JPH10266380A - Execution method of thermal insulation interior wall substrate - Google Patents

Execution method of thermal insulation interior wall substrate

Info

Publication number
JPH10266380A
JPH10266380A JP7347897A JP7347897A JPH10266380A JP H10266380 A JPH10266380 A JP H10266380A JP 7347897 A JP7347897 A JP 7347897A JP 7347897 A JP7347897 A JP 7347897A JP H10266380 A JPH10266380 A JP H10266380A
Authority
JP
Japan
Prior art keywords
heat insulating
wall panel
frame
base frame
insulating inner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7347897A
Other languages
Japanese (ja)
Inventor
Miki Kotani
美樹 小谷
Masami Sugihara
正美 杉原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP7347897A priority Critical patent/JPH10266380A/en
Publication of JPH10266380A publication Critical patent/JPH10266380A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for simply constructing a thermal insulation interior wall substrate capable of obtaining excellent thermal insulation effect. SOLUTION: A moisture prevention sheet 3 is stuck on the outside of a wooden sub-frame 2 framed in the shape of a rectangle and, at the same time, a thermal insulation interior wall panel 1 sticking a thermal insulating material on the outside of the wooden sub-frame 2 as the outside of the moisture prevention sheet 3 is fixed to the wooden sub-frame 2 of the adjacent thermal insulation interior wall panel 1 or a floor substrate material by driving nails 8 from the inside of the wooden sub-frame 2 in a state to erect the thermal insulation interior wall panel 1 on the floor substrate material under a beam 5. The thermal insulation interior wall panel 1 is fixed to the upper side of the wooden sub-frame 2 through a fixed metal fixture 9 under the beam 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、断熱内壁下地の施
工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a heat insulating inner wall foundation.

【0002】[0002]

【従来の技術】一般に、鉄骨構造の建物において、外壁
がカーテンウォール構造をとっているような場合、内壁
の施工に当たって、自立した下地材および断熱材の施工
が必要となる。
2. Description of the Related Art Generally, in a steel-framed building, when the outer wall has a curtain wall structure, it is necessary to install a self-supporting base material and a heat insulating material when constructing the inner wall.

【0003】そこで、従来より、図8に示すように、矩
形に枠組みした木製下地枠bの枠内に断熱材cを設ける
とともに、この木製下地枠bの室内側となる内面側に防
湿シートdを貼設して断熱内壁パネルaを構成し、この
断熱内壁パネルaを施工することで、断熱内壁下地を構
成することが行われている。この場合、断熱内壁パネル
aは、床面eに断面溝型となったランナfを固定してお
き、このランナfに、下辺を挿し込んで梁gの直下に自
立させていた。また、隣接する断熱内壁パネルa同士
も、図9に示すように、一方の断熱内壁パネルaの木製
下地枠bに連結金具hをビスjで固定しておき、この連
結金具hの突出部分を、隣接する他方の断熱内壁パネル
aに折り曲げてビス固定jすることで、この両者を固定
していた。そして、断熱内壁パネルaの上辺と梁gとの
間は、木製下地枠bの上辺に固定した固定金具kを、梁
gのフランジ部lに当接した状態で固定片mによって固
定していた。
[0003] Conventionally, as shown in Fig. 8, a heat insulating material c is provided in a rectangular wooden base frame b, and a moisture-proof sheet d is provided on the inner side of the wooden base frame b which is the indoor side. To form a heat insulating inner wall panel a, and constructing the heat insulating inner wall panel a to form a heat insulating inner wall base. In this case, the heat-insulating inner wall panel a is configured such that a runner f having a groove-shaped cross section is fixed to a floor surface e, and the lower side is inserted into the runner f to be self-supporting directly below the beam g. Also, as shown in FIG. 9, the adjacent heat-insulating inner wall panels a are fixed to the wooden base frame b of one of the heat-insulating inner wall panels a with the screws j. Then, the two are fixed to each other by bending the other adjacent heat-insulating inner wall panel a and fixing it with a screw j. And, between the upper side of the heat-insulating inner wall panel a and the beam g, the fixing metal k fixed to the upper side of the wooden base frame b is fixed by the fixing piece m in a state of contacting the flange portion l of the beam g. .

【0004】[0004]

【発明が解決しようとする課題】しかし、上記従来のよ
うに断熱内壁パネルaを使用して断熱内壁下地を施工す
る場合、断熱内壁パネルaは、木製下地枠bの枠内に断
熱材cが詰まった状態でパネル化されているため、木製
下地枠bの部分を直接床面eに釘固定するといったこと
ができない。したがって、床面eにランナfを固定して
おき、このランナfを利用して断熱内壁パネルaの縁部
を支持するといったことで施工しなければならず、施工
作業が煩わしくなるといった不都合を生じることとな
る。また、隣接する断熱内壁パネルa同士も、直接釘固
定することができず、連結金具hを使用しなければなら
ず、施工作業が煩わしくなるといった不都合を生じるこ
ととなる。
However, when the heat insulating inner wall panel a is constructed using the heat insulating inner wall panel a as in the prior art, the heat insulating inner wall panel a has the heat insulating material c in the wooden base frame b. Since the panel is formed in a clogged state, the wooden base frame b cannot be directly nailed to the floor surface e. Therefore, it is necessary to fix the runner f to the floor surface e and use the runner f to support the edge of the heat-insulating inner wall panel a, so that the work is troublesome. It will be. In addition, the adjacent heat-insulating inner wall panels a cannot be directly fixed to each other by nails, and the connecting metal fittings h must be used.

【0005】そのため、断熱内壁パネルaを使用せず
に、現場で木製下地枠b、断熱材c、および防湿シート
dを個々に施工することが考えられるが、この場合、断
熱内壁パネルaを施工する以上に施工作業が煩わしくな
るといった不都合を生じることとなる。
For this reason, it is conceivable to separately install the wooden base frame b, the heat insulating material c, and the moisture-proof sheet d on site without using the heat-insulating inner wall panel a. This causes inconvenience that the construction work becomes more troublesome than necessary.

【0006】本発明は、係る実情に鑑みてなされたもの
であって、優れた断熱効果の得られる断熱内壁下地を簡
単に施工する方法を提供することを目的としている。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for easily constructing a heat-insulating inner wall base material having an excellent heat-insulating effect.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
の本発明の断熱内壁下地の施工方法は、矩形に枠組みさ
れた木製下地枠の外面側に防湿シートが貼設されるとと
もに、この防湿シートの外面側であって、木製下地枠の
枠外に、断熱材が貼設されてなる断熱内壁パネルを、梁
下の床下地材上に立設させた状態で、木製下地枠の枠内
から釘打ちすることによって、隣接する断熱内壁パネル
の木製下地枠や、床下地材に固定するとともに、木製下
地枠の上辺に固定金具を介して梁下に固定するものであ
る。
According to the present invention, there is provided a method for constructing a heat-insulating inner wall foundation, in which a moisture-proof sheet is attached to an outer surface of a rectangular wooden foundation frame. On the outer surface side of the sheet, outside the frame of the wooden base frame, in a state where the heat insulating inner wall panel on which the heat insulating material is attached is erected on the floor base material under the beam, from within the wooden base frame. By nailing, it is fixed to the wooden base frame or floor base material of the adjacent heat-insulating inner wall panel, and is fixed to the upper side of the wooden base frame below the beam via a fixing bracket.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0009】図1は断熱内壁パネル1によって施工され
た断熱内壁下地を示し、図2は同断熱内壁下地に石膏ボ
ードなどの内壁仕上げ材10を施工して施工完了した状
態を示している。
FIG. 1 shows a heat insulating inner wall foundation constructed by the heat insulating inner wall panel 1, and FIG. 2 shows a state in which construction has been completed by applying an inner wall finishing material 10 such as a gypsum board to the heat insulating inner wall foundation.

【0010】すなわち、この断熱内壁下地の施工方法
は、断熱内壁パネル1を、隣接する断熱内壁パネル1や
床下地材61に釘8で固定するとともに、固定金具9を
介して梁5に固定して自立した断熱内壁下地を形成する
ものである。
That is, in the method of applying the heat insulating inner wall base, the heat insulating inner wall panel 1 is fixed to the adjacent heat insulating inner wall panel 1 and the floor base material 61 with the nail 8 and is fixed to the beam 5 via the fixing bracket 9. To form a self-supporting heat insulating inner wall base.

【0011】断熱内壁パネル1は、図3および図4に示
すように、木製下地枠2の外面側に防湿シート3が貼設
されるとともに、この防湿シート3の外面側に断熱材4
が貼設されて構成されている。
As shown in FIGS. 3 and 4, the heat-insulating inner wall panel 1 has a moisture-proof sheet 3 stuck on the outer surface side of the wooden base frame 2 and a heat-insulating material 4 on the outer surface side of the moisture-proof sheet 3.
Is affixed.

【0012】木製下地枠2は、縦桟材21と横桟材22
とを矩形に枠組みして構成されている。また、縦桟材2
1間には、横桟材22と平行する複数の中桟材23が設
けられて木製下地枠2全体が補強されている。この木製
下地枠2は、中桟材23に配線孔20が設けられてお
り、この配線孔20を利用して木製下地枠2内に自由に
配線(図示省略)を取りまわせるようになされている。
また、木製下地枠2のうち、室内側となる内面側であっ
て、上辺の横桟材22に隣接した位置には、この木製下
地枠2の内面側と面一となるように、上辺の横桟材22
と直交して天井下地取付桟材24が設けられている。さ
らに、木製下地枠2の端面の内、一方の縦桟材21の外
面寄りの位置に、この縦桟材21に沿って気密材25が
設けられている。
The wooden base frame 2 comprises a vertical beam 21 and a horizontal beam 22.
Are framed into a rectangle. In addition, vertical beam 2
Between them, a plurality of middle crosspieces 23 parallel to the horizontal crosspieces 22 are provided to reinforce the entire wooden base frame 2. The wooden base frame 2 is provided with a wiring hole 20 in the middle cross member 23, and the wiring (not shown) can be freely arranged in the wooden base frame 2 using the wiring hole 20. .
In addition, at the position on the inner side of the wooden base frame 2 which is the indoor side and adjacent to the horizontal rail 22 on the upper side, the upper side of the wooden base frame 2 is flush with the inner side of the wooden base frame 2. Cross beam 22
At right angles to the above, a ceiling base mounting bar 24 is provided. Further, an airtight material 25 is provided along the vertical rail 21 at a position near the outer surface of one of the vertical rails 21 in the end surface of the wooden base frame 2.

【0013】防湿シート3は、木製下地枠2の外面側全
体に貼設される。この防湿シート3としては、アルミニ
ウム蒸着したポリエチレン製フィルムを使用することが
できる。
The moisture-proof sheet 3 is attached to the entire outer surface of the wooden base frame 2. As the moisture-proof sheet 3, a polyethylene film on which aluminum is deposited can be used.

【0014】断熱材4は、上記防湿シート3の外面側で
あって、木製下地枠2の枠外に貼設される。この断熱材
4は、木製下地枠2と略同じ大きさに貼設されるが、断
熱内壁パネル1を施工した状態で、木製下地枠2の上辺
の横桟材22と梁5との間隙を充分に被覆することがで
きるように、木製下地枠2の上辺の横桟材22から、か
なり上方にはみ出した状態となるように貼設される。ま
た、幅方向にも、木製下地枠2よりも気密材25の分だ
けはみ出した状態となるように貼設される。この断熱材
4としては、例えば、フィルム包装された高密度グラス
ウール製の断熱材4を使用することができる。この断熱
材4は、木製下地枠2の外面側に当接した状態で、この
木製下地枠2に、鋲41によって固定される。この断熱
材4は、木製下地枠2に対して一体となった一つの断熱
材4を貼設するものであっても良いし、複数の断熱材4
を貼設するものであっても良い。
The heat insulating material 4 is attached to the outer surface of the moisture-proof sheet 3 and outside the wooden base frame 2. The heat insulating material 4 is stuck to the same size as the wooden base frame 2, but in a state where the heat insulating inner wall panel 1 is constructed, a gap between the horizontal rail 22 on the upper side of the wooden base frame 2 and the beam 5 is formed. In order to be able to cover sufficiently, it is stuck so as to protrude considerably upward from the horizontal rail 22 on the upper side of the wooden base frame 2. In addition, it is attached in the width direction so as to protrude from the wooden base frame 2 by the amount of the airtight material 25. As the heat insulating material 4, for example, a heat insulating material 4 made of high-density glass wool packaged in a film can be used. The heat insulating material 4 is fixed to the wooden base frame 2 by the studs 41 in a state of being in contact with the outer surface side of the wooden base frame 2. The heat insulating material 4 may be one in which a single heat insulating material 4 is attached to the wooden base frame 2 or a plurality of heat insulating materials 4.
May be attached.

【0015】次に、このようにして構成される断熱内壁
パネル1による断熱内壁下地の施工方法について説明す
る。
Next, a method of constructing a heat insulating inner wall base using the heat insulating inner wall panel 1 configured as described above will be described.

【0016】まず、施工に先立って、梁5およびラーメ
ン柱(図示省略)によって構成される建物躯体に、床材
6、床下地材61および外壁パネル7を施工しておく。
そして、図1および図2に示すように、まず、断熱内壁
パネル1を梁5の直下の床下地材61の上に立設させ
る。そして、木製下地枠2の枠内から、下辺の横桟材2
2に釘8を打ちつけて、この横桟材22を床下地材61
に固定する。
First, prior to construction, a floor material 6, a floor covering material 61 and an outer wall panel 7 are constructed on a building frame constituted by beams 5 and ramen columns (not shown).
Then, as shown in FIGS. 1 and 2, first, the heat-insulating inner wall panel 1 is erected on a floor base material 61 directly below the beam 5. Then, from within the frame of the wooden base frame 2, the lower horizontal beam 2
2 is nailed to the horizontal beam 22 and the floor material 61
Fixed to

【0017】また、図5および図6に示すように、隣接
する断熱内壁パネル1の縦桟材21同士の間隙に、木板
片からなるスペーサ80を介在させて縦桟材21同士を
釘8で固定する。この際、縦桟材21の間隙には、気密
材25が介在するので、スペーサ80としては、気密材
25による気密性を保つために、この気密材25よりも
若干幅の狭いものを使用する。また、スペーサ80は、
釘8の位置にだけ介在する木板片であっても良いし、縦
桟材21の長さに相当し、間隙全体に介在するようにな
された帯板状のものであっても良い。
As shown in FIGS. 5 and 6, the vertical bars 21 are sandwiched between the vertical bars 21 of the heat-insulating inner wall panel 1 by nails 8 with a spacer 80 made of a piece of wood board interposed between the vertical bars 21. Fix it. At this time, since the airtight material 25 is interposed in the gap between the vertical beam members 21, a spacer having a width slightly smaller than the airtight material 25 is used as the spacer 80 in order to maintain the airtightness of the airtight material 25. . Also, the spacer 80
It may be a piece of wood board interposed only at the position of the nail 8, or may be a strip having a length corresponding to the length of the vertical crosspiece 21 and interposed in the entire gap.

【0018】さらに、上辺の横桟材22に固定金具9を
取り付け、この固定金具9を梁5に固定する。この固定
金具9は、図7に示すように、木製下地枠2の上辺の横
桟材22に嵌め込む溝型に形成された金具本体91と、
梁5のフランジ部50に噛み込む固定部材92とがボル
ト93によって連結されている。そして、ボルト93の
回動具合によって、梁5に固定された固定部材92に対
して金具本体91を矢符A、B方向に動かすことがで
き、これによって断熱内壁パネル1の出入り調整を行う
ことで、梁5の直下に断熱内壁パネル1が正しい建ちで
施工されることとなる。
Further, a fixing metal 9 is attached to the upper cross member 22, and the fixing metal 9 is fixed to the beam 5. As shown in FIG. 7, the fixing metal member 9 includes a groove-shaped metal member body 91 that is fitted into the horizontal rail 22 on the upper side of the wooden base frame 2.
A fixing member 92 that bites into the flange portion 50 of the beam 5 is connected by a bolt 93. The fitting main body 91 can be moved in the directions of the arrows A and B with respect to the fixing member 92 fixed to the beam 5 by the degree of rotation of the bolt 93, thereby adjusting the entrance and exit of the heat insulating inner wall panel 1. Thus, the heat-insulating inner wall panel 1 is constructed right below the beam 5 in a correct construction.

【0019】このようにして断熱内壁パネル1を施工し
た後は、木製下地枠2の表面に、石膏ボードなどの内壁
仕上げ材10が貼設される。また、梁5の内側に断熱材
4が設けられる。さらに、木製下地枠2の天井下地取付
桟材24に野縁ランナ51を介して野縁52が設けら
れ、この野縁52に、石膏ボードなどの天井仕上げ材5
3が施工される。さらに、床下地材61の表面には、フ
ローリング材などの床仕上げ材62が貼設される。
After the heat insulating inner wall panel 1 is constructed in this manner, an inner wall finishing material 10 such as a gypsum board is stuck on the surface of the wooden base frame 2. Further, the heat insulating material 4 is provided inside the beam 5. Further, a ridge 52 is provided on the ridge-mounting support member 24 of the wooden framing frame 2 via a ridge runner 51, and the ridge 52 is provided with a ceiling finishing material 5 such as a gypsum board.
3 is constructed. Further, a floor finishing material 62 such as a flooring material is stuck on the surface of the floor base material 61.

【0020】このようにして施工される断熱内壁下地
は、木製下地枠2の枠内に断熱材4が無く、この枠内が
空隙となった断熱内壁パネル1を使用して施工されるの
で、釘8を打ちつけることによって簡単に床下地材61
の上に断熱内壁パネル1を固定したり、隣接する断熱内
壁パネル1同士を固定して構成することができる。ま
た、床下地材61の上に、断熱内壁パネル1を規制する
ランナなどを設けることなく、この床下地材61上に断
熱内壁パネル1を直接固定するので、間仕切に直交する
部分や最後の一枚を施工する場合のように取付スペース
が限定されるような場合であっても、容易に位置決めし
て固定することができる。さらに、施工ミスをしたよう
な場合も、釘8を抜くことで簡単に固定を解除すること
ができるので、簡単に施工のやり直しを行うことができ
る。
The heat insulating inner wall foundation thus constructed is constructed by using the heat insulating inner wall panel 1 in which there is no heat insulating material 4 in the frame of the wooden foundation frame 2 and the inside of this frame is a gap. By hitting the nail 8, the floor base material 61 can be easily obtained.
The heat-insulating inner wall panels 1 can be fixed on top of each other, or the adjacent heat-insulating inner wall panels 1 can be fixed to each other. Further, since the heat insulating inner wall panel 1 is directly fixed on the floor base material 61 without providing a runner or the like for regulating the heat insulating inner wall panel 1 on the floor base material 61, a portion orthogonal to the partition or the last one is provided. Even in the case where the mounting space is limited as in the case of constructing sheets, it can be easily positioned and fixed. Further, even in the case of a construction error, the fixing can be easily released by pulling out the nail 8, so that the construction can be easily redone.

【0021】また、このようにして構成した断熱内壁下
地は、木製下地枠2内の中桟材23に、配線孔20を設
けているので、この配線孔20に配線を挿通させて配線
を自由にとりまわすことができる。この場合、木製下地
枠2の外面側に防湿シート3や断熱材4を貼設している
ので、これらの防湿シート3や断熱材4を破ることなく
配線工事をすることができる。したがって、この防湿シ
ート3や断熱材4を破ることによって断熱性能が低下す
るのを防止することができる。
In the heat insulating inner wall base formed in this way, since the wiring hole 20 is provided in the middle crosspiece 23 in the wooden base frame 2, the wiring is inserted through the wiring hole 20 to allow the wiring freely. Can be passed on to. In this case, since the moisture-proof sheet 3 and the heat insulating material 4 are attached to the outer surface side of the wooden base frame 2, wiring work can be performed without breaking the moisture-proof sheet 3 and the heat insulating material 4. Therefore, it is possible to prevent the heat insulation performance from being lowered by breaking the moisture-proof sheet 3 and the heat insulating material 4.

【0022】さらに、防湿シート3には、アルミニウム
蒸着をしているため、木製下地枠2の枠内の空気中に熱
を輻射させることができ、優れた断熱効果が得られるこ
ととなる。
Furthermore, since the moisture-proof sheet 3 is deposited with aluminum, heat can be radiated into the air in the frame of the wooden base frame 2, and an excellent heat insulating effect can be obtained.

【0023】さらに、施工完了状態で、木製下地枠2と
梁5との間は、通常、固定金具9が取り付けられるため
に間隙を生じることとなるが、この断熱内壁パネル1
は、木製下地枠2よりも上方に突出するように断熱材4
を貼設しているため、この間隙の部分を断熱材4で塞い
だ状態とすることができる。したがって、室内から外部
へと熱橋が形成されることが無く、優れた断熱性を保つ
ことができ、この間隙の部分に後工程で断熱材4を入れ
るといった作業を無くすことができる。また、この断熱
材4は、木製下地枠2の外面側に貼設しているため、こ
の木製下地枠2の枠内に納めるといったことを考えるこ
となく、自由な幅や厚みのものを貼設することができる
ので、一般地域や寒冷地域などの断熱地域区分に簡単に
対応することができる。
Further, when the construction is completed, a gap is usually formed between the wooden base frame 2 and the beam 5 because the fixing metal 9 is attached thereto.
Are heat insulating materials 4 so as to protrude above the wooden base frame 2.
Is attached, the gap can be closed by the heat insulating material 4. Therefore, a thermal bridge is not formed from the room to the outside, and excellent heat insulating properties can be maintained, and the work of putting the heat insulating material 4 into the gap in a later step can be eliminated. Also, since the heat insulating material 4 is stuck on the outer surface side of the wooden base frame 2, the heat insulating material 4 is stuck with a free width and thickness without considering that the heat insulating material 4 is to be accommodated in the frame of the wooden base frame 2. Therefore, it is possible to easily cope with heat insulation area divisions such as general areas and cold areas.

【0024】なお、本実施の形態における断熱内壁パネ
ル1の木製下地枠2については、特に木製のものに限定
されず、鋼製のものであっても良い。ただし、この場
合、釘8を打ち付けて固定できるように、釘8を打ち付
ける位置に釘孔(図示省略)などをあらかじめ形成して
おくなどの考慮をしておかなければならない。
The wooden base frame 2 of the heat-insulating inner wall panel 1 in the present embodiment is not particularly limited to a wooden one but may be a steel one. However, in this case, it is necessary to take into consideration that a nail hole (not shown) or the like is formed in advance at a position where the nail 8 is driven so that the nail 8 can be driven and fixed.

【0025】[0025]

【発明の効果】以上述べたように、本発明によると、外
面側に防湿シートを貼設し、この防湿シートの外面側で
あって、木製下地枠の枠外に断熱材を貼設した断熱内壁
パネルを使用しているので、木製下地枠の枠内は、空隙
となる。そして、木製下地枠の空隙となった枠内から釘
打ちすることによって、この断熱内壁パネルを、隣接す
る断熱内壁パネルの木製下地枠や、床面に固定するとと
もに、木製下地枠の上辺に固定金具を介して梁下に固定
しているので、梁下に固定する固定金具以外は、釘を使
用するだけで簡単に施工することが可能となる。
As described above, according to the present invention, a heat-insulating inner wall in which a moisture-proof sheet is stuck on the outer surface side, and a heat insulating material is stuck on the outer surface side of the moisture-proof sheet and outside the frame of the wooden base frame. Since the panel is used, the inside of the frame of the wooden base frame becomes a void. Then, by nailing from inside the voided frame of the wooden base frame, this heat-insulating inner wall panel is fixed to the wooden base frame or floor of the adjacent heat-insulating inner wall panel and fixed to the upper side of the wooden base frame. Since it is fixed under the beam via the metal fitting, it is possible to easily perform the construction only by using a nail except for the fixing metal fixed under the beam.

【0026】また、梁下に固定する固定金具以外は、釘
を使用するだけで、床下地材の上に、断熱内壁パネルを
固定するので、この断熱内壁パネルを規制するランナな
どを床下地材の上に設ける必要がない。したがって、最
後の一枚を施工する場合や、室内の角の部分および間仕
切壁付近のように取付スペースが限定されるような場合
などであっても、容易に位置決めして固定することがで
きる。さらに、施工ミスをしたような場合も、釘を抜く
ことで簡単に固定を解除することができるので、簡単に
施工のやり直しを行うことができる。
Except for the fixing fittings to be fixed under the beams, the heat-insulating inner wall panel is fixed on the floor base material only by using nails. There is no need to set it on Therefore, even when the last sheet is constructed, or when the mounting space is limited such as in a corner of a room or near a partition wall, the positioning and fixing can be easily performed. Further, even in the case of a construction error, the fixing can be easily released by pulling out the nail, so that the construction can be easily redone.

【図面の簡単な説明】[Brief description of the drawings]

【図1】断熱内壁下地の全体構成の概略を示す部分斜視
図である。
FIG. 1 is a partial perspective view schematically showing an overall configuration of a heat insulating inner wall base.

【図2】断熱内壁下地の内装を仕上げた施工完了状態を
示す断面図である。
FIG. 2 is a cross-sectional view showing a completed construction in which the interior of a heat insulating inner wall base has been finished.

【図3】断熱内壁下地の施工に使用される断熱内壁パネ
ルの全体構成の概略を示す分解斜視図である。
FIG. 3 is an exploded perspective view schematically showing an overall configuration of a heat insulating inner wall panel used for constructing a heat insulating inner wall base.

【図4】(a)ないし(c)は、断熱内壁下地の施工に
使用される断熱内壁パネルの全体構成の概略を示す平面
図、正面図および側面図である。
FIGS. 4A to 4C are a plan view, a front view, and a side view schematically showing an overall configuration of a heat insulating inner wall panel used for constructing a heat insulating inner wall base.

【図5】断熱内壁パネルの施工状態を示す部分拡大図で
ある。
FIG. 5 is a partially enlarged view showing a construction state of a heat insulating inner wall panel.

【図6】断熱内壁パネルの施工状態を示す部分断面図で
ある。
FIG. 6 is a partial cross-sectional view showing a construction state of a heat insulating inner wall panel.

【図7】固定金具による断熱内壁パネルと梁との固定状
態を示す部分拡大図である。
FIG. 7 is a partially enlarged view showing a state where the heat insulating inner wall panel and the beam are fixed by the fixing metal.

【図8】(a)および(b)は、従来の断熱内壁下地を
構成する断熱内壁パネルの施工工程を示す断面図であ
る。
8 (a) and 8 (b) are cross-sectional views showing a construction process of a heat insulating inner wall panel constituting a conventional heat insulating inner wall base.

【図9】従来の断熱内壁下地を構成する断熱内壁パネル
同士の連結状態を示す部分斜視図である。
FIG. 9 is a partial perspective view showing a connection state between heat insulating inner wall panels constituting a conventional heat insulating inner wall base.

【符号の説明】[Explanation of symbols]

1 断熱内壁パネル 2 木製下地枠 3 防湿シート 4 断熱材 61 床下地材 8 釘 9 固定金具 DESCRIPTION OF SYMBOLS 1 Insulated inner wall panel 2 Wooden base frame 3 Moisture-proof sheet 4 Heat insulating material 61 Floor base material 8 Nail 9 Fixing bracket

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 矩形に枠組みされた木製下地枠の外面側
に防湿シートが貼設されるとともに、この防湿シートの
外面側であって、木製下地枠の枠外に、断熱材が貼設さ
れてなる断熱内壁パネルを、梁下の床下地材上に立設さ
せた状態で、木製下地枠の枠内から釘打ちすることによ
って、隣接する断熱内壁パネルの木製下地枠や、床下地
材に固定するとともに、木製下地枠の上辺に固定金具を
介して梁下に固定することを特長とする断熱内壁下地の
施工方法。
1. A moisture-proof sheet is stuck on the outer surface side of a rectangular wooden base frame, and a heat insulating material is stuck on the outer surface side of the moisture-proof sheet and outside the wooden base frame. Insulated inner wall panel is fixed on the wooden base frame of adjacent heat insulating inner wall panel or floor base material by nailing from inside the frame of wooden base frame while standing on the floor base material under the beam A method for constructing a heat-insulating inner wall base, characterized by being fixed to the upper side of a wooden base frame below a beam via a fixing bracket.
JP7347897A 1997-03-26 1997-03-26 Execution method of thermal insulation interior wall substrate Pending JPH10266380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7347897A JPH10266380A (en) 1997-03-26 1997-03-26 Execution method of thermal insulation interior wall substrate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7347897A JPH10266380A (en) 1997-03-26 1997-03-26 Execution method of thermal insulation interior wall substrate

Publications (1)

Publication Number Publication Date
JPH10266380A true JPH10266380A (en) 1998-10-06

Family

ID=13519437

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7347897A Pending JPH10266380A (en) 1997-03-26 1997-03-26 Execution method of thermal insulation interior wall substrate

Country Status (1)

Country Link
JP (1) JPH10266380A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294981A (en) * 2014-09-18 2015-01-21 浙江绿建住宅科技有限公司 Auxiliary supporting device of structure thermal insulation wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294981A (en) * 2014-09-18 2015-01-21 浙江绿建住宅科技有限公司 Auxiliary supporting device of structure thermal insulation wall

Similar Documents

Publication Publication Date Title
JP2003074132A (en) Latch of thermal insulating wall member
JP3571484B2 (en) Mounting structure of heat insulating inner wall panel
JPH10266380A (en) Execution method of thermal insulation interior wall substrate
JPH05248012A (en) Heat insulating panel for wall of wooden building and execution method thereof
US8250831B2 (en) Method for installing window between joists
JP3506873B2 (en) Insulated interior wall panel
JP3634102B2 (en) Insulated inner wall panel
JP3557332B2 (en) Construction structure of insulation base
JP3571485B2 (en) Insulation inner wall foundation method of window opening
JP2000356024A (en) Mounting bracket for exterior trim material, furring strips for vertical sticking, and mounting construction method
JP2934413B2 (en) Insulation support structure
JP2507196Y2 (en) Wall panels for windows
JP2779438B2 (en) Wooden building and its construction method
JP3589224B2 (en) Exterior wall base panel
JPH0752814Y2 (en) Door panels for doorways
JPH09256463A (en) Two-storied wooden building
JP2793733B2 (en) Eaves back ventilation structure
JPH11236731A (en) Wooden building and execution method of feather pattern material thereof
JP3227372B2 (en) Edge mounting structure and method
JP3126572B2 (en) Boundary wall structure and building wall construction method of building unit
JP4580107B2 (en) Construction method of falling partition wall of unit housing
JPH11303251A (en) Backing for wall for wooden house
JPH10115023A (en) Heat insulating interior wall backing structure and its executing method
JPH0748885A (en) Structure for fire-resistant wall body
JPH11190091A (en) Supporting structure of roof

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040127

A521 Written amendment

Effective date: 20040325

Free format text: JAPANESE INTERMEDIATE CODE: A523

A02 Decision of refusal

Effective date: 20040518

Free format text: JAPANESE INTERMEDIATE CODE: A02