JPH10198880A - Meter-reading information reporting device - Google Patents

Meter-reading information reporting device

Info

Publication number
JPH10198880A
JPH10198880A JP391297A JP391297A JPH10198880A JP H10198880 A JPH10198880 A JP H10198880A JP 391297 A JP391297 A JP 391297A JP 391297 A JP391297 A JP 391297A JP H10198880 A JPH10198880 A JP H10198880A
Authority
JP
Japan
Prior art keywords
meter reading
day
meter
reading
integration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP391297A
Other languages
Japanese (ja)
Inventor
Koichi Shibayama
浩一 柴山
Chizuru Kouno
ちづる 河野
Shigekazu Koyama
重和 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP391297A priority Critical patent/JPH10198880A/en
Publication of JPH10198880A publication Critical patent/JPH10198880A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a meter-reading information reporting device that makes neither too much nor too little collection of charge even when the first meter- reading integration day and the last meter-reading integration last day are changed and set. SOLUTION: A data processor 3A makes a disk reading and writing device read the data of the previous meter-reading working day and a meter-reading reference day from a magnetic disk, when change processing is performed of the read meter-reading reference day and the current day already passed the meter-reading reference day, makes the next day of the previous meter- reading integration last day a meter-reading integration first day, makes the last day which makes one month the next meter-reading period, sets a period that makes the last day the meter-reading integration last day as a taking-in period, outputs a sending request command signal of an integration value of meter-reading data that corresponds to the take-in period, fetches the integration value of the meter-reading data of each pulsemeter M1 to Mn in the take-in period, calculates charges, after that, updates the data of a meter-reading working day and a meter-reading reference day and writes them on a magnetic disk.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は建物の入居者が使用
する電気、水道等の消費材の使用量を指定された期間
毎、入居者毎に積算した積算値を検針値とし、この検針
値に相当する料金を計算し、これらのデータを電話回線
を介して公共料金徴収施設に送信するようにした検針情
報通報装置の技術分野に属する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a meter reading value obtained by integrating the consumption of consumables such as electricity and water used by a resident of a building for each designated period for each occupant. And transmits the data to a utility collection facility via a telephone line.

【0002】[0002]

【従来の技術】建物内の使用者毎に水道、ガス、電気等
の使用量を当該建物に設置された端末装置が自動的に積
算して、電話回線を介して遠隔地にある公共料金徴収施
設に使用量データとして送信するようにした検針装置が
知られている。例えば、特開平3−48998号公報に
は水道等の使用量に応じた数のパルス信号を発生するパ
ルス発生器と、パルス発生器から出力されたパルス信号
に基づいて水道等の使用量の検針値を演算する検針値演
算回路と、検針値演算回路が演算した検針値を記録する
検針値記録装置と、数字等の文字の活字形状のデータを
記憶する活字形状記憶装置と、一定期間毎に検針値記録
装置から各使用者毎の使用量の検針値を読み出して、該
検針値が示す数字の活字形状を活字形状記憶装置から読
み出し、その活字形状のデータを1行の文字列分だけR
AMに記憶させる仮文字列作成回路と、RAMに記憶さ
れた1行の文字列の活字形状の各ドットラインを走査し
て、ドット毎に同一符号が連続する場合に所定の規則に
従ってドットラインに沿った冗長なデータを符号化する
帯域圧縮回路と、帯域圧縮回路の出力信号を所定の搬送
波に重畳させる変調回路と、電話回線との接続を行い、
公共料金徴収施設の電話番号を発信して回線接続を行っ
た後、変調回路から出力された被変調信号を公共料金徴
収施設に送信する網制御回路を具えた検針情報通報装置
の発明が開示されている。
2. Description of the Related Art A terminal installed in a building automatically accumulates the usage of water, gas, electricity, etc. for each user in the building, and collects a utility charge in a remote place via a telephone line. There is known a meter reading device which transmits the data to a facility as usage data. For example, Japanese Patent Application Laid-Open No. 3-48998 discloses a pulse generator that generates a number of pulse signals corresponding to the amount of water used or the like, and meter reading of the amount of water used or the like based on the pulse signals output from the pulse generator. A meter reading value calculating circuit for calculating a value, a meter reading value recording device for recording a meter reading calculated by the meter reading value calculating circuit, a character shape storage device for storing character type data of characters such as numerals, The meter reading value of the usage amount for each user is read from the meter reading value recording device, the character shape of the number indicated by the meter reading value is read from the character shape storage device, and the character shape data is stored in one line of the character string by R.
A provisional character string creation circuit to be stored in the AM, and a scan of each character-type dot line of a one-line character string stored in the RAM to form a dot line according to a predetermined rule when the same code continues for each dot. A band compression circuit that encodes redundant data along with a modulation circuit that superimposes an output signal of the band compression circuit on a predetermined carrier, and connects to a telephone line,
An invention of a meter reading information reporting device including a network control circuit for transmitting a modulated signal output from a modulation circuit to a utility collection facility after transmitting a telephone number of the utility collection facility and making a line connection is disclosed. ing.

