JP3574228B2 - Detachable loading device for transport conveyor - Google Patents

Detachable loading device for transport conveyor Download PDF

Info

Publication number
JP3574228B2
JP3574228B2 JP19371495A JP19371495A JP3574228B2 JP 3574228 B2 JP3574228 B2 JP 3574228B2 JP 19371495 A JP19371495 A JP 19371495A JP 19371495 A JP19371495 A JP 19371495A JP 3574228 B2 JP3574228 B2 JP 3574228B2
Authority
JP
Japan
Prior art keywords
conveyor
loading
work
skid
transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP19371495A
Other languages
Japanese (ja)
Other versions
JPH0940169A (en
Inventor
優 大久保
田 哲 也 吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Trinity Industrial Corp
Original Assignee
Trinity Industrial Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Trinity Industrial Corp filed Critical Trinity Industrial Corp
Priority to JP19371495A priority Critical patent/JP3574228B2/en
Publication of JPH0940169A publication Critical patent/JPH0940169A/en
Application granted granted Critical
Publication of JP3574228B2 publication Critical patent/JP3574228B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、周回軌道に沿って移送されるハンガや台車等の搬送体に被搬送物を支持させて搬送する搬送コンベアに対し、搬送体で搬送されてきた被搬送物を脱荷した後、当該搬送体に他の被搬送物を着荷する搬送コンベア用の着脱荷装置に関する。
【0002】
【従来の技術】
例えば、被塗物に前処理を施した後、電着塗装を行う塗装工程においては、被塗物をハンガで吊り下げた状態で連続的に搬送するために、搬送コンベアとしてオーバーヘッドコンベアが用いられている。
図4はこのようなオーバーヘッドコンベアを用いて前処理−電着塗装−塗膜乾燥までを連続的に行う塗装設備のレイアウトを示すもので、周回軌道41に沿って、被塗物Wをハンガ(図示せず)に載せる着荷装置42や、ハンガで搬送される被塗物Wに対して脱脂処理,水洗処理,皮膜化成処理等を行う前処理装置43や、電着塗装を行う貯留された電着槽44や、被塗物の表面に付着している余剰な電着液を除去する水洗装置45や、塗膜を加熱乾燥する塗装乾燥炉46や、乾燥終了した被塗物Wをハンガから脱荷する脱荷装置47が配設されている。
【0003】
これによれば、周回軌道41に沿って連続的に移送されるハンガが所定の着荷位置に到来すると、着荷装置42により被塗物Wが着荷されて搬送され、前処理装置43,電着槽44,水洗装置45,塗装乾燥炉46で夫々所定の処理が施された後、脱荷装置47に至る。
そして脱荷装置47で被塗物Wが脱荷されると、空になったハンガは、再び着荷位置に移送され、着荷装置42で新たな被塗物Wが載せられて、周回軌道41を循環する。
【0004】
【発明が解決しようとする課題】
しかしながら、ハンガが周回軌道41に沿って連続的に移送されている以上、ハンガから被塗物を脱荷した後でなければ、当該ハンガに新たな被塗物を着荷することができないので、脱荷装置と着荷装置を別々に設置しなければならず、しかも、脱荷装置及び着荷装置にハンガを停止させる際にストレージさせなければならないので、面積の限られた工場内に非常に大きな設置スペース及びストレージスペースを確保しなければならという問題があった。
また、脱荷位置及び着荷位置の夫々でハンガを一旦停止させて、脱荷作業/着荷作業を行わなければならないので、作業効率が低下するという問題があった。
さらに、ワークがスキッドに載せられたままの状態で搬送され、ワーク脱荷位置でワークWout をスキッドSout から離して当該ワークWout のみを脱荷し、ワーク着荷位置でハンガから空のスキッドSout を降ろした後、当該ハンガに別のワークWin及びスキッドSinを着荷するようになされたオーバーヘッドコンベアでは、図5に示すように、ワーク脱荷位置に設置されたワーク脱荷装置51ではワークWout しか脱荷されないので、ワーク着荷位置には空のスキッドSout を脱荷するスキッド脱荷装置52とワークWinをスキッドSinに載せたままの状態で着荷するワーク着荷装置53を並設させなければならず、その分、さらに大きな設置スペース及びストレージスペースを確保しなければならなかった。
そこで、本発明は、同じ位置で脱荷と着荷を行えるようにして搬送体の停止回数を減らすことにより作業効率を向上させるだけでなく、被搬送物をそのまま搬送体に載せて移送する場合には、一台の着脱荷装置でワークの脱荷と着荷を行うことができ、また、ワークをスキッドに載せた状態で移送する場合には、ワーク着荷位置に設置された一台の着脱荷装置で空のスキッドの脱荷とワークの着荷を行うことにより、その設置スペース及びストレージスペースを大幅に削減することを技術的課題としている。
【0005】
【課題を解決するための手段】
この課題を解決するために、本発明は、搬送コンベアの周回軌道に沿って移送される搬送体に被搬送物を支持させて搬送する際に、所定の搬送体停止位置で、搬送体により搬送されてきた被搬送物を脱荷した後、当該搬送体に他の被搬送物を着荷する搬送コンベア用の着脱荷装置であって、前記搬送コンベアの上方又は下方に位置して、前記搬送体に着荷しようとする被搬送物を搬入する搬入用コンベアと、前記搬送体から脱荷した被搬送物を回収する回収用コンベアが上下二段に配設されると共に、前記搬入用コンベアから前記搬送コンベアの搬送体に被搬送物を載せ換えて着荷する被搬送物搬入用昇降テーブルと、前記搬送コンベアの搬送体から被搬送物を脱荷して回収用コンベアに載せ換える被搬送物回収用昇降テーブルを上下二段に形成したエレベータ装置が設置され、当該エレベータ装置の被搬送物搬入用昇降テーブルには、着荷しようとするワークを支持するフォークが搬入用コンベア及び搬送コンベア搬送体に対して進退可能に配設されると共に、被搬送物回収用昇降テーブルには、脱荷した被搬送物を支持するフォークが搬送コンベアの搬送体及び回収用コンベアに対して進退可能に配設されたことを特徴とする。
【0006】
本発明によれば、搬入用コンベアで被搬送物が搬入されると、搬入用昇降テーブルのフォークを搬入用コンベアに対して進出させ、被搬送物をフォーク上に支持させる。
そして、例えば搬送コンベアの下方に、搬入用コンベア及び回収用コンベアが敷設されている場合、搬入用昇降テーブルに被搬送物を載せたまま、当該昇降テーブルと回収用昇降テーブルをエレベータ装置で上昇させ、回収用昇降テーブルが搬送体との間で被搬送物の受渡しが可能な高さに位置決めされて、搬送物が搬送体停止位置に到来するまで待機する。
【0007】
そして、搬送体が停止位置に到来すると、まず回収用昇降テーブルのフォークが搬送体に対して進出させ、搬送体で搬送されてきた被搬送物を回収用昇降テーブルのフォーク上に支持させて脱荷し、搬送体を空にした後、今度は、搬入用昇降テーブルを搬送体との間で被搬送物の受渡しが可能な高さに位置決めしてそのフォークを搬送体に対して進退させることにより、フォークで支持している被搬送物を搬送体に着荷させる。
最後に、回収用昇降テーブルを降下させ、回収用コンベアに対してフォークを進退させると、搬送体から脱荷された被搬送物を回収用コンベアに載せ替えて着脱荷作業が完了する。
【0008】
【発明の実施の形態】
以下、本発明を図面に記載した実施形態に基づいて具体的に説明する。
図1は本発明に係る搬送コンベア用の着脱荷装置の一例を示す斜視図、図2はその動作を示す説明図である。
【0009】
本例はオーバーヘッドコンベアの着脱荷装置に適用したものである。
図中1は、周回軌道2に沿ってワーク(被搬送物)Win,Wout をハンガ(搬送体)3に吊り下げて搬送するオーバーヘッドコンベア(搬送用コンベア)であって、予め設定されたワーク着脱荷位置(搬送体停止位置)には、ハンガ3で搬送されてきたワークWout を脱荷した後、同じ位置で当該ハンガ3に他のワークWinを着荷する着脱荷装置4が設置されている。
このハンガ3は、少なくともその片側側面からワークWin,Wout を着脱荷することができる形状に形成され、例えば正面から見てC型またはL型のものが用いられている。
【0010】
そして、ワーク着脱荷位置には、前記搬送コンベア1の下方に位置して、当該コンベア1に対して直交する方向から、ハンガ3に着荷しようとするワークWinを搬入する搬入用コンベア5Aと、ハンガ3から脱荷したワークWout を回収する回収用コンベア5Bが上下二段に配設されている。
また、搬入用コンベア5Aからオーバーヘッドコンベア1のハンガ3にワークWinを載せ換えて着荷するワーク搬入用昇降テーブル (被搬送物搬入用昇降テーブル)6Aと、オーバーヘッドコンベア1のハンガ3からワークWout を脱荷して回収用コンベア5Bに載せ換える被搬送物回収用昇降テーブル6Bを上下二段に形成したエレベータ装置7が設置され、一台の昇降駆動装置(図示せず)により前記各テーブル6A及び6Bが一体的に上下に昇降移動されるようになされている。
【0011】
前記エレベータ装置7のワーク搬入用昇降テーブル6Aには、着荷しようとするワークWinを支持するフォーク8Aが搬入用コンベア5A及びオーバーヘッドコンベア1のハンガ3に対して進退可能に配設されると共に、ワーク回収用昇降テーブル6Aには、脱荷した被搬送物Wout を支持するフォーク8Aがオーバーヘッドコンベア1のハンガ3及び回収用コンベア5Bに対して進退可能に配設されている。
【0012】
そして、ハンガ3又は搬入用コンベア5Aで搬送されてきたワークWin,Wout を各昇降テーブル6A,6Bに受け渡すときは、ワークWin,Wout の下にフォーク8A,8Bを伸長させて挿し入れた後、各昇降テーブル6A,6Bを上昇させれば、ワークWin,Wout がフォーク8A,8B上に支持される。
また、昇降テーブル6A,6Bのフォーク8A,8Bに支持されたワークWin,Wout をハンガ3,回収用コンベア5B上に受け渡すときは、フォーク8A,8B上を伸長させた状態で、各テーブル6A,6Bを降下させてハンガ3,回収用コンベア5B上にワークWin,Wout を降ろした後、フォーク8A,8Bを抜き出せばよい。
【0013】
なお、本例では、搬入用コンベア5Aがエレベータ装置7に対して進退可能に配設され、前記ワーク搬入用昇降テーブル6Aとの間でワークWinの受渡しが行われるときに伸長され、ワーク回収用昇降テーブル6Bのフォーク8Bを伸ばした状態でその上にワークWout を載せたまま当該テーブル6Bを回収用コンベア5Bの高さまで降下させるときは、邪魔にならないように収縮される。
【0014】
以上が本発明の一例構成であって、次にその動作について図2を伴って説明する。
オーバーヘッドコンベア1のハンガ3で搬送されてきたワークWout を脱荷して、搬入用コンベア5Aで搬入されたワークWinをオーバーヘッドコンベア1に着荷する際は、まず、搬入用コンベア5Aで搬入されたワークWinをワーク搬入用昇降テーブル6Aのフォーク8Aに受け渡す。
このとき、図2(a)に示すように、ワーク搬入用昇降テーブル6Aのフォーク8Aを伸ばして、搬入用コンベア5Aよりやや低めに待機させ、次いで、搬入用コンベア5Aを伸長させると共に、その先端位置までワークWinを搬入し、この状態でエレベータ装置7によりワーク搬入用昇降テーブル6Aを上昇させる。
そして、フォーク8Aが搬入用コンベア5Aの切欠部9A(図1参照)を通って上方に抜けるときに当該フォーク8AによりワークWinが搬入用コンベア5Aから持ち上げられるので、ワークWinはフォーク8A上に支持される。
なお、ワークWinを受け取ったフォーク8Aは収縮させて、ワークWinをテーブル6A上に位置させておく。
【0015】
次いで、ハンガ3で搬送されてきたワークWout を脱荷する。
このとき、図2(b)に示すように、ワーク回収用昇降テーブル6Bのフォーク8Bを伸ばしてハンガ3よりやや低めに待機させ、ハンガ3が停止した時点で、エレベータ装置7によりワーク回収用昇降テーブル6Bを上昇させる。
そして、フォーク8Bがハンガ3のフレームの間を通って上方に抜けるときに当該フォーク8BによりワークWout がハンガ3から持ち上げられるので、ワークWout はフォーク8B上に支持されることとなり、このフォーク6Bを収縮させればワークWout はワーク回収用昇降テーブル7B上に移動し、ハンガ3は空になる。
【0016】
ハンガ3が空になったら、今度は、ワーク搬入用昇降テーブル6Aのフォーク8Aに支持されているワークWinをハンガ3に着荷する。
これは、図2(c)に示すように、ワーク搬入用昇降テーブル6Aをハンガ3よりやや高い位置まで降下させ、フォーク8Aを伸長させることによりワークWinをハンガ3内に差し出し、この状態でエレベータ装置7によりワーク搬入用昇降テーブル6Aをハンガ3の下まで降下させる。
これにより、フォーク8Aはハンガ3のフレームの間を通って下方に抜け、ワークWinのみがハンガ3上に残り、したがってワークWinがハンガ3に着荷される。
【0017】
そして最後に、ハンガ3から脱荷されてワーク回収用昇降テーブル6Bのフォーク8Bに支持されているワークWout を回収用コンベア5Bに受け渡す。
これは、図2(d)に示すように、搬入用コンベア5Aを元の位置に退避させておき、フォーク8Bを伸長させてワークWout を横に差し出したまま、ワーク回収用昇降テーブル6Bを回収用コンベア5Bの下まで降下させる。
これにより、フォーク8Bは回収用コンベア5Bの切欠部9Bを通って下方に抜け、ワークWout のみが回収用コンベア8B上に残り、したがってワークWout が回収用コンベア8B上に受け渡され、当該コンベア8Bにより次工程へ送られる。
【0018】
このように、本例によれば、搬入用コンベア5Aと回収用コンベア5Bが上下二段に配設されると共に、ワーク搬入用昇降テーブル6A及びワーク回収用昇降テーブル6Bが上下二段に配設されており、当該各テーブル6A及び6Bをエレベータ装置7で昇降させることにより、ハンガ3で搬送されてきたワークWout の脱荷と、これから搬送しようとするワークWinの着荷を、同じ位置で行うことができるから、着脱荷装置4が一台で足り、ワークの着脱荷に必要なスペースを従来の約半分に押さえることができると同時に、ハンガを停止させる回数も一回で済むので作業効率が向上する。
【0019】
図3は本発明に係る他のオーバーヘッドコンベア用の着脱荷装置の動作を示すもので、図1及び図2と共通する部分については同一符号を付して詳細説明は省略する。
本例は、周回軌道2に沿って移送されるハンガ3にワークをスキッドに載せた状態で支持させて搬送し、ワーク脱荷位置(図示せず)でワークをスキッドSout から離して当該ワークのみをハンガ3から脱荷し、ワーク着荷位置で空のスキッドSout を脱荷した後、当該ハンガ3にワークWinをスキッドSinに載せたままの状態で着荷するオーバーヘッドコンベア1の着脱荷装置として使用したものである。
【0020】
このオーバーヘッドコンベア1のワーク着荷位置に設置される本例の着脱荷装置20は、ハンガ3に着荷しようとするワークWinをスキッドSinに載せたままの状態で搬入する搬入用コンベア21Aと、前記ハンガ3からスキッドSout を脱荷して回収する回収用コンベア21Bが上下二段に形成されてオーバーヘッドコンベア1の下方に配設されると共に、搬入用コンベア21Aからオーバーヘッドコンベア1のハンガ3にワークWinをスキッドSinに載せたままの状態で載せ換えるワーク搬入用昇降テーブル22Aと、ハンガ3から回収用コンベア21BにスキッドSout を載せ換えるスキッド回収用昇降テーブル22Bを上下二段に形成したエレベータ装置23が設置されている。
【0021】
また、エレベータ装置23のワーク搬入用昇降テーブル22Aには、着荷しようとするワークWinをスキッドSinに載せたまま支持するフォーク24Aが、搬入用コンベア21A及びオーバーヘッドコンベア1のハンガ3に対して進退可能に配設されると共に、スキッド回収用昇降テーブル22Bには、脱荷したスキッドSout を支持するフォーク21Bが、オーバーヘッドコンベア1のハンガ3及び回収用コンベア24Bに対して進退可能に配設されている。
【0022】
なお、本例ではスキッド回収用昇降テーブル22Bと回収用コンベア21Bは、その上に厚みの薄いスキッドSout を載せることができればよいことから、各コンベア21A,21Bの間隔や、各昇降テーブル22A,22Bの間隔は低く設定されている。
【0023】
この着脱荷装置20によれば、まず、搬入用コンベア21Aで搬入されたワークWinをワーク搬入用昇降テーブル22Aに受け渡す。これは、図3(a)に示すように、ワーク搬入用昇降テーブル22Aのフォーク24Aを伸ばして、搬入用コンベア21Aよりやや低めに待機させ、次いで、搬入用コンベア21Aを伸長させると共に、その先端位置までワークWinをスキッドSinに載せたまま搬入し、この状態でエレベータ装置23によりワーク搬入用昇降テーブル22Aを上昇させれば、ワークWinがスキッドSinに載せられたままフォーク21A上に支持される。
【0024】
次いで、既にワーク脱荷位置でワークが降ろされたハンガ3に残っている空のスキッドSout を脱荷する。これは、図3(b)に示すように、スキッド回収用昇降テーブル22Bのフォーク21Bを伸ばしてハンガ3よりやや低めに待機させ、ハンガ3が停止した時点でエレベータ装置23によりスキッド回収用昇降テーブル22Bを上昇させると、スキッドSout がフォーク24B上に支持されることとなり、このフォーク21Bを収縮させればワークWout はスキッド回収用昇降テーブル7B上に移動し、ハンガ3は空になる。
【0025】
ハンガ3が空になったら、今度は、ワーク搬入用昇降テーブル22Aのフォーク24A上に支持されているワークWin及びスキッドSinをハンガ3に着荷する。これは、図3(c)に示すように、ワーク搬入用昇降テーブル22Aをハンガ3よりやや高い位置まで降下させ、フォーク21Aを伸長させることによりワークWinをスキッドSinに載せたままハンガ3内に差し出し、この状態でエレベータ装置23によりワーク搬入用昇降テーブル22Aをハンガ3の下まで降下させれば、フォーク21Aは搬入用コンベア24Aの切欠部を通って下方に抜け、ワークWin及びスキッドSinがハンガ3上に残り、したがってワークWin及びスキッドSinがハンガ3に着荷されることとなる。
【0026】
そして最後に、ハンガ3から脱荷されてスキッド回収用昇降テーブル22Bのフォーク24Bに支持されているスキッドSout を回収用コンベア21Bに受け渡す。これは、図3(d)に示すように、搬入用コンベア21Aを元の位置に退避させておき、フォーク24Bを伸長させてスキッドSout を横に差し出したまま、スキッド回収用昇降テーブル22Bを降下させていき、回収用コンベア21Bの下まで降下させれば、フォーク21Bは回収用コンベア24Bの切欠部を通って下方に抜け、スキッドSout のみが回収用コンベア24B上に残り、したがってスキッドSout が回収用コンベア21B上に受け渡される。
【0027】
このように、本例によれば、搬入用コンベア21Aと回収用コンベア21Bが上下二段に配設されると共に、ワーク搬入用昇降テーブル22A及びスキッド回収用昇降テーブル22Bが上下二段に配設されており、当該各テーブル22A及び22Bをエレベータ装置23で昇降させることにより、ハンガ3で搬送されてきたワークWout の脱荷と、これから搬送しようとするワークWinの着荷を、同じ位置で行うことができるから、ワーク着荷位置に、スキッド脱荷装置を別途設ける必要がなく、設置スペースを大幅に節約することができる。
また、スキッドの脱荷とワークの着荷が同じ位置で行われるので、ハンガ3を小刻みに停止させる必要がなく作業効率が向上する。
【0028】
なお、上記実施形態の説明では、いずれもオーバーヘッドコンベア1の着脱荷装置として使用した場合について説明したが、周回軌道に沿って台車が走行する通常のフロアコンベアやその他のコンベアの着脱荷装置として使用することもできる。
また、搬入用コンベア6A及び21Aと,回収用コンベア6B及び21Bをオーバーヘッドコンベア1の下方に敷設した場合について説明したが、本発明はこれに限らずオーバーヘッドコンベア1の上方に位置させて敷設する場合であってもよい。
【0029】
【発明の効果】
以上述べたように、本発明によれば、ハンガで搬送されてきた被搬送物の脱荷と、これからハンガに載せて搬送させようすとする被搬送物の着荷を同じ位置で行うことができるので、脱荷装置と着荷装置を別々に設置する必要がなく、例えば工場内の限られたスベースを有効に利用することができ、また、ハンガの停止回数が減少するので作業効率が向上するという大変優れた効果を有する。
【図面の簡単な説明】
【図1】本発明に係る搬送コンベア用の着脱荷装置の一例を示す斜視図。
【図2】その動作を示す説明図。
【図3】本発明に係る他の着脱荷装置及びその動作を示す説明図。
【図4】従来装置の設置形態を示す説明図。
【図5】他の従来装置の設置形態を示す説明図。
【符号の説明】
1・・・オーバーヘッドコンベア(搬送コンベア)
2・・・周回軌道
Win,Wout ・・・ワーク(被搬送物)
3・・・ハンガ(搬送体)
4・・・着脱荷装置
5A・・搬入用コンベア
5B・・回収用コンベア
6A・・ワーク搬入用昇降テーブル
6B・・ワーク回収用昇降テーブル
7・・・エレベータ装置
8A,8B・・・フォーク
20・・・着脱荷装置
Sin,Sout ・・スキッド
21A・・搬入用コンベア
21B・・回収用コンベア
22A・・ワーク搬入用昇降テーブル
22B・・スキッド回収用昇降テーブル
23・・・エレベータ装置
24A,24B・・フォーク
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention is, with respect to the transporting conveyer for conveying by supporting the object to be conveyed to the conveying member such as a hanger or carriage which is transported along the orbit, after Datsuni transferred object which is conveyed by the conveying member, The present invention relates to a loading / unloading device for a transport conveyor that loads another transported object onto the transport body.
[0002]
[Prior art]
For example, after applying a pretreatment to the object to be coated, in the coating step of performing electrodeposition coating, in order to continuously transport the object to be coated while being hung by a hanger, an overhead conveyor is used as a transport conveyor. ing.
FIG. 4 shows a layout of a coating facility for continuously performing pretreatment, electrodeposition coating, and coating film drying using such an overhead conveyor. (Not shown), a pretreatment device 43 for performing a degreasing process, a washing process, a film conversion process, etc. on the workpiece W conveyed by a hanger, and a stored electrode for performing electrodeposition coating. The coating tank 44, a water washing device 45 for removing excess electrodeposition liquid adhering to the surface of the object to be coated, a coating drying furnace 46 for heating and drying the coating film, and a coating object W that has been dried are removed from a hanger. An unloading device 47 for unloading is provided.
[0003]
According to this, when the hanger continuously transported along the orbit 41 reaches a predetermined loading position, the workpiece W is loaded and transported by the loading device 42, and the pretreatment device 43, the electrodeposition tank After a predetermined process is performed in each of 44, a water washing device 45, and a paint drying furnace 46, the process reaches an unloading device 47.
When the article W is unloaded by the unloading device 47, the emptied hanger is transported again to the loading position, and a new article W is loaded by the loading device 42, and the trajectory 41 is moved. Circulate.
[0004]
[Problems to be solved by the invention]
However, as long as the hanger is continuously transferred along the orbit 41, the object cannot be loaded on the hanger unless the object is unloaded from the hanger. Since the loading device and the receiving device must be installed separately, and the unloading device and the receiving device must be stored when the hanger is stopped, a very large installation space is required in a factory with a limited area. And the need to secure storage space.
Further, since the hanger must be temporarily stopped at each of the unloading position and the receiving position to perform the unloading / receiving operation, there is a problem that the working efficiency is reduced.
Further, the work is conveyed while being placed on the skid, the work Wout is separated from the skid Sout at the work unloading position, only the work Wout is unloaded, and the empty skid Sout is unloaded from the hanger at the work loading position. After that, in the overhead conveyor in which another work Win and skid Sin are loaded on the hanger, only the work Wout is unloaded by the work unloading device 51 installed at the work unloading position, as shown in FIG. Therefore, a skid unloading device 52 for unloading the empty skid Sout and a work loading device 53 for loading the workpiece Win on the skid Sin must be provided side by side at the workpiece loading position. In addition, more space and storage space had to be secured.
Accordingly, the present invention not only improves the work efficiency by reducing the number of stops of the transport body by enabling unloading and arrival at the same position, but also when the transported object is directly mounted on the transport body and transferred. Can be used for unloading and loading of a work with a single loading / unloading device, and when transferring a work placed on a skid, a single loading / unloading device installed at the work loading position A technical problem is to significantly reduce installation space and storage space by unloading empty skids and loading workpieces.
[0005]
[Means for Solving the Problems]
In order to solve this problem, the present invention provides a method for transporting an object by supporting the object to be transported along a conveyor orbit of a transport conveyor and transporting the transported object at a predetermined transport body stop position. A loading and unloading device for a conveyor for unloading a conveyed object and then loading another object to be conveyed on the conveyor, wherein the conveyor is located above or below the conveyor, and A carry-in conveyor for carrying a conveyed object to be loaded on the conveyor, and a collection conveyor for collecting the conveyed material unloaded from the carrier are arranged in upper and lower two stages, and the conveyor is provided from the carry-in conveyor. A lifting table for loading and unloading an object to be conveyed onto the conveyor of the conveyer, and a lifting and lowering table for unloading the object to be conveyed from the conveyor of the conveyer and reloading the object on the conveyor for collection. Two tables up and down Are forms elevator apparatus installation, the object to be conveyed loading lifting table of the elevator installation, the fork for supporting a workpiece to be arrival is disposed for advancing and retracting with respect to the transport of the carrying-in conveyor and conveyor in that bets both the object to be conveyed recovery lifting table, characterized in that the fork for supporting the object to be conveyed that Datsuni is disposed for advancing and retracting with respect to the transport member and the collecting conveyor conveyor .
[0006]
According to the present invention, when an object to be conveyed is carried in by the carry-in conveyor, the fork of the carry-in elevating table is advanced to the carry-in conveyor, and the object to be carried is supported on the fork.
Then, for example, when a carry-in conveyor and a collection conveyor are laid below the conveyor, the elevator table and the collection elevating table are raised by the elevator device while the transported object is placed on the carry-in elevating table. Then, the recovery elevating table is positioned at a height at which the conveyed object can be delivered to and from the conveyer, and waits until the conveyed object reaches the conveyer stop position.
