage track 14 ··· Second storage track 13a, 14a ··· Retraction side 13b, 14b ···・ Sending side P 1・ ・ ・ Reception position P 2・ ・ ・ Replacement position P 3・ ・ ・ Return position P 4・ ・ ・ Unload position

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 循環軌道(3)に形成されたオーバーヘ
ッドコンベア(2)に沿って、前工程から搬送されてく
るワーク(W)を所定の着荷位置(P1) で前記オーバー
ヘッドコンベア(2)のハンガ(H)に着荷する着荷装
置(4)と、当該着荷装置(4)で着荷されたワーク
(W)の表面を前処理する前処理装置(5)と、当該前
処理装置(5)で前処理の終了したワーク(W)を塗料
に浸漬してその表面に塗料を付着させる塗装装置(6)
と、当該塗装装置(6)で塗料が付着されたワーク
(W)を所定の載換え位置 (P2) でオーバーヘッドコン
ベア(2)のハンガ(H)から降ろして乾燥炉(8)内
を走行するフロアコンベア(9)の台車(T)に載せ換
えるエレベータ装置(7)が順に配設されて成り、ワー
ク(W)をオーバーヘッドコンベア(2)で搬送しなが
ら前処理及び塗装を行った後、当該ワーク(W)をフロ
アコンベア(9)の台車(T)に載せ換えて搬送しなが
ら乾燥させ、乾燥終了後に次工程へ搬送するように成さ
れた塗装設備において、 前記フロアコンベア(9)は、乾燥炉(8)内を走行し
て乾燥炉出口(8out)から前記載換え位置(P2)を通り
乾燥炉入口(8in)に戻る循環軌道(10)に形成されると
共に、乾燥炉出口(8out) から載換え位置(P2)に至る
フロアコンベア(9)の循環軌道(10)に沿って、前記
乾燥炉(8)で乾燥終了したワーク(W)を所定の載返
し位置 (P3) で当該フロアコンベア(9)の台車(T)
から再びオーバーヘッドコンベア(2)のハンガ(H)
に載せ返すエレベータ装置(7)が配設され、前記載返
し位置 (P3) から前記着荷位置(P1) に戻るオーバーヘ
ッドコンベア(2)の循環軌道(3)に沿って、前記載
返し位置 (P3) でハンガ(H)に載せ返されたワーク
(W)を所定の脱荷位置 (P4) でオーバーヘッドコンベ
ア(2)から降ろして次工程へ移送するコンベア(11)
に載せ換える脱荷装置(12)が順に配設され、 前記オーバーヘッドコンベア(2)の循環軌道(3)上
を移送されるハンガ(H)の所定台数分のワーク(W)
をハンガ(H)に懸吊した状態でストレージするループ
状の第一のストレージ軌道(13)が、その引込側(13a)
及び送出側(13b) を前記オーバーヘッドコンベア(2)
の載返し位置 (P3) と脱荷位置 (P4)の間で当該循環軌
道(3)に分岐及び合流するように敷設され、 前記フロアコンベア(9)の循環軌道(10)を走行する
台車(T)の所定台数分の予備ハンガ (Hs) を備え、当
該予備ハンガ (Hs) にワーク(W)を懸吊した状態でス
トレージするループ状の第二のストレージ軌道(14)
が、その引込側(14a)を前記オーバーヘッドコンベア
(2)の載返し位置 (P3) と脱荷位置 (P4) の間で当該
循環軌道(3)から分岐させると共に、その送出側(14
b)を前記オーバーヘッドコンベア(2)の載返し位置
(P3) の手前で当該循環軌道(3)に合流させるように
敷設され、 ワーク(W)の前工程からの搬入及び次工程への搬出が
停止した時点で、前記オーバーヘッドコンベア(2)及
びフロアコンベア(9)で搬送中の全てのワーク(W)
について、前処理,塗装及び乾燥を終了させて、先頭側
の所要台数のワーク(W)を前記載返し位置 (P3) でハ
ンガ(H)に載せ返した後、当該ハンガ(H)に懸吊し
た状態で前記第一のストレージ軌道(13)にストレージ
すると共に、残りのワーク(W)を予備ハンガ(Hs) に
載せ返した後、当該予備ハンガ(Hs) に懸吊した状態で
状態で前記第二のストレージ軌道(14)にストレージす
るように成されたことを特徴とする塗装設備。
1. A work (W) conveyed from a previous process is moved along an overhead conveyor (2) formed on a circulation track (3) at a predetermined loading position (P 1 ) to the overhead conveyor (2). Loading device (4) for loading on the hanger (H), a pretreatment device (5) for pretreating the surface of the work (W) loaded by the loading device (4), and the pretreatment device (5) A coating device (6) for immersing the work (W), which has been subjected to the pre-treatment, in the paint and applying the paint to the surface thereof
Then, the work (W) to which the paint has been applied by the coating device (6) is lowered from the hanger (H) of the overhead conveyor (2) at a predetermined transfer position (P 2 ) and travels through the drying furnace (8). And an elevator device (7) for transferring the work (W) to the carriage (T) of the floor conveyor (9), which is pre-processed and painted while transporting the work (W) by the overhead conveyor (2). The work (W) is placed on a truck (T) of a floor conveyor (9), dried while being conveyed, and is dried. After the drying is completed, the coating equipment is conveyed to the next step. a drying oven (8) in is formed in a circulation track (10) back to traveling the drying furnace outlet according repositioned before the (8out) (P 2) street drying oven entrance (8in), drying furnace outlet off, from (8out) to Nokae position (P 2) Akonbea (9) along a circular trajectory (10), the carriage of drying furnace (8) in dry finished workpiece (W) a predetermined mounting flashing position (P 3) in the floor conveyor (9) (T)
Again from the hanger (H) on the overhead conveyor (2)
An elevator device (7) is mounted on the overhead conveyor (2) which returns from the return position (P 3 ) to the loading position (P 1 ) along the circulation path (3) of the overhead conveyor. A conveyor (11) for transferring the work (W) returned to the hanger (H) at (P 3 ) from the overhead conveyor (2) at a predetermined unloading position (P 4 ) and transferring it to the next process
The unloading device (12) for reloading the work (W) is arranged in order, and works (W) for a predetermined number of hangers (H) transferred on the circulation track (3) of the overhead conveyor (2).
The first storage track (13) in the form of a loop for storing the data while suspending it on a hanger (H) is provided on the retracted side (13a).
And the sending side (13b) to the overhead conveyor (2).
Between the loading position (P 3 ) and the unloading position (P 4 ) so as to branch and join the circulation track (3) and travel on the circulation track (10) of the floor conveyor (9). A loop-shaped second storage track (14) that has a predetermined number of spare hangers (Hs) of the trolleys (T) and stores the work (W) suspended in the spare hangers (Hs).
Diverges the inlet side (14a) from the circulation track (3) between the return position (P 3 ) and the unloading position (P 4 ) of the overhead conveyor (2), and branches the outlet side (14a).
b) is the return position of the overhead conveyor (2)
Before (P 3 ), it is laid so as to join the circulation track (3), and when the loading of the work (W) from the previous process and the unloading to the next process are stopped, the overhead conveyor (2) and All works (W) being conveyed on the floor conveyor (9)
After finishing the pretreatment, painting and drying, the required number of workpieces (W) on the top side are placed on the hanger (H) at the return position (P 3 ) described above, and then suspended on the hanger (H). After being suspended and stored in the first storage track (13), the remaining work (W) is placed back on the spare hanger (Hs), and then suspended in the spare hanger (Hs). A coating facility characterized by being stored in the second storage track (14).
JP22953296A 1996-08-30 1996-08-30 Painting equipment Expired - Fee Related JP3615876B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22953296A JP3615876B2 (en) 1996-08-30 1996-08-30 Painting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22953296A JP3615876B2 (en) 1996-08-30 1996-08-30 Painting equipment

Publications (2)

Publication Number Publication Date
JPH1071356A true JPH1071356A (en) 1998-03-17
JP3615876B2 JP3615876B2 (en) 2005-02-02

Family

ID=16893651

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22953296A Expired - Fee Related JP3615876B2 (en) 1996-08-30 1996-08-30 Painting equipment

Country Status (1)

Country Link
JP (1) JP3615876B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999044751A1 (en) * 1998-03-04 1999-09-10 Trinity Industrial Corporation Coating equipment
JP2008081764A (en) * 2006-09-26 2008-04-10 Nissan Motor Co Ltd Conveyance system for coating surface treatment line
JP2015144979A (en) * 2014-01-31 2015-08-13 パナソニックIpマネジメント株式会社 Coating line
KR102307753B1 (en) * 2020-12-04 2021-10-01 황진리 Plant cultivation method and plant cultivation system for plant factory using cultivation bed of circulation rotarty type

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999044751A1 (en) * 1998-03-04 1999-09-10 Trinity Industrial Corporation Coating equipment
US6217652B1 (en) * 1998-03-04 2001-04-17 Trinity Industrial Corporation Coating equipment
JP2008081764A (en) * 2006-09-26 2008-04-10 Nissan Motor Co Ltd Conveyance system for coating surface treatment line
JP2015144979A (en) * 2014-01-31 2015-08-13 パナソニックIpマネジメント株式会社 Coating line
KR102307753B1 (en) * 2020-12-04 2021-10-01 황진리 Plant cultivation method and plant cultivation system for plant factory using cultivation bed of circulation rotarty type

Also Published As

Publication number Publication date
JP3615876B2 (en) 2005-02-02

Similar Documents

Publication Publication Date Title
WO1999044751A1 (en) Coating equipment
JP2013030003A (en) Processing facility
JP2607982B2 (en) Electrocoating equipment
JP3067682B2 (en) Overhead traveling vehicle system
JPH1071356A (en) Coating equipment
JP3615877B2 (en) Painting equipment
JPH08127898A (en) Dipping device
JP3574228B2 (en) Detachable loading device for transport conveyor
KR950012430B1 (en) Process for electrodepotion coating
JP4872566B2 (en) Paint surface treatment line transport system
JP2906091B2 (en) Surface treatment method and surface treatment device
JP3458691B2 (en) Transport equipment for electrodeposition coating process
JPH0657327B2 (en) Painting process equipment using hanging beams
Betz et al. Electroporcelain enameling
JP4021802B2 (en) Electrodeposition coating system
JPH073498A (en) Immersion treating device
JP4949741B2 (en) Wire coil transfer system
JPH06228793A (en) Conveyor for electrodeposition
TW436459B (en) Storage apparatus having synchronously accessing ports and automatic conveying system
JP2915845B2 (en) Electrocoating system
JPS595348B2 (en) Painting conveyance device
JPH06200359A (en) Hot-dip metal coating system
JPH03202498A (en) Work hanger for electrodeposition coating and its transferring and conveying device
JP3148441B2 (en) Immersion processing equipment
JPS63141671A (en) Method for conveying vehicle body in painting line

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040315

A131 Notification of reasons for refusal

Effective date: 20040427

Free format text: JAPANESE INTERMEDIATE CODE: A131

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041012

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041102

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081112

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees