JPH08169682A - Rail base and its repairing method - Google Patents

Rail base and its repairing method

Info

Publication number
JPH08169682A
JPH08169682A JP31704594A JP31704594A JPH08169682A JP H08169682 A JPH08169682 A JP H08169682A JP 31704594 A JP31704594 A JP 31704594A JP 31704594 A JP31704594 A JP 31704594A JP H08169682 A JPH08169682 A JP H08169682A
Authority
JP
Japan
Prior art keywords
rail
concrete
fixing block
recess
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP31704594A
Other languages
Japanese (ja)
Other versions
JP2874573B2 (en
Inventor
Shozo Kato
正三 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP31704594A priority Critical patent/JP2874573B2/en
Publication of JPH08169682A publication Critical patent/JPH08169682A/en
Application granted granted Critical
Publication of JP2874573B2 publication Critical patent/JP2874573B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To establish a rail foundation which allows easy performance of assembly and disassembly by installing a rail fixing block with whose upper part a rail is consolidated, on a level adjusting part as the inner bottom surface of a rail foundation recessed part, inserting sacks into the gaps between the two sides of this rail fixing block and the inner wall surface of the recessed part, and filling them with a filler concrete. CONSTITUTION: A rail foundation has a body part 10 of ferro-concrete having a recessed section, which is constructed in embedded condition with the top left underground E and has a recessed part 10a in through form in the longitudinal direction, and a level adjusting concrete 12 is furnished on the bottom surface of the recessed part 10a. A rail fixing block 16 with whose upper part a rail 14 is consolidated, is installed in the center of the oversurface of the level adjusting concrete 12, and a pair of sacks 18 made of polyethylene sheet, etc., are inserted into the gaps between the two sides of the block 16 and the inner wall surface of the recessed part 10a, and they are filled with a filler concrete 20 consisting of a quick solidifying concrete. On this filler concrete 20, asphalt mortar 22 is placed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、港湾,造船あるいは
重機メーカーなどに用いられる大型の門形移動クレーン
やガントリークレーン等の荷役設備用の軌条や、あるい
は貨物引き込み線等に好適なレール基礎およびその改修
方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to rails suitable for cargo handling equipment such as large-sized gate-type mobile cranes and gantry cranes used in ports, shipbuilding or heavy equipment manufacturers, and rail foundations suitable for cargo lead-in lines. It relates to the repair method.

【0002】[0002]

【従来の技術】港湾,造船あるいは重機メーカーなどに
用いられる大型の門形移動クレーンやガントリークレー
ン等の荷役設備用の軌条を構成するレール基礎は、一般
に図3に示す断面構造となっている。
2. Description of the Related Art A rail foundation constituting a rail for cargo handling equipment such as a large gate type mobile crane and a gantry crane used in a harbor, shipbuilding or heavy equipment manufacturer generally has a sectional structure shown in FIG.

【0003】図において、1は地中Eに頂部を残して埋
設固定され長手通し状の凹部を有する鉄筋コンクリート
製のレール基礎本体、2は前記凹部の底面にベッド3を
介して設置され、かつ両側をアンカーボルト4を介して
基礎本体1に連結されたレールである。
In the figure, 1 is a reinforced concrete rail foundation body which is embedded and fixed in the ground E except for the top, and has a longitudinally extending recess, and 2 is installed on the bottom surface of the recess via a bed 3 and on both sides. Is a rail connected to the base body 1 via anchor bolts 4.

【0004】ところで、例えば港湾における移動式クレ
ーンはコンテナリーゼーション化の進展により近年益々
大型化し、また稼働率も高いものとなっており、造船,
重機メーカなどにおいても同じであるが、これらを支持
する既存のレール基礎は経年的に沈下や蛇行が累積さ
れ、このような沈下や蛇行が大きくなると走行に支障を
きたすので、この場合には改修を行う必要がある。改修
方法は、一般に以下のような手順で行なわれている。
By the way, for example, mobile cranes in harbors have become larger and larger in recent years due to the progress of containerization, and have a high operating rate.
The same applies to heavy equipment manufacturers, but the existing rail foundations that support them accumulate subsidence and meandering over time, and if such subsidence and meandering become large, it will interfere with running, so repair in this case. Need to do. The repair method is generally performed in the following procedure.

【0005】基礎本体1の周囲を掘削して基礎本体1
の上部を地表部に暴露した後、既存のレール2を撤去す
る。 基礎本体1の上部(図3中で斜線図示)を斫り取る。 打継ぎ部を清掃し、補強鉄筋を配置する。 新たにコンクリートを打設して想像線図示のごとく嵩
上げを行う。 コンクリートが固化した後、再度レール2を敷設し、
基礎本体1の周囲を埋め戻す。
The base body 1 is excavated around the base body 1.
After exposing the upper part of the to the ground surface, the existing rail 2 is removed. The upper part of the base body 1 (shown with diagonal lines in FIG. 3) is scraped off. Clean the splice and place reinforcing bars. Concrete is newly placed and the height is raised as shown in the imaginary line. After the concrete has solidified, lay the rail 2 again,
Backfill the periphery of the base body 1.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、以上の
改修方法では大規模な斫り作業を伴うほか、工数が多く
工事期間もかなり長いものとなり、またその間はクレー
ンの稼働を停止することになり、不経済となっていた。
However, in addition to the large-scale scavenging work, the above-mentioned repair method requires a large number of man-hours and a considerably long construction period, and the crane operation is stopped during that period. It was uneconomical.

【0007】この発明は以上の問題点に鑑みなされたも
のであって、その目的とするところは将来の改修工事を
見込んで、組立て分解が容易な構造としたレール基礎お
よびこれに好適な改修方法を提供するものである。
The present invention has been made in view of the above problems, and its purpose is to anticipate future repair work, and to construct a rail base which is easy to assemble and disassemble, and a suitable repair method therefor. Is provided.

【0008】[0008]

【課題を解決するための手段】前記目的を達成するた
め、この発明にかかるレール基礎は、地中に頂部を残し
て埋設状態に構築され長手通し状の凹部が形成される断
面凹状のレール基礎本体と、前記凹部の底面に配置され
るレベル調整部と、該レベル調整部の上面に設置され、
かつ上部にレールが一体に配置されるレール固定ブロッ
クと、該レール固定ブロックの両側部と前記凹部の内壁
面との隙間に配置された一対の袋体の中空内部に充填さ
れる間詰め用コンクリートとを備えたことを特徴とする
ものである。
In order to achieve the above-mentioned object, a rail foundation according to the present invention is a rail foundation having a concave cross section, which is constructed in a buried state with a top portion left in the ground to form a longitudinally extending concave portion. A main body, a level adjusting section arranged on the bottom surface of the recess, and an upper surface of the level adjusting section,
And a rail fixing block in which rails are integrally arranged, and filling concrete filled in the hollow inside of a pair of bags disposed in a gap between both side portions of the rail fixing block and the inner wall surface of the recess. It is characterized by having and.

【0009】また、この発明にかかるレール基礎の改修
方法は、地中に頂部を残して埋設状態に構築され長手通
し状の凹部が形成される断面凹状のレール基礎本体と、
前記凹部の底面に配置されるレベル調整部と、該レベル
調整部の上面に設置され、かつ上部にレールが一体に配
置されるレール固定ブロックと、該レール固定ブロック
の両側部と前記凹部の内壁面との隙間に配置された一対
の袋体の中空内部に充填される間詰め用コンクリートと
を備えたレール基礎の改修方法であって、前記袋体ごと
間詰めコンクリートを撤去する工程と、前記レール基礎
本体の凹部を跨いで掛け渡される吊上げ治具により前記
レールを固定ブロックとともに吊上げる工程と、前記レ
ベル調整部に嵩上げ部を形成する工程と、前記固定ブロ
ックの両側と前記凹部内壁面との隙間に新たな袋体を配
置して該袋体内に間詰め用コンクリートを充填すること
を特徴とするものである。
Further, the rail foundation repairing method according to the present invention comprises a rail foundation main body having a concave cross section, which is constructed in a buried state with a top portion left in the ground to form a longitudinal through recess.
A level adjusting portion arranged on the bottom surface of the recess, a rail fixing block installed on the upper surface of the level adjusting portion and having a rail integrally arranged on the upper portion, both side portions of the rail fixing block and the inside of the recess. A method of repairing a rail foundation comprising a filling concrete filled in the hollow inside of a pair of bags arranged in a gap between a wall surface, a step of removing the filling concrete together with the bags, and A step of hoisting the rail together with a fixed block by a hoisting jig that is hung over the recessed portion of the rail foundation body, a step of forming a raised portion in the level adjustment portion, both sides of the fixed block and the inner wall surface of the recessed portion. A new bag is placed in the gap and the filling concrete is filled in the bag.

【0010】[0010]

【作用】以上のレール基礎にあっては、基礎本体の構築
後は、予め上部にレールを一体化したレール固定ブロッ
クを凹部の内底面であるレベル調整部上に設置すること
で水平度が確保され、袋体をレール固定ブロックの両側
と凹部内壁面との隙間に差し込んで間詰めコンクリート
を充填すれば、袋体は膨脹してレール固定ブロックの両
側を圧し、コンクリートの固化によって固定ブロックの
水平移動を規制する。レール固定ブロックは左右の動き
を規制されているが、間詰めコンクリートとは結合され
ていないため、後の改修にあたってはこれを引き抜くこ
とにより、簡単にレールごと抜去できる。
[Operation] In the above rail foundation, after building the main body of the rail, leveling is ensured by installing the rail fixing block with the rail integrated on the top in advance on the level adjusting section which is the inner bottom surface of the recess. If the bag is inserted into the gap between both sides of the rail fixing block and the inner wall surface of the recess to fill the space with concrete, the bag expands and presses both sides of the rail fixing block, and the solidification of the concrete causes the fixing block to move horizontally. Regulate movement. Although the rail fixing block is restricted from moving to the left and right, it is not connected to the stuffed concrete, so it can be easily pulled out together with the rail by pulling it out for later repair.

【0011】また、レール基礎の改修方法にあっては、
前述のごとく間詰め用コンクリートと、レール固定ブロ
ックおよび基礎本体は一体化されていないので、最初に
このコンクリートを袋体ごとを引き抜くことによりレー
ルごとレール固定ブロックは抜去可能となり、吊上げ治
具を介して吊上げることによりその水平度および直線度
を一定に保持した状態で所定の高さに上昇する。この段
階で所望の嵩上げ高さに保持しつつ、嵩上げ部を配置す
ることでその嵩上げ高さ位置に固定され、次いで袋体を
介した間詰めコンクリートの充填により横方向も固定さ
れる。
In addition, in the method of repairing the rail foundation,
As mentioned above, the filling concrete, the rail fixing block and the foundation body are not integrated, so the rail fixing block can be removed together with the rail by first pulling out the concrete for each bag, and the rail fixing block can be removed via the lifting jig. It is lifted to a predetermined height while keeping its horizontality and straightness constant. At this stage, while maintaining the desired raised height, the raised portion is arranged so that the raised portion is fixed at the raised height position, and then it is also fixed laterally by filling the filling concrete with the bag body.

【0012】[0012]

【実施例】以下、この発明の実施例を図面を参照して詳
細に説明する。図1はこの発明によるレール基礎を示す
ものである。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 shows a rail foundation according to the present invention.