[0007]
When the transport body reaches the stop position, first, the fork of the recovery elevating table advances to the transport body, and the transported object transported by the transport body is supported on the fork of the recovery elevating table to be removed. After loading and emptying the carrier, this time, position the carry-in elevating table at a height at which the transferred object can be transferred to and from the carrier, and move the fork toward and away from the carrier. Thus, the transported object supported by the fork is loaded on the transport body.
Finally, when the recovery elevating table is lowered and the fork is moved forward and backward with respect to the recovery conveyor, the transported object unloaded from the carrier is replaced on the recovery conveyor, and the loading / unloading operation is completed.
[0008]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, the present invention will be specifically described based on embodiments illustrated in the drawings.
FIG. 1 is a perspective view showing an example of a loading / unloading device for a conveyor according to the present invention, and FIG. 2 is an explanatory diagram showing the operation thereof.
[0009]
This example is applied to a loading / unloading device for an overhead conveyor.
In FIG. 1, reference numeral 1 denotes an overhead conveyor (transport conveyor) for suspending and transporting works (transported objects) Win and Wout along a orbit 2 on a hanger (transport body) 3, and includes a preset work attachment / detachment. A loading / unloading device 4 that unloads the work Wout conveyed by the hanger 3 and then loads another work Win on the hanger 3 at the same position is installed at the load position (transportation body stop position).
The hanger 3 is formed in a shape in which the workpieces Win and Wout can be loaded and unloaded from at least one side surface thereof. For example, a C-shaped or L-shaped one viewed from the front is used.
[0010]
And, at the work loading / unloading position, a carry-in conveyor 5A for carrying the work Win to be loaded on the hanger 3 from a direction perpendicular to the conveyor 1 and a hanger. A collection conveyor 5B for collecting the work Wout unloaded from the conveyor 3 is provided in two upper and lower stages.
In addition, the work Wint is removed from the work conveyer lifting / lowering table (lifting table for loading / unloading the conveyed object) 6A for transferring the work Win onto the hanger 3 of the overhead conveyor 1 from the carry-in conveyor 5A and receiving the work Wout. An elevator device 7 is provided in which an up-down table 6B for loading and reloading the conveyed object is mounted on the collection conveyor 5B in two vertical stages, and each of the tables 6A and 6B is driven by a single up-down driving device (not shown). Are integrally moved up and down.
[0011]
A fork 8A for supporting a workpiece Win to be loaded is disposed on the work loading elevating table 6A of the elevator apparatus 7 so as to be able to advance and retreat with respect to the loading conveyor 5A and the hanger 3 of the overhead conveyor 1. On the collection elevating table 6A, a fork 8A supporting the unloaded conveyed object Wout is provided so as to be able to advance and retreat with respect to the hanger 3 of the overhead conveyor 1 and the collection conveyor 5B.
[0012]
When the work Win, Wout conveyed by the hanger 3 or the carry-in conveyor 5A is delivered to each of the elevating tables 6A, 6B, the forks 8A, 8B are extended and inserted under the work Win, Wout. When the lifting tables 6A and 6B are raised, the work Win and Wout are supported on the forks 8A and 8B.
When the work Win, Wout supported by the forks 8A, 8B of the elevating tables 6A, 6B is transferred to the hanger 3, the collection conveyor 5B, the tables 6A are extended with the forks 8A, 8B extended. , 6B to lower the work Win, Wout onto the hanger 3, the collecting conveyor 5B, and then pull out the forks 8A, 8B.
[0013]
In this example, the carry-in conveyor 5A is provided so as to be able to advance and retreat with respect to the elevator device 7, and is extended when the work Win is transferred to and from the work carry-in elevating table 6A, and is used for work collection. When the fork 8B of the elevating table 6B is extended and the table 6B is lowered to the height of the collection conveyor 5B with the work Wout placed thereon, it is contracted so as not to be in the way.
[0014]
The above is an example of the configuration of the present invention, and its operation will be described next with reference to FIG.
When unloading the work Wout carried by the hanger 3 of the overhead conveyor 1 and loading the work Win carried in by the carry-in conveyor 5A to the overhead conveyor 1, first, the work carried in by the carry-in conveyor 5A. Win is delivered to the fork 8A of the work loading / lowering table 6A.
At this time, as shown in FIG. 2 (a), the fork 8A of the work loading / lowering table 6A is extended to wait slightly lower than the loading conveyor 5A, and then the loading conveyor 5A is extended and its leading end is extended. The work Win is carried in to the position, and in this state, the work carrying lift table 6A is raised by the elevator device 7.
When the fork 8A passes upward through the notch 9A (see FIG. 1) of the carry-in conveyor 5A, the work Win is lifted from the carry-in conveyor 5A by the fork 8A, so that the work Win is supported on the fork 8A. Is done.
The fork 8A that has received the work Win is contracted so that the work Win is positioned on the table 6A.
[0015]
Next, the work Wout conveyed by the hanger 3 is unloaded.
At this time, as shown in FIG. 2 (b), the fork 8B of the work collection elevating table 6B is extended to stand by a little lower than the hanger 3, and when the hanger 3 stops, the elevator device 7 raises and lowers the work. Raise the table 6B.
The work Wout is lifted from the hanger 3 by the fork 8B when the fork 8B passes through the frame of the hanger 3 and comes out upward, so that the work Wout is supported on the fork 8B. When contracted, the work Wout moves onto the work collection elevating table 7B, and the hanger 3 becomes empty.
[0016]
When the hanger 3 is empty, the work Win supported by the fork 8A of the work loading / lowering table 6A is loaded on the hanger 3 this time.
As shown in FIG. 2C, the work loading elevating table 6A is lowered to a position slightly higher than the hanger 3, and the work Win is inserted into the hanger 3 by extending the fork 8A. The apparatus 7 lowers the work loading elevating table 6A below the hanger 3.
As a result, the fork 8A passes downward between the frames of the hanger 3, and only the work Win remains on the hanger 3, so that the work Win is loaded on the hanger 3.
[0017]
Finally, the work Wout unloaded from the hanger 3 and supported by the fork 8B of the work collection elevating table 6B is delivered to the collection conveyor 5B.
As shown in FIG. 2 (d), the loading conveyor 5A is retracted to the original position, the fork 8B is extended, and the work collection elevating table 6B is collected while the work Wout is extended sideways. Down to below the conveyor 5B.
As a result, the fork 8B passes downward through the notch 9B of the collection conveyor 5B, and only the work Wout remains on the collection conveyor 8B. Therefore, the work Wout is transferred to the collection conveyor 8B. To the next step.
[0018]
As described above, according to the present example, the carry-in conveyor 5A and the collection conveyor 5B are arranged in two upper and lower stages, and the work carry-in elevating table 6A and the work collection elevating table 6B are arranged in two upper and lower stages. By lifting the tables 6A and 6B by the elevator device 7, the unloading of the work Wout conveyed by the hanger 3 and the arrival of the work Win to be conveyed from now on are performed at the same position. As a result, only one loading / unloading device 4 is needed, the space required for loading / unloading the work can be reduced to about half of the conventional one, and at the same time, the hanger needs to be stopped only once, thus improving work efficiency. I do.
[0019]
FIG. 3 shows the operation of another loading / unloading device for an overhead conveyor according to the present invention. Parts common to those in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description is omitted.
In this example, the work is supported and transported on a hanger 3 transported along the orbit 2 while being mounted on a skid, and the work is separated from the skid Sout at a work unloading position (not shown) and only the work is moved. Was unloaded from the hanger 3 and the empty skid Sout was unloaded at the work loading position, and then used as a loading / unloading device for the overhead conveyor 1 for loading the hanger 3 while the work Win was still loaded on the skid Sin. Things.
[0020]
The loading / unloading device 20 of the present example installed at the work loading position of the overhead conveyor 1 includes a loading conveyor 21A for loading the workpiece Win to be loaded on the hanger 3 while being placed on the skid Sin, and the hanger 3, a collection conveyor 21B for unloading and collecting the skid Sout is formed in two upper and lower stages and disposed below the overhead conveyor 1, and the work Win is transferred from the carry-in conveyor 21A to the hanger 3 of the overhead conveyor 1. The elevator device 23 is provided with a work carrying elevating table 22A for reloading while being mounted on the skid Sin and a skid collecting elevating table 22B for reloading the skid Sout from the hanger 3 to the collecting conveyor 21B. Have been.
[0021]
A fork 24A for supporting the work Win to be loaded on the skid Sin can be moved forward and backward with respect to the carry-in conveyor 21A and the hanger 3 of the overhead conveyor 1 on the work carry-in elevating table 22A of the elevator apparatus 23. And a fork 21B for supporting the unloaded skid Sout is provided on the skid collection elevating table 22B so as to be able to advance and retreat with respect to the hanger 3 of the overhead conveyor 1 and the collection conveyor 24B. .
[0022]
In this example, since the skid collecting elevating table 22B and the collecting conveyer 21B only need to be able to place the thin skid Sout thereon, the interval between the conveyers 21A and 21B and the respective elevating tables 22A and 22B. Are set low.
[0023]
According to the loading / unloading device 20, first, the work Win carried in by the carry-in conveyor 21A is transferred to the work carry-in elevating table 22A. As shown in FIG. 3 (a), this involves extending the fork 24A of the work loading / lowering table 22A to make it stand by slightly lower than the loading conveyor 21A, and then extending the loading conveyor 21A and the tip thereof. If the work Win is carried in while being placed on the skid Sin to the position, and the work loading elevating table 22A is raised by the elevator device 23 in this state, the work Win is supported on the fork 21A while being placed on the skid Sin. .
[0024]
Next, the empty skid Sout remaining on the hanger 3 where the work has been unloaded at the work unloading position is unloaded. As shown in FIG. 3B, the fork 21B of the skid collection elevating table 22B is extended to wait slightly lower than the hanger 3, and when the hanger 3 stops, the elevator device 23 stops the skid collection elevating table. When the 22B is raised, the skid Sout is supported on the fork 24B, and when the fork 21B is contracted, the work Wout moves onto the skid collecting elevating table 7B, and the hanger 3 becomes empty.
[0025]
When the hanger 3 is empty, the work Win and the skid Sin supported on the fork 24A of the work loading / lowering table 22A are loaded on the hanger 3 this time. As shown in FIG. 3 (c), the work loading / lowering table 22A is lowered to a position slightly higher than the hanger 3, and the fork 21A is extended, so that the work Win is placed on the skid Sin and is placed in the hanger 3. In this state, if the work loading elevating table 22A is lowered to below the hanger 3 by the elevator device 23, the fork 21A falls down through the notch of the loading conveyor 24A, and the work Win and the skid Sin are hung. Thus, the work Win and the skid Sin are loaded on the hanger 3.
[0026]
Finally, the skid Sout unloaded from the hanger 3 and supported by the fork 24B of the skid collection elevating table 22B is transferred to the collection conveyor 21B. As shown in FIG. 3 (d), the skid collecting elevating table 22B is lowered while the loading conveyor 21A is retracted to its original position, the fork 24B is extended, and the skid Sout is extended sideways. Then, when the fork 21B is lowered to a position below the collecting conveyor 21B, the fork 21B passes down through the cutout portion of the collecting conveyor 24B, and only the skid Sout remains on the collecting conveyor 24B, so that the skid Sout is collected. Delivered on the conveyor 21B.
[0027]
As described above, according to the present example, the carry-in conveyor 21A and the collection conveyor 21B are arranged in two upper and lower stages, and the work carry-in elevating table 22A and the skid collection elevating table 22B are arranged in two upper and lower stages. By lifting each of the tables 22A and 22B by the elevator device 23, the unloading of the work Wout conveyed by the hanger 3 and the arrival of the work Win to be conveyed from now on are performed at the same position. Therefore, it is not necessary to separately provide a skid unloading device at the work loading position, and the installation space can be greatly reduced.
Further, since the unloading of the skid and the loading of the work are performed at the same position, there is no need to stop the hanger 3 in small increments, and the work efficiency is improved.
[0028]
In addition, in the description of the above embodiment, the case where each is used as a loading / unloading device for the overhead conveyor 1 has been described, but it is used as a loading / unloading device for a normal floor conveyor or other conveyor on which a bogie travels along a orbit. You can also.
Also, the case where the carrying-in conveyors 6A and 21A and the collecting conveyors 6B and 21B are laid below the overhead conveyor 1 has been described. However, the present invention is not limited to this. It may be.
[0029]
【The invention's effect】
As described above, according to the present invention, the unloading of the conveyed object transported by the hanger and the arrival of the conveyed object to be transported on the hanger can be performed at the same position. There is no need to separately install the unloading device and the receiving device. For example, the limited space in the factory can be used effectively, and the number of hanger stops has been reduced, resulting in improved work efficiency. Has excellent effects.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an example of a loading / unloading device for a conveyor according to the present invention.
FIG. 2 is an explanatory diagram showing the operation.
FIG. 3 is an explanatory view showing another loading / unloading device according to the present invention and its operation.
FIG. 4 is an explanatory view showing an installation mode of a conventional apparatus.
FIG. 5 is an explanatory view showing an installation mode of another conventional apparatus.
[Explanation of symbols]
1 ... Overhead conveyor (transport conveyor)
2 ... orbit Win, Wout ... work (transported object)
3 hanger (carrier)
4 ··· Detachable loading device 5A ··· Conveyor 5B ··· Recovery conveyor 6A · · · · Work loading elevating table 6B · · · Work recovery elevating table 7 · · · Elevator device 8A, 8B · · · Fork 20 · ··· Removable loading devices Sin, Sout ··· Skid 21A ··· Conveyor 21B ··· Recovery conveyor 22A ··· Work loading elevating table 22B ··· Skid collecting elevating table 23 ··· Elevator devices 24A and 24B ··· fork

Claims (2)

搬送コンベア(1)の周回軌道(2)に沿って移送される搬送体(3)に被搬送物(Win, Wout)を支持させて搬送する際に、所定の搬送体停止位置で、搬送体(3)により搬送されてきた被搬送物(Wout) を脱荷した後、当該搬送体(3)に他の被搬送物(Win)を着荷する搬送コンベア用の着脱荷装置であって、
前記搬送コンベア(1)の上方又は下方に位置して、前記搬送体(3)に着荷しようとする被搬送物(Win)を搬入する搬入用コンベア(5A)と、前記搬送体(3)から脱荷した被搬送物(Wout) を回収する回収用コンベア(5B)が上下二段に配設されると共に、
前記搬入用コンベア(5A)から前記搬送コンベア(1)の搬送体(3)に被搬送物(Win)を着荷する被搬送物搬入用昇降テーブル(6A)と、前記搬送コンベア(1)の搬送体(3)から被搬送物(Wout) を脱荷して回収用コンベア(5B)に載せ換える被搬送物回収用昇降テーブル(6B)を上下二段に形成したエレベータ装置(7)が設置され、
当該エレベータ装置(7)の被搬送物搬入用昇降テーブル(6A)には、着荷しようとする被搬送物(Win) を支持するフォーク(6A) が搬入用コンベア(5A) 及び搬送コンベア(1)の搬送体(3)に対して進退可能に配設されると共に、被搬送物回収用昇降テーブル(6B)には、脱荷した被搬送物(Wout) を支持するフォーク (8B) が搬送コンベア(1)の搬送体(3)及び回収用コンベア(5B)に対して進退可能に配設されたことを特徴とする搬送コンベア用の着脱荷装置。
When a transport object (Win, Wout) is transported by supporting the transport object (Win, Wout) on a transport body (3) that is transported along the orbit (2) of the transport conveyor (1), the transport body is stopped at a predetermined transport body stop position. A loading / unloading device for a transport conveyer for unloading a transported object (Wout) transported by (3) and then loading another transported object (Win) on the transported body (3);
A carry-in conveyor (5A) which is located above or below the carry conveyor (1) and carries an object (Win) to be loaded on the carry body (3); A collection conveyor (5B) for collecting unloaded conveyed articles (Wout) is arranged in two stages, upper and lower,
An object loading / lowering table (6A) for loading an object (Win) from the loading conveyor (5A) to the transporting body (3) of the transporting conveyor (1), and transport of the transporting conveyor (1). An elevator device (7) is provided in which a conveyed object elevating table (6B) for unloading the conveyed object (Wout) from the body (3) and replacing it on the collection conveyor (5B) is formed in two stages, upper and lower. ,
A fork (6A) for supporting an object (Win) to be loaded is loaded on a carry-in conveyor (5A) and a conveyor (1) on the object carrying elevator table (6A) of the elevator device (7). movably while being disposed with respect to the conveying member (3) of the object to be conveyed recovery lifting table (6B), the conveyed object (Wout) fork for supporting (8B) is a conveyor that Datsuni A loading / unloading device for a transport conveyor, which is provided so as to be able to advance and retreat with respect to the transport body (3) and the collection conveyor (5B) of (1).
搬送コンベア(1)の周回軌道(2)に沿って移送される搬送体(3)にワークをスキッドに載せた状態で支持させて搬送し、ワーク脱荷位置でワークをスキッド(Sout) から離して当該ワークのみを脱荷した搬送体(3)がワーク着荷位置に到来した際に、空のスキッド(Sout) を脱荷した後、当該搬送体(3)にワーク(Win)をスキッド (Sin)に載せたままの状態で着荷するようになされた搬送コンベア用の着脱荷装置であって、
前記搬送コンベア(1)の上方又は下方に位置して、前記搬送体(3)に着荷しようとするワーク(Win) をスキッドに載せた状態で搬入する搬入用コンベア(21A)と、前記搬送体(3)から脱荷したスキッド(Sout) を回収する回収用コンベア(21B )が上下二段に配設されると共に、
前記搬入用コンベア(21A)から前記搬送コンベア(1)の搬送体(3)に対してワーク(Win)をスキッド(Sin) に載せたままの状態で載せ換えて着荷するワーク搬入用昇降テーブル(22A)と、前記搬送コンベア(1)からスキッド(Sout) を脱荷して回収用コンベア(21B)に載せ換えるスキッド回収用昇降テーブル(22B)を上下二段に形成したエレベータ装置(23)が設置され、
当該エレベータ装置(23)のワーク搬入用昇降テーブル(22A)には、着荷しようとするワーク(Win) をスキッド(Sin) に載せたまま支持するフォーク(24A) が搬入用コンベア(21A) 及び搬送コンベア(1)の搬送体(3)に対して進退可能に配設されると共に、スキッド回収用昇降テーブル(22B)には、脱荷したスキッド(Sout) を支持するフォーク(24B) が搬送コンベア(1)の搬送体(3)及び回収用コンベア(21B) に対して進退可能に配設されたことを特徴とする搬送コンベア用の着脱荷装置。
The work is supported on a skid while being carried on a skid (3) conveyed along the orbit (2) of the conveyor (1), and the work is separated from the skid (Sout) at the work unloading position. When the transporter (3), which has only unloaded the work, arrives at the work loading position, the empty skid (Sout) is unloaded, and then the work (Win) is skid (Sin) onto the transporter (3). ) Is a loading and unloading device for a transport conveyor, which is configured to arrive while being placed on
A loading conveyor (21A) positioned above or below the transport conveyor (1) for loading a workpiece (Win) to be loaded on the transport body (3) on a skid; A collection conveyor (21B) for collecting skids (Sout) unloaded from (3) is arranged in two stages, upper and lower,
The work loading / lowering table () for loading a workpiece (Win) from the loading conveyor (21A) to the transporting body (3) of the transporting conveyor (1) while loading the workpiece (Sin) on the skid (Sin). 22A) and an elevator device (23) in which a skid collection lifting table (22B) for unloading skids (Sout) from the transport conveyor (1) and replacing the skids (Sout) with a collection conveyor (21B) is formed in two stages, upper and lower. Installed,
A fork (24A) for supporting a workpiece (Win) to be loaded while being loaded on a skid (Sin) is provided on the loading conveyor (21A) and transporting the workpiece loading / lowering table (22A) of the elevator device (23). carrier conveyor (1) movably while being disposed relative to (3), the skid recovery lifting table (22B), a fork (24B) is conveyor for supporting the skid (Sout) that Datsuni A loading / unloading device for a transport conveyor, which is provided so as to be able to advance and retreat with respect to the transport body (3) and the collection conveyor (21B) of (1).
JP19371495A 1995-07-28 1995-07-28 Detachable loading device for transport conveyor Expired - Fee Related JP3574228B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19371495A JP3574228B2 (en) 1995-07-28 1995-07-28 Detachable loading device for transport conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19371495A JP3574228B2 (en) 1995-07-28 1995-07-28 Detachable loading device for transport conveyor

Publications (2)

Publication Number Publication Date
JPH0940169A JPH0940169A (en) 1997-02-10
JP3574228B2 true JP3574228B2 (en) 2004-10-06

Family

ID=16312578

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19371495A Expired - Fee Related JP3574228B2 (en) 1995-07-28 1995-07-28 Detachable loading device for transport conveyor

Country Status (1)

Country Link
JP (1) JP3574228B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003010075A1 (en) * 2001-07-24 2003-02-06 Honda Giken Kogyo Kabushiki Kaisha Work conveying device
CN112591401A (en) * 2020-12-11 2021-04-02 九牧厨卫股份有限公司 A novel lifting machine for work piece production line

Also Published As

Publication number Publication date
JPH0940169A (en) 1997-02-10

Similar Documents

Publication Publication Date Title
JP2008178803A (en) Elevating mechanism for automobile body drying booth
JPH10250835A (en) Overhead traveling vehicle system
JP3574228B2 (en) Detachable loading device for transport conveyor
JPH0155161B2 (en)
JP3615877B2 (en) Painting equipment
CN218841603U (en) Logistics distribution goods handling device
CN116835256B (en) Feeding and discharging workstation of robot
JPS6246449B2 (en)
JPH0710240Y2 (en) Vacuum furnace
JP2000302204A (en) Work conveying device and work conveying method
JP2906091B2 (en) Surface treatment method and surface treatment device
JPS634937Y2 (en)
JPH0414457Y2 (en)
JPH05213442A (en) Loading device for pallet-loaded article-to-be-carried
JPH0780388A (en) Coating material supplying equipment
JPS6316473B2 (en)
JPH0343242Y2 (en)
JPS5935460Y2 (en) Transfer equipment
JPH0450952Y2 (en)
JP3254784B2 (en) Perforated panel loading method and apparatus
JPH02295820A (en) Product carrying device
JPS62118535A (en) Automatic transfer mechanism for wafer carrier
JPH0581111U (en) Stacker crane
JPH05271997A (en) Automatic plating treating device
CN117734035A (en) Three-in-one viscose production system for photovoltaic crystal bar

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040301

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040601

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040701

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080709

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080709

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090709

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100709

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110709

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees