JPH10292334A - Operation method of snow-thawing device with splinkling water - Google Patents
Operation method of snow-thawing device with splinkling waterInfo
- Publication number
- JPH10292334A JPH10292334A JP10315097A JP10315097A JPH10292334A JP H10292334 A JPH10292334 A JP H10292334A JP 10315097 A JP10315097 A JP 10315097A JP 10315097 A JP10315097 A JP 10315097A JP H10292334 A JPH10292334 A JP H10292334A
- Authority
- JP
- Japan
- Prior art keywords
- water
- temperature
- hot water
- tank
- heat storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は散水融雪設備の運転
方法に関し、ボイラ焚きした温水と冷たい水(河川水及
び回収水)とを混合した水を、融雪のために道路に散水
する設備において、ボイラで用いる燃料の消費量を低減
することができるように工夫したものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for operating a snow melting facility for spraying water, and relates to a facility for sprinkling water mixed with hot water and cold water (river water and recovered water) boiled on a road for snow melting. It is devised so that the consumption of fuel used in the boiler can be reduced.
【0002】[0002]
【従来の技術】積雪の多い地方では、道路の除雪作業を
することなく道路の運行を確保するために、散水融雪設
備を道路に設置している。散水融雪設備とは、降雪があ
ったときに水を道路に散水して、道路上の雪を解かす装
置である。このような散水融雪設備としては、ボイラ焚
きした温水と冷たい水(河川水及び回収水)とを混合し
た水(温度は約4℃〜5℃)を道路に散水するタイプの
ものがある。2. Description of the Related Art In regions with heavy snowfall, sprinkling snow melting facilities are installed on roads in order to ensure road operation without removing snow from the roads. Sprinkling snow melting equipment is a device that melts snow on a road by spraying water on the road when snow falls. As such a sprinkling snow melting facility, there is a type of spraying water (temperature of about 4 ° C. to 5 ° C.) obtained by mixing hot water boiled with boiler and cold water (river water and recovered water) on a road.
【0003】ボイラ焚きした温水と冷たい水とを混合し
た水を道路に散水するタイプの散水融雪設備は、処理水
槽と、混合槽と、蓄熱槽と、ボイラを主要部材として構
成されている。[0003] A water-sprinkling snow-melting facility of the type in which water mixed with hot and cold water fired by a boiler is sprayed on a road is mainly composed of a treated water tank, a mixing tank, a heat storage tank, and a boiler.
【0004】前記処理水槽には、河川から取り込んだ河
川水と、路面に散水した水を回収してきた回収水とが流
入してきて、水が貯水される。この処理水槽に貯水した
水の温度は約2℃である。[0004] River water taken in from the river and collected water that has collected water sprinkled on the road surface flow into the treated water tank, and the water is stored. The temperature of the water stored in the treated water tank is about 2 ° C.
【0005】また前記蓄熱槽には、河川から取り込んだ
水が流入してきて水が貯水される。しかも、蓄熱槽に貯
水された水は、前記ボイラにより加熱されており、散水
融雪をする時には、この水を約50℃の温水としてい
る。なお、冬期においても散水をしないとき(降雪の無
いとき)には、蓄熱槽の水の温度が50℃になったらボ
イラによる加熱を停止し、蓄熱槽の水の温度が20℃に
なったらボイラによる加熱を起動するようにしており、
蓄熱槽の水を約20℃〜約50℃に保持して待機状態と
なっている。[0005] In addition, water taken in from the river flows into the heat storage tank and is stored. In addition, the water stored in the heat storage tank is heated by the boiler, and is used as hot water of about 50 ° C. when water is melted. When water is not sprayed even in winter (when there is no snowfall), heating by the boiler is stopped when the temperature of the heat storage tank reaches 50 ° C, and when the temperature of the water in the heat storage tank reaches 20 ° C. To start heating by
The water in the heat storage tank is maintained at about 20 ° C. to about 50 ° C. and is in a standby state.
【0006】前記混合槽には、処理水槽からの水(約2
℃)と蓄熱槽からの水(約50℃の温水)とが流入して
混合し、約4℃〜5℃の水が貯水される。この混合槽の
水(約4℃〜5℃)が道路に散水されて融雪に利用され
る。散水された水の一部(約50%)は、道路に設置し
た回収樋及び回収槽を介して、前記処理水槽に回収水と
して回収される。In the mixing tank, water from the treatment water tank (about 2
° C) and water from the heat storage tank (warm water at about 50 ° C) flows in and mixes, and water at about 4 ° C to 5 ° C is stored. The water (about 4 ° C. to 5 ° C.) in the mixing tank is sprinkled on a road and used for melting snow. Part (about 50%) of the sprinkled water is collected as collected water in the treated water tank via a collection gutter and a collection tank installed on the road.
【0007】上述したように、温水を用いて散水融雪を
するタイプの散水融雪設備は、河川水を大量に取水する
ことのできない地域において採用されている。このよう
な地域では、散水した水を回収することにより、不足す
る水を補っているのである。ただし、回収した回収水の
温度は約0℃と大変冷たいので、上述したように、温水
を混合してから、散水をしているのである。[0007] As described above, a water-sprinkling snow-melting facility of the type that performs snow-melting by using hot water is employed in an area where a large amount of river water cannot be taken. In such areas, the lack of water is compensated for by collecting sprinkled water. However, since the temperature of the recovered water is very low, about 0 ° C., the water is mixed and then sprinkled as described above.
【0008】なお、河川水の温度は冬期であっても5℃
程度以上であるので、河川水を大量に取水することので
きる地域では、この河川水をそのまま(温水を混合する
ことなく)散水することで、融雪をすることができる。[0008] The temperature of river water is 5 ° C even in winter.
Since it is above the level, in an area where a large amount of river water can be taken, it is possible to melt snow by spraying the river water as it is (without mixing hot water).
【0009】[0009]
【発明が解決しようとする課題】ところで、ボイラ焚き
した温水と冷たい水とを混合した水を道路に散水するタ
イプの従来の散水融雪設備は、冬期においても降雪が無
く散水を必要としない待機時では、蓄熱槽の水の温度が
50℃になったらボイラによる加熱を停止し、蓄熱槽の
水の温度が20℃になったらボイラによる加熱を起動す
るようにしてあり、蓄熱槽の水を約20℃〜約50℃に
保持している。By the way, the conventional water-sprinkling snow-melting equipment of the type in which hot and cold water mixed with boiler-fired water is sprinkled on roads has no snowfall even in winter and requires no water sprinkling. Then, the heating by the boiler is stopped when the temperature of the water in the heat storage tank reaches 50 ° C, and the heating by the boiler is started when the temperature of the water in the heat storage tank reaches 20 ° C. It is kept at 20 ° C to about 50 ° C.
【0010】更に詳述すると、蓄熱槽の外面には保温材
が装着されており、ボイラ加熱により内部の水(温水)
の温度は初期には50℃であるが、自然放熱によって保
持温度が低下してくる。そして半月〜1月でその温度が
約25℃になる。一方、蓄熱槽の温水を加熱するボイラ
は、蓄熱槽の温水が20℃になったら起動し、50℃に
なったら停止するようコントロールしている。[0010] More specifically, a heat insulating material is mounted on the outer surface of the heat storage tank, and the internal water (hot water) is heated by boiler heating.
Is 50 ° C. in the beginning, but the holding temperature decreases due to natural heat radiation. Then, in half a month to January, the temperature becomes about 25 ° C. On the other hand, the boiler that heats the hot water in the heat storage tank is controlled to start when the temperature of the hot water in the heat storage tank reaches 20 ° C and stop when the hot water in the heat storage tank reaches 50 ° C.
【0011】ここで、自然放熱量は、温水温度と外気温
の温度差に比例するので、高温で保持する程、損失熱量
が大きくなり、ボイラ用の燃料を無駄に使うことにな
る。従来では待機時であっても、温水を50℃にまで温
度上昇させているため損失熱量が大きく、ボイラ用燃料
の消費量が多かった。Here, the amount of natural heat radiation is proportional to the difference between the temperature of hot water and the temperature of outside air. Therefore, the higher the temperature is maintained, the greater the amount of heat loss, and wasteful use of boiler fuel. Conventionally, even during standby, since the temperature of the hot water is raised to 50 ° C., the amount of heat loss is large, and the consumption of boiler fuel is large.
【0012】また、降雪センサにより降雪があったこと
を検知したときには、温水ポンプ(蓄熱槽から混合槽に
温水を供給するためのポンプ)が起動し、蓄熱槽から混
合槽に温水が供給される。混合槽に供給する温水量は、
混合槽の温度によって制御されており、混合槽の水の温
度が目標温度(4℃〜5℃)を越えるときには温水の供
給を停止し、目標温度以下の時には温度が低いほど温水
供給量を増大させるようにしている。ただし、この制御
系の応答速度は大変遅いので、混合槽の水の温度が目標
値よりも高い場合であっても、制御が効きだすまでに、
温水が不必要に供給されてしまい、エネルギーの無駄
(ボイラ燃料の無駄)となっていた。When a snowfall sensor detects that snow has fallen, a hot water pump (a pump for supplying hot water from the heat storage tank to the mixing tank) is activated, and hot water is supplied from the heat storage tank to the mixing tank. . The amount of hot water supplied to the mixing tank is
It is controlled by the temperature of the mixing tank. When the temperature of the water in the mixing tank exceeds the target temperature (4 ° C. to 5 ° C.), the supply of hot water is stopped. I try to make it. However, the response speed of this control system is very slow, so even if the temperature of the water in the mixing tank is higher than the target value,
Unnecessary hot water was supplied, resulting in waste of energy (boiler fuel waste).
【0013】本発明は、上記従来技術に鑑み、ボイラで
用いる燃料の消費量を低減することのできる散水融雪設
備の運転方法を提供することを目的とする。The present invention has been made in view of the above-mentioned prior art, and has as its object to provide a method for operating a water-sprinkling snow melting facility that can reduce the consumption of fuel used in a boiler.
【0014】[0014]
【課題を解決するための手段】上記課題を解決する本発
明の構成は、河川から取り込んだ河川水と道路の路面に
散水した水を回収してきた回収水とが流入してきて水を
貯水する処理水槽と、河川から取り込んだ河川水をボイ
ラ部により加熱してなる温水を貯水する蓄熱槽と、処理
水槽の水と蓄熱槽の温水とが流入してくる混合槽とを有
し、混合槽の水を融雪のために道路の路面に散水する散
水融雪設備において、散水融雪をするとき又は散水融雪
をすることが必要になると予想されるときには、蓄熱槽
の温水の温度が温水中間温度になったら前記ボイラ部に
よる加熱を起動し、前記温水の温度が温水上限温度にな
ったら前記ボイラ部による加熱を停止するとともに、散
水融雪をしない待機時には、蓄熱槽の温水の温度が温水
下限温度になったら前記ボイラによる加熱を起動し、前
記温水の温度が温水中間温度になったら前記ボイラによ
る加熱を停止することを特徴とする。The structure of the present invention for solving the above-mentioned problem is a process of storing water by flowing river water taken in from a river and collected water collected from water sprinkled on a road surface. A water tank, a heat storage tank for storing hot water obtained by heating river water taken from the river by the boiler section, and a mixing tank into which the water in the treatment water tank and the hot water in the heat storage tank flow. When the temperature of hot water in the heat storage tank reaches the intermediate temperature of hot water when water spraying or melting is expected to be required in water spraying and snow melting equipment that sprays water on the road surface for snow melting. The heating by the boiler unit was started, and the heating by the boiler unit was stopped when the temperature of the hot water reached the upper limit of the hot water, and the temperature of the hot water in the heat storage tank reached the lower limit temperature of the hot water during standby without water spray and snow melting. Start the heating by the boiler, the temperature of the hot water is characterized by stopping the heating by the boiler Once turned hot water intermediate temperature.