【0013】図におけるレール基礎は、地中Eに頂部を
残して埋設状態に構築され長手通し状の凹部10aを有
する断面凹状の鉄筋コンクリート製のレール基礎本体1
0と、基礎本体10の凹部10aの底面に配置されたレ
ベル調整コンクリート(但し、モルタルを含む)12
と、レベル調整コンクリート12の上面中央に設置さ
れ、かつ上部に予めレール14を一体に配置したレール
固定ブロック16と、レール固定ブロック16の両側部
と前記凹部10a内壁面との隙間に配置されるポリエチ
レンシート等からなる一対の袋体18を介して隙間形状
に充填された急結コンクリートからなる間詰め用コンク
リート20と、間詰めコンクリート20の上部に前記レ
ール14の下面と同一レベルで積層されかつ間詰め用コ
ンクリート20内に差し込まれた図示しない鉄筋と一体
化するアスファルトモルタル22を備えている。前記レ
ール14は、レベル調整コンクリート12により水平度
が維持され、またレール固定ブロック16の左右を間詰
め用コンクリート20が圧することによって直線度が保
持される。
The rail foundation shown in the figure is a rail foundation body 1 made of reinforced concrete having a concave cross section and having a recess 10a having a longitudinal through shape, which is constructed to be buried in the ground E with the top left.
0 and level adjustment concrete (including mortar) 12 arranged on the bottom surface of the recess 10a of the base body 10
And a rail fixing block 16 installed at the center of the upper surface of the level-adjusting concrete 12 and having a rail 14 integrally arranged on the upper part in advance, and arranged in a gap between both side portions of the rail fixing block 16 and the inner wall surface of the recess 10a. The filling concrete 20 made of quick-setting concrete filled in a gap shape via a pair of bags 18 made of polyethylene sheet or the like, and the filling concrete 20 is laminated on the upper surface of the filling concrete 20 at the same level as the lower surface of the rail 14, and The asphalt mortar 22 integrated with the reinforcing bars (not shown) inserted in the filling concrete 20 is provided. The level of the rail 14 is maintained by the level-adjusting concrete 12, and the straightness is maintained by pressing the left and right sides of the rail fixing block 16 with the filling concrete 20.

【0014】前記レール14は、図の一部に拡大して示
すように、レール固定ブロック16上に配置された複数
枚のベッドプレート24上にレール14の下部と同じ幅
の複数枚のレールパッド26を介して設置され、ベッド
プレート24を貫通してレール固定ブロック16内に埋
設固定されたアンカーボルト28aに螺合する取付ボル
ト28の頂部に設けたクランプ金具30によって左右を
固定されており、またアスファルトモルタル22の天端
はベッドプレート24の天端に同一レベルになるように
敷設されている。
As shown in an enlarged view of a part of the drawing, the rail 14 is provided on a plurality of bed plates 24 arranged on a rail fixing block 16 and a plurality of rail pads having the same width as the lower portion of the rail 14. 26 is installed via 26, the left and right are fixed by a clamp metal fitting 30 provided on the top of a mounting bolt 28 that is screwed into an anchor bolt 28a that is fixed through the bed plate 24 and embedded in the rail fixing block 16. The top end of the asphalt mortar 22 is laid on the top end of the bed plate 24 so as to be at the same level.

【0015】なお、前記レールパッド26は不等沈下差
が6mm以下の場合に高さを修正するものであり、ベッ
ドプレート24は不等沈下差が25〜75mmの範囲で
の修正を行なうために介在されるもので大改修工事以外
の日常メンテナンスはこれらレールパッド26,ベット
プレート24の差込によって微調整される。
The rail pad 26 corrects the height when the uneven settlement difference is 6 mm or less, and the bed plate 24 corrects the uneven settlement difference in the range of 25 to 75 mm. Routine maintenance other than major renovation work is intervening and is finely adjusted by inserting the rail pad 26 and the bed plate 24.

【0016】次に不等沈下差が75mm以上に達した場
合における前記構成のレール基礎の改修方法について図
2を用いて説明する(なお、同図では不等沈下の状況を
誇張して描いてある)。
Next, a method of repairing the rail foundation having the above-described configuration when the difference in uneven settlement reaches 75 mm or more will be described with reference to FIG. 2 (note that the condition of uneven settlement is exaggerated in FIG. 2). is there).

【0017】まず、凹部10a内の左右の最上層に位
置するアスファルトモルタル22を斫りつつ、間詰め用
コンクリート20を引き抜くことで(a)に示すように
凹部10a内にはレール固定ブロック16が残置され
る。作業時にアスファルトモルタル22は容易に剥離す
ることができ、また間詰め用コンクリート20と、レー
ル固定ブロック16および基礎本体10は袋体18を介
して分離されているためコンクリート20を袋体18ご
とを引き抜くことができる。
First, the asphalt mortar 22 located on the left and right uppermost layers in the recess 10a is removed, and the filling concrete 20 is pulled out, so that the rail fixing block 16 is provided in the recess 10a as shown in (a). Left behind. During work, the asphalt mortar 22 can be easily peeled off, and the concrete 20 for packing and the rail fixing block 16 and the base body 10 are separated via the bag body 18. Can be pulled out.

【0018】次に(b)に示すように、両端をジャッ
キ32を介して前記レール基礎本体10の頂部両側に凹
部10aを跨いで掛け渡される吊上げ治具34に設けた
チャック部34aにより前記レール14をチャックし、
ジャッキ32のジャッキアップ操作によって前記レール
14の水平度および直線度を保持しつつレール固定ブロ
ック16ごと所望の嵩上げ位置まで吊上げる。
Next, as shown in (b), both ends of the rail are supported by a chuck portion 34a provided on a lifting jig 34 which is laid over both sides of the top of the rail base body 10 via jacks 32 so as to straddle the recess 10a. Chuck 14
By jacking up the jack 32, the rail fixing block 16 is lifted up to a desired raised position while maintaining the levelness and linearity of the rail 14.

【0019】吊上げ作業完了後は、治具34によりそ
の状態に保持したまま(c)に示すように、レール固定
ブロック16の底面と調整コンクリート12の間に嵩上
げモルタル36を充填する。
After the hoisting work is completed, the raised mortar 36 is filled between the bottom surface of the rail fixing block 16 and the adjusted concrete 12 as shown in FIG.

【0020】モルタル36の固化後、(d)に示すご
とくレール固定ブロック16の左右に袋体18を配置
し、その後、急結コンクリートからなる新たな間詰めコ
ンクリート20を袋体18の図示しない注入口から注入
すれば、間詰めコンクリート20の充填により袋体18
は隙間形状に沿って膨脹し、コンクリート20の固化に
よりレール固定ブロック16の左右は固定される。
After the mortar 36 is solidified, the bags 18 are arranged on the left and right of the rail fixing block 16 as shown in (d), and then a new filling concrete 20 made of quick-setting concrete is added to the bag 18 not shown. If it is injected from the inlet, the bag 18 is filled with the filling concrete 20.
Expands along the gap shape, and the left and right of the rail fixing block 16 are fixed by the solidification of the concrete 20.

【0021】その後間詰めコンクリート20の上部に
新たなアスファルトモルタル22を打設すれば、図1と
類似する断面形状であって、嵩上げモルタル36によっ
てレール14を沈下量に相当する所望の嵩上げ高さに改
修したレール基礎が得られることになる。
After that, when a new asphalt mortar 22 is placed on the top of the stuffed concrete 20, the cross-sectional shape is similar to that of FIG. You will be able to obtain the rail foundation that has been renovated.

【0022】さらに、吊上げ治具34を撤去した後、
必要に応じてレール基礎本体10の両側頂部を嵩上げす
る。この嵩上げは、従来と同様に、掘削による暴露、斫
り、清掃、補強鉄筋の配置、コンクリートの打設により
行われるが、従来の改修方法に比べてその作業量は著し
く少ない。
Further, after removing the lifting jig 34,
The tops of both sides of the rail base body 10 are raised as needed. As in the conventional method, this raising is performed by exposure by excavation, scumming, cleaning, arranging reinforcing bars, and placing concrete, but the amount of work is significantly smaller than in the conventional repairing method.

【0023】[0023]

【発明の効果】以上実施例によって詳細に説明したよう
に、この発明にかかるレール基礎にあっては、基礎本体
の構築後は、予め上部にレールを一体化したレール固定
ブロックを凹部の内底面であるレベル調整部上に設置す
ることで水平度が確保され、袋体をレール固定ブロック
の両側と凹部内壁面との隙間に差し込んで間詰めコンク
リートを充填すれば、袋体は膨脹してレール固定ブロッ
クの両側を圧し、コンクリートの固化によって固定ブロ
ックの水平移動が規制される。レール固定ブロックは左
右の動きが規制されているが、間詰めコンクリートとは
結合されていないため、後の改修にあたってはこれを引
き抜くことにより、簡単にレールごと抜去でき、従来の
構造に対し、改修を前提とした分解組立て自在な構造と
なる。
As described above in detail with reference to the embodiments, in the rail foundation according to the present invention, after the foundation body is constructed, the rail fixing block having the rail integrated in the upper portion is previously formed on the inner bottom surface of the recess. By installing it on the level adjustment part, the levelness is secured, and if the bag body is inserted into the gap between both sides of the rail fixing block and the inner wall surface of the recess and filled with filling concrete, the bag body will expand and the rail will expand. The horizontal movement of the fixed block is restricted by pressing both sides of the fixed block and solidifying the concrete. Although the rail fixing block is restricted from moving to the left and right, it is not connected to the stuffed concrete, so it can be easily pulled out together with the rail for later repairs. It has a structure that allows free disassembly and assembly.

【0024】また、以上のレール基礎の改修にあたって
は、最初に間詰め用コンクリートを袋体ごとを引き抜く
ことによりレールごとレール固定ブロックは抜去可能と
なり、吊上げ治具を介して吊上げることによりその水平
度および直線度を一定に保持した状態で所定の高さに上
昇する。この段階で所望の嵩上げ高さに保持しつつ、嵩
上げ部を配置することでその嵩上げ高さ位置に固定さ
れ、次いで袋体を介した新たな間詰めコンクリートの充
填により水平方向も固定されるため、従来の基礎本体の
斫りやコンクリートの打継ぎなどの作業が一切なく、改
修施工が簡単で工期も短縮できる利点がある。
Further, in the above-mentioned repair of the rail foundation, the rail fixing block can be removed together with the rail by first pulling out the bagging concrete for each bag, and the rail fixing block can be lifted horizontally through the lifting jig. It rises to a predetermined height with the degree and straightness kept constant. At this stage, while maintaining the desired raised height, it is fixed at the raised height position by arranging the raised portion, and then it is also fixed in the horizontal direction by filling new padding concrete through the bag. Since there is no work such as scavenging of the basic body and splicing of concrete, there is an advantage that the repair work is easy and the construction period can be shortened.

【0025】したがって、この発明は、港湾,造船ある
いは重機メーカーなどに用いられる大型の門形移動クレ
ーンやガントリークレーン等の荷役設備用の軌条や、あ
るいは貨物引き込み線等に好適である。
Therefore, the present invention is suitable for rails for cargo handling equipment such as large-sized gate-type mobile cranes and gantry cranes used in harbors, shipbuilding or heavy equipment manufacturers, or cargo lead-in lines.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明によるレール基礎の断面図である。1 is a cross-sectional view of a rail foundation according to the present invention.

【図2】(a)〜(d)は同レール基礎の改修工事手順
を示す断面説明図である。
2 (a) to (d) are cross-sectional explanatory views showing a procedure for repairing the rail foundation.

【図3】従来のレール基礎およびこれの改修を説明する
ための断面図である。
FIG. 3 is a cross-sectional view for explaining a conventional rail foundation and a repair thereof.

【符号の説明】[Explanation of symbols]

10 レール基礎本体 12 調整コンクリート(調整部) 14 レール 16 レール固定ブロック 18 袋体 20 間詰めコンクリート 28a,28,30 締結金具(28a インサートナ
ット、28 取付ボルト、30 クランプ具) 32 ジャッキ 34 吊上げ治具 34a チャック部 36 嵩上げモルタル
10 Rail Foundation Main Body 12 Adjusting Concrete (Adjusting Section) 14 Rail 16 Rail Fixing Block 18 Bag Body 20 Padding Concrete 28a, 28, 30 Fastening Metal Fittings (28a Insert Nuts, 28 Mounting Bolts, 30 Clamping Tools) 32 Jack 34 Lifting Jig 34a chuck part 36 raised mortar

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地中に頂部を残して埋設状態に構築され
長手通し状の凹部が形成される断面凹状のレール基礎本
体と、前記凹部の底面に配置されるレベル調整部と、該
レベル調整部の上面に設置され、かつ上部にレールが一
体に配置されるレール固定ブロックと、該レール固定ブ
ロックの両側部と前記凹部の内壁面との隙間に配置され
た一対の袋体の中空内部に充填される間詰め用コンクリ
ートとを備えたことを特徴とするレール基礎。
1. A rail base body having a concave cross-section, which is constructed to be buried in the ground leaving an apex and has a longitudinally extending recess, a level adjusting unit disposed on the bottom surface of the recess, and the level adjusting. A rail fixing block which is installed on the upper surface of the portion and in which the rail is integrally arranged on the upper portion, and a hollow inside of a pair of bags arranged in the gap between both side portions of the rail fixing block and the inner wall surface of the recess. A rail foundation provided with filling concrete for filling.
【請求項2】 地中に頂部を残して埋設状態に構築され
長手通し状の凹部が形成される断面凹状のレール基礎本
体と、前記凹部の底面に配置されるレベル調整部と、該
レベル調整部の上面に設置され、かつ上部にレールが一
体に配置されるレール固定ブロックと、該レール固定ブ
ロックの両側部と前記凹部の内壁面との隙間に配置され
た一対の袋体の中空内部に充填される間詰め用コンクリ
ートとを備えたレール基礎の改修方法であって、 前記袋体ごと間詰めコンクリートを撤去する工程と、前
記レール基礎本体の凹部を跨いで掛け渡される吊上げ治
具により前記レールを固定ブロックとともに吊上げる工
程と、前記レベル調整部に嵩上げ部を形成する工程と、
前記固定ブロックの両側と前記凹部内壁面との隙間に新
たな袋体を配置して該袋体内に間詰め用コンクリートを
充填することを特徴とするレール基礎の改修方法。
2. A rail base body having a concave cross section, which is constructed to be buried in the ground leaving a top portion and has a longitudinally extending concave portion, a level adjusting portion arranged on the bottom surface of the concave portion, and the level adjusting portion. A rail fixing block which is installed on the upper surface of the portion and in which the rail is integrally arranged on the upper portion, and a hollow inside of a pair of bags arranged in the gap between both side portions of the rail fixing block and the inner wall surface of the recess. A method of repairing a rail foundation comprising filling concrete to be filled, wherein the step of removing the filling concrete together with the bag body, and the lifting jig suspended over the recessed portion of the rail foundation body A step of hoisting the rail together with a fixed block, a step of forming a raised portion in the level adjusting portion,
A method of repairing a rail foundation, wherein a new bag is arranged in a gap between both sides of the fixed block and the inner wall surface of the recess, and the bag is filled with filling concrete.
JP31704594A 1994-12-20 1994-12-20 Rail foundation and its repair method Expired - Fee Related JP2874573B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31704594A JP2874573B2 (en) 1994-12-20 1994-12-20 Rail foundation and its repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31704594A JP2874573B2 (en) 1994-12-20 1994-12-20 Rail foundation and its repair method

Publications (2)

Publication Number Publication Date
JPH08169682A true JPH08169682A (en) 1996-07-02
JP2874573B2 JP2874573B2 (en) 1999-03-24

Family

ID=18083806

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31704594A Expired - Fee Related JP2874573B2 (en) 1994-12-20 1994-12-20 Rail foundation and its repair method

Country Status (1)

Country Link
JP (1) JP2874573B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002332645A (en) * 2001-05-08 2002-11-22 Nkk Corp Foundation structure of rail for ground-traveling crane and laying method for foundation
CN103663135A (en) * 2012-09-04 2014-03-26 上海神尹重工机械设备有限公司 Composite stick steel repairing and reinforcing technology of concrete rail-bearing beam of crane
JP2020026731A (en) * 2018-08-09 2020-02-20 株式会社オーイケ Construction method of rail foundation and rail foundation block
JP2020026354A (en) * 2019-09-12 2020-02-20 株式会社オーイケ Construction method for rail foundation and rail foundation block

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104609300B (en) * 2015-02-02 2017-02-22 宏华海洋油气装备(江苏)有限公司 Railway structure of 10000-ton movable portal crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002332645A (en) * 2001-05-08 2002-11-22 Nkk Corp Foundation structure of rail for ground-traveling crane and laying method for foundation
CN103663135A (en) * 2012-09-04 2014-03-26 上海神尹重工机械设备有限公司 Composite stick steel repairing and reinforcing technology of concrete rail-bearing beam of crane
JP2020026731A (en) * 2018-08-09 2020-02-20 株式会社オーイケ Construction method of rail foundation and rail foundation block
JP2020026354A (en) * 2019-09-12 2020-02-20 株式会社オーイケ Construction method for rail foundation and rail foundation block

Also Published As

Publication number Publication date
JP2874573B2 (en) 1999-03-24

Similar Documents

Publication Publication Date Title
CN101736749B (en) Method for constructing soft soil foundation continuous caisson
CN112503247A (en) Slope section water pipeline and construction method thereof
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN112554250A (en) Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof
JPH07268885A (en) Method of drive construction used for construction of subsurface structure
JPH08169682A (en) Rail base and its repairing method
CN116608323A (en) Quick construction equipment and construction method for fully assembled concrete drainage pipeline
JP2019120115A (en) Method of constructing tunnel lining structure
JP2004316100A (en) Construction method for building
CN109488341B (en) Supporting method and supporting structure of curtain frame type underground excavation system
CN211849445U (en) Construction system of river levee dam concrete bed course
CN111501468A (en) Fabricated road structure and construction process
CN115450262B (en) Working method for setting construction channel on upper part of post-pouring strip of building structure
CN113217002B (en) Construction method for jacking side positions crossing existing lines in frame culvert points
CN218027861U (en) A prefabricated assembly quality for post-cast strip is as construction passageway
CN216664193U (en) Bottom-sealing-free jacket box system
CN216664194U (en) Assembled suit case bottom plate
CN115198794B (en) Steel pipe column section reverse construction method based on cover-excavation reverse construction method deep foundation pit engineering
CN115929399B (en) Construction protection device and construction protection method for electric power tunnel
JPH07985B2 (en) Expandable and contractible liner form and its shaft excavation method
CN108894128B (en) In-situ upgrading structure and construction method for in-service arch culvert
CN117266624A (en) Ancient stone wall moving technology
CN117513351A (en) Recoverable deep foundation pit inclined throwing support system
KR960002379B1 (en) A form-less style working method and a structure apparatus for underground constructions
CN117536238A (en) Construction method of high-bearing water open cut tunnel

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080114

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090114

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20100114

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110114

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110114

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20120114

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees