JPH10245840A - Surface layer ground construction block, surface layer ground using the same, and method for constructing plant utilizing the surface layer ground - Google Patents

Surface layer ground construction block, surface layer ground using the same, and method for constructing plant utilizing the surface layer ground

Info

Publication number
JPH10245840A
JPH10245840A JP9870698A JP9870698A JPH10245840A JP H10245840 A JPH10245840 A JP H10245840A JP 9870698 A JP9870698 A JP 9870698A JP 9870698 A JP9870698 A JP 9870698A JP H10245840 A JPH10245840 A JP H10245840A
Authority
JP
Japan
Prior art keywords
block
ground
surface ground
surface layer
formation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9870698A
Other languages
Japanese (ja)
Other versions
JP3226869B2 (en
Inventor
Tadashi Matsuura
忠 松浦
Katsuichi Nagase
勝一 長瀬
Koichi Nochida
孝一 後田
Akinori Tajiri
明徳 田尻
Sakae Ebata
栄 江端
Naoto Yoshida
直人 吉田
Keiya Sato
圭也 佐藤
Tatsuo Makita
辰雄 牧田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Plant Technologies Ltd
Original Assignee
Hitachi Ltd
Hitachi Plant Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Plant Technologies Ltd filed Critical Hitachi Ltd
Priority to JP09870698A priority Critical patent/JP3226869B2/en
Publication of JPH10245840A publication Critical patent/JPH10245840A/en
Application granted granted Critical
Publication of JP3226869B2 publication Critical patent/JP3226869B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To contrive suppression of mutual dislocation of surface layer ground construction blocks and facilitation of laying-on and removal by providing a difference in a level vertically overlapped on adjacent blocks on the peripheral part of the block fixing a solidification body layer on the lower side and providing a hanging fitting for horizontally hanging the block. SOLUTION: The upper side surface of reinforced concrete 4 is covered with an iron plate 5 to be made a block 1, and a hanging fitting 7 is fixedly or detachably provided on the iron plate 5. A horizontal projection part 12 and a horizontal recess part 13 provided on opposite short side peripheral parts are engaged, so that the block 1 suppresses horizontal dislocation, and it is made structure for suppressing vertical location by disposing a lower side overhang part 14 so as to receive an upper side overhang part 15. A wire 19 is hung between a hanging fitting 7 and the hook 18 of a heavy hoist, and set at a prescribed position of hanging in the horizontal direction. Laying and removal of the ground and facilitated by using the surface layer ground construction block 1, and a normal reinforced ground face is maintained even in a boundary by suppressing the dislocation between the blocks 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、大きな地耐圧を要
する大型機材稼働エリア、あるいは重量製品の保管エリ
アにおいて、地盤造成、並びに撤去に関わる作業を簡略
化する技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for simplifying the work related to ground preparation and removal in a large equipment operation area requiring a large ground pressure or a storage area for heavy products.

【0002】[0002]

【従来の技術】原子力発電プラント、並びに再処理設備
における重量製品の据付工事では、製品の物量が大きい
ことに加えて、単品製品の重量が大きいこともあり、製
品据付用の揚重機用地盤及び重量製品保管用地盤の補強
が不可欠である。
2. Description of the Related Art In the installation of heavy products in a nuclear power plant and a reprocessing facility, in addition to the large amount of products, the weight of a single product may be large. It is essential to reinforce the ground for storing heavy products.

【0003】大負荷に耐える地盤養生としては、鉄筋入
りコンクリートによる表層補強の地盤造成が一般的であ
る(従来技術−1)。
[0003] As a ground curing that can withstand a large load, it is common to create a ground with a surface layer reinforced by concrete containing reinforcing steel (prior art-1).

【0004】また、一時的に大負荷に耐えられるように
鉄板を地面に敷き詰める方法も用いられている(従来技
術−2)。
[0004] A method of laying an iron plate on the ground so as to temporarily withstand a large load is also used (prior art-2).

【0005】さらには、地盤への杭打ちによる強化方法
も用いられる(従来技術−3)。
Further, a method of reinforcing the ground by piling is also used (prior art-3).

【0006】これらの従来技術の存在は、特公平4−711
96号公報の第5欄中第31行目から第37行目にかけて
指摘されている。
[0006] The existence of these prior arts is disclosed in
It is pointed out from the 31st line to the 37th line in the fifth column of the 96 publication.

【0007】[0007]

【発明が解決しようとする課題】杭打ちによる地盤強化
は手間がかかるので、鉄板を地面に敷き詰める方法が手
間のかからない方法としては採用できるが、鉄板だけで
は強度不足の上、ずれやすくて一時的にしか利用出来な
い。
The hardening of the ground by pile driving is time-consuming, so a method of laying an iron plate on the ground can be adopted as a time-saving method. However, the iron plate alone is insufficient in strength and easily shifts temporarily. Only available to.

【0008】上記で示した従来技術−1による地盤の補
強方法は、コンクリートの養成期間を必要とするから期
間がかかりすぎる。しかも、補強地盤を使用終了した後
の撤去を考慮していない。この地盤を撤去するには、地
盤表層を形成する鉄筋入りコンクリートを、ブルドーザ
ー,ダンプトラックなどの運搬用機材で運搬可能な大き
さにまで十分に破砕して撤去する必要がある。
[0008] The method of reinforcing the ground according to the prior art 1 described above requires a concrete training period, which takes too much time. Moreover, it does not consider removal after the use of the reinforced ground. In order to remove the ground, it is necessary to sufficiently crush the concrete with the reinforcing steel forming the surface of the ground to a size that can be transported by transporting equipment such as a bulldozer or a dump truck and then remove the ground.

【0009】原子力発電所のプラント建設は、図1に示
すような大型の建設用揚重機である移動式揚重機2(通
称クローラークレーン)を用いて原子力発電プラント構
成製品3の搬入を行っている。
In the construction of a plant of a nuclear power plant, the components 3 of the nuclear power plant are carried in using a mobile lifting machine 2 (commonly called a crawler crane) which is a large-sized construction lifting machine as shown in FIG. .

【0010】従来技術の組み合わせとして、強化地盤を
鉄筋コンクリートと鉄板で構成する計画もあり得る。
[0010] As a combination of the prior art, there may be a plan to construct the reinforced ground with reinforced concrete and steel plates.

【0011】原子力発電プラント構成品のように大型で
大重量の製品を搬入することができるような大型の移動
式揚重機の場合、接地圧が非常に大きなもの(最大で約
90t/平方メートル)となる。
In the case of a large-sized mobile hoist capable of carrying a large and heavy product such as a component of a nuclear power plant, the ground pressure is very large (at most about 90 t / m 2). Become.

【0012】このような大きな接地圧を有する大型の移
動式揚重機2を稼働させるためには、それに十分に耐え
る強固な基礎地盤を造成しておく必要がある。但し、原
子力発電プラントの場合、大型の移動式揚重機2が稼働
しているエリア、あるいは、基礎地盤として用いている
範囲にも恒久的には他の計画物が設定されることが多い
ため、大型の移動式揚重機2の稼働用に造成された地盤
は、原子力発電プラントの建設が進行し、大型の移動式
揚重機2が必要でなくなった段階で撤去される。従来の
大型の移動式揚重機2用の基礎地盤は、鉄筋コンクリー
トと鉄板で構成されている。
[0012] In order to operate the large-sized mobile lifting machine 2 having such a large contact pressure, it is necessary to construct a solid foundation ground capable of withstanding the heavy lifting machine 2 sufficiently. However, in the case of a nuclear power plant, other projects are often set permanently in the area where the large mobile lifting machine 2 is operating or in the range used as the foundation ground. The ground created for the operation of the large mobile hoist 2 is removed when the construction of the nuclear power plant progresses and the large mobile hoist 2 becomes unnecessary. The foundation ground for the conventional large-sized mobile lifting machine 2 is composed of reinforced concrete and an iron plate.

【0013】これを撤去するには、強化地盤を構成する
鉄筋コンクリートをトラック等の輸送機器による運搬が
可能な大きさにまで十分に破砕しなければならない。ま
た、一度破砕した鉄筋コンクリートを別の場所で大型の
移動式揚重機2用の基礎地盤として再利用することは不
可能である。
In order to remove the reinforced concrete, the reinforced concrete constituting the reinforced ground must be sufficiently crushed to a size that can be transported by a transportation device such as a truck. Further, it is impossible to reuse the reinforced concrete once crushed as the foundation ground for the large-sized mobile hoist 2 at another place.

【0014】このため、大きな地耐圧を要する大型機材
稼働エリアにおいて可搬式で、設定,撤去が簡単で、し
かも再利用が可能な仮設の強化地盤造成用手段が要望さ
れる。
[0014] Therefore, there is a demand for a temporary reinforced ground forming means which is portable, can be easily set and removed, and can be reused in a large equipment operation area requiring a large ground pressure.

【0015】本発明の第1目的は、再利用が可能で、複
数個設置した際における上下方向での相互のずれを抑制
でき、且つ容易に敷設又は撤去できる表層地盤造成用ブ
ロックを提供することであり、第2目的は、その表層地
盤造成用ブロックを用いた表層地盤を提供することであ
り、第3目的は、その表層地盤を用いたプラント建設方
法を提供することにある。
[0015] A first object of the present invention is to provide a surface ground building block which can be reused, can suppress the mutual displacement in the vertical direction when a plurality of the grounds are installed, and can be easily laid or removed. The second object is to provide a surface layer using the surface layer formation block, and the third object is to provide a plant construction method using the surface layer.

【0016】[0016]

【課題を解決するための手段】第1目的を達成するため
の第1手段は、固化体層を金属板の下側に固定したブロ
ックを備え、前記ブロックは周辺部に隣接する前記ブロ
ックと上下方向に重なる段差部が備えられ、さらには前
記ブロックを水平に吊ることが出来る前記ブロックの複
数箇所の部位に吊り金具が固定的に又は着脱自在に装備
されていることを特徴とした表層地盤造成用ブロックで
ある。
A first means for achieving the first object comprises a block in which a solidified layer is fixed to a lower side of a metal plate, and the block is vertically connected to the block adjacent to a peripheral portion. A stepped portion that overlaps in a direction, and furthermore, a hanging metal fitting is fixedly or detachably mounted at a plurality of portions of the block that can horizontally hang the block, and Block.

【0017】同じく第2手段は、第1手段において、吊
り金具がブロックの上面より下方の位置に装備されてい
ることを特徴とした表層地盤造成用ブロックである。
Similarly, the second means is a surface ground formation block characterized in that the hanging means is provided at a position below the upper surface of the block in the first means.

【0018】同じく第3手段は、第1手段又は第2手段
において、前記固化体層は鉄筋コンクリートであり、前
記鉄筋コンクリートと金属板とは前記鉄筋コンクリート
に埋設固定した部材により固定されていることを特徴と
した表層地盤造成用ブロック。
[0018] A third means is the first means or the second means, wherein the solidified layer is reinforced concrete, and the reinforced concrete and the metal plate are fixed by a member embedded and fixed in the reinforced concrete. Block for surface ground preparation.

【0019】同じく第4手段は、第1手段から第3手段
までのいずれか一手段において、前記ブロックは隣接す
る各前記ブロックに係合される複数の水平方向ずれ抑制
係合部を周辺部に備えることを特徴とした表層地盤造成
用ブロックである。
[0019] The fourth means is the device according to any one of the first means to the third means, wherein the block is provided with a plurality of horizontal displacement suppressing engaging portions which are engaged with each of the adjacent blocks. It is a block for surface ground preparation characterized by having.

【0020】第2目的を達成するための第5手段は、造
成用地盤の表層部に、第1手段から第4手段までのいず
れか一手段の複数の表層地盤造成用ブロックを、周辺部
の前記段差部同志を重ね合わせた状態で敷き詰めて成る
表層地盤である。
A fifth means for attaining the second object is that a plurality of surface ground formation blocks of any one of the first to fourth means are provided on the surface layer of the formation ground, This is a surface ground formed by laying the step portions together in an overlapping manner.

【0021】同じく第6手段は、第5手段において、第
4手段の表層地盤造成用ブロックに設けられた水平方向
ずれ抑制係合部と、隣接する他の表層地盤造成用ブロッ
クに設けられた水平方向ずれ抑制係合部とを、互いに係
合した表層地盤である。
The sixth means is the same as the fifth means, except that the horizontal displacement suppressing engagement portion provided on the surface ground formation block of the fourth means and the horizontal displacement prevention engagement portion provided on the other adjacent surface ground formation block are provided. It is a surface layer ground which mutually engaged the direction shift suppressing engagement part.

【0022】同じく第7手段は、第5手段又は第6手段
において、造成用地盤の表層部に調整砂を置いて、その
調整砂の上方に複数の前記表層地盤造成用ブロックを敷
き詰めて成る表層地盤である。
[0022] A seventh means is the same as the fifth means or the sixth means, except that the adjustment sand is placed on the surface layer of the formation ground, and a plurality of the surface formation blocks are spread over the adjustment sand. It is the ground.

【0023】第3目的を達成するための第8手段は、第
5手段から第7手段までのいずれか一手段の前記表層地
盤上に移動式揚重機を載せ、その後に前記表層地盤上で
前記移動式揚重機を稼働させることによりプラント構成
品の所定の場所への吊り込み作業を行うプラントの建設
方法である。
Eighth means for achieving the third object is to mount a mobile lifting machine on the surface ground of any one of the fifth means to the seventh means, and thereafter, on the surface ground, This is a method for constructing a plant in which a mobile lifting machine is operated to suspend a plant component at a predetermined place.

【0024】同じく第9手段は、第8手段において、プ
ラント構成品は吊り込み作業前に大組されていることを
特徴としたプラント建設方法である。
A ninth means is a plant construction method according to the eighth means, wherein the plant components are assembled in large groups before the hanging operation.

【0025】第1手段によれば、表層地盤造成用ブロッ
クをほぼ水平に吊って取り扱うことが出来るので、表層
地盤造成用ブロックを地盤表層に敷き詰めて表層地盤が
簡単に造成でき、かつ表層地盤の撤去も容易である。ま
た、この表層地盤造成用ブロックは再利用が可能であ
る。しかも、表層地盤造成用ブロックを地盤表層部に敷
き詰めた際に、隣接する表層地盤造成用ブロック同志は
上下方向において一部が重ね合わせられるから、表層地
盤造成用ブロックの上下方向のずれが抑制され、且つ隣
接する表層地盤造成用ブロック同志間で荷重伝達が円滑
に行われる。従って、重量物である移動式揚重機が表層
地盤造成用ブロック上を移動してもその揚重機の重量を
隣接する他の表層地盤造成用ブロックに分散させて受け
持たせることができるという作用が得られる。
[0025] According to the first means, the surface ground formation block can be suspended and handled almost horizontally, so that the surface ground formation block can be spread over the ground surface to easily form the surface ground, and the surface ground can be formed easily. Removal is also easy. Also, the surface layer block can be reused. In addition, when the surface ground formation block is laid on the ground surface layer, the adjacent surface ground formation blocks are partially overlapped in the vertical direction, so that the vertical displacement of the surface ground formation block is suppressed. In addition, the load can be smoothly transmitted between the adjacent ground formation blocks. Therefore, even if a mobile lifting machine, which is a heavy object, moves on the surface ground formation block, the weight of the lift machine can be distributed to another adjacent surface ground formation block to be served. can get.

【0026】第2手段によれば、第1手段による作用に
加えて、吊り金具が表層地盤造成用ブロックの上面より
下方に位置して、その造成後の面に吊り金具が突き出る
ことなく揚重機の移動に支障がないし、移動中の揚重機
によって吊り金具が損傷を受けることもなく、安全且つ
再利用が確実に行える。
According to the second means, in addition to the operation of the first means, the lifting device is located below the upper surface of the surface ground formation block, and the lifting device does not protrude from the surface after the formation. There is no hindrance to the movement, and the lifting hardware is not damaged by the moving lifting machine, and safe and reliable reuse can be performed.

【0027】第3手段によれば、第1手段又は第2手段
による作用に加えて、固化体層はコンクリートを鉄筋で
補強して強度を増させ、金属板はその強化されたコンク
リート層に強固に固定され、全体としての強度を増させ
る作用が得られる。
According to the third means, in addition to the action of the first means or the second means, the solidified body layer reinforces the concrete with a reinforcing bar to increase the strength, and the metal plate is firmly attached to the reinforced concrete layer. And the effect of increasing the strength as a whole is obtained.

【0028】第4手段によれば、第1手段から第3手段
までのいずれか一手段による作用に加えて、第2手段に
よる作用に加えて、ブロックを地盤表層部に敷き詰めて
利用した際に、隣接し合うブロック同志は水平方向ずれ
抑制係合部で係合されているから、重量物である移動式
揚重機が水平方向に移動しても水平方向へのずれを抑制
できる作用が得られる。
According to the fourth means, in addition to the action of any one of the first means to the third means, in addition to the action of the second means, when the blocks are spread over the ground surface layer and used. Since the adjacent blocks are engaged with each other by the horizontal displacement suppressing engagement portion, an effect of suppressing the displacement in the horizontal direction can be obtained even when the mobile lifting machine, which is a heavy object, moves in the horizontal direction. .

【0029】第5手段によれば、第1手段から第4手段
までのいずれかの表層地盤造成用ブロックを敷き詰めて
強化された表層地盤が提供できる上、表層地盤造成用ブ
ロックの敷設,撤去が容易に成せるという作用が得られ
る。このため、敷設及び撤去とが容易に成せる表層地盤
も提供できる。その上、表層地盤造成用ブロックの周辺
段差部を隣接表層地盤造成用ブロック間で重ね合わせて
いるので隣接表層地盤造成用ブロックが上下方向にずれ
ることを抑制できる。
According to the fifth means, it is possible to provide a reinforced surface ground by laying any of the surface ground formation blocks of the first means to the fourth means, and to lay or remove the surface ground formation blocks. The effect that it can be easily achieved is obtained. For this reason, the surface ground which can be laid and removed easily can be provided. In addition, since the peripheral step portion of the surface ground formation block is overlapped between the adjacent surface ground formation blocks, it is possible to suppress the adjacent surface ground formation block from shifting vertically.

【0030】第6手段によれば、第5手段による作用に
加えて、水平方向ずれ抑制係合部の係合により隣接し合
う表層地盤造成用ブロックの水平方向の一体化を増強で
き、水平方向への地盤のずれを抑制できる。
According to the sixth means, in addition to the effect of the fifth means, the horizontal integration of the adjacent surface ground formation blocks can be enhanced by the engagement of the horizontal displacement suppressing engagement portion, and the horizontal direction can be enhanced. Displacement of the ground can be suppressed.

【0031】第7手段によれば、第5手段又は第6手段
による作用に加えて、地盤の凹凸をなくすように調整砂
を地盤上に置いて、その砂の上に置かれる複数のブロッ
ク間の平坦度を出せるようにするとともに、その砂の置
き量を調整して複数のブロック間の沈み込み量を平坦化
する作用が得られる。これにより、平坦な強化地盤を得
る作用が得られる。
According to the seventh means, in addition to the operation of the fifth means or the sixth means, the adjusting sand is placed on the ground so as to eliminate the unevenness of the ground, and the plurality of blocks are placed on the sand. In addition to providing the flatness, the effect of flattening the sinking amount between a plurality of blocks by adjusting the amount of the sand is obtained. Thereby, an effect of obtaining a flat reinforced ground can be obtained.

【0032】第8手段によれば、隣接した表層地盤造成
用ブロック間で上下方向のずれを抑制できるので、表層
地盤上での移動式揚重機の移動を円滑に行うことができ
る。表層地盤造成用ブロックの敷設が迅速に行えるの
で、移動式揚重機の稼働開始時期を早めることができ
る。このため、プラント構成品の吊り込み開始時期が早
まり、プラント建設の工期短縮に貢献する作用が得られ
る。
According to the eighth means, the displacement in the vertical direction between the adjacent surface ground formation blocks can be suppressed, so that the mobile hoist can be smoothly moved on the surface ground. Since the surface ground preparation block can be laid quickly, the operation start time of the mobile hoist can be advanced. For this reason, the start time of suspension of the plant components is advanced, and an effect that contributes to shortening the construction period of the plant construction can be obtained.

【0033】第9手段によれば、第8手段による作用効
果に加えて、地盤が強化されているから、大組されたプ
ラント構成製品を建設用揚重機が吊り上げてもその総荷
重を強化された地盤で受け止めることができて、支障な
くプラント構成製品の吊り込み作業が達成される。そし
て、吊り込み作業前にプラント構成製品は大組されてい
るから吊り込み回数も少なくてプラント建設の工期の短
縮が成せる作用が得られる。
According to the ninth means, in addition to the function and effect of the eighth means, since the ground is strengthened, the total load is strengthened even if the construction hoist lifts a large set of plant components. It can be received on the ground that has been broken, and the work of hanging the plant component products can be achieved without any trouble. Further, since the plant component products are assembled in a large group before the hanging work, the number of times of hanging is small, and an effect of shortening the construction period of the plant construction can be obtained.

【0034】[0034]

【発明の実施の形態】以下に本発明による大きな地耐圧
を要する大型機材稼働エリアにおいて可搬式でリサイク
ル可能な表層地盤造成用ブロックを適用した建設工法の
実施例を図を用いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to the drawings, an embodiment of a construction method according to the present invention, in which a portable and recyclable surface layer forming block is applied in a large equipment operating area requiring a large ground pressure, will be described.

【0035】図1は、本発明の実施例である、大きな地
耐圧を要する大型機材稼働エリアにおいて可搬式でリサ
イクル可能な表層地盤造成用ブロックとして可搬式仮設
地盤ブロック1(以下、単にブロック1という。)を原
子力発電プラントの建設において製品の搬入に用いる大
型の移動式揚重機2の稼働エリアの仮設基礎地盤として
適用した状況を示したものである。
FIG. 1 shows a portable temporary ground block 1 (hereinafter simply referred to as a block 1) as a portable and recyclable surface ground forming block in an operation area of a large equipment requiring a large ground pressure, which is an embodiment of the present invention. ) Is applied as a temporary foundation for an operation area of a large-sized mobile lifting machine 2 used for carrying in a product in the construction of a nuclear power plant.

【0036】原子力発電所の建設は、本図に示すような
大型の建設用揚重機である移動式揚重機2(通称クロー
ラークレーン)を用いて吊り込み前に各部を組み合わせ
て大組されてモジュウル化した原子力発電プラント構成
製品3の吊り込み搬入を行っている。
The construction of the nuclear power plant is carried out by using a mobile hoist 2 (commonly called a crawler crane), which is a large-sized construction hoist as shown in FIG. Of the nuclear power plant component products 3 which have been turned into and carried out.

【0037】原子力発電プラント構成品のように大型で
大重量の製品を搬入することができるような大型の移動
式揚重機2の場合、接地圧が非常に大きなもの(最大で
約90t/平方メートル)となり、このような大きな接
地圧を有する大型の移動式揚重機2を稼働させるために
は、それに十分に耐える強固な基礎地盤を造成しておく
必要がある。
In the case of a large-sized mobile hoist 2 capable of carrying a large and heavy product such as a component of a nuclear power plant, an extremely large contact pressure (maximum of about 90 t / sq.m.) In order to operate the large-sized mobile lifting machine 2 having such a large contact pressure, it is necessary to construct a solid foundation ground capable of withstanding the large-sized mobile lifting machine 2.

【0038】但し、原子力発電プラントの場合、大型の
移動式揚重機2が稼働しているエリア、あるいは、基礎
地盤として用いている範囲にも恒久的には他の計画物が
設定されることが多いため、移動式揚重機2の稼働用に
造成された地盤は、原子力発電プラントの建設が進行
し、移動式揚重機2が必要でなくなった段階で撤去され
る。
However, in the case of a nuclear power plant, other plans may be permanently set in the area where the large-sized mobile hoist 2 is operating or in the area used as the foundation ground. Because of the large number, the ground created for the operation of the mobile crane 2 is removed when the construction of the nuclear power plant progresses and the mobile crane 2 becomes unnecessary.

【0039】これを撤去するには、強化地盤を構成する
ブロック1をトラック等の輸送機器による運搬が可能な
大きさにする。
In order to remove the block, the block 1 constituting the reinforced ground is made large enough to be transported by a transport device such as a truck.

【0040】そして、トラック等の輸送機器に対するブ
ロックの積降し及び地盤への敷き詰め並びに撤去は揚重
機を利用して行われる。
The loading / unloading of blocks to / from transport equipment such as trucks, the spread of the blocks on the ground, and the removal of the blocks are performed using a hoist.

【0041】そして、運搬できる大きさにして新地に運
搬して再利用することを果たす。
Then, it is transported to a new land in a size that can be transported and reused.

【0042】このようにして、本実施例はプラント建設
に応用できる。
Thus, the present embodiment can be applied to plant construction.

【0043】本実施例による大きな地耐圧を要する大型
機材稼働エリアにおいて可搬式でリサイクル可能なブロ
ック1は、設定,撤去が簡単で、しかも再利用が可能な
仮設の強化地盤造成用に極めて有効であり、図2以下に
そのブロック1の詳細な構造,ブロック1を用いた地盤
の造成方法、並びにブロック1の利用方法,撤去方法に
ついて示す。
The portable and recyclable block 1 according to the present embodiment, which is portable and recyclable in a large equipment area where a large ground pressure is required, is extremely effective for forming a temporary reinforced ground which can be easily set and removed and which can be reused. FIG. 2 shows the detailed structure of the block 1, a method of forming the ground using the block 1, and a method of using and removing the block 1.

【0044】図2は、鉄筋コンクリートをベースにした
ブロック1の第1実施例を示したものである。
FIG. 2 shows a first embodiment of a block 1 based on reinforced concrete.

【0045】鉄筋コンクリート4の上側表面を覆うよう
に鉄板5を設ける。
An iron plate 5 is provided so as to cover the upper surface of the reinforced concrete 4.

【0046】鉄板5には、鉄筋コンクリート内に埋設さ
れる固定手段としてスタッドジベル6を設けておき、鉄
筋コンクリートと鉄板が鉄筋コンクリートに埋設された
スタッドジベル6で強固に固定されるようにしておく。
The iron plate 5 is provided with a stud dowel 6 as a fixing means embedded in the reinforced concrete, and the reinforced concrete and the iron plate are firmly fixed by the stud dowel 6 embedded in the reinforced concrete.

【0047】以上で構成される鉄筋コンクリート4と鉄
板5との複合材による板構造のブロックを構成する。
A block having a plate structure made of a composite material of the reinforced concrete 4 and the iron plate 5 configured as described above is formed.

【0048】鉄板5に運搬用の吊り金具7を設定し、揚
重機による吊り上げ運搬を可能とする。
A lifting metal 7 for transportation is set on the iron plate 5 to enable lifting and transportation by a hoist.

【0049】その際、鉄板1の吊り金具7部にボックス
状の窪みを設けておきこの中に吊り金具7が納まる構造
にし、より平坦な仮設地盤が設営可能である。
At this time, a box-shaped recess is provided in the hanging metal member 7 of the iron plate 1 so that the hanging metal member 7 can be accommodated in the box-shaped hollow, so that a more flat temporary ground can be set up.

【0050】平坦な仮設地盤を設営可能とするため、吊
り金具7は、図2に示すような固定式のものでなく、ア
イボルトをブロック1に捩じ込み、地盤として使用する
際には取外して平坦な面とする様にしても良い。
In order to make it possible to set up a flat temporary ground, the hanging bracket 7 is not a fixed type as shown in FIG. 2, but an eyebolt is screwed into the block 1 and detached when used as the ground. You may make it a flat surface.

【0051】ブロック1は、図2で見られるように、そ
の周辺部に段差部が形成されている。
As shown in FIG. 2, the block 1 has a step portion formed in the periphery thereof.

【0052】その段差部は、あたかも鉄筋コンクリート
4の層を上下二分割してブロック1の対角線方向に互い
にずらした結果生じる段差形状を外観上備えている。
The step has an appearance as if the layer of the reinforced concrete 4 is divided into upper and lower parts and shifted in the diagonal direction of the block 1.

【0053】もちろん、鉄筋コンクリート4の層は上下
二分割してあるわけではなくて連続した一体化物であ
る。
Of course, the layer of the reinforced concrete 4 is not divided into upper and lower parts but is a continuous integrated material.

【0054】第2実施例として、第1実施例を変形し
て、図3のように、ブロック1の向かい合う短辺周辺部
に、水平方向ずれ抑制係合部として、水平方向に対して
凸部12及び凹部13を設ける。
As a second embodiment, the first embodiment is modified, and as shown in FIG. 3, a convex portion in the horizontal direction is formed as a horizontal displacement suppressing engaging portion around a short side facing the block 1. 12 and a recess 13 are provided.

【0055】その凸部12及び凹部13は隣接するブロ
ック1の凸部12及び凹部13とはまりあって水平方向
に重なり合う。
The convex portions 12 and the concave portions 13 fit with the convex portions 12 and the concave portions 13 of the adjacent block 1 and overlap in the horizontal direction.

【0056】その重なり合いにより、隣接するブロック
1相互間の水平方向のずれを抑えることができる。
Due to the overlap, horizontal displacement between adjacent blocks 1 can be suppressed.

【0057】その他の構成は、第1実施例と同じであ
る。
The other structure is the same as that of the first embodiment.

【0058】図2に示すブロック1の第1実施例は、隣
接するブロック一体同志が、図4のように、隣接部分で
一部上下方向に重なり合う構造と成るので、接合性を向
上し、垂直方向のブロック相互間のずれを抑えることを
目的とした大きな地耐圧を要する大型機材稼働エリアに
使用する可搬式でリサイクル可能なブロック1の形状の
例である。
The first embodiment of the block 1 shown in FIG. 2 has a structure in which adjacent blocks are partly vertically overlapped with each other at adjacent portions as shown in FIG. This is an example of the shape of a portable and recyclable block 1 used in a large equipment operation area requiring a large ground pressure for the purpose of suppressing the displacement between the blocks in the direction.

【0059】この場合、ブロック1の設定時において、
図4のように、ブロック1の下側張出し部14が、ブロ
ック1の上側張出し部15を受けるように配置されるこ
とによって、ブロック1相互間の垂直方向のずれを抑え
ることができる。
In this case, when setting the block 1,
As shown in FIG. 4, by disposing the lower overhanging portion 14 of the block 1 to receive the upper overhanging portion 15 of the block 1, vertical displacement between the blocks 1 can be suppressed.

【0060】更に、図3に示すブロック1の第2実施例
は、複合形状としてブロック1の設定時において、ブロ
ック1の水平方向凸部12と水平方向凹部13が噛み合
うことで水平方向のずれを抑え、同時にブロックの下側
張出し部14が、ブロックの上側張出し部15を受ける
ことによって垂直方向のずれを抑える構造として、水平
方向,垂直方向両方のずれを抑えるものである。
Further, in the second embodiment of the block 1 shown in FIG. 3, when the block 1 is set as a composite shape, the horizontal projection 12 and the horizontal recess 13 of the block 1 are engaged with each other to prevent the horizontal displacement. At the same time, the lower overhanging portion 14 of the block receives the upper overhanging portion 15 of the block to suppress vertical displacement, thereby suppressing both horizontal and vertical displacements.

【0061】いずれの例の表層地盤造成用ブロックも、
上表面が金属板であるから重量物が載っても傷付きにく
く、且つ固化体と固定されて一体と成っているからずれ
にくく反りにくい。しかも、金属板への荷重は固化体に
伝わり分散して既存の地盤に伝わりやすい。
In each of the examples, the surface ground formation block is
Since the upper surface is a metal plate, even if a heavy object is placed thereon, it is hardly damaged, and since it is fixed to the solidified body and integrated, it is hard to be displaced and warped. In addition, the load on the metal plate is transmitted to the solidified body, dispersed and easily transmitted to the existing ground.

【0062】また、複数の各吊り金具7の位置はブロッ
ク1を吊った際に、例えば図6のように、水平になるよ
うに設定される。
The positions of the plurality of hanging members 7 are set so as to be horizontal when the block 1 is hung, for example, as shown in FIG.

【0063】次に、図3に示すブロック1の地盤への設
置例について説明する。
Next, an example of installing the block 1 shown in FIG. 3 on the ground will be described.

【0064】図5,図6は、鉄筋コンクリート4をベー
スにした大きな地耐圧を要する大型機材稼働エリアに使
用する可搬式でリサイクル可能なブロック1の設置例を
示したものである。
FIGS. 5 and 6 show an example of installation of a portable and recyclable block 1 based on reinforced concrete 4 and used in a large equipment operating area requiring a large ground pressure.

【0065】大きな地耐圧を要する大型機材稼働エリア
に使用する可搬式でリサイクル可能な地盤ブロック1を
設定するには、改良地盤、あるいは改良地盤16をエリ
ア造成範囲に設定し、図5のように調整砂17を敷き詰
めて平坦とする。
In order to set a portable and recyclable ground block 1 to be used in an operation area of a large equipment requiring a large ground pressure, the improved ground or the improved ground 16 is set in an area creation area as shown in FIG. The adjustment sand 17 is spread and flattened.

【0066】その平坦な状態にしたら、揚重機を用いて
建設用揚重機の稼働エリアの所定の位置に複数のブロッ
ク1を吊り込み、図5で示した、既説明のように周辺部
を重ねて設定する。
When the flat state is attained, the plurality of blocks 1 are hung at predetermined positions in the operation area of the construction hoist using the hoist, and the peripheral portions are overlapped as described with reference to FIG. To set.

【0067】さらには、隣接し合うブロック間で凸部1
2と凹部13を噛み合わせる。
Further, the protrusions 1 between adjacent blocks
2 and recess 13 are engaged.

【0068】隣接し合うブロックのうち片方が沈み量が
大きいと予測される場合には、より多くの調整砂をその
下に敷く。
When one of the adjacent blocks is predicted to have a large sinking amount, more adjustment sand is laid thereunder.

【0069】また、より堅固な地盤造成を行う場合は、
改良地盤上16に均しコンクリートを打設し、その上に
調整砂17を敷き詰めたうえで大きな地耐圧を要する大
型機材稼働エリアに使用する可搬式でリサイクル可能な
地盤ブロック1を設定することも可能である。
When a more solid ground is to be formed,
It is also possible to place leveling concrete on the improved ground 16 and spread the adjusting sand 17 on it, and then set the portable and recyclable ground block 1 to be used in the operation area of large equipment requiring large ground pressure. It is possible.

【0070】また、地盤養生を簡略化する場合には、改
良地盤16の造成を省略して大きな地耐圧を要する大型
機材稼働エリアに使用する可搬式でリサイクル可能な地
盤ブロック1を設定することで地盤造成を完了しても良
い。
In order to simplify the ground curing, the construction of the improved ground 16 is omitted, and the portable and recyclable ground block 1 used in a large equipment operating area requiring a large ground pressure is set. The ground preparation may be completed.

【0071】図6は、本発明における大きな地耐圧を要
する大型機材稼働エリアに使用する可搬式でリサイクル
可能な図3に示す第2実施例のブロック1の設定方法を
示したものである。
FIG. 6 shows a method of setting the block 1 of the second embodiment shown in FIG. 3 which is portable and recyclable and is used in a large equipment operation area requiring a large ground pressure in the present invention.

【0072】図2に示す第1実施例のブロック1で地盤
を設定する場合には、隣接し合うブロック間で凸部12
と凹部13を噛み合わせる作業がないことが第2実施例
のブロック1を用いた場合と異なり、他は同様となる。
In the case of setting the ground in the block 1 of the first embodiment shown in FIG.
The difference is that there is no work of engaging the concave portion 13 with the case of using the block 1 of the second embodiment.

【0073】本発明における大きな地耐圧を要する大型
機材稼働エリアに使用する可搬式でリサイクル可能なブ
ロック1を現場の所定のエリアに設定するには、吊り金
具7部と揚重機のフック18との間にワイヤー19をか
けて揚重機を用いて水平に吊り上げ、所定の位置に移動
して吊り降ろし、設定すれば良い。
In order to set the portable and recyclable block 1 used in the large equipment operation area requiring a large ground pressure according to the present invention in a predetermined area of the site, the hanging metal fitting 7 and the hook 18 of the lifting machine are used. What is necessary is just to lift it horizontally by using a lifting machine with a wire 19 interposed therebetween, move it to a predetermined position, drop it, and set it.

【0074】また、エリアから撤去する際には、吊り金
具7部にワイヤー19をかけて揚重機を用いて水平に吊
り上げ、搬出すれば良い。
Further, when removing from the area, the wire 19 may be hung horizontally by a hoist using a wire 19 to be attached to the hanging metal part 7 and carried out.

【0075】大きな地耐圧を要する大型機材稼働エリア
から撤去されたブロック1は、別の場所に移動して再利
用が可能である。
The block 1 removed from the large equipment operating area requiring a large ground pressure can be moved to another place and reused.

【0076】同一エリアあるいは隣接するエリアで地盤
養生を必要とする範囲が変化するような場合には、大き
な地耐圧を要する大型機材稼働エリアに使用する可搬式
でリサイクル可能なブロック1を揚重機を用いて移動さ
せることで対応可能である。また、撤去したブロック1
を元の場所から離れた場所に設置して再利用する際は、
図7に示すようにトラック20もしくはトレーラーに積
込み、次の利用エリアまで運搬し、再利用する。
In the case where the range requiring ground curing changes in the same area or an adjacent area, a portable and recyclable block 1 used for a large equipment operating area requiring a large ground pressure is used as a lifting machine. It can be dealt with by using and moving. Also removed block 1
If you want to relocate and reuse the
As shown in FIG. 7, they are loaded on the truck 20 or the trailer, transported to the next use area, and reused.

【0077】本発明の各実施例におけるブロック1の適
用例としては、移動式揚重機2の稼働エリアの地盤の
他、重量品保管用仮設倉庫地盤,資材置場地盤,仮設道
路の地盤,簡易式の滑走路等が考えられる。
Examples of application of the block 1 in each embodiment of the present invention include a ground for a temporary warehouse for storing heavy goods, a ground for material storage, a ground for a temporary road, a ground for a temporary road, in addition to a ground for an operation area of the mobile lifting machine 2. Runway etc. can be considered.

【0078】いずれの実施例によるブロック1も上述の
ような利用の仕方ができる。
The block 1 according to any of the embodiments can be used in the manner described above.

【0079】[0079]

【発明の効果】請求項1の発明によれば、表層地盤造成
用ブロックをほぼ水平に取り扱うことが出来るので、地
盤の敷設及び撤去が簡単に行え、かつ地盤の再利用も容
易に行える上、複数の表層地盤造成用ブロックを敷き詰
めて使用した際に、表層地盤造成用ブロック間の境界が
上下方向に重なるから、隣接した表層地盤造成用ブロッ
クの上下方向におけるずれを抑制でき、その境界におい
ても、正常な強化地盤面を維持できる効果が得られる。
According to the first aspect of the present invention, the surface ground formation block can be handled substantially horizontally, so that the ground can be laid and removed easily, and the ground can be reused easily. When a plurality of surface ground formation blocks are spread and used, the boundaries between the surface ground formation blocks overlap in the vertical direction, so that it is possible to suppress the displacement of the adjacent surface ground formation blocks in the vertical direction, and at the boundary. Thus, an effect of maintaining a normal reinforced ground surface can be obtained.

【0080】請求項2の発明によれば、請求項1の発明
による効果に加えて、表層地盤造成用ブロックの吊り金
具の損傷を防止し、安全性も向上する。
According to the second aspect of the present invention, in addition to the effect of the first aspect of the present invention, it is possible to prevent the hanging metal fittings of the surface layer ground formation block from being damaged and to improve safety.

【0081】請求項3の発明によれば、請求項1又は請
求項2の発明による効果に加えて、固化体層に大きな強
度が期待できる鉄筋コンクリートを採用し、その鉄筋コ
ンクリートと金属板とを一体不可分に固定して表層地盤
造成用ブロックの強度を向上し、地盤の強化を向上させ
ることができる。
According to the third aspect of the present invention, in addition to the effects of the first or second aspect of the present invention, reinforced concrete which can be expected to have a large strength in the solidified layer is adopted, and the reinforced concrete and the metal plate are integrally formed. To improve the strength of the surface layer ground preparation block and improve the ground reinforcement.

【0082】請求項4の発明によれば、請求項1から請
求項3までのいずれか一項の発明による効果に加えて、
表層地盤造成用ブロックを敷き詰めて利用した際に、表
層地盤造成用ブロック相互の水平方向のずれを抑制して
正常な強化地盤面を維持できる効果が得られる。
According to the fourth aspect of the present invention, in addition to the effects of any one of the first to third aspects of the present invention,
When the blocks for surface ground formation are spread and used, an effect of suppressing a horizontal displacement between the blocks for surface ground formation and maintaining a normal reinforced ground surface is obtained.

【0083】請求項5の表層地盤の発明によれば、請求
項1と同様な効果を生じる。
According to the fifth aspect of the present invention, the same effects as those of the first aspect are produced.

【0084】請求項6の発明によれば、請求項5の発明
による効果に加えて、隣接した表層地盤造成用ブロック
相互の水平方向のずれを防止できる。
According to the invention of claim 6, in addition to the effect of the invention of claim 5, it is possible to prevent the horizontal displacement of adjacent surface ground formation blocks from each other.

【0085】請求項7の発明によれば、請求項5又は請
求項6の発明による効果に加えて、強化された表層地盤
面の平坦度が得やすい。
According to the invention of claim 7, in addition to the effect of the invention of claim 5 or claim 6, it is easy to obtain a reinforced flatness of the ground surface.

【0086】請求項8の発明によれば、移動式揚重機の
稼働開始時期を早めることができ、プラントの建設工程
を短縮することができる。
According to the eighth aspect of the present invention, the operation start time of the mobile hoist can be advanced, and the construction process of the plant can be shortened.

【0087】請求項9の発明によれば、請求項8の発明
による効果に加えて、より一層プラントの建設工程を短
縮することができる。
According to the ninth aspect of the present invention, in addition to the effect of the eighth aspect, the construction process of the plant can be further shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による強化地盤上でのプラント構成品の
吊り込み作業状況を示した作業現場の斜視図である。
FIG. 1 is a perspective view of a work site showing a state of hanging a plant component on a reinforced ground according to the present invention.

【図2】図1に示した表層地盤造成用ブロックの第1実
施例によるブロック部拡大斜視図である。
FIG. 2 is an enlarged perspective view of a block portion according to a first embodiment of the surface layer formation block shown in FIG. 1;

【図3】本発明の第2実施例による表層地盤造成用ブロ
ックの拡大斜視図である。
FIG. 3 is an enlarged perspective view of a surface ground formation block according to a second embodiment of the present invention.

【図4】図2の表層地盤造成用ブロックを複数敷き詰め
た際の表層地盤造成用ブロック間境界部の縦断面図であ
る。
FIG. 4 is a vertical cross-sectional view of a boundary portion between surface ground formation blocks when a plurality of surface ground formation blocks of FIG. 2 are spread.

【図5】本発明による表層地盤造成用ブロックの地盤へ
の設置状態を表層地盤造成用ブロック間境界部において
示した縦断面図である。
FIG. 5 is a longitudinal sectional view showing a state in which a surface layer ground formation block according to the present invention is installed on the ground at a boundary between surface layer land formation blocks.

【図6】本発明の表層地盤造成用ブロックの敷き詰め作
業状態を示す斜視図である。
FIG. 6 is a perspective view showing a state of laying a surface ground formation block according to the present invention.

【図7】本発明による表層地盤造成用ブロックのトラッ
クへの積載作業状態を示す斜視図である。
FIG. 7 is a perspective view showing a state where a surface layer forming block is loaded on a truck according to the present invention.

【符号の説明】[Explanation of symbols]

1…可搬式仮設地盤ブロック、2…移動式揚重機、3…
原子力発電プラント構成製品、4…鉄筋コンクリート、
5…鉄板、6…スタッドジベル、7…吊り金具、12…
凸部、13…凹部、14…下側張出し部、15…上側張
出し部、16…改良地盤、17…調整砂、18…フッ
ク、19…ワイヤー、20…トラック。
1: Portable temporary ground block, 2: Mobile lifting machine, 3:
Nuclear power plant component products, 4 ... reinforced concrete,
5 ... iron plate, 6 ... stud dowel, 7 ... hanging bracket, 12 ...
Projections, 13 recesses, 14 lower protrusions, 15 upper protrusions, 16 improved ground, 17 adjustment sand, 18 hooks, 19 wires, 20 trucks.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 後田 孝一 茨城県日立市幸町三丁目1番1号 株式会 社日立製作所日立工場内 (72)発明者 田尻 明徳 茨城県日立市幸町三丁目1番1号 株式会 社日立製作所日立工場内 (72)発明者 江端 栄 茨城県日立市幸町三丁目1番1号 株式会 社日立製作所日立工場内 (72)発明者 吉田 直人 茨城県日立市幸町三丁目1番1号 株式会 社日立製作所日立工場内 (72)発明者 佐藤 圭也 東京都千代田区内神田一丁目1番14号 日 立プラント建設株式会社内 (72)発明者 牧田 辰雄 東京都千代田区内神田一丁目1番14号 日 立プラント建設株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Koichi Gota 3-1-1, Sachimachi, Hitachi-shi, Ibaraki Pref. Hitachi, Ltd. Hitachi Plant (72) Inventor Akinori Tajiri 3-chome, Sachimachi, Hitachi-shi, Ibaraki # 1 Inside Hitachi, Ltd.Hitachi Plant (72) Inventor Sakae Ebata 3-1-1, Sachimachi, Hitachi, Hitachi, Ibaraki Prefecture Inside Hitachi, Ltd.Hitachi Plant (72) Inventor, Naoto Yoshida, Hitachi, Ibaraki 3-1-1, Machi-cho, Hitachi, Ltd.Hitachi Plant (72) Inventor Keiya Sato 1-1-1 Uchikanda, Chiyoda-ku, Tokyo Inside Hitachi Plant Construction Co., Ltd. (72) Inventor Tatsuo Makita Tokyo 1-1-14 Uchikanda, Chiyoda-ku, Tokyo Nippon Plant Construction Co., Ltd.

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】固化体層を金属板の下側に固定したブロッ
クを備え、前記ブロックは周辺部に隣接する前記ブロッ
クと上下方向に重なる段差部が備えられ、さらには前記
ブロックを水平に吊ることが出来る前記ブロックの複数
箇所の部位に吊り金具が固定的に又は着脱自在に装備さ
れていることを特徴とした表層地盤造成用ブロック。
1. A block having a solidified body layer fixed to a lower side of a metal plate, the block having a step portion vertically overlapping the block adjacent to a peripheral portion, and further suspending the block horizontally. A surface ground formation block, wherein hanging metal fittings are fixedly or detachably provided at a plurality of portions of the block that can be used.
【請求項2】請求項1において、吊り金具がブロックの
上面より下方の位置に装備されていることを特徴とした
表層地盤造成用ブロック。
2. The block for forming a surface ground according to claim 1, wherein the hanging metal fitting is provided below the upper surface of the block.
【請求項3】請求項1又は請求項2において、前記固化
体層は鉄筋コンクリートであり、前記鉄筋コンクリート
と金属板とは前記鉄筋コンクリートに埋設固定した部材
により固定されていることを特徴とした表層地盤造成用
ブロック。
3. The surface ground preparation according to claim 1, wherein the solidified body layer is made of reinforced concrete, and the reinforced concrete and the metal plate are fixed by a member embedded and fixed in the reinforced concrete. Block.
【請求項4】請求項1から請求項3までのいずれかにお
いて、前記ブロックは隣接する各前記ブロックに係合さ
れる複数の水平方向ずれ抑制係合部を周辺部に備えるこ
とを特徴とした表層地盤造成用ブロック。
4. The peripheral device according to claim 1, wherein the block has a plurality of horizontal displacement suppressing engagement portions which are engaged with the adjacent blocks. Block for surface ground preparation.
【請求項5】造成用地盤の表層部に、請求項1から請求
項4までのいずれか一項の複数の表層地盤造成用ブロッ
クを、周辺部の前記段差部同志を重ね合わせた状態で敷
き詰めて成る表層地盤。
5. A plurality of surface ground formation blocks according to any one of claims 1 to 4 are laid on a surface layer of the formation ground in a state where the stepped portions in the peripheral portion are overlapped with each other. Surface ground consisting of
【請求項6】請求項5において、請求項4の表層地盤造
成用ブロックに設けられた水平方向ずれ抑制係合部と、
隣接する他の表層地盤造成用ブロックに設けられた水平
方向ずれ抑制係合部とを、互いに係合した表層地盤。
6. A horizontal displacement suppressing engagement portion provided in the surface ground formation block according to claim 4, wherein:
The surface ground in which the horizontal displacement suppressing engaging portions provided on another adjacent surface ground forming block are engaged with each other.
【請求項7】請求項5又は請求項6において、造成用地
盤の表層部に調整砂を置いて、その調整砂の上方に複数
の前記表層地盤造成用ブロックを敷き詰めて成る表層地
盤。
7. The surface ground according to claim 5 or 6, wherein adjustment sand is placed on a surface portion of the formation ground, and a plurality of said surface formation blocks are spread over the adjustment sand.
【請求項8】請求項5から請求項7までのいずれか一項
の前記表層地盤上に移動式揚重機を載せ、その後に前記
表層地盤上で前記移動式揚重機を稼働させることにより
プラント構成品の所定の場所への吊り込み作業を行うプ
ラントの建設方法。
8. A plant configuration by mounting a mobile lifting machine on the surface ground according to any one of claims 5 to 7, and thereafter operating the mobile lifting machine on the surface ground. A method of constructing a plant for hanging a product at a predetermined place.
【請求項9】請求項8において、プラント構成品は吊り
込み作業前に大組されていることを特徴としたプラント
建設方法。
9. The plant construction method according to claim 8, wherein the plant components are assembled in large groups before the hanging operation.
JP09870698A 1998-04-10 1998-04-10 Surface ground formation block, surface ground using the same, and method of constructing a plant using the surface ground Expired - Fee Related JP3226869B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09870698A JP3226869B2 (en) 1998-04-10 1998-04-10 Surface ground formation block, surface ground using the same, and method of constructing a plant using the surface ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09870698A JP3226869B2 (en) 1998-04-10 1998-04-10 Surface ground formation block, surface ground using the same, and method of constructing a plant using the surface ground

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP5334893A Division JP2887062B2 (en) 1993-12-28 1993-12-28 Surface ground formation block, surface ground using the same, and method of constructing plant using the surface ground

Publications (2)

Publication Number Publication Date
JPH10245840A true JPH10245840A (en) 1998-09-14
JP3226869B2 JP3226869B2 (en) 2001-11-05

Family

ID=14226963

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09870698A Expired - Fee Related JP3226869B2 (en) 1998-04-10 1998-04-10 Surface ground formation block, surface ground using the same, and method of constructing a plant using the surface ground

Country Status (1)

Country Link
JP (1) JP3226869B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144238A (en) * 2004-11-16 2006-06-08 Toda Constr Co Ltd Foundation for crane working platform and maintenance system therefor
KR100665967B1 (en) 2006-08-09 2007-01-09 김진팔 Deck plate
JP2007170119A (en) * 2005-12-26 2007-07-05 Energia Life & Access:Kk Modular foundation block and installing method therefor
KR101492066B1 (en) * 2012-09-12 2015-02-10 삼성물산 주식회사 Construction method for foundation structure of column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144238A (en) * 2004-11-16 2006-06-08 Toda Constr Co Ltd Foundation for crane working platform and maintenance system therefor
JP2007170119A (en) * 2005-12-26 2007-07-05 Energia Life & Access:Kk Modular foundation block and installing method therefor
KR100665967B1 (en) 2006-08-09 2007-01-09 김진팔 Deck plate
KR101492066B1 (en) * 2012-09-12 2015-02-10 삼성물산 주식회사 Construction method for foundation structure of column

Also Published As

Publication number Publication date
JP3226869B2 (en) 2001-11-05

Similar Documents

Publication Publication Date Title
US7670084B2 (en) Precasting of fabricated flumes for machining coolant systems
KR100744693B1 (en) Concrete-steel house and pile foundation footing construction method using thereof
JP4853429B2 (en) Support structure of lining board, method of supporting lining board
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
JP2887062B2 (en) Surface ground formation block, surface ground using the same, and method of constructing plant using the surface ground
JP3226869B2 (en) Surface ground formation block, surface ground using the same, and method of constructing a plant using the surface ground
CN111074893B (en) Construction system and construction method for concrete cushion layer of river dike and dyke
JP3279950B2 (en) Surface ground using a surface ground formation block and a method of constructing a plant using the surface ground
JPH1054037A (en) Coffering method and steel structural body therefor
KR101462827B1 (en) Asphalt mat for friction increase and manufacturing method of the same
JPH06264453A (en) Precast concrete-made permanent form for foundation, and foundation practice using its form
JP6944900B2 (en) Construction method of linear structure
CN217810304U (en) Multifunctional road construction prefabricated slab
JP3086949B2 (en) Asphalt mat for steel structures
CN218713281U (en) Near-track foundation pit external construction platform
JPH08169682A (en) Rail base and its repairing method
CN216664194U (en) Assembled suit case bottom plate
KR100690049B1 (en) Reinforced ground structure of a sur-softground using EPS blocks
JP2649887B2 (en) Construction method of mat slab
CN108517785B (en) Bridge precast beam slab translation installation method
JP2000170185A (en) Structure of underground tank
JPH0438325A (en) Execution method of large-sized concrete block
JP4754513B2 (en) Liner plate displacement prevention device and displacement prevention system
JPH10266110A (en) Laying plate
JPH04194120A (en) Production of asphalt mat

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20070831

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080831

Year of fee payment: 7

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20080831

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080831

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080831

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090831

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20100831

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20100831

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110831

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120831

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20130831

LAPS Cancellation because of no payment of annual fees