JPH10311045A - Surface table construction method and device for erecting post - Google Patents

Surface table construction method and device for erecting post

Info

Publication number
JPH10311045A
JPH10311045A JP13450497A JP13450497A JPH10311045A JP H10311045 A JPH10311045 A JP H10311045A JP 13450497 A JP13450497 A JP 13450497A JP 13450497 A JP13450497 A JP 13450497A JP H10311045 A JPH10311045 A JP H10311045A
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
steel
surface plate
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13450497A
Other languages
Japanese (ja)
Other versions
JP3659766B2 (en
Inventor
Takeshi Komon
武 小門
Yoshihiro Takano
良広 高野
Shinichi Mutaguchi
晋一 牟田口
Tatsuya Fukumoto
達也 福元
Masamichi Sawaishi
正道 澤石
Shinkichi Kimura
新吉 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINYOU SANKEN KK
Nippon Steel Corp
Original Assignee
SHINYOU SANKEN KK
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINYOU SANKEN KK, Nippon Steel Corp filed Critical SHINYOU SANKEN KK
Priority to JP13450497A priority Critical patent/JP3659766B2/en
Publication of JPH10311045A publication Critical patent/JPH10311045A/en
Application granted granted Critical
Publication of JP3659766B2 publication Critical patent/JP3659766B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To adjust the reference plane level of a surface table without any need for a worker to enter within a steel pipe pile by suspending a surface table member within the pile via a metal fixture mounted on a steel pipe pile head, adjusting the roof positional level of the surface table member with a vertically movable jig and then fixing the surface table member within the steel pipe pile. SOLUTION: A surface table member 1 for forming the surface table plane of a post has channel steels 3 respectively welded to the forward ends of angle steel members 2 assembled like a cross, and the roof as the upper surface of the channel steels 3 is used as a reference plane for erecting the post. For forming a surface table, a rod material 6 is fitted to a sheet pile catcher 4 on the upper surface of the channel steel 3, and the surface table member 1 is suspended within a steel pipe pile 5. Also, the rod member 6 is attached to a metal fixture 7 mounted on the head of the steel pipe pile 5. A level adjustment nut 8 attached to each metal fixture 7 is rotated for vertically moving the rod material 6 screwed to the nut 8 and the level of a surface table installation position is thereby adjusted. Thereafter, concrete is placed in the steel pipe pile 5, thereby fixing the surface table member 1 within the steel pipe pile 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鋼管柱や鉄骨柱等
の柱を鋼管杭内に差し込み、コンクリートを打設し、鋼
管杭と鋼管柱とを接合し一体化してなる土木建築構造
物、例えば高架橋、高架鉄道、ビル等の基礎杭としての
柱を建て込む時の定盤の施工方法および装置に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a civil engineering construction structure in which a column such as a steel pipe column or a steel column is inserted into a steel pipe pile, concrete is cast, and the steel pipe pile and the steel pipe column are joined and integrated. For example, the present invention relates to a method and an apparatus for constructing a surface plate when a pillar as a foundation pile of a viaduct, an elevated railway, a building, or the like is built.

【0002】[0002]

【従来の技術】土木建築構造物の鋼管基礎杭と柱との接
合方法としては、鋼管基礎杭の上に鉄筋コンクリートの
基礎を設け、この基礎の上に鋼管柱の柱脚をアンカーボ
ルトで固定し、必要に応じて、鋼管柱にコンクリートを
充填するのが一般的な施工方法である。ところが最近、
鋼管基礎杭と柱の接合方法として、鋼管基礎杭上に設け
た鉄筋コンクリート基礎を省略し、鋼管杭に鋼管柱を差
し込んでコンクリートを充填して鋼管杭と鋼管柱とを接
合一体化し、鋼管基礎杭と柱とを接合する必要が生じて
いる。
2. Description of the Related Art As a method of joining a steel pipe foundation pile and a column of a civil engineering building structure, a reinforced concrete foundation is provided on the steel pipe foundation pile, and the column base of the steel pipe column is fixed on this foundation with anchor bolts. It is a common construction method to fill concrete into steel pipe columns as necessary. However, recently
As a method of joining the steel pipe foundation pile and the column, the reinforced concrete foundation provided on the steel pipe foundation pile is omitted, the steel pipe pillar is inserted into the steel pipe pile and filled with concrete, and the steel pipe pile and the steel pipe column are joined and integrated, and the steel pipe foundation pile is joined. It is necessary to join the column and the pillar.

【0003】鋼管杭に鋼管柱を差し込んで接合する施工
方法に関連する公知技術としては、例えば、特開平5−
86630号公報に、コンクリート充填鋼管杭とコンク
リート充填鋼管柱の接合構造が提案されていて、コンク
リートを充填した鋼管杭の頭部にアンカーボルトを埋め
込み、鋼管柱の脚部を鋼管杭内に挿入して、アンカーボ
ルトで固定した後にコンクリートを打設して接合し一体
化することが開示されている。
[0003] As a known technique relating to a construction method of inserting and joining a steel pipe column into a steel pipe pile, for example, Japanese Unexamined Patent Publication No.
No. 86630 proposes a joint structure between a concrete-filled steel pipe pile and a concrete-filled steel pipe column. An anchor bolt is embedded in the head of a concrete-filled steel pipe pile, and a leg of the steel pipe column is inserted into the steel pipe pile. It is disclosed that concrete is cast and joined and integrated after fixing with anchor bolts.

【0004】しかし、鋼管杭内のコンクリートに埋め込
まれたアンカーボルトでは、水平方向の位置調整はでき
ても、上下方向のレベル調整はできないため、別途モル
タル・厚板等を用いて据付の基準面となる定盤を形成す
る必要があるが、鋼管杭内の作業空間がせまいため、
定盤の施工に難渋する、作業空間を確保しようとする
と、設計上大径の鋼管杭とする必要がないにもかかわら
ず鋼管杭の径を大きくせざるを得ず、経済性が悪いとい
う問題が生じる。
However, with an anchor bolt embedded in concrete in a steel pipe pile, since the horizontal position can be adjusted, but the vertical level cannot be adjusted, a mortar, a thick plate or the like is used to separately install a reference surface. Although it is necessary to form a platen that becomes, the work space in the steel pipe pile is small,
Difficult to construct a surface plate, and when trying to secure a work space, it is necessary to increase the diameter of the steel pipe pile, although it is not necessary to use a large-diameter steel pipe pile by design, which is a problem of poor economic efficiency. Occurs.

【0005】また、特開平3−64008号公報には、
建築構造物の柱と杭の接合構造として、柱の鋼管下部を
杭の鋼管上部に挿嵌し、コンクリートを介して両者を接
合することが記載されているが、柱となる鋼管柱を据え
付ける時の定盤のレベル調整の施工方法や施工装置につ
いては何らの開示もない。
[0005] Also, Japanese Patent Application Laid-Open No. 3-64008 discloses that
It is described that the lower part of the steel pipe of the pillar is inserted into the upper part of the steel pipe of the pile and the two are connected via concrete as the joint structure of the pillar and the pile of the building structure. There is no disclosure of any method or apparatus for adjusting the level of the surface plate.

【0006】即ち、鋼管柱や鉄骨柱等の柱を鋼管杭内に
差し込み柱を建て込む際に、所定のレベルに柱を据え付
けるための基準面となる定盤を形成する施工方法および
施工装置についての具体的な技術は、これまで流布され
ていないのが実状である。
That is, when a pillar such as a steel pipe pillar or a steel frame pillar is inserted into a steel pipe pile and a pillar is built, a construction method and a construction apparatus for forming a surface plate serving as a reference plane for mounting the pillar at a predetermined level are provided. The actual technology has not been circulated so far.

【0007】[0007]

【発明が解決しようとする課題】そこで、本発明は、鋼
管柱や鉄骨柱等の柱を鋼管杭内に差し込み、コンクリー
トで固着して鋼管杭と柱とを接合し一体化する柱の建て
込み施工を行う際に、柱を据え付ける定盤の基準面のレ
ベル調整を鋼管杭内に作業者が入らなくて行うことがで
きる定盤の施工方法および装置を提供することを解決課
題とするものである。
SUMMARY OF THE INVENTION Accordingly, the present invention relates to a method of inserting a column such as a steel pipe column or a steel column into a steel pipe pile, fixing the column with concrete, and joining the steel pipe pile and the column to integrate them. It is an object of the present invention to provide a method and an apparatus for constructing a surface plate capable of performing a level adjustment of a reference surface of a surface plate on which a column is to be installed when an operator does not enter a steel pipe pile. is there.

【0008】[0008]

【課題を解決するための手段】本発明は、鋼管杭頭部に
固定金具を装着し、固定金具により棒材を介して定盤部
材を吊り下げ、そして、鋼管杭頭部に装着した固定金具
のレベル調整具により棒材を上下動して定盤部材の天盤
位置をレベル調整すれば、鋼管杭内に作業者が入ること
なく柱を建て込むための定盤を鋼管杭内に形成できるこ
とを知見して本発明を完成した。
SUMMARY OF THE INVENTION According to the present invention, a fixture is mounted on a steel pipe pile head, a platen member is suspended via a bar by the fixture, and the fixture is mounted on the steel pipe pile head. By moving the bar up and down with the level adjuster to adjust the roof position of the surface plate member, a surface plate can be formed in the steel pipe pile to allow the column to be built without workers entering the steel pipe pile. The present invention was completed based on the findings.

【0009】本発明の要旨は、以下の通りである。The gist of the present invention is as follows.

【0010】(1) 十字に組んだ山形鋼等の部材の先
端部に定盤となる溝形鋼等の鋼材を固着した定盤部材を
鋼管杭頭部に装着した固定金具により鋼管杭内に棒材を
介して吊り下げ、固定金具に設けた棒材の上下動治具に
よって棒材を上下動させて定盤部材の天盤位置のレベル
調整を行い、次いで、鋼管杭内にコンクリートを打設
し、定盤部材を鋼管杭内に固定することによって定盤を
形成することを特徴とする、鋼管杭内に鋼管柱や鉄骨柱
等の柱を建て込むための定盤の施工方法。
(1) A platen member in which a steel material such as a grooved steel plate serving as a platen is fixed to the tip of a cross-shaped member such as an angle iron or the like is fixed in the steel pipe pile by a fixing fitting attached to the head of the steel pipe pile. The bar is suspended via the bar, and the bar is moved up and down by the vertical jig for the bar provided on the fixing bracket to adjust the level of the roof of the surface plate member, and then concrete is poured into the steel pipe pile. A method of constructing a surface plate for installing columns, such as steel pipe columns and steel columns, in a steel tube pile, wherein the surface plate is formed by fixing the surface plate members in the steel tube pile.

【0011】(2) 鋼管杭内にコンクリートを打設し
て定盤部材を鋼管杭内に固定する際に、打設後のコンク
リートが軟かい状態の時に定盤の天盤位置の再度のレベ
ル調整を行うことを特徴とする、上記(1)記載の鋼管
杭内に鋼管柱や鉄骨柱等の柱を建て込むための定盤の施
工方法。
(2) When concrete is poured into a steel pipe pile and a surface plate member is fixed in the steel pipe pile, when the concrete after casting is in a soft state, the level of the roof position of the surface plate is restored. The method for constructing a surface plate for erection of columns such as steel pipe columns and steel frame columns in the steel pipe pile according to the above (1), wherein adjustment is performed.

【0012】(3) 鋼管杭頭部の上端に嵌合可能な断
面コ字状の係合部材と、該係合部材の一つの足部に螺合
されているボルトと、該係合部材の他の足部から略直角
に延出している支持部材と、該支持部材の中央に回転自
在に配設されているレベル調整ナットとからなる固定金
具と、十字に組んだ部材の先端部に天盤面を形成する鋼
材を固着した定盤部材と、そして、該定盤部材を前記固
定金具のレベル調整ナットと螺合して吊り下げるための
棒材とを備えていることを特徴とする、鋼管杭内に鋼管
柱や鉄骨柱等の柱を建て込むための定盤の施工装置。
(3) An engagement member having a U-shaped cross section that can be fitted to the upper end of the steel pipe pile head, a bolt screwed to one foot of the engagement member, A fixing member consisting of a supporting member extending substantially at a right angle from the other leg and a level adjusting nut rotatably disposed at the center of the supporting member, and a top end of the member assembled in a cross shape A steel pipe comprising: a plate member to which a steel material forming a plate surface is fixed; and a bar member for screwing the plate member with a level adjustment nut of the fixing bracket to suspend the plate member. Surface plate construction equipment for erection of steel pipe columns and steel columns in piles.

【0013】(4)定盤部材を吊り下げるための棒材
を、固定金具のレベル調整ナットと螺合するネジが切っ
てある棒材部分と、定盤部材と結合する棒材部分とをセ
パジョイントにより連結した棒材としたことを特徴とす
る、上記(3)記載の鋼管杭内に鋼管柱や鉄骨柱等の柱
を建て込むための定盤の施工装置。
(4) The bar for suspending the surface plate member is separated into a threaded bar portion to be screwed into the level adjusting nut of the fixing bracket and a bar portion to be joined to the surface plate member. The platen construction device for erection of columns such as steel tube columns and steel frame columns in the steel tube pile according to the above (3), wherein the column members are rods connected by joints.

【0014】[0014]

【発明の実施の形態】以下本発明の実施の形態を図に基
づいて詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings.

【0015】図1は、十字に組んだ山形鋼の先端部に溝
形鋼を固着した定盤部材の平面図を示す図である。
FIG. 1 is a plan view of a platen member in which a channel steel is fixed to the tip of a cross-shaped angle iron.

【0016】図2は、定盤部材を鋼管杭内に設置した状
態を示す図である。
FIG. 2 is a view showing a state where the platen member is installed in a steel pipe pile.

【0017】図1に示すように、柱の定盤面を形成する
定盤部材1は、十字に組んだ断面L字状の山形鋼部材2
のそれぞれのの先端部に定盤のレベル出しをするための
4つの溝形鋼3が溶接により固着されている。この4つ
の溝形鋼の上面となる天盤が、柱を据え付ける際の基準
面となる。そして、溝形鋼の上面には、定盤部材を棒材
で吊り下げるための矢板キャツチャー4或いはナット部
が設けられている。なお、定盤部材として山形鋼、溝形
鋼を用いているが、角形鋼や中空鋼等の任意の形状の鋼
材を選択して使用することができる。
As shown in FIG. 1, a platen member 1 forming a platen surface of a pillar is formed by a cross-shaped angle-shaped steel member 2 having an L-shaped cross section.
Four channel steels 3 for leveling the surface plate are fixed to the respective front ends of the base plates by welding. The roof serving as the upper surface of the four channel steels serves as a reference surface when the column is installed. And, on the upper surface of the channel steel, a sheet pile catcher 4 or a nut portion for suspending the surface plate member with a bar is provided. Although the angle plate steel and the channel steel are used as the surface plate members, steel materials of any shape such as square steel and hollow steel can be selected and used.

【0018】定盤を形成するに当たっては、図2に示す
ように、基準面を形成するための定盤部材を鋼管杭5内
に挿入する。定盤部材を鋼管杭内に設置するには、定盤
部材の矢板キャツチャー4に棒材6を取り付けて鋼管杭
内に吊り下げて挿入した後、鋼管杭頭部に装着されてい
る固定金具7に定盤部材1を吊り下げている棒材6を取
り付ける。そして、棒材の上部表面にはネジが切ってあ
って、固定金具に設置されている回動自在のレベル調整
ナット8と係合させて固定金具より吊り下げる。
In forming the platen, a platen member for forming a reference surface is inserted into the steel pipe pile 5 as shown in FIG. In order to install the surface plate member in the steel pipe pile, a bar member 6 is attached to the sheet pile catch 4 of the surface plate member, inserted into the steel pipe pile by suspending it, and then the fixing bracket 7 attached to the head of the steel pipe pile. A bar member 6 suspending the platen member 1 is attached to the table. Then, a thread is cut on the upper surface of the bar, and the bar is engaged with a rotatable level adjustment nut 8 provided on the fixing bracket and is suspended from the fixing bracket.

【0019】固定金具7には、鋼管杭頭部の上縁部と嵌
合できる断面がコ字状の係合部材9が設けられていて、
コ字状係合部材の1つの足部には螺合した締め付けボル
ト10が装着されていて、ボルトを締めるとボルト先端
が鋼管杭頭部の外表面を締め付け、それによって鋼管杭
頭部に固定金具を固定できるようになっている。
The fixing member 7 is provided with an engagement member 9 having a U-shaped cross section which can be fitted to the upper edge of the steel pipe pile head.
One foot of the U-shaped engaging member is provided with a threaded tightening bolt 10, and when the bolt is tightened, the bolt tip tightens the outer surface of the steel pipe pile head, thereby fixing the steel pipe pile head to the steel pipe pile head. The bracket can be fixed.

【0020】また、コ字状係合部材の鋼管杭頭部の内表
面側に設置することとなる他の足部には、その足部から
略直角(図2では水平方向となる)に延出する支持部材
11が設けられている。支持部材11の上下には、二つ
のレベル調整ナット8が回動自在に配設されている。そ
して、レベル調整ナットの内表面のネジと棒材の外表面
のネジとが螺合できるようになっている。したがって、
支持部材11の中心孔に棒材6を差し込み、かつ、棒材
6と螺合している二つのレベル調節ナット8が支持部材
11の上下に配置した状態とする。次いで、レベル調整
ナットを回転させると、レベル調整ナットの回転に応じ
て棒材は上下方向のレベル位置に調整可能となる。その
結果、棒材に吊り下げられている定盤部材の上下方向の
高さ位置を任意に制御することができる。また、レベル
調整ナットは、支持部材中に回動自在に埋込まれていて
も良い。
The other foot, which is to be installed on the inner surface side of the steel pipe pile head of the U-shaped engaging member, extends from the foot at a substantially right angle (in the horizontal direction in FIG. 2). An outgoing support member 11 is provided. Above and below the support member 11, two level adjustment nuts 8 are rotatably arranged. The screw on the inner surface of the level adjusting nut and the screw on the outer surface of the bar can be screwed together. Therefore,
The bar 6 is inserted into the center hole of the support member 11, and two level adjusting nuts 8 screwed to the bar 6 are arranged above and below the support member 11. Next, when the level adjusting nut is rotated, the bar can be adjusted to the vertical level position according to the rotation of the level adjusting nut. As a result, it is possible to arbitrarily control the vertical position of the surface plate member suspended from the bar. Further, the level adjustment nut may be rotatably embedded in the support member.

【0021】つまり、固定金具のコ字状の係合部材11
を鋼管杭の上縁部に嵌合させて、締め付けボルト10を
締め付けることにより固定金具は鋼管杭に装着できる。
そして、鋼管杭頭部には等間隔で固定金具が4箇所装着
されていて、棒材6を介して定盤部材1の定盤面を形成
する4つの部材をそれぞれ吊り下げている。この状態
で、各固定金具に配設されているレベル調整ナットを回
転さて、レベル調整ナットと螺合している棒材を上下動
させることにより定盤の据え付け位置のレベル調整を行
い、定盤部材を鋼管杭内に据え付ける。
That is, the U-shaped engaging member 11 of the fixing bracket
Is fitted to the upper edge of the steel pipe pile, and the fastening fitting can be mounted on the steel pipe pile by tightening the tightening bolt 10.
At the same time, four metal fittings are attached to the head of the steel pipe pile at equal intervals, and four members forming the surface of the surface plate 1 are suspended via the bars 6. In this state, the level adjustment nut provided on each fixture is rotated, and the bar material screwed with the level adjustment nut is moved up and down to adjust the level of the installation position of the surface plate, The member is installed in the steel pipe pile.

【0022】なお、棒材6は、必要に応じて、セパジョ
イント12により連結することができる。
The bars 6 can be connected by a separate joint 12 if necessary.

【0023】つまり、作業性を考慮すれば、固定金具に
螺合している棒材に定盤部材を吊り下げている棒材をセ
パジョイントにより連結させることが好ましい。
That is, in consideration of workability, it is preferable that the bar material hanging from the platen member is connected to the bar material screwed to the fixing bracket by a separate joint.

【0024】図3は、鋼管杭内にコンクリートを打設し
て定盤部材を固定した状態を示す図である。
FIG. 3 is a view showing a state in which concrete is poured into a steel pipe pile and a surface plate member is fixed.

【0025】定盤部材の天盤レベルが所定のレベルにな
るようにレベル調整して、鋼管杭内に定盤部材を据え付
けた後、図3に示すように、鋼管杭内の所定の位置、例
えば定盤部材を固定できる位置までコンクリート13を
打設する。コンクリートが固まった後、固定金具を取り
除くと、柱を載置するための定盤となる。
After adjusting the level so that the roof level of the surface plate member becomes a predetermined level and installing the surface plate member in the steel pipe pile, as shown in FIG. For example, the concrete 13 is cast to a position where the surface plate member can be fixed. After the concrete has hardened, the fixtures are removed and the platen becomes a place for placing the pillars.

【0026】なお、必要に応じて、コンクリートが軟ら
かいうちに、再度定盤部材の位置のレベル調整をレベル
調整ナット8を回転させて行うことができる。このた
め、定盤部材のレベル位置が、コンクリートの打設によ
って狂ったとしても、再度のレベル調整によって精度の
高い設置レベルの調整を行うことができる。
If necessary, while the concrete is soft, the level of the position of the surface plate member can be adjusted again by rotating the level adjusting nut 8. For this reason, even if the level position of the surface plate member is misaligned due to the casting of concrete, it is possible to adjust the installation level with high accuracy by adjusting the level again.

【0027】図4は、鋼管杭内に鋼管柱を差し込んだ状
態を示す図である。
FIG. 4 is a view showing a state where a steel pipe column is inserted into a steel pipe pile.

【0028】定盤部材の設置が完了した後、図4に示す
ように、鋼管杭5内に鋼管柱14を差し込んで鋼管柱1
4を定盤部材1上に載置し、コンクリートを鋼管杭及び
鋼管柱内に打設し、両者をコンクリートにより接合し一
体化することにより、鋼管柱の建て込みをすることがで
きる。なお、棒材6は残したままでもよいが、必要に応
じて、コンクリートの打設前に取り除いてもよい。ま
た、柱としては、円形や角形等の鋼管柱、鉄骨柱等を使
用することができ、そして、鋼管杭としては、円形や角
形等の鋼管杭を使用することができる。
After the installation of the surface plate member is completed, as shown in FIG.
4 is placed on the surface plate member 1, concrete is cast into a steel pipe pile and a steel pipe column, and the two are joined and integrated with concrete, whereby the steel pipe column can be built. Although the bar 6 may be left as it is, it may be removed before the concrete is cast, if necessary. Further, as the column, a circular or square steel pipe column, a steel frame column or the like can be used, and as the steel pipe pile, a circular or square steel pipe pile can be used.

【0029】[0029]

【発明の効果】本発明では、鋼管杭頭部で定盤のレベル
調整を行うものであるため、杭内に作業者が入る必要が
なく施工性が良い。また、作業者が入らないため、定盤
の施工空間確保の必要性がなく、鋼管杭の径を適切な設
計値以上に不必要に大きくしなくてよい。更に、コンク
リート打設後もコンクリートが軟らかい間に定盤のレベ
ル調整をし直すことが可能なため、精度の高いレベル出
しができるという効果を奏する。
According to the present invention, since the level of the platen is adjusted at the head of the steel pipe pile, there is no need for an operator to enter the pile and the workability is good. In addition, since no workers are required, there is no need to secure a work space for the surface plate, and the diameter of the steel pipe pile does not need to be unnecessarily increased to a value larger than an appropriate design value. Furthermore, since the level of the surface plate can be adjusted again while the concrete is soft even after the concrete is cast, there is an effect that the level can be set with high accuracy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】十字に組んだ山形鋼の先端部に溝形鋼を固着し
た定盤部材を示す図である。
FIG. 1 is a view showing a surface plate member in which a channel steel is fixed to the tip of a cross-shaped angle iron.

【図2】定盤部材を鋼管杭内に設置した状態を示す図で
ある。
FIG. 2 is a diagram showing a state in which a surface plate member is installed in a steel pipe pile.

【図3】鋼管杭内にコンクリートを打設して定盤部材を
固定した状態を示す図である。
FIG. 3 is a view showing a state where concrete is poured into a steel pipe pile and a surface plate member is fixed.

【図4】鋼管杭内に鋼管柱を差し込んだ状態を示す図で
ある。
FIG. 4 is a view showing a state in which a steel pipe column is inserted into a steel pipe pile.

【符号の説明】[Explanation of symbols]

1 定盤部材 2 山形鋼部材 3 溝形鋼 4 矢板キャッチャー 5 鋼管杭 6 棒材 7 固定金具 8 レベル調整ナット 9 係合部材 10 ボルト 11 支持部材 12 セパジョイント 13 コンクリート 14 鋼管柱 DESCRIPTION OF SYMBOLS 1 Surface plate member 2 Angle steel member 3 Channel steel 4 Sheet pile catcher 5 Steel pipe pile 6 Bar material 7 Fixing bracket 8 Level adjustment nut 9 Engagement member 10 Bolt 11 Support member 12 Sepa joint 13 Concrete 14 Steel pipe column

───────────────────────────────────────────────────── フロントページの続き (72)発明者 牟田口 晋一 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 福元 達也 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 澤石 正道 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 木村 新吉 千葉県君津市人見1201 新葉産建株式会社 内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shinichi Mutaguchi 2-6-3 Otemachi, Chiyoda-ku, Tokyo Inside Nippon Steel Corporation (72) Inventor Tatsuya Fukumoto 2-6, Otemachi, Chiyoda-ku, Tokyo 3 Nippon Steel Corporation (72) Inventor Masamichi Sawaishi 2-6-3 Otemachi, Chiyoda-ku, Tokyo Nippon Steel Corporation (72) Inventor Shinkichi Kimura 1201 Hitomi Kimitsu City, Chiba Prefecture Sanken Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 十字に組んだ部材の先端部に定盤となる
鋼材を固着した定盤部材を鋼管杭頭部に装着した固定金
具により鋼管杭内に棒材を介して吊り下げ、固定金具に
設けた棒材の上下動調整治具によって棒材を上下動させ
て定盤部材の天盤位置のレベル調整を行い、次いで、鋼
管杭内にコンクリートを打設し、定盤部材を鋼管杭内に
固定することによって定盤を形成することを特徴とす
る、鋼管杭内に鋼管柱や鉄骨柱等の柱を建て込むための
定盤の施工方法。
1. A metal plate fixed to a tip of a cross-shaped member with a steel material serving as a surface plate fixedly attached to a steel pipe pile head by a metal fitting suspended from a steel pipe pile via a bar. The bar is moved up and down with the bar up and down adjustment jig provided at the stage to adjust the level of the roof of the surface plate member, then concrete is poured into the steel pipe pile, and the surface plate member is A method of constructing a surface plate for installing columns such as steel pipe columns and steel frame columns in a steel pipe pile, characterized in that the surface plate is formed by being fixed in the inside.
【請求項2】 鋼管杭内にコンクリートを打設して定盤
部材を鋼管杭内に固定する際に、打設後のコンクリート
が軟かい状態の時に定盤の天盤位置の再度のレベル調整
を行うことを特徴とする、請求項1記載の鋼管杭内に鋼
管柱や鉄骨柱等の柱を建て込むための定盤の施工方法。
2. When the concrete is poured into the steel pipe pile and the platen member is fixed in the steel pipe pile, when the concrete after the casting is in a soft state, the level adjustment of the roof position of the platen is performed again. The method for constructing a surface plate for erection of columns such as steel pipe columns and steel frame columns in the steel pipe pile according to claim 1, characterized in that:
【請求項3】 鋼管杭頭部の上端部に嵌合可能な断面コ
字状の係合部材と、該係合部材の一つの足部に螺合され
ているボルトと、該係合部材の他の足部から略直角に延
出している支持部材と、該支持部材の中央に回転自在に
配設されているレベル調整ナットとからなる固定金具
と、十字に組んだ部材の先端部に天盤面を形成する鋼材
を固着した定盤部材と、そして、該定盤部材を前記固定
金具のレベル調整ナットと螺合して吊り下げるための棒
材とを備えていることを特徴とする、鋼管杭内に鋼管柱
や鉄骨柱等の柱を建て込むための定盤の施工装置。
3. An engagement member having a U-shaped cross section which can be fitted to an upper end portion of a steel pipe pile head, a bolt screwed to one foot of the engagement member, and A fixing member consisting of a supporting member extending substantially at a right angle from the other leg and a level adjusting nut rotatably disposed at the center of the supporting member, and a top end of the member assembled in a cross shape A steel pipe comprising: a plate member to which a steel material forming a plate surface is fixed; and a bar member for screwing the plate member with a level adjustment nut of the fixing bracket to suspend the plate member. Surface plate construction equipment for erection of steel pipe columns and steel columns in piles.
【請求項4】 定盤部材を吊り下げるための棒材を、固
定金具のレベル調整ナットと螺合するネジが切ってある
棒材部分と、定盤部材と結合する棒材部分とをセパジョ
イントにより連結した棒材としたことを特徴とする、請
求項3記載の鋼管杭内に鋼管柱や鉄骨柱等の柱を建て込
むための定盤の施工装置。
4. A bar joint for suspending a surface plate member, wherein a threaded bar portion to be screwed into a level adjustment nut of a fixing bracket and a bar portion to be joined to the surface plate member are separated joints. The platen construction device for erection of columns such as steel pipe columns and steel frame columns in the steel pipe pile according to claim 3, wherein the rod members are connected by a bar.
JP13450497A 1997-05-09 1997-05-09 Surface plate construction method and apparatus for building pillars Expired - Fee Related JP3659766B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13450497A JP3659766B2 (en) 1997-05-09 1997-05-09 Surface plate construction method and apparatus for building pillars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13450497A JP3659766B2 (en) 1997-05-09 1997-05-09 Surface plate construction method and apparatus for building pillars

Publications (2)

Publication Number Publication Date
JPH10311045A true JPH10311045A (en) 1998-11-24
JP3659766B2 JP3659766B2 (en) 2005-06-15

Family

ID=15129877

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13450497A Expired - Fee Related JP3659766B2 (en) 1997-05-09 1997-05-09 Surface plate construction method and apparatus for building pillars

Country Status (1)

Country Link
JP (1) JP3659766B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009834A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR20030009835A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR100461914B1 (en) * 2001-07-24 2004-12-14 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
WO2013040950A1 (en) * 2011-09-22 2013-03-28 江苏省交通科学研究院股份有限公司 Shear connector for corrugated sheet steel and concrete
JP2021085141A (en) * 2019-11-25 2021-06-03 東日本旅客鉄道株式会社 Column body installation structure
CN114032792A (en) * 2021-12-06 2022-02-11 中国核工业华兴建设有限公司 Cantilever cast-in-place beam prestress construction operation platform and manufacturing method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009834A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR20030009835A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR100461914B1 (en) * 2001-07-24 2004-12-14 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
WO2013040950A1 (en) * 2011-09-22 2013-03-28 江苏省交通科学研究院股份有限公司 Shear connector for corrugated sheet steel and concrete
US9447553B2 (en) 2011-09-22 2016-09-20 Jiangsu Transportation Research Institute Co., Ltd. Shear connector for corrugated sheet steel and concrete
JP2021085141A (en) * 2019-11-25 2021-06-03 東日本旅客鉄道株式会社 Column body installation structure
CN114032792A (en) * 2021-12-06 2022-02-11 中国核工业华兴建设有限公司 Cantilever cast-in-place beam prestress construction operation platform and manufacturing method thereof
CN114032792B (en) * 2021-12-06 2023-11-24 中国核工业华兴建设有限公司 Cantilever cast-in-situ beam prestress construction operation platform and manufacturing method thereof

Also Published As

Publication number Publication date
JP3659766B2 (en) 2005-06-15

Similar Documents

Publication Publication Date Title
JP4020406B2 (en) Formwork support mechanism and placement method
JP5961778B1 (en) Anchor bolt installation base
JP3922455B2 (en) Formwork support mechanism, beam holding jig, floor slab placement method
JPH10311045A (en) Surface table construction method and device for erecting post
JPH111924A (en) Erection method and device of insertion type steel pipe column
JPH10311047A (en) Post positioning method and device for erecting plug-in type post
JP4416141B2 (en) How to install seismic isolation devices
JPH09189132A (en) Fixing method of column base for steel frame column
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JPH09268573A (en) Connection member of column and pile
JP7192153B1 (en) Anchor bolt construction method and level adjustment member
JP2716357B2 (en) Rising section formwork fixing jig
JPH08170366A (en) Temporary stopper for column/beam joint member
JP2981691B2 (en) Joint method and joint structure of box-shaped column in steel frame construction
JPH07173873A (en) Fixing structure for foundation bolt
JPH10299004A (en) Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column
JPH10299019A (en) Joining method for permanent sub-structural column and main steel in inverted construction method
JPH093912A (en) Plate anchor construction method
JPH08246681A (en) Equipment and method of adjusting level of column
JPS62107132A (en) House anchoring apparatus
JPH041328A (en) Construction of strut base for cable way
JPH07102584A (en) Method of underground structural stud construction
JP2761455B2 (en) ALC external wall panel mounting method on the floor taken out
JPH0742377A (en) Handrail bracket and constructing method for temporary handrail using same
JPH06280365A (en) Construction method and device for handrail support post

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040511

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050315

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090325

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100325

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110325

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120325

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140325

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees