JPH1037459A - Control system of work and process of the work - Google Patents

Control system of work and process of the work

Info

Publication number
JPH1037459A
JPH1037459A JP19621096A JP19621096A JPH1037459A JP H1037459 A JPH1037459 A JP H1037459A JP 19621096 A JP19621096 A JP 19621096A JP 19621096 A JP19621096 A JP 19621096A JP H1037459 A JPH1037459 A JP H1037459A
Authority
JP
Japan
Prior art keywords
work
information
construction
computer
construction process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP19621096A
Other languages
Japanese (ja)
Inventor
Tomokichi Ibe
智吉 井辺
Ryota Hiura
亮太 日浦
Naoto Kawauchi
直人 川内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP19621096A priority Critical patent/JPH1037459A/en
Publication of JPH1037459A publication Critical patent/JPH1037459A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

PROBLEM TO BE SOLVED: To automatically record and control a progressing state of work in correspondence with a program of work and to enable the issuance of a warning automatically to workers when the progressing state of work is not matched with the program of work. SOLUTION: Data base 9 for storing a working drawing 7 and a working planning 8 is put in a work controlling computer 6, information 10 (tool position and measuring result of tool characteristic working information) sent from a wrench tool 1 through network 5 and information sent from a camera 16 taking a picture of a direction of the working place as the object to be photographed by making use of the measuring information are combined with position information, and the actual working contents is recorded in the data base 9. While. in the case the actual working contents are not matched with the working planning 8, indication/warning device 12 near by the working place concerned are detected, and warning output is made to workers therefrom.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土木建築物、各種
プラントの新設・メンテナンス工事に適用される工事工
程管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction process management system applied to new construction and maintenance work of civil engineering buildings and various plants.

【0002】[0002]

【従来の技術】土木工事、建築工事、プラント建設工事
等において、従来は、現場監督者が作業状況を目視で確
認し、必要に応じて写真を撮るなどして工事工程の管理
及び記録を行うのが一般的であった。
2. Description of the Related Art Conventionally, in civil engineering work, building work, plant construction work, and the like, a site supervisor supervises the work status visually and takes photographs as necessary to manage and record the construction process. Was common.

【0003】また従来は、工事工程計画を計算機を用い
て管理するシステムも使用されているが、工事が実際に
工程通りに実行されているかどうかの確認は全て現場監
督者が行っていた。
Conventionally, a system for managing a construction process plan using a computer has also been used, but a site supervisor has always confirmed whether or not the construction is actually being carried out according to the process.

【0004】このため、現場監督者の見落としによる施
工不良の可能性があり、また遠隔地にある施主の事務所
などから工程の進行状況をリアルタイムに把握できない
という問題があった。
[0004] Therefore, there is a possibility that the construction may be defective due to oversight of the site supervisor, and there is a problem that the progress of the process cannot be grasped in real time from an office of a remote owner or the like.

【0005】[0005]

【発明が解決しようとする課題】上記したように従来
は、各種工事の工程管理及び記録、更には工事が工程通
りに実行されているかどうかの確認を現場監督者が行っ
ていたため、現場監督者の負担が大きいだけでなく、確
認誤りを招く可能性があり、しかも遠隔地にある施主の
事務所などから工程の進行状況をリアルタイムに把握で
きないという問題があった。
Conventionally, as described above, the on-site supervisor has performed the process management and recording of various types of construction and the confirmation of whether or not the construction is being carried out as scheduled. In addition to the heavy load, there is a possibility that a confirmation error may be caused, and furthermore, there is a problem that the progress of the process cannot be grasped in real time from an office of a remote owner or the like.

【0006】本発明は上記の点を考慮してなされたもの
でその目的は、工事の進捗状況を工事工程計画と対応付
けて自動的に記録・管理できる工事工程管理システムを
提供することにある。
The present invention has been made in view of the above points, and an object of the present invention is to provide a construction process management system capable of automatically recording and managing the progress of construction in association with a construction process plan. .

【0007】本発明の他の目的は、工事の進捗状況が工
事工程計画と整合しない場合に、自動的に作業者に警告
を発することができる工事工程管理システムを提供する
ことにある。本発明の更に他の目的は、工事の進捗状況
を遠隔地からリアルタイムに把握することができる工事
工程管理システムを提供することにある。
Another object of the present invention is to provide a construction process management system capable of automatically issuing a warning to an operator when the progress of the construction does not match the construction process plan. Still another object of the present invention is to provide a construction process management system capable of grasping the progress of construction from a remote place in real time.

【0008】[0008]

【課題を解決するための手段】本発明の工事工程管理シ
ステムは、上記課題を解決するために、工事作業に用い
られ、自身の位置と、実施した作業内容に対応した工具
固有の作業情報を計測し、その両計測情報を通信手段に
よりネットワークに発信する機能を有する工具と、自身
の位置及び姿勢を計測し、その計測情報を利用して撮影
対象となる工事作業箇所の方向を撮影し、撮影対象の位
置と撮影した画像情報を通信手段により上記ネットワー
クに発信する機能を有するカメラと、工事工程管理用の
計算機と、自身の位置を計測して、その計測した位置情
報を通信手段により上記ネットワークを介して上記計算
機に通知すると共に、上記計算機からの指示に従う作業
者への警告出力を行う警告出力手段とを備えて構成され
る他、上記計算機に、以下のデータベース及び処理手
段、即ち管理対象となる工事に関する施工図面と各工程
毎の作業箇所並びに作業内容を定義した工事工程計画を
記憶したデータベースであって、上記施工図面と工事工
程計画、及び上記工具とカメラから得られる情報を、主
として位置情報を基に関連付けて記録しておくためのデ
ータベースと、このデータベース中の工事工程計画と、
上記工具及びカメラからネットワークを介して得られた
情報を位置情報によって結びつけて、データベースに実
際の作業内容を記録する一方、この実際の作業内容と上
記工事工程計画の間の整合性を判定し、整合性なしと判
定した場合には、該当する作業箇所の近傍にある上記警
告出力手段を当該警告出力手段からの位置情報により検
出し、当該警告出力手段に対して作業者への警告出力を
ネットワークを介して指示する処理手段とを設けたこと
を特徴とする。
In order to solve the above-mentioned problems, the construction process management system of the present invention is used for construction work, and stores its own position and tool-specific work information corresponding to the contents of the work performed. Measure and measure the position and orientation of the tool with the function of transmitting both measurement information to the network by communication means, use the measurement information to photograph the direction of the construction work location to be photographed, A camera having a function of transmitting the position of the photographing target and photographed image information to the network by the communication means, a computer for construction process management, and measuring the position of the self, and transmitting the measured position information to the communication means A warning output unit for notifying the computer via a network and outputting a warning to a worker in accordance with an instruction from the computer. The following database and processing means, that is, a database that stores construction drawings relating to construction to be managed and a construction process plan that defines work locations and work contents for each process, the construction drawings and the construction process plan, and A database for recording information obtained from the tool and the camera in association with mainly position information, and a construction process plan in the database;
By linking information obtained from the tool and the camera via the network by position information and recording the actual work content in the database, while determining the consistency between the actual work content and the construction process plan, If it is determined that there is no consistency, the warning output means near the corresponding work location is detected based on the position information from the warning output means, and a warning output to the worker is output to the warning output means via a network. And processing means for giving an instruction via the.

【0009】また本発明の工事工程管理システムは、上
記工事工程管理用の計算機と遠隔地の計算機とを遠隔通
信手段により接続し、上記遠隔地にある計算機から、上
記工事工程管理用計算機内のデータベースの内容を上記
遠隔通信手段を介して確認、修正可能なようにしたこと
をも特徴とする。
In the construction process management system of the present invention, the construction process management computer and the remote computer are connected by remote communication means, and the remote computer is connected to the computer in the construction process management computer. It is also characterized in that the contents of the database can be confirmed and corrected via the remote communication means.

【0010】このような構成の工事工程管理システムに
おいて、工事作業に用いられる工具は、自身の位置を計
測する自己位置計測手段と、実施した作業内容に対応し
た工具固有の作業情報を計測する作業情報計測手段と、
通信手段を内蔵している。自己位置計測手段はGPS
(汎地球測位システム)などを用いて実現することが可
能である。また、作業情報計測手段は上記工具が例えば
レンチである場合は、締めつけトルクの計測器などであ
る。上記工具は自己位置計測手段及び作業情報計測手段
によって得られた両計測情報を組にして通信手段により
ネットワークに発信する。
[0010] In the construction process management system having such a configuration, the tool used for the construction work includes a self-position measuring means for measuring its own position, and a work for measuring work information specific to the tool corresponding to the contents of the performed work. Information measurement means;
Built-in communication means. Self-position measuring means is GPS
(Global positioning system) or the like. When the tool is, for example, a wrench, the work information measuring means is a tightening torque measuring device. The tool transmits a set of both measurement information obtained by the self-position measurement means and the work information measurement means to the network by the communication means.

【0011】ネットワークには工事工程管理用の計算機
が接続されている。この計算機は、工具からネットワー
クに発信された情報を受信する。計算機上では工程管理
ソフトウェアが動作している。計算機は、データベース
中に施工図面及び工事工程計画のデータを記憶してい
る。工事工程計画の各工程にはそれぞれの実施されるべ
き場所の情報が含まれており、これによって施工図面と
関連付けられている。
A computer for construction process management is connected to the network. This computer receives information transmitted from the tool to the network. Process management software is running on the computer. The computer stores construction drawings and construction process plan data in a database. Each process of the construction process plan includes information on a place where the process is to be performed, and is associated with the construction drawing.

【0012】計算機がネットワークより受信した工具か
らの情報は、工具(中の自己位置計測手段)が計測した
工具自身の位置の情報(自己位置の情報)を含んでい
る。そこで、計算機上で工程管理ソフトウェアが動作す
ることで実現される処理手段は、上記工具の自己位置の
情報を基に、施工図面を通して工事工程計画の何れかの
工程と関連付ける。ここで工具からの情報に対応する工
程が関連付けられない場合と、工具からの情報と関連付
けられた工程との間に作業情報などの相違がある場合
(工具がレンチの場合であれば、工具中の作業情報計測
手段により計測された締めつけトルクが、上記関連付け
られた工程の作業内容で定義されている締めつけトルク
の範囲から外れている場合)には、計算機の処理手段は
工具による作業内容と工事工程計画が整合していないと
判定する。
The information from the tool received by the computer from the network includes information on the position of the tool itself (self-position information) measured by the tool (self-position measuring means therein). Then, the processing means realized by the operation of the process management software on the computer associates any process of the construction process plan through the construction drawing based on the information on the self-position of the tool. Here, when there is a difference in work information or the like between the step corresponding to the information from the tool and the step associated with the information from the tool (if the tool is a wrench, If the tightening torque measured by the work information measuring means is out of the range of the tightening torque defined in the work contents of the above-described associated process), the processing means of the computer determines the work contents of the tool and the work It is determined that the process plan is not consistent.

【0013】警告出力手段は、上記工具と同様に自己位
置計測手段と通信手段を内蔵しており、自己位置の情報
を通信手段によりネットワークに発信している。計算機
は、この警告出力手段からネットワークに発信された自
己位置の情報を受信し、その情報を基に、警告出力手段
の位置に関係した工程を選択し、警告出力手段に対して
出力を指示する。警告出力手段は、計算機により工具の
作業内容と工事工程計画が整合していないと判定された
場合は、作業者への警告を表示出力、音声出力などによ
って行う。
The warning output means includes a self-position measuring means and a communication means like the above-mentioned tool, and transmits information on the self-position to the network by the communication means. The computer receives the information on the self-position transmitted to the network from the warning output means, selects a process related to the position of the warning output means based on the information, and instructs the warning output means to output. . When the computer determines that the work content of the tool and the construction process plan do not match, the warning output means outputs a warning to the operator by display output, voice output, or the like.

【0014】カメラは上記工具と同様に自己位置計測手
段と通信手段を内蔵している。このカメラは、自己位置
計測手段により計測された自己位置を基に、工事工程計
画によって決められた作業位置(撮影対象)の方向へ自
動的にねらいを定めて、その位置の(例えば静止画及び
動画の)撮影を行う。この撮影結果の情報(画像情報)
は、通信手段によりネットワーク5を通して計算機に発
信される。計算機の処理手段は、このカメラからの画像
情報を受信して、工事工程計画上での該当する工程に対
応させてデータベース内に記録する。
The camera has a built-in self-position measuring means and a communication means like the above-mentioned tool. The camera automatically determines an aim in the direction of a work position (an object to be photographed) determined by a construction process plan based on the self-position measured by the self-position measuring means, and determines the position (for example, a still image and Take a video). Information of this shooting result (image information)
Is transmitted to the computer through the network 5 by the communication means. The processing means of the computer receives the image information from the camera and records it in the database in correspondence with the corresponding process in the construction process plan.

【0015】また、上記工事工程管理用計算機はインタ
ーネットや衛星通信などの遠隔通信手段を通して遠隔地
の計算機と接続されており、これにより当該遠隔地の計
算機からは、工事工程管理用計算機のデータベース内に
記憶されている情報の確認及び修正を遠隔通信手段を通
して行うことができる。
The construction process management computer is connected to a remote computer through a remote communication means such as the Internet or satellite communication, so that the remote computer can access the database of the construction process management computer. Can be confirmed and corrected through the remote communication means.

【0016】以上により、本発明においては、次のよう
な作用効果を得ることが可能となる。 (1)作業の行われた場所、時間、作業内容を予め決め
られた工事工程計画と対応付けてデータベース内に記録
することができる。
As described above, according to the present invention, the following operation and effect can be obtained. (1) The place where the work was performed, the time, and the content of the work can be recorded in the database in association with a predetermined construction process plan.

【0017】(2)行われた作業が工事工程計画と整合
しない場合にこれを検出し、作業者に警告することがで
きる。 (3)遠隔地からリアルタイムに工事の進捗状況を把握
することができる。
(2) When the work performed is not consistent with the construction process plan, this can be detected and a warning can be given to the worker. (3) The construction progress can be grasped in real time from a remote place.

【0018】[0018]

【発明の実施の形態】以下、本発明の実施の形態につき
図面を参照して説明する。図1は本発明の一実施形態に
係る工事工程管理システムのシステム構成図、図2は同
システムを構成する各要素相互の関係と各要素の内部構
成を示す図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a system configuration diagram of a construction process management system according to an embodiment of the present invention, and FIG. 2 is a diagram showing a mutual relationship between components of the system and an internal configuration of each component.

【0019】図において、1は土木工事、建築工事、プ
ラント建設工事等における作業に用いられる工具、例え
ばレンチ工具である。このレンチ工具1は、図2に示す
ように、自身の位置を例えばGPS(汎地球測位システ
ム)を用いて計測するための自己位置計測手段としての
GPS受信機2を内蔵している。このGPS受信機2
は、GPS衛星22からの電波(GPS電波)を受信す
るGPSアンテナ2aを持ち、その受信したGPS電波
(受信GPSデータ)からレンチ工具1の位置を計測
し、その位置情報(GPS情報)を取得する。
In FIG. 1, reference numeral 1 denotes a tool, for example, a wrench tool, used for civil engineering work, construction work, plant construction work and the like. As shown in FIG. 2, the wrench tool 1 has a built-in GPS receiver 2 as self-position measuring means for measuring its own position using, for example, GPS (Global Positioning System). This GPS receiver 2
Has a GPS antenna 2a for receiving a radio wave (GPS radio wave) from a GPS satellite 22, measures the position of the wrench tool 1 from the received GPS radio wave (received GPS data), and obtains its position information (GPS information). I do.

【0020】レンチ工具1はまた、図2に示すように、
当該工具1に固有の作業内容(作業情報)、例えば締め
つけトルクを計測する作業情報計測手段としての締めつ
けトルク計測器3と、GPS受信機2によって得られた
位置情報(GPS情報)及び締めつけトルク計測器3に
よって得られた作業情報(工具1に固有の計測情報)の
組を例えばネットワーク5に無線により発信するための
通信手段としての無線通信装置4とを内蔵している。こ
のネットワーク5には、別の無線通信装置24が接続さ
れており、レンチ工具1(内の無線通信装置4)から発
信された情報(工具1の位置情報及び作業情報)は、当
該無線通信装置24を介してネットワーク5上に送信さ
れる。
The wrench tool 1 is also provided as shown in FIG.
Work contents (work information) specific to the tool 1, for example, a tightening torque measuring device 3 as work information measuring means for measuring tightening torque, position information (GPS information) obtained by the GPS receiver 2, and tightening torque measurement A wireless communication device 4 as a communication means for wirelessly transmitting a set of work information (measurement information unique to the tool 1) obtained by the device 3 to a network 5, for example. Another wireless communication device 24 is connected to the network 5, and information (position information and work information of the tool 1) transmitted from the wrench tool 1 (the wireless communication device 4 therein) is transmitted to the wireless communication device 24. 24 and transmitted over the network 5.

【0021】また、図1中の23はGPS基地局であ
り、このGPS基地局23は、GPS衛星22の電波を
受信して、その受信データをネットワーク5に発信して
いる。ネットワーク5には計算機6が接続されている。
計算機6は、レンチ工具1から無線通信装置24を介し
てネットワーク5に発信された情報(工具1の位置情報
及び作業情報)、及びGPS基地局23からネットワー
ク5に発信された情報を、当該ネットワーク5から受信
している。そして計算機6は、受信したレンチ工具1か
らの位置情報(GPS情報)を、基準点をなすGPS基
地局23からのデータを用いたディファレンシャル方式
により補正して、レンチ工具1の正確な位置を求める。
In FIG. 1, reference numeral 23 denotes a GPS base station. The GPS base station 23 receives radio waves from the GPS satellites 22 and transmits the received data to the network 5. A computer 6 is connected to the network 5.
The computer 6 transmits the information transmitted from the wrench tool 1 to the network 5 via the wireless communication device 24 (position information and work information of the tool 1) and the information transmitted from the GPS base station 23 to the network 5, 5 Then, the computer 6 corrects the received position information (GPS information) from the wrench tool 1 by a differential method using data from the GPS base station 23 serving as a reference point, and obtains an accurate position of the wrench tool 1. .

【0022】計算機6は、管理対象となる工事に関する
施工図面7及び工事工程計画8のデータを記憶したデー
タベース9を有している。工事工程計画8は、実施され
るべき位置(場所)と時間(順序)、及び予め定められ
た作業内容としての例えば正当な締めつけトルクの範
囲、撮影の要否によって定義された工程の集合である。
この工事工程計画8の示す各工程は、上記実施されるべ
き位置の情報によって、図2において矢印Aで示される
ように施工図面7と関連付けられている。
The computer 6 has a database 9 that stores data of construction drawings 7 and construction process plans 8 relating to the construction to be managed. The construction process plan 8 is a set of processes defined by the position (place) and time (sequence) to be executed, the range of a proper tightening torque as predetermined work content, and the necessity of photographing. .
Each process indicated by the construction process plan 8 is associated with the construction drawing 7 as indicated by an arrow A in FIG.

【0023】計算機6は、レンチ工具1が使用された結
果、当該工具1からネットワーク5に情報が発信される
と、その工具1からの情報を受信する。この計算機6が
工具1から受信した情報(工具からの受信情報)10に
は、当該工具1自身の位置情報(工具1内のGPS受信
機2が計測した自己位置の情報)と作業情報(工具1内
の締めつけトルク計測器3が計測した締めつけトルクの
計測データ)を含んでいる。
When information is transmitted from the tool 1 to the network 5 as a result of the use of the wrench tool 1, the computer 6 receives the information from the tool 1. Information 10 received by the computer 6 from the tool 1 (information received from the tool) 10 includes position information of the tool 1 itself (information of a self-position measured by the GPS receiver 2 in the tool 1) and work information (tool information). 1 includes tightening torque measurement data measured by the tightening torque measuring device 3).

【0024】そのため計算機6は、工具1から受信した
情報10中の位置情報、即ち工具1の位置情報(実際に
は、前述したようにGPS基地局23からのデータで補
正された位置情報)により、施工図面7を通して工事工
程計画8を検索することで、工具1の位置を工事工程計
画8中の何れかの工程と関連付けることができる。この
関連付けは、計算機6が工事工程管理ソフトウェア(工
事工程管理ソフトウェアプログラム)11を実行するこ
とで実現される。
Therefore, the computer 6 uses the position information in the information 10 received from the tool 1, that is, the position information of the tool 1 (actually, the position information corrected by the data from the GPS base station 23 as described above). By searching the construction process plan 8 through the construction drawing 7, the position of the tool 1 can be associated with any process in the construction process plan 8. This association is realized by the computer 6 executing the construction process management software (construction process management software program) 11.

【0025】ここで、工事工程計画8内に工具1からの
情報10中の位置情報と対応する工事工程が見つからな
い場合(即ち工具1の位置が工事工程計画8の何れの工
程とも関連付けられない場合)と、工程の行われるべき
順序あるいは作業内容が工事工程計画8での定義と相違
している場合(例えば、工具1からの情報10に含まれ
ている作業情報の示す締めつけトルクが、工事工程計画
8中の作業内容で示されている正当な締めつけトルクの
範囲から外れている場合)には、計算機6は工具1によ
る作業内容と工事工程計画8が整合していない、即ち作
業が工事工程計画8から逸脱していると判定する。
Here, when the construction process corresponding to the position information in the information 10 from the tool 1 is not found in the construction process plan 8 (that is, the position of the tool 1 is not associated with any process of the construction process plan 8). Case) and a case where the order in which the process is to be performed or the work content is different from the definition in the construction process plan 8 (for example, the tightening torque indicated by the work information included in the information 10 from the tool 1 is In the case where the work is out of the range of the legitimate tightening torque indicated by the work content in the process plan 8), the computer 6 does not match the work content by the tool 1 with the construction process plan 8, ie, the work is It is determined that it deviates from the process plan 8.

【0026】さて、本システムでは、各工程が行われる
場所に、計算機5からの指示に従う作業者への警告出力
を行う警告出力手段としての表示・警告装置12がそれ
ぞれ配置されている(但し、図では1つだけが示されて
いる)。表示・警告装置12は、表示装置13の他に、
レンチ工具1が有するのと同様の、GPSアンテナ14
aを持った自己位置計測手段としてのGPS受信機1
4、及び通信手段としての無線通信装置15を内蔵して
おり、そのGPS受信機14で計測された自己位置の情
報を無線通信装置15から発信し、ネットワーク5に接
続された別の無線通信装置24を介して当該ネットワー
ク5に送信している。
In the present system, a display / warning device 12 as a warning output means for outputting a warning to a worker in accordance with an instruction from the computer 5 is arranged at a place where each process is performed (however, Only one is shown in the figure). The display / warning device 12 is, in addition to the display device 13,
GPS antenna 14 similar to that of wrench tool 1
GPS receiver 1 as self-position measuring means having a
And a wireless communication device 15 having a built-in wireless communication device 15 as communication means, transmitting information on its own position measured by the GPS receiver 14 from the wireless communication device 15, and connecting to another network 5 24 to the network 5.

【0027】計算機6は、表示・警告装置12から無線
通信装置24を介してネットワーク5に送信されている
当該表示・警告装置12自身の位置情報を受信する。そ
して計算機6は、この表示・警告装置12からの位置情
報を基に、工事工程計画8から当該表示・警告装置12
の設置位置に対応した工程、即ち当該表示・警告装置1
2が置かれている場所で実施されるべき工程を検索し、
その工程の内容を当該表示・警告装置12にネットワー
ク5(及び無線通信装置24)を介して送り、当該表示
・警告装置12(の持つ表示装置13)に表示させる。
The computer 6 receives the position information of the display / warning device 12 transmitted from the display / warning device 12 to the network 5 via the wireless communication device 24. Then, based on the position information from the display / warning device 12, the computer 6 sends the display / warning device 12
Of the display / warning device 1 corresponding to the installation position of the
Search for the process to be performed in the place where 2 is located,
The contents of the process are sent to the display / warning device 12 via the network 5 (and the wireless communication device 24) and displayed on (the display device 13 of) the display / warning device 12.

【0028】また計算機6は、前記したように工具1か
らの情報を基に工事工程計画8を検索した結果、その工
具1を用いての作業が工程計画8から逸脱していると判
定した場合には、上記各表示・警告装置12からの位置
情報を基に、その作業の行われた位置の付近にある表示
・警告装置12を探して、当該表示・警告装置12にネ
ットワーク5を介して警告を表示させる。この他、警告
の表示に代えて、或いは警告の表示に加えて、音声によ
る警告を行うようにしても構わない。
When the computer 6 searches the construction process plan 8 based on the information from the tool 1 as described above, it determines that the work using the tool 1 deviates from the process plan 8. On the basis of the position information from each of the display / warning devices 12, a search is made for a display / warning device 12 near the position where the work has been performed, and the display / warning device 12 is connected to the display / warning device 12 via the network 5. Display a warning. In addition, a warning by sound may be performed instead of or in addition to the warning display.

【0029】さて、本システムには、例えば移動式のカ
メラ16が、上記した表示・警告装置12と同様に、各
工程が行われる場所(の近傍)にそれぞれ配置されてい
る。カメラ16は、撮影方向が可変可能な撮影装置17
の他に、GPSアンテナ18aを持った自己位置計測手
段としてのGPS受信機18、及び通信手段としての無
線通信装置19を内蔵しており、そのGPS受信機18
で計測された自己位置の情報を無線通信装置19から発
信し、ネットワーク5に接続された別の無線通信装置2
4を介して当該ネットワーク5に送信している。これに
より計算機6は、各カメラ16からネットワーク5に発
信されている当該カメラ16自身の位置情報を受信す
る。
In the present system, for example, a mobile camera 16 is disposed at (near) a place where each process is performed, similarly to the display / warning device 12 described above. The camera 16 includes a photographing device 17 capable of changing a photographing direction.
In addition, a GPS receiver 18 as a self-position measuring means having a GPS antenna 18a and a wireless communication device 19 as a communication means are built in.
The information of the self-position measured by the wireless communication device 19 is transmitted from the wireless communication device 19, and another wireless communication device 2 connected to the network 5 is transmitted.
4 to the network 5. Accordingly, the computer 6 receives the position information of the camera 16 itself transmitted from each camera 16 to the network 5.

【0030】計算機6は、実施されている作業に対応付
けられた工程が工事工程計画8上で、撮影必要と定義さ
れている場合と、前記したように工程計画8から逸脱し
た作業が行われたと判定した場合には、上記各カメラ1
6からの位置情報を基に、該当する作業位置の付近に設
置されているカメラ16を選択する。そして計算機6
は、選択したカメラ16の位置と工事工程計画8で示さ
れている作業位置との差から作業位置の方位を求め、そ
の方位にカメラ14の向きを調整して作業位置の撮影を
行わせる指令を当該カメラ16にネットワーク5を介し
て発信する。
The computer 6 performs the operation when the process corresponding to the work being performed is defined as required on the construction process plan 8 and the operation deviating from the process plan 8 as described above. If it is determined that the camera 1
The camera 16 installed near the corresponding work position is selected based on the position information from 6. And computer 6
Is a command for obtaining the azimuth of the work position from the difference between the position of the selected camera 16 and the work position indicated in the construction process plan 8, adjusting the direction of the camera 14 to the azimuth, and photographing the work position. Is transmitted to the camera 16 via the network 5.

【0031】カメラ16は計算機6からの指令に従い、
指示された方向、即ち工事工程計画8によって決められ
た撮影対象となる作業位置(場所)の方向にねらいを定
めて、その作業位置の(例えば、静止画及び動画の)撮
影を行い、その作業位置の画像情報を得る。カメラ16
で得られた作業位置の画像情報は、無線通信装置19か
らネットワーク5を通して計算機6に発信される。な
お、計算機6からは作業位置の情報だけを送り、(GP
S受信機18で計測されている)カメラ16の位置と計
算機6から送られる作業位置との差から、カメラ16自
身が作業位置の方位を求めて当該カメラ16の方向を調
整するようにしても構わない。また、カメラ16が固定
式の場合には、その位置が既知であることから、GPS
受信機18は不要となる。
The camera 16 follows a command from the computer 6 and
Aim at the designated direction, that is, the direction of the work position (place) to be photographed determined by the construction process plan 8, photograph the work position (for example, a still image and a moving image), and perform the work. Obtain the image information of the position. Camera 16
The image information of the work position obtained in step (1) is transmitted from the wireless communication device 19 to the computer 6 through the network 5. It should be noted that only the information on the work position is sent from the computer 6 and (GP
From the difference between the position of the camera 16 (measured by the S receiver 18) and the work position sent from the computer 6, the camera 16 itself obtains the azimuth of the work position and adjusts the direction of the camera 16. I do not care. If the camera 16 is of a fixed type, its position is known,
The receiver 18 becomes unnecessary.

【0032】計算機6はカメラ16から発信された作業
位置の画像情報を受信すると、その画像情報を工事工程
計画8上での該当する工程に対応させて当該計算機6の
データベース9内に記録する。
When the computer 6 receives the image information of the work position transmitted from the camera 16, the computer 6 records the image information in the database 9 of the computer 6 in correspondence with the corresponding step on the construction process plan 8.

【0033】本システムにおいて、計算機6は、遠隔通
信手段としての例えばインターネット20により、遠隔
地にある例えば施主の事務所に設置されている計算機
(遠隔地の計算機)21と接続されている。この計算機
21は、インターネット20を介して計算機6をアクセ
スすることで、当該計算機6のデータベース9内に記憶
されている情報の確認及び修正を行う。これにより、計
算機21を通して、遠隔地からリアルタイムに工事の進
捗状況を把握することができる。
In the present system, the computer 6 is connected to a computer (remote computer) 21 installed at a remote location, for example, at an owner's office, for example, via the Internet 20 as remote communication means. The computer 21 checks and corrects information stored in the database 9 of the computer 6 by accessing the computer 6 via the Internet 20. Thereby, the progress of the construction can be grasped in real time from a remote place through the computer 21.

【0034】[0034]

【発明の効果】以上詳述したように本発明によれば、次
に列挙する効果を得ることができる。 (1)工具の場所、時間、作業内容(工具がレンチの場
合であれば、作業時の締めつけトルク)を予め決められ
た工事工程計画と対応付けてデータベース内に記録する
ことができる。 (2)工具によって行われた作業の位置、順序、作業内
容などが計画と相違している場合に作業者に警告を行う
ことができる。 (3)遠隔地からリアルタイムに作業の進捗状況を把握
することができる。
According to the present invention, as described in detail above, the following effects can be obtained. (1) The location, time, and work content of the tool (when the tool is a wrench, tightening torque at the time of work) can be recorded in the database in association with a predetermined construction process plan. (2) It is possible to warn the operator when the position, order, work content, and the like of the work performed by the tool are different from the plan. (3) Work progress can be grasped in real time from a remote location.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る工事工程管理システ
ムのシステム構成図。
FIG. 1 is a system configuration diagram of a construction process management system according to an embodiment of the present invention.

【図2】図1のシステムを構成する各要素相互の関係と
同システムにおける主要な要素の内部構成を示す図。
FIG. 2 is a diagram showing a mutual relationship between respective elements constituting the system of FIG. 1 and an internal configuration of main elements in the system.

【符号の説明】[Explanation of symbols]

1…レンチ工具(工具)、 2,14,18…GPS受信機(自己位置計測手段)、 3…締めつけトルク計測器(作業情報計測手段)、 4,15,19,24…無線通信装置(通信手段)、 5…ネットワーク、 6…計算機(工程管理用計算機)、 7…施工図面、 8…工事工程計画、 9…データベース、 10…情報(工具からの情報) 11…工事工程管理ソフトウェア(処理手段)、 12…表示・警告装置(警告出力手段)、 13…表示装置、 16…カメラ、 17…撮影装置、 20…インターネット(遠隔通信手段)、 21…計算機(遠隔地の計算機)、 22…GPS衛星、 23…GPS基地局。 DESCRIPTION OF SYMBOLS 1 ... Wrench tool (tool), 2, 14, 18 ... GPS receiver (self-position measuring means) 3, ... Tightening torque measuring instrument (work information measuring means), 4, 15, 19, 24 ... Wireless communication device (communication) 5) Network, 6 ... Computer (process management computer), 7 ... Construction drawing, 8 ... Construction process plan, 9 ... Database, 10 ... Information (information from tool) 11 ... Construction process management software (processing means) 12) Display / warning device (warning output means), 13 ... Display device, 16 ... Camera, 17 ... Photographing device, 20 ... Internet (remote communication means), 21 ... Computer (remote computer), 22 ... GPS Satellite, 23 ... GPS base station.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 各種工事における工事工程を管理するた
めの工事工程管理システムにおいて、 工事作業に用いられ、自身の位置と、実施した作業内容
に対応した工具固有の作業情報を計測し、その両計測情
報を通信手段によりネットワークに発信する機能を有す
る工具と、 自身の位置及び姿勢を計測し、その計測情報を利用して
撮影対象となる工事作業箇所の方向を撮影し、撮影対象
の位置と撮影した画像情報を通信手段により前記ネット
ワークに発信する機能を有するカメラと、 工事工程管理用の計算機と、 自身の位置を計測して、その計測した位置情報を通信手
段により前記ネットワークを介して前記計算機に通知す
ると共に、前記計算機からの指示に従う作業者への警告
出力を行う警告出力手段とを具備し、 前記計算機は、管理対象となる工事に関する施工図面と
各工程毎の作業箇所並びに作業内容を定義した工事工程
計画を記憶したデータベースであって、前記施工図面と
工事工程計画、及び前記工具と前記カメラから得られる
情報を、主として位置情報を基に関連付けて記録してお
くためのデータベースと、前記データベース中の工事工
程計画と、前記工具及び前記カメラから前記ネットワー
クを介して得られた情報を位置情報によって結びつけ
て、前記データベースに実際の作業内容を記録する一
方、この実際の作業内容と前記工事工程計画の間の整合
性を判定し、整合性なしと判定した場合には、該当する
作業箇所の近傍にある前記警告出力手段を当該警告出力
手段からの位置情報により検出し、当該警告出力手段に
対して作業者への警告出力を前記ネットワークを介して
指示する処理手段とを有していることを特徴とする工事
工程管理システム。
1. A construction process management system for managing construction processes in various types of construction, which is used for construction work, and measures its own position and tool-specific work information corresponding to the contents of work performed. A tool that has the function of transmitting measurement information to the network via communication means, measures its own position and orientation, and uses that measurement information to photograph the direction of the construction work location to be photographed. A camera having a function of transmitting photographed image information to the network by communication means, a computer for construction process management, measuring its own position, and transmitting the measured position information to the network via the network by the communication means. Warning output means for notifying a computer and outputting a warning to a worker in accordance with an instruction from the computer, wherein the computer is a management target Is a database that stores the construction drawings related to the construction and the construction process plan that defines the work location and the work content for each process, the construction drawings and the construction process plan, and the information obtained from the tools and the camera, A database for recording in association with the position information, a construction process plan in the database, and information obtained from the tool and the camera via the network by the position information, and linked to the database. While recording the actual work content, the consistency between the actual work content and the construction process plan is determined, and when it is determined that there is no consistency, the warning output means near the corresponding work location is determined. Is detected by the position information from the warning output means, and a warning output to the worker is output to the warning output means by the network. Construction process control system characterized in that it has a processing means for instructing through.
【請求項2】 前記工事工程管理用の計算機と遠隔地の
計算機とを遠隔通信手段により接続し、 前記遠隔地の計算機から、前記工事工程管理用計算機内
のデータベースの内容を前記遠隔通信手段を介して確
認、修正可能なようにしたことを特徴とする請求項1記
載の工事工程管理システム。
2. The computer for construction process management and a computer at a remote location are connected by remote communication means, and the contents of the database in the computer for construction process management are transmitted from the remote computer to the remote communication means. The construction process management system according to claim 1, wherein the construction process management system can be confirmed and corrected via a server.
JP19621096A 1996-07-25 1996-07-25 Control system of work and process of the work Withdrawn JPH1037459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19621096A JPH1037459A (en) 1996-07-25 1996-07-25 Control system of work and process of the work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19621096A JPH1037459A (en) 1996-07-25 1996-07-25 Control system of work and process of the work

Publications (1)

Publication Number Publication Date
JPH1037459A true JPH1037459A (en) 1998-02-10

Family

ID=16354043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19621096A Withdrawn JPH1037459A (en) 1996-07-25 1996-07-25 Control system of work and process of the work

Country Status (1)

Country Link
JP (1) JPH1037459A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001290866A (en) * 2000-04-05 2001-10-19 Iida Sangyo:Kk Management and inquiry system for construction progress state
JP2002175349A (en) * 2000-09-27 2002-06-21 Ben System:Kk Site management system
JP2002224922A (en) * 2001-01-31 2002-08-13 Hitachi Ltd System and program for work instruction
JP2006277549A (en) * 2005-03-30 2006-10-12 Toshiba Corp Field work authentication management system
JP2008040569A (en) * 2006-08-02 2008-02-21 Hitachi Ltd Management device of facility and management method of facility
JP2008046786A (en) * 2006-08-11 2008-02-28 Yokogawa Electric Corp Inspection operation system
JP2008084068A (en) * 2006-09-28 2008-04-10 Toshiba Corp Field operation executing state management device and management method
JP2009255225A (en) * 2008-04-16 2009-11-05 Murata Mach Ltd Display device of processing machine
JP2011512605A (en) * 2008-02-18 2011-04-21 ザ・ボーイング・カンパニー System and method for electronic inspection and record making of assembly, repair and maintenance processes
JP2011145809A (en) * 2010-01-13 2011-07-28 Hitachi Ltd Work management device, work management system and work management method
JP2013215865A (en) * 2012-04-12 2013-10-24 Hitachi Ltd Fastening working device and method of the same
JP2016081309A (en) * 2014-10-16 2016-05-16 ヤンマー株式会社 Remote monitoring system and management server
WO2018123433A1 (en) * 2016-12-28 2018-07-05 パナソニックIpマネジメント株式会社 Tool system
JP2018120611A (en) * 2018-03-19 2018-08-02 パナソニックIpマネジメント株式会社 Tool system and program
JP2018147156A (en) * 2017-03-03 2018-09-20 株式会社日立ビルシステム Preservation work support apparatus and preservation work support method
EP3563977A4 (en) * 2016-12-28 2020-01-22 Panasonic Intellectual Property Management Co., Ltd. Tool system
JP2020095761A (en) * 2020-03-23 2020-06-18 パナソニックIpマネジメント株式会社 Tool system and program
JP2020154434A (en) * 2019-03-18 2020-09-24 大豊精機株式会社 Work management system and work management method
WO2020217364A1 (en) * 2019-04-24 2020-10-29 京セラ株式会社 Information processing device, information processing method, and information processing program
JP2021173727A (en) * 2020-04-30 2021-11-01 株式会社トプコン Work management system, work management method, and work management program therefor

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001290866A (en) * 2000-04-05 2001-10-19 Iida Sangyo:Kk Management and inquiry system for construction progress state
JP2002175349A (en) * 2000-09-27 2002-06-21 Ben System:Kk Site management system
JP2002224922A (en) * 2001-01-31 2002-08-13 Hitachi Ltd System and program for work instruction
JP2006277549A (en) * 2005-03-30 2006-10-12 Toshiba Corp Field work authentication management system
JP2008040569A (en) * 2006-08-02 2008-02-21 Hitachi Ltd Management device of facility and management method of facility
JP2008046786A (en) * 2006-08-11 2008-02-28 Yokogawa Electric Corp Inspection operation system
JP2008084068A (en) * 2006-09-28 2008-04-10 Toshiba Corp Field operation executing state management device and management method
JP2011512605A (en) * 2008-02-18 2011-04-21 ザ・ボーイング・カンパニー System and method for electronic inspection and record making of assembly, repair and maintenance processes
JP2009255225A (en) * 2008-04-16 2009-11-05 Murata Mach Ltd Display device of processing machine
JP2011145809A (en) * 2010-01-13 2011-07-28 Hitachi Ltd Work management device, work management system and work management method
JP2013215865A (en) * 2012-04-12 2013-10-24 Hitachi Ltd Fastening working device and method of the same
JP2016081309A (en) * 2014-10-16 2016-05-16 ヤンマー株式会社 Remote monitoring system and management server
WO2018123433A1 (en) * 2016-12-28 2018-07-05 パナソニックIpマネジメント株式会社 Tool system
EP3563977A4 (en) * 2016-12-28 2020-01-22 Panasonic Intellectual Property Management Co., Ltd. Tool system
US11550289B2 (en) 2016-12-28 2023-01-10 Panasonic Intellectual Property Management Co., Ltd. Tool system
US11762365B2 (en) 2016-12-28 2023-09-19 Panasonic Intellectual Property Management Co., Ltd. Tool system
JP2018147156A (en) * 2017-03-03 2018-09-20 株式会社日立ビルシステム Preservation work support apparatus and preservation work support method
JP2018120611A (en) * 2018-03-19 2018-08-02 パナソニックIpマネジメント株式会社 Tool system and program
JP2020154434A (en) * 2019-03-18 2020-09-24 大豊精機株式会社 Work management system and work management method
WO2020217364A1 (en) * 2019-04-24 2020-10-29 京セラ株式会社 Information processing device, information processing method, and information processing program
JP2020095761A (en) * 2020-03-23 2020-06-18 パナソニックIpマネジメント株式会社 Tool system and program
JP2021185525A (en) * 2020-03-23 2021-12-09 パナソニックIpマネジメント株式会社 Tool system and program
JP2021173727A (en) * 2020-04-30 2021-11-01 株式会社トプコン Work management system, work management method, and work management program therefor

Similar Documents

Publication Publication Date Title
JPH1037459A (en) Control system of work and process of the work
US11244272B2 (en) Patrol check system, patrol check device, patrol check method, and storage medium
US9510150B2 (en) Integrating position information into a handheld tool
US8862184B2 (en) System and methods for management of mobile field assets via wireless handheld devices
US6791492B2 (en) GPS positioning system
US10192178B2 (en) Application information for power tools
US20140365259A1 (en) In-field installation record of a project
KR100786718B1 (en) Method and apparatus for locating to installing and removing sensor node
JP2002189513A (en) Equipment management method, abnormality confirmation method and equipment management server
US10460267B2 (en) Integration of as built data of a project
JP2013140418A (en) Patrol inspection system and management server for power facility apparatus
JP6236101B2 (en) Infrastructure facility management system and method, display system therefor, server, terminal device and program used therefor
EP3765817A1 (en) Object recognition and tracking using a real-time robotic total station and building information modeling
JP2002092082A (en) System for realizing unitary construction site working management
EP2786338A2 (en) Managing information at a construction site
JP3838387B2 (en) Surveying system and surveying method
US20150286981A1 (en) Service monitoring device and method of use
JP6370320B2 (en) Equipment management support system, equipment management support method, information terminal, and program
JP2018081713A (en) Information gathering system, information gathering terminal device, information gathering server device, and information gathering method
JP4693018B2 (en) Surveying instrument network system
WO2022064611A1 (en) Air conditioner management system, portable terminal used in same, and air conditioner
JP2003316426A (en) Patrol checking system and method
CN115604317B (en) Prompting system and method for industrial daily inspection
JP2003303013A (en) Work history management device
JP2003186982A (en) Management supporting system and method for machine and its program

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20031007