JPH10110436A - Method and device for greening cut slope - Google Patents
Method and device for greening cut slopeInfo
- Publication number
- JPH10110436A JPH10110436A JP26467996A JP26467996A JPH10110436A JP H10110436 A JPH10110436 A JP H10110436A JP 26467996 A JP26467996 A JP 26467996A JP 26467996 A JP26467996 A JP 26467996A JP H10110436 A JPH10110436 A JP H10110436A
- Authority
- JP
- Japan
- Prior art keywords
- greening
- cut slope
- slope
- cut
- tree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、切土法面の緑化装
置及び緑化工法に関し、更に詳細には開削トンネル、ト
ンネル坑口、アンダーピーニングなどの土木工事用法面
や根切りなどの建築工事用法面などに対する緑化装置及
び緑化工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a revegetation method and a revegetation method for a cut slope, and more particularly, to a slope for civil engineering work such as open tunnels, tunnel entrances, and underpeening, and a slope for construction work such as root cutting. The present invention relates to a greening device and a greening method for the like.
【0002】[0002]
【従来の技術】切土法面の施工法は、地質、風化程度、
施工期間などの条件により異なるが、一般的にはまず所
定の高さまで地山を掘削して法面を形成し、次にこの法
面に金網を張付け、更にモルタルを吹き付けることによ
り覆工を形成する。次に、この覆工の上から地山に複数
の穴をあけて補強用の棒状部材を挿入し、この棒状部材
の周囲をグラウトなどで補強する。このような工程を繰
り返すことによって、地山の上方から下方にかけて切土
施工を進めていた。2. Description of the Related Art Construction methods for cut slopes are based on geology, weathering degree,
Although it depends on conditions such as the construction period, in general, the ground is first excavated to a predetermined height to form a slope, then a wire mesh is attached to this slope, and mortar is sprayed to form a lining. I do. Next, a plurality of holes are made in the ground from above the lining, and a reinforcing bar-shaped member is inserted, and the periphery of the bar-shaped member is reinforced with grout or the like. By repeating such a process, the cutting work was advanced from above the ground to below.
【0003】切土法面を形成した後は、緑化工法によっ
て草本または木本の植栽が行われる。従来の緑化工法と
しては、草本を植栽する場合は種子を肥料及び水に混ぜ
て覆工に吹き付ける種子散布工法や、これに土を加えて
吹き付ける客土吹き付け工法など、比較的薄層の吹き付
けを行うのが主流であった。また、土、種子、肥料、
水、添加剤などを混合した材料をエアーで覆工に吹き付
ける厚層基材吹き付け工法も行われていた。[0003] After the cut slope is formed, plants or trees are planted by a greening method. Conventionally, when planting herbs, relatively thin layers such as a seed spraying method in which seeds are mixed with fertilizer and water and sprayed on the lining, or a customer soil spraying method in which soil is added and sprayed. Was the mainstream. Also, soil, seeds, fertilizer,
A method of spraying a thick layer base material in which a material in which water, additives, and the like are mixed is sprayed on the lining with air has also been performed.
【0004】一方、木本を植栽する場合には、根の活着
に必要な層の厚さが増すため、上述の厚層基材吹き付け
工法を行うか、又はベースとしてファイバー混入土砂を
吹き付け、その上に種子散布工法や客土吹き付け工法を
行っていた。[0004] On the other hand, when planting a woody plant, the above-mentioned thick layer base material spraying method is used or a fiber-mixed earth and sand is sprayed as a base to increase the thickness of the layer necessary for root survival. On top of that, the seed spraying method and the soil spraying method were performed.
【0005】[0005]
【発明が解決しようとする課題】しかし、従来の切土法
面の緑化工法では、切土法面を金網、モルタル吹き付け
及びロックボルトなどの補強材で安定させた後、草本又
は木本の植栽が行われるので、工数が増加すると共に施
工期間が長くなるという問題があった。また、草本や木
本が成育するまで相当長い期間を要するため、その間に
風雨によって植栽基材が崩れ落ちてしまって緑化が不完
全になることがあった。However, in the conventional cutting slope revegetation method, after the cut slope is stabilized with reinforcing materials such as wire mesh, mortar spraying and rock bolts, the planting of a herbaceous or woody plant is performed. Since the planting is performed, there is a problem that the number of steps increases and the construction period becomes longer. Also, since it takes a considerably long time for the plants and trees to grow, the planting base material has collapsed due to wind and rain during that time, and the greening was sometimes incomplete.
【0006】本発明の目的は、このような問題点を解決
することにあり、施工期間の短縮及び工数低減が可能
で、更に切土法面の緑化を確実に行うことにより緑化品
質の確保が可能な切土法面の緑化装置及び緑化工法を提
供することにある。[0006] An object of the present invention is to solve such problems, and it is possible to shorten the construction period and reduce the number of man-hours, and to secure the greening quality by reliably greening the cut slope. It is an object of the present invention to provide a revegetation device and a revegetation method for a cut slope that is possible.
【0007】[0007]
【課題を解決するための手段】本発明は切土法面の緑化
装置及び緑化工法であり、前述の技術的課題を解決する
ために以下のように構成されている。すなわち、本発明
は、地山を掘削して切土法面を形成し、前記切土法面に
草本又は木本を植栽することにより前記法面を緑化する
ための緑化装置において、変形可能な網状部材で袋状に
形成された外被ネット部と、前記外被ネット部内に充填
された厚層基材とを備え、前記厚層基材に前記草本又は
木本を植栽したことを特徴とする。SUMMARY OF THE INVENTION The present invention relates to a revegetation method and a revegetation method for a cut slope, and is constituted as follows in order to solve the above-mentioned technical problem. That is, the present invention is a greening device for greening the slope by excavating the ground to form a cut slope and planting a herb or a tree on the cut slope. Comprising a sheath net portion formed in a bag shape with a simple net-like member, and a thick base material filled in the sheath net portion, and planting the herb or wood on the thick base material. Features.
【0008】また、本発明は 地山を掘削して切土法面
を形成し、前記切土法面に草本又は木本を植栽すること
により前記法面を緑化するための緑化工法において、上
述の切土法面の緑化装置を前記切土法面の凹凸に応じて
変形させることにより前記切土法面に密着させて敷設す
ることを特徴とする。The present invention also relates to a greening method for greening the slope by excavating the ground to form a cut slope, and planting a herb or a tree on the cut slope. The above-described cut slope revegetation device is laid in close contact with the cut slope by deforming according to the unevenness of the cut slope.
【0009】本発明の切土法面の緑化装置は、外被ネッ
ト部内の厚層基材に予め草本及び木本が植栽されている
ので、強風雨が吹き付けても厚層基材、草本及び木本が
吹き飛ばされるのを防止できるため、高品質な緑化が可
能になる。In the apparatus for greening a cut slope according to the present invention, grass and wood are planted in advance on the thick base material in the jacket net portion. In addition, since it is possible to prevent the wood from being blown off, high-quality greening is possible.
【0010】また、本発明の切土法面の緑化工法は、上
述の緑化装置を切土法面に敷設固定するだけで緑化する
ことができるため、工数低減及び工期短縮が可能にな
る。更に、緑化装置を切土法面の凹凸に合わせて変形さ
せることにより、緑化装置を切土法面に密着させて敷設
固定するので、草本又は木本の根が確実に活着するよう
になるため、切土法面の高品質な緑化が可能になる。[0010] In the method for greening a cut slope according to the present invention, greening can be performed only by laying and fixing the above-described greening device on the cut slope, so that it is possible to reduce the number of steps and the construction period. Furthermore, since the greening device is deformed according to the unevenness of the cut slope, the greening device is laid and fixed in close contact with the cut slope, so that the roots of the herbaceous or woody plants will surely take root. This enables high quality greening of the cut slope.
【0011】[0011]
【発明の実施の形態】以下、本発明に係る切土法面の緑
化装置及び緑化工法の実施の形態について、図面を参照
して詳細に説明する。BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of a revegetation method and a revegetation method for a cut slope according to the present invention will be described in detail with reference to the drawings.
【0012】図1は、本発明に係る切土法面の緑化装置
1を示す。この緑化装置1は、外被ネット部11と、こ
の外被ネット部11内に充填された厚層基材12とを備
えている。厚層基材12には、草本13及び木本14が
植栽されている。FIG. 1 shows a cutting slope revegetation apparatus 1 according to the present invention. The greening apparatus 1 includes a jacket net portion 11 and a thick base material 12 filled in the jacket net portion 11. Herbs 13 and wood 14 are planted on the thick base material 12.
【0013】外被ネット部11は、例えば塩化ビニール
やポリエチレンなどで被覆された鋼線、或いはポリプロ
ピレンやポリエチレンなどのジオグリッドと称される高
分子材料などの高引張強度で可撓性に優れしかも耐腐食
性を有する線材などによって扁平な四角形の袋状に形成
されている。The sheath net portion 11 has high tensile strength and excellent flexibility such as a steel wire covered with, for example, vinyl chloride or polyethylene, or a polymer material called geogrid such as polypropylene or polyethylene. It is formed in a flat rectangular bag shape by a wire having corrosion resistance or the like.
【0014】この外被ネット部11の網目の大きさは、
内部の厚層基材12が逸脱することなく、しかも後述の
ように切土法面に固定するため例えばロックボルト25
(図3)やホールインアンカ26などを通すことができ
る程度の大きさに設定されている。そして、図2にも示
すように厚層基材12が偏らないようにするため、外被
ネット部11の適宜な位置が複数の逢着部16によって
部分的に上下に縫い付けられている。厚層基材12は、
黒ぼく等の現地発生土やコンポストなど適宜な材料を使
用することができる。この緑化装置1は、外被ネット部
11が可撓性を有しているので全体を波状に変形させる
ことができる。The size of the mesh of the jacket net portion 11 is
For example, a lock bolt 25 is used to fix the internal thick base material 12 to the cut slope without deviating, as described later.
(FIG. 3) and a size that can pass through the hole-in anchor 26 and the like. Then, as shown in FIG. 2, appropriate positions of the jacket net portion 11 are partially sewn up and down by a plurality of welding portions 16 in order to prevent the thick layer base material 12 from being biased. The thick base material 12
Appropriate materials, such as locally generated soil such as kuroboku and compost, can be used. The entire greening device 1 can be deformed into a wavy shape because the jacket net portion 11 has flexibility.
【0015】次に、上述の緑化装置1を使用した切土法
面の緑化工法について説明する。この緑化工法において
は、図3に示すように先ず地山21を掘削して切土法面
22を形成し、この切土法面22に金網入りモルタル2
3を吹付ける。このモルタル23によって切土法面22
の小さな凹凸が埋められ、モルタル23の表面には比較
的大きな波状の凹凸が残される。このモルタル23の所
定の位置に、ロックボルト25を挿入する。Next, a method of greening a cut slope using the above-described greening apparatus 1 will be described. In this greening method, first, a ground 21 is excavated to form a cut slope 22 as shown in FIG.
Spray 3 The cut slope 22 is formed by the mortar 23.
Are filled, and relatively large wavy irregularities are left on the surface of the mortar 23. The lock bolt 25 is inserted into a predetermined position of the mortar 23.
【0016】次に、上述の緑化装置1をモルタル23上
に敷設する。このときには、緑化装置1をモルタル23
の凹凸に合わせて変形させることにより、緑化装置1を
モルタル23に密着させて敷設する。次に、この緑化装
置1の周端部をロックボルト25で固定し、必要があれ
ばホールインアンカー26を打設して固定する。同様に
して、所定数の緑化装置1をモルタル23上に敷設固定
することによって、緑化処理が終了する。Next, the above-mentioned greening apparatus 1 is laid on a mortar 23. At this time, the greening device 1 is
The greening device 1 is laid in close contact with the mortar 23 by being deformed in accordance with the irregularities of. Next, the peripheral end of the greening device 1 is fixed with a lock bolt 25, and if necessary, a hole-in anchor 26 is cast and fixed. Similarly, the greening process is completed by laying and fixing a predetermined number of greening devices 1 on the mortar 23.
【0017】なお、上述の実施の形態では切土法面22
上にモルタル23を吹き付け、その上に緑化装置1を敷
設固定したが、切土法面22が安定している場合にはモ
ルタル23を吹き付けることなく緑化装置1を切土法面
22上に直接敷設固定することができる。In the above embodiment, the cut slope 22 is used.
The mortar 23 was sprayed thereon, and the greening device 1 was laid and fixed thereon. However, when the cut slope 22 is stable, the greening device 1 is directly sprayed on the cut slope 22 without spraying the mortar 23. Can be laid and fixed.
【0018】また、切土法面22又はモルタル23上に
挿入されているロックボルト25又はホールインアンカ
26(ロックボルト25のみ図示)の間隔が緑化装置1
の大きさに合っていない場合には、図4に示すように隣
接する緑化装置1、1の端部を重ねて一本のロックボル
ト25で固定することができる。また、図5に示すよう
に隣接する緑化装置1、1の間に隙間ができてしまった
ような場合には、両方の緑化装置1、1の外被ネット部
11、11に張り出し部材27、27を設け、これらの
張り出し部材27、27を一本のロックボルト25で固
定することもできる。なお、緑化装置1、1の間の隙間
は、これらの緑化装置1の草本13及び木本14の成長
によって埋められて完全に緑化される。The distance between the lock bolts 25 or the hole-in anchors 26 (only the lock bolts 25 are inserted) inserted on the cut slope 22 or the mortar 23 is changed to the greening device 1.
In this case, the ends of adjacent greening devices 1 and 1 can be overlapped and fixed with one lock bolt 25 as shown in FIG. In the case where a gap is formed between the adjacent greening devices 1 and 1 as shown in FIG. 5, the overhang members 27 are attached to the outer net portions 11 and 11 of both the greening devices 1 and 1. 27, and these projecting members 27, 27 can be fixed with one lock bolt 25. The gap between the greening devices 1 and 1 is completely filled by the growth of the herbs 13 and the trees 14 of the greening devices 1 and is completely greened.
【0019】上述のように、本発明に係る切土法面の緑
化装置1は、変形可能な外被ネット部11内に厚層基材
12を充填し、この厚層基材12に草本13及び木本1
4を植栽したので、切土法面22にモルタル23が吹き
付けられている場合でも緑化装置1をモルタル23上に
敷設するだけで簡単に緑化することができる。更に、厚
層基材12が袋状の外被ネット部11に充填されている
ので、強風雨が吹き付けた場合でも厚層基材12、草本
13及び木本14が吹き飛ばされるのを防止することが
でき、これによって、草本13及び木本14が正常に成
育されて高品質な緑化を行うことができる。As described above, the cut slope revegetation apparatus 1 according to the present invention fills the deformable jacket net portion 11 with the thick base material 12, and places the herbaceous material 13 on the thick base material 12. And Kimoto 1
Since the plant 4 is planted, even if the mortar 23 is sprayed on the cut slope 22, the plant can be easily planted simply by laying the planting device 1 on the mortar 23. Furthermore, since the thick base material 12 is filled in the bag-shaped outer net portion 11, even when the strong wind and rain is blown, the thick base material 12, the herbaceous plant 13 and the woody plant 14 are prevented from being blown off. As a result, the herbs 13 and the trees 14 can be grown normally and high-quality greening can be performed.
【0020】また、本発明に係る切土法面の緑化工法
は、草本13及び木本14が植栽されている緑化装置1
を切土法面22又はモルタル23上に敷設固定するだけ
なので、工数低減及び工期短縮が可能になる。更に、例
えば切土法面22が不安定な場合には、その上にモルタ
ル23を吹き付けて安定化を図ってから確実に緑化する
ことができる。また、切土法面22上に既にコンクリー
トが施工されている場合でも、このコンクリート上に緑
化装置1を敷設固定することによって簡単に緑化するこ
とができる。The revegetation method for the cut slope according to the present invention is a revegetation apparatus 1 in which a herb 13 and a tree 14 are planted.
Is simply laid and fixed on the cut slope 22 or the mortar 23, so that the number of steps and the period of work can be reduced. Furthermore, for example, when the cut slope 22 is unstable, mortar 23 is sprayed on the cut slope 22 to stabilize the cut slope 22 before the greening can be achieved. Even if concrete has already been constructed on the cut slope 22, the greening can be easily achieved by laying and fixing the greening device 1 on this concrete.
【0021】この切土法面の緑化工法では、切土法面2
2又はモルタル23の表面の凹凸に合わせて緑化装置1
を変形させることにより、緑化装置1を切土法面22又
はモルタル23に密着させて敷設固定するので、草本1
3及び木本14の根を活着させて高品質な緑化を達成す
ることができる。In the greening method of the cut slope, the cut slope 2
2 or greening device 1 according to the unevenness of the surface of mortar 23
, The planting apparatus 1 is laid and fixed in close contact with the cut slope 22 or the mortar 23.
3 and the roots of the tree 14 can be alive to achieve high quality greening.
【0022】なお、上述の実施の形態では外被ネット部
11の網目を、厚層基材12が逸脱せずしかもロックボ
ルト25及びホールインアンカー26を通すことができ
る程度の大きさにしたが、網目の大きさを比較的大きく
してポリエチレンやポリプロピレンなどの不織布(ジオ
テキスタイル)、又は網目の細かいネットなどを外被ネ
ット部11に重ねて使用することもできる。In the above-described embodiment, the mesh of the jacket net portion 11 is made large enough that the thick base material 12 does not deviate and that the lock bolt 25 and the hole-in anchor 26 can pass therethrough. The size of the mesh can be made relatively large, and a nonwoven fabric (geotextile) such as polyethylene or polypropylene, or a net having a fine mesh can be used by overlapping it with the jacket net portion 11.
【0023】[0023]
【発明の効果】以上説明したように、本発明の切土法面
の緑化装置によれば、外被ネット部内の厚層基材に予め
草本及び木本が植栽されているので、強風雨が吹き付け
ても厚層基材、草本及び木本が吹き飛ばされるのを防止
できるため、高品質な緑化が可能になる。As described above, according to the cut slope revegetation apparatus of the present invention, grass and trees are planted in advance on the thick base material in the jacket net portion. Can prevent the thick base material, the herbaceous plants and the woody plants from being blown off, thereby enabling high-quality greening.
【0024】また、本発明の切土法面の緑化工法によれ
ば、上述の緑化装置を切土法面に敷設固定するだけで緑
化することができるため、工数低減及び工期短縮が可能
になる。更に、緑化装置を切土法面の凹凸に合わせて変
形させることにより、緑化装置を切土法面に密着させて
敷設固定するので、草本又は木本の根が確実に活着する
ようになるため、切土法面の高品質な緑化が可能にな
る。Further, according to the method for greening a cut slope according to the present invention, greening can be performed only by laying and fixing the above-mentioned greening device on the cut slope, so that the number of man-hours and the construction period can be reduced. . Furthermore, since the greening device is deformed according to the unevenness of the cut slope, the greening device is laid and fixed in close contact with the cut slope, so that the roots of the herbaceous or woody plants will surely take root. This enables high quality greening of the cut slope.
【図1】本発明に係る切土法面の緑化装置の断面図であ
る。FIG. 1 is a sectional view of a greening device for a cut slope according to the present invention.
【図2】本発明に係る切土法面の緑化装置の逢着部を示
す平面図である。FIG. 2 is a plan view showing an attachment part of the greening device for a cut slope according to the present invention.
【図3】本発明に係る切土法面の緑化工法を説明する断
面図である。FIG. 3 is a cross-sectional view illustrating a greening method for a cut slope according to the present invention.
【図4】本発明に係る切土法面の緑化工法において緑化
装置の端部が重なった状態を示す断面図である。FIG. 4 is a cross-sectional view showing a state in which the ends of the greening apparatus are overlapped in the greening method for the cut slope according to the present invention.
【図5】本発明に係る切土法面の緑化工法において緑化
装置の間に隙間が発生した状態を示す断面図である。FIG. 5 is a cross-sectional view showing a state in which a gap is generated between the greening devices in the greening method of the cut slope according to the present invention.
1 切土法面の緑化装置 11 外被ネット部 12 厚層基材 13 草本 14 木本 21 地山 22 切土法面 25 ロックボルト 26 ホールインアンカー DESCRIPTION OF SYMBOLS 1 Greening device of cut slope 11 Net net part 12 Thick base material 13 Herb 14 Kimoto 21 Ground mountain 22 Cut slope 25 Rock bolt 26 Hole-in anchor
Claims (2)
切土法面に草本又は木本を植栽することにより前記法面
を緑化するための緑化装置において、 変形可能な網状部材で袋状に形成された外被ネット部
と、 前記外被ネット部内に充填された厚層基材とを備え、 前記厚層基材に前記草本又は木本を植栽したことを特徴
とする切土法面の緑化装置。1. A greening apparatus for greening a slope by excavating a ground to form a cut slope, and planting a herb or a tree on the cut slope. It is characterized by comprising a jacket net portion formed in a bag shape with a net-like member, and a thick base material filled in the jacket net portion, wherein the herb or wood is planted on the thick base material. Greening equipment for cut slopes.
切土法面に草本又は木本を植栽することにより前記法面
を緑化するための緑化工法において、 請求項1に記載の切土法面の緑化装置を前記切土法面の
凹凸に応じて変形させることにより前記切土法面に密着
させて敷設することを特徴とする切土法面の緑化工法。2. A greening method for greening a slope by excavating a ground to form a cut slope and planting a herb or a tree on the cut slope. A greening method for a cut slope, characterized in that the cut slope greening apparatus according to (1) is deformed in accordance with the unevenness of the cut slope to be laid in close contact with the cut slope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26467996A JPH10110436A (en) | 1996-10-04 | 1996-10-04 | Method and device for greening cut slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26467996A JPH10110436A (en) | 1996-10-04 | 1996-10-04 | Method and device for greening cut slope |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10110436A true JPH10110436A (en) | 1998-04-28 |
Family
ID=17406703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP26467996A Pending JPH10110436A (en) | 1996-10-04 | 1996-10-04 | Method and device for greening cut slope |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10110436A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002285557A (en) * | 2001-03-27 | 2002-10-03 | Nisshoku Corp | Slope greening and protecting method by using borrow- filled mat |
-
1996
- 1996-10-04 JP JP26467996A patent/JPH10110436A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002285557A (en) * | 2001-03-27 | 2002-10-03 | Nisshoku Corp | Slope greening and protecting method by using borrow- filled mat |
JP4521709B2 (en) * | 2001-03-27 | 2010-08-11 | 日本植生株式会社 | Slope greening protection method using a soil injection mat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4223081B2 (en) | Tree planting on the slope | |
JPH09302667A (en) | Slope face construction method and slope face structure of natural ecology self-restoration type | |
KR102226656B1 (en) | Trees Growing Slope Area Greening Method | |
KR100830150B1 (en) | Inclined plane greening method and tree planting device for the method | |
JP3880673B2 (en) | Greening equipment and greening method for cut slope | |
JPH10110436A (en) | Method and device for greening cut slope | |
KR100346053B1 (en) | Method for revegetation of a shotcrete construction area using tree-planting sandbags | |
KR100884017B1 (en) | Method of Constructing Bank Walls with Recovering Natural Environment | |
JP2002191232A (en) | Planting anchor bag body and engineering method for greening slope | |
KR19990046526A (en) | A structure for establing a slope and execution method using it | |
JP3413381B2 (en) | Greening basic construction net and greening basic construction method using this net | |
KR20060075707A (en) | Vegetation mat construction using anchor-type gabion and method of construction for stability and afforestation of sloping surface | |
JP3152884B2 (en) | Planting base creation method | |
JP3300934B2 (en) | Hard slope vegetation method | |
JP3623543B2 (en) | Slope greening method and reinforcing frame for planting used in the method | |
JP3170480B2 (en) | Greening method of slope | |
JPS63284321A (en) | Sheathing for inclined surface of filling | |
JP2001323472A (en) | Method for seeding and planting special precast slope frame work | |
JPH06102896B2 (en) | Slope greening method | |
JP3163329B2 (en) | Sandbag for vegetation and method of constructing the sandbag | |
JPH1037199A (en) | Greening work method for face of slope | |
JP2000248553A (en) | Repairing scene seeding and planting construction method of face of slope | |
JP3562915B2 (en) | Greening device and greening method for cut slope | |
KR20230020215A (en) | Cut Slope Area Greening Structure | |
JPH1077633A (en) | Greening method for cut slope face |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Effective date: 20040203 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A02 | Decision of refusal |
Effective date: 20041005 Free format text: JAPANESE INTERMEDIATE CODE: A02 |