JPH10311047A - Post positioning method and device for erecting plug-in type post - Google Patents

Post positioning method and device for erecting plug-in type post

Info

Publication number
JPH10311047A
JPH10311047A JP13450697A JP13450697A JPH10311047A JP H10311047 A JPH10311047 A JP H10311047A JP 13450697 A JP13450697 A JP 13450697A JP 13450697 A JP13450697 A JP 13450697A JP H10311047 A JPH10311047 A JP H10311047A
Authority
JP
Japan
Prior art keywords
steel pipe
column
pipe pile
pillar
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13450697A
Other languages
Japanese (ja)
Inventor
Takeshi Komon
武 小門
Yoshihiro Takano
良広 高野
Shinichi Mutaguchi
晋一 牟田口
Tatsuya Fukumoto
達也 福元
Masamichi Sawaishi
正道 澤石
Shinkichi Kimura
新吉 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINYOU SANKEN KK
Nippon Steel Corp
Original Assignee
SHINYOU SANKEN KK
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINYOU SANKEN KK, Nippon Steel Corp filed Critical SHINYOU SANKEN KK
Priority to JP13450697A priority Critical patent/JPH10311047A/en
Publication of JPH10311047A publication Critical patent/JPH10311047A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To erect a post without fixing the leg part there of an anchor bolt by applying the constitution that a plurality of positioning devices with gauge materials slidable on a seating are mounted on a steel pipe pile head, and the post suspended within the pile is adjusted to suit a position contact with the positionally adjusted and fixed gauge materials. SOLUTION: Two to four pieces of a horizontal positioning device having a seating 1 and a gauge material 2 slidable mounted thereon, are arranged on a head part of a steel pipe pile erected on foundation concrete. Then, the erection position of a post such as a steel pipe post is measured and the gauge material 2 is made to slide on the seating 1 so that the forward end position of the gauge material 2 is aligned with the external surface of the post at the measured erection position. The gauge material 2 is thereby positioned and fixed to the top plate 3 of the seating 1. Thereafter, the post is suspended and inserted within the steel pipe pile and after the post is positionally adjusted and held so as to come into contact with the guide material 2, and fixture such as a wedge is inserted in a gap between the post and the steel pipe pile. The post is thereby fixed and then concrete is placed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鋼管柱や鉄骨柱等
の柱を鋼管杭内に差し込み、柱の周囲にコンクリートを
打設し、鋼管杭と柱とを接合し一体化してなる土木建築
構造物、例えば高架橋、高架鉄道、ビル等の柱を建込む
際に、柱を鋼管杭内の所定の位置に位置決めする方法及
び装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a civil engineering construction in which a column such as a steel pipe column or a steel frame column is inserted into a steel pipe pile, concrete is cast around the column, and the steel pipe pile and the column are joined and integrated. The present invention relates to a method and an apparatus for positioning a pillar at a predetermined position in a steel pipe pile when building a pillar such as a viaduct, an elevated railway, a building, and the like.

【0002】[0002]

【従来の技術】土木建築構造物の鋼管基礎杭と柱との接
合方法としては、鋼管基礎杭の上に鉄筋コンクリートの
基礎を設け、この基礎の上に鋼管柱の柱脚をアンカーボ
ルトで固定し、必要に応じて、鋼管柱にコンクリートを
充填するのが一般的な施工方法である。ところが最近、
鋼管基礎杭と柱の接合方法として、鋼管基礎杭上に設け
た鉄筋コンクリート基礎を省略し、鋼管杭に鋼管柱を差
し込んでコンクリートを充填して鋼管杭と鋼管柱とを接
合一体化し、鋼管基礎杭と柱とを接合する必要が生じて
いる。
2. Description of the Related Art As a method of joining a steel pipe foundation pile and a column of a civil engineering building structure, a reinforced concrete foundation is provided on the steel pipe foundation pile, and the column base of the steel pipe column is fixed on this foundation with anchor bolts. It is a common construction method to fill concrete into steel pipe columns as necessary. However, recently
As a method of joining the steel pipe foundation pile and the column, the reinforced concrete foundation provided on the steel pipe foundation pile is omitted, the steel pipe pillar is inserted into the steel pipe pile and filled with concrete, and the steel pipe pile and the steel pipe column are joined and integrated, and the steel pipe foundation pile is joined. It is necessary to join the column and the pillar.

【0003】鋼管杭に鋼管柱を差し込んで接合する施工
方法に関連する公知技術としては、例えば、特開平5−
86630号公報に、コンクリート充填鋼管杭とコンク
リート充填鋼管柱の接合構造が提案されていて、コンク
リートを充填した鋼管杭の頭部にアンカーボルトを埋め
込み、鋼管柱の脚部を鋼管杭内に挿入して、アンカーボ
ルトで固定した後にコンクリートを打設して接合し一体
化することが開示されている。
[0003] As a known technique relating to a construction method of inserting and joining a steel pipe column into a steel pipe pile, for example, Japanese Unexamined Patent Publication No.
No. 86630 proposes a joint structure between a concrete-filled steel pipe pile and a concrete-filled steel pipe column. An anchor bolt is embedded in the head of a concrete-filled steel pipe pile, and a leg of the steel pipe column is inserted into the steel pipe pile. It is disclosed that concrete is cast and joined and integrated after fixing with anchor bolts.

【0004】しかし、鋼管杭内のコンクリートに埋め込
まれたアンカーボルトにて水平方向の位置決めを行おう
とすると、アンカーボルトの設置位置が鋼管杭内の狭
隘な空間となるため、精度の高いボルトの据付が困難で
ある、精度よいアンカーボルトの据付を行うために、
杭径を設計上不必要な大きさにする必要があり、不経済
となる、杭の施工誤差が任意に生じるため、画一的な
アンカーボルトの据付がしづらい、等の課題がある。ま
た、アンカーボルトの固定のために、柱脚部にベースプ
レートが必要であり、柱の加工度が上がるとともに、ベ
ースプレートを杭内に収めるために、設計上大径の鋼管
杭とする必要がないにもかかわらず鋼管杭の径を大きく
せざるを得ず、経済性が悪いという問題が生じる。
[0004] However, when an attempt is made to perform horizontal positioning with anchor bolts embedded in concrete in a steel pipe pile, the anchor bolts are installed in a narrow space in the steel pipe pile. It is difficult to install accurate anchor bolts
It is necessary to make the pile diameter unnecessarily large in design, which is uneconomical, and there is a problem that the installation error of the pile is arbitrarily generated, so that it is difficult to uniformly install the anchor bolts. In addition, a base plate is required on the column base to fix the anchor bolts, and the workability of the column is increased, and it is not necessary to design a large-diameter steel pipe pile to accommodate the base plate in the pile. Nevertheless, the diameter of the steel pipe pile must be increased, which causes a problem of poor economy.

【0005】また、特開平3−64008号公報には、
建築構造物の柱と杭の接合構造として、柱の鋼管下部を
杭の鋼管上部に挿嵌し、コンクリートを介して両者を接
合することが記載されているが、柱となる鋼管柱を所定
位置に位置決めして建て込むことについては何らの開示
もない。
[0005] Also, Japanese Patent Application Laid-Open No. 3-64008 discloses that
As a joint structure between a pillar and a pile of a building structure, it is described that the lower part of the steel pipe of the pillar is inserted into the upper part of the steel pipe of the pile and the two are joined via concrete. There is no disclosure of positioning and building.

【0006】即ち、鋼管柱、鉄骨柱等の柱を鋼管杭内に
差し込み、柱周囲にコンクリートを打設し、鋼管杭と柱
とを接合し一体化する柱の建て込み施工を行う際に、柱
の水平方向の位置決めを行うための具体的な施工方法及
び装置については、これまで流布されていないのが実状
である。
That is, when a pillar such as a steel pipe pillar or a steel pillar is inserted into a steel pipe pile, concrete is poured around the pillar, and when the steel pipe pile and the pillar are joined and integrated, a pillar is built. Actually, a concrete construction method and apparatus for positioning the column in the horizontal direction have not been distributed so far.

【0007】[0007]

【発明が解決しようとする課題】そこで、本発明は、鋼
管杭内に差し込んだ鋼管柱、鉄骨柱等の柱の脚部をアン
カーボルトに固定する事なく、鋼管杭内に差し込んだ柱
を所定の水平方向位置に位置決めして、柱の建込みを行
い得るようにした柱の水平方向位置決め方法および装置
を提供することを解決課題とするものである。
SUMMARY OF THE INVENTION Accordingly, the present invention provides a method for fixing a column inserted into a steel pipe pile without fixing the legs of the column such as a steel pipe column or a steel column inserted into the steel pipe pile to anchor bolts. It is an object of the present invention to provide a method and apparatus for positioning a pillar in the horizontal direction, which can be positioned at a horizontal position of the pillar and can be erected.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するため
に、本発明では、鋼管柱、鉄骨柱等の柱を鋼管杭内に差
し込んで立柱する際に、鋼管杭の頭部にすくなくとも2
つの位置決め装置を取り付けて、柱の水平方向の位置決
めを行えば、杭内での人の作業が排除でき、かつ、作業
全体が画一的で簡便に行えることに着目して発明を完成
したものである。
In order to solve the above-mentioned problems, according to the present invention, when a column such as a steel pipe column or a steel frame column is inserted into a steel pipe pile and erected, at least two heads are attached to the head of the steel pipe pile.
Completed the invention by focusing on the fact that by installing two positioning devices and positioning the columns in the horizontal direction, human work in the pile can be eliminated and the entire work can be performed uniformly and easily. It is.

【0009】本発明の要旨は、以下の通りである。The gist of the present invention is as follows.

【0010】(1)鋼管杭内に鋼管柱や鉄骨柱等の柱を
差し込み、鋼管杭内に柱を立柱した後に、コンクリート
を打設し、鋼管杭と柱とを接合し一体化して、鋼管杭内
に柱を建て込む際の鋼管杭内での柱の水平方向位置決め
方法であって、台座と、台座上に摺動可能に装着されて
いるゲージ材とを備えた位置決め装置を少なくとも2個
鋼管杭頭部に取り付け、柱の据え付け位置を測量し、測
量した据え付け位置の柱の外表面とゲージ材とが接する
ことができるようにゲージ材を台座の上で移動させてゲ
ージ材の位置を調整し、ゲージ材を台座に固定した後、
柱を吊って杭内に差し込み、柱をゲージ材に接する位置
に調整することを特徴とする、鋼管杭内での柱の水平方
向位置決め方法。
[0010] (1) A steel pipe column or a steel column is inserted into a steel pipe pile, and after the column is erected in the steel pipe pile, concrete is cast, and the steel pipe pile and the column are joined and integrated to form a steel pipe. What is claimed is: 1. A method for horizontally positioning a pillar in a steel pipe pile when the pillar is built in the pile, comprising at least two positioning devices each including a pedestal and a gauge material slidably mounted on the pedestal. Attach it to the steel pipe pile head, measure the installation position of the column, move the gauge material on the pedestal so that the outer surface of the column at the measured installation position can contact the gauge material, and adjust the position of the gauge material. After adjusting and fixing the gauge material to the pedestal,
A method for horizontally positioning a column in a steel pipe pile, comprising suspending a column, inserting the column into a pile, and adjusting the column to a position in contact with a gauge material.

【0011】(2)中央に長孔を穿孔された天板と、該
天板から垂下する2つの脚部材と、そして一方の脚部材
に設けられた締め付けボルトとからなっている台座と、
台座上部の天板に摺動可能に装着されたゲージ材と、そ
して天板の長孔内を貫通して位置されていてゲージ材と
台座天板とを固定するための固定具とを備えていること
を特徴とする、鋼管柱内に差し込まれた柱の水平方向位
置決め装置。
(2) A pedestal including a top plate having a long hole formed in the center, two leg members hanging from the top plate, and a fastening bolt provided on one of the leg members.
A gauge material slidably mounted on the top plate on the pedestal, and a fixture for fixing the gauge material and the pedestal top plate that are positioned through the long holes of the top plate. A horizontal positioning device for a column inserted into a steel tube column.

【0012】(3)ゲージ材の端部に、上方に延出し、
かつ、先端部が柱をガイドし易いように曲げられている
板状または棒状のガイド材を設けたことを特徴とする、
請求項2記載の鋼管柱内に差し込まれた柱の水平方向位
置決め装置。
(3) extending upward at the end of the gauge material,
And, provided with a plate-shaped or rod-shaped guide member whose tip is bent so as to easily guide the column,
A horizontal positioning device for a column inserted into a steel tube column according to claim 2.

【0013】[0013]

【発明の実施の形態】以下本発明の実施の形態を図に基
づいて詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings.

【0014】本発明では、柱を据え付ける際に、柱の水
平方向位置決め用装置を用いて柱の据え付け位置を決定
するものである。
According to the present invention, when the column is installed, the installation position of the column is determined by using a device for horizontal positioning of the column.

【0015】まず、本発明の柱の水平方向位置決め装置
について説明する。
First, a column horizontal positioning device according to the present invention will be described.

【0016】図1は、本発明の柱の水平方向位置決め装
置の斜視図である。図2は、柱の水平方向位置決め装置
の台座を占めす図である。図3、柱の水平方向位置決め
装置を組み立てた状態を示す図である。
FIG. 1 is a perspective view of a column horizontal positioning device according to the present invention. FIG. 2 is a view occupying the pedestal of the column horizontal positioning device. FIG. 3 is a view showing a state where the horizontal positioning device for the pillar is assembled.

【0017】図1〜図3に示すように、本発明の柱の水
平方向位置決め装置は、台座1と台座に摺動可能取り付
けられたゲージ材2とを備えている。台座1は、天板3
と天板3から垂下する2つの脚部材4、5と、そして、
一方の脚部材4に設けたボルト取付孔6に取り付けられ
た締付けボルト7とを備えている。また、天板3には、
その中央部に長孔8が穿孔されているが、これはゲージ
板を天板上で摺動させた時に、ゲージ板と天板とを固定
するためのボルト9の軸が天板の長い孔内を自由に移動
できるようにするために設けているものである。ゲージ
材2には、その両側に下方に折れ曲がった形状のゲージ
板の脚部14を設けてあって、天板3を跨ぐように天板
上にゲージ材が配置されている。この脚部14を設けた
ことによって、ゲージ材の横方向へのずれが防止でき
る。なお、ゲージ材は天板を抱え込むように設けること
もできる。ゲージ材2を天板3に固定するには、ボルト
取付孔17に挿入したボルト9をナット10で締め付け
ることにより固定できるが他の固定具であってもよい。
As shown in FIGS. 1 to 3, the column horizontal positioning device of the present invention includes a pedestal 1 and a gauge member 2 slidably mounted on the pedestal. Pedestal 1 is top plate 3
And two leg members 4, 5 hanging from the top plate 3, and
And a tightening bolt 7 mounted in a bolt mounting hole 6 provided in one leg member 4. Also, on the top plate 3,
A long hole 8 is drilled in the center of the hole. This is because when the gauge plate is slid on the top plate, the shaft of the bolt 9 for fixing the gauge plate and the top plate is elongated in the top plate. It is provided so that it can move freely inside. The gauge member 2 is provided with a leg portion 14 of a gauge plate bent downward on both sides thereof, and the gauge member is arranged on the top plate so as to straddle the top plate 3. The provision of the legs 14 prevents the lateral displacement of the gauge material. Note that the gauge material can be provided so as to hold the top plate. In order to fix the gauge member 2 to the top plate 3, the bolt 9 inserted into the bolt mounting hole 17 can be fixed by tightening with a nut 10, but other fixing tools may be used.

【0018】次いで、本発明の水平方向位置決め装置を
用いて、鋼管杭内に差し込んだ鋼管柱の位置決めの施工
方法を説明する。
Next, a description will be given of a method of positioning a steel pipe column inserted into a steel pipe pile using the horizontal positioning device of the present invention.

【0019】図5は鋼管杭に水平方向位置決め装置を取
り付けて鋼管杭内に柱を差し込む状態を示す図である。
FIG. 5 is a view showing a state in which a horizontal positioning device is attached to a steel pipe pile and a column is inserted into the steel pipe pile.

【0020】図5に示すように、台座1にゲージ材2を
取り付けた水平方向位置決め装置を基礎コンクリートに
据え付けた鋼管杭の頭部に設置する。即ち台座1の脚部
材4、5間の凹所に鋼管杭頭部上端を嵌入させる。そし
て、脚部材4に2箇所取り付けられているボルトを締付
けるとボルト先端部11は鋼管杭頭部外表面を押し付け
ることとなる。その結果、鋼管杭頭部は脚部材5とボル
ト先端部11とで締め付けられ、台座1は鋼管杭頭部に
固定できる。台座を鋼管杭頭部に強固に取り付けるため
には、締め付けボルトは少なくとも2箇所設けることが
好ましい。
As shown in FIG. 5, a horizontal positioning device in which a gauge member 2 is mounted on a pedestal 1 is installed on the head of a steel pipe pile installed on a foundation concrete. That is, the upper end of the steel pipe pile head is fitted into the recess between the leg members 4 and 5 of the pedestal 1. When the bolts attached to the leg member 4 at two locations are tightened, the bolt tip 11 presses the outer surface of the steel pipe pile head. As a result, the steel pipe pile head is fastened by the leg member 5 and the bolt tip 11, and the pedestal 1 can be fixed to the steel pipe pile head. In order to firmly attach the pedestal to the steel pipe pile head, it is preferable to provide at least two fastening bolts.

【0021】水平方向位置決め装置は、柱の水平方向位
置決めのためには鋼管杭内における柱の両側の位置を決
定しなくてはならないため、少なくとも2箇所鋼管杭頭
部に設置する必要がある。2箇所の場合は鋼管杭の円周
を2分割した位置に設けることが望ましく、また、3箇
所設ける場合は鋼管杭の円周を3分割設置することが望
ましい。4箇所以上設ける場合にも同様に鋼管杭円周を
分割した位置とすると良い。しかし、あまり多く設置す
ることは実用的でなく、2〜4箇所の設置が望ましい。
The horizontal positioning device must be installed at at least two places on the head of the steel pipe pile because the horizontal position of the pillar must be determined on both sides of the pillar in the steel pipe pile. In the case of two locations, it is desirable to provide the circumference of the steel pipe pile in two divided positions, and in the case of providing three locations, it is desirable to provide the circumference of the steel pipe pile in three parts. In the case where four or more locations are provided, the circumference of the steel pipe pile may be similarly set to a divided position. However, it is not practical to install too many, and two to four locations are desirable.

【0022】鋼管杭頭部に台座1を装着した後に、柱の
建て込み位置を測量し、その測量した柱の建込み位置に
おける外表面位置にゲージ材の先端位置が合うようにゲ
ージ材2を天板3上でスライドさせて、ゲージ材の位置
合わせを行う。
After mounting the pedestal 1 on the head of the steel pipe pile, the erection position of the column is measured, and the gage member 2 is positioned so that the tip position of the gage material matches the measured outer surface position at the erection position of the column. The gauge material is slid on the top plate 3 to perform positioning.

【0023】つまり、鋼管杭頭部に設けた各々の位置決
め装置のゲージ材2が所定の位置の柱の外表面と接する
ことができるようにゲージ材2の位置を調整する。
That is, the position of the gauge member 2 is adjusted so that the gauge member 2 of each positioning device provided at the head of the steel pipe pile can contact the outer surface of the column at a predetermined position.

【0024】ゲージ材の位置調整を行った後、ボルト9
とナット10を締め付けてゲージ材2を台座1の天板3
に固定する。
After adjusting the position of the gauge material, the bolt 9
And the nut 10 to tighten the gauge material 2 to the top plate 3 of the base 1.
Fixed to

【0025】柱の据え付けは、柱を吊って、鋼管杭内に
差し込んで柱がゲージ材2に接するように柱の位置を調
整する。
The column is installed by suspending the column, inserting the column into a steel pipe pile, and adjusting the position of the column so that the column contacts the gauge member 2.

【0026】これによって、ゲージ材の先端が柱の据え
付け位置の外表面となるので、柱の水平方向の据え付け
位置が決定できる。柱を吊って杭内に差し込み、ゲージ
先端と接する据え付け位置に保持した後に、例えば、柱
と鋼管杭との隙間に楔等の固定具を挿入し、楔作用によ
り柱の固定を行い、コンクリートを打設すれば柱の立柱
が完了する。
Thus, since the tip of the gauge material becomes the outer surface of the installation position of the column, the installation position of the column in the horizontal direction can be determined. After hanging the column and inserting it into the pile and holding it at the installation position in contact with the gauge tip, for example, insert a fixture such as a wedge into the gap between the column and the steel pipe pile, fix the column by wedge action, and fix the concrete. If it is cast, the standing pillar is completed.

【0027】また、柱を鋼管杭内に差し込む際に柱がゲ
ージ材2と衝突し、柱の差し込み作業に手間がかかるこ
とがある。そこで、本発明では、ゲージ材2にガイド材
12を設けて柱を差し込む際に柱がガイド材12に案内
されてゲージ材2と衝突しないように工夫した。
Further, when inserting the column into the steel pipe pile, the column collides with the gauge member 2, and it may take time to insert the column. Therefore, in the present invention, when the guide member 12 is provided on the gauge member 2 and the column is inserted, the column is guided by the guide member 12 so that the column does not collide with the gauge member 2.

【0028】図4は、ゲージ材に柱をガイドするガイド
材としてガイド板を設けた状態を示す図である。
FIG. 4 is a view showing a state in which a guide plate is provided as a guide member for guiding the column to the gauge member.

【0029】図4に示すようにガイド材12は、ゲージ
材2端部から上方に延出し、上部が曲げられて(図4で
は右方に曲げられている)柱のガイドの役割を果たすよ
うになっている。
As shown in FIG. 4, the guide member 12 extends upward from the end of the gauge member 2 and its upper portion is bent (rightwardly bent in FIG. 4) to serve as a column guide. It has become.

【0030】さらに、柱とガイド材との摩擦を少なくす
るために、ガイド材にローラ等の摩擦を減少する部材を
埋め込んで、柱がガイド材表面をスムースに移動できる
ようにすることができる。また、ガイド材の変形を防止
するためには、ガイド材12とゲージ材2とを繋ぐ補強
材13を設けるとよい。そして、ガイド材としては、板
状や棒状のものを使用することができる。
Further, in order to reduce the friction between the column and the guide member, a member such as a roller for reducing friction can be embedded in the guide member so that the column can move smoothly on the surface of the guide member. Further, in order to prevent deformation of the guide member, a reinforcing member 13 connecting the guide member 12 and the gauge member 2 may be provided. And, as the guide material, a plate-like or rod-like material can be used.

【0031】[0031]

【発明の効果】本発明では、柱の水平方向の据え付け位
置調整を鋼管杭頭部でおこなうため、杭内部に人が入っ
て作業する必要がなく施工性がよい。しかも、杭内部で
の人の作業を排除したため、杭径を必要以上に大きくす
る必要がない。また、台座とゲージ材とにスライド機構
を設けているため、任意に生じる杭の施工誤差の吸収が
容易にでき、作業も画一的な方法で実施できるために施
工性が良いという効果を奏する。
According to the present invention, the installation position of the column in the horizontal direction is adjusted at the head of the steel pipe pile, so that there is no need for a person to work inside the pile and workability is improved. Moreover, since the operation of a person inside the pile is eliminated, it is not necessary to increase the pile diameter more than necessary. In addition, since the slide mechanism is provided on the pedestal and the gauge material, it is possible to easily absorb the construction error of the arbitrarily generated pile, and it is possible to carry out the work in a uniform manner, so that the workability is good. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の柱の位置決め装置の斜視図である。FIG. 1 is a perspective view of a column positioning device according to the present invention.

【図2】柱の位置決め装置の台座を示す図である。FIG. 2 is a view showing a pedestal of a column positioning device.

【図3】柱の位置決め装置を組み立てた状態を示す図で
ある。
FIG. 3 is a view showing a state where the column positioning device is assembled.

【図4】ゲージ材にガイド材を設けた状態を示す図であ
る。
FIG. 4 is a diagram showing a state in which a guide member is provided on a gauge member.

【図5】鋼管杭に水平方向位置決め装置を取り付けて鋼
管杭内に柱を差し込む状態を示す図である。
FIG. 5 is a view showing a state in which a horizontal positioning device is attached to a steel pipe pile and a column is inserted into the steel pipe pile.

【符号の説明】[Explanation of symbols]

1 台座 2 ゲージ材 3 天板 4 脚部材 5 脚部材 6 ボルト取り付け孔 7 ボルト 8 長孔 9 ボルト 10 ナット 11 ボルト先端部 12 ガイド材 13 補強材 14 ゲージ材の脚部 15 鋼管杭 16 鋼管柱 17 ボルト取り付け孔 DESCRIPTION OF SYMBOLS 1 Pedestal 2 Gauge material 3 Top plate 4 Leg member 5 Leg member 6 Bolt mounting hole 7 Bolt 8 Elongated hole 9 Bolt 10 Nut 11 Bolt tip part 12 Guide material 13 Reinforcement material 14 Gauge material leg 15 Steel pipe pile 16 Steel pipe column 17 Bolt mounting hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 牟田口 晋一 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 福元 達也 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 澤石 正道 東京都千代田区大手町二−6−3 新日本 製鐵株式会社内 (72)発明者 木村 新吉 千葉県君津市人見1201 新葉産建株式会社 内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shinichi Mutaguchi 2-6-3 Otemachi, Chiyoda-ku, Tokyo Inside Nippon Steel Corporation (72) Inventor Tatsuya Fukumoto 2-6, Otemachi, Chiyoda-ku, Tokyo 3 Nippon Steel Corporation (72) Inventor Masamichi Sawaishi 2-6-3 Otemachi, Chiyoda-ku, Tokyo Nippon Steel Corporation (72) Inventor Shinkichi Kimura 1201 Hitomi Kimitsu City, Chiba Prefecture Sanken Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 鋼管杭内に鋼管柱や鉄骨柱等の柱を差し
込み、鋼管杭内に柱を立柱した後に、コンクリートを打
設し、鋼管杭と柱とを接合し一体化して、鋼管杭内に柱
を建て込む際の鋼管杭内での柱の水平方向位置決め方法
であって、台座と、台座上に摺動可能に装着されている
ゲージ材とを備えた位置決め装置を少なくとも2個鋼管
杭頭部に取り付け、柱の据え付け位置を測量し、測量し
た据え付け位置の柱の外表面とゲージ材とが接すること
ができるようにゲージ材を台座の上で移動させてゲージ
材の位置を調整し、ゲージ材を台座に固定した後、柱を
吊って杭内に差し込み、柱をゲージ材に接する位置に調
整することを特徴とする、鋼管杭内での柱の水平方向位
置決め方法。
1. A steel pipe pile, a steel pipe pillar, a steel pillar or the like is inserted into the steel pipe pile, and after the pillar is erected in the steel pipe pile, concrete is cast, and the steel pipe pile and the column are joined and integrated to form a steel pipe pile. A horizontal positioning method of a pillar in a steel pipe pile when a pillar is erected therein, wherein at least two positioning devices including a pedestal and a gauge material slidably mounted on the pedestal are provided. Attach it to the pile head, measure the installation position of the column, move the gauge material on the pedestal so that the outer surface of the pillar at the measured installation position can contact the gauge material, and adjust the position of the gauge material A method of positioning a pillar in a steel pipe pile in a horizontal direction, comprising: fixing a gauge material to a pedestal; suspending the column, inserting the column into the pile, and adjusting the column to a position in contact with the gauge material.
【請求項2】 中央に長孔を穿孔された天板と、該天板
から垂下する2つの脚部材と、そして一方の脚部材に設
けられた締め付けボルトとからなっている台座と、台座
上部の天板に摺動可能に装着されたゲージ材と、そして
天板の長孔内を貫通して位置されていてゲージ材と台座
天板とを固定するための固定具とを備えていることを特
徴とする、鋼管柱内に差し込まれた柱の水平方向位置決
め装置。
2. A pedestal comprising a top plate having a long hole formed in the center, two leg members hanging from the top plate, and a fastening bolt provided on one of the leg members. A gauge material slidably mounted on the top plate of the above, and a fixture for fixing the gauge material and the pedestal top plate, which is located through an elongated hole of the top plate. A horizontal positioning device for a pillar inserted into a steel pipe pillar.
【請求項3】 ゲージ材の端部に、上方に延出し、か
つ、先端部が柱をガイドし易いように曲げられている板
状または棒状のガイド材を設けたことを特徴とする、請
求項2記載の鋼管柱内に差し込まれた柱の水平方向位置
決め装置。
3. An end portion of the gauge member is provided with a plate-like or rod-like guide member extending upward and having a tip portion bent so as to easily guide the column. Item 3. A horizontal positioning device for a column inserted into a steel pipe column according to Item 2.
JP13450697A 1997-05-09 1997-05-09 Post positioning method and device for erecting plug-in type post Pending JPH10311047A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13450697A JPH10311047A (en) 1997-05-09 1997-05-09 Post positioning method and device for erecting plug-in type post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13450697A JPH10311047A (en) 1997-05-09 1997-05-09 Post positioning method and device for erecting plug-in type post

Publications (1)

Publication Number Publication Date
JPH10311047A true JPH10311047A (en) 1998-11-24

Family

ID=15129925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13450697A Pending JPH10311047A (en) 1997-05-09 1997-05-09 Post positioning method and device for erecting plug-in type post

Country Status (1)

Country Link
JP (1) JPH10311047A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009835A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR20030009834A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
JP2006299587A (en) * 2005-04-19 2006-11-02 Mitsubishi Heavy Ind Ltd Construction method and positioning device of column base foundation
CN106836261A (en) * 2017-02-14 2017-06-13 国网安徽省电力公司芜湖供电公司 Suitable for the rock foundation structure and its construction method of transmission line construction
JP2019052416A (en) * 2017-09-12 2019-04-04 大和ハウス工業株式会社 Steel pole
CN113123620A (en) * 2021-04-01 2021-07-16 中国建筑第八工程局有限公司 Auxiliary device for connecting column base and column body and construction method thereof
CN114908979A (en) * 2022-06-19 2022-08-16 重庆建工第二建设有限公司 Construction and installation method of special-shaped component of super high-rise building
CN115142614A (en) * 2022-07-13 2022-10-04 中国建筑第八工程局有限公司 Structural column and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009835A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR20030009834A (en) * 2001-07-24 2003-02-05 삼성중공업 주식회사 Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
JP2006299587A (en) * 2005-04-19 2006-11-02 Mitsubishi Heavy Ind Ltd Construction method and positioning device of column base foundation
CN106836261A (en) * 2017-02-14 2017-06-13 国网安徽省电力公司芜湖供电公司 Suitable for the rock foundation structure and its construction method of transmission line construction
JP2019052416A (en) * 2017-09-12 2019-04-04 大和ハウス工業株式会社 Steel pole
CN113123620A (en) * 2021-04-01 2021-07-16 中国建筑第八工程局有限公司 Auxiliary device for connecting column base and column body and construction method thereof
CN114908979A (en) * 2022-06-19 2022-08-16 重庆建工第二建设有限公司 Construction and installation method of special-shaped component of super high-rise building
CN114908979B (en) * 2022-06-19 2023-08-11 重庆建工第二建设有限公司 Construction and installation method of super high-rise building special-shaped component
CN115142614A (en) * 2022-07-13 2022-10-04 中国建筑第八工程局有限公司 Structural column and construction method thereof
CN115142614B (en) * 2022-07-13 2023-11-21 中国建筑第八工程局有限公司 Structural column and construction method thereof

Similar Documents

Publication Publication Date Title
US5609005A (en) Foundation connector for tilt-up concrete wall panel and method of use
JPH10311047A (en) Post positioning method and device for erecting plug-in type post
JPH111924A (en) Erection method and device of insertion type steel pipe column
JPH10121576A (en) Fixing structure of pedestal
JPH11324341A (en) Reinforcement structure of masonry building and aseismatic modification method therefor
JP4416141B2 (en) How to install seismic isolation devices
JP3659766B2 (en) Surface plate construction method and apparatus for building pillars
JP2000240196A (en) Method for mounting tie-bar of steel-sheet concrete structure, and tie-bar
JP2005139811A (en) Joining structure of precast concrete member
JPH09177366A (en) Structure and method for joining steel encased reinforced concrete support and seismic isolator
JPH09125415A (en) Foundation base for equipment devices
JP4038086B2 (en) Bracing unit mounting structure
JP3659767B2 (en) Temporary fixing method and apparatus for pillars when inserting plug-in pillars
JPH0539616A (en) Reinforcing steel basket for foundation having reinforcing steel anchor frame
JPH0734531A (en) Anchoring method for lower end of post
JPH1025808A (en) Steel column base anchoring structure
JPH0612048Y2 (en) Anchor bolt installation device
JPS62296035A (en) Column base metal fitting and apparatus for fixing the same
JPH05272145A (en) Steel column base
JPH093912A (en) Plate anchor construction method
JPH11117321A (en) Method and device for fixing anchor bolt
JP3077815U (en) Adjustment fittings for mounting hole-down hardware
JPH0220778B2 (en)
JP2004316278A (en) Structure of steel pipe plinth part
JP3875910B2 (en) Connection structure of basic reinforcing steel / steel core unit and basic reinforcing steel / steel core unit

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040324

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040511

A02 Decision of refusal

Effective date: 20041026

Free format text: JAPANESE INTERMEDIATE CODE: A02