JPH10248095A - Installation management system - Google Patents
Installation management systemInfo
- Publication number
- JPH10248095A JPH10248095A JP5127897A JP5127897A JPH10248095A JP H10248095 A JPH10248095 A JP H10248095A JP 5127897 A JP5127897 A JP 5127897A JP 5127897 A JP5127897 A JP 5127897A JP H10248095 A JPH10248095 A JP H10248095A
- Authority
- JP
- Japan
- Prior art keywords
- polling
- monitoring
- simultaneous
- management system
- transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009434 installation Methods 0.000 title abstract 8
- 230000005540 biological transmission Effects 0.000 claims description 92
- 238000012544 monitoring process Methods 0.000 claims description 55
- 238000000034 method Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 238000005259 measurement Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Landscapes
- Alarm Systems (AREA)
- Selective Calling Equipment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は設備管理システムに
関し、特に建物等に設置された設備の監視及び制御を行
う監視制御装置に対する外部からの操作指示の送出方法
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a facility management system and, more particularly, to a method of sending an external operation instruction to a monitoring control device for monitoring and controlling facilities installed in a building or the like.
【0002】[0002]
【従来の技術】従来、設備管理システムとしては、建物
の窓に設置されるブラインドの昇降やスラット角度を集
中管理して自動制御するシステムがある。このシステム
において、各ブラインドのブラインドコントローラに対
してはシリアル回線で接続されたフロアコントローラに
よって、定期的な状態収集及びスケジュール等による自
動制御が行われている。また、各ブラインドは居住者が
エリアスイッチパネルを操作することで制御することが
できるようになっている。2. Description of the Related Art Conventionally, as a facility management system, there is a system for centrally controlling the vertical movement of a blind installed in a window of a building and a slat angle and automatically controlling the same. In this system, a blind controller of each blind is automatically controlled by a floor controller connected by a serial line by periodically collecting status and scheduling. Each blind can be controlled by a resident operating an area switch panel.
【0003】上記の設備管理システムではセンタ装置と
して動作するフロアコントローラからの一斉ポーリング
信号に応答して各ブラインドコントローラが定期的に収
集した各ブラインドの状態をフロアコントローラに送出
している。フロアコントローラは各ブラインドコントロ
ーラからの情報に基づいて各ブラインドの状態を集中管
理している。In the above facility management system, the state of each blind periodically collected by each blind controller is sent to the floor controller in response to a simultaneous polling signal from the floor controller operating as a center device. The floor controller centrally manages the state of each blind based on information from each blind controller.
【0004】上述したポーリング信号による情報収集方
式としては、特開昭56−65300号公報に開示され
た方法がある。すなわち、この公報記載の情報収集方式
では、交通信号機等の端末機に無線送受信機を設け、障
害情報収集センタからの一斉ポーリングと、これに伴う
エリア内対象端末機からの交通状態情報の伝達と、端末
機側で障害が発生した場合に直ちに障害情報収集センタ
に対して障害情報を送信することができるランダム発報
期間とを具備している。As an information collection method using the above-mentioned polling signal, there is a method disclosed in Japanese Patent Application Laid-Open No. 56-65300. That is, in the information collection method described in this publication, a wireless transceiver is provided in a terminal such as a traffic signal, and simultaneous polling from a failure information collection center and transmission of traffic state information from a target terminal in the area accompanying this are performed. And a random notification period in which fault information can be transmitted to the fault information collection center immediately when a fault occurs on the terminal side.
【0005】上記の情報収集方式では、障害情報収集セ
ンタから送信された一斉ポーリングを端末機が受信する
と、一斉ポーリングに付されたエリア番号に含まれるエ
リア内の端末機が個別に定められた一定時間間隔で順次
障害情報収集センタへ交通状態情報を伝達している。障
害情報収集センタからの一斉ポーリングに対する端末機
からの応答が終了してから、次の一斉ポーリングの開始
時間まではランダム発報期間とし、端末機側で障害情報
を直ちに送信可能としている。In the above information collection method, when the terminal receives the simultaneous polling transmitted from the failure information collection center, the terminals within the area included in the area number assigned to the simultaneous polling are individually determined. Traffic condition information is sequentially transmitted to the obstacle information collection center at time intervals. From the end of the response from the terminal to the simultaneous polling from the failure information collection center to the start time of the next simultaneous polling, a random alert period is set, and the terminal can immediately transmit the failure information.
【0006】[0006]
【発明が解決しようとする課題】上述した従来の情報収
集方式では、一斉ポーリングによって端末機からの交通
状態情報を順次収集し、ランダム発報期間に端末機から
の障害情報を随時受信している。In the conventional information collection method described above, traffic condition information from terminals is sequentially collected by simultaneous polling, and failure information from terminals is received as needed during a random alert period. .
【0007】この方法を上記の設備管理システムに用い
た場合、一斉ポーリングでブラインドコントローラから
ブラインドの状態を定期的に収集し、ランダム発報期間
にエリアスイッチパネルの操作情報をブラインドコント
ローラに伝達することとなる。この場合、一斉ポーリン
グ周期を短くしたり、ランダム発報期間を長くとること
でエリアスイッチパネルの操作性を確保することができ
るが、一斉ポーリングの実行中に居住者がエリアスイッ
チパネルを操作すると、ブラインドコントローラからフ
ロアコントローラへの状態情報の送出と、エリアスイッ
チパネルからブラインドコントローラへの操作情報の送
出とが重なってしまい、エリアスイッチパネルからの操
作情報が破棄されてしまう恐れがある。When this method is used in the above equipment management system, the blind state is periodically collected from the blind controller by simultaneous polling, and operation information of the area switch panel is transmitted to the blind controller during a random alert period. Becomes In this case, the operability of the area switch panel can be secured by shortening the simultaneous polling cycle or lengthening the random alert period, but if the resident operates the area switch panel during the execution of the simultaneous polling, The transmission of the state information from the blind controller to the floor controller and the transmission of the operation information from the area switch panel to the blind controller may overlap, and the operation information from the area switch panel may be discarded.
【0008】また、上記のランダム発報期間に、複数の
エリアスイッチパネルが同時に操作され、複数のエリア
スイッチパネル各々からブラインドコントローラに操作
情報が同じタイミングで送出されると、エリアスイッチ
パネルからの操作情報の誤認識や破棄の恐れがある。In addition, when a plurality of area switch panels are simultaneously operated during the above-mentioned random alerting period and operation information is transmitted from each of the plurality of area switch panels to the blind controller at the same timing, the operation from the area switch panel is performed. There is a risk of misrecognition or destruction of information.
【0009】そこで、本発明の目的は上記の問題点を解
消し、設備に対する操作情報の輻輳を防止することがで
き、当該操作情報の信頼性を確保することができる設備
管理システムを提供することにある。Accordingly, an object of the present invention is to provide an equipment management system which can solve the above-mentioned problems, can prevent congestion of operation information for equipment, and can ensure the reliability of the operation information. It is in.
【0010】[0010]
【課題を解決するための手段】本発明による設備管理シ
ステムは、各種設備の状態を集中管理するセンタ装置
と、各々前記設備を制御しかつ前記設備の状態を監視情
報として前記センタ装置に送出する複数の監視制御装置
と、各々前記設備に対する外部からの操作情報を前記複
数の監視制御装置に送出する複数の端末装置とを含み、
前記センタ装置からの一斉ポーリング信号に応答して前
記複数の監視制御装置各々から前記センタ装置に前記監
視情報を順次送出するよう構成された設備管理システム
であって、前記複数の端末装置各々に前記複数の監視制
御装置各々への前記操作情報の送出を許可する一斉送信
権利解放ポーリング信号を出力する手段を前記センタ装
置に備えている。An equipment management system according to the present invention includes a center device for centrally managing the status of various types of equipment, each of which controls the equipment and sends the status of the equipment to the center device as monitoring information. Including a plurality of monitoring and control devices, and a plurality of terminal devices each transmitting operation information from the outside to the equipment to the plurality of monitoring and control devices,
A facility management system configured to sequentially send the monitoring information from each of the plurality of monitoring control devices to the center device in response to a simultaneous polling signal from the center device, wherein the monitoring information is transmitted to each of the plurality of terminal devices. The center device includes means for outputting a simultaneous transmission right release polling signal for permitting transmission of the operation information to each of the plurality of monitoring control devices.
【0011】本発明による他の設備管理システムは、上
記の構成のほかに、前記一斉送信権利解放ポーリング信
号に応答して前記複数の監視制御装置に前記操作情報を
送出する送出手段を前記複数の端末装置各々に具備して
いる。[0011] In another equipment management system according to the present invention, in addition to the above configuration, the transmitting means for transmitting the operation information to the plurality of monitoring and control devices in response to the simultaneous transmission right release polling signal is provided. It is provided for each terminal device.
【0012】本発明による別の設備管理システムは、上
記の構成のほかに、外部からの操作情報を少なくとも前
記一斉送信権利解放ポーリング信号が入力されるまで保
持する手段を前記複数の端末装置各々に具備している。In another equipment management system according to the present invention, in addition to the above configuration, means for holding at least operation information from outside until at least the simultaneous transmission right release polling signal is input is provided in each of the plurality of terminal devices. I have it.
【0013】すなわち、フロアコントローラに一斉送信
権利解放ポーリングの送信を追加し、操作性を高めるた
めに一斉ポーリング周期を短くする場合でも、エリアス
イッチパネルが一斉送信権利解放ポーリングを受信する
ことで送信タイミングの同期を取得することができるた
め、同期タイミングを計測して求める方式と比べて信頼
性を確保することができる。That is, even when the simultaneous polling release polling transmission is added to the floor controller and the simultaneous polling period is shortened in order to enhance the operability, the area switch panel receives the simultaneous transmission right release polling and thus receives the transmission timing. , The reliability can be secured as compared with the method of measuring and obtaining the synchronization timing.
【0014】一斉送信権利解放ポーリングの受信に応答
してエリアスイッチパネルから操作情報を送信した後、
一斉送信権利解放ポーリングの受信に同期して個別に定
められた一定時間後に同じ操作情報を再度送信する再確
認送信の機能を追加する。この場合、エリア内のブライ
ンドコントローラはエリアスイッチパネルの操作情報を
連続して受信した場合に正常と判定することができるた
め、再確認送信がない方式と比べてブラインドコントロ
ーラの状態情報とエリアスイッチパネルの操作情報との
輻輳や、複数のエリアスイッチパネル各々からの操作情
報の輻輳を防止するとともに、ブラインドコントローラ
が受信した操作情報の誤認識を防止することができ、操
作情報の信頼性を確保することができる。After transmitting the operation information from the area switch panel in response to the reception of the simultaneous transmission right release polling,
A re-confirmation transmission function for transmitting the same operation information again after a predetermined time individually determined in synchronization with the reception of the simultaneous transmission right release polling is added. In this case, since the blind controller in the area can determine that the operation is normal when the operation information of the area switch panel is continuously received, the state information of the blind controller and the area switch panel are compared with the method without reconfirmation transmission. Of the operation information from each of the plurality of area switch panels and the operation information received by the blind controller can be prevented, and the reliability of the operation information can be secured. be able to.
【0015】[0015]
【発明の実施の形態】次に、本発明の一実施例について
図面を参照して説明する。図1は本発明の一実施例によ
る設備管理システムの構成を示すブロック図である。図
において、設備管理システムでは設備管理装置11と、
アドレス#1〜#nが設定された監視制御装置21〜2
nと、アドレス#1〜#mが設定された操作端末装置3
1〜3mとがシリアル回線100を介して接続されてい
る。Next, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing a configuration of an equipment management system according to one embodiment of the present invention. In the figure, in the equipment management system, the equipment management device 11
Monitoring and control devices 21 and 2 to which addresses # 1 to #n are set
n and the operation terminal device 3 in which addresses # 1 to #m are set
1 to 3 m are connected via a serial line 100.
【0016】この設備管理システムは、複数の設備(図
示せず)を集中管理するシステムである。設備管理装置
11は監視制御装置21〜2nから設備状態を定期的に
収集する。監視制御装置21〜2nは接続された設備の
状態監視及びシリアル回線100からの制御電文による
設備の制御を行う。操作端末装置31〜3mはオペレー
タによる操作を操作制御電文としてシリアル回線100
に送信し、監視制御装置21〜2nの制御によって設備
の操作を行う。また、操作端末装置31〜3mは少なく
ともこの操作制御電文をオペレータが操作してから設備
管理装置11からの送信許可信号(一斉送信権利解放ポ
ーリング)を受信するまで保持する。This equipment management system is a system for centrally managing a plurality of equipment (not shown). The equipment management device 11 periodically collects the equipment status from the monitoring control devices 21 to 2n. The monitoring control devices 21 to 2n monitor the status of the connected equipment and control the equipment based on a control message from the serial line 100. The operation terminal devices 31 to 3m use the serial line 100 as an operation control message for the operation by the operator.
To operate the equipment under the control of the monitoring and control devices 21 to 2n. The operation terminal devices 31 to 3m hold the operation control message at least until an operator operates the operation control message and receives a transmission permission signal (broadcast transmission right release polling) from the facility management device 11.
【0017】尚、上述したブラインドの管理システムに
おいてはフロアコントローラが設備管理装置11に、ブ
ラインドコントローラが監視制御装置21〜2nに、エ
リアスイッチパネルが操作端末装置31〜3mに夫々相
当する。In the above-described blind management system, the floor controller corresponds to the equipment management device 11, the blind controller corresponds to the monitoring control devices 21 to 2n, and the area switch panel corresponds to the operation terminal devices 31 to 3m.
【0018】図2は図1の監視制御装置21の構成を示
すブロック図である。図において、監視制御装置21は
システムを構成する各装置間のデータ転送の制御を行う
回線制御部21aと、設備の状態を監視する監視部21
bと、シリアル回線100からの制御電文に応じた制御
信号を設備に出力する制御部21cとを備えている。
尚、図示していないが、他の監視制御装置22〜2nも
上記の監視制御装置21と同様の構成となっている。FIG. 2 is a block diagram showing the configuration of the monitoring control device 21 of FIG. In the figure, a supervisory control device 21 includes a line control unit 21a that controls data transfer between devices constituting a system, and a monitoring unit 21 that monitors the state of equipment.
b, and a control unit 21c that outputs a control signal corresponding to a control message from the serial line 100 to the equipment.
Although not shown, the other monitoring control devices 22 to 2n have the same configuration as the monitoring control device 21 described above.
【0019】図3は図1の操作端末装置31の構成を示
すブロック図である。図において、操作端末装置31は
システムを構成する各装置間のデータ転送の制御を行う
回線制御部31aと、オペレータによる操作を入力して
操作制御電文を生成する操作入力部31bとを備えてい
る。尚、図示していないが、他の操作端末装置32〜3
mも上記の操作端末装置31と同様の構成となってい
る。FIG. 3 is a block diagram showing the configuration of the operation terminal device 31 of FIG. In the figure, an operation terminal device 31 includes a line control unit 31a that controls data transfer between the devices constituting the system, and an operation input unit 31b that inputs an operation by an operator and generates an operation control message. . Although not shown, the other operation terminal devices 32 to 3
m has the same configuration as the operation terminal device 31 described above.
【0020】図4は図1の監視制御装置21〜2nの動
作を示すフローチャートであり、図5は図1の操作端末
装置31〜3mの動作を示すフローチャートである。ま
た、図6は本発明の一実施例による設備管理システムの
各装置間の通信シーケンスを示すシーケンスチャートで
あり、図7は図6に示す通信シーケンスのタイミングを
示すタイミングチャートである。これら図1〜図7を用
いて本発明の一実施例による設備管理システムの通信シ
ーケンスについて説明する。FIG. 4 is a flowchart showing the operation of the monitoring control devices 21 to 2n in FIG. 1, and FIG. 5 is a flowchart showing the operation of the operation terminal devices 31 to 3m in FIG. FIG. 6 is a sequence chart showing a communication sequence between each device of the equipment management system according to one embodiment of the present invention, and FIG. 7 is a timing chart showing the timing of the communication sequence shown in FIG. The communication sequence of the equipment management system according to one embodiment of the present invention will be described with reference to FIGS.
【0021】本発明の一実施例による設備管理システム
では監視制御装置21〜2nをx台毎(xは正の整数)
にブロック化し、このブロック毎に一斉ポーリングを行
っている。つまり、設備管理装置11はブロックNo.
1,ブロックNo.2,……,ブロックNo.b,……
の順に一斉ポーリングを行う。この場合ブロックNo.
1はアドレス#1〜#xの監視制御装置21〜2x、ブ
ロックNo.2はアドレス#(x+1)〜#2xの監視
制御装置2(x+1)〜2(2x),ブロックNo.b
はアドレス#[x(b−1)+1]〜#bxの監視制御
装置2[x(b−1)+1]〜2(bx)から夫々構成
されている。In the equipment management system according to the embodiment of the present invention, the monitoring control devices 21 to 2n are provided for every x units (x is a positive integer).
, And simultaneous polling is performed for each block. That is, the facility management apparatus 11 uses the block No.
1, block No. 2, ..., Block No. b, ...
All polling is performed in the order of. In this case, block No.
1 is the monitoring control device 21 to 2x of the address # 1 to #x, and the block No. 2 is the monitoring control device 2 (x + 1) to 2 (2x) of the address # (x + 1) to # 2x, and the block No. b
Are composed of monitoring control devices 2 [x (b-1) +1] to 2 (bx) at addresses # [x (b-1) +1] to #bx, respectively.
【0022】設備管理装置11がまずブロックNo.1
に一斉ポーリングを行うと、監視制御装置21〜2xは
自アドレスに対応して予め設定された遅延時間Dの後に
応答電文、つまり設備の状態を示す監視状態電文を送信
する(図4ステップS1,S6,S7)(図6参照)。The equipment management apparatus 11 first receives the block No. 1
When the simultaneous polling is performed, the monitoring control devices 21 to 2x transmit a response message, that is, a monitoring status message indicating the state of the equipment, after a delay time D set in advance corresponding to the own address (step S1, FIG. 4). S6, S7) (see FIG. 6).
【0023】設備管理装置11はブロックNo.1に対
する一斉ポーリングに続いて、各操作端末装置31〜3
mに対して監視制御装置21〜2nへの操作制御電文の
送出を許可する一斉送信権利解放ポーリングを行う。こ
の場合、各操作端末装置31〜3mはオペレータによる
操作が行われていれば操作制御電文を保持しているの
で、一斉送信権利解放ポーリングに同期して遅延なくそ
の操作制御電文を送信する(図5ステップS11,S1
4〜S16)(図6参照)。The equipment management device 11 has a block No. After the simultaneous polling of the operation terminals 1, the operation terminal devices 31 to 3
m, a simultaneous transmission right release polling for permitting transmission of the operation control message to the monitoring control devices 21 to 2n is performed. In this case, since each of the operation terminal devices 31 to 3m holds the operation control message if the operation is performed by the operator, it transmits the operation control message without delay in synchronization with the simultaneous transmission right release polling (FIG. 5 steps S11, S1
4 to S16) (see FIG. 6).
【0024】その後に、操作端末装置31〜3mは自ア
ドレスに対応して予め設定された遅延時間D1〜Dmの
後に同じ操作制御電文を再度送信(以下、再確認送信と
する)する(図5ステップS17,S18)(図6参
照)。Thereafter, the operation terminal devices 31 to 3m transmit the same operation control message again (hereinafter referred to as reconfirmation transmission) after the delay time D1 to Dm set in advance corresponding to the own address (FIG. 5). Steps S17 and S18) (see FIG. 6).
【0025】ここで、図7を用いて再確認送信時の遅延
時間について説明する。尚、図7において、t0は設備
管理装置11から操作端末装置31〜3mへの送信許可
電文(一斉送信権利解放ポーリングの信号)の送信時間
を示し、t1は操作端末装置31〜3mの操作制御電文
の送信時間を示し、t2は各電文間のタイムマージンを
示し、t3は操作端末装置固有でもつ遅延時間である。Here, the delay time at the time of reconfirmation transmission will be described with reference to FIG. In FIG. 7, t0 indicates a transmission time of a transmission permission message (broadcast transmission right release polling signal) from the facility management apparatus 11 to the operation terminal apparatuses 31 to 3m, and t1 indicates an operation control of the operation terminal apparatuses 31 to 3m. The transmission time of the message is indicated, t2 is a time margin between the messages, and t3 is a delay time inherent to the operation terminal device.
【0026】各操作端末装置31〜3mの再確認送信時
の遅延時間D1〜Dmは、 D1=(t1+t2)+t3×0 D2=(t1+t2)+t3×1 D3=(t1+t2)+t3×2 D4=(t1+t2)+t3×3 ・ ・ ・ Dm=(t1+t2)+t3×(m−1) となる。したがって、アドレス#1を含むアドレス#y
(y=1〜m)の遅延時間Dyは、 Dy=(t1+t2)+t3×(y−1) で表される。D1 = (t1 + t2) + t3 × 0 D2 = (t1 + t2) + t3 × 1 D3 = (t1 + t2) + t3 × 2 D4 = (t1 + t2) + t3 × 0 t1 + t2) + t3 × 3 Dm = (t1 + t2) + t3 × (m−1) Therefore, address #y including address # 1
The delay time Dy of (y = 1 to m) is represented by Dy = (t1 + t2) + t3 × (y-1).
【0027】上述した操作端末装置31〜3mにおける
操作制御電文の送信中にブロックに対する一斉ポーリン
グを受信すると(図5ステップS11,S12)、操作
端末装置31〜3mはその操作制御電文の送信を中断す
る(図5ステップS13)。また、監視制御装置21〜
2nは監視状態電文の送信中に一斉送信権利解放ポーリ
ングを受信すると(図4ステップS1,S2)、その監
視状態電文の送信を中断する(図4ステップS3)。更
に、監視制御装置21〜2nは操作制御電文を含む制御
電文の受信であれば(図4ステップS4)、その制御電
文を受信する(図4ステップS5)。When simultaneous polling of the blocks is received during the transmission of the operation control message in the operation terminal devices 31 to 3m (steps S11 and S12 in FIG. 5), the operation terminal devices 31 to 3m interrupt the transmission of the operation control message. (Step S13 in FIG. 5). Also, the monitoring control devices 21 to 21
2n, upon receiving the simultaneous transmission right release polling during transmission of the monitoring state message (steps S1 and S2 in FIG. 4), interrupts transmission of the monitoring state message (step S3 in FIG. 4). Further, when the monitoring control devices 21 to 2n receive the control message including the operation control message (Step S4 in FIG. 4), they receive the control message (Step S5 in FIG. 4).
【0028】設備管理装置11は操作端末装置31〜3
mに対する一斉送信権利解放ポーリングが終了すると、
つまり操作端末装置31〜3mのうちの最大アドレス
(#m)の操作端末装置3mが操作制御電文の送信を終
わる時間Tmが経過すると、次のブロックNo.2に対
する一斉ポーリングをブロックNo.1に対する一斉ポ
ーリングと同様にして行う。このブロックNo.2に対
する一斉ポーリングが終了すると、つまりブロックN
o.2内の最大アドレス(#2x)の監視制御装置2
(2x)が監視状態電文の送信を終わる時間Txが経過
すると、設備管理装置11は、上記と同様にして操作端
末装置31〜3mに対する一斉送信権利解放ポーリング
を行う(図6参照)。The equipment management device 11 includes operation terminal devices 31 to 3
When the broadcast right release polling for m is completed,
That is, when the time Tm at which the operation terminal device 3m of the maximum address (#m) among the operation terminal devices 31 to 3m finishes transmitting the operation control message has elapsed, the next block No. Block polling for block 2 is performed. This is performed in the same manner as the simultaneous polling for 1. This block No. 2 is completed, that is, block N
o. Monitor control device 2 of the maximum address (# 2x)
When the time Tx at which (2x) ends transmission of the monitoring state message has elapsed, the facility management apparatus 11 performs simultaneous transmission right release polling on the operation terminal apparatuses 31 to 3m in the same manner as described above (see FIG. 6).
【0029】設備管理装置11からの一斉送信権利解放
ポーリングを受信した操作端末装置31〜3mはオペレ
ータの操作による操作制御電文を保持していれば、その
操作電文を送信する。したがって、監視制御装置の数が
多数の時も、操作端末装置31〜3mの操作レスポンス
を確保したまま、監視制御装置21〜2nの状態収集の
効率化を図ることができる。The operation terminal devices 31 to 3m, which have received the simultaneous transmission right release polling from the facility management device 11, hold the operation control message by the operation of the operator and transmit the operation message. Therefore, even when the number of monitoring control devices is large, the efficiency of state collection of the monitoring control devices 21 to 2n can be improved while ensuring the operation response of the operation terminal devices 31 to 3m.
【0030】図8は本発明の一実施例による一斉送信権
利解放ポーリングを用いない時の動作を示すシーケンス
チャートであり、図9は本発明の一実施例による一斉送
信権利解放ポーリングを用いた時の動作を示すシーケン
スチャートである。これら図8及び図9を用いて本発明
の一実施例による一斉送信権利解放ポーリングについて
説明する。FIG. 8 is a sequence chart showing the operation when the simultaneous transmission right release polling is not used according to one embodiment of the present invention. FIG. 9 is the sequence chart when the simultaneous transmission right release polling according to one embodiment of the present invention is used. 6 is a sequence chart showing the operation of FIG. The simultaneous transmission right release polling according to an embodiment of the present invention will be described with reference to FIGS.
【0031】一斉送信権利解放ポーリングを用いない場
合、操作端末装置31〜3mは一斉ポーリングの受信に
同期して操作制御電文の送信タイミングの計測を行う。
操作端末装置31〜3mからの操作制御電文の送信は送
信タイミングの計測値がTmin未満の場合に監視制御
装置21〜2nからの監視状態電文の送信と輻輳し、送
信タイミングの計測値がTmaxを越える場合に設備管
理装置11からの一斉ポーリングの送信と輻輳すること
になる。When the simultaneous transmission right release polling is not used, the operation terminal devices 31 to 3m measure the transmission timing of the operation control message in synchronization with the reception of the simultaneous polling.
The transmission of the operation control message from the operation terminal devices 31 to 3m is congested with the transmission of the monitoring state message from the monitoring control devices 21 to 2n when the measured value of the transmission timing is less than Tmin, and the measured value of the transmission timing is Tmax. If it exceeds, transmission of simultaneous polling from the equipment management apparatus 11 will cause congestion.
【0032】そこで、例えば操作端末装置31〜3mが
送信タイミングの計測を開始してから操作aが行われた
とすると、操作aに対応する操作制御電文bの送信は送
信タイミングの計測値がTminを越える前に行わなけ
ればならない。このタイミング以外に操作制御電文bの
送信を行うと、上記のような輻輳を招くこととなる(図
8)参照)。Therefore, for example, if operation a is performed after the operation terminal devices 31 to 3m start measuring the transmission timing, the transmission of the operation control message b corresponding to the operation a is performed when the transmission timing measurement value is Tmin. Must be done before crossing. If the operation control message b is transmitted at a timing other than this timing, the above congestion will be caused (see FIG. 8).
【0033】一方、一斉送信権利解放ポーリングを用い
る場合、操作端末装置31〜3mは一斉送信権利解放ポ
ーリングの受信に同期して操作制御電文の送信を直ちに
行うことができる。すなわち、上記のような輻輳の発生
を招くことがなくなる。On the other hand, when the simultaneous transmission right release polling is used, the operation terminal devices 31 to 3m can immediately transmit the operation control message in synchronization with the reception of the simultaneous transmission right release polling. That is, the occurrence of the congestion as described above does not occur.
【0034】この場合、設備管理装置11が一斉ポーリ
ングを送信してから操作aが行われても、操作端末装置
31〜3mでは一斉送信権利解放ポーリングを受信して
いないために一斉送信権利禁止期間となっており、操作
aに対応する操作制御電文cの送信が禁止されている。
そこで、操作端末装置31〜3mではその操作制御電文
cを一斉送信権利解放ポーリングの受信まで保持する。In this case, even if the operation a is performed after the facility management apparatus 11 transmits the simultaneous polling, the simultaneous transmission right prohibition period is not received since the operation terminal apparatuses 31 to 3m do not receive the simultaneous transmission right release polling. The transmission of the operation control message c corresponding to the operation a is prohibited.
Therefore, the operation terminal devices 31 to 3m hold the operation control message c until the simultaneous transmission right release polling is received.
【0035】操作端末装置31〜3mは一斉送信権利解
放ポーリングを受信すると一斉送信権利解放期間となる
ので、それまで保持していた操作制御電文cの送信を一
斉送信権利解放ポーリングの受信に同期して行う(図9
参照)。When the operation terminal devices 31 to 3m receive the simultaneous transmission right release polling, the simultaneous transmission right release period starts. Therefore, the transmission of the operation control message c held until then is synchronized with the reception of the simultaneous transmission right release polling. (Fig. 9
reference).
【0036】図10は本発明の一実施例による再確認送
信を行わない場合の動作を示すシーケンスチャートであ
り、図11は本発明の一実施例による再確認送信を行う
場合の動作を示すシーケンスチャートである。これら図
10及び図11を用いて本発明の一実施例による再確認
送信について説明する。FIG. 10 is a sequence chart showing an operation when reconfirmation transmission is not performed according to one embodiment of the present invention, and FIG. 11 is a sequence chart showing an operation when reconfirmation transmission is performed according to one embodiment of the present invention. It is a chart. The reconfirmation transmission according to one embodiment of the present invention will be described with reference to FIGS.
【0037】再確認送信を行わない場合、例えば設備管
理装置11から一斉ポーリングが送信されてから操作端
末装置31〜3mでの送信タイミングの計測値がTmi
nになる前に操作端末装置31,32に対して操作d,
eが行われると、操作端末装置31,32は送信タイミ
ングの計測値がTminを越えた時に操作d,eに夫々
対応する操作制御電文f,gを送信する。この場合、操
作端末装置31,32は送信タイミングの計測値に基づ
いて操作制御電文f,gの送信を行うので、操作制御電
文f,gの送信が輻輳することとなる(図10参照)。When the reconfirmation transmission is not performed, for example, after the simultaneous polling is transmitted from the facility management apparatus 11, the measurement value of the transmission timing at the operation terminal apparatuses 31 to 3m becomes Tmi.
before the operation terminal device 31 or 32 is operated,
When e is performed, the operation terminal devices 31 and 32 transmit operation control messages f and g respectively corresponding to the operations d and e when the measured value of the transmission timing exceeds Tmin. In this case, since the operation terminal devices 31 and 32 transmit the operation control messages f and g based on the measurement values of the transmission timing, the transmission of the operation control messages f and g is congested (see FIG. 10).
【0038】これに対し、再確認送信を行う場合、上記
のように、操作端末装置31,32に対して操作d,e
が行われると、操作端末装置31,32は一斉送信権利
解放ポーリングの受信に同期して操作d,eに夫々対応
する操作制御電文f,gの送信を行う。操作端末装置3
1,32は操作制御電文f,gの送信後、操作制御電文
f,gと夫々同じ操作制御電文h,iを、各々のアドレ
ス#1,#2に応じて予め設定された遅延時間D1,D
2が経過した後に送信する(図11参照)。On the other hand, when the reconfirmation transmission is performed, as described above, the operation d, e
Is performed, the operation terminal devices 31 and 32 transmit operation control messages f and g corresponding to the operations d and e, respectively, in synchronization with the reception of the simultaneous transmission right release polling. Operation terminal device 3
After the transmission of the operation control messages f and g, the operation control messages h and i, which are the same as the operation control messages f and g, respectively, are transmitted to the delay times D1 and D2 set in advance in accordance with the respective addresses # 1 and # 2. D
2 is transmitted (see FIG. 11).
【0039】この場合、監視制御装置21〜2nは操作
端末装置31,32から夫々連続して同一の操作制御電
文f,hまたは操作制御電文g,iを受信しなければ異
常と判断する。したがって、一斉送信権利解放ポーリン
グの受信後に、操作端末装置31,32からの操作制御
電文f,gの送信が輻輳しても、操作制御電文f,gと
同じ内容の操作制御電文h,iが夫々時間をずらして送
信されるので、操作制御電文f,gの送信の輻輳による
悪影響を回避することができる。In this case, the monitoring control devices 21 to 2n judge that an abnormality has occurred unless the same operation control messages f and h or operation control messages g and i are continuously received from the operation terminal devices 31 and 32, respectively. Therefore, even if the transmission of the operation control messages f and g from the operation terminal devices 31 and 32 becomes congested after receiving the simultaneous transmission right release polling, the operation control messages h and i having the same contents as the operation control messages f and g are transmitted. Since the transmissions are performed at different times, it is possible to avoid an adverse effect due to the congestion of the transmission of the operation control messages f and g.
【0040】このように設備管理装置11から、監視制
御装置21〜2nに監視状態電文の送信を許可する一斉
ポーリングと、操作端末装置31〜3mに操作制御電文
の送信を許可する一斉送信権利解放ポーリングとを送信
することによって、操作端末装置31〜3m各々が送信
タイミングの同期を取得することができるので、操作制
御電文の送信のための同期タイミングを計測する方式に
比べて信頼性を確保することができる。As described above, the simultaneous polling from the equipment management apparatus 11 to the monitoring control apparatuses 21 to 2n to permit transmission of the monitoring state message and the simultaneous transmission right release from the operation terminal apparatuses 31 to 3m to permit the transmission of the operation control message. By transmitting the polling, each of the operation terminal devices 31 to 3m can acquire the synchronization of the transmission timing. Therefore, reliability is ensured as compared with the method of measuring the synchronization timing for transmitting the operation control message. be able to.
【0041】また、操作端末装置31〜3mが一斉送信
権利解放ポーリングの受信に応答して操作制御電文を送
信した後、同じ操作制御電文をアドレス#1〜#mに対
応して予め設定された遅延時間D1〜Dmの経過後に再
度送信することによって、監視制御装置21〜2nから
の監視状態電文の送信と操作端末装置31〜3mからの
操作制御電文の送信との輻輳や操作端末装置31〜3m
からの操作制御電文の送信同士の輻輳を防止することが
できるとともに、監視制御装置21〜2nが受信した操
作制御電文の誤認識を防止することができるので、操作
制御電文の信頼性を確保することができる。After the operation terminal devices 31 to 3m transmit the operation control message in response to the reception of the simultaneous transmission right release polling, the same operation control message is set in advance corresponding to the addresses # 1 to #m. By transmitting again after the delay times D1 to Dm elapse, the congestion between the transmission of the monitoring state message from the monitoring control devices 21 to 2n and the transmission of the operation control message from the operation terminal devices 31 to 3m and the operation terminal device 31 to 31m. 3m
Can prevent congestion between transmissions of operation control messages from the network, and can prevent erroneous recognition of operation control messages received by the monitoring control devices 21 to 2n, thereby ensuring reliability of the operation control messages. be able to.
【0042】[0042]
【発明の効果】以上説明したように本発明の設備管理シ
ステムによれば、監視制御装置に対して監視情報の送出
を許可する一斉ポーリングの送信と、端末装置に対して
監視制御装置への操作情報の送信を許可する一斉送信権
利解放ポーリングの送信とを行う機能をセンタ装置に備
えることによって、設備に対する操作情報の送信の輻輳
を防止することができ、当該操作情報の信頼性を確保す
ることができるという効果がある。As described above, according to the equipment management system of the present invention, simultaneous polling transmission for permitting transmission of monitoring information to the supervisory control device and operation of the terminal device to the supervisory control device are performed. By providing the center device with a function of performing simultaneous transmission right release polling that permits transmission of information, congestion of transmission of operation information to equipment can be prevented, and reliability of the operation information can be ensured. There is an effect that can be.
【0043】また、本発明の他の設備管理システムによ
れば、一斉送信権利解放ポーリングの受信に応答して操
作情報を送信した後、同じ操作情報を各端末装置個別に
設定された遅延時間の経過後に再度送信することによっ
て、設備に対する操作情報の輻輳を防止することがで
き、当該操作情報の信頼性を確保することができるとい
う効果がある。According to another equipment management system of the present invention, after transmitting operation information in response to the reception of the simultaneous transmission right release polling, the same operation information is transmitted for the delay time set individually for each terminal device. By transmitting the information again after the elapse, it is possible to prevent the operation information from being congested with respect to the equipment, and to ensure the reliability of the operation information.
【図1】本発明の一実施例による設備管理システムの構
成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of an equipment management system according to an embodiment of the present invention.
【図2】図1の監視制御装置の構成を示すブロック図で
ある。FIG. 2 is a block diagram illustrating a configuration of the monitoring control device of FIG. 1;
【図3】図1の操作端末装置の構成を示すブロック図で
ある。FIG. 3 is a block diagram illustrating a configuration of the operation terminal device of FIG. 1;
【図4】図1の監視制御装置の動作を示すフローチャー
トである。FIG. 4 is a flowchart illustrating an operation of the monitoring control device of FIG. 1;
【図5】図1の操作端末装置の動作を示すフローチャー
トである。FIG. 5 is a flowchart showing an operation of the operation terminal device of FIG. 1;
【図6】本発明の一実施例による設備管理システムの各
装置間の通信シーケンスを示すシーケンスチャートであ
る。FIG. 6 is a sequence chart showing a communication sequence between each device of the equipment management system according to one embodiment of the present invention.
【図7】図6に示す通信シーケンスのタイミングを示す
タイミングチャートである。FIG. 7 is a timing chart showing the timing of the communication sequence shown in FIG.
【図8】本発明の一実施例による一斉送信権利解放ポー
リングを用いない時の動作を示すシーケンスチャートで
ある。FIG. 8 is a sequence chart showing an operation when broadcast polling release polling is not used according to an embodiment of the present invention.
【図9】本発明の一実施例による一斉送信権利解放ポー
リングを用いる時の動作を示すシーケンスチャートであ
る。FIG. 9 is a sequence chart showing an operation when using broadcast right release polling according to an embodiment of the present invention;
【図10】本発明の一実施例による再確認送信を行わな
い場合の動作を示すシーケンスチャートである。FIG. 10 is a sequence chart showing an operation when reconfirmation transmission is not performed according to an embodiment of the present invention.
【図11】本発明の一実施例による再確認送信を行う場
合の動作を示すシーケンスチャートである。FIG. 11 is a sequence chart showing an operation when performing reconfirmation transmission according to an embodiment of the present invention.
11 設備管理装置 21〜2n 監視制御装置 31〜3m 操作端末装置 21a,31a 回線制御部 21b 監視部 21c 制御部 31b 操作入力部 11 Equipment management device 21-2n Monitoring control device 31-3m Operation terminal device 21a, 31a Line control unit 21b Monitoring unit 21c Control unit 31b Operation input unit
Claims (4)
置と、各々前記設備を制御しかつ前記設備の状態を監視
情報として前記センタ装置に送出する複数の監視制御装
置と、各々前記設備に対する外部からの操作情報を前記
複数の監視制御装置に送出する複数の端末装置とを含
み、前記センタ装置からの一斉ポーリング信号に応答し
て前記複数の監視制御装置各々から前記センタ装置に前
記監視情報を順次送出するよう構成された設備管理シス
テムであって、前記複数の端末装置各々に前記複数の監
視制御装置各々への前記操作情報の送出を許可する一斉
送信権利解放ポーリング信号を出力する手段を前記セン
タ装置に有することを特徴とする設備管理システム。1. A center device for centrally managing the status of various facilities, a plurality of monitoring and control devices for controlling the respective facilities and transmitting the status of the facilities to the center device as monitoring information, and an external device for each of the facilities. A plurality of terminal devices for sending operation information from the plurality of monitoring control devices to the plurality of monitoring control devices, and the monitoring information is transmitted from the plurality of monitoring control devices to the center device in response to a simultaneous polling signal from the center device. The facility management system configured to sequentially transmit, the means for outputting a simultaneous transmission right release polling signal that permits each of the plurality of terminal devices to transmit the operation information to each of the plurality of monitoring control devices. An equipment management system provided in a center device.
応答して前記複数の監視制御装置に前記操作情報を送出
する送出手段を前記複数の端末装置各々に含むことを特
徴とする請求項1記載の設備管理システム。2. The terminal device according to claim 1, wherein each of the plurality of terminal devices includes transmitting means for transmitting the operation information to the plurality of monitoring control devices in response to the simultaneous transmission right release polling signal. Equipment management system.
ポーリング信号に同期して前記操作情報を送出しかつ当
該操作情報を送出してから前記複数の端末装置各々個別
に予め設定された遅延時間後に同一の操作情報を再度送
出するよう構成したことを特徴とする請求項2記載の設
備管理システム。3. The transmission means transmits the operation information in synchronization with the simultaneous transmission right release polling signal, and sets a delay time set individually for each of the plurality of terminal devices after transmitting the operation information. 3. The equipment management system according to claim 2, wherein the same operation information is transmitted again later.
斉送信権利解放ポーリング信号が入力されるまで保持す
る手段を前記複数の端末装置各々に含むことを特徴とす
る請求項1から請求項3のいずれか記載の設備管理シス
テム。4. The terminal device according to claim 1, wherein each of the plurality of terminal devices includes means for holding external operation information at least until the simultaneous transmission right release polling signal is input. Or the equipment management system described.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5127897A JPH10248095A (en) | 1997-03-06 | 1997-03-06 | Installation management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5127897A JPH10248095A (en) | 1997-03-06 | 1997-03-06 | Installation management system |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10248095A true JPH10248095A (en) | 1998-09-14 |
Family
ID=12882483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5127897A Withdrawn JPH10248095A (en) | 1997-03-06 | 1997-03-06 | Installation management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10248095A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002074555A (en) * | 2000-08-29 | 2002-03-15 | Nittan Co Ltd | Disaster prevention system |
JP2002544635A (en) * | 1999-05-13 | 2002-12-24 | ハネウェル・インコーポレーテッド | Wireless control network with scheduled time slots |
JP2004005757A (en) * | 2003-09-18 | 2004-01-08 | Taiheiyo Kouhatsu Kk | Program for monitoring underground |
-
1997
- 1997-03-06 JP JP5127897A patent/JPH10248095A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002544635A (en) * | 1999-05-13 | 2002-12-24 | ハネウェル・インコーポレーテッド | Wireless control network with scheduled time slots |
JP2002074555A (en) * | 2000-08-29 | 2002-03-15 | Nittan Co Ltd | Disaster prevention system |
JP2004005757A (en) * | 2003-09-18 | 2004-01-08 | Taiheiyo Kouhatsu Kk | Program for monitoring underground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH10248095A (en) | Installation management system | |
JPS61177047A (en) | Centralized control system for terminal | |
JP2009118298A (en) | Control system and communication control method | |
JP2010063010A (en) | Fault monitoring system and fault monitoring method | |
CN100367262C (en) | Method and device for testing a monitoring function of a bus system and a corresponding bus system | |
JP2002237827A (en) | Lan controller, driver, switching hub and lan controller automatic switching system having them | |
JP2001223722A (en) | Centralized fault monitor system | |
JPH01220094A (en) | Home bus system | |
JP2001341953A (en) | Control device for elevator | |
JP4137304B2 (en) | Packet communication network failure detection method | |
JP2865047B2 (en) | Bus monitoring method | |
JP3836671B2 (en) | Network duplexing apparatus and method | |
JP3703603B2 (en) | Virtual terminal | |
JP2021026284A (en) | Fire alarm facility and renewal method of fire alarm facility | |
JP5349215B2 (en) | Equipment remote monitoring system | |
JPH0326096A (en) | Cpu resetting system for controller to be supervised | |
JP2699904B2 (en) | Network system | |
JPH01183937A (en) | Network supervising system | |
JP2009199376A (en) | Crime-prevention system | |
JPH10233792A (en) | Polling system/method | |
JPS6376539A (en) | Repeater calling epuipment | |
JPH1023046A (en) | Poling type monitoring method | |
JPH02277397A (en) | Remote supervisory system | |
JPS63240147A (en) | Status supervisory system | |
JPH0495199A (en) | Remote monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Application deemed to be withdrawn because no request for examination was validly filed |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20040511 |