【0003】[0003]

【発明が解決しようとする課題】従来技術に係る上述の
検針通報装置では検針値を読み出す期間は入力装置から
設定入力されるようになっているが、この検針の基準と
なる期間が変更される場合がある。検針基準日が変更さ
れた時には以前登録されていた検針基準日のデータは消
去されてしまう。例えば、月毎の検針値を検針して送信
する場合に、変更後の検針基準日が以前の検針基準日よ
り前の日に変更された場合には、以前の検針基準日に従
って検針された使用量の検針値と変更された検針基準日
に従って検針された使用量の検針値とは、検針期間に重
複検針部分が生じるため、当該期間分重複して検針した
検針値を公共料金徴収施設に通報してしまう。また、変
更後の検針基準日が以前の検針基準日より後の日に変更
された場合には、以前の検針基準日に従って検針された
使用量の検針値と変更された検針基準日に従って検針さ
れた使用量の検針値とは、検針期間に未検針部分が生じ
るため、当該期間分不足した検針値を公共料金徴収施設
に通報してしまうことになる。
In the above-described conventional meter reading notification device, the period for reading the meter reading is set and input from the input device, but the reference period of the meter reading is changed. There are cases. When the meter reading reference date is changed, the previously registered meter reading reference date data is deleted. For example, when reading and sending the monthly meter reading, if the changed meter reading reference date is changed to a day before the previous meter reading reference date, the usage metered according to the previous meter reading reference date is used. The meter reading of the amount used and the meter reading of the amount used according to the changed meter reading reference date have an overlapping meter reading part during the meter reading period. Resulting in. In addition, if the changed meter reading reference date is changed to a date after the previous meter reading reference date, meter reading is performed according to the meter reading value of the usage metered according to the previous meter reading reference date and the changed meter reading reference date. Since the meter reading value of the used amount includes a non-metering portion during the meter reading period, the meter reading value short for the period is reported to the utility collection facility.

【0004】このように、定期的に検針を行う検針基準
日が変更された場合には、検針期間に重複検針部分が生
じたり、未検針部分が生じるため、別途入力操作を行っ
て当該期間分の超過料金や不足料金を積算させ、既に積
算した検針値との減算または加算を行わせなければなら
ない。本発明の目的は検針積算初日と検針積算末日が変
更設定された場合であっても、積算した徴収料金に過不
足が生じない検針情報通報装置を提供することにある。
As described above, when the meter reading reference date at which meter reading is performed periodically is changed, an overlapping meter reading portion or an unmetered meter portion occurs during the meter reading period. It is necessary to accumulate the excess charges and the shortage charges, and to perform subtraction or addition with the meter reading value already accumulated. SUMMARY OF THE INVENTION It is an object of the present invention to provide a meter reading information notifying apparatus in which the collected fee does not become excessive or insufficient even when the first day of meter reading and the last day of meter reading are changed.

【0005】[0005]

【課題を解決するための手段】本発明は上記課題を解決
するために、検針値を算出する際の指定された期間を画
定する検針積算初日と検針積算末日のデータを記憶する
期間画定日記憶手段と、入力手段から期間画定日記憶手
段が記憶する検針積算初日と検針積算末日のデータを更
新する期間画定日更新指令が入力された場合に、期間画
定日記憶手段に更新された検針積算初日と検針積算末日
のデータと共に少なくとも更新前の検針積算初日と検針
積算末日のデータを記憶させる更新記憶制御手段と、入
力手段から送信指令が入力されたことを確認した後、期
間画定日記憶手段が記憶する検針積算末日より当該日が
後か否かを判定する検針日判定手段と、該検針日判定手
段が期間画定日記憶手段が記憶する検針積算末日より当
該日が後と判定した時、検針値を算出する際の指定され
た期間を画定する検針積算初日を更新前の検針積算初日
と設定する更新時初日設定手段を有したものである。ま
た、好ましくは、検針積算初日と検針積算末日は連続す
る月の同一の応答日としたものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention solves the above-mentioned problem by storing a data of a first day of meter integration and a last day of meter integration for defining a designated period for calculating a meter reading. Means, and when a period defining date update command for updating data of the meter reading first day and meter reading ending date stored in the period defining date storage means is input from the input means, the meter reading first day updated in the period defining date storage means. Update storage control means for storing at least the data of the first day of meter reading before the update and the last day of meter reading together with the data of the last day of meter reading, and after confirming that a transmission command has been input from the input means, the period defining day storage means The meter reading date determining means for determining whether or not the date is later than the meter reading integration last day, and the meter reading date determining means determine that the date is later than the meter reading integration day stored in the period defining day storage means. When, those having the update time of day setting means for setting a needle cumulative day before updating the needle cumulative day defining a specified period of time for calculating the meter reading value. Preferably, the first day of meter reading and the last day of meter reading are the same response day in consecutive months.

【0006】[0006]

【発明の実施の形態】以下、図面を参照して本発明の一
具体例を詳細に説明する。図1は本発明を具体化した検
針情報通報装置の構成を示すブロック図、図2はその見
取図である。これらの図において、1は複数(n)の入
居者が居る建物、2は建物1に設置された検針端末装
置、3は通信回線T2を介して検針端末装置2と接続さ
れた課金計算装置、M1 〜Mn は建物1の各入居者毎に
その電気、水道、燃料等の使用量を計測して、当該使用
量に相当するパルス信号を出力するパルスメーター、N
1 〜Nn は各パルスメーターM1 〜Mn にそれぞれ接続
され、パルスメーターM1 〜Mn から出力されたパルス
信号のパルス数を積算し、それらの値が所定値となる毎
に積算信号を出力する積算計である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a block diagram showing a configuration of a meter reading information notifying device embodying the present invention, and FIG. 2 is a sketch thereof. In these figures, 1 is a building in which a plurality of (n) residents are located, 2 is a meter reading terminal installed in the building 1, 3 is a billing calculation device connected to the meter reading terminal 2 via a communication line T2, M1 to Mn are pulse meters for measuring the amount of electricity, water, fuel, etc. used by each resident of the building 1 and outputting a pulse signal corresponding to the amount of use;
1 to Nn are respectively connected to the pulse meters M1 to Mn, accumulate the number of pulses of the pulse signals output from the pulse meters M1 to Mn, and output an integration signal each time the value becomes a predetermined value. It is.

【0007】検針端末装置2の内部構成では、2Aは制
御処理装置(CPU)、2Bは計算結果や送信されたデ
ータを一時記憶する一時記憶装置(RAM)、2Cは制
御処理を行うプログラムを記憶する固定記憶装置(RO
M)、2Dは通信線T1と同数の入力ポートを有し、積
算計N1 〜Nn からの信号がそれぞれ入力される入力
部、2EはCPU2Aで処理された情報を通信回線T2
を介して課金計算装置3に出力する出力部、2Fはこれ
らを接続するバスラインである。
In the internal configuration of the meter reading terminal device 2, 2A is a control processing device (CPU), 2B is a temporary storage device (RAM) for temporarily storing calculation results and transmitted data, and 2C is a program for performing a control process. Fixed storage device (RO
M), 2D has the same number of input ports as the communication line T1, and an input section to which signals from the integrators N1 to Nn are respectively input, and 2E transmits information processed by the CPU 2A to the communication line T2.
And an output unit 2F for outputting to the billing calculation device 3 via a bus line connecting them.

【0008】課金計算装置3の内部構成では、3Aはデ
ータ処理装置(課金手段、網制御手段、更新記憶制御手
段、検針日判定手段、更新時初日設定手段)、3Bは計
算結果や登録データを表示する表示装置、3Cは各種デ
ータの入力や修正を行うための操作卓(入力手段)、3
Dはデータ処理装置3Aの処理結果、例えば、料金請求
書の帳票を印字する印字装置、3Eは格納した磁気ディ
スクを読み書きするディスク読書装置であり、4Aは計
算処理ソフトと固定データを格納する磁気ディスク(検
針データ記憶手段、期間画定日記憶手段)である。
[0008] In the internal configuration of the billing calculation device 3, 3A is a data processing device (charging means, network control means, update storage control means, meter reading date determination means, first day setting means for updating), and 3B is a calculation result and registration data. A display device 3C is a console (input means) for inputting and correcting various data, and 3C.
D is a printing device that prints processing results of the data processing device 3A, for example, a bill form, 3E is a disk reading device that reads and writes the stored magnetic disk, and 4A is a magnetic reading device that stores calculation processing software and fixed data. It is a disk (metering data storage means, period definition date storage means).

【0009】この磁気ディスク4Aには通信回線T2を
介して検針端末装置2から送信されたパルスメーターM
1 〜Mn 毎の1カ月間の検針データ値およびこれら検針
データ値から計算した請求金額等のデータや料金を計算
するための計算処理プログラム等が格納されている。な
お、課金計算装置3はこの外に図示しない、電話回線と
の接続を行い、公共料金徴収施設の電話番号を発信して
回線接続を行った後、検針端末装置2から送信されたパ
ルスメーターM1 〜Mn 毎の検針データ値およびデータ
処理装置3Aが計算した請求金額等のデータを公共料金
徴収施設に送信する網制御回路を具えている。
The pulse meter M transmitted from the meter reading terminal device 2 via the communication line T2 is provided on the magnetic disk 4A.
It stores meter reading data values for one month for each of 1 to Mn, data such as billing amount calculated from these meter reading data values, and a calculation processing program for calculating a fee. The billing calculation device 3 connects to a telephone line (not shown), transmits the telephone number of the utility collection facility, connects the line, and then connects the pulse meter M1 transmitted from the meter reading terminal device 2. A network control circuit for transmitting data such as meter reading data values for each of .about.Mn and billing amounts calculated by the data processing device 3A to a utility collection facility.

【0010】図3は課金計算処理の流れ図である。同図
を参照して本発明の具体例の動作を説明する。課金計算
装置3の機能の選択は表示装置3Bの画面表示に従った
操作卓3Cの操作により行われる。そこで、操作者が操
作卓3Cの検針釦を押下すると(S1で有)、以下に述
べるように、課金計算装置3から検針端末装置2に対し
て所定期間内の電気代等の検針データの積算値の送信要
求を行う指令信号が出力される。まず、データ処理装置
3Aはディスク読書装置3Eに対して前回の検針作業日
と検針基準日のデータを磁気ディスク4Aから読み取ら
せる(S2)。次に、読み出した検針基準日に対して変
更処理が施されているかどうか来歴の確認を行う(S
3)。
FIG. 3 is a flowchart of the accounting calculation process. The operation of the specific example of the present invention will be described with reference to FIG. The selection of the function of the charge calculation device 3 is performed by operating the console 3C according to the screen display of the display device 3B. Then, when the operator presses the meter reading button of the console 3C (Yes in S1), as described below, the charge calculation device 3 integrates the meter reading terminal device 2 with meter reading data such as electricity bills within a predetermined period. A command signal for requesting the transmission of the value is output. First, the data processing device 3A causes the disk reading device 3E to read data of the previous meter reading operation date and the meter reading reference date from the magnetic disk 4A (S2). Next, it is confirmed whether or not the log reading process has been performed on the read meter reading reference date (S
3).

【0011】その結果、来歴無しであったならば、当日
が検針基準日を経過しているかどうかを判断する(S
4)。その判断結果が否、即ち、未だ経過していなかっ
たならば、前回の検針積算初日と同一日を検針積算初日
とし、前回の検針積算末日と同一日を検針積算末日とし
た期間を取込期間として設定する(S5)。手順S4の
判断結果が然り、即ち、既に検針基準日を経過していた
ならば、前回の検針積算末日の翌日を検針積算初日と
し、課金計算を行う際の検針期間とされた期間、即ち、
1カ月を次の検針期間とした末日を検針積算末日とする
期間を取込期間として設定する(S6)。
As a result, if there is no history, it is determined whether or not the current day has passed the meter reading reference date (S
4). If the result of the determination is no, that is, if the elapsed time has not yet elapsed, the same day as the first day of the previous metering integration is regarded as the first day of metering integration, and the same day as the last day of metering integration is set as the last day of metering integration. (S5). If the result of the determination in step S4 is true, that is, if the meter reading reference date has already passed, the day following the last day of the previous meter integration is set as the meter reading first day, and the meter reading period for performing the billing calculation, that is, ,
A period in which the last day of one month as the next meter reading period is the last day of meter reading integration is set as a capture period (S6).

【0012】手順S4の判断結果が来歴有りであった場
合は、変更された検針基準日のデータを磁気ディスク4
Aから読み取らせて、本日が検針基準日を経過している
かどうかを判断する(S7)。その判断結果が否、即
ち、未経過であったならば、前回の検針積算初日と同一
日を検針積算初日とし、前回の検針積算末日と同一日を
検針積算末日とした期間を取込期間として設定する(S
8)。手順S7の判断結果が然り、即ち、既経過であっ
たならば、前回の検針積算末日の翌日を検針積算初日と
し、また、変更された検針基準日を検針積算末日とした
期間を取込期間として設定する(S9)。なお、検針基
準日を変更する場合は操作者が操作卓3Cを操作して新
たな日付を入力する。入力された検針基準日を変更する
日付データは変更前の検針基準日の日付データと共に磁
気ディスク4Aに書き込まれる。
If the result of the determination in step S4 is that there is a history, the data of the changed meter reading reference date is stored on the magnetic disk 4.
A is read, and it is determined whether or not today is the meter reading reference date (S7). If the result of the determination is no, that is, if it has not elapsed, the same day as the first day of the previous metering integration is set as the first day of metering integration, and the period with the same day as the last day of metering integration the last day of metering integration is set as the importing period. Set (S
8). If the result of the determination in step S7 is true, that is, if it has already elapsed, the period following the last day of the last meter integration is set as the first meter integration day, and the changed meter reading reference date is set as the last day of meter integration. A period is set (S9). When changing the meter reading reference date, the operator operates the console 3C and inputs a new date. The input date data for changing the meter reading reference date is written to the magnetic disk 4A together with the date data for the meter reading reference date before the change.

【0013】手順S5,S6,S8,S9の処理が終了
したら、上述の手順で設定された取込期間に相当する検
針データの積算値の送信要求を行う指令信号を検針端末
装置2に出力する(S10)。そして、データ処理装置
3Aは送信要求に応じて検針端末装置2の出力部2Eか
ら通信回線T2を介して送信され、設定された取込期間
のパルスメーターM1 〜Mn 毎の検針データの積算値を
取り込んで、磁気ディスク4Aから読み出した計算処理
プログラムに従って料金を計算する。その後、検針作業
日と検針基準日のデータを更新して、磁気ディスク4A
に書き込ませて(S11)、この課金計算処理を終了す
る。
When the processes in steps S5, S6, S8, and S9 are completed, a command signal for requesting the transmission of the integrated value of the meter reading data corresponding to the capturing period set in the above-described procedure is output to the meter reading terminal device 2. (S10). Then, the data processing device 3A transmits the integrated value of the meter reading data for each of the pulse meters M1 to Mn during the set capturing period, which is transmitted from the output unit 2E of the meter reading terminal device 2 via the communication line T2 in response to the transmission request. Then, the charge is calculated according to the calculation processing program read from the magnetic disk 4A. After that, the data of the meter reading work day and the meter reading reference date are updated and the magnetic disk 4A is read.
(S11), and the accounting calculation process ends.

【0014】この具体例の動作をさらにその実例につい
て説明する。図4は検針基準日を繰上げ変更した場合の
取込期間の設定の仕方を説明するための説明図、図5は
検針基準日を繰下げ変更した場合の取込期間の設定の仕
方を説明するための説明図である。まず、図4を参照し
て検針基準日が月末日から20日に変更された場合の例
について説明する。検針作業日が月初めであった場合
に、操作者が操作卓3Cの検針釦を押下して課金計算処
理動作を行わせると、来歴が無いならば手順S6を経て
前月の1日から月末日までの期間が取込期間に設定さ
れ、課金計算装置3からの送信要求(請求1)指令信号
に従って検針端末装置2は前月の1日〜月末日の間の検
針データの積算値を課金計算装置3に送信する。そし
て、手順S11を経てこの時の検針作業日と検針基準日
のデータが更新記憶される。
The operation of this embodiment will be further described with reference to an actual example. FIG. 4 is an explanatory diagram for explaining how to set the capture period when the meter reading reference date is advanced, and FIG. 5 is a diagram for explaining how to set the capture period when the meter reading reference date is reduced. FIG. First, an example in which the meter reading reference date is changed from the last day of the month to the 20th will be described with reference to FIG. When the meter reading work day is the beginning of the month, when the operator presses the meter reading button of the console 3C to perform the billing calculation processing operation, if there is no history, the procedure goes through step S6 to the last day of the month from the first day of the previous month. Is set as the capture period, and the meter reading terminal device 2 calculates the integrated value of the meter reading data between the first day of the previous month and the last day of the month in accordance with the transmission request (claim 1) command signal from the charging calculator 3. Send to 3. Then, after step S11, the data of the meter reading operation date and the meter reading reference date at this time are updated and stored.

【0015】その後、当該月の初旬に検針基準日が20
日に変更設定される。そして、当該月の下旬に検針作業
が行われると、課金計算処理動作の手順S3で来歴有り
と判断され、手順S9で前回の検針積算末日の翌日の当
該月の1日が検針積算初日として、また、変更された検
針基準日、即ち、20日を検針積算末日とした期間が取
込期間として設定設定される。従って、課金計算装置3
からの送信要求(請求2)指令に対して、検針端末装置
2は当該月の1日〜20日の間の検針データの積算値を
送信する。その後、各月の下旬に行われる検針作業毎
に、課金計算装置3からの送信要求(請求3)指令によ
って前月の20日〜当該月の20日の間の検針データの
積算値が送信される。
Thereafter, at the beginning of the month, the reference
Changed to day. Then, when the meter reading operation is performed at the end of the month, it is determined that there is a history in step S3 of the charge calculation processing operation, and in step S9, the first day of the month following the last day of the last meter reading integration is set as the first day of meter reading integration. Further, a period in which the changed meter reading reference date, that is, the 20th day is the last meter reading integration date, is set and set as the capture period. Therefore, the charge calculation device 3
In response to the transmission request (Claim 2) command from, the meter reading terminal device 2 transmits the integrated value of the meter reading data during the 1st to 20th of the month. Thereafter, for each meter reading operation performed at the end of each month, an integrated value of meter reading data from the 20th day of the previous month to the 20th day of the month is transmitted by a transmission request (claim 3) command from the charging calculation device 3. .

【0016】次に、図5を参照して検針基準日が20日
から月末日に変更された場合の例について説明する。あ
る月の下旬に検針作業が行われ、操作者が操作卓3Cの
検針釦を押下すると、来歴が無いならば手順S6を経て
前月の20日から当該月の20日までの期間が取込期間
に設定され、課金計算装置3からの送信要求(請求1)
指令信号に従って検針端末装置2は前月の20日〜当該
月の20日の間の検針データの積算値を課金計算装置3
に送信する。そして、手順S11を経てこの時の検針作
業日と検針基準日のデータが更新記憶される。
Next, an example in which the meter reading reference date is changed from the 20th to the last day of the month will be described with reference to FIG. When the meter reading operation is performed at the end of a certain month and the operator presses the meter reading button on the console 3C, if there is no history, the period from the 20th of the previous month to the 20th of the relevant month via the step S6 is the capture period. And a transmission request from the charge calculation device 3 (claim 1)
In accordance with the command signal, the meter reading terminal device 2 calculates the integrated value of the meter reading data between the 20th of the previous month and the 20th of the month, the charge calculating device 3.
Send to Then, after step S11, the data of the meter reading operation date and the meter reading reference date at this time are updated and stored.

【0017】その後、翌月の初旬に検針基準日が月末日
に変更設定される。そして、翌々月の初旬に検針作業が
行われると、課金計算処理動作の手順S3で来歴有りと
判断され、手順S9で前回の検針積算末日の翌日、即
ち、当該検針作業日から見た前々月の21日を検針積算
初日として、また、変更された検針基準日、即ち、前月
の月末日を検針積算末日とした期間が取込期間として設
定設定される。従って、課金計算装置3からの送信要求
(請求2)指令に対して、検針端末装置2は前々月の2
1日〜前月の月末日の間の検針データの積算値を送信す
る。その後、各月の初旬に行われる検針作業毎に、課金
計算装置3からの送信要求(請求3)指令によって前月
の1日〜月末日の間の検針データの積算値が送信され
る。
Thereafter, at the beginning of the following month, the meter reading reference date is changed to the last day of the month. When the meter reading operation is performed at the beginning of the next two months, it is determined that there is a history in step S3 of the billing calculation process operation, and in step S9, the day after the last meter reading integration last day, that is, 21 days before the meter reading work day. The day is set as the first day of meter reading integration, and the period in which the changed meter reading reference date, that is, the last day of the month of the previous month is the last day of meter reading integration, is set and set as the capture period. Therefore, the meter reading terminal device 2 responds to the transmission request (claim 2) command from the charge calculation device 3 by
The integrated value of the meter reading data between the first day and the last day of the previous month is transmitted. Thereafter, for each meter reading operation performed at the beginning of each month, an integrated value of the meter reading data from the first day to the last day of the previous month is transmitted by a transmission request (claim 3) command from the charging calculation device 3.

【0018】このように、この具体例では検針作業毎に
課金計算装置3のデータ処理装置3Aはディスク読書装
置3Eに対して当該検針作業日と検針基準日のデータを
磁気ディスク4Aに更新記憶させるようにしたので、検
針基準日が変更される毎に検針期間に重複検針部分が生
じたり、未検針部分が生じるのを防止でき、別途入力操
作を行って当該期間分の超過料金や不足料金を積算さ
せ、既に積算した検針値との減算または加算を行わせる
手間を省くことができる。
As described above, in this specific example, the data processing device 3A of the billing calculation device 3 causes the disk reading device 3E to update and store the data of the meter reading work date and the meter reading reference date on the magnetic disk 4A for each meter reading operation. Each time the meter reading reference date is changed, it is possible to prevent duplicate meter readings and unmetered meter readings during the meter reading period. It is possible to save the trouble of accumulating and performing subtraction or addition with the meter reading value already accumulated.

【0019】[0019]

【発明の効果】以上説明したように請求項1記載の発明
によれば、検針積算末日のデータを更新する期間画定日
更新指令が入力された場合に、更新された検針積算初日
と検針積算末日のデータと共に少なくとも更新前の検針
積算初日と検針積算末日のデータを記憶させ、期間画定
日記憶手段が記憶する検針積算末日より当該日が後と判
定した時、検針値を算出する際の指定された期間を画定
する検針積算初日を更新前の検針積算初日と設定するよ
うにしたので、検針積算初日と検針積算末日が変更設定
された場合であっても、積算した徴収料金に過不足が生
ずるのを防止して、徴収料金の過不足を補償するための
余計な労力負担を無くすることができる。請求項2記載
の発明によれば、検針積算初日と検針積算末日は連続す
る月の同一の応答日としたので、毎月の課金計算処理に
おける余計な労力負担を無くすることができる。
As described above, according to the first aspect of the present invention, when a command to update the data of the last day of meter reading is inputted, the updated first day of meter reading and last day of meter reading are updated. The data of at least the first day of meter reading and the last day of meter reading before updating are stored together with the data of the meter, and when it is determined that the day is later than the last day of meter reading stored by the period definite date storage means, the designated value when calculating the meter reading is specified. The first day of meter reading that defines the period of time that was set is set as the first day of meter reading before updating, so even if the first day of meter reading and the last day of meter reading are changed and set, there will be excess or deficiency in the collected charge Can be prevented and unnecessary labor burden for compensating for the excess or deficiency of the collection fee can be eliminated. According to the second aspect of the present invention, since the first day of meter reading and the last day of meter reading are the same response day in consecutive months, unnecessary labor burden in the monthly billing calculation process can be eliminated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の具体例に係る検針情報通報装置の構成
を示すブロック図
FIG. 1 is a block diagram showing a configuration of a meter reading information notification device according to a specific example of the present invention.

【図2】同じく、その見取図FIG. 2 is a sketch of the same.

【図3】課金計算処理の流れ図FIG. 3 is a flowchart of a billing calculation process;

【図4】検針基準日を繰上げ変更した場合の取込期間の
設定の仕方を説明するための説明図
FIG. 4 is an explanatory diagram for explaining a method of setting a fetching period when a meter reading reference date is advanced and changed;

【図5】検針基準日を繰下げ変更した場合の取込期間の
設定の仕方を説明するための説明図
FIG. 5 is an explanatory diagram for explaining a method of setting a fetching period when a meter reading reference date is changed to an earlier date.

【符号の説明】[Explanation of symbols]

1 建物 2 検針端末装置 2A 制御処理装置(CPU) 2B 一時記憶装置(RAM) 2C 固定記憶装置(ROM) 2D 入力部 2E 出力部 2F バスライン 3 課金計算装置 3A データ処理装置 3B 表示装置 3C 操作卓 3D 印字装置 3E ディスク読書装置 4A 磁気ディスク M1 〜Mn パルスメーター N1 〜Nn 積算計 T1 通信線 T2 通信回線 DESCRIPTION OF SYMBOLS 1 Building 2 Meter-reading terminal device 2A Control processing device (CPU) 2B Temporary storage device (RAM) 2C Fixed storage device (ROM) 2D input unit 2E output unit 2F bus line 3 Billing calculator 3A Data processor 3B Display 3C Console 3D printing device 3E disk reading device 4A magnetic disk M1 to Mn pulse meter N1 to Nn integrator T1 communication line T2 communication line

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 建物の入居者が使用する電気、水道等の
消費材の使用量が所定値以上になるとパルス発生器から
出力されるパルス数を積算する積算手段が出力した積算
値を指定された期間毎、入居者毎に検針値として記憶す
る検針データ記憶手段と、指令データを入力するための
入力手段と、前記検針データ記憶手段から読み出した前
記検針値に相当する料金を計算する課金手段と、前記入
力手段から入力された送信指令に従って前記検針データ
記憶手段から読み出した前記検針値と前記課金手段が計
算した入居者毎の前記料金のデータを電話回線を介して
公共料金徴収施設に送信する網制御手段を具えた検針情
報通報装置において、前記検針値を算出する際の指定さ
れた期間を画定する検針積算初日と検針積算末日のデー
タを記憶する期間画定日記憶手段と、前記入力手段から
期間画定日記憶手段が記憶する前記検針積算初日と前記
検針積算末日のデータを更新する期間画定日更新指令が
入力された場合に、前記期間画定日記憶手段に更新され
た前記検針積算初日と前記検針積算末日のデータと共に
少なくとも更新前の前記検針積算初日と前記検針積算末
日のデータを記憶させる更新記憶制御手段と、前記入力
手段から送信指令が入力されたことを確認した後、前記
期間画定日記憶手段が記憶する前記検針積算末日より当
該日が後か否かを判定する検針日判定手段と、該検針日
判定手段が前記期間画定日記憶手段が記憶する前記検針
積算末日より当該日が後と判定した時、前記検針値を算
出する際の指定された期間を画定する前記検針積算初日
を更新前の前記検針積算初日と設定する更新時初日設定
手段を有したことを特徴とする検針情報通報装置。
An integrated value output by an integrating means for integrating the number of pulses output from a pulse generator when an amount of consumables such as electricity and water used by a resident of a building exceeds a predetermined value is designated. Meter reading data storage means for storing as a meter reading value for each occupant, input means for inputting command data, and charging means for calculating a fee corresponding to the meter reading value read from the meter reading data storing means. And transmitting the meter reading value read from the meter reading data storage unit in accordance with the transmission command input from the input unit and the fee data calculated for each resident by the charging unit to a utility collection facility via a telephone line. In the meter reading information reporting device provided with a network control means for performing the meter reading, the period meter for storing the data of the first day of meter reading integration and the last day of meter reading integration defining a specified period for calculating the meter reading value. A fixed date storage means, and a period fixed date update command for updating data of the meter reading integration first day and the meter reading integration last date stored in the period setting date storage means from the input means; An update storage control means for storing at least the data of the first day of meter integration and the last day of meter integration before update together with the data of the first day of meter integration and the last day of meter integration, and a transmission command from the input means. After confirming that, the period setting date storage means stores the meter reading date determination means for determining whether or not the date is later than the meter reading integration end date, and the meter reading date determination means stores the period setting date storage means. When it is determined that the date is later than the last day of the meter reading, the first day of meter reading that defines a specified period for calculating the meter reading is set as the first day of meter reading before updating. Meter reading information notification apparatus characterized by having the update time of day setting means.
【請求項2】 検針積算初日と検針積算末日は連続する
月の同一の応答日であることを特徴とする請求項1記載
の検針情報通報装置。
2. The meter reading information notification device according to claim 1, wherein the first day of meter reading and the last day of meter reading are the same response day in consecutive months.
JP391297A 1997-01-13 1997-01-13 Meter-reading information reporting device Pending JPH10198880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP391297A JPH10198880A (en) 1997-01-13 1997-01-13 Meter-reading information reporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP391297A JPH10198880A (en) 1997-01-13 1997-01-13 Meter-reading information reporting device

Publications (1)

Publication Number Publication Date
JPH10198880A true JPH10198880A (en) 1998-07-31

Family

ID=11570402

Family Applications (1)

Application Number Title Priority Date Filing Date
JP391297A Pending JPH10198880A (en) 1997-01-13 1997-01-13 Meter-reading information reporting device

Country Status (1)

Country Link
JP (1) JPH10198880A (en)

Similar Documents

Publication Publication Date Title
CN111784317A (en) Method and device for automatic payment
DE19608510A1 (en) Device and method for displaying telephone charges
JPH10198880A (en) Meter-reading information reporting device
KR20010098727A (en) Sheet-recognizing machine
JP2006505228A (en) Billing method in flat-rate communication system
JPH0310278B2 (en)
JP2000253466A (en) Road survey system, central device and terminal equipment
JPH0785027B2 (en) Management device for measurement data
KR100601335B1 (en) Remote automatic meter reading system
JPH06231132A (en) Device for distributing charge of shared rate to residents in building
JP2752875B2 (en) Invoice issuing device
KR20000034234A (en) Method for using remote inspection combined wireless terminal capable of verifying rates
JP2970749B2 (en) Data collection method of weighing counter
CN109325813A (en) It is a kind of to take for bidding documents and the billing system and method for service charge invoice of getting the bid
JPH0638279B2 (en) Taxi operation data collection device
KR100344032B1 (en) Advanced portable notice system
JP4102017B2 (en) Billing system
KR20000058916A (en) Remote inspection of a meter method and device using watt hour meter therefor
JPH10302155A (en) Electronic fund transfer meter and method
JPH0634388A (en) Common rate charge allocating device for resident in building
JPH09172503A (en) Automatic metering system
KR20010044040A (en) Network-based on a fee management system and method thereof
US5912955A (en) Method and apparatus for management of remotely-deployed stations
JP2555643Y2 (en) Data transmission processing device
JPH11282903A (en) Intra-building charge billing system