JPH10154017A - Chamber pressure controller - Google Patents

Chamber pressure controller

Info

Publication number
JPH10154017A
JPH10154017A JP33138197A JP33138197A JPH10154017A JP H10154017 A JPH10154017 A JP H10154017A JP 33138197 A JP33138197 A JP 33138197A JP 33138197 A JP33138197 A JP 33138197A JP H10154017 A JPH10154017 A JP H10154017A
Authority
JP
Japan
Prior art keywords
damper
supply
exhaust
target
air supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33138197A
Other languages
Japanese (ja)
Other versions
JP3044205B2 (en
Inventor
Yoshiaki Matsui
義明 松井
Akiya Nojiri
明哉 野尻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taikisha Ltd
Original Assignee
Taikisha Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taikisha Ltd filed Critical Taikisha Ltd
Priority to JP9331381A priority Critical patent/JP3044205B2/en
Publication of JPH10154017A publication Critical patent/JPH10154017A/en
Application granted granted Critical
Publication of JP3044205B2 publication Critical patent/JP3044205B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Ventilation (AREA)
  • Control Of Fluid Pressure (AREA)

Abstract

PROBLEM TO BE SOLVED: To effectively prevent chamber pressure fluctuation at the time of the start and stop of an air supply and exhaust operation. SOLUTION: To a stop command of an air supply and exhaust operation, an air supply side adjusting damper 8B is closed and operated under the execution of necessary chamber pressure control, and also, after that, a closing operation of an air supply side airtight damper Vs and an air exhaust side airtight damper Ve is started as a cutoff control with a closing operation speed of the damper 8B limited. On the other hand, to a start command of the air supply and exhaust operation, an opening operation of the dampers Vs and Ve is started as cutoff release control with the damper 8B closed totally and also, at the same timer or later it returns to the necessary chamber pressure control under the execution of the necessary chamber pressure control with an opening operation speed limited in the returning process from the total closure of the damper 8B.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、製薬工場やLSI工
場、あるいは、微生物研究所など、室圧管理が必要な対
象室を有する施設で用いる室圧制御装置に関し、詳しく
は、対象室に対する給気路に、給気側調整ダンパと給気
側気密ダンパとを直列に介装し、前記対象室に対する排
気路に、排気側調整ダンパと排気側気密ダンパとを直列
に介装し、前記給気側調整ダンパを開度調整して前記対
象室への給気量を設定必要給気量に調整する必要給気量
制御と、前記排気側調整ダンパを開度調整して前記対象
室の室圧を設定必要室圧に調整する必要室圧制御とを実
行する制御手段を設けた室圧制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a room pressure control device used in a facility having a target room requiring room pressure control, such as a pharmaceutical factory, an LSI factory, or a microorganism research laboratory. An air-supply-side adjustment damper and an air-supply-side airtight damper are interposed in series in an air path, and an exhaust-side adjustment damper and an exhaust-side airtight damper are interposed in series in an exhaust path for the target chamber. The required air supply control for adjusting the opening amount of the air-side adjustment damper to adjust the air supply amount to the target chamber to the required air supply amount, and the opening of the exhaust-side adjustment damper for adjusting the opening degree of the target chamber The present invention relates to a room pressure control device provided with control means for performing required room pressure control for adjusting pressure to a required room pressure.

【0002】[0002]

【従来の技術】この種の室圧制御装置は、対象室に対す
る給排気運転の停止の際、給気側気密ダンパ及び排気側
気密ダンパを閉じることにより、対象室への給気路及び
排気路を確実に遮断するものであるが、従来、この種の
室圧制御装置では、対象室に対する給排気運転を停止す
るのに、給気側調整ダンパを開度調整して対象室への給
気量を設定必要給気量に調整する必要給気量制御、及
び、排気側調整ダンパを開度調整して対象室の室圧を設
定必要室圧に調整する必要室圧制御の実行下において、
給気側気密ダンパ及び排気側気密ダンパを閉じ操作して
いた。
2. Description of the Related Art When a supply / exhaust operation for a target chamber is stopped, a room pressure control device of this type closes a supply-side airtight damper and an exhaust-side airtight damper to supply and exhaust air to and from the target chamber. Conventionally, in this type of room pressure control device, in order to stop the air supply / exhaust operation to the target room, the air supply to the target room is adjusted by adjusting the opening degree of the air supply side adjustment damper. Under the execution of the required air supply control that adjusts the amount to the set required air supply, and the necessary room pressure control that adjusts the opening pressure of the exhaust-side adjustment damper to adjust the room pressure of the target room to the set required air pressure,
The supply-side airtight damper and the exhaust-side airtight damper were closed.

【0003】また、対象室に対する給排気運転を開始す
る場合も、上記の必要給気量制御及び必要室圧制御の実
行下において、給気側気密ダンパ及び排気側気密ダンパ
を開き操作していた。
[0003] Also, when the supply / exhaust operation to the target chamber is started, the supply-side airtight damper and the exhaust-side airtight damper are opened while the required air supply amount control and the required room pressure control are executed. .

【0004】[0004]

【発明が解決しようとする課題】しかし、従来装置で
は、給排気運転の停止の際、必要給気量制御及び必要室
圧制御の実行下において給気側気密ダンパ及び排気側気
密ダンパを閉じ操作するものの、これら給気側気密ダン
パと排気側気密ダンパとの閉じ動作のズレに原因する給
排気バランスの変化に対し、排気側調整ダンパの開度調
整による必要室圧制御が追従できなくなって、対象室の
室圧が設定必要室圧から大きく変動する場合があった。
However, in the conventional apparatus, when the supply / exhaust operation is stopped, the supply-side airtight damper and the exhaust-side airtight damper are closed and operated while the required supply amount control and the required room pressure control are executed. However, the required chamber pressure control by adjusting the opening degree of the exhaust-side adjustment damper cannot follow the change in the supply-exhaust balance caused by the deviation of the closing operation between the supply-side airtight damper and the exhaust-side airtight damper, There was a case where the room pressure of the target room greatly fluctuated from the required room pressure.

【0005】また、給排気運転の開始の際には、必要給
気量制御の下で給気側気密ダンパ及び排気側気密ダンパ
の開き操作を行うことにおいて、給気側気密ダンパが未
だ全閉にある給気停止段階での必要給気量制御の為に給
気側調整ダンパが大きく開かれた状態になって、その状
態の下で給気側気密ダンパの開き操作を開始することに
なり、この為、これら気密ダンパの開き操作開始時に給
気量が急激に変化し、これに対し必要室圧制御が追従で
きずに対象室の室圧が大きく変動する場合があった。
When the supply / exhaust operation is started, the supply-side airtight damper and the exhaust-side airtight damper are opened under the required supply amount control, so that the supply-side airtight damper is still fully closed. In order to control the required amount of air supply at the air supply stop stage, the air supply side adjustment damper is widely opened, and under this state, the air supply side airtight damper opening operation is started. Therefore, when the opening operation of these airtight dampers is started, the amount of air supply changes abruptly, and the required room pressure control cannot follow this, and the room pressure of the target room sometimes fluctuates greatly.

【0006】そして、これら室圧変動の為に、例えば、
対象室の清浄度を維持したり、また、対象室からの有害
物漏出を防止するなどの、室圧制御の所期目的を十分に
達成できなくなる問題があった。
Then, due to these room pressure fluctuations, for example,
There has been a problem that the intended purpose of room pressure control, such as maintaining the cleanliness of the target room and preventing harmful substances from leaking from the target room, cannot be sufficiently achieved.

【0007】しかも、このような室圧変動を極力防止す
るには、給気側気密ダンパと排気側気密ダンパとをでき
るだけ同調させて開閉動作させたり、これら気密ダンパ
を緩速度で開閉動作させる付加的な制御手段が必要にな
り、このことで装置コストが高く付く問題もあった。
Further, in order to prevent such fluctuations in the room pressure as much as possible, the airtight damper on the air supply side and the airtight damper on the exhaust side can be opened and closed by operating in synchronism as much as possible, or by opening and closing these airtight dampers at a slow speed. This requires a special control means, which causes a problem that the apparatus cost is increased.

【0008】以上の実情に鑑み、本発明の目的は、合理
的な制御形態を採ることにより、上記の如き問題を効果
的に解消する点ある。
In view of the above circumstances, an object of the present invention is to effectively solve the above-mentioned problems by adopting a rational control mode.

【0009】[0009]

【課題を解決するための手段】請求項1に係る発明の特
徴構成は、対象室に対する給気路に、給気側調整ダンパ
と給気側気密ダンパとを直列に介装し、前記対象室に対
する排気路に、排気側調整ダンパと排気側気密ダンパと
を直列に介装し、前記給気側調整ダンパを開度調整して
前記対象室への給気量を設定必要給気量に調整する必要
給気量制御と、前記排気側調整ダンパを開度調整して前
記対象室の室圧を設定必要室圧に調整する必要室圧制御
とを実行する制御手段を設ける構成において、前記制御
手段を、給排気運転の停止指令が付与されると、前記給
気側気密ダンパ及び前記排気側気密ダンパを閉じる遮断
制御として、前記給気側調整ダンパの閉じ動作速度を制
限した状態で、必要室圧制御の実行下において前記給気
側調整ダンパを閉じ動作させ、かつ、その後に、前記給
気側気密ダンパ及び前記排気側気密ダンパの閉じ操作を
開始し、一方、給排気運転の開始指令が付与されると、
前記給気側気密ダンパ及び前記排気側気密ダンパを開く
遮断解除制御として、前記給気側調整ダンパを全閉にし
た状態の下で前記給気側気密ダンパ及び前記排気側気密
ダンパの開き操作を開始し、かつ、それと同時に又はそ
の後に、前記給気側調整ダンパの全閉からの復帰過程に
おける開き動作速度を制限した状態で、必要室圧制御の
実行下において必要給気量制御へ復帰する構成にしてあ
る点にある。
According to a first feature of the present invention, a supply-side adjustment damper and a supply-side hermetic damper are interposed in series in a supply path to a target chamber, and the target chamber is provided with a control valve. In the exhaust path, an exhaust-side adjustment damper and an exhaust-side airtight damper are interposed in series, and the degree of opening of the supply-side adjustment damper is adjusted to adjust the supply amount to the target chamber to the required supply amount. A control means for executing a required air supply amount control to perform necessary air pressure control and a necessary room pressure control for adjusting an opening degree of the exhaust side adjustment damper to adjust the room pressure of the target room to a set required room pressure. Means, when a stop command of the supply / exhaust operation is given, as a shut-off control for closing the supply-side airtight damper and the exhaust-side airtight damper, it is necessary to limit the closing operation speed of the supply-side adjustment damper. Closes the supply-side adjustment damper during execution of room pressure control Is operated, and, thereafter, to start the closing operation of the air supply side airtight damper and the exhaust-side gas-tight damper, whereas, when the start command of the supply and exhaust operation is applied,
Opening of the supply-side airtight damper and the exhaust-side airtight damper in a state in which the air-supply-side adjustment damper is fully closed is performed as shutoff release control for opening the air-supply-side airtight damper and the exhaust-side airtight damper. At the same time or after that, while the opening operation speed in the process of returning from the fully closed state of the air supply side adjustment damper is limited, the operation returns to the required air supply amount control under the execution of the required room pressure control. The point is that it is configured.

【0010】請求項2に係る発明の特徴構成は、前記し
た請求項1に係る発明の実施において、前記制御手段
を、前記の遮断解除制御では、前記給気側調整ダンパと
ともに前記排気側調整ダンパを全閉にした状態の下で、
前記給気側気密ダンパ及び前記排気側気密ダンパの開き
操作を開始し、かつ、それと同時に又はその後に、前記
給気側調整ダンパの全閉からの復帰過程における開き動
作速度を制限した状態で、必要室圧制御の復帰下におい
て必要給気量制御へ復帰する構成にしてある点にある。
According to a second aspect of the present invention, in the first aspect of the present invention, the control means is arranged such that, in the shutoff release control, the exhaust side adjustment damper is provided together with the air supply side adjustment damper. With the fully closed
Starting the opening operation of the supply-side airtight damper and the exhaust-side airtight damper, and at the same time or thereafter, with the opening operation speed in the process of returning from the fully closed state of the air supply-side adjustment damper, The point is that it is configured to return to the required air supply control under the return of the required chamber pressure control.

【0011】請求項3に係る発明の特徴構成は、前記し
た請求項1又は2に係る発明の実施において、主給気路
から複数の前記対象室へ各別に分岐接続した前記給気路
の夫々に、前記給気側調整ダンパと前記給気側気密ダン
パとを直列に介装し、かつ、主排気路から複数の前記対
象室へ各別に分岐接続した前記排気路の夫々に、前記排
気側調整ダンパと前記排気側気密ダンパとを直列に介装
する構成に対し、前記制御手段を、前記対象室のうち一
部の対象室のみを対象にする給排気運転の停止指令が付
与されると、その一部の対象室についてのみ前記の遮断
制御を実行し、かつ、前記対象室のうち一部の対象室の
みを対象にする給排気運転の開始指令が付与されると、
その一部の対象室についてのみ前記の遮断解除制御を実
行する構成にしてある点にある。
According to a third aspect of the present invention, in the embodiment of the first or second aspect of the present invention, each of the air supply passages separately branched from the main air supply passage to the plurality of target chambers. The air supply side adjustment damper and the air supply side airtight damper are interposed in series, and each of the exhaust paths branched and connected from a main exhaust path to a plurality of the target chambers respectively is connected to the exhaust side. With respect to the configuration in which the adjustment damper and the exhaust-side airtight damper are interposed in series, when the control means is given a stop command of the supply / exhaust operation for only some of the target chambers, Performing the cutoff control only for some of the target rooms, and, when a start command of a supply / exhaust operation for only some of the target rooms among the target rooms is given,
The point is that the above-mentioned block release control is executed only for some of the target rooms.

【0012】請求項4に係る発明の特徴構成は、前記し
た請求項1〜3のいずれか1項に係る発明の実施におい
て、主給気路から複数の前記対象室へ各別に分岐接続し
た前記給気路の夫々に、前記給気側調整ダンパと前記給
気側気密ダンパとを直列に介装し、かつ、主排気路から
複数の前記対象室へ各別に分岐接続した前記排気路の夫
々に、前記排気側調整ダンパと前記排気側気密ダンパと
を直列に介装する構成に対し、前記制御手段を、装置全
体としての給排気運転の開始指令が付与されると、複数
の前記対象室の夫々について前記の遮断解除制御を実行
し、かつ、装置全体としての給排気運転の停止指令が付
与されると、複数の前記対象室の夫々について前記の遮
断制御を実行する構成にしてある点にある。
According to a fourth aspect of the present invention, in the embodiment of the first aspect of the present invention, the main supply path is branched and connected to a plurality of the target chambers. In each of the air supply paths, the air supply side adjustment damper and the air supply side airtight damper are interposed in series, and each of the exhaust paths separately branched and connected from the main exhaust path to the plurality of target chambers. In a configuration in which the exhaust-side adjustment damper and the exhaust-side hermetic damper are interposed in series, the control unit is provided with a plurality of target chambers when a start command of a supply / exhaust operation of the entire apparatus is given. And the shutdown control is executed for each of the plurality of target chambers when a command to stop the supply / exhaust operation of the entire apparatus is given. It is in.

【0013】[0013]

【作用】請求項1に係る発明の特徴構成では、給排気運
転の停止指令に対し、給気側気密ダンパ及び排気側気密
ダンパを閉じる遮断制御として、先ず、給気側調整ダン
パの閉じ動作速度を制限した状態で、必要室圧制御の実
行下において給気側調整ダンパを閉じ動作させることに
より、対象室への給気量を設定必要給気量から徐々に減
少させるとともに、これに伴い、必要室圧制御上で排気
側調整ダンパを給気量減少に追従させて閉じ動作させ、
これにより、対象室の室圧を設定必要室圧に安定的に保
ちながら給気量及び排気量を減少させる。
According to the first aspect of the present invention, in response to a stop command of the supply / exhaust operation, the closing operation speed of the supply-side adjustment damper is firstly controlled as shut-off control for closing the supply-side airtight damper and the exhaust-side airtight damper. In a state where the required air pressure is controlled, the air supply side adjustment damper is closed under the execution of the required room pressure control, so that the air supply amount to the target room is gradually reduced from the set required air supply amount. On the required chamber pressure control, the exhaust side adjustment damper is closed by following the decrease in air supply amount,
As a result, the supply air amount and the exhaust air amount are reduced while the room pressure of the target room is stably maintained at the set necessary room pressure.

【0014】そして、その後に、給気量及び排気量が減
少した状態の下で給気側気密ダンパ及び排気側気密ダン
パの閉じ操作を開始することにより、給気側気密ダンパ
と排気側気密ダンパとの閉じ動作にズレがあったとして
も、給気量及び排気量を減少させずに気密ダンパの閉じ
操作を行う場合に比べ、その閉じ動作のズレに原因する
給排気バランスの変化が小さくなるようにし、これによ
り、これら気密ダンパの閉じ操作時における室圧変動を
防止する。
Thereafter, the closing operation of the supply-side airtight damper and the exhaust-side airtight damper is started in a state where the supply amount and the exhaust amount are reduced, so that the supply-side airtight damper and the exhaust-side airtight damper are started. Even if there is a shift in the closing operation, the change in the supply / exhaust balance caused by the shift in the closing operation is smaller than in the case where the closing operation of the hermetic damper is performed without reducing the air supply amount and the exhaust amount. As a result, fluctuations in the room pressure during the closing operation of these hermetic dampers are prevented.

【0015】一方、給排気運転の開始指令に対しては、
給気側気密ダンパ及び排気側気密ダンパを開く遮断解除
制御として、給気側調整ダンパを全閉にした状態の下で
給気側気密ダンパ及び排気側気密ダンパの開き操作を開
始することにより、給排気運転の開始の際に給気側調整
ダンパが大きく開かれた状態の下で給気側気密ダンパを
開くことに原因する給気量急変による室圧変動を防止す
る。
On the other hand, in response to the start command of the supply / exhaust operation,
As shut-off release control for opening the supply-side airtight damper and the exhaust-side airtight damper, by starting the operation of opening the supply-side airtight damper and the exhaust-side airtight damper in a state in which the supply-side adjustment damper is fully closed, At the start of the supply / exhaust operation, room pressure fluctuation due to a sudden change in the supply amount caused by opening the supply-side airtight damper while the supply-side adjustment damper is largely opened is prevented.

【0016】また、この開き操作の開始と同時に又はそ
の後に、給気側調整ダンパの全閉からの復帰過程におけ
る開き動作速度を制限した状態で、必要室圧制御の実行
下において必要給気量制御へ復帰することにより、対象
室への給気量を設定必要給気量へ向けて徐々に増加させ
るとともに、これに伴い、必要室圧制御上で排気側調整
ダンパを給気量増加に追従させて開き動作させ、これに
より、対象室の室圧を設定必要室圧に安定的に保ちなが
ら給気量及び排気量を増加させて、定常の給排気運転状
態に入る。
Simultaneously with or after the start of the opening operation, while the opening operation speed in the process of returning from the fully closed state of the air supply side adjustment damper is limited, the required air supply amount is controlled under the necessary room pressure control. By returning to control, the amount of air supply to the target room is gradually increased toward the set required amount of air supply, and accordingly, the exhaust side adjustment damper follows the increase in the amount of air supply in the necessary room pressure control Then, the opening operation is performed, thereby increasing the air supply amount and the exhaust amount while stably maintaining the room pressure of the target room at the set necessary room pressure, and entering a steady air supply / exhaust operation state.

【0017】なお、必要給気量制御への復帰を気密ダン
パの開き操作開始と同時に行う場合には上記開き動作速
度の制限による給気量の制限をもって、また、必要給気
量制御への復帰を気密ダンパの開き操作開始後でその開
き操作完了前に行う場合には、その復帰を行うまでの給
気側調整ダンパの全閉保持と、それに続く上記開き動作
速度の制限による給気量の制限をもって、さらにまた、
必要給気量制御への復帰を気密ダンパの開き操作完了後
に行う場合には、その復帰を行うまでの給気側調整ダン
パの全閉保持をもって、夫々、給気側気密ダンパと排気
側気密ダンパとの開き動作のズレに原因する室圧変動も
防止できる。
When the return to the required air supply control is performed simultaneously with the start of the opening operation of the airtight damper, the air supply dam is limited by the above-described restriction of the opening operation speed, and the return to the required air supply control is performed. Is performed after the opening operation of the airtight damper is started and before the opening operation is completed, the air supply side adjustment damper is fully closed until the operation is returned, and the air supply amount is limited by the restriction of the opening operation speed. With restrictions,
When the return to the required air supply control is performed after the airtight damper is opened, the air supply damper and the exhaust airtight damper are held by holding the air supply damper fully closed until the airtight damper is opened. The fluctuation of the room pressure caused by the deviation of the opening operation can be prevented.

【0018】請求項2に係る発明の特徴構成では、前記
の遮断解除制御において、給気側調整ダンパとともに排
気側調整ダンパを全閉にした状態の下で、給気側気密ダ
ンパ及び排気側気密ダンパの開き操作を開始することに
より、給排気運転の開始の際に排気側調整ダンパが開度
不定の開き状態にある状況の下で排気側気密ダンパを開
くことに原因する室圧変動を防止する。
According to a second aspect of the present invention, in the shut-off release control, the supply-side airtight damper and the exhaust-side airtight damper are provided with the exhaust-side adjustment damper and the exhaust-side adjustment damper fully closed. By starting the opening operation of the damper, it is possible to prevent room pressure fluctuations caused by opening the exhaust-side airtight damper when the exhaust-side adjustment damper is in an open state with an undefined opening at the start of the supply / exhaust operation I do.

【0019】つまり、先述の従来装置では、給排気運転
の開始の際、必要室圧制御の下で給気側気密ダンパ及び
排気側気密ダンパの開き操作を行うことにおいて、これ
ら気密ダンパが未だ全閉にある給排気停止段階での必要
室圧制御の為に排気側調整ダンパが開度不定の開き状態
になって、その状態の下で排気側気密ダンパの開き操作
を開始することになり、この為、これら気密ダンパの開
き操作開始時に排気量が急激に変化し、これに対し必要
室圧制御が追従できずに対象室の室圧が大きく変動する
問題もあったが、これに対し、上記の如く、給気側調整
ダンパとともに排気側調整ダンパも全閉にした状態の下
で、給気側気密ダンパ及び排気側気密ダンパの開き操作
を開始することにより、この種の室圧変動も合わせ防止
することができる。
That is, in the conventional apparatus described above, when the supply / exhaust operation is started, the air supply damper and the exhaust gas damper are opened under the required room pressure control. In order to control the required chamber pressure in the closed supply / exhaust stop stage, the exhaust-side adjustment damper is opened at an indefinite opening degree, and the opening operation of the exhaust-side airtight damper is started under that state, For this reason, at the start of the opening operation of these airtight dampers, the exhaust volume changes rapidly, and there is a problem that the required room pressure control cannot follow up and the room pressure of the target room fluctuates greatly. As described above, by starting the opening operation of the supply-side airtight damper and the exhaust-side airtight damper in a state where the exhaust-side adjustment damper together with the air-supply-side adjustment damper is fully closed, this kind of room pressure fluctuation can be reduced. Can prevent alignment

【0020】そして、気密ダンパ開き操作の開始と同時
に又はその後に、給気側調整ダンパの全閉からの復帰過
程における開き動作速度を制限した状態で、必要室圧制
御の復帰下において必要給気量制御へ復帰することによ
り、請求項1に係る発明と同様、対象室への給気量を設
定必要給気量へ向けて徐々に増加させるとともに、これ
に伴い、必要室圧制御上で排気側調整ダンパを給気量増
加に追従させて開き動作させ、これにより、対象室の室
圧を設定必要室圧に安定的に保ちながら給気量及び排気
量を増加させて、定常の給排気運転状態に入る。
At the same time as or after the start of the airtight damper opening operation, with the opening operation speed limited in the process of returning from the fully closed state of the air supply side adjustment damper, the required air supply is restored under the required room pressure control return. By returning to the amount control, the air supply amount to the target chamber is gradually increased toward the set required air supply amount as in the invention according to claim 1, and the exhaust gas is controlled in the necessary room pressure control. The side adjustment damper is opened by following the increase in the air supply amount, thereby increasing the air supply amount and the exhaust amount while stably maintaining the room pressure of the target room at the set required room pressure. Enter operating state.

【0021】請求項3に係る発明の特徴構成では、複数
の対象室のうち一部の対象室のみを対象にする給排気運
転の停止指令に対し、その一部の対象室についてのみ前
記の遮断制御を実行することにより、他の対象室につい
ては現状を維持したままで、その一部の対象室について
のみ、前記の如く給排気運転停止の際の室圧変動を防止
した状態で給気側気密ダンパ及び排気側気密ダンパを閉
じて給排気運転を停止する。
According to the characteristic configuration of the invention according to claim 3, in response to a command to stop the supply / exhaust operation for only a part of the plurality of target rooms, the shutoff is performed only for the part of the target rooms. By executing the control, the air supply side is maintained in a state in which the room pressure fluctuation at the time of the supply / exhaust operation stoppage is prevented as described above only for some of the target rooms while maintaining the current state of the other target rooms. The airtight damper and the exhaust side airtight damper are closed to stop the supply / exhaust operation.

【0022】また、複数の対象室のうち一部の対象室の
みを対象にする給排気運転の開始指令に対しては、その
一部の対象室についてのみ前記の遮断解除制御を実行す
ることにより、他の対象室については現状を維持したま
まで、その一部の対象室についてのみ、前記の如く給排
気運転開始の際の室圧変動を防止した状態で給気側気密
ダンパ及び排気側気密ダンパを開いて給排気運転に入
る。
In response to a supply / exhaust operation start command for only some of the target rooms out of a plurality of target rooms, the above-mentioned shutoff release control is executed only for some of the target rooms. For the other target chambers, the current state is maintained, and only for some of the target chambers, the supply-side airtight damper and the exhaust-side airtight Open the damper and start the air supply / exhaust operation.

【0023】請求項4に係る発明の特徴構成では、装置
全体としての給排気運転の開始指令に対し、複数の対象
室の夫々について前記の遮断解除制御を実行することに
より、それら複数の対象室の夫々について、前記の如く
給排気運転開始の際の室圧変動を防止した状態で給気側
気密ダンパ及び排気側気密ダンパを開いて給排気運転に
入る。
According to a characteristic feature of the invention according to claim 4, in response to a start command of the supply / exhaust operation of the entire apparatus, the above-mentioned shutoff release control is executed for each of the plurality of target rooms, thereby to set the plurality of target rooms. As described above, the supply-side airtight damper and the exhaust-side airtight damper are opened in the state where the room pressure fluctuation at the start of the supply / exhaust operation is prevented as described above, and the supply / exhaust operation is started.

【0024】また、装置全体としての給排気運転の停止
指令に対し、複数の対象室の夫々について前記の遮断制
御を実行することにより、それら複数の対象室の夫々に
ついて、前記の如く給排気運転停止の際の室圧変動を防
止した状態で給気側気密ダンパ及び排気側気密ダンパを
閉じて給排気運転を停止する。
Further, in response to a command to stop the supply / exhaust operation of the entire apparatus, the above-described shutoff control is executed for each of the plurality of target rooms, so that the supply / exhaust operation is performed for each of the plurality of target rooms as described above. The supply-side airtight damper and the exhaust-side airtight damper are closed in a state where the room pressure fluctuation during the stop is prevented, and the supply / exhaust operation is stopped.

【0025】[0025]

【発明の効果】請求項1に係る発明によれば、給排気運
転停止の際の給気側気密ダンパと排気側気密ダンパとの
閉じ動作のズレに原因する室圧変動とともに、給排気運
転開始の際の給気量急変による室圧変動を効果的に防止
でき、また、給排気運転開始の際の給気側気密ダンパと
排気側気密ダンパとの開き動作のズレに原因する室圧変
動も合わせ防止でき、これらのことから、従来に比べ、
対象室の清浄度を維持したり、対象室からの有害物漏出
を防止するなどの室圧制御の所期目的を一層確実に達成
できる。
According to the first aspect of the present invention, when the supply / exhaust operation is stopped, the supply / exhaust operation is started together with the fluctuation of the room pressure caused by the deviation of the closing operation between the supply-side airtight damper and the exhaust-side airtight damper. In this case, it is possible to effectively prevent room pressure fluctuations caused by sudden changes in the air supply amount, and also to prevent room pressure fluctuations caused by the deviation of the opening operation between the air supply damper and the airtight damper when the air supply / exhaust operation starts. Can be prevented, and from these things,
The intended purpose of room pressure control, such as maintaining the cleanliness of the target room and preventing harmful substances from leaking from the target room, can be more reliably achieved.

【0026】また、必要給気量制御や必要給気量制御の
為に本来的に開度制御構成を備える給気側調整ダンパ及
び排気側調整ダンパを利用して、給排気運転の停止の際
や開始の際の室圧変動を防止する形態を採るから、給気
側気密ダンパと排気側気密ダンパとをできるだけ同調さ
せて開閉動作させたり、これら気密ダンパを緩速度で開
閉動作させるなどの気密ダンパに対する付加的な制御手
段が不要ないし簡単なもので済み、このことから装置コ
ストも安価にすることができる。
Further, when the supply / exhaust operation is stopped, the supply-side adjustment damper and the exhaust-side adjustment damper, which are originally provided with the opening control structure for the required supply amount control and the required supply amount control, are used. To prevent the chamber pressure from fluctuating at the start of the operation, the supply-side airtight damper and the exhaust-side airtight damper are opened / closed by synchronizing as much as possible, or by opening / closing these airtight dampers at a slow speed. No additional control means for the damper is required or simple, which makes it possible to reduce the equipment costs.

【0027】請求項2に係る発明によれば、給排気運転
開始の際の排気量急変による室圧変動も合わせ効果的に
防止でき、このことから室圧制御の所期目的をさらに確
実に達成できる。
According to the second aspect of the present invention, it is also possible to effectively prevent the fluctuation of the room pressure due to the sudden change of the displacement at the start of the supply / exhaust operation, thereby more reliably achieving the intended purpose of the room pressure control. it can.

【0028】請求項3に係る発明によれば、複数の対象
室のうち一部の対象室のみを対象にする給排気運転の停
止指令及び開始指令により、その一部の対象室について
のみ、室圧変動を効果的に防止した状態で給排気運転の
停止及び開始を行うことができ、このことから、複数の
対象室のうち一部の対象室のみを燻蒸などの為に一時的
に給排気運転停止する必要がある施設において、好適な
装置となる。
According to the third aspect of the present invention, the stop and start commands of the supply / exhaust operation for only some of the target rooms out of the plurality of target rooms are used to control the room only for some of the target rooms. The supply and exhaust operation can be stopped and started in a state where pressure fluctuations are effectively prevented, and as a result, only some of the multiple target rooms are temporarily supplied for fumigation etc. This is a suitable device for facilities that need to be shut down.

【0029】請求項4に係る発明によれば、装置全体と
しての給排気運転の開始指令及び停止指令により、複数
の対象室の夫々について、室圧変動を防止した状態で給
排気運転の開始及び停止を行うことができ、このことか
ら、例えば、施設の稼働開始時及び稼働停止時などに、
複数の対象室の給排気運転を一斉に開始及び停止する必
要がある施設において、好適な装置となる。
According to the fourth aspect of the present invention, the start and stop commands of the supply / exhaust operation of the entire apparatus are used to start and stop the supply / exhaust operation of each of the plurality of target rooms in a state where the room pressure fluctuation is prevented. The suspension can be performed, and for this reason, for example, when the facility starts operating and when the facility is stopped,
It is a suitable device in a facility where it is necessary to start and stop the supply / exhaust operation of a plurality of target rooms at the same time.

【0030】[0030]

【実施例】次に実施例を説明する。Next, an embodiment will be described.

【0031】図1は複数の対象室1に対する給排気設備
の設備構成を示し、給気ファン2からの主給気路3を分
岐給気路4を介して対象室1の夫々に接続するととも
に、排気ファン5に接続の主排気路6を分岐排気路7を
介して対象室1の夫々に接続し、そして、主給気路3と
主排気路6とは、それらの基幹部において還気路Bによ
り接続してある。
FIG. 1 shows an arrangement of supply / exhaust equipment for a plurality of target chambers 1, wherein a main air supply path 3 from an air supply fan 2 is connected to each of the target chambers 1 via a branch air supply path 4. The main exhaust path 6 connected to the exhaust fan 5 is connected to each of the target chambers 1 via the branch exhaust path 7, and the main air supply path 3 and the main exhaust path 6 return air at their backbones. It is connected by road B.

【0032】分岐給気路4の夫々には、その上流側から
給気側気密ダンパVs、及び、給気量調整装置8を設け
てあり、この給気量調整装置8は、対象室1に対する給
気量を検出する給気量センサ8A、給気側気密ダンパV
sとは直列に分岐給気路4に介装されて開度調整により
給気量を調整する給気側調整ダンパ8B、及び、給気量
センサ8Aによる検出給気量Qx1,Qx2,Qx3が
目標給気量Qm1,Qm2,Qm3となるように給気側
調整ダンパ8Bを開度調整する給気量制御器8Cを備え
ている。
Each of the branch air supply passages 4 is provided with an airtight damper Vs on the air supply side and an air supply amount adjusting device 8 from the upstream side thereof. Air supply amount sensor 8A for detecting the air supply amount, air supply-side airtight damper V
s and a supply-side adjustment damper 8B which is interposed in series in the branch supply path 4 to adjust the supply amount by adjusting the opening degree, and the supply amounts Qx1, Qx2, Qx3 detected by the supply amount sensor 8A. An air supply controller 8C is provided to adjust the opening of the air supply-side adjustment damper 8B so that the target air supply amounts Qm1, Qm2, and Qm3 are obtained.

【0033】また、分岐排気路7の夫々には、その上流
側から室圧調整装置9、及び、排気側気密ダンパVeを
設けてあり、この室圧調整装置9は、対象室1の室圧
(外部との差圧、又は、対象室1の絶対圧)を検出する
室圧センサ9A、排気側気密ダンパVeとは直列に分岐
排気路7に介装されて開度調整により排気量を調整する
排気側調整ダンパ9B、及び、室圧センサ9Aによる検
出室圧Px1,Px2,Px3が目標室圧Pm1,Pm
2,Pm3となるように排気側調整ダンパ9Bを開度調
整する室圧制御器9Cを備えている。
Each of the branch exhaust passages 7 is provided with a chamber pressure adjusting device 9 and an exhaust-side airtight damper Ve from the upstream side thereof. The chamber pressure sensor 9A for detecting (differential pressure from the outside or the absolute pressure of the target chamber 1) and the exhaust side airtight damper Ve are interposed in series in the branch exhaust path 7 to adjust the exhaust amount by adjusting the opening degree. The chamber pressure Px1, Px2, and Px3 detected by the exhaust-side adjustment damper 9B and the chamber pressure sensor 9A are changed to target chamber pressures Pm1 and Pm.
A room pressure controller 9C is provided for adjusting the opening of the exhaust-side adjustment damper 9B so as to be 2, Pm3.

【0034】なお、Aは給気を温湿度調整する空調機で
あり、また、Vbは主排気路6から主給気路3への還気
風量を調整する還気ダンパである。
A is an air conditioner for adjusting the temperature and humidity of the supply air, and Vb is a return air damper for adjusting the amount of return air from the main exhaust passage 6 to the main air supply passage 3.

【0035】10は給排気運転の起動・停止、各対象室
1に対する給気量制御、各対象室1に対する室圧制御、
並びに、ダンパ類の制御を統括管理する中央制御装置で
あり、この中央制御装置10には、給気ファン2及び排
気ファン5に対するファン制御部11、給気量設定部1
2、室圧設定部13、目標給気量変更部14、並びに、
ダンパ制御部Dを装備してある。
Reference numeral 10 denotes start / stop of the supply / exhaust operation, control of the amount of supply air to each target room 1, control of the room pressure to each target room 1,
The central control device 10 controls and controls the dampers. The central control device 10 includes a fan control unit 11 for the air supply fan 2 and the exhaust fan 5, and a supply amount setting unit 1.
2. Room pressure setting unit 13, target air supply amount changing unit 14, and
A damper control unit D is provided.

【0036】ファン制御部11は、給排気運転の起動指
令(すなわち、装置全体としての給排気運転の開始指
令)が与えられると、図2に示すように、給気ファン2
及び排気ファン5を起動して、それらファン2,5の出
力を所定の変化速度α1,β1(本例ではα1<β1に
設定してある)で徐々に増大させ、一方、給排気運転の
停止指令(すなわち、装置全体としての給排気運転の停
止指令)が与えられると、同図2に示すように、各ファ
ン2,5に対する停止操作を所定の順序(本例では給気
ファン2を排気ファン5よりも先に)で開始し、かつ、
それらファン停止操作では各ファン2,5の出力を所定
の変化速度α2,β2(本例ではα2<β2に設定して
ある)で徐々に低下させて、最終的にそれらファン2,
5を停止させる。
When a start command of the supply / exhaust operation (that is, a start command of the supply / exhaust operation of the entire apparatus) is given to the fan control unit 11, as shown in FIG.
And the exhaust fans 5 are started, and the outputs of the fans 2 and 5 are gradually increased at predetermined change rates α1 and β1 (α1 <β1 is set in this example), while the supply / exhaust operation is stopped. When a command (that is, a command to stop the supply / exhaust operation of the entire apparatus) is given, as shown in FIG. 2, the stop operation for each of the fans 2 and 5 is performed in a predetermined order (in this example, the air supply fan 2 is exhausted). Before fan 5), and
In these fan stop operations, the outputs of the fans 2 and 5 are gradually decreased at predetermined change rates α2 and β2 (α2 <β2 is set in this example).
Stop 5

【0037】また、給排気運転が定常状態にあるときに
は、主給気路3における給気圧、及び、主排気路6にお
ける排気圧を夫々、所定の圧力値に維持するように給気
ファン2及び排気ファン5夫々の出力を調整制御する。
When the air supply / exhaust operation is in a steady state, the air supply fan 2 and the air supply fan 2 are controlled to maintain the air supply pressure in the main air supply passage 3 and the exhaust pressure in the main air exhaust passage 6 at predetermined pressure values, respectively. The output of each exhaust fan 5 is adjusted and controlled.

【0038】ダンパ制御部Dは、同図2に示すように、
給排気運転の起動指令(装置全体としての給排気運転の
開始指令)が与えられると、還気ダンパVbを所定の変
化速度γ1で開き操作するとともに、対象室1夫々の給
気側気密ダンパVs及び排気側気密ダンパVeを開き操
作して、それまでの対象室遮断状態を解除し、また、こ
れら給気側気密ダンパVs及び排気側気密ダンパVeの
開き操作が完了するまでは、給気量制御器8C及び室圧
制御器9Cに対し優先する状態で、対象室遮断時から継
続して各対象室1の給気側調整ダンパ8B及び排気側調
整ダンパ9Bを強制的に全閉状態に保ち、給気側気密ダ
ンパVs及び排気側気密ダンパVeの開き操作が完了し
た時点で、給気側調整ダンパ8Bの開度制御(すなわち
給気量制御)を給気量制御器8Cに移管し、かつ、排気
側調整ダンパ9Bの開度制御(すなわち、室圧制御)を
室圧制御器9Cに移管する。
As shown in FIG. 2, the damper control unit D
When a start command of the supply / exhaust operation (a start command of the supply / exhaust operation of the entire apparatus) is given, the return air damper Vb is opened at a predetermined change speed γ1, and the supply-side airtight damper Vs of each of the target chambers 1 is operated. And opening the exhaust-side hermetic damper Ve to release the target chamber shut-off state. Further, until the opening operation of the supply-side hermetic damper Vs and the exhaust-side hermetic damper Ve is completed, the air supply amount is maintained. In a state prioritizing the controller 8C and the room pressure controller 9C, the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B of each target chamber 1 are forcibly maintained in the fully closed state continuously from the time of shutting down the target chamber. When the opening operation of the supply-side airtight damper Vs and the exhaust-side airtight damper Ve is completed, the opening degree control (that is, the supply amount control) of the supply-side adjustment damper 8B is transferred to the supply amount controller 8C. And the exhaust-side adjustment damper 9B Opening control (i.e., room pressure control) will be transferred to the chamber pressure controller 9C.

【0039】そして、給排気運転の停止指令(装置全体
としての給排気運転の停止指令)が与えられると、還気
ダンパVbを所定の変化速度γ2で閉じ操作するととも
に、給気ファン2及び排気ファン5の停止完了時期に各
対象室1の給気側気密ダンパVs及び排気側気密ダンパ
Veを閉じ操作して対象室遮断状態とし、また、それら
給気側気密ダンパVs及び排気側気密ダンパVeの閉じ
操作が完了すると、給気量制御器8C及び室圧制御器9
Cに優先して、各対象室1の給気側調整ダンパ8B及び
排気側調整ダンパ9Bを強制的に全閉状態に切り換え、
対象室遮断状態の間、これら調整ダンパ8B,9Bの全
閉状態を保つ。
When a command to stop the supply / exhaust operation (a command to stop the supply / exhaust operation of the entire apparatus) is given, the return air damper Vb is closed at a predetermined change speed γ2, and the supply fan 2 and the exhaust When the stop of the fan 5 is completed, the supply-side airtight damper Vs and the exhaust-side airtight damper Ve of each target room 1 are closed to shut off the target room, and the supply-side airtight damper Vs and the exhaust-side airtight damper Ve are closed. Is completed, the air supply controller 8C and the room pressure controller 9
Prior to C, the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B of each target chamber 1 are forcibly switched to the fully closed state,
While the target room is shut off, these adjustment dampers 8B and 9B are kept in the fully closed state.

【0040】室圧設定部13は、それに対し各対象室1
の必要室圧Ps1,Ps2,Ps3を設定すると、それ
ら設定必要室圧Ps1,Ps2,Ps3を各室圧制御器
9Cの目標室圧Pm1,Pm2,Pm3(Ps1=Pm
1,Ps2=Pm2,Ps3=Pm3)として各室圧制
御器9Cに指定し、これにより、室圧制御として、排気
側調整ダンパ9Bの開度調整により各対象室1の室圧P
x1,Px2,Px3を設定必要室圧Ps1,Ps2,
Ps3に調整する必要室圧制御を実施し、必要室圧Ps
1,Ps2,Ps3の設定変更があるまでは、各室圧制
御器9Cの目標室圧Pm1,Pm2,Pm3を一定に固
定する。
The room pressure setting section 13 responds to each object room 1
Are set, the required room pressures Ps1, Ps2, and Ps3 are set to target room pressures Pm1, Pm2, and Pm3 (Ps1 = Pm3) of the respective room pressure controllers 9C.
1, Ps2 = Pm2, Ps3 = Pm3) to each of the room pressure controllers 9C, thereby controlling the room pressure P of each of the target rooms 1 by adjusting the opening degree of the exhaust-side adjustment damper 9B as room pressure control.
x1, Px2, Px3 must be set.
The required room pressure control which adjusts to Ps3 is performed, and the required room pressure Ps
Until the setting of 1, Ps2, and Ps3 is changed, the target chamber pressures Pm1, Pm2, and Pm3 of the respective chamber pressure controllers 9C are fixed.

【0041】一方、給気量制御については、各対象室1
の必要給気量Qs1,Qs2,Qs3を給気量設定部1
2に対し設定するが、この必要給気量Qs1,Qs2,
Qs3の設定に対し目標給気量変更部14は、同図2に
示すように、給排気運転の起動指令(装置全体としての
給排気運転の開始指令)が付与された後、給気側気密ダ
ンパVs及び排気側気密ダンパVeの開き操作が完了し
て給気側調整ダンパ8Bの開度制御が給気量制御器8C
に移管されるまでは、給気量設定部12に設定された各
対象室1の設定必要給気量Qs1,Qs2,Qs3にか
かわらず、各給気量制御器8Cの目標給気量Qm1,Q
m2,Qm3として0を指定(Qm1=Qm2=Qm3
=0)する。
On the other hand, with respect to the air supply amount control, each target room 1
The required air supply amount Qs1, Qs2, Qs3 of the air supply amount setting unit 1
2, the required air supply amount Qs1, Qs2,
In response to the setting of Qs3, as shown in FIG. 2, the target air supply amount changing unit 14 supplies an air supply / exhaust operation start instruction (a start instruction of the air supply / exhaust operation of the entire apparatus) and then supplies air to the air supply side. The opening operation of the damper Vs and the exhaust side airtight damper Ve is completed, and the opening degree control of the air supply side adjustment damper 8B is performed by the air supply amount controller 8C.
Until the transfer to, the target supply amount Qm1 of each supply amount controller 8C regardless of the set required supply amount Qs1, Qs2, Qs3 of each target room 1 set in the supply amount setting unit 12. Q
Specify 0 as m2 and Qm3 (Qm1 = Qm2 = Qm3
= 0).

【0042】そして、その後、給気側調整ダンパ8Bの
開度制御が給気量制御器8Cに移管されると、各給気量
制御器8Cに指定する目標給気量Qm1,Qm2,Qm
3を、前記の目標室圧Pm1,Pm2,Pm3(すなわ
ち、設定必要室圧Ps1,Ps2,Ps3)の高い対象
室1から順に所定の時間間隔T1,T2,T3で、か
つ、互いに等しい所定の変化速度θ1で0から設定必要
給気量Qs1,Qs2,Qs3へ順次増大させ、これに
より、対象室1間での一時的な室圧逆転現象を防止した
状態で、また、給気側調整ダンパ8Bの全閉からの復帰
過程における開き動作速度を制限した状態で、各対象室
1の給気量Qx1,Qx2,Qx3を設定必要給気量Q
s1,Qs2,Qs3へ増大させて定常の給排気運転状
態に入り、その定常運転状態では、給気量制御として、
給気側調整ダンパ8Bの開度調整により各対象室1への
給気量Qx1,Qx2,Qx3を設定必要給気量Qs
1,Qs2,Qs3に調整する必要給気量制御を実施す
る。
After that, when the opening degree control of the supply side adjustment damper 8B is transferred to the supply amount controller 8C, the target supply amounts Qm1, Qm2, Qm designated to the respective supply amount controllers 8C.
3 at predetermined time intervals T1, T2, and T3 in order from the target room 1 having the higher target room pressures Pm1, Pm2, and Pm3 (that is, the set required chamber pressures Ps1, Ps2, and Ps3), and at predetermined time intervals equal to each other. At the change rate θ1, the required supply air amount Qs1, Qs2, Qs3 is sequentially increased from 0, thereby preventing the temporary chamber pressure reversal phenomenon between the target chambers 1 and the supply air adjustment damper. In a state where the opening operation speed in the process of returning from the fully closed state of 8B is limited, the air supply amounts Qx1, Qx2, and Qx3 of each target room 1 are set.
s1, Qs2, and Qs3 to increase to a steady supply / exhaust operation state.
The air supply amount Qx1, Qx2, Qx3 to each target room 1 is set by adjusting the opening degree of the air supply side adjustment damper 8B.
The required air supply amount control is adjusted to 1, Qs2, and Qs3.

【0043】なお、図2においては設定必要室圧の高低
関係がPs1>Ps2>Ps3の場合を示している。
FIG. 2 shows a case where the relationship between the set room pressures is Ps1>Ps2> Ps3.

【0044】また、目標給気量変更部14は、同図2に
示すように、給排気運転の停止指令(装置全体としての
給排気運転の停止指令)が与えられると、各給気量制御
器8Cに指定する目標給気量Qm1,Qm2,Qm3
を、目標室圧Pm1,Pm2,Pm3(すなわち、設定
必要室圧Ps1,Ps2,Ps3)の低い対象室1から
順に所定の時間間隔T4,T5で、かつ、互いに等しい
所定の変化速度θ2で設定必要給気量Qs1,Qs2,
Qs3から0へ順次減少させ、これにより、対象室1間
での一時的な室圧逆転現象を防止した状態で、また、給
気側調整ダンパ8Bの閉じ動作速度を制限した状態で、
各対象室1の給気量Qx1,Qx2,Qx3を減少させ
て、その給気量減少状態の下でダンパ制御部Dによる給
気側気密ダンパVs及び排気側気密ダンパVeの閉じ操
作が行われるようにする。
As shown in FIG. 2, when a target supply / exhaust operation stop command (a command to stop the supply / exhaust operation of the entire apparatus) is given, the target supply amount changing unit 14 controls each supply amount control. Target air supply amount Qm1, Qm2, Qm3 to be specified for the heater 8C
Are set at predetermined time intervals T4 and T5 in order from the target chamber 1 having the lower target chamber pressures Pm1, Pm2, and Pm3 (that is, the required set chamber pressures Ps1, Ps2, and Ps3), and at the same predetermined change speed θ2. Required air supply Qs1, Qs2
Qs3 is sequentially reduced from 0 to 0, thereby preventing the temporary room pressure reversal phenomenon between the target chambers 1 and limiting the closing operation speed of the air supply side adjustment damper 8B.
The supply amount Qx1, Qx2, Qx3 of each target room 1 is reduced, and the closing operation of the supply side airtight damper Vs and the exhaust side airtight damper Ve by the damper control unit D is performed under the reduced supply amount. To do.

【0045】以上は給気ファン2及び排気ファン5の起
動・停止を伴う設備全体としての給排気運転の起動・停
止について述べたが、給気ファン2及び排気ファン5の
運転は継続する設備全体としての給排気運転実施中に、
一部の対象室1についてのみ対象室遮断状態にしてその
対象室1に対する給排気運転を一時停止する部分一時停
止の場合(例えば、一部の対象室1に対し燻蒸処理を施
すなどのためにその対象室1を一時的に遮断状態とする
場合等)についても中央制御装置10は上記と同形態の
制御を実施する。
In the above, the start / stop of the supply / exhaust operation of the entire equipment with the start / stop of the air supply fan 2 and the exhaust fan 5 has been described. During the supply and exhaust operation as
In the case of a partial suspension in which only a part of the target rooms 1 is shut off and the supply / exhaust operation to the target rooms 1 is temporarily stopped (for example, in order to perform a fumigation process on some of the target rooms 1). The central control device 10 also performs the same control as described above for the case where the target room 1 is temporarily shut off.

【0046】具体的には(図3参照)、給排気運転を一
時停止する対象室1が指定された一時停止指令(すなわ
ち、一部の対象室1のみを対象にした給排気運転の停止
指令)が与えられると、目標給気量変更部14は、一時
停止する対象室1の給気量制御器8Cに指定する目標給
気量Qm2,Qm3を、それら一時停止する対象室1の
うち目標室圧Pm2,Pm3(すなわち、設定必要室圧
Ps2,Ps3)の低い対象室1から順に所定の時間間
隔T4で、かつ、互いに等しい所定の変化速度θ2で設
定必要給気量Qs2,Qs3から0へ順次減少させ、こ
れにより、給排気運転を一時停止する対象室1間での一
時的な室圧逆転現象を防止した状態で、また、給気側調
整ダンパ8Bの閉じ動作速度を制限した状態で、それら
一時停止する対象室1の給気量Qx2,Qx3を減少さ
せる。
Specifically, (see FIG. 3), a temporary stop command in which the target room 1 for temporarily stopping the supply / exhaust operation is designated (ie, a stop instruction for the supply / exhaust operation for only some target rooms 1) ) Is given, the target air supply amount changing unit 14 sets the target air supply amounts Qm2 and Qm3 specified in the air supply amount controller 8C of the target room 1 to be temporarily stopped by the target air supply amounts Qm2 and Qm3 of the target room 1 to be temporarily stopped. From the target chamber 1 having the lower room pressures Pm2 and Pm3 (that is, the set required chamber pressures Ps2 and Ps3), the required air supply amounts Qs2 and Qs3 are set to 0 at predetermined time intervals T4 and at predetermined equal change rates θ2. In a state in which the temporary room pressure reversal phenomenon between the target chambers 1 in which the supply / exhaust operation is temporarily stopped is prevented, and the closing operation speed of the supply-side adjustment damper 8B is limited. In, those to pause Reducing the first air supply amount Qx2, Qx3.

【0047】また、ダンパ制御部Dは、一時停止する対
象室1の目標給気量Qm2,Qm3が0に至る時期に、
一時停止する対象室1の給気側気密ダンパVs及び排気
側気密ダンパVeを閉じ操作して、それら一時停止する
対象室1を遮断状態とし、それら給気側気密ダンパVs
及び排気側気密ダンパVeの閉じ操作が完了すると、給
気量制御器8C及び室圧制御器9Cに優先して、一時停
止する対象室1の給気側調整ダンパ8B及び排気側調整
ダンパ9Bを強制的に全閉状態に切り換え、対象室遮断
状態の間、これら調整ダンパ8B,9Bの全閉状態を保
つ。
Further, the damper control unit D determines when the target supply air amounts Qm2 and Qm3 of the target room 1 to be temporarily stopped become zero.
The supply-side airtight damper Vs and the exhaust-side airtight damper Ve of the target room 1 to be temporarily stopped are closed to shut off the target room 1 to be temporarily stopped.
When the closing operation of the exhaust-side hermetic damper Ve is completed, the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B of the target room 1 to be temporarily stopped are prioritized over the supply amount controller 8C and the room pressure controller 9C. The state is forcibly switched to the fully closed state, and the adjustment dampers 8B and 9B are kept in the fully closed state during the target room shutoff state.

【0048】その後、給排気運転を一時停止した対象室
1についての再開指令(すなわち、一部の対象室1のみ
を対象にした給排気運転の開始指令)が与えられると、
ダンパ制御部Dは、一時停止した対象室1の給気側気密
ダンパVs及び排気側気密ダンパVeを開き操作して対
象室遮断を解除し、そして、それら給気側気密ダンパV
s及び排気側気密ダンパVeの開き操作が完了するまで
は、給気量制御器8C及び室圧制御器9Cに対し優先す
る状態で、対象室遮断時から継続して一時停止した対象
室1の給気側調整ダンパ8B及び排気側調整ダンパ9B
を強制的に全閉状態に保ち、それら給気側気密ダンパV
s及び排気側気密ダンパVeの開き操作が完了した時点
で、給気側調整ダンパ8Bの開度制御(すなわち給気量
制御)を給気量制御器8Cに移管し、かつ、排気側調整
ダンパ9Bの開度制御(すなわち、室圧制御)を室圧制
御器9Cに移管する。
Thereafter, when a restart command for the target room 1 in which the supply / exhaust operation is temporarily stopped (ie, a start command for the supply / exhaust operation for only some of the target rooms 1) is given,
The damper control unit D opens and shuts off the supply-side airtight damper Vs and the exhaust-side airtight damper Ve of the temporarily stopped target room 1 to release the target room shutoff, and then releases the supply-side airtight damper V.
s and the opening operation of the exhaust-side hermetic damper Ve are completed, and the priority is given to the air supply amount controller 8C and the room pressure controller 9C. Supply side adjustment damper 8B and exhaust side adjustment damper 9B
Forcibly fully closed, and the airtight dampers V on the air supply side
s and the opening operation of the exhaust side airtight damper Ve is completed, the opening degree control of the air supply side adjustment damper 8B (that is, the air supply amount control) is transferred to the air supply amount controller 8C, and the exhaust side adjustment damper is transferred. The opening degree control of 9B (that is, the room pressure control) is transferred to the room pressure controller 9C.

【0049】また、目標給気量変更部14は、一時停止
した対象室1の給気側気密ダンパVs及び排気側気密ダ
ンパVeの開き操作が完了して給気側調整ダンパ8Bの
開度制御が給気量制御器8Cに移管されるまでは、一時
停止した対象室1の給気量制御器8Cに指定する目標給
気量Qm2,Qm3を0に保ち、その後、それら一時停
止した対象室1の給気量制御器8Cに指定する目標給気
量Qm2,Qm3を、一時停止した対象室1のうち目標
室圧Pm2,Pm3(すなわち、設定必要室圧Ps2,
Ps3)の高い対象室1から順に所定の時間間隔T1,
T2で、かつ、互いに等しい所定の変化速度θ1で0か
ら設定必要給気量Qs2,Qs3へ順次増大させ、これ
により、給排気運転を一時停止した対象室1間での一時
的な室圧逆転現象を防止した状態で、また、給気側調整
ダンパ8Bの全閉からの復帰過程における開き動作速度
を制限した状態で、それら一時停止した対象室1の給気
量Qx2,Qx3を設定必要給気量Qs2,Qs3へ増
大させて、それら一時停止した対象室1を定常の給排気
運転状態へ復帰させる。
Further, the target air supply amount changing unit 14 completes the opening operation of the air supply damper Vs and the air exhaust damper Ve of the temporarily stopped target chamber 1 and completes the opening control of the air supply adjustment damper 8B. Until is transferred to the air supply controller 8C, the target air supply amounts Qm2 and Qm3 specified in the air supply controller 8C of the temporarily stopped target room 1 are kept at 0, and thereafter, the target rooms 1 and 2 are temporarily stopped. The target air supply amounts Qm2 and Qm3 specified in the air supply amount controller 8C of the first target room 1 are set to the target room pressures Pm2 and Pm3 of the temporarily stopped target room 1 (that is, the set required room pressures Ps2 and Pm2).
Ps3) Predetermined time intervals T1,
At T2 and at a predetermined change rate θ1 equal to each other, the required supply air amount Qs2 is gradually increased from Qs3 to Qs3, thereby temporarily reversing the room pressure between the target rooms 1 in which the supply / exhaust operation is temporarily stopped. In a state where the phenomenon is prevented, and in a state where the opening operation speed in the process of returning from the fully closed state of the air supply side adjustment damper 8B is limited, the air supply amounts Qx2 and Qx3 of the temporarily stopped target room 1 are set. The air volumes are increased to Qs2 and Qs3, and the temporarily stopped target room 1 is returned to the normal supply / exhaust operation state.

【0050】なお、設備全体としての給排気運転の停
止、及び、上記の部分一時停止のいずれの場合にも、給
気側気密ダンパVs及び排気側気密ダンパVeを閉じて
対象室遮断を行う際には、PID制御を採用する給気量
制御器8Cでの給気量偏差積分値、及び、同じくPID
制御を採用する室圧制御器9Cでの室圧偏差積分値をリ
セットし、そして、次の給排気運転開始の際、給気側及
び排気側の気密ダンパVs,Veの開き操作が完了して
給気側調整ダンパ8Bの開度制御が給気量制御器8Cに
移管され、また、排気側調整ダンパ9Bの開度制御が室
圧制御器9Cに移管されたときには、各偏差積分値が0
の初期状態から給気量制御器8C及び室圧制御器9Cを
制御動作させるようにしてあり、これにより、残存偏差
積分値の影響で、給気量制御器8C及び室圧制御器9C
への制御移管直後における給気側調整ダンパ8Bの開度
調整や排気側調整ダンパ9Bの開度調整が不安定化する
のを防止する。
In both cases of stopping the supply / exhaust operation of the entire equipment and the above-mentioned partial suspension, the supply-side airtight damper Vs and the exhaust-side airtight damper Ve are closed to shut off the target chamber. Is the integral value of the air supply amount deviation in the air supply amount controller 8C adopting the PID control, and also the PID
The room pressure controller 9C employing the control resets the integral value of the chamber pressure deviation, and at the start of the next supply / exhaust operation, the opening operation of the supply-side and exhaust-side hermetic dampers Vs, Ve is completed. When the opening degree control of the air supply side adjustment damper 8B is transferred to the air supply amount controller 8C, and the opening degree control of the exhaust side adjustment damper 9B is transferred to the room pressure controller 9C, each deviation integrated value becomes 0.
From the initial state, the control operation of the air supply controller 8C and the room pressure controller 9C is performed, whereby the air supply controller 8C and the room pressure controller 9C are influenced by the residual deviation integrated value.
It is possible to prevent the opening degree adjustment of the air supply side adjustment damper 8B and the opening degree adjustment of the exhaust side adjustment damper 9B from becoming unstable immediately after the transfer to the control.

【0051】また、部分一時停止での一時停止期間に対
象室1を燻蒸処理する場合等では、再開時に燻蒸排気が
他の対象室1に導かれることがないように、還気ダンパ
Vbは一時閉止する。
In the case where the target chamber 1 is subjected to the fumigation treatment during the partial suspension period, the return air damper Vb is temporarily set so that the fumigation exhaust gas is not led to another target chamber 1 at the time of resumption. Close.

【0052】以上要するに、本実施例において、中央制
御装置10,給気量センサ8A,給気量制御器8C,室
圧センサ9A,室圧制御器9Cは、給気側調整ダンパ8
Bを開度調整して対象室1への給気量Qx1,Qx2,
Qx3を設定必要給気量Qs1,Qs2,Qs3に調整
する必要給気量制御と、排気側調整ダンパ9Bを開度調
整して対象室1の室圧Px1,Px2,Px3を設定必
要室圧Ps1,Ps2,Ps3に調整する必要室圧制御
とを実行する制御手段を構成する。
In summary, in the present embodiment, the central control device 10, the air supply sensor 8A, the air supply controller 8C, the room pressure sensor 9A, and the room pressure controller 9C comprise the air supply side adjustment damper 8
Adjust the opening degree of B to supply air Qx1, Qx2 to the target room 1.
The required air supply amount control for adjusting Qx3 to the set required air supply amount Qs1, Qs2, Qs3, and the opening degree of the exhaust-side adjustment damper 9B is adjusted to set the room pressures Px1, Px2, and Px3 of the target room 1 to the required room pressure Ps1. , Ps2, Ps3, and Ps3.

【0053】そして、この制御手段は、給排気運転の停
止指令が付与されると、給気側気密ダンパVs及び排気
側気密ダンパVeを閉じる遮断制御として、給気側調整
ダンパ8Bの閉じ動作速度を制限した状態で、必要室圧
制御の実行下において給気側調整ダンパ8Bを閉じ動作
させ、かつ、その後に、給気側気密ダンパVs及び排気
側気密ダンパVeの閉じ操作を開始し、一方、給排気運
転の開始指令が付与されると、給気側気密ダンパVs及
び排気側気密ダンパVeを開く遮断解除制御として、給
気側調整ダンパ8Bを全閉にした状態の下で給気側気密
ダンパVs及び排気側気密ダンパVeの開き操作を開始
し、かつ、その後に(又は、後記の如くそれと同時
に)、給気側調整ダンパ8Bの全閉からの復帰過程にお
ける開き動作速度を制限した状態で、必要室圧制御の実
行下において必要給気量制御へ復帰する構成にしてあ
る。
When a command to stop the supply / exhaust operation is given, the control means performs a closing operation speed of the supply-side adjustment damper 8B as a shutoff control for closing the supply-side airtight damper Vs and the exhaust-side airtight damper Ve. In a state in which the required chamber pressure control is performed, the supply-side adjustment damper 8B is closed, and thereafter, the closing operation of the supply-side airtight damper Vs and the exhaust-side airtight damper Ve is started. When the start command of the supply / exhaust operation is given, the supply-side adjustment damper 8B is fully closed, and the supply-side adjustment damper 8B is fully closed. The opening operation of the hermetic damper Vs and the exhaust-side hermetic damper Ve is started, and thereafter (or at the same time as described later), the opening operation speed in the process of returning the supply-side adjustment damper 8B from the fully closed state is controlled. And in state, are the structure to return to the required air supply amount control in need chamber pressure control under execution.

【0054】また、この制御手段は、上記の遮断解除制
御では、給気側調整ダンパ8Bとともに排気側調整ダン
パ9Bを全閉にした状態の下で、給気側気密ダンパVs
及び排気側気密ダンパVeの開き操作を開始し、かつ、
その後に(又は、それと同時に)、給気側調整ダンパ8
Bの全閉からの復帰過程における開き動作速度を制限し
た状態で、必要室圧制御の復帰下において必要給気量制
御へ復帰する構成にしてある。
In the shut-off release control, the control means controls the supply-side airtight damper Vs while the exhaust-side adjustment damper 9B is fully closed together with the supply-side adjustment damper 8B.
And the opening operation of the exhaust side airtight damper Ve is started, and
Thereafter (or simultaneously), the supply-side adjustment damper 8
In a state in which the opening operation speed in the process of returning from the fully closed state of B is limited, the control is returned to the required air supply control under the required room pressure control.

【0055】さらにまた、この制御手段は、対象室1の
うち一部の対象室1のみを対象にする給排気運転の停止
指令が付与されると、その一部の対象室1についてのみ
前記の遮断制御を実行し、かつ、対象室1のうち一部の
対象室1のみを対象にする給排気運転の開始指令が付与
されると、その一部の対象室1についてのみ前記の遮断
解除制御を実行する構成にするとともに、装置全体とし
ての給排気運転の開始指令が付与されると、複数の対象
室1の夫々について前記の遮断解除制御を実行し、か
つ、装置全体としての給排気運転の停止指令が付与され
ると、複数の対象室1の夫々について前記の遮断制御を
実行する構成にしてある。
Further, when a stop command of the supply / exhaust operation for only a part of the target rooms 1 out of the target rooms 1 is given, the control means performs the above-mentioned operation for only some of the target rooms 1. When the shutoff control is executed and a start command of the supply / exhaust operation for only a part of the target chambers 1 among the target chambers 1 is given, the cutoff release control is performed only for the part of the target chambers 1. When the start command of the supply / exhaust operation of the entire apparatus is given, the above-described shutoff release control is executed for each of the plurality of target chambers 1, and the supply / exhaust operation of the entire apparatus is performed. When the stop command is given, the shutoff control is executed for each of the plurality of target rooms 1.

【0056】〔別実施例〕前述の実施例においては、遮
断解除制御において給気側気密ダンパVs及び排気側気
密ダンパVeの開き操作が完了するまで、給気側調整ダ
ンパ8B及び排気側調整ダンパ9Bを全閉状態に保つよ
うにしたが、遮断解除制御において、給気側調整ダンパ
8Bや排気側調整ダンパ9Bを全閉にした状態の下で給
気側気密ダンパVs及び排気側気密ダンパVeの開き操
作を開始するのに対し、それら給気側調整ダンパ8Bや
排気側調整ダンパ9Bの全閉状態保持を解除して、給気
側調整ダンパ8Bや排気側調整ダンパ9Bの開度制御を
給気量制御器8Cや室圧制御器9Cに移管する時点(す
なわち、給気側調整ダンパ8Bの全閉からの復帰過程に
おける開き動作速度を制限した状態で必要給気量制御へ
復帰する時点、及び、必要室圧制御へ復帰する時点)
は、給気側気密ダンパVs及び排気側気密ダンパVeの
開き操作完了時点に限定されるものではなく、給気側気
密ダンパVs及び排気側気密ダンパVeの開き操作開始
時点や、開き操作途中の時点であってもよい。
[Another Embodiment] In the above-described embodiment, the supply-side adjustment damper 8B and the exhaust-side adjustment damper are operated until the opening operation of the supply-side airtight damper Vs and the exhaust-side airtight damper Ve is completed in the shutoff release control. 9B is kept in the fully closed state, but in the shutoff release control, the supply-side airtight damper Vs and the exhaust-side airtight damper Ve in a state in which the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B are fully closed. In response to the opening operation, the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B are released from the fully closed state, and the opening degree control of the supply-side adjustment damper 8B and the exhaust-side adjustment damper 9B is performed. At the time of transfer to the air supply amount controller 8C or the room pressure controller 9C (that is, at the time of returning to the required air supply amount control with the opening operation speed limited in the process of returning from the full closing of the air supply side adjustment damper 8B) , , The time to return to the required chamber pressure control)
Is not limited to the time when the opening operation of the supply-side airtight damper Vs and the exhaust-side airtight damper Ve is completed, but the time when the opening operation of the air-supply-side airtight damper Vs and the exhaust-side airtight damper Ve starts, and during the opening operation. It may be a point in time.

【0057】対象室1の用途は何であってもよく、ま
た、室圧制御の目的も室内清浄度の維持を初めとして、
どのような目的であってもよい。
The object room 1 may be used for any purpose, and the purpose of room pressure control is to maintain the cleanliness of the room.
Any purpose may be used.

【0058】尚、特許請求の範囲の項に図面との対照を
便利にするため符号を記すが、該記入により本発明は添
付図面の構成に限定されるものではない。
In the claims, reference numerals are provided for convenience of comparison with the drawings, but the present invention is not limited to the configuration shown in the attached drawings.

【図面の簡単な説明】[Brief description of the drawings]

【図1】設備構成図FIG. 1 Equipment configuration diagram

【図2】給排気運転の起動及び停止における運転制御形
態を示す図
FIG. 2 is a diagram showing an operation control mode in starting and stopping the supply / exhaust operation.

【図3】部分一時停止の際の運転制御形態を示す図FIG. 3 is a diagram showing an operation control mode at the time of partial suspension.

【符号の説明】[Explanation of symbols]

1 対象室 3 主給気路 4 給気路 6 主排気路 7 排気路 8B 給気側調整ダンパ 9B 排気側調整ダンパ 10,8A,8C,9A,9C 制御手段 Vs 給気側気密ダンパ Ve 排気側気密ダンパ Qx1,Qx2,Qx3 給気量 Qs1,Qs2,Qs3 設定必要給気量 Px1,Px2,Px3 室圧 Ps1,Ps2,Ps3 設定必要室圧 DESCRIPTION OF SYMBOLS 1 Target room 3 Main air supply path 4 Air supply path 6 Main exhaust path 7 Exhaust path 8B Supply side adjustment damper 9B Exhaust side adjustment damper 10, 8A, 8C, 9A, 9C Control means Vs Supply side airtight damper Ve Exhaust side Airtight damper Qx1, Qx2, Qx3 Air supply amount Qs1, Qs2, Qs3 Set required air supply amount Px1, Px2, Px3 Room pressure Ps1, Ps2, Ps3 Set required room pressure

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 対象室(1)に対する給気路(4)に、
給気側調整ダンパ(8B)と給気側気密ダンパ(Vs)
とを直列に介装し、 前記対象室(1)に対する排気路(7)に、排気側調整
ダンパ(9B)と排気側気密ダンパ(Ve)とを直列に
介装し、 前記給気側調整ダンパ(8B)を開度調整して前記対象
室(1)への給気量(Qx1),(Qx2),(Qx
3)を設定必要給気量(Qs1),(Qs2),(Qs
3)に調整する必要給気量制御と、前記排気側調整ダン
パ(9B)を開度調整して前記対象室(1)の室圧(P
x1),(Px2),(Px3)を設定必要室圧(Ps
1),(Ps2),(Ps3)に調整する必要室圧制御
とを実行する制御手段(10,8A,8C,9A,9
C)を設けてある室圧制御装置であって、 前記制御手段(10,8A,8C,9A,9C)を、 給排気運転の停止指令が付与されると、前記給気側気密
ダンパ(Vs)及び前記排気側気密ダンパ(Ve)を閉
じる遮断制御として、前記給気側調整ダンパ(8B)の
閉じ動作速度を制限した状態で、必要室圧制御の実行下
において前記給気側調整ダンパ(8B)を閉じ動作さ
せ、かつ、その後に、前記給気側気密ダンパ(Vs)及
び前記排気側気密ダンパ(Ve)の閉じ操作を開始し、 一方、給排気運転の開始指令が付与されると、前記給気
側気密ダンパ(Vs)及び前記排気側気密ダンパ(V
e)を開く遮断解除制御として、前記給気側調整ダンパ
(8B)を全閉にした状態の下で前記給気側気密ダンパ
(Vs)及び前記排気側気密ダンパ(Ve)の開き操作
を開始し、かつ、それと同時に又はその後に、前記給気
側調整ダンパ(8B)の全閉からの復帰過程における開
き動作速度を制限した状態で、必要室圧制御の実行下に
おいて必要給気量制御へ復帰する構成にしてある室圧制
御装置。
1. An air supply passage (4) for a target room (1),
Supply side adjustment damper (8B) and supply side airtight damper (Vs)
And an exhaust-side adjustment damper (9B) and an exhaust-side hermetic damper (Ve) are interposed in series in an exhaust path (7) for the target chamber (1). The opening degree of the damper (8B) is adjusted to supply air (Qx1), (Qx2), (Qx
3) Set the required air supply amount (Qs1), (Qs2), (Qs
3) The required supply amount control to be adjusted to 3) and the opening pressure of the exhaust side adjustment damper (9B) are adjusted to adjust the chamber pressure (P) of the target chamber (1).
x1), (Px2) and (Px3) are set as required chamber pressure (Ps
Control means (10, 8A, 8C, 9A, 9) for executing necessary room pressure control to adjust to (1), (Ps2) and (Ps3)
C), wherein the control means (10, 8A, 8C, 9A, 9C) controls the air-supply-side airtight damper (Vs ) And the shut-off control for closing the exhaust-side airtight damper (Ve), with the closing operation speed of the air-supply-side adjustment damper (8B) limited, and under the execution of the required chamber pressure control, the air-supply-side adjustment damper ( 8B), and thereafter, the closing operation of the air supply damper (Vs) and the airtight damper (Ve) is started. On the other hand, when a start command of the air supply / exhaust operation is given. , The supply-side airtight damper (Vs) and the exhaust-side airtight damper (Vs).
e) As shut-off release control for opening e), the opening operation of the air supply damper (Vs) and the exhaust air tight damper (Ve) is started with the air supply damper (8B) fully closed. At the same time or after that, while the opening operation speed in the process of returning from the fully closed state of the air supply side adjustment damper (8B) is limited, the necessary air supply amount control is performed under the execution of the necessary room pressure control. A room pressure control device that is configured to return.
【請求項2】 前記制御手段(10,8A,8C,9
A,9C)を、 前記の遮断解除制御では、前記給気側調整ダンパ(8
B)とともに前記排気側調整ダンパ(9B)を全閉にし
た状態の下で、前記給気側気密ダンパ(Vs)及び前記
排気側気密ダンパ(Ve)の開き操作を開始し、かつ、
それと同時に又はその後に、前記給気側調整ダンパ(8
B)の全閉からの復帰過程における開き動作速度を制限
した状態で、必要室圧制御の復帰下において必要給気量
制御へ復帰する構成にしてある請求項1記載の室圧制御
装置。
2. The control means (10, 8A, 8C, 9)
A, 9C), in the shutoff release control, the air supply side adjustment damper (8
B) with the exhaust-side adjustment damper (9B) fully closed together with B), start opening the supply-side airtight damper (Vs) and the exhaust-side airtight damper (Ve), and
At the same time or thereafter, the supply-side adjustment damper (8
2. The room pressure control device according to claim 1, wherein, in a state in which the opening operation speed in the process of returning from the fully closed state in B) is limited, the operation returns to the required air supply amount control under the return of the required room pressure control.
【請求項3】 主給気路(3)から複数の前記対象室
(1)へ各別に分岐接続した前記給気路(4)の夫々
に、前記給気側調整ダンパ(8B)と前記給気側気密ダ
ンパ(Vs)とを直列に介装し、 かつ、主排気路(6)から複数の前記対象室(1)へ各
別に分岐接続した前記排気路(7)の夫々に、前記排気
側調整ダンパ(9B)と前記排気側気密ダンパ(Ve)
とを直列に介装する構成において、 前記制御手段(10,8A,8C,9A,9C)を、 前記対象室(1)のうち一部の対象室(1)のみを対象
にする給排気運転の停止指令が付与されると、その一部
の対象室(1)についてのみ前記の遮断制御を実行し、 かつ、前記対象室(1)のうち一部の対象室(1)のみ
を対象にする給排気運転の開始指令が付与されると、そ
の一部の対象室(1)についてのみ前記の遮断解除制御
を実行する構成にしてある請求項1又は2記載の室圧制
御装置。
3. The supply-side adjusting damper (8B) and the supply-side adjustment damper (8B) are respectively connected to each of the supply paths (4) branched from the main supply path (3) to the plurality of target chambers (1). An air-side hermetic damper (Vs) is interposed in series, and each of the exhaust paths (7) branch-connected separately from the main exhaust path (6) to the plurality of target chambers (1). Side adjustment damper (9B) and the exhaust side airtight damper (Ve)
And the control means (10, 8A, 8C, 9A, 9C) is operated in a supply / exhaust operation for only a part of the target room (1) of the target room (1). When the stop command is given, the shut-off control is executed only for some of the target rooms (1), and only for some of the target rooms (1) of the target rooms (1). 3. The room pressure control device according to claim 1, wherein when the start command of the supply / exhaust operation to be performed is given, the shutoff release control is executed only for a part of the target room (1). 4.
【請求項4】 主給気路(3)から複数の前記対象室
(1)へ各別に分岐接続した前記給気路(4)の夫々
に、前記給気側調整ダンパ(8B)と前記給気側気密ダ
ンパ(Vs)とを直列に介装し、 かつ、主排気路(6)から複数の前記対象室(1)へ各
別に分岐接続した前記排気路(7)の夫々に、前記排気
側調整ダンパ(9B)と前記排気側気密ダンパ(Ve)
とを直列に介装する構成において、 前記制御手段(10,8A,8C,9A,9C)を、 装置全体としての給排気運転の開始指令が付与される
と、複数の前記対象室(1)の夫々について前記の遮断
解除制御を実行し、 かつ、装置全体としての給排気運転の停止指令が付与さ
れると、複数の前記対象室(1)の夫々について前記の
遮断制御を実行する構成にしてある請求項1〜3のいず
れか1項に記載の室圧制御装置。
4. The supply-side adjustment damper (8B) and the supply air supply damper (8B) are respectively connected to each of the supply paths (4) branched and connected from the main supply path (3) to the plurality of target chambers (1). An air-side hermetic damper (Vs) is interposed in series, and each of the exhaust paths (7) branch-connected separately from the main exhaust path (6) to the plurality of target chambers (1). Side adjustment damper (9B) and the exhaust side airtight damper (Ve)
Are arranged in series, and when the control means (10, 8A, 8C, 9A, 9C) is provided with a command to start the supply / exhaust operation of the entire apparatus, the plurality of target chambers (1) The above-mentioned block release control is executed for each of the above, and when a stop command of the supply / exhaust operation of the entire apparatus is given, the above-mentioned block control is executed for each of the plurality of target chambers (1). The room pressure control device according to any one of claims 1 to 3, wherein
JP9331381A 1997-12-02 1997-12-02 Room pressure control device Expired - Lifetime JP3044205B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9331381A JP3044205B2 (en) 1997-12-02 1997-12-02 Room pressure control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9331381A JP3044205B2 (en) 1997-12-02 1997-12-02 Room pressure control device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP05071320A Division JP3089130B2 (en) 1993-03-30 1993-03-30 Room pressure control device

Publications (2)

Publication Number Publication Date
JPH10154017A true JPH10154017A (en) 1998-06-09
JP3044205B2 JP3044205B2 (en) 2000-05-22

Family

ID=18243061

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9331381A Expired - Lifetime JP3044205B2 (en) 1997-12-02 1997-12-02 Room pressure control device

Country Status (1)

Country Link
JP (1) JP3044205B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007024326A (en) * 2005-07-12 2007-02-01 Dai-Dan Co Ltd Air conditioning system
JP2009019871A (en) * 2008-10-14 2009-01-29 Takasago Thermal Eng Co Ltd Room pressure control system
JP2011133221A (en) * 2011-02-09 2011-07-07 Dai-Dan Co Ltd Air conditioning system
JP2012078044A (en) * 2010-10-05 2012-04-19 Dai-Dan Co Ltd Indoor atmospheric pressure control system
JP2014059125A (en) * 2012-09-19 2014-04-03 Azbil Corp Room pressure control system and simultaneous shut-off control method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007024326A (en) * 2005-07-12 2007-02-01 Dai-Dan Co Ltd Air conditioning system
JP4714517B2 (en) * 2005-07-12 2011-06-29 ダイダン株式会社 Air conditioning system
JP2009019871A (en) * 2008-10-14 2009-01-29 Takasago Thermal Eng Co Ltd Room pressure control system
JP2012078044A (en) * 2010-10-05 2012-04-19 Dai-Dan Co Ltd Indoor atmospheric pressure control system
JP2011133221A (en) * 2011-02-09 2011-07-07 Dai-Dan Co Ltd Air conditioning system
JP2014059125A (en) * 2012-09-19 2014-04-03 Azbil Corp Room pressure control system and simultaneous shut-off control method

Also Published As

Publication number Publication date
JP3044205B2 (en) 2000-05-22

Similar Documents

Publication Publication Date Title
JP3089130B2 (en) Room pressure control device
JP3044205B2 (en) Room pressure control device
JP2002181361A (en) Control device for room pressure
JP5049699B2 (en) Indoor pressure control system
JP5049599B2 (en) Room pressure control method and apparatus
JP4712853B2 (en) Room pressure control system
JP2006078086A (en) Room pressure control system
JPH0579888B2 (en)
JPS613933A (en) Controlling system of air conditioning of special working room
JP3418634B2 (en) Room pressure control device
JPH1183006A (en) Method for controlling internal pressure of combustion furnace
JP3963823B2 (en) Air conditioning system
JPH10132265A (en) Control method of pressure in furnace
JPH04350434A (en) Indoor pressure control device
JP4242684B2 (en) Room pressure control system
JP3226134B2 (en) Air conditioner
JPH01256743A (en) Room pressure regulating device for plurality of rooms
JP2898944B2 (en) Air-conditioning system for controlling space pressure
JPH0756626A (en) Control equipment
JP4976154B2 (en) Room pressure control system using multi-stage CAV
JPH0814404B2 (en) Air conditioner
JP3226131B2 (en) Air conditioner
JPH10110983A (en) Room pressure control system
JP3038042B2 (en) Room pressure control device
JPH0828941A (en) Vav control system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20090310

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20090310

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20100310

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20110310

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20110310

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20120310

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130310

Year of fee payment: 13