【0015】また本発明の構成は、河川から取り込んだ
河川水と道路の路面に散水した水を回収してきた回収水
とが流入してきて水を貯水する処理水槽と、河川から取
り込んだ河川水をボイラ部により加熱してなる温水を貯
水する蓄熱槽と、処理水槽の水と蓄熱槽の温水とが流入
してくる混合槽とを有し、混合槽の水を融雪のために道
路の路面に散水する散水融雪設備において、散水融雪の
際に、前記処理水槽の水の温度が、散水融雪をするのに
適当な目標温度以下であるときには、蓄熱槽から混合槽
に温水を供給し、散水融雪の際に、前記処理水槽の水の
温度が、前記目標温度を越えるときには、蓄熱槽から混
合槽への温水の供給を停止することを特徴とする。Further, the configuration of the present invention comprises a treated water tank for storing river water taken in from a river and collected water collected from water sprinkled on the road surface, and a river water taken from the river. It has a heat storage tank for storing hot water heated by the boiler section, and a mixing tank into which the water in the treatment water tank and the hot water in the heat storage tank flow, and the water in the mixing tank is put on the road surface of the road to melt snow. In the water-sprinkling snow-melting facility that sprays water, when the temperature of the water in the treated water tank is equal to or lower than a target temperature suitable for performing the water-melting and snow-melting at the time of water-melting and snow-melting, hot water is supplied from the heat storage tank to the mixing tank, In this case, when the temperature of the water in the treated water tank exceeds the target temperature, the supply of hot water from the heat storage tank to the mixing tank is stopped.
【0016】また本発明の構成は、河川から取り込んだ
河川水と道路の路面に散水した水を回収してきた回収水
とが流入してきて水を貯水する処理水槽と、河川から取
り込んだ河川水をボイラ部により加熱してなる温水を貯
水する蓄熱槽と、処理水槽の水と蓄熱槽の温水とが流入
してくる混合槽とを有し、混合槽の水を融雪のために道
路の路面に散水する散水融雪設備において、散水融雪を
するとき又は散水融雪をすることが必要となることが予
想されるときには、蓄熱槽の温水の温度が温水中間温度
になったら前記ボイラ部による加熱を起動し、前記温水
の温度が温水上限温度になったら前記ボイラ部による加
熱を停止するとともに、散水融雪をしない待機時には、
蓄熱槽の温水の温度が温水下限温度になったら前記ボイ
ラによる加熱を起動し、前記温水の温度が温水中間温度
になったら前記ボイラによる加熱を停止し、散水融雪の
際に、前記処理水槽の水の温度が、散水融雪をするのに
適当な目標温度以下であるときには、蓄熱槽から混合槽
に温水を供給し、散水融雪の際に、前記処理水槽の水の
温度が、前記目標温度を越えるときには、蓄熱槽から混
合槽への温水の供給を停止することを特徴とする。Further, the configuration of the present invention comprises a treatment tank for storing river water taken in from a river and collected water collected from water sprinkled on the road surface and storing the water, and a river water taken from the river. It has a heat storage tank for storing hot water heated by the boiler section, and a mixing tank into which the water in the treatment water tank and the hot water in the heat storage tank flow, and the water in the mixing tank is put on the road surface of the road to melt snow. In the sprinkling snow melting facility where water is sprinkled, when it is anticipated that it is necessary to perform the sprinkling snow melting or the sprinkling snow melting, the heating by the boiler unit is started when the temperature of the hot water in the heat storage tank reaches the intermediate temperature of the hot water. When the temperature of the hot water reaches the hot water upper limit temperature, the heating by the boiler unit is stopped, and at the time of standby without water spray snow melting,
When the temperature of the hot water in the heat storage tank reaches the lower limit temperature of the hot water, heating by the boiler is started, and when the temperature of the hot water reaches the intermediate temperature of the hot water, the heating by the boiler is stopped. When the temperature of the water is equal to or lower than the target temperature suitable for water-melting snow, the hot water is supplied from the heat storage tank to the mixing tank. When it exceeds, the supply of hot water from the heat storage tank to the mixing tank is stopped.
【0017】[0017]
【発明の実施の形態】以下に、本発明の実施の形態に係
る散水融雪設備を図面に基づき詳細に説明する。図1
は、ボイラ焚きした温水と冷たい水とを混合した水を道
路に散水する本実施の形態にかかる散水融雪設備を示
す。同図に示すように、貯水槽1を仕切壁2により二分
することにより、処理水槽3と混合槽4とが形成されて
おり、両槽3,4は下部にて連通している。BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, a water-sprinkling snow melting facility according to an embodiment of the present invention will be described in detail with reference to the drawings. FIG.
1 shows a water-sprinkling snow melting facility according to the present embodiment for sprinkling water mixed with hot water and cold water fired by a boiler on a road. As shown in FIG. 1, a treatment tank 3 and a mixing tank 4 are formed by dividing a water tank 1 into two parts by a partition wall 2, and both tanks 3 and 4 communicate with each other at a lower portion.
【0018】処理水槽3には、河川から取り込んだ河川
水と、融雪のため道路5の路面に散水した水を回収して
きた回収水とが配管6を介して流入し、水が貯水され
る。回収水の温度は約0℃であり、河川水の温度は冬期
であっても5℃程度以上であるので、処理水槽3に貯水
した水の温度は、通常では約2℃となっている。なお、
回収水が少ない場合などでは、処理水槽3に貯水した水
の温度が4℃程度以上になる場合もある。In the treated water tank 3, river water taken in from a river and collected water that has collected water sprinkled on the road surface of the road 5 due to snow melting flows in through a pipe 6, and water is stored. The temperature of the recovered water is about 0 ° C., and the temperature of the river water is about 5 ° C. or more even in winter. Therefore, the temperature of the water stored in the treated water tank 3 is usually about 2 ° C. In addition,
When the amount of recovered water is small, the temperature of the water stored in the treated water tank 3 may be about 4 ° C. or more.
【0019】混合槽4には、処理水槽3からの水と、蓄
熱槽7から供給されてくる温水(後述)とが流入してき
て、攪拌機(図示省略)により混合され、約4℃〜5℃
の水が貯水される。この混合槽4には散水ポンプ8が設
置されており、散水ポンプ8が駆動すると、混合槽4内
の水は、散水管9を介して送られ、道路5の路面上に散
水されて雪を解かす。散水される水の温度は約4℃〜5
℃となっているため、良好に雪を溶かすことができる。
なお散水された水の一部(約50%)は、道路5に設置
した回収樋(図示省略)及び回収槽(図示省略)を通
り、配管6を介して処理水槽3に回収水として回収され
る。The water from the treated water tank 3 and the hot water (described later) supplied from the heat storage tank 7 flow into the mixing tank 4 and are mixed by a stirrer (not shown).
Of water will be stored. A watering pump 8 is installed in the mixing tank 4. When the watering pump 8 is driven, water in the mixing tank 4 is sent through a watering pipe 9 and is sprinkled on the road surface of the road 5 to remove snow. Unravel. The temperature of the sprinkled water is about 4 ° C-5
° C, so that snow can be melted well.
A part (approximately 50%) of the sprinkled water passes through a collecting gutter (not shown) and a collecting tank (not shown) provided on the road 5 and is collected as collected water in the treated water tank 3 through the pipe 6. You.
【0020】蓄熱槽7には、河川から取り込んだ河川水
が配管10を介して流入し、水が貯水される。蓄熱槽7
には、ボイラ11中を貫通して配置された循環配管12
が取付けられており、またこの循環配管12にはボイラ
循環ポンプ13が介装されている。制御箱11aの制御
によりボイラ11に燃料が供給されてボイラ11が起動
(燃焼)し、かつ、ボイラ循環ポンプ13が駆動する
と、蓄熱槽7内の水は、循環配管12を流通してボイラ
11にて加熱され、温度上昇して温水となる。散水融雪
をするときには、蓄熱槽7内の温水の温度を35℃〜5
0℃程度にする(詳細は後述する)。なお、ボイラ1
1,制御箱11a,循環配管12,ボイラ循環ポンプ1
3により、蓄熱槽7の温水を加熱するボイラ部が形成さ
れている。The river water taken in from the river flows into the heat storage tank 7 through the pipe 10, and the water is stored. Thermal storage tank 7
Has a circulation pipe 12 disposed through the boiler 11.
The boiler circulation pump 13 is interposed in the circulation pipe 12. When fuel is supplied to the boiler 11 under the control of the control box 11a and the boiler 11 is started (combusted) and the boiler circulation pump 13 is driven, the water in the heat storage tank 7 flows through the circulation pipe 12 and flows through the boiler 11 And heated to warm water. When water spraying and melting snow, the temperature of the hot water in the heat storage tank 7 should be 35 ° C to 5 ° C.
The temperature is set to about 0 ° C. (details will be described later). In addition, boiler 1
1, control box 11a, circulation pipe 12, boiler circulation pump 1
3, a boiler section for heating the hot water in the heat storage tank 7 is formed.
【0021】詳細は後述するが、散水融雪をする際には
通常、温水ポンプ14が駆動して、蓄熱槽7内の温水が
温水管15を介して混合槽4に供給される。As will be described in detail later, when water spraying and melting snow, the hot water pump 14 is usually driven to supply the hot water in the heat storage tank 7 to the mixing tank 4 via the hot water pipe 15.
【0022】一方、処理水槽3に貯水した水の温度は温
度センサ21により検出され、混合槽4に貯水した水の
温度は温度センサ22により検出され、蓄熱槽7に貯水
した水(温水)の温度は温度センサ23により検出され
る。On the other hand, the temperature of the water stored in the treated water tank 3 is detected by the temperature sensor 21, the temperature of the water stored in the mixing tank 4 is detected by the temperature sensor 22, and the temperature of the water (hot water) stored in the heat storage tank 7 is detected. The temperature is detected by the temperature sensor 23.
【0023】また、散水管9を介して混合槽4から道路
5に供給される水の流量は流量計24により計測され
る。また、雪が降っているかどうかを検出する降雪セン
サ25が道路5に配置されている。The flow rate of the water supplied from the mixing tank 4 to the road 5 via the sprinkling pipe 9 is measured by a flow meter 24. Further, a snowfall sensor 25 for detecting whether or not snow is falling is arranged on the road 5.
【0024】また、温度コントローラ31、流量コント
ローラ32、温水コントローラ33及びモード切換スイ
ッチ34が設置されている。Further, a temperature controller 31, a flow rate controller 32, a hot water controller 33 and a mode changeover switch 34 are provided.
【0025】モード切換スイッチ34は、人間による手
動操作や遠隔操作(テレメータ等による)により、「通
常運転モード」と「省エネ運転モード」とに切り換える
ことができる。つまり、人間の判断により、降雪の予想
が無さそうな時には「省エネ運転モード」とし、天気予
報により寒波が来そうな時には「通常運転モード」とす
るように切り換えられる。The mode changeover switch 34 can be switched between a "normal operation mode" and an "energy saving operation mode" by manual operation by a human or remote operation (by a telemeter or the like). In other words, according to human judgment, the mode is switched to the “energy-saving operation mode” when the snowfall is unlikely to be predicted, and to the “normal operation mode” when the cold wave is likely to come due to the weather forecast.
【0026】次に、各コントローラ31〜33を中心と
した制御動作を説明する。Next, a control operation centered on each of the controllers 31 to 33 will be described.
【0027】まずはじめに、温度コントローラ31を中
心とした制御動作を、各状態に分けて説明する。First, the control operation centered on the temperature controller 31 will be described for each state.
【0028】(1)モード切換スイッチ34が「省エネ
運転モード」になっており、かつ、降雪センサ25によ
り降雪が無いことが検出されているとき。このときに
は、温度コントローラ31は、ボイラ11を省エネ運転
する。即ち、温度センサ23により検出した蓄熱槽7の
温水の温度が20℃(温水下限温度)になったら、制御
箱11aによりボイラ11に燃料を供給してボイラ11
を起動(燃焼運転)させるとともに、ボイラ循環ポンプ
13を駆動させる。一方、蓄熱槽7の温水の温度が上昇
してきて35℃(温水中間温度)になったら、制御箱1
1aによりボイラ11への燃料の供給を停止してボイラ
11を停止(燃焼停止)させるとともに、ボイラ循環ポ
ンプ13を停止させる(図2参照)。(1) When the mode changeover switch 34 is in the "energy saving operation mode" and the snowfall sensor 25 detects that there is no snowfall. At this time, the temperature controller 31 performs the energy saving operation of the boiler 11. That is, when the temperature of the hot water in the heat storage tank 7 detected by the temperature sensor 23 becomes 20 ° C. (the lower limit temperature of the hot water), the control box 11 a supplies fuel to the boiler 11 and
(Combustion operation), and the boiler circulation pump 13 is driven. On the other hand, when the temperature of the hot water in the heat storage tank 7 rises to 35 ° C. (intermediate hot water temperature), the control box 1
At 1a, the supply of fuel to the boiler 11 is stopped to stop the boiler 11 (stop combustion), and the boiler circulation pump 13 is stopped (see FIG. 2).
【0029】このようにしているので、降雪が無さそう
なときや降雪が無い待機状態のときには、蓄熱槽7内の
温水は、約20℃〜35℃の温度範囲内で維持される。
このように待機状態では、蓄熱槽7の温水の温度を低温
域にて維持しているので、従来技術に比べて自然放熱量
が半減し、ボイラ11で使用する燃料を節減して省エネ
を図ることができる。かかる効果は本発明に独特なもの
である。With this arrangement, the hot water in the heat storage tank 7 is maintained within a temperature range of about 20 ° C. to 35 ° C. when there is almost no snowfall or when there is no snowfall.
As described above, in the standby state, the temperature of the hot water in the heat storage tank 7 is maintained in a low temperature range, so that the amount of natural heat radiation is halved compared to the related art, the fuel used in the boiler 11 is saved, and energy is saved. be able to. Such an effect is unique to the present invention.
【0030】(2)モード切換スイッチ34が「通常運
転モード」になっているか、または、降雪センサにより
降雪があることが検知されたとき。このときには、温度
コントローラ31は、ボイラ11を通常運転する。即
ち、温度センサ23により検出した蓄熱槽7の温水の温
度が35℃(温水中間温度)になったら、制御箱11a
によりボイラ11に燃料を供給してボイラ11を起動
(燃焼運転)させるとともに、ボイラ循環ポンプ13を
駆動させる。一方、蓄熱槽7の温水の温度が上昇してき
て50℃(温水上限温度)になったら、制御箱11aに
よりボイラ11への燃料の供給を停止してボイラ11を
停止(燃焼停止)させるとともに、ボイラ循環ポンプ1
3を停止させる(図2参照)。(2) When the mode changeover switch 34 is in the "normal operation mode" or when it is detected by the snowfall sensor that there is snowfall. At this time, the temperature controller 31 operates the boiler 11 normally. That is, when the temperature of the hot water in the heat storage tank 7 detected by the temperature sensor 23 reaches 35 ° C. (the intermediate temperature of the hot water), the control box 11 a
To supply fuel to the boiler 11 to start the boiler 11 (combustion operation) and drive the boiler circulation pump 13. On the other hand, when the temperature of the hot water in the heat storage tank 7 rises to 50 ° C. (upper limit of the hot water temperature), the supply of fuel to the boiler 11 is stopped by the control box 11 a to stop the boiler 11 (stop combustion). Boiler circulation pump 1
3 is stopped (see FIG. 2).
【0031】このようにしているので、降雪がありそう
なときや実際に降雪があるときには、蓄熱槽7内の温水
は、約35℃〜50℃の温度範囲内で維持される。この
ように、蓄熱槽7の温水の温度を高温域にて維持してい
るので、この蓄熱槽7の温水を混合槽4に供給すること
により、混合槽4の水を迅速に適温(4℃〜5℃)にす
ることができる。かかる効果は本発明に独特なものであ
る。In this manner, when snowfall is likely or when snowfall actually occurs, the hot water in the heat storage tank 7 is maintained within a temperature range of about 35 ° C. to 50 ° C. As described above, since the temperature of the hot water in the heat storage tank 7 is maintained in the high temperature range, by supplying the hot water in the heat storage tank 7 to the mixing tank 4, the water in the mixing tank 4 is quickly heated to an appropriate temperature (4 ° C.). 55 ° C.). Such an effect is unique to the present invention.
【0032】次に、温水コントローラ33を中心とした
制御動作を、各状態に分けて説明する。Next, the control operation centered on the hot water controller 33 will be described for each state.
【0033】(1)降雪センサ25により降雪が無いこ
とが検出されているとき。このときには、温水コントロ
ーラ33は、温水ポンプ14を停止させ、蓄熱槽7から
混合槽4への温水の供給を停止させる。(1) When the absence of snowfall is detected by the snowfall sensor 25. At this time, the hot water controller 33 stops the hot water pump 14 and stops the supply of hot water from the heat storage tank 7 to the mixing tank 4.
【0034】(2)降雪センサ25により降雪があるこ
とが検出され、かつ、温度センサ21により検出した処
理水槽3内の水の温度が4℃以下であるとき。なお、水
の温度が4℃であるときには、散水をして良好に融雪を
することができるので、本実施の形態では、4℃の水温
を散水・融雪のための目標温度としている。このときに
は、温水コントローラ33は、温水ポンプ14を駆動さ
せ、蓄熱槽7から混合槽4へ温水を供給させる。しか
も、温水の供給量は、温度センサ22により検出した混
合槽4内の水の温度が低いほど多くするように制御して
いる。このため、混合槽4では、処理水槽3の冷たい水
(4℃以下)と、温水(35℃〜50℃)の水が混合し
て、混合槽4内の水の温度は、散水融雪をするのに最適
な約4℃〜5℃となる。(2) When the presence of snowfall is detected by the snowfall sensor 25 and the temperature of the water in the treated water tank 3 detected by the temperature sensor 21 is 4 ° C. or less. When the temperature of the water is 4 ° C., it is possible to satisfactorily melt the snow by spraying water. Therefore, in the present embodiment, the water temperature of 4 ° C. is set as the target temperature for watering and melting the snow. At this time, the hot water controller 33 drives the hot water pump 14 to supply hot water from the heat storage tank 7 to the mixing tank 4. In addition, the supply amount of the hot water is controlled so as to increase as the temperature of the water in the mixing tank 4 detected by the temperature sensor 22 decreases. For this reason, in the mixing tank 4, the cold water (4 ° C. or less) of the treatment water tank 3 and the warm water (35 ° C. to 50 ° C.) are mixed, and the temperature of the water in the mixing tank 4 is sprayed and melted. About 4 ° C. to 5 ° C.
【0035】なお、降雪センサ25により降雪があるこ
とが検出され、かつ、温度センサ21により検出した処
理水槽3内の水の温度が4℃以下であり、さらに、外気
温が1℃以下のときに、上記動作をするようにしてもよ
い。When the snow sensor 25 detects that snow has fallen, and the temperature of the water in the treated water tank 3 detected by the temperature sensor 21 is 4 ° C. or less and the outside air temperature is 1 ° C. or less. Then, the above operation may be performed.
【0036】(3)降雪センサ25により降雪があるこ
とが検出され、かつ、温度センサ21により検出した処
理水槽3内の水の温度が4℃(目標温度)を越えると
き。このときには、温水コントローラ33は、温水ポン
プ14を停止させ、蓄熱槽7から混合槽4への温水の供
給を停止させる。このため混合槽4には温水は供給され
ないが、処理水槽3の水の温度、即ち、混合槽4の水の
温度が4℃を越えるため、この水をそのまま(温水を混
合させることなく)散水することにより、良好に融雪を
することができる。(3) When the presence of snowfall is detected by the snowfall sensor 25 and the temperature of the water in the treated water tank 3 detected by the temperature sensor 21 exceeds 4 ° C. (target temperature). At this time, the hot water controller 33 stops the hot water pump 14 and stops the supply of hot water from the heat storage tank 7 to the mixing tank 4. For this reason, hot water is not supplied to the mixing tank 4, but since the temperature of the water in the treated water tank 3, that is, the temperature of the water in the mixing tank 4 exceeds 4 ° C., the water is sprayed as it is (without mixing the hot water). By doing so, it is possible to melt snow satisfactorily.
【0037】このように、処理水槽3の水の温度が4℃
を越えるときには、温水を供給しないようにしているの
で、温水を無駄に使用することはなくなり、ボイラ11
で使用する燃料を節減して省エネを図ることができる。
かかる効果は本発明に独特なものである。Thus, the temperature of the water in the treatment water tank 3 is 4 ° C.
Is not supplied when the temperature of the boiler is exceeded.
It is possible to save fuel by using less fuel.
Such an effect is unique to the present invention.
【0038】次に、流量コントローラ32を中心とした
制御動作について説明する。Next, a control operation centered on the flow controller 32 will be described.
【0039】(1)降雪センサ25により降雪が無いこ
とが検出されているとき。このときには、流量コントロ
ーラ32は、散水ポンプ8を停止させ、混合槽4から道
路5への散水を停止させる。(1) When no snowfall is detected by the snowfall sensor 25. At this time, the flow controller 32 stops the watering pump 8 and stops watering from the mixing tank 4 to the road 5.
【0040】(2)降雪センサ25により降雪があるこ
とが検出されたとき。このときには、流量コントローラ
32は、散水ポンプ8を駆動させる。このため散水管9
を介して混合槽4から道路5に向けて水が供給されて散
水され、融雪に利用される。このとき、流量計24にて
検出した供給水量が、予め設定した水量となるように、
流量コントローラ32は、散水ポンプ8の回転数を制御
する。(2) When the snowfall sensor 25 detects that there is snowfall. At this time, the flow controller 32 drives the watering pump 8. For this reason, watering pipe 9
Water is supplied from the mixing tank 4 to the road 5 through the, and is sprinkled, and is used for melting snow. At this time, the supply water amount detected by the flow meter 24 becomes a predetermined water amount.
The flow controller 32 controls the rotation speed of the watering pump 8.
【0041】[0041]
【発明の効果】以上実施の形態とともに具体的に利用し
たように、本発明では、河川から取り込んだ河川水と道
路の路面に散水した水を回収してきた回収水とが流入し
てきて水を貯水する処理水槽と、河川から取り込んだ河
川水をボイラ部により加熱してなる温水を貯水する蓄熱
槽と、処理水槽の水と蓄熱槽の温水とが流入してくる混
合槽とを有し、混合槽の水を融雪のために道路の路面に
散水する散水融雪設備において、 散水融雪をするとき又は散水融雪をすることが必要に
なると予想されるときには、蓄熱槽の温水の温度が温水
中間温度になったら前記ボイラ部による加熱を起動し、
前記温水の温度が温水上限温度になったら前記ボイラ部
による加熱を停止するとともに、散水融雪をしない待機
時には、蓄熱槽の温水の温度が温水下限温度になったら
前記ボイラによる加熱を起動し、前記温水の温度が温水
中間温度になったら前記ボイラによる加熱を停止した
り、 散水融雪の際に、前記処理水槽の水の温度が、散水融
雪をするのに適当な目標温度以下であるときには、蓄熱
槽から混合槽に温水を供給し、散水融雪の際に、前記処
理水槽の水の温度が、前記目標温度を越えるときには、
蓄熱槽から混合槽への温水の供給を停止するようにし
た。According to the present invention, as specifically used in connection with the above embodiments, the river water taken in from the river and the collected water collected from the water sprinkled on the road surface flow into the water storage tank. A water storage tank for storing hot water formed by heating river water taken in from a river by a boiler unit, and a mixing tank into which the water in the processing water tank and the hot water in the heat storage tank flow. In a water-melting facility that sprays water from a tank on the road surface to melt snow, when it is anticipated that it will be necessary to perform water-melting or snow-melting, the temperature of the hot water in the heat storage tank will be set to the intermediate temperature of the hot water. When it is, start heating by the boiler section,
When the temperature of the hot water reaches the hot water upper limit temperature, the heating by the boiler unit is stopped, and in a standby state in which water spraying and melting do not occur, heating by the boiler is started when the temperature of the hot water in the heat storage tank reaches the hot water lower limit temperature, When the temperature of the hot water reaches the intermediate temperature of the hot water, the heating by the boiler is stopped.When the temperature of the water in the treated water tank is equal to or lower than a target temperature suitable for performing the snow melting, the heat storage is performed. When hot water is supplied from the tank to the mixing tank, and the temperature of the water in the treated water tank exceeds the target temperature during water spraying and snow melting,
The supply of warm water from the heat storage tank to the mixing tank was stopped.
【0042】このように、本発明では、蓄熱槽の温水の
温度を、散水融雪時または散水融雪が必要と予想される
時には高温域(温水上限温度〜温水中間温度)に維持し
ているが、散水をしない待機時には低温域(温水中間温
度〜温水下限温度)に維持しているので、待機時におけ
る蓄熱槽からの自然放熱量が、従来技術に比べて半減
し、ボイラで使用する燃料を節減して省エネを図ること
ができる。As described above, in the present invention, the temperature of the hot water in the heat storage tank is maintained in a high temperature range (upper limit temperature of hot water to intermediate temperature of hot water) at the time of sprinkling snow melting or when it is anticipated that sprinkling snow melting is required. During the standby without watering, the temperature is maintained in the low temperature range (the intermediate temperature of the hot water to the minimum temperature of the hot water), so the natural heat radiation from the heat storage tank during the standby is halved compared to the conventional technology, and the fuel used in the boiler is saved. Energy saving.
【0043】また、散水融雪の際に、処理水槽の水の温
度が目標温度を越えるときには、蓄熱槽から混合槽への
温水の供給を停止するため、温水を無駄に使用すること
がなくなり、ボイラで使用する燃料を節減して省エネを
図ることができる。Further, when the temperature of the water in the treated water tank exceeds the target temperature during the spraying and melting of snow, the supply of the hot water from the heat storage tank to the mixing tank is stopped, so that the hot water is not wasted. It is possible to save fuel by using less fuel.
【図1】本発明の実施の形態にかかる散水融雪設備を示
す構成図。FIG. 1 is a configuration diagram showing a sprinkling snow melting facility according to an embodiment of the present invention.
【図2】本発明の実施の形態にかかる散水融雪設備のボ
イラ運転方法を従来のボイラ運転方法と対比して示す説
明図。FIG. 2 is an explanatory diagram showing a boiler operating method of the water-sprinkling snow melting facility according to the embodiment of the present invention in comparison with a conventional boiler operating method.
1 貯水槽 2 仕切壁 3 処理槽 4 混合槽 5 道路 6 配管 7 蓄熱槽 8 散水ポンプ 9 散水管 10 配管 11 ボイラ 11a 制御箱 12 循環配管 13 ボイラ循環ポンプ 14 温水ポンプ 15 温水管 21,22,23 温度センサ 24 流量計 25 降雪センサ 31 温度コントローラ 32 流量コントローラ 33 温水コントローラ 34 モード切換スイッチ DESCRIPTION OF SYMBOLS 1 Water storage tank 2 Partition wall 3 Processing tank 4 Mixing tank 5 Road 6 Pipe 7 Heat storage tank 8 Water spray pump 9 Water spray pipe 10 Pipe 11 Boiler 11a Control box 12 Circulation pipe 13 Boiler circulation pump 14 Hot water pump 15 Hot water pipe 21, 22, 23 Temperature sensor 24 Flow meter 25 Snowfall sensor 31 Temperature controller 32 Flow controller 33 Hot water controller 34 Mode switch
Claims (3)
に散水した水を回収してきた回収水とが流入してきて水
を貯水する処理水槽と、河川から取り込んだ河川水をボ
イラ部により加熱してなる温水を貯水する蓄熱槽と、処
理水槽の水と蓄熱槽の温水とが流入してくる混合槽とを
有し、混合槽の水を融雪のために道路の路面に散水する
散水融雪設備において、 散水融雪をするとき又は散水融雪をすることが必要にな
ると予想されるときには、蓄熱槽の温水の温度が温水中
間温度になったら前記ボイラ部による加熱を起動し、前
記温水の温度が温水上限温度になったら前記ボイラ部に
よる加熱を停止するとともに、 散水融雪をしない待機時には、蓄熱槽の温水の温度が温
水下限温度になったら前記ボイラによる加熱を起動し、
前記温水の温度が温水中間温度になったら前記ボイラに
よる加熱を停止することを特徴とする散水融雪設備の運
転方法。Claims: 1. A treated water tank in which river water taken in from a river and collected water that has collected water sprinkled on a road surface enter and store water, and river water taken in from a river is heated by a boiler unit. Snow melting equipment that has a heat storage tank for storing hot water, and a mixing tank into which the water in the treated water tank and the hot water in the heat storage tank flow, and sprays the water in the mixing tank onto the road surface for snow melting. In the case of spraying snowmelt or when it is expected that it is necessary to perform snowmelt, when the temperature of the hot water in the heat storage tank reaches the intermediate temperature of the hot water, the heating by the boiler unit is started, and the temperature of the hot water is changed to the hot water. When the heating by the boiler section is stopped when the temperature reaches the upper limit temperature, and when the temperature of the hot water in the heat storage tank reaches the lower limit temperature of the hot water, the heating by the boiler is started in a standby state without spraying and melting the snow,
When the temperature of the hot water reaches the intermediate temperature of the hot water, the heating by the boiler is stopped.
に散水した水を回収してきた回収水とが流入してきて水
を貯水する処理水槽と、河川から取り込んだ河川水をボ
イラ部により加熱してなる温水を貯水する蓄熱槽と、処
理水槽の水と蓄熱槽の温水とが流入してくる混合槽とを
有し、混合槽の水を融雪のために道路の路面に散水する
散水融雪設備において、 散水融雪をする際に、前記処理水槽の水の温度が、散水
融雪をするのに適当な目標温度以下であるときには、蓄
熱槽から混合槽に温水を供給し、 散水融雪をする際に、前記処理水槽の水の温度が、前記
目標温度を越えるときには、蓄熱槽から混合槽への温水
の供給を停止することを特徴とする散水融雪設備の運転
方法。2. A treated water tank in which river water taken in from a river and collected water that has collected water sprinkled on a road surface enter and store water, and river water taken in from a river is heated by a boiler unit. Snow melting equipment that has a heat storage tank for storing hot water, and a mixing tank into which the water in the treated water tank and the hot water in the heat storage tank flow, and sprays the water in the mixing tank onto the road surface for snow melting. In the case of water spraying and melting, when the temperature of the water in the treated water tank is equal to or lower than a target temperature suitable for performing water spraying and snow melting, supplying hot water from the heat storage tank to the mixing tank, When the temperature of the water in the treated water tank exceeds the target temperature, the supply of warm water from the heat storage tank to the mixing tank is stopped.
に散水した水を回収してきた回収水とが流入してきて水
を貯水する処理水槽と、河川から取り込んだ河川水をボ
イラ部により加熱してなる温水を貯水する蓄熱槽と、処
理水槽の水と蓄熱槽の温水とが流入してくる混合槽とを
有し、混合槽の水を融雪のために道路の路面に散水する
散水融雪設備において、 散水融雪をするとき又は散水融雪をすることが必要にな
ると予想されるときには、蓄熱槽の温水の温度が温水中
間温度になったら前記ボイラ部による加熱を起動し、前
記温水の温度が温水上限温度になったら前記ボイラ部に
よる加熱を停止するとともに、 散水融雪をしない待機時には、蓄熱槽の温水の温度が温
水下限温度になったら前記ボイラによる加熱を起動し、
前記温水の温度が温水中間温度になったら前記ボイラに
よる加熱を停止し、 散水融雪をする際に、前記処理水槽の水の温度が、散水
融雪をするのに適当な目標温度以下であるときには、蓄
熱槽から混合槽に温水を供給し、 散水融雪をする際に、前記処理水槽の水の温度が、前記
目標温度を越えるときには、蓄熱槽から混合槽への温水
の供給を停止することを特徴とする散水融雪設備の運転
方法。3. A treated water tank in which river water taken in from a river and collected water that has collected water sprinkled on a road surface flow in and store water, and river water taken in from a river is heated by a boiler unit. Snow melting equipment that has a heat storage tank for storing hot water, and a mixing tank into which the water in the treated water tank and the hot water in the heat storage tank flow, and sprays the water in the mixing tank onto the road surface for snow melting. In the case of spraying snowmelt or when it is expected that it is necessary to perform snowmelt, when the temperature of the hot water in the heat storage tank reaches the intermediate temperature of the hot water, the heating by the boiler unit is started, and the temperature of the hot water is changed to the hot water. When the heating by the boiler section is stopped when the temperature reaches the upper limit temperature, and when the temperature of the hot water in the heat storage tank reaches the lower limit temperature of the hot water, the heating by the boiler is started in a standby state without spraying and melting the snow,
When the temperature of the hot water reaches the intermediate temperature of the hot water, the heating by the boiler is stopped, and when water spraying and melting, when the temperature of the water in the treated water tank is equal to or lower than a target temperature suitable for water spraying and melting, When hot water is supplied from the heat storage tank to the mixing tank, and when the water is melted by spraying water, the supply of the hot water from the heat storage tank to the mixing tank is stopped when the temperature of the water in the treated water tank exceeds the target temperature. How to operate the snowmelting equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10315097A JPH10292334A (en) | 1997-04-21 | 1997-04-21 | Operation method of snow-thawing device with splinkling water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10315097A JPH10292334A (en) | 1997-04-21 | 1997-04-21 | Operation method of snow-thawing device with splinkling water |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10292334A true JPH10292334A (en) | 1998-11-04 |
Family
ID=14346487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10315097A Withdrawn JPH10292334A (en) | 1997-04-21 | 1997-04-21 | Operation method of snow-thawing device with splinkling water |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10292334A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011038376A (en) * | 2009-08-18 | 2011-02-24 | Takaaki Endo | Circulating snow melting system utilizing ground heat and underground water heat |
-
1997
- 1997-04-21 JP JP10315097A patent/JPH10292334A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011038376A (en) * | 2009-08-18 | 2011-02-24 | Takaaki Endo | Circulating snow melting system utilizing ground heat and underground water heat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207729757U (en) | A kind of roofing automatic spray heat sink | |
CN209562503U (en) | A kind of solar energy photovoltaic panel and for solar energy photovoltaic panel clear the snow and cooling device | |
JPH10292334A (en) | Operation method of snow-thawing device with splinkling water | |
CN205711614U (en) | Overhead road of city road surface automatic freezing-protective deicing system | |
JP4174608B2 (en) | Snowmelt water supply system for running roof | |
JP2003185190A (en) | Outdoor unit for air conditioning apparatus | |
JP2001303527A (en) | Snow melting method and its device | |
JP2003147741A (en) | Snow melter | |
JP2012007424A (en) | Rooftop liquid spraying device | |
JP2000073465A (en) | Method and device for cooling building | |
CN214501648U (en) | Chassis deicing device and air conditioner | |
JPS62200135A (en) | Method of circulating water in snow melting with no water sprinkled | |
JP3086967U (en) | Roof snow melting device using water surface | |
JP2549951B2 (en) | Non-sprinkling snow control method | |
JP2005226440A (en) | Method of melting snow with water sprinkling | |
JPS63201498A (en) | Operation of cooling tower in cold district | |
JPH01107780U (en) | ||
JP2593072B2 (en) | Roll temperature control method in continuous casting machine | |
JPH09159226A (en) | Method for storing warm and chilled waters in underground aquifer and alternately using in winter and summer | |
JPH05214716A (en) | Snow melting device | |
JP2008051356A (en) | Snow melting system using heat storage tank | |
JP3567529B2 (en) | Snow melting equipment | |
JPH02285178A (en) | Snow-melting roof | |
JP3113387B2 (en) | Snow melting equipment | |
JPS5813250Y2 (en) | automatic ice maker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20040706 |